Pradhan Mantri Gram Sadak Yojana

Road List for attachment with Sanction Letter - District Wise Abstract

State : Sanction Year : 2016-2017 Batch : 1 Collaboration : Regular PMGSY

Sr.No. District No of Road Length MoRD Cost State Cost (Rs Total Cost Maint. Cost Habs (1000+, 500+, 250+, <250, Total) Works (Kms) / Bridge (Rs Lacs) Lacs) (Rs Lacs) (Rs Lacs) Length (Mtrs) 1 2 3 4 5 6 7 8 9

Road Proposals

1 Ajmer 17 40.050 787.95 525.30 1,313.25 118.09 (0 , 0 , 17 , 0 , 17)

2 Banswara 64 123.435 3,022.96 2,015.31 5,038.27 453.44 (0 , 0 , 64 , 1 , 65)

3 Barmer 153 562.935 12,950.77 8,633.85 21,584.62 1,946.54 (0 , 0 , 154 , 0 , 154)

4 Bikaner 54 249.800 4,833.98 3,222.65 8,056.63 725.02 (0 , 0 , 53 , 2 , 55)

5 Churu 15 46.800 883.31 588.88 1,472.19 132.52 (0 , 0 , 15 , 0 , 15)

6 Dungarpur 137 299.110 7,914.84 5,276.52 13,191.36 1,187.59 (0 , 0 , 137 , 0 , 137)

7 4 8.000 216.46 144.30 360.76 32.58 (0 , 0 , 6 , 0 , 6)

8 Jaisalmer 12 83.350 1,400.68 933.78 2,334.46 209.34 (0 , 0 , 12 , 0 , 12)

9 Jalor 110 366.075 7,265.20 4,843.41 12,108.61 1,089.64 (0 , 0 , 111 , 0 , 111)

10 Jhunjhunun 123 284.130 6,244.73 4,163.20 10,407.93 936.72 (0 , 1 , 123 , 4 , 128)

11 Jodhpur 221 764.100 12,546.77 8,364.50 20,911.27 1,882.23 (0 , 0 , 221 , 0 , 221)

12 Nagaur 112 338.825 6,222.59 4,148.36 10,370.95 933.50 (0 , 0 , 112 , 0 , 112)

13 Pali 44 87.545 1,828.59 1,219.06 3,047.65 274.01 (0 , 0 , 44 , 0 , 44)

14 Pratapgarh 53 97.575 2,509.51 1,673.00 4,182.51 376.89 (0 , 0 , 55 , 0 , 55)

15 Rajsamand 11 15.535 455.48 303.64 759.12 68.27 (0 , 1 , 10 , 0 , 11)

16 41 89.605 2,192.73 1,461.86 3,654.59 327.89 (0 , 0 , 41 , 0 , 41)

17 Sirohi 43 139.800 4,182.42 2,788.34 6,970.76 627.40 (0 , 0 , 43 , 0 , 43)

18 253 696.020 21,256.12 14,170.74 35,426.86 3,187.45 (0 , 0 , 253 , 0 , 253)

Roads Total 1,467 4,292.690 96,715.09 64,476.70 1,61,191.79 14,509.12 (0 , 2 , 1471 , 7 , 1480)

Grand Total 1,467 4,292.690 96,715.09 64,476.70 1,61,191.79 14,509.12 (0 , 2 , 1471 , 7 , 1480)

Page 1 of 1 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

State : Rajasthan Sanction Year : 2016-2017 Batch : 1 Collaboration : Regular PMGSY Note : All Costs are in Lakhs and Lengths are in Kms.

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Road Proposals

District- Ajmer

Block- Peesangan

1 L102 L102-AR to Bhambhiyon ka New -- 2.330 3.750 Complete 5 55.45 36.96 92.41 8.32 (0 , 0 , 1 , 0 , 1) Badia 2 L099 L099-AR to Adawa Ki New RBI 81 1.750 3.750 Complete 3 38.99 25.99 64.98 5.85 (0 , 0 , 1 , 0 , 1)

3 L112 L112-AR to Rawto Ki Dhani New RBI 81 1.600 3.750 Complete 4 32.90 21.94 54.84 4.94 (0 , 0 , 1 , 0 , 1)

4 L111 L111-Ar to Maliyo Ki Badi New -- 0.700 3.750 Complete 1 20.74 13.82 34.56 3.11 (0 , 0 , 1 , 0 , 1)

5 L114 L114-Pushkar Govindgarh New -- 2.420 3.750 Complete 6 43.10 28.73 71.83 6.47 (0 , 0 , 1 , 0 , 1) Road 6 L117 L117-GANAHERA CHAWANDIA New -- 1.550 3.750 Complete 4 32.32 21.54 53.86 4.85 (0 , 0 , 1 , 0 , 1)

7 L105 L105-AR to Brahmanon Ka New -- 1.900 3.750 Complete 1 29.38 19.58 48.96 4.41 (0 , 0 , 1 , 0 , 1) Badia 8 L115 L115-Bidakchiawas leeri New -- 3.000 3.750 Complete 0 48.74 32.49 81.23 7.31 (0 , 0 , 1 , 0 , 1) road 9 L119 L119-Jethana Samla road to New -- 1.500 3.750 Complete 0 23.74 15.82 39.56 3.56 (0 , 0 , 1 , 0 , 1) Gola 10 L108 L108-Jethana Samla road to New -- 4.500 3.750 Complete 10 83.00 55.34 138.34 12.45 (0 , 0 , 1 , 0 , 1) Gola 11 L113 L113-Beawar gola Pisangan New -- 3.000 3.750 Complete 2 41.81 27.87 69.68 6.27 (0 , 0 , 1 , 0 , 1) road Block Peesangan Total 24.250 36 450.15 300.10 750.25 67.54 (0 , 0 , 11 , 0 , 11)

Page 1 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Silora (Kishangarh)

12 L091 L091-Approach road to New -- 2.000 3.750 Complete 5 54.00 36.00 90.00 7.97 (0 , 0 , 1 , 0 , 1) Kasiyon Ki Dhani 13 L095 L095-Approach Road New -- 3.000 3.750 Complete 8 64.19 42.79 106.98 9.63 (0 , 0 , 1 , 0 , 1) Umamal Ki Dhani 14 L087 L087-Sursura Thal Road New -- 4.500 3.750 Complete 11 90.90 60.60 151.50 13.64 (0 , 0 , 1 , 0 , 1)

15 L094 L094-Approach road to New -- 1.800 3.750 Complete 3 37.79 25.20 62.99 5.67 (0 , 0 , 1 , 0 , 1) Shyam Khojo Ki Dhani 16 L090 L090-Approach road to Kali New -- 3.500 3.750 Complete 8 67.30 44.86 112.16 10.09 (0 , 0 , 1 , 0 , 1) Pole Block Silora (Kishangarh) Total 14.800 35 314.18 209.45 523.63 47.00 (0 , 0 , 5 , 0 , 5)

Block- Srinagar

17 L119 L119-AR TO BADLIYA New RBI 81 1.000 3.750 Complete 0 23.62 15.75 39.37 3.55 (0 , 0 , 1 , 0 , 1)

Block Srinagar Total 1.000 0 23.62 15.75 39.37 3.55 (0 , 0 , 1 , 0 , 1)

District Ajmer Total 40.050 71 787.95 525.30 1,313.25 118.09 (0 , 0 , 17 , 0 , 17) District- Banswara

Block- Anandpuri

18 L046 L046-AR Bhameda Pada New -- 1.230 3.750 Complete 7 29.60 19.73 49.33 4.44 (0 , 0 , 1 , 0 , 1) (VR1123) 19 L029 L029-AR Kaba Pada (VR1126) New -- 1.330 3.750 Complete 12 40.92 27.28 68.20 6.14 (0 , 0 , 1 , 0 , 1)

20 L054 L054-AR Mana Pada New -- 0.930 3.750 Complete 5 21.71 14.48 36.19 3.26 (0 , 0 , 1 , 0 , 1) (VR1122) 21 L079 L079-AR Nawapada (VR1120) New Waste Plastics 2.500 3.750 Complete 21 74.93 49.95 124.88 11.24 (0 , 0 , 1 , 0 , 1)

22 L041 L041-AR Nichala Pada New -- 2.900 3.750 Complete 20 82.33 54.89 137.22 12.35 (0 , 0 , 1 , 0 , 1) (VR1108)

Page 2 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

23 L098 L098-AR Temarn Km. 1 to New Waste Plastics 1.000 3.750 Complete 7 24.71 16.47 41.18 3.71 (0 , 0 , 1 , 0 , 1) Bhabar Pada (VR1114) 24 L090 L090-AR Talab Pada New Waste Plastics 2.500 3.750 Complete 10 90.59 60.40 150.99 13.52 (0 , 0 , 1 , 0 , 1) (VR1117) 25 L094 L094-AR Badla Pada New Waste Plastics 1.630 3.750 Complete 12 58.26 38.84 97.10 8.75 (0 , 0 , 1 , 0 , 1) (VR1116) Block Anandpuri Total 14.020 94 423.05 282.04 705.09 63.41 (0 , 0 , 8 , 0 , 8)

Block- Bagidora

26 L145 L145-Chouradi Chouraha - New -- 2.950 3.750 Complete 18 93.68 62.46 156.14 14.06 (0 , 0 , 1 , 0 , 1) Gangartalai Road Km. 11/900 (LS) to Nichala Fala 27 L157 L157-A/R Garadiya Km. New -- 0.900 3.750 Complete 5 25.73 17.15 42.88 3.85 (0 , 0 , 1 , 0 , 1) 0/800 (LS) to Kanthal 28 L161 L161-Chhinch Borigama New -- 1.200 3.750 Complete 6 29.89 19.93 49.82 4.48 (0 , 0 , 1 , 0 , 1) Road Km. 4/0 (LS) to Padar Pada 29 L162 L162-Bodigama Jolana Road New -- 2.200 3.750 Complete 12 51.39 34.26 85.65 7.71 (0 , 0 , 1 , 0 , 1) Km. 0/600 (RS) to Kandi 30 L136 L136-A/R Taliya Daida Km. New -- 2.900 3.750 Complete 11 74.75 49.84 124.59 11.22 (0 , 0 , 1 , 0 , 1) 0/450 (RS) to Bojapada 31 L153 L153-Chhinch Choraha - New -- 2.600 3.750 Complete 10 59.23 39.49 98.72 8.89 (0 , 0 , 1 , 0 , 1) Anadpuri Road (MDR-83) Km. 19/100 (RS) to Matafala 32 L149 L149-A/R Haripura Km. New -- 0.930 3.750 Complete 7 23.83 15.88 39.71 3.57 (0 , 0 , 1 , 0 , 1) 0/800 ((LS) to Chabutra Fala 33 L159 L159-Garhi Kalianjara New -- 1.350 3.750 Complete 6 27.98 18.65 46.63 4.19 (0 , 0 , 1 , 0 , 1) Kushalgarh Road (MDR- 43)Km. 21/0 (LS) to Damorfala

Page 3 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

34 L154 L154-A/R Ratanpura Km. New -- 1.980 3.750 Complete 8 38.57 25.71 64.28 5.79 (0 , 0 , 1 , 0 , 1) 1/100 (LS) to Uapala Fala Block Bagidora Total 17.010 83 425.05 283.37 708.42 63.76 (0 , 0 , 9 , 0 , 9)

Block- Banswara

35 L166 L166-AR Mungathali Km. 4 New -- 2.780 3.750 Complete 10 67.32 44.88 112.20 10.10 (0 , 0 , 1 , 0 , 1) To Chitarmala 36 L167 L167-AR Kohala Km. 4 To New -- 1.250 3.750 Complete 6 29.28 19.52 48.80 4.40 (0 , 0 , 1 , 0 , 1) Sekar basti (VR1359) 37 L140 L140-AR Jhupel Km. 3 To New -- 2.000 3.750 Complete 11 56.32 37.54 93.86 8.45 (0 , 0 , 1 , 0 , 1) Chapara Para (VR1360) Block Banswara Total 6.030 27 152.92 101.94 254.86 22.95 (0 , 0 , 3 , 0 , 3)

Block- Garhi

38 L159 L159-Bodigama Timurwa New -- 2.900 3.750 Complete 5 91.73 61.15 152.88 13.77 (0 , 0 , 1 , 0 , 1) Road to Herpada 39 L157 L157-Sh 10 to Bantalai New -- 1.500 3.750 Complete 7 38.80 25.86 64.66 5.81 (0 , 0 , 1 , 0 , 1)

40 L160 L160-Kotara Paderi Road to New -- 3.000 3.750 Complete 6 60.88 40.59 101.47 9.14 (0 , 0 , 1 , 0 , 1) Dindor pada 41 L156 L156-AR Biloda Km. 4 to New -- 3.500 3.750 Complete 13 71.62 47.74 119.36 10.75 (0 , 0 , 1 , 0 , 1) Prathvipura 42 L149 L149-Saredi Badi to Lohariya New -- 6.000 3.750 Complete 12 169.67 113.12 282.79 25.46 (0 , 0 , 1 , 0 , 1) to Ojhariya Basti 43 L158 L158-Jolana Bhatar Road to New -- 2.000 3.750 Complete 6 53.18 35.46 88.64 7.98 (0 , 0 , 1 , 0 , 1) Majiya 44 L155 L155-Raiyana Odawada New -- 3.000 3.750 Complete 6 83.95 55.96 139.91 12.60 (0 , 0 , 1 , 0 , 1) Arthoona to Nalpada 45 L151 L151-Garhi Bagidora MDR 43 New -- 2.300 3.750 Complete 7 63.59 42.39 105.98 9.55 (0 , 0 , 1 , 0 , 1) to Nagaji ka padi 46 L152 L152-AR Ghanewa to New -- 1.000 3.750 Complete 4 37.49 24.99 62.48 5.61 (0 , 0 , 1 , 0 , 1) Herpada

Page 4 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

47 L153 L153-Dadooka Zadas New -- 2.000 3.750 Complete 5 43.72 29.15 72.87 6.56 (0 , 0 , 1 , 0 , 1) hadmatiya Road to Kupadiya Block Garhi Total 27.200 71 714.62 476.42 1,191.04 107.23 (0 , 0 , 10 , 0 , 10) Block- Ghatol

48 L191 L191-Jhanjor Kanthav Road New -- 2.500 3.750 Complete 11 75.68 50.45 126.13 11.35 (0 , 0 , 1 , 0 , 1) km. 1.500 to Sakarapada 49 L194 L194-Khadiyo Ka Pada To New -- 1.200 3.750 Complete 8 32.42 21.61 54.03 4.87 (0 , 0 , 1 , 0 , 1) Padra 50 L250 L250-AR Jagpura Km. 4 to New -- 1.025 3.750 Complete 6 32.68 21.78 54.46 4.90 (0 , 0 , 1 , 0 , 1) Lamba Patiya 51 L179 L179-AR Sarodiy Km. 6.500 New -- 2.500 3.750 Complete 10 74.85 49.90 124.75 11.21 (0 , 0 , 1 , 0 , 1) To Sapariya Pada 52 L238 L238-AR Doodka Km. 6 To New -- 3.100 3.750 Complete 15 97.60 65.06 162.66 14.65 (0 , 0 , 1 , 0 , 1) Nichala Pada 53 L214 L214-Ghatol to jambui New -- 4.000 3.750 Complete 17 113.58 75.72 189.30 17.03 (0 , 0 , 1 , 0 , 1)

Block Ghatol Total 14.325 67 426.80 284.53 711.33 64.01 (0 , 0 , 6 , 0 , 6)

Block- Kushalgarh

54 L173 L173-AR Jamri Km. 1 to New -- 1.000 3.750 Complete 2 21.32 14.21 35.53 3.20 (0 , 0 , 1 , 0 , 1) Ragapada (VR983) 55 L175 L175-Kushalgarh Gamda New -- 1.000 3.750 Complete 1 16.38 10.92 27.30 2.46 (0 , 0 , 1 , 0 , 1) Road Km. 3 to Sodaliya (VR985) 56 L177 L177-AR Saran Km. 1 to New -- 2.250 3.750 Complete 4 38.85 25.90 64.75 5.83 (0 , 0 , 1 , 0 , 1) Pathla (VR987) 57 L178 L178-AR Dhol ka Nai Km. 2 New -- 1.750 3.750 Complete 1 34.60 23.07 57.67 5.19 (0 , 0 , 1 , 0 , 1) to Naka (VR988)

Page 5 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

58 L179 L179-AR Saran Km. 1.500 to New -- 1.000 3.750 Complete 1 27.19 18.12 45.31 4.08 (0 , 0 , 1 , 0 , 1) Kalan Fala (VR989) Block Kushalgarh Total 7.000 9 138.34 92.22 230.56 20.76 (0 , 0 , 5 , 0 , 5)

Block- Sajjangarh

59 L181 L181-AR Maska Khurd Km. 2 New -- 0.900 3.750 Complete 4 22.67 15.11 37.78 3.40 (0 , 0 , 1 , 0 , 1) to Charpota fala (VR2257) 60 L182 L182-Kasarwadi Chura Road New -- 2.600 3.750 Complete 10 54.54 36.36 90.90 8.18 (0 , 0 , 1 , 0 , 1) Km. 3.500 to Damor fala (VR2262) 61 L184 L184-AR Semal Kheda Km. New -- 1.300 3.750 Complete 7 31.51 21.01 52.52 4.73 (0 , 0 , 1 , 0 , 1) 1.300 to Holifala (VR2260) 62 L185 L185-Garhi Kalinjra New -- 1.100 3.750 Complete 3 22.82 15.22 38.04 3.42 (0 , 0 , 1 , 0 , 1) Kushalgarh road Km. 109.800 to Jhopada fala (VR2259) 63 L186 L186-AR Bhimkhora Km. New -- 1.500 3.750 Complete 6 32.23 21.49 53.72 4.84 (0 , 0 , 1 , 0 , 1) 2.200 to Mal fala (VR2261) 64 L187 L187-Kasarwadi Chura Road New -- 1.600 3.750 Complete 5 37.56 25.04 62.60 5.63 (0 , 0 , 1 , 0 , 1) Km. 3.500 to Damor fala (VR2262) 65 L188 L188-Nalpala Maska Road to New -- 3.750 3.750 Complete 9 79.94 53.30 133.24 11.99 (0 , 0 , 1 , 0 , 1) Katara fala (VR2264) 66 L189 L189-Ghatiya to Baria fala New -- 1.800 3.750 Complete 6 37.32 24.88 62.20 5.60 (0 , 0 , 1 , 0 , 1) (VR2265) 67 L190 L190-Bhikuwa Kushalgarh New -- 2.100 3.750 Complete 5 36.58 24.39 60.97 5.49 (0 , 0 , 1 , 0 , 1) Road KM. 6.250 to Rangi fala (VR2267) 68 L191 L191-Dungra Kasarwadi New -- 1.200 3.750 Complete 3 23.60 15.74 39.34 3.54 (0 , 0 , 1 , 0 , 1) satsera Km. 5.750 to panrda fala (VR2266)

Page 6 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

69 L192 L192-Garhi Kalinjara New -- 1.750 3.750 Complete 4 35.43 23.62 59.05 5.31 (0 , 0 , 1 , 0 , 1) Kushalgarh Road Km. 100.0 to Mavji fala (VR2268) 70 L193 L193-AR Kanchala Km. 1.150 New -- 2.650 3.750 Complete 6 53.02 35.34 88.36 7.95 (0 , 0 , 1 , 0 , 1) to Nichala fala (VR2269) 71 L194 L194-AR Bhimkhora Km. New -- 1.650 3.750 Complete 7 39.58 26.39 65.97 5.94 (0 , 0 , 1 , 1 , 2) 0.350 to Pipali fala (VR2270) 72 L195 L195-Garhi Kalinjara New -- 1.350 3.750 Complete 2 12.99 8.66 21.65 1.95 (0 , 0 , 1 , 0 , 1) Kushalgarh Road Km. 104.500 to Bhamari (VR2271) 73 L196 L196-AR Biyapada Km. 2.450 New -- 2.000 3.750 Complete 7 41.77 27.85 69.62 6.27 (0 , 0 , 1 , 0 , 1) to Bari Fala (VR2272) 74 L197 L197-AR Chor parnala Km. New -- 1.500 3.750 Complete 2 14.41 9.61 24.02 2.16 (0 , 0 , 1 , 0 , 1) 1.900 to Mal Fala (VR2273) 75 L198 L198-Bhoora pour to New -- 1.100 3.750 Complete 5 26.89 17.93 44.82 4.03 (0 , 0 , 1 , 0 , 1) Garasiya Fala (VR2274) 76 L199 L199-Pali Khurd to Nichala New -- 1.100 3.750 Complete 5 31.88 21.26 53.14 4.78 (0 , 0 , 1 , 0 , 1) fala (VR2275) 77 L201 L201-AR Patapor Km. 3.100 New -- 1.900 3.750 Complete 2 21.47 14.31 35.78 3.22 (0 , 0 , 1 , 0 , 1) to Mal fala (VR2277) 78 L202 L202-Sukheda to Nichala New -- 1.500 3.750 Complete 6 25.65 17.10 42.75 3.85 (0 , 0 , 1 , 0 , 1) fala (VR2278) 79 L203 L203-Village Harendra Garh New -- 1.150 3.750 Complete 4 23.81 15.88 39.69 3.57 (0 , 0 , 1 , 0 , 1) to AR Bariya fala (VR2279) 80 L204 L204-Garhi Kalinjara New -- 1.000 3.750 Complete 2 11.25 7.50 18.75 1.68 (0 , 0 , 1 , 0 , 1) Kushalgarh Road KM. 114.550 to Katara fala (VR2280) 81 L205 L205-AR Nalpada Km. 1.200 New -- 1.350 3.750 Complete 3 25.24 16.82 42.06 3.79 (0 , 0 , 1 , 0 , 1) to Garasiya fala (VR2281) Block Sajjangarh Total 37.850 113 742.18 494.79 1,236.97 111.32 (0 , 0 , 23 , 1 , 24)

Page 7 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

District Banswara Total 123.435 464 3,022.96 2,015.31 5,038.27 453.44 (0 , 0 , 64 , 1 , 65) District- Barmer

Block- Balotra (Pachpadra)

82 L213 L213-Bheelo Ki Dhani to New -- 2.400 3.750 Complete 2 44.63 29.76 74.39 6.70 (0 , 0 , 1 , 0 , 1) Jato Ki Dhani 83 L162 L162-Tirsingri - Newari road New -- 5.000 3.750 Complete 2 86.49 57.66 144.15 12.97 (0 , 0 , 1 , 0 , 1) to Jato Ki Dhani 84 L169 L169-Araba Unda to Rajputo New -- 1.500 3.750 Complete 0 29.88 19.92 49.80 4.48 (0 , 0 , 1 , 0 , 1) Ki Dhani 85 L215 L215-Umarlai Jageer to New -- 5.000 3.750 Complete 0 84.31 56.20 140.51 12.65 (0 , 0 , 1 , 0 , 1) Rathoro Ki Dhani 86 L202 L202-Than Malinath to New -- 3.000 3.750 Complete 6 77.25 51.50 128.75 11.59 (0 , 0 , 1 , 0 , 1) Bagundi 87 L189 L189-Jagsa to Boko Ki Dhani New -- 4.500 3.750 Complete 2 95.89 63.92 159.81 14.48 (0 , 0 , 1 , 0 , 1)

88 L203 L203-Gole Station to Janiyo New -- 5.300 3.750 Complete 0 126.59 84.39 210.98 18.99 (0 , 0 , 1 , 0 , 1) Ki Dhani 89 L170 L170-Varia Varecha to New CELL Filled 7.000 3.750 Complete 0 125.71 83.81 209.52 18.86 (0 , 0 , 1 , 0 , 1) Tilwara Concrete
Waste Plastics 90 L196 L196-NH-112 to Lolo Ki New -- 4.300 3.750 Complete 1 111.19 74.13 185.32 16.68 (0 , 0 , 1 , 0 , 1) Dhani 91 L192 L192-Kaluri to Karna New -- 3.000 3.750 Complete 0 63.40 42.27 105.67 9.51 (0 , 0 , 1 , 0 , 1)

92 L163 L163-Deria to Rajguro Ki New -- 3.700 3.750 Complete 3 75.40 50.27 125.67 11.31 (0 , 0 , 1 , 0 , 1) Dhani 93 L165 L165-Kuri Umarlai Road to New -- 2.750 3.750 Complete 0 51.12 34.08 85.20 7.67 (0 , 0 , 1 , 0 , 1) Siyato Ki Dhani 94 L208 L208-Patodi - Nawatalla New -- 3.000 3.750 Complete 0 59.59 39.72 99.31 8.94 (0 , 0 , 1 , 0 , 1) Road to Suraniyon Ki Dhani

Page 8 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

95 L210 L210-Patodi - Nawatalla New Waste Plastics 6.000 3.750 Complete 0 139.57 93.04 232.61 20.93 (0 , 0 , 1 , 0 , 1) Road to Musalmano Ki Dhani 96 L180 L180-Barnawa - Patodi Road New -- 5.100 3.750 Complete 0 137.88 91.92 229.80 20.69 (0 , 0 , 1 , 0 , 1) SH-65 to Phogliya 97 L175 L175-Barnawa - Madpura New -- 2.000 3.750 Complete 0 50.05 33.37 83.42 7.50 (0 , 0 , 1 , 0 , 1) Road to Khajuraniyo Ki Dhani 98 L209 L209-Patodi - Nawatalla New -- 1.500 3.750 Complete 0 34.12 22.74 56.86 5.12 (0 , 0 , 1 , 0 , 1) Road to Roopani Dugro Ki Dhani 99 L206 L206-Navatalla to Dulaniyon New -- 3.000 3.750 Complete 0 76.15 50.76 126.91 11.42 (0 , 0 , 1 , 0 , 1) Ki Dhani 100 L211 L211-Nawatall to Asaniyo Ki New -- 3.300 3.750 Complete 0 77.00 51.33 128.33 11.55 (0 , 0 , 1 , 0 , 1) Beri 101 L191 L191-Kaludi to Dakha New -- 3.000 3.750 Complete 0 65.18 43.46 108.64 9.78 (0 , 0 , 1 , 0 , 1)

