Arch Bridges.Ai

Total Page:16

File Type:pdf, Size:1020Kb

Arch Bridges.Ai Arch Bridges ARCH BRIDGES Arch bridges are one of the oldest types of bridges and have great natural strength. Instead of pushing straight down as in the case of a beam bridge, rigid frame bridge or truss, the load supported by of an arch bridge is carried along the curve of the arch to the supports at each end. These supports, called the abutments, transfer the load to the ground and keep the ends of the bridge from moving apart. Arches use a curved structure which provides a high resistance to bending forces. Unlike girder and truss bridges, both ends of an arch are fixed in the horizontal direction and no horizontal movement is allowed in the bearing. Thus when a load is placed on the bridge, such as a passing car, horizontal forces occur in the bearings of the arch. Structurally there are three basic arch types: hinge-less, hinged and tied arches The hinge-less arch uses no hinges and allows no rotation at the foundations. As a result, significant horizontal, vertical, and bending forces are generated at the foundations. Special care must be taken in the design of the foundations for such a bridge. However, the hinge-less arch is a very stiff structure and experiences less deflection than other arches. The two hinged arch uses hinged bearings which allow rotation at the bearings resulting in only horizontal and vertical forces developing. This is perhaps the most commonly used variation for steel arches and is generally a very economical design. The tied arch is a variation on the arch which allows for smaller foundations. Rather than having the foundations resist the horizontal forces, a girder "ties" both ends of the arch together. 3.4.2 Where Are They Used Arch spans are typically used to span deep canyons resulting in the abutments bearing against the canyon walls. However, the tied arch is a common form used to span rivers since it results in only vertical forces being applied to the abutments. The typical span length of arch bridges range from 40 to 150 meters. The longest arch span in the world is the New River Gorge Bridge with a main span of 518 meters. 3.4.3 What They Typically Cost The typical cost of arch bridges ranges from $4,000 to $5,000 US per square meter. Parsons.
Recommended publications
  • Bridges and Applications Bridges and Applications Bridges and Applications Arch Bridges
    10/23/2014 Bridges and Applications Bridges and Applications • Bridges are used to span across distances that are difficult to otherwise pass through. • Rivers • Deep gorges • Other roadways Bridges and Applications Arch Bridges • There are four basic types of bridges – Arch – Beam – Suspension – Cable‐stayed • Each type has different design and is therefore better suited to different applications 1 10/23/2014 Arch Bridges Arch Bridges • Instead of pushing straight down, the weight of an arch bridge is carried outward along the curve of the arch to the supports at each end. Abutments, carry • These supports, called the abutments, carry the load the load and keep the ends of the bridge from spreading outward. and keep the ends of the bridge from spreading outward Arch Bridges Arch Bridges • When supporting its own weight and the • Today, materials like steel and pre‐stressed weight of crossing traffic, every part of the concrete have made it possible to build longer arch is under compression. and more elegant arches. • For this reason, arch bridges must be made of materials that are strong under compression. New River Gorge, – Rock West Virginia. – Concrete 2 10/23/2014 Arch Bridges Arch Bridges • Usually arch bridges employ vertical supports • Typically, arch bridges span between 200 and called spandrels to distribute the weight of 800 feet. the roadway to the arch below. Arch Bridges One of the most revolutionary arch bridges in recent years is the Natchez Trace Parkway Bridge in Franklin, Tennessee, which was opened to traffic in 1994. It's the first American arch bridge to be constructed from segments of precast concrete, a highly economical material.
