O T M WORKS CARRIED OUT

PROJECT CHARACTER PERIOD OWNER VALUE KIND STAGE GEOLOGY

Ministry of Public Works – District of East Egnatia Odos, section Vaniano – Iasmos: Macedonian & geological study. H, B, E p, d 1993-1994 Thrace 10.000(+) Geological study on the construction conditions of highway including bridges, tunnels and cuts at Egnatia Odos, H, T, B, section Ag.Nicolaos – Koumaria. E d, w 1996-1997 AKTOR S.A. 15.000(+)

Geological studies for the entire Attiki H, T, B, “Attiki Odos” Odos highway, 78km length. E d, e, w 1996-2002 S.A. 280.000(+) Ministry of Geological study on the construction Public Works – conditions of a deviation road Trikala – H, T, B, District of Arta in Gropa site. E p, d 1997-1998 Thessalia 5.000(+)

Geological study for new railway line in Greek Railway Pelloponissos, section Kiato – Xyloca- R, B, T, Organization stro. E d 1998-1999 S.A. 30.000(+)

Geological study for Asprovalta tunnel in “Egnatia Odos” Egnatia Odos. H, T d 1999-2000 S.A. 10.000(+) Geological study on foundation conditions of T1 viaduct at Egnatia Odos, “Egnatia Odos” section Asprovalta – Strymonas. B, H p 1999-2000 S.A. 15.000(+) Project: Two-way Railway Line connecting Korinthos – Patra. Geological investigation to search and truck quarries and borrow areas. H p 1999-2000 OSE S.A. 15.000(+) Geological study on the settlement conditions of Esxatia stream in Attiki. The Water & aim is to settle and expand the river-bed Sewage under hard conditions due to dense Company of buildings in the area. Y p, d 2000 Athens S.A. 8.000(+) Geological and specific seismotectonic study on structure conditions of a Sport General Hall in Alikarnassos, Heraklion in Crete Secretariat of island. S d 2000 the Athletics 10.000(+) Highway connecting Athens – Korinthos. Geological study for tunnels at PANTECHNIKI Skaramagas Interchange. T d, e, w 2000 S.A. 18.000(+)

Egnatia Odos: geological study in section H, T, B, “Egnatia Odos” Nestos – Vaniano. E d 2000 S.A. 5.000(+) Investigation on geological conditions at the exploitation area of Pinios Delta in Thessalia. S p 2000 Κ.Ε.D. S.A. 12.000(+) Technical and geological study in order to face a landslide at the “Moutsara” area “Egnatia Odos” (section 2.3 of Egnatia Odos). I d 2002 S.A. 20.000(+) Egnatia Odos, section Metsovo – Panagia. Geological study on foundation conditions at T2 bridge which was “Egnatia Odos” constructed with the cantilever method. B p, d 2003 S.A. 20.000(+) Egnatia Odos, section Metsovo – Panagia. Geological study in the area of “Egnatia Odos” Γ7 bridge. Β, Η e 2003 S.A. 15.000(+)

Issue 2018 O T M WORKS CARRIED OUT PROJECT CHARACTER PERIOD OWNER VALUE KIND STAGE GEOLOGY

Geological study and geotechnical investigation for the construction of Tithorea bridge at a provincial road in Fokida Parnassos mountain. B d 2004 Prefecture 5.000(+) Geological study for the foundation of a bridge in Chamezi, Eastern Crete. Construction design for a proposal with a “Gantzoulas” lump sum offer. B p 2004 S.A. 10.000(+)