102 L201 L201-Balotra Jerla Sambhra New -- 6.000 3.750 Complete 0 121.54 81.03 202.57 18.23 (0 , 0 , 1 , 0 , 1) Road 103 L062 L062-SH-28 to Ram Nagar New -- 3.800 3.750 Complete 3 80.54 53.70 134.24 12.06 (0 , 0 , 1 , 0 , 1)

104 L157 L157-Rodwa Khurd to New -- 3.150 3.750 Complete 0 69.07 46.05 115.12 10.36 (0 , 0 , 1 , 0 , 1) Pabupura Bheelo Ki Dhani 105 L158 L158-Thumbli to Rajputo Ki New -- 1.600 3.750 Complete 0 44.85 29.90 74.75 6.73 (0 , 0 , 1 , 0 , 1) Dhani 106 L214 L214-Moolji Ki Dhani to New -- 5.200 3.750 Complete 0 89.44 59.63 149.07 13.42 (0 , 0 , 1 , 0 , 1) Gharsi Ka Bara 107 L177 L177-Madpura to Navatalla New -- 2.000 3.750 Complete 0 43.98 29.32 73.30 6.60 (0 , 0 , 1 , 0 , 1) Pareu Road 108 L164 L164-Premgiri Ashram Ki New -- 3.500 3.750 Complete 0 64.57 43.05 107.62 9.69 (0 , 0 , 1 , 0 , 1) Dhaniyan to Chuna Bhata 109 L187 L187-Muthali to Buriwara New -- 5.000 3.750 Complete 4 122.56 81.71 204.27 18.38 (0 , 0 , 1 , 0 , 1)

Block Balotra (Pachpadra) Total 104.600 23 2,247.95 1,498.64 3,746.59 337.29 (0 , 0 , 28 , 0 , 28)

Page 9 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Barmer

110 L289 L289-Chadi to Bhilon Ki New -- 2.500 3.750 Complete 1 57.04 38.03 95.07 8.56 (0 , 0 , 1 , 0 , 1) Basti 111 L277 L277-Mahabar Hajaniyon Ki New -- 4.700 3.750 Complete 0 132.43 88.29 220.72 19.86 (0 , 0 , 1 , 0 , 1) Dhani Km. 13.050 to Bhorani Meghwalon Ki Dhani 112 L291 L291-Bhilon Ka Par to New -- 2.500 3.750 Complete 1 48.01 32.01 80.02 7.20 (0 , 0 , 1 , 0 , 1) Choudhariyon Ki Dhani 113 L290 L290-Pandhi Ka Par to Hasan New -- 2.000 3.750 Complete 0 40.45 26.97 67.42 6.07 (0 , 0 , 1 , 0 , 1) Musalmano Ki Dhani 114 L278 L278-Mahabar Pithal Road New -- 2.880 3.750 Complete 0 74.50 49.66 124.16 11.17 (0 , 0 , 1 , 0 , 1) Km. 1.600 to Inder Singh Ki Dhani 115 L286 L286-Pandhi Ka Par to Jalal New -- 2.000 3.750 Complete 1 50.47 33.64 84.11 7.57 (0 , 0 , 1 , 0 , 1) Bhilon Ki Dhani 116 L287 L287-Suwara Village to New -- 1.500 3.750 Complete 0 27.55 18.36 45.91 4.13 (0 , 0 , 1 , 0 , 1) Musalmano Ki Basti 117 L284 L284-Suara Ganv to New -- 1.500 3.750 Complete 1 32.88 21.92 54.80 4.93 (0 , 0 , 1 , 0 , 1) Meghwalon Ki Dhani 118 L279 L279-Danji Ki Hodi to New -- 2.700 3.750 Complete 0 53.06 35.38 88.44 7.96 (0 , 0 , 1 , 0 , 1) Bhatiyon Ki Dhani 119 L276 L276-Jasai Radwa Road Km. New -- 1.600 3.750 Complete 0 42.64 28.42 71.06 6.40 (0 , 0 , 1 , 0 , 1) 8 to Jalani Bheel 120 L282 L282-Ravli Dhani to New -- 3.700 3.750 Complete 3 75.34 50.23 125.57 11.30 (0 , 0 , 1 , 0 , 1) Kumbharon Ki Dhani 121 L281 L281-Sanau Ranisar Road New -- 2.000 3.750 Complete 0 56.21 37.47 93.68 8.43 (0 , 0 , 1 , 0 , 1) Km. 2 to Meghwalon Ki Dhani 122 L280 L280-Sanau to Purohiton Ki New -- 4.000 3.750 Complete 0 91.05 60.70 151.75 13.66 (0 , 0 , 1 , 0 , 1) Dhani

Page 10 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

123 L275 L275-Jasai Radwa Road Km. New -- 2.000 3.750 Complete 2 56.24 37.49 93.73 8.46 (0 , 0 , 1 , 0 , 1) 3 to Sidhani Bhil Block Barmer Total 35.580 9 837.87 558.57 1,396.44 125.70 (0 , 0 , 14 , 0 , 14) Block- Baytoo

124 L259 L259-Rohila to Jaton Ki New -- 2.000 3.750 Complete 0 41.26 27.50 68.76 6.19 (0 , 0 , 1 , 0 , 1) Dhani 125 L244 L244-NH-15 Km. 124 to New Waste Plastics 6.000 3.750 Complete 0 109.97 73.31 183.28 16.50 (0 , 0 , 1 , 0 , 1) Guneshano Kumbharon KD 126 L249 L249-Rohila to Seslaniyon Ki New CELL Filled 4.500 3.750 Complete 2 83.81 55.88 139.69 12.57 (0 , 0 , 1 , 0 , 1) Dhani Concrete 127 L254 L254-Deluo Ki Dhani to New -- 4.000 3.750 Complete 0 90.41 60.28 150.69 13.56 (0 , 0 , 1 , 0 , 1) Jaton Ki Dhani 128 L247 L247-Jhak Shahar Road Km. New Waste Plastics 5.750 3.750 Complete 0 102.16 68.10 170.26 15.32 (0 , 0 , 1 , 0 , 1) 14 to Karwasaron Ki Dhani 129 L255 L255-Meghwalon Ki Dhani to New -- 3.000 3.750 Complete 0 55.05 36.70 91.75 8.26 (0 , 0 , 1 , 0 , 1) Kumharon Ki Dhani 130 L250 L250-Gira to Mahendraniyon New -- 5.500 3.750 Complete 0 135.54 90.36 225.90 20.33 (0 , 0 , 1 , 0 , 1) Ki Dhani 131 L256 L256-Deluo Ki Dhani to New -- 4.000 3.750 Complete 0 86.12 57.41 143.53 12.92 (0 , 0 , 1 , 0 , 1) Rajputon Ki Dhani 132 L246 L246-Pareu Jasoro Ki Beri to New -- 4.000 3.750 Complete 0 93.16 62.10 155.26 13.97 (0 , 0 , 1 , 0 , 1) Sobhani Godaron Ki Dhani 133 L257 L257-Santra Chirya Road to New -- 2.000 3.750 Complete 0 43.66 29.11 72.77 6.55 (0 , 0 , 1 , 0 , 1) Beradiyon Ki Dhani 134 L251 L251-Jajwa to Bhatiyon Ka New -- 4.150 3.750 Complete 0 98.95 65.97 164.92 14.84 (0 , 0 , 1 , 0 , 1) Was 135 L252 L252-Bagundi - Santra Road New -- 3.500 3.750 Complete 0 72.56 48.37 120.93 10.88 (0 , 0 , 1 , 0 , 1) to Kamto Ka Khera

Page 11 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

136 L260 L260-Santra Chiriya Road New -- 3.000 3.750 Complete 0 84.46 56.31 140.77 12.67 (0 , 0 , 1 , 0 , 1) Km. 4 to Kumaharon Ki Dhani 137 L248 L248-NH-112 Km. 286 to New Waste Plastics 7.050 3.750 Complete 0 136.49 90.99 227.48 20.47 (0 , 0 , 1 , 0 , 1) Meghwalon Ki Dhani 138 L258 L258-Santra Ridiya Talar New -- 4.500 3.750 Complete 0 90.15 60.10 150.25 13.52 (0 , 0 , 1 , 0 , 1) road to Meghwalon Ki Dhaniya Block Baytoo Total 62.950 2 1,323.74 882.50 2,206.24 198.55 (0 , 0 , 15 , 0 , 15) Block- Chohtan

139 L215 L215-Chohtan Bakhsar Road New -- 3.100 3.750 Complete 0 86.23 57.48 143.71 12.93 (0 , 0 , 1 , 0 , 1) to Lalani Beharaniyo Ki Dhani 140 L220 L220-Talsar to Motiyani New -- 3.125 3.750 Complete 0 85.22 56.81 142.03 12.78 (0 , 0 , 1 , 0 , 1) Meghwalon Ka Pada 141 L221 L221-Talsar Kishane Ka Talla New -- 1.800 3.750 Complete 0 43.87 29.24 73.11 6.58 (0 , 0 , 1 , 0 , 1) to Uma Ram Bhadu Ki Dhani 142 L216 L216-Deengarh to Sutharon New -- 4.600 3.750 Complete 0 121.78 81.19 202.97 18.27 (0 , 0 , 1 , 0 , 1) Ka Talla 143 L214 L214-AR Gida to Godara Ki New -- 3.200 3.750 Complete 0 89.75 59.83 149.58 13.46 (0 , 0 , 1 , 0 , 1) Dhani 144 L211 L211-Ibre Ka Talla Sodho Ki New -- 2.950 3.750 Complete 0 74.87 49.92 124.79 11.23 (0 , 0 , 1 , 0 , 1) Dhani 145 L204 L204-Buran Ka Talla to New -- 3.900 3.750 Complete 0 101.53 67.68 169.21 15.23 (0 , 0 , 1 , 0 , 1) Vichiya Musalmano ki Basti 146 L207 L207-Chohatan Kelnore New -- 2.000 3.750 Complete 0 50.41 33.60 84.01 7.56 (0 , 0 , 1 , 0 , 1) Road to Viratara Phanta 147 L209 L209-Sarla to Pidelo Ki Basti New -- 2.600 3.750 Complete 0 72.38 48.25 120.63 10.86 (0 , 0 , 1 , 0 , 1)

148 L202 L202-Ageemshah Ki Dhani to New -- 3.875 3.750 Complete 0 101.75 67.84 169.59 15.26 (0 , 0 , 1 , 0 , 1) Samejo Ki Dhani 149 L201 L201-Sedwa to Lakhadheero New -- 2.100 3.750 Complete 0 58.30 38.86 97.16 8.74 (0 , 0 , 1 , 0 , 1) ki Dhani

Page 12 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

150 L021 L021-Buran Ka Talla New -- 3.200 3.750 Complete 0 87.40 58.26 145.66 13.11 (0 , 0 , 1 , 0 , 1) Punjasar to Ukte ka tala Block Chohtan Total 36.450 0 973.48 648.97 1,622.45 146.01 (0 , 0 , 12 , 0 , 12) Block- Dhorimanna (Gudha Malani)

151 L257 L257-Bhagbhare Ki Beri to New -- 2.000 3.750 Complete 0 66.01 44.00 110.01 9.96 (0 , 0 , 1 , 0 , 1) Aduwaniyon Ki Dhani 152 L227 L227-Ogala Village to Asani New -- 2.900 3.750 Complete 0 67.27 44.84 112.11 10.23 (0 , 0 , 1 , 0 , 1) Kumharon Ki Dhani 153 L237 L237-Gangasara to Bheel New -- 4.500 3.750 Complete 0 105.23 70.15 175.38 16.01 (0 , 0 , 1 , 0 , 1) Basti 154 L241 L241-Kartiya Phanta to New -- 4.000 3.750 Complete 0 103.43 68.95 172.38 15.77 (0 , 0 , 1 , 0 , 1) Bhilon Ki Dhani 155 L253 L253-Kekar Village to Dobki New Waste Plastics 5.900 3.750 Complete 0 154.94 103.30 258.24 23.63 (0 , 0 , 1 , 0 , 1) Beri 156 L198 L198-Koushle Ki Dhani to New -- 5.000 3.750 Complete 0 116.64 77.76 194.40 17.85 (0 , 0 , 1 , 0 , 1) Jeewani Godaron Ki Dhani 157 L230 L230-Akal Goda Road Km. 2 New -- 4.500 3.750 Complete 0 110.73 73.82 184.55 16.83 (0 , 0 , 1 , 0 , 1) to Khimaniyon Ki Dhani 158 L238 L238-Kartiya to Meghwalon New -- 5.500 3.750 Complete 0 126.02 84.02 210.04 19.18 (0 , 0 , 1 , 0 , 1) Ki Dhani 159 L254 L254-Bhaghbhare Ki Beri to New -- 5.400 3.750 Complete 0 116.17 77.44 193.61 17.65 (0 , 0 , 1 , 0 , 1) Moti Ki Beri 160 L259 L259-Koja Village to New -- 5.300 3.750 Complete 0 147.77 98.52 246.29 22.55 (0 , 0 , 1 , 0 , 1) Tetarwalon Ki Dhani 161 L214 L214-Ratanpura Hemaguda New -- 4.000 3.750 Complete 0 109.93 73.29 183.22 16.82 (0 , 0 , 1 , 0 , 1) Km. 1 to Bhilo Ki Dhani 162 L212 L212-Guda Jalore Road Km. New -- 3.000 3.750 Complete 0 68.56 45.70 114.26 10.42 (0 , 0 , 1 , 0 , 1) 12 to Faka Kalbiyo Ki Dhani 163 L223 L223-AR Gandhav Khurd KM. New -- 2.200 3.750 Complete 0 48.49 32.33 80.82 7.34 (0 , 0 , 1 , 0 , 1) 2 to Kalbiyo Ki Dhani

Page 13 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

164 L209 L209-Guda Jalore Road Km. New -- 3.000 3.750 Complete 0 74.77 49.84 124.61 11.43 (0 , 0 , 1 , 0 , 1) 16 to Silona Kalbiyo Ki Dhani 165 L222 L222-Gandhav Khurd Km. 2 New CELL Filled 3.000 3.750 Complete 0 78.56 52.38 130.94 12.00 (0 , 0 , 1 , 0 , 1) to Sutharo Ki Dhani Concrete 166 L200 L200-Dhorimana Guda Road New -- 4.000 3.750 Complete 0 85.61 57.08 142.69 12.84 (0 , 0 , 1 , 0 , 1) Km. 12 to Bhebufa Meghwal Ki Dhani 167 L206 L206-Mega Highway Km. New -- 3.500 3.750 Complete 0 79.80 53.20 133.00 11.97 (0 , 0 , 1 , 0 , 1) 260.400 to Heerji Solanki Dhani 168 L228 L228-Dhorimanna Sata Km. New -- 3.700 3.750 Complete 0 90.83 60.56 151.39 13.63 (0 , 0 , 1 , 0 , 1) 29 to Karwasaron Ki Dhani 169 L226 L226-Borla Jatan to Lakhana New -- 3.000 3.750 Complete 0 79.24 52.83 132.07 11.89 (0 , 0 , 1 , 0 , 1) Ki Nadi 170 L205 L205-AR to Rawali Nadi to New -- 4.500 3.750 Complete 0 91.12 60.74 151.86 13.66 (0 , 0 , 1 , 0 , 1) Nehron Ki Dhani 171 L231 L231-Boli Village to Pahad New Waste Plastics 8.000 3.750 Complete 2 196.97 131.31 328.28 29.54 (0 , 0 , 1 , 0 , 1) Singh Ki Dhani 172 L258 L258-AR Meghwalon Ki New -- 3.800 3.750 Complete 0 76.52 51.01 127.53 11.47 (0 , 0 , 1 , 0 , 1) Dhani Km. 3 to Raiko Ki Dhani 173 L233 L233-Gangasara to Siyag New -- 6.300 3.750 Complete 0 171.58 114.39 285.97 25.74 (0 , 0 , 1 , 0 , 1) Vishnoiyon Ki Dhani 174 L261 L261-Bhalisar Talab to New Waste Plastics 8.800 3.750 Complete 0 190.91 127.27 318.18 28.61 (0 , 0 , 1 , 0 , 1) Alawariya Ka Tala 175 L243 L243-A/R Jangu Bhartaniyon New -- 3.200 3.750 Complete 0 91.28 60.85 152.13 13.69 (0 , 0 , 1 , 0 , 1) Ki Dhani Km.1 to Alazar Ka Kua 176 L264 L264-Chachi Beri to New -- 4.550 3.750 Complete 0 103.97 69.31 173.28 15.60 (0 , 0 , 1 , 0 , 1) Kudanpura Via Goole Ki Beri 177 L244 L244-A/R Sobhala Darshan New -- 3.500 3.750 Complete 0 86.62 57.75 144.37 12.99 (0 , 0 , 1 , 0 , 1) to Jangu Bhartaniyon Ki Dhani

Page 14 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

178 L247 L247-Sobhala Darsan to New -- 1.050 3.750 Complete 0 29.15 19.44 48.59 4.37 (0 , 0 , 1 , 0 , 1) Mobtani Dakhon Ki Dhani 179 L242 L242-Sobhala Rohila Road to New Waste Plastics 5.600 3.750 Complete 0 130.41 86.94 217.35 19.56 (0 , 0 , 1 , 0 , 1) Peera Bhil Ki Basti 180 L245 L245-A/R Israniyon Ka Tala New -- 1.225 3.750 Complete 0 28.93 19.28 48.21 4.34 (0 , 0 , 1 , 0 , 1) to Siddikaniyon Ki Dhani 181 L251 L251-Sonari to Sonaram New -- 4.100 3.750 Complete 0 107.09 71.39 178.48 16.06 (0 , 0 , 1 , 0 , 1) Sarpanch Ki Dhani Block Dhorimanna (Gudha Malani) Total 129.025 2 3,134.54 2,089.70 5,224.24 473.63 (0 , 0 , 31 , 0 , 31) Block- Sheo

182 L216 L216-Bhiyad Mokhab Road New -- 5.000 3.750 Complete 0 98.26 65.51 163.77 14.74 (0 , 0 , 1 , 0 , 1) km 9 to Jaton Ki Dhani 183 L217 L217-Kareem Ka Par New -- 2.000 3.750 Complete 3 41.57 27.71 69.28 6.24 (0 , 0 , 1 , 0 , 1) Khaniyani Rawtsar Khadeen Road km 14 to Nohariyli ki dhani 184 L218 L218-Kareem Ka Par New Waste Plastics 6.000 3.750 Complete 4 121.91 81.27 203.18 18.29 (0 , 0 , 1 , 0 , 1) Khaniyani Rawtsar Khadeen Road km 16 to Dokar Dhani 185 L219 L219-Sheo-Phalsoond Road New -- 2.000 3.750 Complete 2 43.30 28.87 72.17 6.50 (0 , 0 , 1 , 0 , 1) km 26 to Lalani Sarno ki Dhani 186 L220 L220-Sheo-Phalsoond oad New -- 3.000 3.750 Complete 3 61.07 40.71 101.78 9.16 (0 , 0 , 1 , 0 , 1) km 3 to Lalcho ki Dhani 187 L224 L224-Manihari to Junejon ki New -- 4.000 3.750 Complete 7 85.65 57.10 142.75 12.85 (0 , 0 , 1 , 0 , 1) Dhani 188 L226 L226-AR Jaisindhar Village New -- 5.000 3.750 Complete 4 105.73 70.48 176.21 15.86 (0 , 0 , 1 , 0 , 1) km 2 to Bhure ki Basti 189 L227 L227-NH-15Km 96 to New -- 3.800 3.750 Complete 5 109.53 73.02 182.55 16.43 (0 , 0 , 1 , 0 , 1) kananiyon ki Dhani

Page 15 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

190 L228 L228-Bhiyad Chochra road New -- 2.000 3.750 Complete 3 45.14 30.10 75.24 6.78 (0 , 0 , 1 , 0 , 1) km3 to Sado Ki Dhani Block Sheo Total 32.800 31 712.16 474.77 1,186.93 106.85 (0 , 0 , 9 , 0 , 9)

Block- Sindhari

191 L219 L219-Amarpura to New RBI 81 3.900 3.750 Complete 0 67.93 45.29 113.22 10.19 (0 , 0 , 1 , 0 , 1) Rugnathoni Prajato Ki Dhani 192 L236 L236-Nokhra Chotu Road to New -- 4.000 3.750 Complete 0 115.19 76.80 191.99 17.28 (0 , 0 , 1 , 0 , 1) Meghwalo Ki Dhani 193 L241 L241-Chawa Sindhari Road New -- 4.000 3.750 Complete 0 85.77 57.18 142.95 12.87 (0 , 0 , 1 , 0 , 1) to Beniwalo Ki Dhani 194 L214 L214-Joona Mitha Kheda to New -- 1.000 3.750 Complete 0 22.12 14.74 36.86 3.32 (0 , 0 , 1 , 0 , 1) Chando ki Dhani 195 L196 L196-Balotra Sindhari Road New -- 4.000 3.750 Complete 0 71.48 47.66 119.14 10.72 (0 , 0 , 1 , 0 , 1) to Khata Nada Macharo ki Dhani 196 L227 L227-Sada Jhund to Neeriya New -- 2.100 3.750 Complete 0 59.54 39.69 99.23 8.93 (0 , 0 , 1 , 0 , 1) Nada 197 L210 L210-Juna Meetha Khera to New -- 5.000 3.750 Complete 0 109.27 72.84 182.11 16.39 (0 , 0 , 1 , 0 , 1) Jhhinjhhani Nadi 198 L203 L203-Goliya Mahecha to New -- 4.650 3.750 Complete 0 84.67 56.45 141.12 12.70 (0 , 0 , 1 , 0 , 1) Dakha 199 L096 L096-Baitu Sindhari Road to New -- 5.000 3.750 Complete 0 102.70 68.47 171.17 15.41 (0 , 0 , 1 , 0 , 1) Dandali Phanta 200 L229 L229-Jali Khera to Sindhiyo New -- 5.500 3.750 Complete 0 112.00 74.66 186.66 16.80 (0 , 0 , 1 , 0 , 1) Ki Dhani 201 L212 L212-Chado Ki Dhani to New -- 3.130 3.750 Complete 0 61.70 41.13 102.83 9.25 (0 , 0 , 1 , 0 , 1) Khubaniyo Ki Dhani 202 L245 L245-Nosar to Saiyon Ki New -- 1.500 3.750 Complete 0 42.27 28.18 70.45 6.65 (0 , 0 , 1 , 0 , 1) Dhani 203 L234 L234-Goliya Jetmal to New -- 1.500 3.750 Complete 0 30.20 20.13 50.33 4.53 (0 , 0 , 1 , 0 , 1) Meghwalo Ki Dhani

Page 16 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

204 L193 L193-Lohida to Ghanchida New -- 2.800 3.750 Complete 0 48.38 32.25 80.63 7.26 (0 , 0 , 1 , 0 , 1)

205 L232 L232-Adel Meethi Beri Road New -- 3.000 3.750 Complete 0 63.88 42.58 106.46 9.58 (0 , 0 , 1 , 0 , 1) to Galali Dhani 206 L221 L221-Gadesara Loonwa Road New -- 2.000 3.750 Complete 0 46.13 30.76 76.89 6.92 (0 , 0 , 1 , 0 , 1) to Meghwalo Ki Dhani 207 L233 L233-Goliya Jetmal to New -- 3.500 3.750 Complete 0 75.52 50.34 125.86 11.33 (0 , 0 , 1 , 0 , 1) Mudho Ki Dhani 208 L244 L244-Chawa Dablisara Road New -- 3.100 3.750 Complete 0 86.10 57.40 143.50 12.92 (0 , 0 , 1 , 0 , 1) to Naiyon Ki Dhani 209 L228 L228-Nehron Ki Dhani to New -- 3.800 3.750 Complete 0 78.05 52.03 130.08 11.71 (0 , 0 , 1 , 0 , 1) Harkhani Sarno Ki Dhani 210 L223 L223-Motisara to New -- 1.100 3.750 Complete 0 31.04 20.70 51.74 4.64 (0 , 0 , 1 , 0 , 1) Dhatarwalon Ki Dhani 211 L202 L202-Tapra Padru Road to New -- 5.150 3.750 Complete 0 98.75 65.84 164.59 14.81 (0 , 0 , 1 , 0 , 1) Dhandhalo Ki Dhani 212 L211 L211-Khara Mahecha to New -- 5.250 3.750 Complete 0 96.92 64.61 161.53 14.54 (0 , 0 , 1 , 0 , 1) Bhambhuo Ki Dhani 213 L222 L222-Payla Kalan to Darguda New -- 3.700 3.750 Complete 0 70.10 46.74 116.84 10.52 (0 , 0 , 1 , 0 , 1)

214 L231 L231-Koshloo Wananiyon Ki New Waste Plastics 6.000 3.750 Complete 0 178.95 119.30 298.25 26.84 (0 , 0 , 2 , 0 , 2) Beri Road to Dola Saran Ki Dhani 215 L240 L240-Sanjata to Kumbharo New -- 4.000 3.750 Complete 0 90.17 60.12 150.29 13.53 (0 , 0 , 1 , 0 , 1) Ki Dhani 216 L215 L215-Arniyali Mahecha to New -- 2.000 3.750 Complete 0 41.03 27.36 68.39 6.16 (0 , 0 , 1 , 0 , 1) Kohlaniyo Ki Dhani 217 L029 L029-Joona Meetha Kheda New -- 5.850 3.750 Complete 0 121.45 80.96 202.41 18.22 (0 , 0 , 1 , 0 , 1) to Bhata 218 L199 L199-Sindhari Mithura Road New -- 3.800 3.750 Complete 0 64.67 43.11 107.78 9.70 (0 , 0 , 1 , 0 , 1) to Googarwalon Ki Dhani Block Sindhari Total 100.330 0 2,155.98 1,437.32 3,593.30 323.72 (0 , 0 , 29 , 0 , 29)