    [Show full text]
  • Simple Innovative Comparison of Costs Between Tied-Arch Bridge and Cable-Stayed Bridge
    MATEC Web of Conferences 258, 02015 (2019) https://doi.org/10.1051/matecconf/20192 5802015 SCESCM 20 18 Simple innovative comparison of costs between tied-arch bridge and cable-stayed bridge Järvenpää Esko1,*, Quach Thanh Tung2 1WSP Finland, Oulu, Finland 2WSP Finland, Ho Chi Minh, Vietnam Abstract. The proposed paper compares tied-arch bridge alternatives and cable-stayed bridge alternatives based on needed load-bearing construction material amounts in the superstructure. The comparisons are prepared between four tied arch bridge solutions and four cable-stayed bridge solutions of the same span lengths. The sum of the span lengths is 300 m. The rise of arch as well as the height of pylon and cable arrangements follow optimal dimensions. The theoretic optimum rise of tied-arch for minimum material amount is higher than traditionally used for aesthetic reason. The optimum rise for minimum material amount parabolic arch is shown in the paper. The mathematical solution uses axial force index method presented in the paper. For the tied-arches the span-rise-ration of 3 is used. The hangers of the tied-arches are vertical-The tied-arches are calculated by numeric iteration method in order to get moment-less arch. The arches are designed as constant stress arch. The area and the weight of the cross section follow the compression force in the arch. In addition the self-weight of the suspender cables are included in the calculation. The influence of traffic loads are calculated by using a separate FEM program. It is concluded that tied-arch is a competitive alternative to cable-stayed bridge especially when asymmetric bridge spans are considered.
    [Show full text]
  • Visit Ohio's Historic Bridges
    SPECIAL ADVERTISING SECTION Visit Ohio’s Historic Bridges Historic and unique bridges have a way of sticking in our collective memories. Many of us remember the bridge we crossed walking to school, a landmark on the way to visit relatives, the gateway out of town or a welcoming indication that you are back in familiar territory. The Ohio Department of Transportation, in collaboration with the Ohio Historic Bridge Association, Ohio History Connection’s State Historic Preservation Office, TourismOhio and historicbridges.org, has assembled a list of stunning bridges across the state that are well worth a journey. Ohio has over 500 National Register-listed and historic bridges, including over 150 wooden covered bridges. The following map features iron, steel and concrete struc- tures, and even a stone bridge built when canals were still helping to grow Ohio’s economy. Some were built for transporting grain to market. Other bridges were specifically designed to blend into the scenic landscape of a state or municipal park. Many of these featured bridges are Ohio Historic Bridge Award recipients. The annual award is given to bridge owners and engineers that rehabilitate, preserve or reuse historic structures. The awards are sponsored by the Federal Highway Administration, ODOT and Ohio History Connection’s State Historic Preservation Office. Anthony Wayne Bridge - Toledo, OH Ohio Department of Transportation SPECIAL ADVERTISING SECTION 2 17 18 SOUTHEAST REGION in eastern Ohio, Columbiana County has Metropark’s Huntington Reservation on the community. A project that will rehabilitate several rehabilitated 1880’s through truss shore of Lake Erie along US 6/Park Drive.
    [Show full text]
  • Arched Bridges Lily Beyer University of New Hampshire - Main Campus
    University of New Hampshire University of New Hampshire Scholars' Repository Honors Theses and Capstones Student Scholarship Spring 2012 Arched Bridges Lily Beyer University of New Hampshire - Main Campus Follow this and additional works at: https://scholars.unh.edu/honors Part of the Civil and Environmental Engineering Commons Recommended Citation Beyer, Lily, "Arched Bridges" (2012). Honors Theses and Capstones. 33. https://scholars.unh.edu/honors/33 This Senior Honors Thesis is brought to you for free and open access by the Student Scholarship at University of New Hampshire Scholars' Repository. It has been accepted for inclusion in Honors Theses and Capstones by an authorized administrator of University of New Hampshire Scholars' Repository. For more information, please contact [email protected]. UNIVERSITY OF NEW HAMPSHIRE CIVIL ENGINEERING Arched Bridges History and Analysis Lily Beyer 5/4/2012 An exploration of arched bridges design, construction, and analysis through history; with a case study of the Chesterfield Brattleboro Bridge. UNH Civil Engineering Arched Bridges Lily Beyer Contents Contents ..................................................................................................................................... i List of Figures ........................................................................................................................... ii Introduction ............................................................................................................................... 1 Chapter I: History
    [Show full text]
  • Arizona Historic Bridge Inventory | Pages 164-191
    NPS Form 10-900-a OMB Approval No. 1024-0018 (8-86) United States Department of the Interior National Park Service National Register of Historic Places Continuation Sheet section number G, H page 156 V E H I C U L A R B R I D G E S I N A R I Z O N A Geographic Data: State of Arizona Summary of Identification and Evaluation Methods The Arizona Historic Bridge Inventory, which forms the basis for this Multiple Property Documentation Form [MPDF], is a sequel to an earlier study completed in 1987. The original study employed 1945 as a cut-off date. This study inventories and evaluates all of the pre-1964 vehicular bridges and grade separations currently maintained in ADOT’s Structure Inventory and Appraisal [SI&A] listing. It includes all structures of all struc- tural types in current use on the state, county and city road systems. Additionally it includes bridges on selected federal lands (e.g., National Forests, Davis-Monthan Air Force Base) that have been included in the SI&A list. Generally not included are railroad bridges other than highway underpasses; structures maintained by federal agencies (e.g., National Park Service) other than those included in the SI&A; structures in private ownership; and structures that have been dismantled or permanently closed to vehicular traffic. There are exceptions to this, however, and several abandoned and/or privately owned structures of particular impor- tance have been included at the discretion of the consultant. The bridges included in this Inventory have not been evaluated as parts of larger road structures or historic highway districts, although they are clearly integral parts of larger highway resources.