Egnatia Odos, section Panagia – “Egnatia Odos” Grevena. Geological study of Γ3 viaduct. B d 2004 S.A. 15.000(+) Geological study for the suitability of an urban area in Rethymno. S p 2004 O.E.K. 10.000(+) Geological study on construction conditions at Tempi tunnel, bridges & trenches of the highway, section Evangelismos – Platamonas. Design for a proposal in a concession system for B, T, H, J/V “Olympia ΕΥΔΕ-ΟΑΠ, section Maliakos – Kleidi. E p 2004-2005 Odos” 25.000(+) Geological study on the conditions of existing structures and evaluation of possible stability risks or maintenance needs. Design for a proposal in a concession system for ΕΥΔΕ-ΟΑΠ, J/V “Olympia section Maliakos – Kleidi. B, H, E p 2004-2005 Odos” 15.000(+) Geological study on the construction conditions of a new highway (100km length) and the preservation of an existing one (83km length) connecting Korinthos – Tripoli – Kalamata and Kalamata – Sparti. Design for a proposal in a concession system for ΕΥΔΕ-ΟΑΠ, B, T, H, section of central Peloponissos. E p 2005 J/V “Moreas” 50.000(+) Geological study on conditions in area Ministry of Mavromoustako of the National Road Public Works - connecting Kolymbari – Kastelli in Crete. H, E p, d 2005 ΕΥDΕ - ΒΟΑΚ 28.000(+) Detailed design for the Knimis and J/V ACTOR S.A. Dichalorema Tunnels. New highway – INPRE-GILO S.A. – bypassing Ag. Constantinos and Kamena PANTECH-NIKI Vourla cities. Geological final prediction. H, T, E d,e 2005-2006 S.A. 25.000 (+) Geological evaluation study on construction conditions of new highway connecting – Kalambaka – Grevena – Egnatia, as well as on the maintenance requirements of existing sections at the area of Maliakos Gulf. Design for a proposal in a concession J/V system for the project: E65 Highway in B, T, H, «E-FTHIA» Central . Owner: ΕΥΔΕ-ΟΑΠ. E p 2006 ODOS 10.000(+)

Issue 2018 O T M WORKS CARRIED OUT PROJECT CHARACTER PERIOD OWNER VALUE KIND STAGE GEOLOGY

Geology and Hydrogeology for the Athens Subway extension towards Haidari. Line 1,5Km long including one Station , one multistory parking building and two deep shafts for dewatering and R, T, PANTECHNIKI ventilation. S, G d, e ,w 2006-2007 S.A. 40.000 (+)

Geology and Hydrogeology for the new highway Korinthos-Tripolis-Kalamata and

Lefctro – Sparti. Road 200Km long including (bridges, tunnels, cuts and embankments) studies for large structures and construction monitoring. The project is a concession project of the

Greek State given to the concession JV after an international tender ship. The studies are prepared into a frame of design –build system, financed by the Contractor and under the approval of an

Independent Engineer (Faber – Maunsell). H,E,T,B d,e,w 2006-2012 J/V MOREAS 708.000 (+) Geological investigation for a possible crossing between Central (Sterea) Hellas and Evia Island into the place Bathi-St. Nikolas. H,B,T f 2007 DROMOS Ltd 10.000 (+) Geological Studies for the project: North Highway Axis of Creta (Upgrating), Ministry for Public Works section Kalives – Vrysses (Chania) H,B,E, p,d,j 2007-2009 (ΓΓΔΕ-DΜΕΟ) 82.900 (+) Geological Studies for the preliminary design of the suburbian railway :Stavros st –Rafina, in Attika (1 Phase) R,B,T,E f 2008 ERGOSE S.A. 50.000 (+) Geological Studies for the connections of the Egnatia Road with the other roadway net, Gerakarou Interchange – St. Ministry for Public works Prodromos H,B,E p,d,j 2008-2009 (ΓΓΔΕ-DΜΕΟ) 52.000 (+) Geology and Hydrogeology for the extensions of the Metro ATTIKO towards and Stavroupoli. R,T,S p,j 2008-2009 METRO S.A. 60.000 (+) Geology for the landslide management in P.PAPADOPOU Kemeri, Pissouri village, Lemessos, LOS & ASSOCIATES Cyprus Ε,Η p,d 2009-2010 Cons. Eng. Co 10.000 (+) Geological study for the road coastal axis Thessaly in Thessaly, section Kamari-Keramidi- Periphery. Direction of Rakopotamo H,B,T,E p,d 2009-2012 Public Works 109.000 (+) Geological studies for the improvement of the road Pylos- Rizomylos and Pylos – Methoni in the North-Western Ministry for Public Works Peloponnissos. H,B,T,E p,d 2009-2012 (ΓΓΔΕ-DΜΕΟ) 225.000 (+)