Page 17 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Siwana

219 L117 L117-Dheera Village To New CELL Filled 7.000 3.750 Complete 2 188.58 125.72 314.30 28.28 (0 , 0 , 1 , 0 , 1) Dhadhaniyo Ki Dhani Concrete 220 L109 L109-Maylawas To Bus Stand New CELL Filled 1.000 3.750 Complete 0 26.65 17.76 44.41 4.00 (0 , 0 , 1 , 0 , 1) Phanta Concrete 221 L098 L098-Kotari Kharantiya Road New -- 2.100 3.750 Complete 2 42.18 28.12 70.30 6.33 (0 , 0 , 1 , 0 , 1) To Hanumanji Ka Mandir 222 L147 L147-Hinglaz Road To Bheelo New CELL Filled 2.500 3.750 Complete 1 64.69 43.13 107.82 9.70 (0 , 0 , 1 , 0 , 1) Ki Dhani Concrete 223 L134 L134-Padru To Juharwa New Waste Plastics 7.000 3.750 Complete 0 194.17 129.45 323.62 29.12 (0 , 0 , 1 , 0 , 1) Saray 224 L132 L132-Itwaya To Khindnadi New -- 4.000 3.750 Complete 0 112.05 74.70 186.75 16.81 (0 , 0 , 1 , 0 , 1) Bheel Basti 225 L122 L122-Guda To Koteshwar New -- 4.000 3.750 Complete 3 99.94 66.63 166.57 15.04 (0 , 0 , 1 , 0 , 1) Mahadev 226 L158 L158-Moothali to Kitnod New -- 2.000 3.750 Complete 0 35.15 23.43 58.58 5.27 (0 , 0 , 1 , 0 , 1)

227 L130 L130-Pau Bawatra Road To New -- 4.500 3.750 Complete 0 122.29 81.53 203.82 18.33 (0 , 0 , 1 , 0 , 1) Bheelo Ki Dhani 228 L126 L126-Kundal Padru Road To New -- 4.000 3.750 Complete 0 92.60 61.73 154.33 13.89 (0 , 0 , 1 , 0 , 1) Purohito Ki Dhani 229 L137 L137-Dharana to Padaru New -- 5.000 3.750 Complete 0 126.02 84.01 210.03 18.90 (0 , 0 , 1 , 0 , 1)

230 L107 L107-Bijaliya To Rabariyon New -- 2.200 3.750 Complete 0 54.17 36.12 90.29 8.13 (0 , 0 , 1 , 0 , 1) Ki Dhani 231 L102 L102-Sarwari To Meghwal New -- 3.000 3.750 Complete 0 62.48 41.65 104.13 9.37 (0 , 0 , 1 , 0 , 1) Basti 232 L111 L111-Siwana to Sukleshwar New CELL Filled 7.400 3.750 Complete 1 205.39 136.93 342.32 30.80 (0 , 0 , 1 , 0 , 1) Mahadev Concrete
Waste Plastics 233 L159 L159-Thapan To Rabariyo Ka New -- 1.000 3.750 Complete 0 19.65 13.10 32.75 2.95 (0 , 0 , 1 , 0 , 1) Bas

Page 18 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

234 L149 L149-Gudanal to Indrana New -- 4.500 3.750 Complete 1 119.05 79.36 198.41 17.86 (0 , 0 , 1 , 0 , 1)

Block Siwana Total 61.200 10 1,565.06 1,043.37 2,608.43 234.78 (0 , 0 , 16 , 0 , 16) District Barmer Total 562.935 77 12,950.77 8,633.85 21,584.62 1,946.54 (0 , 0 , 154 , 0 , 154) District- Bikaner

Block- Dungargarh

235 L060 L060-Indpalsar Sankhlan to New Waste Plastics 3.500 3.750 Complete 0 75.31 50.21 125.52 11.30 (0 , 0 , 1 , 0 , 1) Dhani Kesrasar (TRACK1151) 236 L064 L064-Momasar to Dhani New -- 8.500 3.750 Complete 0 149.54 99.69 249.23 22.43 (0 , 0 , 1 , 0 , 1) Baniya Jhora (TRACK1155) 237 L065 L065-Momasar to Dhani New -- 6.000 3.750 Complete 0 123.26 82.17 205.43 18.49 (0 , 0 , 1 , 0 , 1) Sankhai (TRACK1156) Block Dungargarh Total 18.000 0 348.11 232.07 580.18 52.22 (0 , 0 , 3 , 0 , 3)

Block- Khajuwala

238 L222 L222-C HHATARGARH TO New -- 6.000 3.750 Complete 8 123.34 82.22 205.56 18.50 (0 , 0 , 1 , 0 , 1) GULAMWALA NADIA (TRACK300) 239 L221 L221-AWA ROAD TO 2 AWM New Waste Plastics 2.500 3.750 Complete 4 63.72 42.48 106.20 9.56 (0 , 0 , 1 , 0 , 1) A&B (TRACK299) 240 L234 L234-14 BD SHIV TEMPLE TO New Waste Plastics 4.500 3.750 Complete 14 104.70 69.80 174.50 15.65 (0 , 0 , 1 , 0 , 1) 17 BD (TRACK312) 241 L224 L224-AWA RAWALA ROAD TO New -- 3.500 3.750 Complete 7 76.58 51.06 127.64 11.49 (0 , 0 , 1 , 0 , 1) 9 AWM-B (TRACK302) 242 L225 L225-AWA ROAD TO 9 AWM-A New -- 8.500 3.750 Complete 11 173.10 115.40 288.50 25.96 (0 , 0 , 1 , 0 , 1) (TRACK303)

Page 19 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

243 L232 L232-KHAJUWALA-BALLAR New -- 2.000 3.750 Complete 6 52.73 35.16 87.89 7.91 (0 , 0 , 0 , 2 , 2) ROAD KM 13 TO 1HWM&2HWM SHIVNAGAR (TRACK310) 244 L239 L239-Pawli Road To 30 33 New -- 3.000 3.750 Complete 6 75.87 50.58 126.45 11.38 (0 , 0 , 1 , 0 , 1) KYD (VR0119) Block Khajuwala Total 30.000 56 670.04 446.70 1,116.74 100.45 (0 , 0 , 6 , 2 , 8)

Block- Kolayat

245 L133 L133-Ranjeetpura Osiyan New -- 4.300 3.750 Complete 6 84.76 56.50 141.26 12.71 (0 , 0 , 1 , 0 , 1) Road To Tanwarbhan Ki Dhani (TRACK1192) 246 L143 L143-Haddan Khariya New -- 6.500 3.750 Complete 6 106.97 71.31 178.28 16.05 (0 , 0 , 1 , 0 , 1) Malinath Road Km 0.0 - 1.0 to Meghwalon Rajputon Ki Dhani (TRACK1182) 247 L144 L144-Haddan to Idan Ki New -- 7.000 3.750 Complete 7 120.20 80.14 200.34 18.03 (0 , 0 , 1 , 0 , 1) Dhani (TRACK1176) 248 L147 L147-Bhatiyon Ki Dhani to New -- 2.500 3.750 Complete 3 50.56 33.71 84.27 7.58 (0 , 0 , 1 , 0 , 1) Khileriyon Ki Dhani (TRACK1173) 249 L148 L148-Khinkhiniyan New -- 3.000 3.750 Complete 3 60.32 40.21 100.53 9.05 (0 , 0 , 1 , 0 , 1) Kundaliyan to megwalaon Ki Dhani (TRACK1171) 250 L153 L153-Bap Bikampur GREF New -- 2.000 3.750 Complete 3 36.88 24.58 61.46 5.53 (0 , 0 , 1 , 0 , 1) Road To Netawaton Ki Dhani (TRACK1200) 251 L152 L152-Nagrasar To Purohiton New -- 3.000 3.750 Complete 3 53.33 35.56 88.89 8.00 (0 , 0 , 1 , 0 , 1) Ki Dhani (TRACK1201) Block Kolayat Total 28.300 31 513.02 342.01 855.03 76.95 (0 , 0 , 7 , 0 , 7)

Page 20 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Nokha

252 L208 L208-Jaisingdesar Magra to New -- 3.000 3.750 Complete 4 62.26 41.51 103.77 9.34 (0 , 0 , 1 , 0 , 1) Ruparam Bhagaram Ki Dhani (TRACK1359) 253 L190 L190-Dharnoke to Jangawo New -- 3.000 3.750 Complete 2 64.83 43.22 108.05 9.72 (0 , 0 , 1 , 0 , 1) Ki Dhani (TRACK1374) 254 L106 L106-Thawaria to New -- 4.000 3.750 Complete 4 103.43 68.96 172.39 15.50 (0 , 0 , 1 , 0 , 1) Meghwalon Ki Dhaniya (TRACK1391) 255 L191 L191-Kumbhsar to Baba New -- 2.000 3.750 Complete 3 43.11 28.74 71.85 6.47 (0 , 0 , 1 , 0 , 1) Ramdev Mandir Ki Dhani (TRACK1370) 256 L202 L202-Udasar to Meghwalo Ki New -- 6.000 3.750 Complete 4 103.39 68.93 172.32 15.51 (0 , 0 , 1 , 0 , 1) Dhaniya (TRACK1389) 257 L183 L183-Panchoo to Dulia New -- 5.000 3.750 Complete 4 97.70 65.13 162.83 14.65 (0 , 0 , 1 , 0 , 1) Dhora Dhaniya (TRACK1372) 258 L189 L189-Dharnoke to Sulai Nadi New -- 6.500 3.750 Complete 3 118.34 78.90 197.24 17.75 (0 , 0 , 1 , 0 , 1) Ki Dhani (TRACK1375) 259 L149 L149-Swaroopsar to New -- 3.000 3.750 Complete 3 53.87 35.92 89.79 8.08 (0 , 0 , 1 , 0 , 1) Gahlotan Ki Dhani (TRACK1387) 260 L220 L220-Bikasar to Nayako Ki New -- 3.000 3.750 Complete 5 74.92 49.94 124.86 11.25 (0 , 0 , 1 , 0 , 1) Dhaniya (TRACK1366) 261 L184 L184-Panchoo to New -- 5.000 3.750 Complete 4 97.94 65.30 163.24 14.69 (0 , 0 , 1 , 0 , 1) Chechaniyon Ki Dhani (TRACK1358) 262 L181 L181-Panchoo to Bhutia New -- 8.000 3.750 Complete 6 146.63 97.76 244.39 22.00 (0 , 0 , 1 , 0 , 1) Dhora Ki Dhaniya (TRACK1394) 263 L163 L163-Sarunda to Dhorabas New -- 2.000 3.750 Complete 3 39.08 26.05 65.13 5.86 (0 , 0 , 1 , 0 , 1) (TRACK1381) 264 L180 L180-Panchoo to Garudon Ki New -- 6.000 3.750 Complete 4 115.43 76.95 192.38 17.31 (0 , 0 , 1 , 0 , 1) Dhani (TRACK1357)

Page 21 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

265 L167 L167-Sadhuna to Meghwalon New -- 5.000 3.750 Complete 3 95.90 63.94 159.84 14.39 (0 , 0 , 1 , 0 , 1) ki Dhani West (TRACK1377) 266 L147 L147-Sadhuna to New -- 5.000 3.750 Complete 3 88.49 58.99 147.48 13.27 (0 , 0 , 1 , 0 , 1) Dhundwalon Ki Dhaniya (TRACK1378) 267 L179 L179-Bhadla-Bhewali Nadi New Waste Plastics 8.500 3.750 Complete 4 148.07 98.72 246.79 22.21 (0 , 0 , 1 , 0 , 1) Road to Jaipala Ki Dhani (TRACK1369) 268 L125 L125-Maiyasar to Dham New -- 5.000 3.750 Complete 3 97.04 64.69 161.73 14.56 (0 , 0 , 1 , 0 , 1) Dhaniya (TRACK1367) 269 L157 L157-Kahira to Girdharipura New -- 3.000 3.750 Complete 3 64.94 43.30 108.24 9.74 (0 , 0 , 1 , 0 , 1) Kudano Ki Dhani (TRACK1376) 270 L146 L146-Kakkoo-Sadhuna Road New Waste Plastics 7.000 3.750 Complete 5 121.21 80.81 202.02 18.18 (0 , 0 , 1 , 0 , 1) to Sidh & Khileria Ki Dhani (TRACK1395) 271 L231 L231-Mukam Bus Stand to New -- 3.000 3.750 Complete 2 64.82 43.21 108.03 9.72 (0 , 0 , 1 , 0 , 1) Joon Ki Dhaniya (TRACK1368) 272 L097 L097-Jasrasar Khiyadi New -- 4.500 3.750 Complete 3 84.25 56.17 140.42 12.64 (0 , 0 , 1 , 0 , 1) Meghwalo Ki Dhani Road to Dhora Kankad Ki Dhani (TRACK1354) 273 L216 L216-Bhamatsar to Modilal New -- 1.500 3.750 Complete 1 34.92 23.28 58.20 5.24 (0 , 0 , 1 , 0 , 1) Ki Dhani (TRACK1379) 274 L159 L159-Chitana to Gobindiya New -- 5.000 3.750 Complete 5 93.70 62.46 156.16 14.05 (0 , 0 , 1 , 0 , 1) Nadi (TRACK1396) 275 L151 L151-Swaroopsar to Siyago New -- 5.000 3.750 Complete 3 84.61 56.41 141.02 12.69 (0 , 0 , 1 , 0 , 1) Ki Dhani upto Gogamedi (TRACK1360) 276 L156 L156-Kahira to Sidh Ashiya New -- 4.000 3.750 Complete 3 82.42 54.95 137.37 12.36 (0 , 0 , 1 , 0 , 1) Nadi (TRACK1380) 277 L150 L150-Swaroopsar to Siyago New -- 3.000 3.750 Complete 3 54.46 36.30 90.76 8.17 (0 , 0 , 1 , 0 , 1) Ki Dhani (TRACK1324)

Page 22 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

278 L135 L135-Charakada to New -- 4.000 3.750 Complete 3 67.63 45.09 112.72 10.14 (0 , 0 , 1 , 0 , 1) Meghwalon Ki Dhani (TRACK1325) 279 L126 L126-Bhom Maiyasar to New -- 6.000 3.750 Complete 5 112.71 75.14 187.85 16.91 (0 , 0 , 1 , 0 , 1) Nahar Nadi (TRACK1383) 280 L152 L152-Swroopsar to Acharyo- New -- 4.000 3.750 Complete 4 79.21 52.80 132.01 11.88 (0 , 0 , 1 , 0 , 1) Meghwalon Ki Dhani (TRACK1355) 281 L185 L185-Sarah Pahchoo Road to New -- 4.000 3.750 Complete 3 73.74 49.16 122.90 11.06 (0 , 0 , 1 , 0 , 1) Kanagala Paiu Ki Dhaniya (TRACK1390) 282 L110 L110-Bhagwanpura to South New Waste Plastics 2.500 3.750 Complete 3 54.70 36.47 91.17 8.21 (0 , 0 , 1 , 0 , 1) Meghwalon Ki Dhaniya (TRACK1393) 283 L199 L199-Roda Panchoo Road to New Waste Plastics 9.000 3.750 Complete 5 148.36 98.91 247.27 22.25 (0 , 0 , 1 , 0 , 1) Jagramroh Ki Dhaniya (TRACK1362) 284 L230 L230-Ankisar to Nibolai Nadi New -- 6.500 3.750 Complete 5 134.23 89.48 223.71 20.13 (0 , 0 , 1 , 0 , 1) (TRACK1384) 285 L215 L215-Bhamatsar to Jogia New -- 5.000 3.750 Complete 6 102.53 68.36 170.89 15.38 (0 , 0 , 1 , 0 , 1) Nadi (TRACK1388) 286 L095 L095-Jasrasar to Poleri New -- 6.000 3.750 Complete 3 115.63 77.09 192.72 17.35 (0 , 0 , 1 , 0 , 1) Kakad Ki Dhani (TRACK1361) 287 L158 L158-Kahira to Jagalion Ki New -- 6.000 3.750 Complete 4 102.15 68.10 170.25 15.32 (0 , 0 , 1 , 0 , 1) Dhani (TRACK1382) 288 L195 L195-Kudsoo to Bhadwaon Ki New -- 4.500 3.750 Complete 3 76.13 50.76 126.89 11.42 (0 , 0 , 1 , 0 , 1) Dhaniya (TRACK1363) Block Nokha Total 173.500 134 3,302.81 2,201.87 5,504.68 495.40 (0 , 0 , 37 , 0 , 37) District Bikaner Total 249.800 221 4,833.98 3,222.65 8,056.63 725.02 (0 , 0 , 53 , 2 , 55) District- Churu

Page 23 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Rajgarh

289 L036 L036-Hameerwas Chotta to New Waste Plastics 2.000 3.750 Complete 0 35.24 23.50 58.74 5.29 (0 , 0 , 1 , 0 , 1) ki Dhani 290 L140 L140-Bairasar Mandrella New -- 3.000 3.750 Complete 0 52.42 34.94 87.36 7.86 (0 , 0 , 1 , 0 , 1) Road to Samarpura Bas 291 L141 L141-Rawatsar Koonjla to New -- 2.000 3.750 Complete 0 37.13 24.76 61.89 5.58 (0 , 0 , 1 , 0 , 1) Indra Colony 292 L142 L142-Mahlana Utrada to Bas New Waste Plastics 4.000 3.750 Complete 0 72.47 48.32 120.79 10.87 (0 , 0 , 1 , 0 , 1) Dhetrwal Block Rajgarh Total 11.000 0 197.27 131.51 328.78 29.60 (0 , 0 , 4 , 0 , 4)

Block- Ratangarh

293 L071 L071-Deepsar to Kurda Ram New -- 3.000 3.750 Complete 0 64.62 43.08 107.70 9.70 (0 , 0 , 1 , 0 , 1)

294 L069 L069-Bhojasar to Chatar New -- 2.500 3.750 Complete 0 54.43 36.29 90.72 8.17 (0 , 0 , 1 , 0 , 1) Singh Ki DHani Block Ratangarh Total 5.500 0 119.05 79.37 198.42 17.87 (0 , 0 , 2 , 0 , 2)

Block- Sardarshahar

295 L121 L121-Sonpalsar to Dhani New RBI 81 9.000 3.750 Complete 0 154.94 103.30 258.24 23.24 (0 , 0 , 1 , 0 , 1) Ishardas Block Sardarshahar Total 9.000 0 154.94 103.30 258.24 23.24 (0 , 0 , 1 , 0 , 1)

Block- Sujangarh

296 L093 L093-Dhigariya Camp to New -- 4.500 3.750 Complete 0 74.80 49.86 124.66 11.22 (0 , 0 , 1 , 0 , 1) Besleu 297 L099 L099-Asarsar to Narakhan New -- 3.300 3.750 Complete 0 65.56 43.71 109.27 9.83 (0 , 0 , 1 , 0 , 1) Dhani 298 L096 L096-Lalgarh to Dhani New -- 3.500 3.750 Complete 0 72.60 48.40 121.00 10.89 (0 , 0 , 1 , 0 , 1) Karnadi 299 L088 L088-Kandhalsar to Chhilani New -- 1.500 3.750 Complete 0 34.04 22.70 56.74 5.11 (0 , 0 , 1 , 0 , 1) Talai

Page 24 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

300 L092 L092- to New -- 3.000 3.750 Complete 0 55.96 37.30 93.26 8.39 (0 , 0 , 1 , 0 , 1) Bhartaniya Johad 301 L094 L094-Dungras Agoona to New -- 2.000 3.750 Complete 0 44.38 29.59 73.97 6.66 (0 , 0 , 1 , 0 , 1) Dhani Hanuman Ghati 302 L090 L090-Chadwas to New -- 2.000 3.750 Complete 0 36.48 24.32 60.80 5.47 (0 , 0 , 1 , 0 , 1) Chadwas 303 L101 L101-Tandesar to Ram Sagar New -- 1.500 3.750 Complete 0 28.23 18.82 47.05 4.24 (0 , 0 , 1 , 0 , 1)

Block Sujangarh Total 21.300 0 412.05 274.70 686.75 61.81 (0 , 0 , 8 , 0 , 8)

District Churu Total 46.800 0 883.31 588.88 1,472.19 132.52 (0 , 0 , 15 , 0 , 15) District- Dungarpur

Block- Aspur

304 L143 L143-Pachlasa chhota to New -- 2.300 3.750 Complete 15 80.29 53.53 133.82 12.05 (0 , 0 , 1 , 0 , 1) Born ka wada 305 L158 L158-Bankoda to Manpura New -- 1.575 3.750 Complete 6 54.46 36.31 90.77 8.17 (0 , 0 , 1 , 0 , 1)

306 L144 L144-Baroda Pindawal Km. 5 New -- 2.425 3.750 Complete 13 65.39 43.59 108.98 9.81 (0 , 0 , 1 , 0 , 1) to Bamaniya wada 307 L151 L151-A.R. Usmaniya Km. 1 New -- 0.700 3.750 Complete 5 20.23 13.49 33.72 3.03 (0 , 0 , 1 , 0 , 1) to Upala wada 308 L147 L147-Aspur Banswara road New -- 1.125 3.750 Complete 9 33.11 22.08 55.19 4.97 (0 , 0 , 1 , 0 , 1) Km. 113 to Adiwasi Basti 309 L163 L163-Devala to Met Fala New -- 2.000 3.750 Complete 12 58.12 38.75 96.87 9.00 (0 , 0 , 1 , 0 , 1)

310 L176 L176-Pachlasa Bada to Asan New -- 1.600 3.750 Complete 12 45.60 30.40 76.00 6.84 (0 , 0 , 1 , 0 , 1) tekari 311 L182 L182-Gada Nathji - New Waste Plastics 1.025 3.750 Complete 4 27.60 18.40 46.00 4.15 (0 , 0 , 1 , 0 , 1) Karwakhas road to Bhagora fala 312 L189 L189-Rayaki to Dand Fala New -- 1.600 3.750 Complete 8 39.57 26.38 65.95 5.93 (0 , 0 , 1 , 0 , 1)

Page 25 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

313 L148 L148-SH-32 Km. 111 to New -- 3.000 3.750 Complete 24 76.24 50.83 127.07 11.44 (0 , 0 , 1 , 0 , 1) Barela fala 314 L190 L190-Mukhaliya to Sabela New Waste Plastics 2.000 3.750 Complete 9 49.33 32.88 82.21 7.40 (0 , 0 , 1 , 0 , 1)

315 L194 L194-Aspur Vijwamata Km. New -- 1.000 3.750 Complete 8 25.51 17.01 42.52 3.83 (0 , 0 , 1 , 0 , 1) 27 to Dholi road 316 L178 L178-SH- 32 Km. 96 to New Waste Plastics 2.500 3.750 Complete 15 68.32 45.55 113.87 10.25 (0 , 0 , 1 , 0 , 1) Dhanela 317 L181 L181-Hiluda to Dhani New Waste Plastics 2.000 3.750 Complete 13 56.29 37.53 93.82 8.45 (0 , 0 , 1 , 0 , 1)

318 L196 L196-Aspur Vijwamata Km. New -- 2.000 3.750 Complete 11 50.24 33.50 83.74 7.53 (0 , 0 , 1 , 0 , 1) 25 to Kawadi Fala 319 L121 L121-Richha Kanoriya Km. 1 New -- 2.050 3.750 Complete 9 50.62 33.74 84.36 7.59 (0 , 0 , 1 , 0 , 1) to Bijula Fala 320 L180 L180-Dhanela to Saleriya New -- 2.000 3.750 Complete 11 56.68 37.78 94.46 8.50 (0 , 0 , 1 , 0 , 1)

321 L169 L169-Indora to Nava Tapra New -- 1.500 3.750 Complete 10 39.31 26.20 65.51 5.90 (0 , 0 , 1 , 0 , 1)

322 L157 L157-Gatiya to Vagadari fala New -- 0.600 3.750 Complete 2 15.40 10.26 25.66 2.31 (0 , 0 , 1 , 0 , 1)

Block Aspur Total 33.000 196 912.32 608.20 1,520.52 137.15 (0 , 0 , 19 , 0 , 19) Block- Bichhiwara

323 L209 L209-A R To Talavadi Fala New -- 2.550 3.750 Complete 13 76.42 50.94 127.36 11.46 (0 , 0 , 1 , 0 , 1)

324 L201 L201-A R To Kola Talai New -- 3.750 3.750 Complete 30 110.96 73.97 184.93 16.64 (0 , 0 , 1 , 0 , 1)

325 L131 L131-A R To Bamna Fala New -- 3.500 3.750 Complete 24 94.39 62.92 157.31 14.16 (0 , 0 , 1 , 0 , 1)

326 L169 L169-A R To Mali Fala New Waste Plastics 2.500 3.750 Complete 7 106.45 70.96 177.41 15.97 (0 , 0 , 1 , 0 , 1)

327 L204 L204-A R To Hariya Fala New -- 1.900 3.750 Complete 13 56.91 37.94 94.85 8.54 (0 , 0 , 1 , 0 , 1)

328 L212 L212-A R To Mataji Fala New -- 1.700 3.750 Complete 10 50.74 33.83 84.57 7.61 (0 , 0 , 1 , 0 , 1)

329 L123 L123-A R To Mataji Fala New -- 2.675 3.750 Complete 15 62.00 41.34 103.34 9.30 (0 , 0 , 1 , 0 , 1)

Page 26 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

330 L257 L257-A R To Khotala Fala New -- 1.600 3.750 Complete 12 38.90 25.93 64.83 5.84 (0 , 0 , 1 , 0 , 1)

331 L234 L234-ODR-1 Km-12 To Sadod New -- 4.825 3.750 Complete 28 96.95 64.64 161.59 14.54 (0 , 0 , 1 , 0 , 1)

332 L217 L217-A R To Temba Fala New -- 1.825 3.750 Complete 9 54.61 36.40 91.01 8.20 (0 , 0 , 1 , 0 , 1)

333 L287 L287-A R To Damor Fala New -- 2.300 3.750 Complete 10 61.60 41.07 102.67 9.25 (0 , 0 , 1 , 0 , 1)

334 L125 L125-A R To Damor Fala New -- 2.400 3.750 Complete 6 65.77 43.84 109.61 9.88 (0 , 0 , 1 , 0 , 1)

335 L151 L151-A R To Semliya New -- 3.575 3.750 Complete 19 81.67 54.45 136.12 12.25 (0 , 0 , 1 , 0 , 1)

336 L165 L165-A R To Khanimal Fala New Waste Plastics 3.400 3.750 Complete 12 151.30 100.86 252.16 22.69 (0 , 0 , 1 , 0 , 1)