    [Show full text]
  • Over Jones Falls. This Bridge Was Originally No
    The same eastbound movement from Rockland crosses Bridge 1.19 (miles west of Hollins) over Jones Falls. This bridge was originally no. 1 on the Green Spring Branch in the Northern Central numbering scheme. PHOTO BY MARTIN K VAN HORN, MARCH 1961 /COLLECTION OF ROBERT L. WILLIAMS. On October 21, 1959, the Interstate Commerce maximum extent. William Gill, later involved in the Commission gave notice in its Finance Docket No. streetcar museum at Lake Roland, worked on the 20678 that the Green Spring track west of Rockland scrapping of the upper branch and said his boss kept would be abandoned on December 18, 1959. This did saying; "Where's all the steel?" Another Baltimore not really affect any operations on the Green Spring railfan, Mark Topper, worked for Phillips on the Branch. Infrequently, a locomotive and a boxcar would removal of the bridge over Park Heights Avenue as a continue to make the trip from Hollins to the Rockland teenager for a summer job. By the autumn of 1960, Team Track and return. the track through the valley was just a sad but fond No train was dispatched to pull the rail from the memory. Green Spring Valley. The steel was sold in place to the The operation between Hollins and Rockland con- scrapper, the Phillips Construction Company of tinued for another 11/2 years and then just faded away. Timonium, and their crews worked from trucks on ad- So far as is known, no formal abandonment procedure jacent roads. Apparently, Phillips based their bid for was carried out, and no permission to abandon was the job on old charts that showed the trackage at its ' obtained.
    [Show full text]
  • Bayonne Bridge Lesson Plan
    The Bayonne Bridge: The Beautiful Arch Resources for Teachers and Students [Printable and Electronic Versions] The Bayonne Bridge: The Beautiful Arch Resources for Teachers And Students [Printable and Electronic Versions] OVERVIEW/OBJECTIVE: Students will be able to understand and discuss the history of NOTES: the Bayonne Bridge and use science and engineering basics • Key words indicated in to investigate bridge design and test an arch bridge model. Bold are defined in call- out boxes. TARGET GRADE LEVEL: • Teacher-only text Fourth grade instruction, adaptable to higher levels as indicated with Italics. desired in the subjects of Social Studies and Engineering. FOCUS: In Part I, students learn about history of the Bayonne Bridge including the many engineering challenges encountered during the project and the people who helped overcome those challenges. In Part II, students learn engineering concepts to understand how bridges stay up and use these concepts to complete activities on bridge design before applying these concepts to theorize how the Bayonne Bridge works. MATERIALS: • Part I: DVD of “The Bayonne Bridge Documentary” • Part II: 2–4 heavy textbooks or 2 bricks per group; 2 pieces of “cereal box” cardboard or similar, 12 x 8 in; weights (anything small that can be stacked on the structure); red and blue marker, crayon or colored pencil for each student or group. The Bayonne Bridge: The Beautiful Arch Contents Teacher Materials | Part I: History of the Bayonne Bridge . T-1 Teacher Materials | Part II: Bridge Engineering . T-7 Student Materials | Part I: History of the Bayonne Bridge . S-1 Student Materials | Part II: Bridge Engineering .