Issue 2018 O T M WORKS CARRIED OUT

PROJECT CHARACTER PERIOD OWNER VALUE KIND STAGE GEOLOGY

New highway “Gerakarou-Prodromos” (length 15km) at “Chalkidiki area. Complete study of geological conditions, construction material locatins and Y.D.E geotechnical investigation supervision I,F,H p 2009-2013 DMEO 50.000(+) Geological studies in various places of the Korinthos-Kalamata-Pirgos highway. Design for the structures of the road (foundations, cuts, embankments J/V APION tunnels, C&C etc) I,F,H d,w 2010-2012 KLEOS A.E. 85.000(+) Geological study for the existing conditions of the Mornos aquaduct at Y,E,T, “Prodromos” M f 2011 EYDAP AE 35.000(+) Northern road axis of Crete, Vrises- Ministry of Kalives section. Geological evaluation for Public Works the road and bridge design I,F,H,B p 2011-2012 EYDE-VOAK 67.000(+)

Geological study for the new highway Ministry of Public Works -, section Neraida- H,B,E, Thessaly Megdovas river M,F p 2011-2013 Periphery 40.000(+) J/V Final geological study for the Athens JP AVAX S.A. metro line extension towards Piraeus R,S,T d,e 2012 GHELLA Spa 45.000(+) Final geological and hydrogeological studies for the improvment and completion of the PATHE highway, B,T,E,H J/V AKTOR- section Stilida-Raches I,M,F d,e 2013 TERNA 15.000(+) Final geological studies for the extension of “Thessaloniki” metro line towards S,T,E,R Kalamaria H d,e 2013-2014 AKTOR S.A. 45.000(+)

Issue 2018 O T M WORKS CARRIED OUT

PROJECT CHARACTER PERIOD OWNER VALUE KIND STAGE GEOLOGY

Geological study in lane covers and retaining walls positions along the new M,F,H, APION KLEOS - highway of Korinthos – Patras. S d,w 2013-2016 JV 70.000(+) Geological Investigation and sudy for the project of the railway line into the section Theotokos – Dimitra on the Kalampaka – M,F,H, Ioannina connection. S p 2011-2013 OSE SA 30.000(+) Geological studies in different places, into a “frame” contract, concerning the project of the vertical axes a cross the Egnatia Road. It is included also the study of measures securing the stabilization of the slope adjacent the Egnatia Odos cemelery of the Metsovo town, in Epirus. M,H p 2013-2014 SA 25.000(+) Geological studies into the frame of the final detailed treatment on the stability cut slopes in the Lefktro – Sparta of M,F,H, Peloponnissos. S d,w 2013-2016 Moreas SA 25.000(+) Geological study for the preparation of the offer for the project: design – construction and operation of the new airport at Kastelli place of Iraklion in the M,F,E, Crete island. S,A p 2014-2015 AKTOR - VINCI 15.000(+) Geological study for the new highway Ministry for Bralos – Amfissa – Itea – Galaxidi – H,B,T,E Public Works - Nafpaktos. M,F p 2014-2015 DMEO 25.000(+) Geological study in the landslide area near Vonitsa on the highway connecting Aktio with the road axis North – South in E,H,M, AKTOR - Epirus. F d 2016 AEGEK 25.000(+) Geological study in preliminary design stage for the immersed tunnel connecting the Salamis island with Perama. Design for participating in a tendering procedure using a competitive dialogue for a E,B,T,H concession contract. ,M,F p 2016 AKTOR - VINCI 15.000(+)

Issue 2018