Naraingarh Sugar Mills Limited
Total Page:16
File Type:pdf, Size:1020Kb
Six monthly compliance report (from July-2014 to December-2014) for Naraingarh Sugar Mills Limited, Naraingarh (Ambala) –Haryana, Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . Ref. No. Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014. Naraingarh Sugar Mills Limited Village –Banondi .P.O. Shahjadpur ,Tehsil-Naraingarh Distt. Ambala, (Haryana) __________________________________________________________ Six Monthly Progress Reports for the Period of Six Month from July-2014 to December-2014. Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . EC Ref.No. SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014. Point wise Reply of the conditions stipulated in Environmental Clearance vide letter for Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014. Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana STATUS OF COMPLIANCE CONDITIONS:- S. No. POINTS (A) SPECIFIC STATUS OF CONDITIONS. COMPLIANCE. (REPLY) 01 Efforts shall be made to reduce PM 2.5, PM10 Under Compliance and We will be levels in the ambient air and a time bound action adequate measures like water plan shall be submitted .As proposed Electrostatic sprinkling on haul roads and precipitator (ESP) along with stack of adequate unpaved areas being under taken to height shall be provided to boiler to control reduce the PM2.5 and PM 10 level particulate emission with in 100mg/NM3 .at no below ambient air quality time , the emission level shall go beyond the standards. ESPs will be installed to Six monthly compliance report (from July-2014 to December-2014) for Naraingarh Sugar Mills Limited, Naraingarh (Ambala) –Haryana, Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . Ref. No. Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014. prescribed standards . In the event of failure of any minimize the particulate pollution control system adopted by the unit, the emissions. respective unit shall not be restarted until the control measures are rectified to achieve the desired efficiency. Efficiency of pollution control device shall be monitored regularly; Stack monitoring report shall be submitted to the regional office MOEF. 02 The National Ambient Air Quality Standards issued We will follow the National by Ministry vide G.S.R.No. 826 (E) dated 16th Ambient Air November-2009 shall be followed. Quality Emission Standards issued by the Ministry vide G.S.R. No. 826(E) dated 16th November, 2009. 03 In plant, Control measures for checking fugitive Under compliance ,same will be emission from all the vulnerable sources shall be point no.01 provided, fugitive emission shall be control by providing closed storage, closed handling & conveyance of chemicals/ materials, multi cyclone separator and water sprinkling system shall be provided at loading areas to control dust emission. Fugitive emission in the work Zone environment, production area, raw materials storage area etc. shall be regularly monitored and recodes shall be marinated. The emission shall confirm to the limits prescribed by Haryana State Pollution Control Board (HSPCB) 04 Pucca approach road to project shall be constructed Complied. prior to commencing construction activity of sugar mill so as to avoid fugitive emission. 05 The gaseous emission from DG set shall be As per CPCB guidelines, adequate dispersed through adequate stack height as per stack height to all the DG sets will CPCB guideline .Acoustic enclosure shall be be provided, acoustic type of DG Provided to DG sets to mitigate the Noise sets will be used to mitigate the Pollution. noise pollution 06 The Company shall upload the status of compliance Same shall be complied with. The of the stipulated environmental clearance condition, ambient air quality monitoring was including results of monitored data on its website carried out and results are enclosed and shall update the same periodically .It shall as Annexure-1 simultaneously be sent to the respective R.O. of MOEF, CPCB and HSPCB. The level of PM2.5, PM, 10So2, NOX in Ambient Air shall be monitored and displayed at a convenient location near the main Gate of the company and at important public places. Six monthly compliance report (from July-2014 to December-2014) for Naraingarh Sugar Mills Limited, Naraingarh (Ambala) –Haryana, Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . Ref. No. Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014. 07 Total fresh water requirement from ground water The fresh water requirement is (Borewell) shall not exceed 970m3/day for this estimated to be 970 m3/day which project and prior permission for drawl of water will be met by ground water & shall be obtained from concerned authorities. recycled water. And we will use our existing borewell and recirculation water. 08 Effluent from sugar unit shall be treated in the Under Complied and effluent treatment plant comprising neutralization Same will be Implemented. tank followed by two stage aeration system .ETP treated water should be used for farming /garding within industry premises. Domestic sewage shall be transferred into aeration tank for treatment. 09 As proposed, no effluent from sugar plant shall be Unit will operate on Zero discharged outside the premises and zero discharge Discharge concept. shall be adopted. 10 Process effluent /any waste water shall not be Separate storm water drains via allowed to mix with storm water. Storm water drain guard pond. shall be passed through guard pond. 11 Adequate number of ground water quality Ground water samples from monitoring stations by providing piezometers different locations were collected around the project area should be set up. Sampling and results are and trend analysis monitoring must be made on attached as Annexure-2 monthly a basis and report submitted to SPCB and this ministry. The ground water quality monitoring for pH,BOD,COD,Sulphate and TDS should be monitord ,sampling and trend analysis monitoring must be made on monthly basis and report submitted to RO Chandigarh and HSPCB. 12 Baggase storage shall be done in such a way that it Under compliance ,same will be does not get air born or fly ash around due to wind. point no.01 13 Boiler ash shall be stored separately as per CPCB Same shall be Complied after guideline so that it shall not adversely affect the air Expansion cum modernization of quality, becoming air born by wind or water regime existing sugar mills from during rainy season by flowing along with the 2500TCD to 5500TCD. storm water. Direct exposure of works to fly ash & dust shall be avoided baggase ash and coal ash shall be stored separately. 14 Till the plant is ready for expansion the project Complied .Consent to operate for proponent have to ensure for compliance of the year 2014-2015 is attached. pollution control norms stipulated in consent to operate for existing unit. 15 Fire fighting system shall be as per norms and Same shall be Complied before cover all areas. Expansion cum modernization of existing sugar mills from 2500TCD to 5500TCD. Six monthly compliance report (from July-2014 to December-2014) for Naraingarh Sugar Mills Limited, Naraingarh (Ambala) –Haryana, Project:- Environmental Clearance for 25MW Co-Generation Power Plant and Expansion cum Modernization of Existing sugar Mills from 2500TCD to 5500TCD capacity with Existing Premises at Naraingarh Sugar Mills Ltd Naraingarh Distriet Ambala Haryana . Ref. No. Environmental Clearance letter Haryana SEIAA No. SEIAA/HR/2014/1481 dated 21/12/2013 and 01/11/2014. 16 Risk Assessment shall be carried out to assess the Complied. fire and explosion risk. 17 Occupational health surveillance programme shall Occupational health surveillance be undertaken as regular exercise for all the programme will be taken as a employees. The first aid facilities in the regular exercise for all the occupational centre shall be strengthened and the employees and their regular medical test records of each employee shall Records maintained. be maintained separately. 18 Dedicated parking facility for loading and Same shall be Complied with all unloading of materials shall be provided in the parking facility for loading and factory premises. Unit shall develop and implement unloading of materials and good traffic management system for their incoming Shall be avoid congestion on the and outgoing vehicles to avoid congestion on the public road public road. 19 Green belt shall be developed in 33% of plot area to Complied. We have already mitigate the effects of fugitive emission all around developed a green belt around 35% the plant as per CPCB guideline in consultation of the total land area. with the local DFO.Thick greenbelt with suitable plant species shall be developed around the proposed distillery to mitigate the odour problem. 20 All the commitments made during the public Same shall be complied with. hearing /Public consultion meeting held on 10th april, 2013shall be satisfactorily implemented and adequate budget provision shall be made accordingly. 21 Provision shall be made for the housing for Same shall be complied with.