    [Show full text]
  • Structural Behaviour of Cable-Stayed Bridges
    Structural Behaviour of Cable-stayed Bridges by Elizabeth Davalos Bachelor of Science in Civil Engineering and Administration Universidad Panamericana sede Guadalajara, Mexico June 1998 Submitted to the Department of Civil and Environmental Engineering In partial fulfillment of the requirements for the Degree of MASTER OF ENGINEERING ENG IN CIVIL AND ENVIRONMENTAL ENGINEERING MASSACHUSETTS INSTITUTE OF TECHNOLOGY At the A3 0 2000 LIBRARIES MASSACHUSETTS INSTITUTE OF TECHNOLOGY May 2000 @2000 Elizabeth Davalos. All rights reserved The author hereby grants to MIT permission to reproduce and distribute publicity paper and electronic copies of this thesis document in whole or in part. Signature of the Author Ddpa ment of Civil and Environmental Engineering May 5, 2000 Certified by Professor Jerome J. Connor 6epartment of ivil and Environmental Engineering 7 Thesis Supervisor Accepted by Daniele Veneziano Chairman, Department Committee on Graduate Studies Structural Behaviour of Cable-stayed Bridges by Elizabeth Davalos Submitted to the Department of Civil and Environmental Engineering on May 5, 2000 in partial fulfillment of the requirements for the degree of Master of Engineering in Civil and Environmental Engineering. Abstract Cable-stayed bridges have emerged as the dominant structural system for long span bridge crossings during the past thirty years. That success is due to a combination of technical advancements and pleasing aesthetics attributes. The interaction of the various structural components results in an efficient structure which is continuously evolving and providing new methods to increase span lengths. The objective of this thesis is to describe in detail the basic structural behaviour of each of the components of cable-stayed bridges, and to present the analysis of a specific cable-stayed bridge which was proposed for the Charles River Crossing.
    [Show full text]
  • Simple Suspension Bridge
    structures STS19 Simple Suspension Bridge Experiment for the study of the characteristics of a simple suspension bridge. Mounts on the Structures platform and connects to the Structures automatic data acquisition unit and software (VDAS® Onboard). Shown fitted to the Structures platform (STS1, available separately) Laptop not included Key Features • One of a range of experiment modules that teach structures principles • Fits to the Structures platform for ergonomic use and space-saving storage • Includes multiple loads for many combinations of loads including uniformly distributed loads (UDLs) • A simplifi ed version of a realistic structure to give students an understanding of real-life structures • Direct measurement of cable tension for simple and quick experiments • Supplied with a storage tray to keep smaller items safe • Works with user-friendly software (VDAS®) TecQuipment Ltd, Bonsall Street, long eaton, Nottingham NG10 2AN, UK tecquipment.com +44 115 972 2611 [email protected] REF 0920 Page 1 of 3 STS19 Simple Suspension Bridge Description Learning outcomes One of a range of experiment modules that fi t to the • How bridge load aff ects the tension in a suspension Structures platform (STS1, available separately), this cable product helps students to understand how loads aff ect • Comparing a central point load with a UDL tension in the suspension cable supporting the ‘deck’ of a suspension bridge. Students add loads to the deck held by • Exploring the ratio of bridge ‘deck’ mass and a moving the suspension cable between two supports. A load cell in load the left-hand support measures the cable tension. • Comparing simple parabola-based theory with a more Students apply loads, which change the cable tension.
    [Show full text]
  • Design Example: Two-Span Continuous Straight Wide-Flange
    U.S. Department of Transportation Federal Highway Administration Steel Bridge Design Handbook Design Example 2B: Two-Span Continuous Straight Composite Steel Wide-Flange Beam Bridge ArchivedPublication No. FHWA-IF-12-052 - Vol. 22 November 2012 Notice This document is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. The U.S. Government assumes no liability for use of the information contained in this document. This report does not constitute a standard, specification, or regulation. Quality Assurance Statement The Federal Highway Administration provides high-quality information to serve Government, industry, and the publicArchived in a manner that promotes public understanding. Standards and policies are used to ensure and maximize the quality, objectivity, utility, and integrity of its information. FHWA periodically reviews quality issues and adjusts its programs and processes to ensure continuous quality improvement. Steel Bridge Design Handbook Design Example 2B: Two-Span Continuous Straight Composite Steel Wide-Flange Beam Bridge Publication No. FHWA-IF-12-052 - Vol. 22 November 2012 Archived Archived Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. FHWA-IF-12-052 - Vol. 22 4. Title and Subtitle 5. Report Date Steel Bridge Design Handbook Design Example 2B: Two-Span November 2012 Continuous Straight Composite Steel Wide-Flange Beam Bridge 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Karl Barth, Ph.D. (West Virginia University) 9. Performing Organization Name and Address 10. Work Unit No. HDR Engineering, Inc. 11 Stanwix Street 11. Contract or Grant No. Suite 800 Pittsburgh, PA 15222 12.