337 L210 L210-A R To Myata Fala New -- 1.300 3.750 Complete 5 37.17 24.78 61.95 5.57 (0 , 0 , 1 , 0 , 1)

338 L232 L232-A R To Jahr Fala New -- 2.500 3.750 Complete 14 74.72 49.82 124.54 11.21 (0 , 0 , 1 , 0 , 1)

339 L158 L158-A R To Nahaver Fala New -- 4.900 3.750 Complete 20 120.61 80.41 201.02 18.09 (0 , 0 , 1 , 0 , 1)

340 L214 L214-A R To Malda Fala New -- 2.000 3.750 Complete 10 50.19 33.46 83.65 7.54 (0 , 0 , 1 , 0 , 1)

341 L149 L149-A R To Samited New -- 1.000 3.750 Complete 8 29.94 19.96 49.90 4.49 (0 , 0 , 1 , 0 , 1)

342 L286 L286-A R To Nanoma Fala New Waste Plastics 3.425 3.750 Complete 13 132.86 88.57 221.43 19.93 (0 , 0 , 1 , 0 , 1)

343 L253 L253-A R To Vagada Fala New -- 4.000 3.750 Complete 30 119.26 79.50 198.76 17.89 (0 , 0 , 1 , 0 , 1)

Block Bichhiwara Total 57.625 308 1,673.42 1,115.59 2,789.01 251.05 (0 , 0 , 21 , 0 , 21) Block- Dungarpur

344 L246 L246-AR Harwani New -- 2.050 3.750 Complete 9 53.67 35.78 89.45 8.05 (0 , 0 , 1 , 0 , 1)

345 L268 L268-AR Masaniya Fala New -- 2.900 3.750 Complete 14 70.13 46.76 116.89 10.52 (0 , 0 , 1 , 0 , 1)

346 L193 L193-AR Saleda New -- 2.750 3.750 Complete 20 77.23 51.49 128.72 11.59 (0 , 0 , 1 , 0 , 1)

347 L256 L256-AR Hadmat Fala New Waste Plastics 2.750 3.750 Complete 20 82.30 54.86 137.16 12.35 (0 , 0 , 1 , 0 , 1)

Page 27 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

348 L266 L266-AR Dolvariya New -- 2.800 3.750 Complete 20 83.87 55.91 139.78 12.58 (0 , 0 , 1 , 0 , 1)

349 L267 L267-AR Taravada New -- 5.000 3.750 Complete 26 148.87 99.24 248.11 22.33 (0 , 0 , 1 , 0 , 1)

350 L242 L242-AR Rani Ghati New -- 2.700 3.750 Complete 13 79.94 53.29 133.23 11.99 (0 , 0 , 1 , 0 , 1)

351 L245 L245-AR Siyariya New -- 1.500 3.750 Complete 11 44.73 29.82 74.55 6.71 (0 , 0 , 1 , 0 , 1)

352 L254 L254-AR Mahudiya New -- 1.500 3.750 Complete 11 44.89 29.92 74.81 6.73 (0 , 0 , 1 , 0 , 1)

353 L263 L263-AR Badela New Waste Plastics 3.125 3.750 Complete 23 93.52 62.35 155.87 14.03 (0 , 0 , 1 , 0 , 1)

354 L134 L134-AR Rupotfala New -- 3.100 3.750 Complete 22 76.64 51.10 127.74 11.51 (0 , 0 , 1 , 0 , 1)

355 L179 L179-AR Ragli New -- 2.500 3.750 Complete 16 60.82 40.54 101.36 9.12 (0 , 0 , 1 , 0 , 1)

356 L155 L155-AR Kamlatfala New -- 3.225 3.750 Complete 10 86.90 57.94 144.84 13.03 (0 , 0 , 1 , 0 , 1)

357 L189 L189-AR Adiwat New -- 2.575 3.750 Complete 14 63.73 42.48 106.21 9.55 (0 , 0 , 1 , 0 , 1)

358 L146 L146-AR Bhamatfala New -- 3.625 3.750 Complete 18 90.07 60.04 150.11 13.52 (0 , 0 , 1 , 0 , 1)

359 L136 L136-AR Limbadiyafala New -- 2.200 3.750 Complete 19 58.88 39.26 98.14 8.83 (0 , 0 , 1 , 0 , 1)

360 L225 L225-A R Mali Fala New -- 1.880 3.750 Complete 11 52.97 35.31 88.28 7.95 (0 , 0 , 1 , 0 , 1)

361 L200 L200-A R Katara Fala New -- 1.625 3.750 Complete 12 44.00 29.34 73.34 6.60 (0 , 0 , 1 , 0 , 1)

362 L158 L158-AR Ahari Fala New -- 2.000 3.750 Complete 17 57.48 38.32 95.80 8.62 (0 , 0 , 1 , 0 , 1)

363 L219 L219-AR Nalwala New -- 0.900 3.750 Complete 7 26.41 17.60 44.01 3.97 (0 , 0 , 1 , 0 , 1)

364 L147 L147-AR Navaghara New -- 3.400 3.750 Complete 25 87.02 58.02 145.04 13.04 (0 , 0 , 1 , 0 , 1)

365 L211 L211-AR Kaklai New -- 1.800 3.750 Complete 12 48.78 32.52 81.30 7.32 (0 , 0 , 1 , 0 , 1)

366 L223 L223-AR Ambawala New -- 1.725 3.750 Complete 11 48.54 32.36 80.90 7.29 (0 , 0 , 1 , 0 , 1)

367 L148 L148-AR Narwali Fala New -- 2.050 3.750 Complete 18 51.31 34.21 85.52 7.70 (0 , 0 , 1 , 0 , 1)

368 L217 L217-AR Dholiwala New -- 3.625 3.750 Complete 24 97.19 64.79 161.98 14.57 (0 , 0 , 1 , 0 , 1)

Page 28 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

369 L151 L151-AR Bich ka Fala New Waste Plastics 2.225 3.750 Complete 21 58.48 38.98 97.46 8.77 (0 , 0 , 1 , 0 , 1)

370 L234 L234-AR Panidara. New Waste Plastics 1.930 3.750 Complete 7 54.88 36.58 91.46 8.23 (0 , 0 , 1 , 0 , 1)

371 L218 L218-AR Bari New -- 1.350 3.750 Complete 12 35.34 23.56 58.90 5.30 (0 , 0 , 1 , 0 , 1)

372 L152 L152-Kharvadiya Fala New Waste Plastics 4.000 3.750 Complete 29 106.99 71.33 178.32 16.05 (0 , 0 , 1 , 0 , 1)

373 L153 L153-AR Nalfala New -- 1.600 3.750 Complete 15 47.08 31.38 78.46 7.07 (0 , 0 , 1 , 0 , 1)

374 L241 L241-AR Godsa New -- 5.000 3.750 Complete 35 149.66 99.77 249.43 22.44 (0 , 0 , 1 , 0 , 1)

375 L181 L181-AR Damor Fala New -- 2.900 3.750 Complete 17 66.84 44.56 111.40 10.03 (0 , 0 , 1 , 0 , 1)

376 L235 L235-AR Padliya. New Waste Plastics 1.775 3.750 Complete 12 49.52 33.02 82.54 7.43 (0 , 0 , 1 , 0 , 1)

377 L127 L127-A R Hadat Fala New -- 3.000 3.750 Complete 21 77.86 51.91 129.77 11.68 (0 , 0 , 1 , 0 , 1)

378 L210 L210-AR Manatalai New -- 2.950 3.750 Complete 24 80.41 53.61 134.02 12.06 (0 , 0 , 1 , 0 , 1)

379 L184 L184-AR Navaghara New -- 1.450 3.750 Complete 14 40.22 26.82 67.04 6.04 (0 , 0 , 1 , 0 , 1)

380 L128 L128-AR Semaliya New -- 2.700 3.750 Complete 20 67.90 45.26 113.16 10.19 (0 , 0 , 1 , 0 , 1)

381 L216 L216-AR Bhagora Fala New -- 1.200 3.750 Complete 7 31.56 21.04 52.60 4.73 (0 , 0 , 1 , 0 , 1)

382 L157 L157-AR Hadmat Fala New -- 3.300 3.750 Complete 19 78.46 52.30 130.76 11.76 (0 , 0 , 1 , 0 , 1)

383 L206 L206-AR Amdara New -- 1.500 3.750 Complete 12 43.19 28.79 71.98 6.49 (0 , 0 , 1 , 0 , 1)

384 L142 L142-AR Hariyat New -- 1.300 3.750 Complete 10 34.93 23.28 58.21 5.23 (0 , 0 , 1 , 0 , 1)

385 L125 L125-AR Upa Pana New -- 2.300 3.750 Complete 12 56.33 37.56 93.89 8.45 (0 , 0 , 1 , 0 , 1)

Block Dungarpur Total 103.785 690 2,809.53 1,873.01 4,682.54 421.45 (0 , 0 , 42 , 0 , 42) Block- Sagwara

386 L206 L206-Padwa to Kali Ghati New -- 3.675 3.750 Complete 17 81.54 54.36 135.90 12.23 (0 , 0 , 1 , 0 , 1) Fala

Page 29 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

387 L158 L158-Panchwati to Kaliya New -- 1.000 3.750 Complete 9 25.74 17.16 42.90 3.86 (0 , 0 , 1 , 0 , 1) Dungara 388 L188 L188-A.R. Barbudaniya to New -- 1.000 3.750 Complete 7 26.15 17.43 43.58 3.92 (0 , 0 , 1 , 0 , 1) Chak Mahudi 389 L205 L205-Bankoda Padra Bhasor New -- 2.000 3.750 Complete 11 48.43 32.29 80.72 7.26 (0 , 0 , 1 , 0 , 1) road Km. 5 to Adiwadi Basti 390 L186 L186-A.R. Barbudaniya Km. New Waste Plastics 2.000 3.750 Complete 11 50.89 33.93 84.82 7.63 (0 , 0 , 1 , 0 , 1) to Bijaliya Fala 391 L175 L175-A.R. Surmana to Beda New -- 1.675 3.750 Complete 12 41.85 27.90 69.75 6.28 (0 , 0 , 1 , 0 , 1) Fala 392 L190 L190-SH- 10 Km. 58 to New -- 2.000 3.750 Complete 15 49.55 33.03 82.58 7.43 (0 , 0 , 1 , 0 , 1) Hangiya Fala 393 L191 L191-SH-10 Km. 46700 to New -- 1.800 3.750 Complete 12 43.98 29.32 73.30 6.60 (0 , 0 , 1 , 0 , 1) Varda to Keshanpura Fala 394 L185 L185-A.R. to Barbudaniya New -- 2.000 3.750 Complete 14 50.69 33.79 84.48 7.60 (0 , 0 , 1 , 0 , 1) Km. 6 to Reda Fala 395 L129 L129-ODR- 2 to Khajuri fala New -- 3.500 3.750 Complete 28 108.70 72.47 181.17 16.31 (0 , 0 , 1 , 0 , 1)

396 L180 L180-A.R. Kesarpura to New -- 2.000 3.750 Complete 11 48.97 32.65 81.62 7.39 (0 , 0 , 1 , 0 , 1) Panwa Fala 397 L200 L200-SH-10 Km. 65.700 to New -- 1.225 3.750 Complete 8 30.94 20.63 51.57 4.64 (0 , 0 , 1 , 0 , 1) Darodi Fala 398 L184 L184-Nandor to Talaiya Fala New -- 2.700 3.750 Complete 13 60.61 40.41 101.02 9.09 (0 , 0 , 1 , 0 , 1)

399 L209 L209-A.R. Gamda Charaniya New -- 1.025 3.750 Complete 7 38.78 25.86 64.64 5.81 (0 , 0 , 1 , 0 , 1) to Nichala Kopra 400 L137 L137-A.R. Vagari Km. 1 to New Waste Plastics 1.100 3.750 Complete 7 28.66 19.10 47.76 4.29 (0 , 0 , 1 , 0 , 1) Navaghara 401 L136 L136-Chibuda to Dhani Fala New -- 1.500 3.750 Complete 8 37.09 24.72 61.81 5.56 (0 , 0 , 1 , 0 , 1)

402 L150 L150-Jogpur to Thuthwasa New Waste Plastics 3.275 3.750 Complete 18 84.62 56.42 141.04 12.69 (0 , 0 , 1 , 0 , 1) Fala Block Sagwara Total 33.475 208 857.20 571.46 1,428.66 128.59 (0 , 0 , 17 , 0 , 17)

Page 30 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Simalwara

403 L202 L202-AR NAI BASTI BADGAMA New -- 2.325 3.000 Complete 12 52.07 34.71 86.78 7.81 (0 , 0 , 1 , 0 , 1) TO BHADAR 404 L320 L320-AR BORMALI TO New -- 1.400 3.000 Complete 7 41.98 27.98 69.96 6.29 (0 , 0 , 1 , 0 , 1) JHANJHRI 405 L275 L275-AR TABIYAD TO New Waste Plastics 0.850 3.000 Complete 6 25.42 16.94 42.36 3.82 (0 , 0 , 1 , 0 , 1) AAMLIYA 406 L279 L279-MDR 43 TO TABIYAD New Waste Plastics 2.375 3.000 Complete 12 47.65 31.77 79.42 7.15 (0 , 0 , 1 , 0 , 1)

407 L280 L280-MDR 43 TO DENDOR New Waste Plastics 1.725 3.000 Complete 8 35.72 23.81 59.53 5.36 (0 , 0 , 1 , 0 , 1) FALA 408 L282 L282-AR MEWRA TO GURJER New Waste Plastics 1.080 3.000 Complete 7 32.13 21.42 53.55 4.82 (0 , 0 , 1 , 0 , 1) I 409 L283 L283-AR MEWRA TO New Waste Plastics 3.200 3.000 Complete 13 62.36 41.57 103.93 9.35 (0 , 0 , 1 , 0 , 1) NANOMA 410 L286 L286-GARA GOKAL TO New -- 1.330 3.000 Complete 8 30.16 20.11 50.27 4.52 (0 , 0 , 1 , 0 , 1) RANGELA 411 L287 L287-RASTA TO BHOUJELA New -- 2.030 3.000 Complete 10 45.46 30.31 75.77 6.82 (0 , 0 , 1 , 0 , 1)

412 L288 L288-RASTA TO BHOUJELA New -- 1.430 3.000 Complete 5 36.35 24.24 60.59 5.46 (0 , 0 , 1 , 0 , 1) GULABPURA 413 L289 L289-RASTA TO GULABPURA New -- 1.600 3.000 Complete 12 36.40 24.27 60.67 5.46 (0 , 0 , 1 , 0 , 1)

414 L293 L293-RASTA TO MANDLI New -- 2.100 3.000 Complete 14 50.96 33.97 84.93 7.64 (0 , 0 , 1 , 0 , 1) BADI 415 L294 L294-RASTA TO MANDLI New -- 1.330 3.000 Complete 7 28.40 18.94 47.34 4.27 (0 , 0 , 1 , 0 , 1) CHHOTI 416 L310 L310-AR BACHHAWARA TO New -- 1.500 3.000 Complete 7 35.41 23.60 59.01 5.31 (0 , 0 , 1 , 0 , 1) HANGAT FALA 417 L313 L313-BEDSA TO KALI New Waste Plastics 3.800 3.000 Complete 18 76.76 51.18 127.94 11.51 (0 , 0 , 1 , 0 , 1) GHANTI 418 L179 L179-RATRIYA TO AHARI New -- 1.500 3.750 Complete 8 44.62 29.74 74.36 6.69 (0 , 0 , 1 , 0 , 1) FALA

Page 31 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

419 L246 L246-PEETH PUNAWARA RD New -- 2.800 3.750 Complete 14 55.39 36.93 92.32 8.30 (0 , 0 , 1 , 0 , 1) TO PADHERI 420 L194 L194-DARIYATI TO PANIHARI New -- 2.400 3.750 Complete 14 54.37 36.24 90.61 8.16 (0 , 0 , 1 , 0 , 1)

421 L206 L206-AR GHANTIGALA TO New -- 2.000 3.750 Complete 10 43.81 29.21 73.02 6.57 (0 , 0 , 1 , 0 , 1) TORAN FALA 422 L231 L231-CHIKHALI AMBADA RD New -- 1.300 3.750 Complete 6 31.87 21.25 53.12 4.77 (0 , 0 , 1 , 0 , 1) TO AMALI NAL 423 L183 L183-GARIYATA TO HARIYA T New -- 1.200 3.750 Complete 4 32.08 21.39 53.47 4.81 (0 , 0 , 1 , 0 , 1) FALA 424 L184 L184-AR CHHAPRO KA New -- 1.600 3.750 Complete 7 47.26 31.50 78.76 7.09 (0 , 0 , 1 , 0 , 1) KUNWA TO MABAR FALA 425 L268 L268-AR KESARPURA TO New -- 1.000 3.750 Complete 6 29.92 19.94 49.86 4.48 (0 , 0 , 1 , 0 , 1) DANDOR FALA 426 L201 L201-AR KHUMANPURA TO New -- 2.500 3.750 Complete 16 55.35 36.90 92.25 8.30 (0 , 0 , 1 , 0 , 1) SAHIYA FALA 427 L247 L247-AR BHATIYA TO New -- 4.225 3.750 Complete 19 103.25 68.84 172.09 15.49 (0 , 0 , 1 , 0 , 1) ADIVASI BASTI 428 L232 L232-CHIKHALI AMBADA RD New -- 1.200 3.750 Complete 9 28.51 19.00 47.51 4.27 (0 , 0 , 1 , 0 , 1) TO NAVA GHARA 429 L260 L260-BHACHADIYA TO New -- 1.425 3.750 Complete 9 38.41 25.60 64.01 5.77 (0 , 0 , 1 , 0 , 1) PANCHAL FALA II 430 L238 L238-AR GUNDLARA TO New -- 2.400 3.750 Complete 11 44.87 29.92 74.79 6.74 (0 , 0 , 1 , 0 , 1) NALAGA FALA 431 L241 L241-AR KHAL TO PARGI New -- 1.200 3.750 Complete 8 29.36 19.58 48.94 4.41 (0 , 0 , 1 , 0 , 1) FALA 432 L255 L255-AR DHOODARIYA RD New -- 1.200 3.750 Complete 7 26.24 17.50 43.74 3.94 (0 , 0 , 1 , 0 , 1) TO BOR FALA 433 L239 L239-AR GUNDLARA TO New -- 2.250 3.750 Complete 13 49.24 32.83 82.07 7.38 (0 , 0 , 1 , 0 , 1) KHAJURI FALA 434 L211 L211-BHACHADIYA KHAS TO New -- 1.200 3.750 Complete 6 27.28 18.19 45.47 4.09 (0 , 0 , 1 , 0 , 1) DAMOR FALA 435 L185 L185-AR BABA KI BAR TO New -- 1.500 3.750 Complete 12 37.40 24.94 62.34 5.61 (0 , 0 , 1 , 0 , 1) GUMRI FALA

Page 32 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

436 L205 L205-KUNWA TO DHOODI TO New -- 1.100 3.750 Complete 6 23.31 15.54 38.85 3.51 (0 , 0 , 1 , 0 , 1) BURJOD 437 L267 L267-AR KESARPURA TO New -- 1.500 3.750 Complete 8 42.07 28.05 70.12 6.31 (0 , 0 , 1 , 0 , 1) DAMLA FALA 438 L212 L212-ROYDA TO SENGADA New -- 2.650 3.750 Complete 14 54.81 36.54 91.35 8.22 (0 , 0 , 1 , 0 , 1)

439 L245 L245-AR DHODHARA TO New -- 2.000 3.750 Complete 7 53.14 35.43 88.57 7.97 (0 , 0 , 1 , 0 , 1) METHWALA 440 L257 L257-PEETH DUKA ROAD TO New -- 3.000 3.750 Complete 17 72.58 48.38 120.96 10.88 (0 , 0 , 1 , 0 , 1) HIRAPUR Block Simalwara Total 71.225 377 1,662.36 1,108.27 2,770.63 249.35 (0 , 0 , 38 , 0 , 38) District Dungarpur Total 299.110 1,779 7,914.84 5,276.52 13,191.36 1,187.59 (0 , 0 , 137 , 0 , 137) District- Jaipur

Block- Dudu

441 L208 L208-Hirnoda to Dhani New -- 1.600 3.750 Complete 2 44.64 29.76 74.40 6.69 (0 , 0 , 1 , 0 , 1) Kilinga 442 L207 L207-Boraj Kachroda Road New -- 1.800 3.750 Complete 1 50.12 33.41 83.53 7.70 (0 , 0 , 1 , 0 , 1) to Dhani Khumaro Ki 443 L210 L210-Mahala Jobner Road New -- 1.600 3.750 Complete 1 43.32 28.88 72.20 6.43 (0 , 0 , 2 , 0 , 2) to Dhani Nojlon Ki via Betariyon Ki Dhani 444 L200 L200-Hawaspura Road to New Waste Plastics 3.000 3.750 Complete 2 78.38 52.25 130.63 11.76 (0 , 0 , 2 , 0 , 2) Dhani Deswaliyon Ki Block Dudu Total 8.000 6 216.46 144.30 360.76 32.58 (0 , 0 , 6 , 0 , 6)

District Jaipur Total 8.000 6 216.46 144.30 360.76 32.58 (0 , 0 , 6 , 0 , 6)

District- Jaisalmer

Page 33 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Jaisalmer

445 L140 L140-BHAGOO KA GOAN TO New -- 5.450 3.750 Complete 0 85.78 57.18 142.96 12.86 (0 , 0 , 1 , 0 , 1) BHAMBHRO KD 446 L138 L138-25 AWD TO GAJ SINGH New -- 10.300 3.750 Complete 14 202.51 135.01 337.52 29.68 (0 , 0 , 1 , 0 , 1) PURA 447 L137 L137-AWAI TO CHAK ABADI 1 New -- 4.600 3.750 Complete 9 80.96 53.97 134.93 12.12 (0 , 0 , 1 , 0 , 1) AWM 448 L139 L139-BHADRIYA TO NARAYAN New -- 7.000 3.750 Complete 9 142.21 94.81 237.02 21.31 (0 , 0 , 1 , 0 , 1) SINGH PURA 449 L135 L135-AJASAR TO ASHU New Waste Plastics 7.000 3.750 Complete 0 107.92 71.95 179.87 16.18 (0 , 0 , 1 , 0 , 1) SINGH KI DHANI 450 L136 L136-DIDHU TO RAJKOY KI New -- 5.500 3.750 Complete 0 81.44 54.29 135.73 12.21 (0 , 0 , 1 , 0 , 1) DHANI Block Jaisalmer Total 39.850 32 700.82 467.21 1,168.03 104.36 (0 , 0 , 6 , 0 , 6)

Block- Sam

451 L178 L178-Zinzinyali-Satto road New -- 3.500 3.750 Complete 0 73.84 49.23 123.07 11.08 (0 , 0 , 1 , 0 , 1) Km. 14 to Deep singh ki dhani 452 L177 L177- to Samel singh New -- 7.000 3.750 Complete 5 126.41 84.28 210.69 18.96 (0 , 0 , 1 , 0 , 1) ki dhani Block Sam Total 10.500 5 200.26 133.50 333.76 30.04 (0 , 0 , 2 , 0 , 2)

Block- Sankra (Pokaran)

453 L147 L147-Setrawa Devikot Road New -- 4.000 3.750 Complete 1 63.17 42.12 105.29 9.48 (0 , 0 , 1 , 0 , 1) km 28 to Raiko ki Dhani 454 L153 L153-Padampura to New -- 7.000 3.750 Complete 2 118.48 78.98 197.46 17.76 (0 , 0 , 1 , 0 , 1) Fulpatron ki Dhani 455 L151 L151-Chandni to Cheniyo ki New -- 7.000 3.750 Complete 2 101.24 67.49 168.73 15.19 (0 , 0 , 1 , 0 , 1) Dhani

Page 34 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

456 L149 L149-Nai Rajmathai To New -- 15.000 3.750 Complete 5 216.71 144.48 361.19 32.51 (0 , 0 , 1 , 0 , 1) Chainsingh ki Dhani Block Sankra (Pokaran) Total 33.000 10 499.60 333.07 832.67 74.94 (0 , 0 , 4 , 0 , 4)

District Jaisalmer Total 83.350 47 1,400.68 933.78 2,334.46 209.34 (0 , 0 , 12 , 0 , 12) District- Jalor

Block- Ahore

457 L085 L085-Vediya to Mamaji Ka New -- 1.600 3.750 Complete 1 28.56 19.04 47.60 4.28 (0 , 0 , 1 , 0 , 1) Than (OT1141) Block Ahore Total 1.600 1 28.56 19.04 47.60 4.28 (0 , 0 , 1 , 0 , 1)

Block- Bhinmal

458 L154 L154-Bhagalbhim to New -- 1.050 3.750 Complete 0 20.76 13.84 34.60 3.11 (0 , 0 , 1 , 0 , 1) Rabariyon ki Dhani (VR0609) 459 L139 L139-Morseem to Kalma Bhil New -- 6.100 3.750 Complete 6 116.95 77.96 194.91 17.48 (0 , 0 , 2 , 0 , 2) ki Dhani (VR0594) 460 L147 L147-Kheerwal to Purohiton New -- 1.200 3.750 Complete 0 24.28 16.19 40.47 3.64 (0 , 0 , 1 , 0 , 1) ki Dhani (VR0602) 461 L141 L141-Bijalia to Bhilo ki New -- 2.900 3.750 Complete 6 53.08 35.38 88.46 7.96 (0 , 0 , 1 , 0 , 1) Dhani (VR0596) 462 L149 L149-Vada Bhadvi to Virar New -- 3.800 3.750 Complete 3 72.88 48.58 121.46 10.93 (0 , 0 , 1 , 0 , 1) Nadi (VR0604) 463 L151 L151-Nimbawas to Arjiyana New -- 1.000 3.750 Complete 0 20.05 13.37 33.42 3.01 (0 , 0 , 1 , 0 , 1) Arjiya (VR0606) 464 L150 L150-Nasoli to Ganesha Bhil New -- 2.000 3.750 Complete 6 36.95 24.63 61.58 5.54 (0 , 0 , 1 , 0 , 1) ki Dhani (VR0605) 465 L144 L144-Junjani to Bhilo ki New -- 1.000 3.750 Complete 2 22.82 15.21 38.03 3.42 (0 , 0 , 1 , 0 , 1) Dhani (VR0599)