    [Show full text]
  • Truss Bridges
    2009 Bridges and Structures Outline • Introduction of Project Organizers and Program o Overall Concept of the half day o Images of Bridges in NH, ME and MA that are examples of the 5 Bridge Designs Beam Bridge Arch Bridge Truss Bridge Suspension Bridge Cable-Stayed Bridge o Images of existing bridges other students / groups have done • Call off participants 1 through 5 o Creating 5 Groups (1 Group for each Bridge Design which creates 4 individuals per Bridge Design.) If more than 20 individuals, then count 1 thru 7 or 8 to create two or three more groups. There will then be 2 of the same bridge types for some of the 5 Bridge Designs. • Package of information for Groups o Groups to review material (Bridge to be wide enough to accept bricks) o Groups to discuss their Bridge o Groups to draw out their Bridge Design o Groups to divide into two sub-groups Cutting Assembly • Presentation of Bridges by Groups (short narrative as to-) o Type of Bridge o Design solution • Test of Weight that each bridge can handle o Groups document their thoughts on their Bridge • Awards / Overview of how and why bridges worked / did not work Materials: Balsa Wood Package for each Bridge Type Group 3’ long sticks maximum String / rope, Glue (Sobo,) Exacto knives, packing tape Other: Bricks or other items for weight Scale for measuring weight units Camera to document before, during and after bridge testing Two sawhorses for bridge weight test American Institute of Architects New Hampshire Chapter Schedule • Introduction of Team Members and Program: 10 minutes o Overall Concept of the Day: 10 minutes o Images of Bridges in NH, ME and MA that are examples of the 5 Bridge Designs 4 minutes Beam Bridge Arch Bridge Truss Bridge Suspension Bridge Cable-Stayed Bridge o Images of existing bridges other students / groups have done 4 minutes • Call off participants 1 through 5 8 minutes o Creating 5 Groups (1 Group for each Bridge Design which creates 4 individuals per Bridge Design.) If more than 20 individuals, then count 1 thru 7 or 8 to create two or three more groups.
    [Show full text]
  • G 13.1 Guidelines for Steel Girder Bridge Analysis.Pdf
    G13.1 Guidelines for Steel Girder Bridge Analysis 2nd Edition American Association of State Highway Transportation Officials National Steel Bridge Alliance AASHTO/NSBA Steel Bridge Collaboration Copyright © 2014 by the AASHTO/NSBA Steel Bridge Collaboration All rights reserved. ii G13.1 Guidelines for Steel Girder Bridge Analysis PREFACE This document is a standard developed by the AASHTO/NSBA Steel Bridge Collaboration. The primary goal of the Collaboration is to achieve steel bridge design and construction of the highest quality and value through standardization of the design, fabrication, and erection processes. Each standard represents the consensus of a diverse group of professionals. It is intended that Owners adopt and implement Collaboration standards in their entirety to facilitate the achievement of standardization. It is understood, however, that local statutes or preferences may prevent full adoption of the document. In such cases Owners should adopt these documents with the exceptions they feel are necessary. Cover graphics courtesy of HDR Engineering. DISCLAIMER The information presented in this publication has been prepared in accordance with recognized engineering principles and is for general information only. While it is believed to be accurate, this information should not be used or relied upon for any specific application without competent professional examination and verification of its accuracy, suitability, and applicability by a licensed professional engineer, designer, or architect. The publication of the material contained herein is not intended as a representation or warranty of the part of the American Association of State Highway and Transportation Officials (AASHTO) or the National Steel Bridge Alliance (NSBA) or of any other person named herein, that this information is suitable for any general or particular use or of freedom from infringement of any patent or patents.
    [Show full text]