Page 35 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

466 L148 L148-Shemkari Mataji New -- 3.000 3.750 Complete 6 66.00 44.00 110.00 9.90 (0 , 0 , 1 , 0 , 1) Temple to Parmaro ki Dhani (VR0603) 467 L136 L136-Nimbora to Narna Nadi New -- 2.200 3.750 Complete 2 44.90 29.94 74.84 6.74 (0 , 0 , 1 , 0 , 1) (VR0591) 468 L145 L145-AR Bali to Thorba New -- 3.000 3.750 Complete 6 65.26 43.50 108.76 9.79 (0 , 0 , 1 , 0 , 1) Thora (VR0600) 469 L140 L140-AR Bali to Bhilo ki New -- 2.000 3.750 Complete 6 43.22 28.81 72.03 6.48 (0 , 0 , 1 , 0 , 1) Dhani-IV (VR0595) 470 L162 L162-Jeran to Omb Singh New -- 3.000 3.750 Complete 6 63.67 42.44 106.11 9.55 (0 , 0 , 1 , 0 , 1) Malam Singh ki Dhani (VR0607) 471 L146 L146-Dantiwas to Khuni New -- 2.500 3.750 Complete 6 54.39 36.26 90.65 8.16 (0 , 0 , 1 , 0 , 1) Bheel ki Dhani (VR0601) 472 L137 L137-Khokha to Jalaniyon ki New -- 4.000 3.750 Complete 6 78.83 52.55 131.38 11.82 (0 , 0 , 1 , 0 , 1) Dhani (VR0592) 473 L143 L143-Lakhni to Mamaji ka New -- 3.600 3.750 Complete 6 80.24 53.50 133.74 12.04 (0 , 0 , 1 , 0 , 1) Than (VR0598) 474 L142 L142-Rah to Luharoan ki New -- 3.200 3.750 Complete 6 69.74 46.49 116.23 10.45 (0 , 0 , 1 , 0 , 1) Dhani (VR0597) 475 L135 L135-Nimbawas to Borli New -- 2.600 3.750 Complete 3 52.80 35.20 88.00 7.92 (0 , 0 , 1 , 0 , 1) Nadi (VR0590) 476 L138 L138-Nawapura New -- 4.000 3.750 Complete 4 81.00 54.00 135.00 12.14 (0 , 0 , 1 , 0 , 1) Champawatan to Kibla Nadi (VR0593) 477 L153 L153-Pangria to Saran New -- 3.800 3.750 Complete 6 85.20 56.80 142.00 12.77 (0 , 0 , 1 , 0 , 1) Meghwalon ki Dhani (VR0608) Block Bhinmal Total 55.950 86 1,153.02 768.65 1,921.67 172.85 (0 , 0 , 21 , 0 , 21) Block- Chitalwana

478 L171 L171-Akoli to Vishnoi ki New -- 5.000 3.750 Complete 0 90.70 60.46 151.16 13.60 (0 , 0 , 1 , 0 , 1) Dhani (VR1058)

Page 36 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

479 L260 L260-Jodhawas to Suthara & New -- 3.250 3.750 Complete 0 57.91 38.61 96.52 8.69 (0 , 0 , 1 , 0 , 1) Kalbiya KD (VR1102) 480 L170 L170-Borli Piuo to Loaro New -- 1.800 3.750 Complete 0 35.66 23.78 59.44 5.35 (0 , 0 , 1 , 0 , 1) Kumaro ki Dhani (VR1059) 481 L185 L185-Mithi Beri to Dhayalo New -- 2.750 3.750 Complete 0 52.44 34.96 87.40 7.87 (0 , 0 , 1 , 0 , 1) ki Dhani (VR1076) 482 L187 L187-Veerawa Phanta to New -- 4.000 3.750 Complete 0 78.59 52.40 130.99 11.79 (0 , 0 , 1 , 0 , 1) Rebariyon ki dhani (VR1078) 483 L239 L239-Malwara to Nibli Nadi New -- 5.750 3.750 Complete 0 101.25 67.50 168.75 15.19 (0 , 0 , 1 , 0 , 1) (VR1075) 484 L178 L178-Haripaur to Rebariyon New -- 2.000 3.750 Complete 0 38.59 25.72 64.31 5.79 (0 , 0 , 1 , 0 , 1) ka Goliya (VR1067) 485 L186 L186-Veerawa to Khichadon New -- 2.000 3.750 Complete 0 39.86 26.57 66.43 5.98 (0 , 0 , 1 , 0 , 1) ki Dhani (VR1077) 486 L180 L180-Dharnawas to Sanpura New -- 4.350 3.750 Complete 0 77.93 51.96 129.89 11.69 (0 , 0 , 1 , 0 , 1) (VR1070) 487 L021 L021-Shivpura to Rebariyon New -- 5.000 3.750 Complete 0 113.84 75.90 189.74 17.08 (0 , 0 , 1 , 0 , 1) ki Dhani (VR1069) 488 L169 L169-Ranodar to Neemda ki New -- 2.250 3.750 Complete 0 45.66 30.44 76.10 6.85 (0 , 0 , 1 , 0 , 1) Dhani (VR1057) 489 L173 L173-Davla to Jambeshwar New -- 3.000 3.750 Complete 0 56.50 37.67 94.17 8.48 (0 , 0 , 1 , 0 , 1) Goliya (VR1063) 490 L184 L184-Khejadiyali to New -- 5.000 3.750 Complete 0 102.64 68.42 171.06 15.40 (0 , 0 , 1 , 0 , 1) Khejdiyali ka Goliya (VR1073) 491 L117 L117-Chitalwana to Girdhar New -- 9.000 3.750 Complete 0 185.45 123.63 309.08 27.82 (0 , 0 , 1 , 0 , 1) Dhora (VR1062) 492 L172 L172-Khirodi to Khirodi Ka New -- 5.500 3.750 Complete 0 96.44 64.29 160.73 14.46 (0 , 0 , 1 , 0 , 1) Goliya (VR1060) 493 L182 L182-Jhab to Thumba New -- 3.750 3.750 Complete 0 93.85 62.57 156.42 14.08 (0 , 0 , 1 , 0 , 1) kadhora (VR1072) 494 L168 L168-Ranodar to Nayawas New -- 7.400 3.750 Complete 0 139.91 93.28 233.19 20.99 (0 , 0 , 1 , 0 , 1) (VR1055)

Page 37 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

495 L176 L176-Hindwara to Meida New -- 2.350 3.750 Complete 0 47.50 31.66 79.16 7.12 (0 , 0 , 1 , 0 , 1) Nadi (VR1066) 496 L072 L072-Khasarvi to Bishnoi ki New -- 5.500 3.750 Complete 0 106.80 71.20 178.00 16.02 (0 , 0 , 1 , 0 , 1) Dhani (VR1017) 497 L137 L137-Bhootel to Mor Dhani New -- 4.000 3.750 Complete 0 70.53 47.02 117.55 10.58 (0 , 0 , 1 , 0 , 1) Nadi (VR1087) Block Chitalwana Total 83.650 0 1,632.05 1,088.04 2,720.09 244.83 (0 , 0 , 20 , 0 , 20) Block- Jaswantpura

498 L089 L089-Panseri to Choudhary New -- 2.600 3.750 Complete 3 46.40 30.93 77.33 6.96 (0 , 0 , 1 , 0 , 1) ki Dhani (VR0694) 499 L085 L085-Rajpura to Ranga ki New -- 2.500 3.750 Complete 3 43.11 28.74 71.85 6.44 (0 , 0 , 1 , 0 , 1) Dhani (VR0690) 500 L088 L088-Rajpura to Choudhary New -- 1.600 3.750 Complete 2 30.05 20.04 50.09 4.51 (0 , 0 , 1 , 0 , 1) ki Dhani (VR0693) 501 L084 L084-Dantlawas to New -- 4.000 3.750 Complete 4 76.04 50.70 126.74 11.41 (0 , 0 , 1 , 0 , 1) Choudhary ki Dhani (VR0689) 502 L081 L081-Panseri to Meghwalo ki New -- 2.400 3.750 Complete 2 44.38 29.58 73.96 6.66 (0 , 0 , 1 , 0 , 1) Dhani (VR0686) 503 L082 L082-Raji ka Bas to Mahadeo New -- 3.600 3.750 Complete 4 65.80 43.86 109.66 9.87 (0 , 0 , 1 , 0 , 1) ki Dhani (VR0687) 504 L191 L191-Munthala Kaba to New -- 4.300 3.750 Complete 4 72.25 48.17 120.42 10.84 (0 , 0 , 1 , 0 , 1) Munthala Kaba ka Goliya (VR0696) 505 L078 L078-Paoti to Faga ki Dhani New -- 3.500 3.750 Complete 4 58.95 39.30 98.25 8.84 (0 , 0 , 1 , 0 , 1) (VR0683) 506 L090 L090-Raj ka Bas to Sutharon New -- 3.700 3.750 Complete 4 63.71 42.47 106.18 9.53 (0 , 0 , 1 , 0 , 1) ki Dhani (VR0695) 507 L083 L083-Pooran to Khaviyon ki New -- 5.250 3.750 Complete 5 89.23 59.48 148.71 13.38 (0 , 0 , 1 , 0 , 1) Dhani (VR0688) 508 L080 L080-Panseri to Babu Bheel New -- 2.250 3.750 Complete 2 39.11 26.08 65.19 5.87 (0 , 0 , 1 , 0 , 1) Ki Dhani (VR0685)

Page 38 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

509 L079 L079-Dhanpura to Purohiton New -- 2.500 3.750 Complete 3 45.29 30.19 75.48 6.79 (0 , 0 , 1 , 0 , 1) ki Dhani (VR0684) Block Jaswantpura Total 38.200 40 674.32 449.54 1,123.86 101.10 (0 , 0 , 12 , 0 , 12) Block- Raniwara

510 L085 L085-Santru to Mhedka Nadi New -- 2.600 3.750 Complete 3 47.28 31.52 78.80 7.09 (0 , 0 , 1 , 0 , 1) (VR0724) 511 L079 L079-Karda to Konaro ki New -- 3.500 3.750 Complete 4 59.20 39.46 98.66 8.88 (0 , 0 , 1 , 0 , 1) Nadi (VR0718) 512 L077 L077-Bhapri to Jagunda New -- 5.000 3.750 Complete 6 108.06 72.04 180.10 16.20 (0 , 0 , 1 , 0 , 1) Nadi (VR0716) 513 L081 L081-Lakhawas to Lalpura New -- 2.000 3.750 Complete 2 35.84 23.89 59.73 5.38 (0 , 0 , 1 , 0 , 1) (VR0720) 514 L084 L084-Kodka to Okha ki Dhani New -- 2.700 3.750 Complete 3 47.14 31.43 78.57 7.07 (0 , 0 , 1 , 0 , 1) (VR0723) 515 L087 L087-Kodka to Talwiyon ki New -- 2.000 3.750 Complete 2 38.82 25.88 64.70 5.82 (0 , 0 , 1 , 0 , 1) Dhani (VR0726) 516 L078 L078-Vandar to Rabariyon ki New -- 3.000 3.750 Complete 3 51.60 34.40 86.00 7.74 (0 , 0 , 1 , 0 , 1) Dhani (VR0717) Block Raniwara Total 20.800 23 387.94 258.62 646.56 58.18 (0 , 0 , 7 , 0 , 7)

Block- Sanchore

517 L232 L232-Sanked to Panwaro ki New -- 1.225 3.750 Complete 0 24.88 16.58 41.46 3.73 (0 , 0 , 1 , 0 , 1) dhani (VR1015) 518 L230 L230-Pur to Gangaram Sau New -- 3.000 3.750 Complete 0 57.57 38.38 95.95 8.64 (0 , 0 , 1 , 0 , 1) ki dhani (VR1013) 519 L214 L214-Arnai to Mamaji ka New Waste Plastics 3.700 3.750 Complete 0 65.65 43.76 109.41 9.85 (0 , 0 , 1 , 0 , 1) Mandir (VR0995) 520 L241 L241-Jailatra to Veeruji ki New -- 2.700 3.750 Complete 0 49.84 33.23 83.07 7.48 (0 , 0 , 1 , 0 , 1) Dhani (VR0918)

Page 39 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

521 L222 L222-NH-15-Gardali to Vala New -- 2.500 3.750 Complete 0 48.46 32.30 80.76 7.27 (0 , 0 , 1 , 0 , 1) ki dhani (VR1012) 522 L231 L231-Pur to Pur ka goliya New -- 1.600 3.750 Complete 0 32.93 21.96 54.89 4.94 (0 , 0 , 1 , 0 , 1) (VR1014) 523 L296 L296-Dhamana goliya-NH-15 New -- 3.000 3.750 Complete 0 55.89 37.26 93.15 8.38 (0 , 0 , 1 , 0 , 1) to Panwaron ki Dhani Ist (VR1002) 524 L212 L212-Khara to Gogla Nadi New Waste Plastics 5.250 3.750 Complete 0 90.91 60.60 151.51 13.64 (0 , 0 , 1 , 0 , 1) (VR0990) 525 L220 L220-Chora-Char rasta to New -- 2.000 3.750 Complete 0 40.47 26.98 67.45 6.06 (0 , 0 , 1 , 0 , 1) sauvo kd (VR1001) 526 L228 L228-NH-15 GSS karola to New -- 4.000 3.750 Complete 0 78.61 52.40 131.01 11.79 (0 , 0 , 1 , 0 , 1) Sutharon ki dhani (VR1008) 527 L209 L209- Hariyali road to New -- 1.250 3.750 Complete 0 23.69 15.79 39.48 3.55 (0 , 0 , 1 , 0 , 1) Bhambhiyo ki Dhani (VR0988) 528 L257 L257-Dhanta to Kalbiyon Ki New Waste Plastics 4.500 3.750 Complete 0 81.20 54.14 135.34 12.18 (0 , 0 , 1 , 0 , 1) dhani (VR1005) 529 L208 L208-Sanchore Raniwara Rd New -- 2.000 3.750 Complete 0 37.49 24.99 62.48 5.62 (0 , 0 , 1 , 0 , 1) to Rebariyo ka Goliya (VR0986) 530 L269 L269-Amarpura to Bishnoie New -- 6.500 3.750 Complete 0 117.76 78.51 196.27 17.66 (0 , 0 , 1 , 0 , 1) ki Dhani (VR1024) 531 L216 L216-Arnai to Ribariyo ki New Waste Plastics 6.250 3.750 Complete 0 112.14 74.76 186.90 16.82 (0 , 0 , 1 , 0 , 1) Dhani (VR0996) 532 L219 L219-Chora- Vedia nadi to New Waste Plastics 3.000 3.750 Complete 0 51.77 34.51 86.28 7.77 (0 , 0 , 1 , 0 , 1) Bishanoie kd (VR1000) 533 L227 L227-Nenol Rebariyon ki New -- 4.250 3.750 Complete 0 88.18 58.78 146.96 13.23 (0 , 0 , 1 , 0 , 1) dhani (VR1009) 534 L262 L262-Dedwa Jakhal road to New Waste Plastics 4.500 3.750 Complete 0 79.30 52.87 132.17 11.90 (0 , 0 , 1 , 0 , 1) Grudon ki dhani (VR1006) 535 L287 L287-Jelatra to Sarvo ki New -- 2.500 3.750 Complete 0 46.61 31.07 77.68 6.99 (0 , 0 , 1 , 0 , 1) Dhani (VR1056)

Page 40 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

536 L207 L207-Gundau -Neeliya to New -- 4.800 3.750 Complete 0 87.73 58.48 146.21 13.16 (0 , 0 , 1 , 0 , 1) Jato ki Dhani (VR0985) 537 L278 L278-Gundau to Khapnada New -- 3.600 3.750 Complete 0 71.47 47.65 119.12 10.72 (0 , 0 , 1 , 0 , 1) (VR1038) 538 L223 L223-Dangra to Leelarai New -- 3.150 3.750 Complete 0 61.30 40.87 102.17 9.20 (0 , 0 , 1 , 0 , 1) Nadi (VR1004) 539 L229 L229-Paldi Solankiyan to New -- 5.750 3.750 Complete 0 113.11 75.40 188.51 16.97 (0 , 0 , 1 , 0 , 1) Siyako ki dhani (VR1011) 540 L224 L224-Agar to Agar ka Goliya New -- 2.500 3.750 Complete 0 46.55 31.04 77.59 6.98 (0 , 0 , 1 , 0 , 1) (VR0994) 541 L218 L218-Bhadroona to Mama New Waste Plastics 4.800 3.750 Complete 0 89.77 59.85 149.62 13.47 (0 , 0 , 1 , 0 , 1) Dhora (VR0999) 542 L233 L233-Sarwana to Khichadon New -- 4.000 3.750 Complete 0 75.01 50.01 125.02 11.25 (0 , 0 , 1 , 0 , 1) ki dhani (VR1016) 543 L263 L263-Jhakal to Rebariyo ki New Waste Plastics 4.250 3.750 Complete 0 74.60 49.73 124.33 11.19 (0 , 0 , 1 , 0 , 1) dhani (VR1007) 544 L258 L258-Sediya to Indro Colony New -- 2.350 3.750 Complete 0 44.18 29.45 73.63 6.63 (0 , 0 , 1 , 0 , 1) (VR0987) 545 L259 L259-Sanchore Raniwara New -- 2.950 3.750 Complete 0 56.14 37.43 93.57 8.42 (0 , 0 , 1 , 0 , 1) Road to Brahmno KD (VR0992) 546 L211 L211-Khara to Balavani Nadi New Waste Plastics 5.300 3.750 Complete 0 90.78 60.52 151.30 13.62 (0 , 0 , 1 , 0 , 1) (VR0989) 547 L217 L217-Bhadruna to Jojardi New Waste Plastics 4.000 3.750 Complete 0 74.98 49.99 124.97 11.25 (0 , 0 , 1 , 0 , 1) Nadi (VR0998) 548 L226 L226-Khara to Sutharo & New Waste Plastics 4.250 3.750 Complete 0 76.06 50.71 126.77 11.41 (0 , 0 , 1 , 0 , 1) Jato ki dhani (VR1010) 549 L268 L268-Siddheshwar to Bhura New -- 2.400 3.750 Complete 0 44.72 29.82 74.54 6.71 (0 , 0 , 1 , 0 , 1) ki Dhani (VR1021) 550 L291 L291-Vka ki Dhani (VR1059) New Waste Plastics 3.350 3.750 Complete 0 57.78 38.52 96.30 8.67 (0 , 0 , 1 , 0 , 1)

551 L221 L221-Dhamana goliya-NH-15 New -- 3.500 3.750 Complete 0 67.36 44.91 112.27 10.10 (0 , 0 , 1 , 0 , 1) to Panwaron ki Dhani Ist (VR1002)

Page 41 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

552 L210 L210-Pamana to Hiraniyo New -- 2.700 3.750 Complete 0 48.29 32.20 80.49 7.24 (0 , 0 , 1 , 0 , 1) Sananiya ki Dhani (VR0991) 553 L264 L264-Dhanta to Baiyo ki New Waste Plastics 3.000 3.750 Complete 0 52.16 34.77 86.93 7.82 (0 , 0 , 1 , 0 , 1) Dhani (VR1017) Block Sanchore Total 130.375 0 2,415.34 1,610.22 4,025.56 362.31 (0 , 0 , 37 , 0 , 37) Block- Sayla

554 L110 L110-PANTHERI TO LADU New -- 5.700 3.750 Complete 4 115.15 76.76 191.91 17.27 (0 , 0 , 1 , 0 , 1) SINGH KI DHANI (VR1085) 555 L102 L102-JALAMPURA TO DHANI New -- 3.200 3.750 Complete 1 56.72 37.82 94.54 8.51 (0 , 0 , 1 , 0 , 1) SCHOOL (VR1077) 556 L098 L098-BHAKRI SAYLA New -- 1.100 3.750 Complete 0 21.07 14.04 35.11 3.16 (0 , 0 , 1 , 0 , 1) SINDHARI KM 4 TO ORAN KHANESHI MATA MANDIR (VR1073) 557 L077 L077-DANGRA TO KESHWANA New -- 3.500 3.750 Complete 2 205.34 136.90 342.24 30.80 (0 , 0 , 1 , 0 , 1) MARG (VR1052) 558 L074 L074-HANUMAN MANDIR New -- 3.500 3.750 Complete 4 74.66 49.78 124.44 11.20 (0 , 0 , 1 , 0 , 1) ALASAN TO PAGTALDHORA (VR1049) 559 L081 L081-SAYLA TO BERA New -- 1.750 3.750 Complete 0 39.26 26.17 65.43 5.89 (0 , 0 , 1 , 0 , 1) DUDAWA (VR1056) 560 L113 L113- TO BENADA New -- 2.600 3.750 Complete 5 59.41 39.61 99.02 8.91 (0 , 0 , 1 , 0 , 1) (VR1088) 561 L132 L132-UNARI TO MALIYO KI New -- 3.600 3.750 Complete 3 67.27 44.85 112.12 10.09 (0 , 0 , 1 , 0 , 1) DHANI (VR1107) 562 L095 L095-MDRA 16 KM 60 TO New -- 1.250 3.750 Complete 2 29.08 19.38 48.46 4.36 (0 , 0 , 1 , 0 , 1) BHARATA WADA (VR1070) 563 L082 L082-ASANA TO AMARSINGH New -- 2.700 3.750 Complete 1 189.26 126.17 315.43 28.39 (0 , 0 , 1 , 0 , 1) KI DHANI (VR1057) 564 L120 L120-SIRANA TO KHAMDI New -- 1.500 3.750 Complete 1 27.67 18.44 46.11 4.15 (0 , 0 , 1 , 0 , 1) WALO KI DHANI (VR1095)

Page 42 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

565 L111 L111-PANTHERI TO New -- 2.500 3.750 Complete 0 42.43 28.28 70.71 6.36 (0 , 0 , 1 , 0 , 1) MEGHAWALO KI DHANI (VR1086) 566 L093 L093-BHUNDWA TO MANDIR New -- 2.600 3.750 Complete 0 46.65 31.10 77.75 7.00 (0 , 0 , 1 , 0 , 1) KE PAS KI DHANI (VR1068) Block Sayla Total 35.500 23 973.96 649.31 1,623.27 146.09 (0 , 0 , 13 , 0 , 13) District Jalor Total 366.075 173 7,265.20 4,843.41 12,108.61 1,089.64 (0 , 0 , 111 , 0 , 111) District- Jhunjhunun

Block- Alsisar

567 L094 L094-Rampura Kant Road to New -- 3.000 3.750 Complete 0 69.67 46.44 116.11 10.45 (0 , 0 , 0 , 4 , 4) Ramkumar Ki Dhani Block Alsisar Total 3.000 0 69.67 46.44 116.11 10.45 (0 , 0 , 0 , 4 , 4)

Block-

568 L120 L120-Mainana to Barala Ki New -- 2.000 3.750 Complete 1 47.95 31.96 79.91 7.18 (0 , 0 , 1 , 0 , 1) Dhani 569 L126 L126-Singhana to New CELL Filled 1.550 3.750 Complete 2 41.85 27.90 69.75 6.28 (0 , 0 , 1 , 0 , 1) Delepurwali Concrete 570 L113 L113- Sahar road to New -- 1.500 3.750 Complete 0 35.46 23.64 59.10 5.32 (0 , 0 , 1 , 0 , 1) Seosinghpura 571 L100 L100-Thali to Jasa Ram Ki New -- 4.000 3.750 Complete 0 84.05 56.03 140.08 12.61 (0 , 0 , 1 , 0 , 1) Dhani 572 L114 L114-Pacheri Sahar road to New -- 2.500 3.750 Complete 0 49.31 32.88 82.19 7.40 (0 , 0 , 1 , 0 , 1) Alipur 573 L097 L097-Singhana Banwas road New -- 1.500 3.750 Complete 1 35.93 23.95 59.88 5.40 (0 , 0 , 1 , 0 , 1) to Vivek Nagar 574 L105 L105-Heerwa to Bas Chuna New -- 3.000 3.750 Complete 0 61.13 40.76 101.89 9.17 (0 , 0 , 1 , 0 , 1) Ram 575 L119 L119-Lambi Jat to Sanwal Ki New -- 1.500 3.750 Complete 0 30.56 20.37 50.93 4.59 (0 , 0 , 1 , 0 , 1) Dhani

Page 43 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

576 L101 L101-Dhadhot to Dhadhot Ki New Waste Plastics 1.500 3.750 Complete 0 31.52 21.01 52.53 4.73 (0 , 0 , 1 , 0 , 1) Dhani 577 L109 L109-Pacheri Sahar road to New -- 1.800 3.750 Complete 0 36.97 24.65 61.62 5.54 (0 , 0 , 1 , 0 , 1) Adresh Goan 578 L102 L102-Dumoli to Bhata Ki New -- 1.050 3.750 Complete 0 23.40 15.60 39.00 3.51 (0 , 0 , 1 , 0 , 1) Dhani 579 L122 L122-Gunti to Bas Johar New -- 1.550 3.750 Complete 0 32.15 21.43 53.58 4.82 (0 , 0 , 1 , 0 , 1)

Block Buhana Total 23.450 4 510.28 340.18 850.46 76.55 (0 , 0 , 12 , 0 , 12) Block-

580 L030 L030-Kithana to Chirasan New -- 1.400 3.750 Complete 0 32.93 21.95 54.88 4.93 (0 , 0 , 1 , 0 , 1)

581 L087 L087-Chirawa Sultana Gowla New -- 1.000 3.750 Complete 0 23.66 15.77 39.43 3.54 (0 , 0 , 1 , 0 , 1) Road to Khatiyon Ki Dhani 582 L090 L090-Lamba Gothra to Jat New Waste Plastics 1.000 3.750 Complete 0 23.60 15.73 39.33 3.54 (0 , 0 , 1 , 0 , 1) Basti 583 L092 L092-Sultana to Paharwa Ki New -- 1.500 3.750 Complete 0 35.98 23.99 59.97 5.40 (0 , 0 , 1 , 0 , 1) Dhani 584 L088 L088-Mandrella to Farda Ki New Waste Plastics 2.500 3.750 Complete 0 50.84 33.90 84.74 7.62 (0 , 0 , 1 , 0 , 1) Dhani Block Chirawa Total 7.400 0 167.01 111.34 278.35 25.03 (0 , 0 , 5 , 0 , 5)

Block- Jhunjhunun

585 L114 L114- Alsisar Road New -- 2.550 3.750 Complete 0 59.20 39.46 98.66 8.88 (0 , 0 , 1 , 0 , 1) to Ambedkar Nagar 586 L115 L115-Marigsar to Ambedkar New -- 2.500 3.750 Complete 0 59.78 39.86 99.64 8.96 (0 , 0 , 1 , 0 , 1) Nagar 587 L116 L116-Derwala to Gadia New -- 1.500 3.750 Complete 0 35.48 23.66 59.14 5.32 (0 , 0 , 1 , 0 , 1) Luhar Basti 588 L117 L117-Doradas to Mahala Ki New -- 2.200 3.750 Complete 0 51.76 34.51 86.27 7.86 (0 , 0 , 1 , 0 , 1) Dhani

Page 44 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

589 L120 L120-Dorasar to Bhairo Mali New -- 2.250 3.750 Complete 0 46.82 31.21 78.03 7.03 (0 , 0 , 1 , 0 , 1) Ki Dhani 590 L119 L119-Ratan Sahar to New -- 2.500 3.750 Complete 0 49.45 32.96 82.41 7.42 (0 , 0 , 2 , 0 , 2) Nagadiyon Ki Dhani Block Jhunjhunun Total 13.500 0 302.48 201.67 504.15 45.47 (0 , 0 , 7 , 0 , 7)

Block-

591 L074 L074-Copper Simla road to New -- 3.000 3.750 Complete 2 71.86 47.90 119.76 10.77 (0 , 0 , 1 , 0 , 1) Ghatawali 592 L075 L075-Copper Simla road to New -- 2.100 3.750 Complete 1 48.83 32.55 81.38 7.32 (0 , 0 , 1 , 0 , 1) Badwali 593 L101 L101-Badalwas to Dhani New -- 1.050 3.750 Complete 1 25.16 16.77 41.93 3.78 (0 , 0 , 1 , 0 , 1) Bheelawara 594 L067 L067-A/R Nanuwali Bawari New -- 1.000 3.750 Complete 0 23.93 15.96 39.89 3.60 (0 , 0 , 1 , 0 , 1) to Dhani Narayan ki 595 L077 L077-Jasrapur to Dhani New -- 3.500 3.750 Complete 3 83.77 55.85 139.62 12.57 (0 , 0 , 1 , 0 , 1) Chaneja 596 L078 L078-Jasrapur to Dhani New -- 3.000 3.750 Complete 4 74.35 49.56 123.91 11.15 (0 , 0 , 1 , 0 , 1) Dhana Rajputan 597 L131 L131-Manota Jatan to Dhani New -- 2.650 3.750 Complete 1 54.74 36.49 91.23 8.20 (0 , 0 , 1 , 0 , 1) Jatan 598 L085 L085-Loyal to Dhani Sati ki New -- 1.550 3.750 Complete 0 37.11 24.74 61.85 5.56 (0 , 0 , 1 , 0 , 1)

599 L072 L072-Copper Simla road to New -- 2.000 3.750 Complete 2 47.78 31.86 79.64 7.17 (0 , 0 , 1 , 0 , 1) Todawali 600 L092 L092-Bansiyal road to New -- 3.950 3.750 Complete 2 94.01 62.67 156.68 14.10 (0 , 0 , 1 , 0 , 1) Nayala 601 L114 L114-Kalota Madhogarh road New -- 2.750 3.750 Complete 4 65.95 43.97 109.92 9.89 (0 , 0 , 1 , 0 , 1) to Permakali 602 L112 L112-Sefraguwar Sunari New -- 1.100 3.750 Complete 0 24.53 16.36 40.89 3.68 (0 , 0 , 1 , 0 , 1) road to Limba wali 603 L108 L108-Hardiya to Lochiba ki New -- 1.500 3.750 Complete 0 33.34 22.23 55.57 4.99 (0 , 0 , 1 , 0 , 1)

Page 45 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

604 L107 L107-Babai Kankariya road New -- 1.100 3.750 Complete 0 24.31 16.21 40.52 3.64 (0 , 0 , 1 , 0 , 1) to Silati 605 L071 L071-Copper Simla road to New -- 4.000 3.750 Complete 3 91.91 61.28 153.19 13.78 (0 , 0 , 1 , 0 , 1) Newariya ki Dhani 606 L095 L095-Pacheri Mehara Sihor New -- 3.000 3.750 Complete 0 67.19 44.80 111.99 10.08 (0 , 0 , 1 , 0 , 1) Mawanda road to Sohanpura 607 L117 L117-Kankariya to Thakran New -- 1.000 3.750 Complete 0 23.23 15.48 38.71 3.48 (0 , 0 , 1 , 0 , 1) wali 608 L080 L080-Jasrapur to Khati Wali New -- 3.100 3.750 Complete 0 64.30 42.86 107.16 9.64 (0 , 0 , 1 , 0 , 1) Johadi 609 L104 L104-SH. 13 to Siradhana ki New -- 1.000 3.750 Complete 0 22.28 14.85 37.13 3.35 (0 , 0 , 1 , 0 , 1) Dhani 610 L097 L097-Papurna Dabla road to New -- 2.500 3.750 Complete 0 53.00 35.34 88.34 7.95 (0 , 0 , 1 , 0 , 1) Laloda Meena 611 L070 L070-A/R Nanuwali Bawari New -- 6.000 3.750 Complete 2 130.96 87.30 218.26 19.63 (0 , 0 , 1 , 0 , 1) to Dhani Hastra mali 612 L079 L079-Jasrapur-Dhani Badhan New -- 3.200 3.750 Complete 0 70.84 47.22 118.06 10.63 (0 , 0 , 1 , 0 , 1) Road to Dhan Ki Dhani 613 L088 L088-Sardarpura Charwas New Waste Plastics 3.000 3.750 Complete 0 64.81 43.21 108.02 9.72 (0 , 0 , 1 , 0 , 1) raod to Dhani Jhadawali 614 L082 L082-Jasrapur to Dhani New -- 1.000 3.750 Complete 0 22.33 14.88 37.21 3.35 (0 , 0 , 1 , 0 , 1) Todpuriya 615 L130 L130-Dhani Badan to Dhani New -- 1.050 3.750 Complete 0 23.98 15.98 39.96 3.60 (0 , 0 , 1 , 0 , 1) Pipla 616 L073 L073-A/R Bhajnawali to New Waste Plastics 6.000 3.750 Complete 4 124.77 83.18 207.95 18.72 (0 , 0 , 1 , 0 , 1) Dhani Naya Bas 617 L087 L087-Sardarpura Charwas New -- 3.000 3.750 Complete 0 64.29 42.86 107.15 9.64 (0 , 0 , 1 , 0 , 1) raod to Dhani Khinwana Johad 618 L102 L102-Badalwas to Dhani New -- 3.000 3.750 Complete 0 59.55 39.70 99.25 8.93 (0 , 0 , 1 , 0 , 1) Kaliyan 619 L111 L111-Sefraguwar Sunari New -- 2.700 3.750 Complete 0 56.08 37.39 93.47 8.42 (0 , 0 , 1 , 0 , 1) road to Bagriyon ki Dhani

Page 46 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

620 L090 L090-MDR-93 to Dhana New -- 1.500 3.750 Complete 0 34.54 23.03 57.57 5.17 (0 , 0 , 1 , 0 , 1) Mayaram Block Khetri Total 75.300 29 1,683.73 1,122.48 2,806.21 252.51 (0 , 0 , 30 , 0 , 30) Block- Nawalgarh

621 L078 L078- Jakhal road New -- 0.750 3.750 Complete 0 17.98 11.99 29.97 2.70 (0 , 0 , 1 , 0 , 1) km 7.500 toKhichron ki Dhani 622 L080 L080-Kolsiya to Khedron ki New -- 3.500 3.750 Complete 0 82.67 55.12 137.79 12.39 (0 , 0 , 1 , 0 , 1) Dhani Pujari ki Dhani 623 L100 L100-Nawalgarh Goliyan New -- 3.150 3.750 Complete 0 69.82 46.55 116.37 10.46 (0 , 0 , 1 , 0 , 1) road to Barawa Todpura Nangal 624 L085 L085-Pujari ki Dhani to New -- 2.300 3.750 Complete 0 52.67 35.11 87.78 7.91 (0 , 0 , 1 , 0 , 1) Bhatiwali Johdi 625 L093 L093-Devgaon Tonk Chhilari New -- 3.200 3.750 Complete 0 71.39 47.60 118.99 10.71 (0 , 0 , 1 , 0 , 1) Indrapura road km 11th to Dhewa ki Dhani 626 L099 L099-Golyana Nawalgarh New -- 3.100 3.750 Complete 0 67.00 44.66 111.66 10.05 (0 , 0 , 1 , 0 , 1) road km 2nd to Bhanawali Dhani 627 L128 L128- to Dhigal New -- 2.000 3.750 Complete 0 45.41 30.28 75.69 6.82 (0 , 0 , 1 , 0 , 1)

628 L086 L086-AR Keswa ki Dhani New -- 1.500 3.750 Complete 0 35.13 23.42 58.55 5.28 (0 , 0 , 1 , 0 , 1) Chaudhani 629 L089 L089-Parasrampura Charan New -- 3.000 3.750 Complete 0 64.94 43.29 108.23 9.75 (0 , 0 , 1 , 0 , 1) ki Dhani road km 2nd to Bhale Khan ki Dhani 630 L098 L098-Nawalgarh Goliyan New -- 2.550 3.750 Complete 1 59.90 39.93 99.83 9.00 (0 , 0 , 1 , 0 , 1) road to Barawa Todpura Nangal

Page 47 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

631 L102 L102- Kirodi New -- 2.000 3.750 Complete 0 46.49 31.00 77.49 6.98 (0 , 0 , 1 , 0 , 1) road to to Naboda ki Dhani 632 L120 L120-Mukandgarh Mandi New -- 1.000 3.750 Complete 0 21.32 14.21 35.53 3.20 (0 , 0 , 1 , 0 , 1) Naharsinghani road to Jhajharion ki Dhani 633 L092 L092-Charan ki Dhani to New -- 3.000 3.750 Complete 0 52.06 34.70 86.76 7.81 (0 , 0 , 1 , 0 , 1) Maliyon ki Dhani 634 L122 L122-Jatwali to Harisingh ki New -- 2.000 3.750 Complete 0 38.86 25.90 64.76 5.84 (0 , 0 , 1 , 0 , 1) Dhani 635 L125 L125-Ghoriwara Kalan New Waste Plastics 1.100 3.750 Complete 0 23.42 15.62 39.04 3.51 (0 , 0 , 1 , 0 , 1) Bhojasar road km 3.400 to Raju ka Bas 636 L107 L107-Golyana Nawalgarh New -- 5.100 3.750 Complete 0 97.65 65.10 162.75 14.65 (0 , 0 , 1 , 0 , 1) road km 3.00 to Chandaka ki Dhani 637 L097 L097-Basawa to Neharo ki New -- 2.600 3.750 Complete 0 50.97 33.98 84.95 7.64 (0 , 0 , 1 , 0 , 1) Dhani Khojas 638 L094 L094-Tonk Chhilari to New Waste Plastics 2.500 3.750 Complete 0 48.20 32.14 80.34 7.23 (0 , 0 , 1 , 0 , 1) Jakhron ki Dhani 639 L123 L123-Ghoriwara kalan to New -- 1.500 3.750 Complete 0 29.12 19.41 48.53 4.36 (0 , 0 , 1 , 0 , 1) Dhayalon ka Bas 640 L106 L106-Golyana Nawalgarh New Waste Plastics 2.500 3.750 Complete 0 49.22 32.81 82.03 7.38 (0 , 0 , 1 , 0 , 1) road km 3.00 to Jasji ka Dera 641 L117 L117-Chelasi to Pooniyon ki New -- 2.500 3.750 Complete 0 47.81 31.87 79.68 7.17 (0 , 0 , 1 , 0 , 1) Dhani Nahar Singhani Kaseru 642 L126 L126-Sikar Jhunjhunu New -- 1.100 3.750 Complete 0 26.39 17.59 43.98 3.96 (0 , 0 , 1 , 0 , 1) Loharu road km 50.400 to Jagdish Harijan ki Dhani 643 L119 L119-Sikar Jhunjhunu New -- 1.000 3.750 Complete 0 21.44 14.29 35.73 3.21 (0 , 0 , 1 , 0 , 1) Loharu road km36.400 to Dhobiyon ki Dhani

Page 48 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

644 L118 L118-Sunari Well Nawalgarh New -- 2.000 3.750 Complete 0 38.55 25.70 64.25 5.79 (0 , 0 , 1 , 0 , 1) to Balwantpura Balariya road Block Nawalgarh Total 54.950 1 1,158.40 772.28 1,930.68 173.80 (0 , 0 , 24 , 0 , 24) Block-

645 L087 L087-Farat road to New -- 1.000 3.750 Complete 0 23.51 15.68 39.19 3.53 (0 , 0 , 1 , 0 , 1) Gopinathpura 646 L095 L095-Chirawa bye pass to New -- 1.000 3.750 Complete 0 23.96 15.97 39.93 3.60 (0 , 0 , 1 , 0 , 1) Gujron Ki Dhani 647 L100 L100-Likhwa to Alipuriyan ki New -- 2.300 3.750 Complete 0 54.89 36.60 91.49 8.23 (0 , 0 , 1 , 0 , 1) Dhani 648 L099 L099-Surajgarh to Kumharon New Waste Plastics 4.000 3.750 Complete 0 88.25 58.83 147.08 13.23 (0 , 0 , 1 , 0 , 1) Ki Dhani 649 L089 L089-Bhawathari to Madu Ki New Waste Plastics 3.300 3.750 Complete 0 64.45 42.96 107.41 9.67 (0 , 0 , 1 , 0 , 1) Dhani 650 L102 L102-Jakhod to Fetaram Ki New Waste Plastics 2.500 3.750 Complete 0 48.75 32.50 81.25 7.32 (0 , 0 , 1 , 0 , 1) Dhani 651 L101 L101-Jakhod road to New Waste Plastics 3.500 3.750 Complete 0 66.61 44.41 111.02 9.99 (0 , 0 , 1 , 0 , 1) Dedachar Ki Dhani 652 L092 L092-Jakhod to Khetaram Ki New Waste Plastics 2.000 3.750 Complete 0 37.60 25.07 62.67 5.65 (0 , 0 , 1 , 0 , 1) Dhani Block Surajgarh Total 19.600 0 408.02 272.02 680.04 61.22 (0 , 0 , 8 , 0 , 8)

Block- Udaipurwati

653 L065 L065-Balaji Chawsari Ked New Waste Plastics 7.130 3.750 Complete 0 143.89 95.93 239.82 21.58 (0 , 0 , 1 , 0 , 1) Chanwara Camp 654 L079 L079-Kirodi road to Saha New -- 4.000 3.750 Complete 4 95.74 63.83 159.57 14.36 (0 , 0 , 1 , 0 , 1) wali Bhata wali Jhada wali 655 L116 L116-Bagoli to Dedi ki New -- 1.900 3.750 Complete 2 45.57 30.38 75.95 6.84 (0 , 0 , 1 , 0 , 1)

Page 49 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

656 L070 L070-Gudha gorji to Godara New Waste Plastics 8.500 3.750 Complete 0 199.07 132.72 331.79 29.86 (0 , 0 , 1 , 0 , 1) ki Dhani 657 L106 L106-Jharaya Chala road to New -- 1.250 3.750 Complete 0 29.93 19.96 49.89 4.48 (0 , 0 , 1 , 0 , 1) Habamba thakur wala 658 L088 L088-Neemkathana New -- 1.600 3.750 Complete 2 38.38 25.59 63.97 5.76 (0 , 0 , 1 , 0 , 1) Udaipurwati road to Neemka jhora 659 L067 L067-Bajawa to Munda ki New -- 3.600 3.750 Complete 0 75.39 50.26 125.65 11.31 (0 , 0 , 1 , 0 , 1) Dhani 660 L099 L099- Mawta road New -- 2.050 3.750 Complete 1 46.77 31.18 77.95 7.02 (0 , 0 , 1 , 0 , 1) to Nowda ki Dhani Maliyon 661 L123 L123-Ponkh to Sumarali New -- 1.000 3.750 Complete 1 23.98 15.98 39.96 3.60 (0 , 0 , 1 , 0 , 1) (Sunarihali) 662 L111 L111-Bagoli Sarai road to km New -- 1.100 3.750 Complete 0 26.12 17.42 43.54 3.93 (0 , 0 , 1 , 0 , 1) 2 to Palwali (Palyali) 663 L118 L118-Manaksas Bagoli road New -- 1.100 3.750 Complete 1 26.32 17.55 43.87 3.94 (0 , 0 , 1 , 0 , 1) to Sanchaliya 664 L069 L069-Ked Kedia sati road to New -- 2.650 3.750 Complete 0 58.94 39.30 98.24 8.84 (0 , 0 , 1 , 0 , 1) Kanbelia basti 665 L110 L110-Papda Pachlangi road New -- 2.050 3.750 Complete 1 48.98 32.66 81.64 7.35 (0 , 0 , 1 , 0 , 1) to Jharaliya ( Jharda ki Dhani) 666 L126 L126-Chanwara Nevri road New -- 1.000 3.750 Complete 0 22.58 15.06 37.64 3.39 (0 , 0 , 1 , 0 , 1) to Kachaliya 667 L063 L063-SH 37 to Khedro Ki New -- 1.500 3.750 Complete 0 30.53 20.36 50.89 4.58 (0 , 1 , 0 , 0 , 1) dhani 668 L068 L068-Chhawasari Ked road New -- 2.550 3.750 Complete 0 55.02 36.68 91.70 8.25 (0 , 0 , 1 , 0 , 1) to Dulai Dhani 669 L133 L133-Deepura to Siradhana New -- 1.550 3.750 Complete 1 37.03 24.69 61.72 5.55 (0 , 0 , 1 , 0 , 1)

670 L100 L100-Kho Manaksas road to New -- 1.550 3.750 Complete 1 37.16 24.77 61.93 5.57 (0 , 0 , 1 , 0 , 1) Dhalaned (Dholamed) 671 L117 L117-Dedi ki Dhani road to New -- 1.000 3.750 Complete 0 23.84 15.89 39.73 3.57 (0 , 0 , 1 , 0 , 1) Naya Basi

Page 50 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

672 L134 L134-Deepura to Khangali New -- 1.500 3.750 Complete 1 35.95 23.96 59.91 5.32 (0 , 0 , 1 , 0 , 1)

673 L120 L120-Ponkh Heeramalji road New -- 2.550 3.750 Complete 3 59.59 39.73 99.32 8.94 (0 , 0 , 1 , 0 , 1) km 2 to Naka ki 674 L119 L119-Ponkh to Heeramalji New -- 3.600 3.750 Complete 2 76.54 51.03 127.57 11.47 (0 , 0 , 1 , 0 , 1)

675 L131 L131-kakrana Deepura road New -- 1.600 3.750 Complete 0 34.82 23.21 58.03 5.22 (0 , 0 , 1 , 0 , 1) to Kagaliyahali 676 L128 L128-Chanwara camp to New -- 1.000 3.750 Complete 0 22.63 15.09 37.72 3.40 (0 , 0 , 1 , 0 , 1) Kedia ki 677 L085 L085-Khandela Udaipurwati New -- 1.500 3.750 Complete 1 35.86 23.91 59.77 5.38 (0 , 0 , 1 , 0 , 1) road Km 101 to Brija Parbha Maina dhani 678 L124 L124-Chanwara ponkh road New -- 2.500 3.750 Complete 0 54.28 36.18 90.46 8.13 (0 , 0 , 2 , 0 , 2) to Jangarkali viaPathala 679 L121 L121-Ponkh to Nai Dhani New Waste Plastics 3.050 3.750 Complete 2 63.78 42.52 106.30 9.58 (0 , 0 , 1 , 0 , 1)

680 L066 L066-Chhawasari to Meena New Waste Plastics 2.500 3.750 Complete 0 54.31 36.21 90.52 8.15 (0 , 0 , 1 , 0 , 1) ki Dhani 681 L097 L097-A/R Haleda from NKT New -- 4.000 3.750 Complete 0 88.79 59.19 147.98 13.33 (0 , 0 , 1 , 0 , 1) Udaipurwati Road 682 L130 L130-Deepura to Khardali New -- 1.050 3.750 Complete 1 25.15 16.77 41.92 3.78 (0 , 0 , 1 , 0 , 1)

683 L074 L074-Dhamora to Lala New -- 3.500 3.750 Complete 0 73.25 48.83 122.08 10.99 (0 , 0 , 1 , 0 , 1) jakhar ki Dhani 684 L136 L136-Chanwara- Ponkh road New -- 1.500 3.750 Complete 0 33.44 22.29 55.73 5.02 (0 , 0 , 1 , 0 , 1) to Barala 685 L125 L125-Baragaon to New -- 1.900 3.750 Complete 0 42.33 28.22 70.55 6.35 (0 , 0 , 1 , 0 , 1) Bharyawali Dhani 686 L078 L078-Nangal bageechi to New -- 2.100 3.750 Complete 0 47.18 31.46 78.64 7.08 (0 , 0 , 1 , 0 , 1) Jalwali Dhani 687 L112 L112-Bagoli Sarai road to km New -- 1.100 3.750 Complete 0 26.34 17.56 43.90 3.94 (0 , 0 , 1 , 0 , 1) 2 to Nadi Bahar 688 L132 L132-kakrana Deepura road New Waste Plastics 2.100 3.750 Complete 1 45.03 30.02 75.05 6.74 (0 , 0 , 1 , 0 , 1) to Rudika ki

Page 51 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

689 L077 L077-Dhola khera stand to New -- 2.800 3.750 Complete 0 60.62 40.41 101.03 9.09 (0 , 0 , 1 , 0 , 1) Jhaduwala johada Block Udaipurwati Total 86.930 25 1,945.14 1,296.79 3,241.93 291.69 (0 , 1 , 37 , 0 , 38) District Jhunjhunun Total 284.130 59 6,244.73 4,163.20 10,407.93 936.72 (0 , 1 , 123 , 4 , 128) District- Jodhpur

Block- Balesar

690 L130 L130-AR to Suveri sasan km New -- 6.550 3.750 Complete 0 109.94 73.29 183.23 16.49 (0 , 0 , 1 , 0 , 1) 1 to Bhananiyon ki Dhani (VR1663) 691 L128 L128-Belwa to Aaniyon ki New -- 4.550 3.750 Complete 1 128.83 85.88 214.71 19.33 (0 , 0 , 1 , 0 , 1) Dhani (VR1665) 692 L119 L119-A R Amritnagar km 4 to New -- 6.750 3.750 Complete 7 189.62 126.41 316.03 28.45 (0 , 0 , 1 , 0 , 1) Govt. Primary school Khilon ka Dhora (VR1668) 693 L117 L117-Jodhpur - Jaisalmer New -- 3.800 3.750 Complete 4 113.19 75.46 188.65 16.98 (0 , 0 , 1 , 0 , 1) road NH- 114 km 68 to Brahmanon ki Dhani (VR1669) 694 L120 L120-Jodhpur - Jaisalmer New -- 1.000 3.750 Complete 0 24.21 16.14 40.35 3.63 (0 , 0 , 1 , 0 , 1) road NH-114 km 71 to Khiyaniyon ka Bera (VR1666) 695 L118 L118-Jodhpur - Jaisalmer New -- 7.000 3.750 Complete 1 124.42 82.94 207.36 18.65 (0 , 0 , 1 , 0 , 1) road NH-114 km 70 to Gumansingh ki Dhani (VR1667) 696 L125 L125-Dewania to Panditon New -- 5.900 3.000 Complete 12 90.06 60.04 150.10 13.47 (0 , 0 , 1 , 0 , 1) ka Bas (VR1661) Block Balesar Total 35.550 25 780.26 520.17 1,300.43 117.00 (0 , 0 , 7 , 0 , 7)

Page 52 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Baori

697 L179 L179-Kherapa Bhopalgarh New Waste Plastics 4.000 3.750 Complete 0 59.74 39.83 99.57 8.96 (0 , 0 , 1 , 0 , 1) road to Jakharon Ki Dhani (VR1934) 698 L182 L182-Govindpura Baori km 3 New -- 1.000 3.750 Complete 1 17.90 11.93 29.83 2.67 (0 , 0 , 1 , 0 , 1) to Gawariyon Ki Dhani (VR1937) 699 L183 L183-Baori Kasti road km 2 New -- 4.500 3.750 Complete 2 67.24 44.82 112.06 10.09 (0 , 0 , 1 , 0 , 1) to Sanwalia Ka Bas Rajputon Ki Dhani (VR1938) 700 L185 L185-Bhawad Gangani road New -- 1.000 3.750 Complete 0 22.21 14.80 37.01 3.33 (0 , 0 , 1 , 0 , 1) km 8 to Inaniyon Ki Dhani (VR1940) 701 L184 L184-Gangani road km 3 New -- 3.700 3.750 Complete 1 53.96 35.98 89.94 8.11 (0 , 0 , 1 , 0 , 1) Roopawaton Ki Dhani to Dudion Khichron Ki Dhani (VR1939) 702 L180 L180-Kherapa Bhopalgarh New Waste Plastics 2.000 3.750 Complete 1 33.88 22.58 56.46 5.08 (0 , 0 , 1 , 0 , 1) road km 5 to Railion Ki Dhani (VR1935) 703 L173 L173-NH-65 km 236 to East New -- 3.700 3.750 Complete 0 53.06 35.37 88.43 7.96 (0 , 0 , 1 , 0 , 1) Naiyon Ki Dhani (VR1928) 704 L188 L188-Kherapa Birsalu road New -- 2.000 3.750 Complete 0 29.46 19.64 49.10 4.42 (0 , 0 , 1 , 0 , 1) km 20 to Utrai Kakron Ki Dhani (VR1975) 705 L167 L167-Osiyan Soyla road km New -- 1.800 3.750 Complete 0 25.63 17.08 42.71 3.85 (0 , 0 , 1 , 0 , 1) 49 to Utri Saowon Ki Dhani (VR1919) 706 L178 L178-Kherapa Bhopalgarh New Waste Plastics 4.000 3.750 Complete 3 67.77 45.18 112.95 10.17 (0 , 0 , 1 , 0 , 1) road km 2 to Godara Ki Dhani (VR1933) 707 L165 L165-Osiyan Soyla road km New -- 0.950 3.750 Complete 0 17.58 11.72 29.30 2.64 (0 , 0 , 1 , 0 , 1) 51 to Rajputon Ki Dhani (VR1913)

Page 53 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

708 L169 L169-ODR-4 km 1 to Shanti New -- 0.600 3.750 Complete 0 10.87 7.25 18.12 1.63 (0 , 0 , 1 , 0 , 1) Nagar (VR1921) 709 L168 L168-Govindpura Baori road New -- 3.000 3.750 Complete 0 40.64 27.10 67.74 6.08 (0 , 0 , 1 , 0 , 1) km 3 to Meghwalo Ki Dhani (VR1920) 710 L187 L187-Kherapa Birsalu road New -- 4.000 3.750 Complete 0 57.20 38.14 95.34 8.58 (0 , 0 , 1 , 0 , 1) km 16 to Kakron Ki Dhani (VR1974) 711 L171 L171-Osiyan Soyla road km New -- 2.000 3.750 Complete 0 28.22 18.82 47.04 4.24 (0 , 0 , 1 , 0 , 1) 51 to Meghwal Modo Ki Dhani (VR1926) 712 L189 L189-Danwara Basni road New -- 3.500 3.750 Complete 1 55.72 37.15 92.87 8.36 (0 , 0 , 1 , 0 , 1) km 1 to Moti Bhakri (VR1976) 713 L177 L177-NH-65 ODR-40 to New Waste Plastics 4.000 3.750 Complete 0 63.42 42.28 105.70 9.51 (0 , 0 , 1 , 0 , 1) Bhichron ki Dhani (VR1932) 714 L172 L172-NH-65 km 242 to New -- 2.600 3.750 Complete 0 37.99 25.33 63.32 5.70 (0 , 0 , 1 , 0 , 1) Megwal Suthar Naiyon Ki Dhani (VR1927) 715 L181 L181-Baori Kasti road km 1 New -- 3.500 3.750 Complete 0 46.91 31.28 78.19 7.04 (0 , 0 , 1 , 0 , 1) to Chhaperiyon Tardon Ki Dhani (VR1936) 716 L170 L170-Baori Kasti road km 1 New -- 3.500 3.750 Complete 0 52.27 34.84 87.11 7.84 (0 , 0 , 1 , 0 , 1) to Tardon Maliyon Ki Dhani (VR1922) 717 L174 L174-Kajnau Khurd road km New -- 3.500 3.750 Complete 3 64.11 42.74 106.85 9.61 (0 , 0 , 1 , 0 , 1) 3 to Radon Ki Dhani (VR1929) 718 L175 L175-Kherapa Birsalu road New Waste Plastics 1.000 3.750 Complete 0 15.94 10.62 26.56 2.39 (0 , 0 , 1 , 0 , 1) km 2 to Kumaron Ki Dhani (VR1930) 719 L176 L176-Kajnau Lawera Kallan New -- 3.500 3.750 Complete 4 79.57 53.05 132.62 11.93 (0 , 0 , 1 , 0 , 1) km 4 to Raikon Ki Dhani (VR1931)

Page 54 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

720 L186 L186-Umaidnagar Dewaton New Waste Plastics 6.000 3.750 Complete 7 129.94 86.63 216.57 19.50 (0 , 0 , 1 , 0 , 1) Ki Dhani to Bhakarwale Raikon Ki Dhani (VR1941) Block Baori Total 69.350 23 1,131.23 754.16 1,885.39 169.69 (0 , 0 , 24 , 0 , 24) Block- Bap

721 L176 L176-CHAMPASAR to New -- 4.000 3.750 Complete 0 57.11 38.08 95.19 8.57 (0 , 0 , 1 , 0 , 1) BRAHMNO KD 722 L167 L167-CHEEMANA to RAMU New -- 2.000 3.750 Complete 0 27.95 18.63 46.58 4.19 (0 , 0 , 1 , 0 , 1) RAM KD 723 L168 L168-NARAYANPURA to New -- 2.500 3.750 Complete 0 32.56 21.71 54.27 4.88 (0 , 0 , 1 , 0 , 1) JHAKAR KD 724 L157 L157-BAJRANG NAGAR to New -- 5.000 3.750 Complete 0 69.39 46.26 115.65 10.41 (0 , 0 , 1 , 0 , 1) MAJNUO KD 725 L177 L177-JAMBA KI DHANI to New -- 4.000 3.750 Complete 0 56.78 37.85 94.63 8.52 (0 , 0 , 1 , 0 , 1) MANJUO KD 726 L170 L170-MALAR to NATH KA New Waste Plastics 9.000 3.750 Complete 0 162.36 108.24 270.60 24.35 (0 , 0 , 1 , 0 , 1) MAGRA KD 727 L178 L178-NANEU to NANEU KI New Waste Plastics 5.000 3.750 Complete 0 64.57 43.05 107.62 9.69 (0 , 0 , 1 , 0 , 1) DHANI 728 L169 L169-BAORIBARSINGA to New -- 5.000 3.750 Complete 0 72.59 48.39 120.98 10.89 (0 , 0 , 1 , 0 , 1) MEGHWALO KD 729 L173 L173-JAIMALA to RAJPUTON New -- 6.500 3.750 Complete 0 84.17 56.12 140.29 12.63 (0 , 0 , 1 , 0 , 1) KD 730 L166 L166-TEKRA to BAKTAWAR New Waste Plastics 3.000 3.750 Complete 0 43.67 29.11 72.78 6.55 (0 , 0 , 1 , 0 , 1) KD 731 L172 L172-TEKRA to KHAYLON KD New Waste Plastics 7.000 3.750 Complete 0 89.98 59.98 149.96 13.50 (0 , 0 , 1 , 0 , 1)

Page 55 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

732 L171 L171-KANASAR to New Waste Plastics 5.000 3.750 Complete 0 68.14 45.43 113.57 10.22 (0 , 0 , 1 , 0 , 1) GEHNAIYO KI DHANI Block Bap Total 58.000 0 829.27 552.85 1,382.12 124.40 (0 , 0 , 12 , 0 , 12) Block- Bhopalgarh

733 L091 L091-Artiya Kallan T-03 to New Waste Plastics 2.500 3.750 Complete 0 37.72 25.15 62.87 5.65 (0 , 0 , 1 , 0 , 1) Jato Ki Dhani (VR1837) 734 L092 L092-Artiya Kallan T-03 to New Waste Plastics 3.500 3.750 Complete 0 51.83 34.56 86.39 7.78 (0 , 0 , 1 , 0 , 1) Rajiv Gandhi Wali, Jaton Vishnoiyon Ki Dhani (VR1847) 735 L093 L093-Artiya Kallan T-03 to New Waste Plastics 5.000 3.750 Complete 0 73.07 48.72 121.79 10.96 (0 , 0 , 1 , 0 , 1) Rawat Ram Ji Ki Bhakari Dara Ki Dhani (VR1849) 736 L095 L095-Artiya KHurd T-03 to New Waste Plastics 2.500 3.750 Complete 0 38.03 25.36 63.39 5.70 (0 , 0 , 1 , 0 , 1) Sahu Panwar Ki Dhani (VR1834) 737 L081 L081-Chokri Khurd T-06 to New -- 1.050 3.750 Complete 0 15.82 10.54 26.36 2.38 (0 , 0 , 1 , 0 , 1) Khinjoor Ki Dhani (VR1830) 738 L074 L074-Kosana L-61 to Radon New -- 4.500 3.750 Complete 0 65.83 43.89 109.72 9.89 (0 , 0 , 1 , 0 , 1) Ki Dhani - II (VR1845) 739 L106 L106-Kosana T-06 to Riyadon New -- 1.100 3.750 Complete 0 17.38 11.58 28.96 2.60 (0 , 0 , 1 , 0 , 1) Ki Dhani (VR1848) 740 L107 L107-Chokri Kallan T-06 to New -- 0.550 3.750 Complete 0 9.56 6.38 15.94 1.43 (0 , 0 , 1 , 0 , 1) Maliyon Ki Dhani (VR1846) 741 L080 L080-SH-63 Km. 57 T-06 to New -- 2.150 3.750 Complete 0 31.75 21.16 52.91 4.75 (0 , 0 , 1 , 0 , 1) Mali, Raikon Ki Dhani (VR1852) 742 L063 L063-Kawaspura T-06 to New -- 2.650 3.750 Complete 0 37.63 25.08 62.71 5.64 (0 , 0 , 1 , 0 , 1) Gotiyon Ki Dhani (VR1844)

Page 56 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

743 L068 L068-Khariya Kangar T-05 to New -- 1.700 3.750 Complete 0 24.98 16.65 41.63 3.74 (0 , 0 , 1 , 0 , 1) Nahar Singh Ki Dhani (VR1839) 744 L110 L110-Nadsar T-05 to Khojo New -- 2.300 3.750 Complete 0 34.81 23.20 58.01 5.23 (0 , 0 , 1 , 0 , 1) Ki Dhani (VR1838) 745 L111 L111-Nadsar T-05 to Gwalon New -- 4.000 3.750 Complete 0 60.55 40.37 100.92 9.08 (0 , 0 , 1 , 0 , 1) Ki Dhani (VR1836) 746 L112 L112-Nadsar T-05 to Khud New -- 3.500 3.750 Complete 0 51.97 34.65 86.62 7.79 (0 , 0 , 1 , 0 , 1) Khudiyon Ki Dhani (VR1833) 747 L101 L101-SH-63 Km. 57 T-03 to New -- 1.550 3.750 Complete 0 23.25 15.50 38.75 3.49 (0 , 0 , 1 , 0 , 1) Basni Theda (VR1835) 748 L104 L104-Surpura T-09 to New -- 3.150 3.750 Complete 0 49.06 32.70 81.76 7.37 (0 , 0 , 1 , 0 , 1) Brahama No & Maliyon Ki Dhani (VR1841) 749 L114 L114-Gajsinghpura T-13 to New -- 1.500 3.750 Complete 0 24.49 16.32 40.81 3.67 (0 , 0 , 1 , 0 , 1) Dukhtawo Ki Dhani (VR1831) 750 L096 L096-Ostra T-12 to New -- 2.500 3.750 Complete 0 39.29 26.19 65.48 5.89 (0 , 0 , 1 , 0 , 1) Jaitmalon Ki Dhani (VR1854) 751 L108 L108-Rundiya T-11 to Khod New -- 3.050 3.750 Complete 0 43.27 28.85 72.12 6.48 (0 , 0 , 1 , 0 , 1) Nahi Dhani (VR1842) 752 L100 L100-Gaderi T-05 to Maliyo New -- 1.400 3.750 Complete 0 21.68 14.46 36.14 3.25 (0 , 0 , 1 , 0 , 1) Kumharon & Gawriyo Ki Dhani (VR1840) 753 L098 L098-Bagoriya L-038 to New -- 1.500 3.750 Complete 0 23.66 15.77 39.43 3.56 (0 , 0 , 1 , 0 , 1) Jakhro Ki Dhani Nichali (VR1855) 754 L085 L085-Ramrawas Kallan Up to New -- 5.050 3.750 Complete 0 78.28 52.19 130.47 11.74 (0 , 0 , 1 , 0 , 1) Devlinadi T-08 to Meghwalon Ki Dhani - II (VR1843) 755 L076 L076-Sathin T-06 to Nokharo New -- 4.950 3.750 Complete 0 74.39 49.60 123.99 11.16 (0 , 0 , 1 , 0 , 1) Bera (VR1851)

Page 57 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

756 L109 L109-Birani T-11 to New -- 1.850 3.750 Complete 0 27.67 18.44 46.11 4.15 (0 , 0 , 1 , 0 , 1) Nayapura (VR1832) Block Bhopalgarh Total 63.500 0 955.97 637.31 1,593.28 143.38 (0 , 0 , 24 , 0 , 24) Block- Bilara

757 L068 L068-Hariyadhana Village New -- 1.550 3.750 Complete 0 24.29 16.19 40.48 3.64 (0 , 0 , 1 , 0 , 1) (T-15) to Chokidaron Ki Dhani (VR1785) 758 L070 L070-Hariyadhana Village New -- 2.550 3.750 Complete 0 38.95 25.97 64.92 5.84 (0 , 0 , 1 , 0 , 1) (T-15) to Tiwariyon Ki Dhani (VR1786) 759 L069 L069-Hariyadhana Village New -- 2.050 3.750 Complete 0 30.54 20.36 50.90 4.58 (0 , 0 , 1 , 0 , 1) (T-15) to Mundelon Ki Dhani (VR1776) 760 L067 L067-L-64 Km. 0/800 (L-64) New -- 2.550 3.750 Complete 0 38.31 25.54 63.85 5.75 (0 , 0 , 1 , 0 , 1) to Dhaglaram Bhawariya Ki Dhani (VR1784) 761 L066 L066-SHW-21 Km. 51 (T-15) New -- 1.300 3.750 Complete 0 20.72 13.81 34.53 3.11 (0 , 0 , 1 , 0 , 1) to Bhabhiyon Ki Dhani (VR1781) 762 L064 L064-Pipar city to Borunda New -- 3.500 3.750 Complete 0 54.50 36.33 90.83 8.18 (0 , 0 , 1 , 0 , 1) Via Khejarla Road Km. 37 (T-15) to Badiyaron Ki Dhani (VR1783) 763 L088 L088-Pichiyak Bye Pass Km. New -- 2.600 3.750 Complete 0 37.96 25.31 63.27 5.69 (0 , 0 , 1 , 0 , 1) 1 (T-03) to Ajij Ba Ki Dhani (VR1778) 764 L079 L079-Rampuriya Bhatiyan New -- 2.500 3.750 Complete 0 40.10 26.73 66.83 6.01 (0 , 0 , 1 , 0 , 1) (T-05) to Bhato (Dhakon) Ki Dhani (VR1780)

Page 58 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

765 L083 L083-Bhavi Village (T-05) to New -- 0.550 3.750 Complete 0 11.92 7.94 19.86 1.79 (0 , 0 , 1 , 0 , 1) Khudan Road Ki Dhani (VR1797) 766 L084 L084-Bilara Khejarla Road New -- 4.100 3.750 Complete 0 62.24 41.49 103.73 9.33 (0 , 0 , 1 , 0 , 1) Km. 6 (T-02) to Tejaram Ki Dhani (VR1788) 767 L091 L091-Khejarla Rawaniyan New -- 3.600 3.750 Complete 0 52.76 35.17 87.93 7.91 (0 , 0 , 1 , 0 , 1) Road Km. 7 (L-35) to Somrado Ki Dhani (VR1782) 768 L086 L086-MDR-90 Km. 12 (T-07) New -- 3.500 3.750 Complete 0 52.72 35.14 87.86 7.91 (0 , 0 , 1 , 0 , 1) to Mori Ki Dhani (VR1789) 769 L111 L111-SHW-21 Km. 8 (T-11) New -- 4.500 3.750 Complete 0 66.64 44.43 111.07 10.00 (0 , 0 , 1 , 0 , 1) to Pabu Ki Dhani (VR1775) 770 L110 L110-SHW-21 Km. 10 (T-11) New -- 4.950 3.750 Complete 0 84.57 56.38 140.95 12.69 (0 , 0 , 1 , 0 , 1) to Maghare Ki Dhani (VR1777) 771 L101 L101-SHW-21 Km. 21 (T-11) New -- 1.150 3.750 Complete 0 17.46 11.64 29.10 2.62 (0 , 0 , 1 , 0 , 1) to Pipaliya Bawariyon Ki Dhani (VR1791) 772 L099 L099-Sindhipura Bhundana New -- 1.000 3.750 Complete 0 15.17 10.11 25.28 2.28 (0 , 0 , 1 , 0 , 1) Road Km. 3 (L-61) to Jalu Kha Ki Dhani (VR1774) 773 L087 L087-Pipar Kaparda Road New -- 4.000 3.750 Complete 0 57.92 38.61 96.53 8.68 (0 , 0 , 1 , 0 , 1) Km. 11 (L-48) to Ibu Kha Ki Dhani (VR1790) 774 L107 L107-Jaspali Village (L-25) New -- 4.650 3.750 Complete 0 68.93 45.95 114.88 10.34 (0 , 0 , 1 , 0 , 1) to Sindhiyon Ki Dhani (VR1792) 775 L077 L077-Chandelao Ramasni New -- 3.150 3.750 Complete 0 53.60 35.74 89.34 8.04 (0 , 0 , 1 , 0 , 1) Road Km. 25 (T-05) to Maliyon Ki Dhani (VR1779) 776 L072 L072-T06 Km. 6 to Maliyon New -- 3.600 3.750 Complete 0 46.97 31.31 78.28 7.04 (0 , 0 , 1 , 0 , 1) Ki Dhani (VR1793) Block Bilara Total 57.350 0 876.25 584.17 1,460.42 131.43 (0 , 0 , 20 , 0 , 20)

Page 59 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Luni

777 L122 L122-Lunawas Khara to New Waste Plastics 2.700 3.750 Complete 0 44.50 29.67 74.17 6.68 (0 , 0 , 1 , 0 , 1) Meghwalon-Bheelon ki Dhani 778 L173 L173-Kakelao to Delri Ki New -- 3.800 3.750 Complete 0 62.93 41.95 104.88 9.44 (0 , 0 , 1 , 0 , 1) Dhani 779 L179 L179-Gujrawas to Nai Basti New -- 3.000 3.750 Complete 0 59.17 39.45 98.62 8.96 (0 , 0 , 1 , 0 , 1)

780 L182 L182-Bhatinda to Jato ki New -- 4.000 3.750 Complete 0 87.65 58.44 146.09 13.15 (0 , 0 , 1 , 0 , 1) Dhani 781 L180 L180-Modijoshiyan to Manna New -- 2.200 3.750 Complete 0 38.52 25.68 64.20 5.78 (0 , 0 , 1 , 0 , 1) Basti 782 L107 L107-Dhundhara to New -- 4.000 3.750 Complete 0 57.19 38.12 95.31 8.57 (0 , 0 , 1 , 0 , 1) Sawaipura ki Dhani 783 L106 L106-Dhundhara to Maliyon New -- 1.600 3.750 Complete 0 39.89 26.60 66.49 5.98 (0 , 0 , 1 , 0 , 1) ki Dhani 784 L140 L140-Nandwan to Dedanada New -- 5.000 3.750 Complete 0 87.43 58.28 145.71 13.11 (0 , 0 , 1 , 0 , 1) ki Dhani 785 L152 L152-Salawas to Jaton ki New -- 2.250 3.750 Complete 0 38.06 25.37 63.43 5.70 (0 , 0 , 1 , 0 , 1) Dhani 786 L141 L141-Feench to Goron ki New -- 3.000 3.750 Complete 0 46.09 30.73 76.82 6.92 (0 , 0 , 1 , 0 , 1) Dhani 787 L115 L115-Feench to Chautiyon ki New -- 5.000 3.750 Complete 0 79.72 53.15 132.87 11.96 (0 , 0 , 1 , 0 , 1) Dhani 788 L125 L125-Jhanwar to Dhana New Waste Plastics 2.450 3.750 Complete 0 39.71 26.47 66.18 5.95 (0 , 0 , 1 , 0 , 1)

789 L124 L124-Khudala to Mithiya New Waste Plastics 1.500 3.750 Complete 0 21.32 14.22 35.54 3.20 (0 , 0 , 1 , 0 , 1) Bera ki Dhani (VR1574) 790 L120 L120-Dhawa to Turko ki New Waste Plastics 6.000 3.750 Complete 0 94.03 62.68 156.71 14.10 (0 , 0 , 1 , 0 , 1) Dhani 791 L128 L128-Chincharli to Beniwalo New -- 1.000 3.750 Complete 0 21.02 14.02 35.04 3.16 (0 , 0 , 1 , 0 , 1) ki Dhani

Page 60 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

792 L127 L127-Purkhawas to Bheelon New -- 3.500 3.750 Complete 0 72.22 48.14 120.36 10.84 (0 , 0 , 1 , 0 , 1) ki Dhani Block Luni Total 51.000 0 889.45 592.97 1,482.42 133.50 (0 , 0 , 16 , 0 , 16) Block- Mandor

793 L126 L126-Jalelei Faujadara to New -- 2.800 3.750 Complete 0 45.10 30.06 75.16 6.77 (0 , 0 , 1 , 0 , 1) Siyakon ki Dhani 794 L129 L129-Soder ki Dhani to New -- 6.200 3.750 Complete 0 118.36 78.91 197.27 17.75 (0 , 0 , 1 , 0 , 1) Patanada ki Dhani 795 L114 L114-Kokunda to Vishnoiyon New -- 3.500 3.750 Complete 0 58.88 39.25 98.13 8.83 (0 , 0 , 1 , 0 , 1) Ki Dhani 796 L113 L113-Jajiwal Vishnoiyon to New -- 1.000 3.750 Complete 0 18.19 12.12 30.31 2.73 (0 , 0 , 1 , 0 , 1) Chotiyon ki Dhani 797 L121 L121-NH112 to Dudiyon ki New -- 2.450 3.750 Complete 0 42.02 28.02 70.04 6.29 (0 , 0 , 1 , 0 , 1) Dhani 798 L115 L115-Ramnagar to Jaton New -- 2.500 3.750 Complete 0 43.32 28.88 72.20 6.50 (0 , 0 , 1 , 0 , 1) Vishnoiyon ki Dhani (VR1641) 799 L116 L116-VR 0407 to Aguni New Waste Plastics 3.600 3.750 Complete 0 60.68 40.45 101.13 9.11 (0 , 0 , 1 , 0 , 1) Dhaniyan (VR1629) 800 L123 L123-Dangiawas to Jaton Ki New Waste Plastics 4.800 3.750 Complete 0 79.34 52.90 132.24 11.92 (0 , 0 , 1 , 0 , 1) Dhani 801 L099 L099-Keru to Naya Nada New -- 7.000 3.750 Complete 0 138.08 92.05 230.13 20.71 (0 , 0 , 1 , 0 , 1)

802 L098 L098-Keru to Bhanwariyon ki New -- 3.000 3.750 Complete 0 57.62 38.41 96.03 8.64 (0 , 0 , 1 , 0 , 1) Dhani 803 L088 L088-Chaukha to Chandala New -- 1.000 3.750 Complete 0 24.75 16.50 41.25 3.72 (0 , 0 , 1 , 0 , 1) Bera 804 L111 L111-Garao to Jaton Ki New -- 1.500 3.750 Complete 0 28.18 18.79 46.97 4.22 (0 , 0 , 1 , 0 , 1) Dhani

Page 61 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

805 L091 L091-Keru to Meghwal Basti New -- 1.500 3.750 Complete 0 29.62 19.75 49.37 4.45 (0 , 0 , 1 , 0 , 1) Chopar (VR1638) 806 L085 L085-NH-114 to Ram New -- 3.000 3.750 Complete 0 54.87 36.58 91.45 8.22 (0 , 0 , 1 , 0 , 1) Bhakhari 807 L087 L087-Keru to Adhon ki Dhani New -- 1.500 3.750 Complete 0 32.31 21.54 53.85 4.84 (0 , 0 , 1 , 0 , 1) (VR1646) 808 L081 L081-Hemnagar to Sonaron New -- 1.500 3.750 Complete 0 31.06 20.70 51.76 4.66 (0 , 0 , 1 , 0 , 1) ki Dhani (VR1645) 809 L084 L084-Karani to Titarwalon ki New Waste Plastics 3.000 3.750 Complete 0 52.66 35.11 87.77 7.91 (0 , 0 , 1 , 0 , 1) Dhani (VR1634) 810 L106 L106-Chawanda to Raikon ki New Waste Plastics 1.500 3.750 Complete 0 37.36 24.90 62.26 5.63 (0 , 0 , 1 , 0 , 1) Dhani 811 L105 L105-Chawanda to Jayanton New Waste Plastics 3.500 3.750 Complete 1 73.83 49.22 123.05 11.07 (0 , 0 , 1 , 0 , 1) ka Bass 812 L103 L103-Ghantiyala to Sutharon New Waste Plastics 2.000 3.750 Complete 1 54.85 36.57 91.42 8.22 (0 , 0 , 1 , 0 , 1) ki Dhani Block Mandor Total 56.850 2 1,081.08 720.71 1,801.79 162.19 (0 , 0 , 20 , 0 , 20) Block- Osian

813 L235 L235-Harlai Samrau Road New -- 4.500 3.750 Complete 0 67.09 44.73 111.82 10.07 (0 , 0 , 1 , 0 , 1) Km. 40 to Bheel Meghwal Majnauon, Naiyon Ki Dhani (VR1924) 814 L216 L216-MDR-32 Km. 28 to New -- 3.000 3.750 Complete 0 48.83 32.55 81.38 7.33 (0 , 0 , 1 , 0 , 1) Bhawal Jalaram Ki Dhani (VR1956) 815 L217 L217-MDR-32 Km. 23 to Jato New -- 4.700 3.750 Complete 0 61.70 41.13 102.83 9.25 (0 , 0 , 1 , 0 , 1) Ki Dhani (VR1957) 816 L226 L226-Berdo Ka Bas to New -- 2.000 3.750 Complete 0 28.68 19.12 47.80 4.30 (0 , 0 , 1 , 0 , 1) Meghwal Lachhaniyon K i Dhani (VR1963)

Page 62 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

817 L228 L228-Ekalkhori Hariom New -- 2.000 3.750 Complete 0 28.03 18.68 46.71 4.20 (0 , 0 , 1 , 0 , 1) Mandir to Preemsagar, Tulchaniyon Ki Dhani (VR1964) 818 L160 L160-MDR-37 Km. 40 to New -- 2.500 3.750 Complete 0 36.61 24.40 61.01 5.49 (0 , 0 , 1 , 0 , 1) Chipli Musalmano Ki Dhani (VR1925) 819 L164 L164-MDR-37 Km. 35 to New -- 3.000 3.750 Complete 0 42.73 28.49 71.22 6.41 (0 , 0 , 1 , 0 , 1) Sadni Jakhar Rathoron Ki Dhani (VR1972) 820 L245 L245-Lakheta to Hirani New -- 3.600 3.750 Complete 0 51.80 34.53 86.33 7.77 (0 , 0 , 1 , 0 , 1) Godaron Ki Dhani (VR1970) 821 L157 L157-Bapini Village to New -- 3.000 3.750 Complete 0 40.88 27.25 68.13 6.13 (0 , 0 , 1 , 0 , 1) Gawariya Kirawato Ki Dhani (VR1971) 822 L246 L246-MDR-37 Km. 1 to New -- 8.400 3.750 Complete 0 113.17 75.45 188.62 16.98 (0 , 0 , 1 , 0 , 1) Karmsoton, Bhatiyon Ki Dhani (VR1917) 823 L171 L171-Osian Chadi Road Km. New -- 3.600 3.750 Complete 0 50.23 33.48 83.71 7.54 (0 , 0 , 1 , 0 , 1) 14 to Jakhron Meghwalon Ki Dhani (VR1982) 824 L224 L224-Khetasar to Saran New -- 5.000 3.750 Complete 0 75.26 50.18 125.44 11.28 (0 , 0 , 1 , 0 , 1) Vishnoi Ki Dhani (VR1960) 825 L214 L214-Badla Basni to Khoto Ki New -- 3.700 3.750 Complete 0 49.90 33.26 83.16 7.48 (0 , 0 , 1 , 0 , 1) Dhani (VR1958) 826 L210 L210-MDR-104 Km. 38 to New -- 0.800 3.750 Complete 0 12.44 8.30 20.74 1.86 (0 , 0 , 1 , 0 , 1) Khokhari Mata Ka Mandir (VR1950) 827 L183 L183-A R Sudhar Dhana Km. New -- 1.300 3.750 Complete 0 22.05 14.70 36.75 3.31 (0 , 0 , 1 , 0 , 1) 2 to Jato Maliyo Ki Dhani, Sunariyo (VR1943) 828 L173 L173-Baithwasiya Village to New -- 3.500 3.750 Complete 2 58.15 38.77 96.92 8.72 (0 , 0 , 1 , 0 , 1) Kerla Bas Godaron Ki Dhani (VR1983)

Page 63 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

829 L162 L162-Bapini Poonasar Road New -- 9.500 3.750 Complete 5 153.00 102.00 255.00 22.95 (0 , 0 , 1 , 0 , 1) Km. 0.500 to Bheelon Ki Dhani (VR1912) 830 L206 L206-Bada Kotecha to Sado New -- 2.000 3.750 Complete 5 43.15 28.77 71.92 6.48 (0 , 0 , 1 , 0 , 1) Ki Dhani (VR1952) 831 L166 L166-Hanuman Sagar New -- 5.000 3.750 Complete 0 77.21 51.47 128.68 11.59 (0 , 0 , 1 , 0 , 1) Musalmano Ki Dhani to Rawana Rajputo Ki Dhani (VR1973) 832 L233 L233-Karnaniyon Ki Dhani to New -- 3.000 3.750 Complete 0 42.16 28.11 70.27 6.33 (0 , 0 , 1 , 0 , 1) Jatarwali Megh & Kumahro Ki Dhani (VR1915) 833 L178 L178-Kharda Mewasa Road New -- 2.600 3.750 Complete 0 47.03 31.36 78.39 7.05 (0 , 0 , 1 , 0 , 1) Km. 1 to Hooda Dudiyon Ki Dhani (VR1979) 834 L179 L179-Jud Kharda Mewasa New -- 2.750 3.750 Complete 0 46.68 31.12 77.80 7.01 (0 , 0 , 1 , 0 , 1) Road Km. 3 to Jakhron Ki Dhani (VR1977) 835 L223 L223-Khetasar to Jat Godaro New -- 4.000 3.750 Complete 0 69.21 46.14 115.35 10.39 (0 , 0 , 1 , 0 , 1) Ki Dhani (VR1959) 836 L204 L204-Mathaniya Balarwa New -- 3.000 3.750 Complete 0 43.82 29.21 73.03 6.58 (0 , 0 , 1 , 0 , 1) Road Km. 6 to Kala Bhakar Meghwalon Ki Dhani (VR1949) 837 L198 L198-Mathaniya Binjwariya New -- 1.000 3.750 Complete 2 22.61 15.08 37.69 3.40 (0 , 0 , 1 , 0 , 1) Road Km. 6 to Khetoji Ki Dhani Raja Sant S.H. (VR1988) 838 L213 L213-Bhaiser Kotwali to New -- 4.500 3.750 Complete 0 68.29 45.52 113.81 10.25 (0 , 0 , 1 , 0 , 1) Tinwari crossing road (VR1048) 839 L242 L242-Matora Bhada Road New -- 3.800 3.750 Complete 2 56.36 37.57 93.93 8.46 (0 , 0 , 1 , 0 , 1) Km. 6.500 to Rajput, Roopowato Bhilo Ki Dhani (VR1969)

Page 64 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

840 L197 L197-ODR-30 Km. 19 to Sado New -- 1.200 3.750 Complete 0 20.67 13.78 34.45 3.10 (0 , 0 , 1 , 0 , 1) Ki Dhani (VR1947) 841 L238 L238-Palli Village to Bassi New -- 6.500 3.750 Complete 1 102.86 68.57 171.43 15.43 (0 , 0 , 1 , 0 , 1) Meghwalon Ki Dhani (VR1923) 842 L222 L222-Panchala Khurd to New -- 3.200 3.750 Complete 0 43.70 29.13 72.83 6.56 (0 , 0 , 1 , 0 , 1) Math Ki Dhani (VR1953) 843 L221 L221-Panchla Khurd to New -- 2.000 3.750 Complete 0 27.55 18.37 45.92 4.13 (0 , 0 , 1 , 0 , 1) Rewlai Nadi (VR1955) 844 L234 L234-Samrau Village to New -- 6.600 3.750 Complete 3 104.59 69.73 174.32 15.69 (0 , 0 , 1 , 0 , 1) Basterwala, Talwala, Meghwalon Ki Dhani (VR1967) 845 L247 L247-SH-61 Km. 73 to New -- 3.700 3.750 Complete 4 62.42 41.62 104.04 9.36 (0 , 0 , 1 , 0 , 1) Jaychandon Ki Dhani (VR1916) 846 L207 L207-Bada Kotecha to New -- 2.000 3.750 Complete 0 30.68 20.45 51.13 4.61 (0 , 0 , 1 , 0 , 1) Daukiyo Ki Dhani Dharmaram (VR1951) 847 L175 L175-Osian Soyala Road Km. New Waste Plastics 1.700 3.750 Complete 6 46.19 30.80 76.99 6.93 (0 , 0 , 1 , 0 , 1) 3 to Chicholi, Bhakaron Ki Dhani (VR1984) 848 L174 L174-SHW-61 Km. 76 to New Waste Plastics 8.000 3.750 Complete 17 170.83 113.89 284.72 25.62 (0 , 0 , 1 , 0 , 1) Hudd Ki Dhani Bethwasiya Osian Road (VR1981) 849 L194 L194-ODR-30 Km. 16 to New -- 1.700 3.750 Complete 0 23.41 15.61 39.02 3.51 (0 , 0 , 1 , 0 , 1) Hanuman Sagar Dhana (VR1945) 850 L193 L193-SHW-61 Km. 108 to New -- 3.500 3.750 Complete 0 48.05 32.03 80.08 7.22 (0 , 0 , 1 , 0 , 1) Patwala Bere Wali Dh, Baba Ke Dewal Ke Pass (VR1944)

Page 65 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

851 L176 L176-Osian Soyala Road Km. New Waste Plastics 4.800 3.750 Complete 19 136.18 90.79 226.97 20.42 (0 , 0 , 1 , 0 , 1) 2 to West Jaton Ki Dhani (VR1985) Block Osian Total 140.650 66 2,274.20 1,516.14 3,790.34 341.19 (0 , 0 , 39 , 0 , 39) Block- Phalodi

852 L165 L165-Ridmalsar to Purohiton New -- 5.900 3.000 Complete 6 66.62 44.42 111.04 9.99 (0 , 0 , 1 , 0 , 1) Dewlo ki Dhani (VR2070) 853 L104 L104-KHEECHAN TO MAJID New -- 2.500 3.750 Complete 0 43.84 29.23 73.07 6.58 (0 , 0 , 1 , 0 , 1) KD 854 L232 L232-BHAYYON KI DHANI TO New -- 4.000 3.750 Complete 0 59.83 39.89 99.72 8.97 (0 , 0 , 1 , 0 , 1) BHANI NADI 855 L216 L216-JALORA TO LATRI NADI New -- 2.000 3.750 Complete 0 32.10 21.40 53.50 4.81 (0 , 0 , 1 , 0 , 1) KD 856 L100 L100-KHEECHAN TO New -- 5.000 3.750 Complete 0 73.31 48.87 122.18 10.98 (0 , 0 , 1 , 0 , 1) PAMANIYO KD 857 L181 L181-ISHRU TO DHIRANIYA New -- 4.000 3.750 Complete 0 59.86 39.91 99.77 8.98 (0 , 0 , 1 , 0 , 1) KD 858 L154 L154-AAU TO ASHAYASH New -- 3.000 3.750 Complete 0 45.28 30.19 75.47 6.79 (0 , 0 , 1 , 0 , 1) GODARA BHEEL MUNDON KD. 859 L162 L162-RIDMALSAR TO BHATI New -- 3.000 3.750 Complete 0 50.07 33.38 83.45 7.51 (0 , 0 , 1 , 0 , 1) NADIYA SUTHARO KD 860 L167 L167-Kharia TO KISHNA New -- 3.000 3.750 Complete 0 56.74 37.83 94.57 8.51 (0 , 0 , 1 , 0 , 1) NAIYO KD 861 L135 L135-HANUMAN NAGAR TO New -- 2.500 3.750 Complete 0 34.22 22.82 57.04 5.13 (0 , 0 , 1 , 0 , 1) DARA DEVAJA KD 862 L140 L140-MOHAR NAGTAR TO New -- 6.000 3.750 Complete 0 80.50 53.66 134.16 12.07 (0 , 0 , 1 , 0 , 1) DHARANI MEGHWAL 863 L251 L251-DHADHO TO UMANIYO New -- 3.000 3.750 Complete 0 48.58 32.38 80.96 7.29 (0 , 0 , 1 , 0 , 1) KD

Page 66 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

864 L139 L139-Mohar Nagar TO New -- 3.800 3.750 Complete 0 52.88 35.26 88.14 7.93 (0 , 0 , 1 , 0 , 1) GANDHI KHAN KIDHANI 865 L136 L136-HANUMAN NAGAR TO New -- 3.500 3.750 Complete 0 48.43 32.29 80.72 7.26 (0 , 0 , 1 , 0 , 1) KHAWA MEWA KD 866 L261 L261-DHADHO TO PETRU KD New -- 4.000 3.750 Complete 0 60.55 40.37 100.92 9.08 (0 , 0 , 1 , 0 , 1)

867 L123 L123-BARJASAR TO SAVAN New -- 3.000 3.750 Complete 0 47.00 31.33 78.33 7.05 (0 , 0 , 1 , 0 , 1) VISNOI KI DHANI 868 L155 L155-CHHITAR BERA TO New -- 2.500 3.750 Complete 0 34.61 23.08 57.69 5.19 (0 , 0 , 1 , 0 , 1) SINDHIYO KD 869 L112 L112-MORIYA TO GAYA KI New -- 5.500 3.750 Complete 0 88.67 59.11 147.78 13.30 (0 , 0 , 1 , 0 , 1) DHANI 870 L142 L142-BHEEYASAR TO SAUON New -- 3.000 3.750 Complete 0 37.87 25.24 63.11 5.68 (0 , 0 , 1 , 0 , 1) KI DHANI 871 L253 L253-DHADHO TO JOGI New -- 6.900 3.750 Complete 0 113.55 75.70 189.25 17.03 (0 , 0 , 1 , 0 , 1) MAGARA 872 L133 L133-BHEEYASAR TO New -- 3.200 3.750 Complete 0 41.86 27.90 69.76 6.28 (0 , 0 , 1 , 0 , 1) PACHANDARA KI DHANI 873 L143 L143-BHEEYASAR TO New -- 3.250 3.750 Complete 0 43.38 28.92 72.30 6.51 (0 , 0 , 1 , 0 , 1) TEJANIO KI DHANI 874 L262 L262-DHADHO TO SUJAN New -- 5.500 3.750 Complete 0 88.12 58.75 146.87 13.22 (0 , 0 , 1 , 0 , 1) SINGH KD 875 L126 L126-JAWAR NADA TO New -- 2.500 3.750 Complete 0 51.92 34.61 86.53 7.79 (0 , 0 , 1 , 0 , 1) NARAYAN RAM VISHNOI KD 876 L125 L125-ASOLAI TO BHEELON & New -- 3.800 3.750 Complete 0 70.97 47.32 118.29 10.65 (0 , 0 , 1 , 0 , 1) PURKHANIYON KD 877 L258 L258-DHADHO TO VISHNOI New -- 4.500 3.750 Complete 0 70.64 47.10 117.74 10.59 (0 , 0 , 1 , 0 , 1) CHAK 878 L260 L260-DHADHO TO KELNO KD New -- 1.500 3.750 Complete 0 24.68 16.46 41.14 3.70 (0 , 0 , 1 , 0 , 1)

879 L127 L127-JAWAR NADA TO HARJI New -- 2.000 3.750 Complete 0 29.62 19.74 49.36 4.44 (0 , 0 , 1 , 0 , 1) GODARA KD

Page 67 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

880 L259 L259-DHADHO TO New -- 2.000 3.750 Complete 0 34.88 23.26 58.14 5.24 (0 , 0 , 1 , 0 , 1) MEGHWALON RANA RAJPUTO KD 881 L250 L250-BAMNOO TO KALYAN New -- 2.000 3.750 Complete 0 31.35 20.90 52.25 4.70 (0 , 0 , 1 , 0 , 1) SINGH KD 882 L257 L257-BAMNOO TO DHUKRI New -- 2.000 3.750 Complete 0 32.55 21.70 54.25 4.88 (0 , 0 , 1 , 0 , 1) NADI KD 883 L263 L263-BENGATI KHURD TO New -- 5.850 3.750 Complete 0 90.76 60.50 151.26 13.62 (0 , 0 , 1 , 0 , 1) SANKHALA RAJPUT MEGHWALO KD 884 L265 L265-KALRAN TO New -- 2.500 3.750 Complete 0 40.78 27.18 67.96 6.13 (0 , 0 , 1 , 0 , 1) MUSHALMANO KD (WEST REG 885 L266 L266-KALRAN TO SINDHIYO New -- 2.500 3.750 Complete 0 39.65 26.44 66.09 5.95 (0 , 0 , 1 , 0 , 1) KD 886 L245 L245-SANWREEJ TO New -- 5.300 3.750 Complete 0 79.49 53.00 132.49 11.92 (0 , 0 , 1 , 0 , 1) JEEYARAM GURA KD 887 L244 L244-SANWREEJ New -- 5.000 3.750 Complete 0 73.41 48.94 122.35 11.03 (0 , 0 , 1 , 0 , 1) BHEEKHARAM JAT KD 888 L121 L121-RANISAR MEGHWAL New -- 4.000 3.750 Complete 0 55.08 36.72 91.80 8.26 (0 , 0 , 1 , 0 , 1) BHILTALON KI DHANI 889 L209 L209-DHELANA TO BHILO KD New -- 4.300 3.750 Complete 1 79.51 53.01 132.52 11.92 (0 , 0 , 1 , 0 , 1)

890 L211 L211-DHELANA TO KUMARO New -- 6.000 3.750 Complete 0 102.14 68.10 170.24 15.33 (0 , 0 , 1 , 0 , 1) KD 891 L213 L213-DHELANA TO GAYANO New -- 4.300 3.750 Complete 0 73.71 49.14 122.85 11.06 (0 , 0 , 1 , 0 , 1) KD 892 L210 L210-DHELANA TO SUTHARO New -- 2.500 3.750 Complete 0 45.20 30.13 75.33 6.78 (0 , 0 , 1 , 0 , 1) KD 893 L212 L212-DHELANA TO MALANI New -- 2.700 3.750 Complete 0 49.49 33.00 82.49 7.42 (0 , 0 , 1 , 0 , 1) MEGHWALO KD 894 L215 L215-DAYAKOR TO New -- 3.500 3.750 Complete 0 55.63 37.08 92.71 8.36 (0 , 0 , 1 , 0 , 1) DANDTALAB KD

Page 68 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

895 L220 L220-DAYAKOR TO DAYAKOR New -- 5.000 3.750 Complete 0 76.07 50.71 126.78 11.41 (0 , 0 , 1 , 0 , 1) GAON KD 896 L208 L208-LOHAWAT BISNAWAS TO New Waste Plastics 3.000 3.750 Complete 0 51.44 34.30 85.74 7.86 (0 , 0 , 1 , 0 , 1) HARTIYALI BHEEL KD 897 L192 L192-LOHAWAT BISNAWAS TO New Waste Plastics 2.500 3.750 Complete 0 57.56 38.37 95.93 8.64 (0 , 0 , 1 , 0 , 1) MEGHWAL SATRI KD (VR2134) 898 L186 L186-MOOLRAJ TO KOLANI New Waste Plastics 2.200 3.750 Complete 0 39.16 26.11 65.27 5.88 (0 , 0 , 1 , 0 , 1) KBNICHAR KD 899 L190 L190-LOHAWAT JATAHWAS New Waste Plastics 5.000 3.750 Complete 0 102.91 68.61 171.52 15.44 (0 , 0 , 1 , 0 , 1) TO JATO KD 900 L120 L120-DENOK TO POKARRAM New Waste Plastics 6.000 3.750 Complete 0 101.99 67.99 169.98 15.29 (0 , 0 , 1 , 0 , 1) CHAMPAWAT KI DHANI 901 L118 L118-MUNJASAR TO New Waste Plastics 5.000 3.750 Complete 0 98.68 65.78 164.46 14.80 (0 , 0 , 1 , 0 , 1) BHIYANION KI DHANI (VR2066) 902 L110 L110-SHAITAN SINGH NAGAR New -- 5.000 3.750 Complete 0 81.34 54.23 135.57 12.21 (0 , 0 , 1 , 0 , 1) TO BHATIYA KI DHANI 903 L111 L111-AMLA TO BABU New -- 4.000 3.750 Complete 0 64.25 42.84 107.09 9.64 (0 , 0 , 1 , 0 , 1) GODARA KI DHANI 904 L107 L107-AMLA TO JANWARO New -- 4.700 3.750 Complete 0 75.37 50.25 125.62 11.31 (0 , 0 , 1 , 0 , 1) NADA KI DHANI 905 L108 L108-AMLA TO RAMSAGAR New -- 6.700 3.750 Complete 0 113.06 75.38 188.44 16.96 (0 , 0 , 1 , 0 , 1) BERA Block Phalodi Total 205.900 7 3,301.19 2,200.80 5,501.99 495.35 (0 , 0 , 54 , 0 , 54) Block- Shergarh

906 L062 L062-Khirjan Khas to Gaon New -- 4.550 3.750 Complete 0 77.47 51.64 129.11 11.62 (0 , 0 , 1 , 0 , 1) Taliya Soda Jorji Ki Dhani (VR2179) 907 L033 L033-Sai to Khetsingh Nagar New -- 2.700 3.750 Complete 0 39.85 26.56 66.41 5.97 (0 , 0 , 1 , 0 , 1) (VR2180)

Page 69 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

908 L075 L075-Suwaliya to Riako ki New -- 6.000 3.750 Complete 0 91.13 60.76 151.89 13.62 (0 , 0 , 1 , 0 , 1) Dhani (VR2181) 909 L069 L069-Pabusar-Raidhanpura New -- 3.700 3.750 Complete 0 50.23 33.48 83.71 7.52 (0 , 0 , 1 , 0 , 1) road to Baganiyon KD,Kumbharon KD (VR2178) 910 L081 L081-Somesar to okatiyon ki New -- 9.000 3.750 Complete 0 169.18 112.79 281.97 25.37 (0 , 0 , 1 , 0 , 1) Dhani (VR2182) Block Shergarh Total 25.950 0 427.86 285.23 713.09 64.10 (0 , 0 , 5 , 0 , 5)

District Jodhpur Total 764.100 123 12,546.77 8,364.50 20,911.27 1,882.23 (0 , 0 , 221 , 0 , 221) District- Nagaur

Block- Degana

911 L090 L090-Khinyas to Bajiyon ki New -- 2.600 3.750 Complete 2 47.90 31.93 79.83 7.20 (0 , 0 , 1 , 0 , 1) Dhani 912 L094 L094-Kutayasani Khurd to New -- 1.000 3.750 Complete 1 26.56 17.71 44.27 3.98 (0 , 0 , 1 , 0 , 1) Tanka ki Dhani 913 L092 L092-Bamna Barna Road Km New -- 1.000 3.750 Complete 0 36.68 24.45 61.13 5.50 (0 , 0 , 1 , 0 , 1) 4 to Sowa ki Dhani 914 L086 L086-Khuri Khurd to New -- 6.380 3.750 Complete 0 98.93 65.96 164.89 14.84 (0 , 0 , 1 , 0 , 1) Ratdiyon ki Dhani 915 L085 L085-Edwa to Jorawarpura New -- 2.000 3.750 Complete 1 57.57 38.38 95.95 8.64 (0 , 0 , 1 , 0 , 1)

Block Degana Total 12.980 4 267.64 178.43 446.07 40.16 (0 , 0 , 5 , 0 , 5)

Block- Didwana

916 L082 L082-Bhopji Ka Bas to New -- 3.000 3.750 Complete 1 81.18 54.12 135.30 12.17 (0 , 0 , 1 , 0 , 1) Fagariyo Ki Dhani 917 L140 L140-Mega Highway (Baba ki New -- 3.400 3.750 Complete 1 65.29 43.53 108.82 9.80 (0 , 0 , 1 , 0 , 1) Dhani) to Kankariya Ki Dhani 918 L132 L132-Ganwari to Bhawani New CELL Filled 1.500 3.750 Complete 1 39.20 26.14 65.34 5.88 (0 , 0 , 1 , 0 , 1) Pura Concrete

Page 70 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

919 L133 L133-Kharesh Road to New -- 1.600 3.750 Complete 1 38.06 25.37 63.43 5.71 (0 , 0 , 1 , 0 , 1) Bijarniya Ki Dhani 920 L130 L130-Koliya to Bera Ki Dhani New -- 4.500 3.750 Complete 1 83.40 55.60 139.00 12.52 (0 , 0 , 1 , 0 , 1)

921 L129 L129-Peedwa - Runwa Road New Roller 0.800 3.750 Complete 1 20.74 13.83 34.57 3.11 (0 , 0 , 1 , 0 , 1) to Utradi ki Dhani Compacted Concrete Pavement 922 L141 L141-Sewa to Nathusar Bas New -- 1.500 3.750 Complete 1 43.66 29.11 72.77 6.56 (0 , 0 , 1 , 0 , 1)

923 L136 L136-Sikar Road (MDR-24) to New Roller 1.500 3.750 Complete 1 40.35 26.90 67.25 6.05 (0 , 0 , 1 , 0 , 1) Khokhi Ki Dhani Compacted Concrete Pavement 924 L066 L066-Singhana to Dukiyo Ki New -- 1.600 3.750 Complete 1 47.41 31.61 79.02 7.12 (0 , 0 , 1 , 0 , 1) Dhani 925 L134 L134-Serani Abad to New -- 5.500 3.750 Complete 1 132.85 88.57 221.42 19.93 (0 , 0 , 1 , 0 , 1) Doongari Ki Dhani Block Didwana Total 24.900 10 592.15 394.77 986.92 88.85 (0 , 0 , 10 , 0 , 10) Block- Jayal

926 L135 L135-Duguastau to Dhatiyad New -- 7.000 3.750 Complete 0 177.85 118.56 296.41 26.67 (0 , 0 , 1 , 0 , 1)

927 L116 L116-Surpaliya to Kanolai New -- 4.200 3.750 Complete 0 70.80 47.20 118.00 10.62 (0 , 0 , 1 , 0 , 1) Nadi ki Dhani 928 L112 L112-Jalniyasar to New -- 3.900 3.750 Complete 0 64.79 43.20 107.99 10.00 (0 , 0 , 1 , 0 , 1) Bhinwasar Ki Dhani 929 L125 L125-Borwa to Bawariyo ki New -- 2.000 3.750 Complete 0 32.43 21.62 54.05 4.86 (0 , 0 , 1 , 0 , 1) Dhani 930 L117 L117-Gugriyali to Jat New -- 3.000 3.750 Complete 0 50.54 33.69 84.23 7.58 (0 , 0 , 1 , 0 , 1) Bishnoi ki Dhani 931 L133 L133-Kachras to Nahayi ki New -- 3.000 3.750 Complete 0 51.46 34.31 85.77 7.72 (0 , 0 , 1 , 0 , 1) Dhani Block Jayal Total 23.100 0 447.87 298.58 746.45 67.45 (0 , 0 , 6 , 0 , 6)

Page 71 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Kuchaman City

932 L145 L145-Piprali Road to Genano New -- 3.600 3.750 Complete 3 68.14 45.42 113.56 10.22 (0 , 0 , 1 , 0 , 1) Ki Dhani 933 L155 L155-Shimbpura Road to New -- 2.500 3.750 Complete 2 47.57 31.71 79.28 7.14 (0 , 0 , 1 , 0 , 1) Tandi Ki Dhani 934 L151 L151-Gudha Salt Road to New -- 1.800 3.750 Complete 1 34.22 22.81 57.03 5.13 (0 , 0 , 1 , 0 , 1) Kumawato Ki Dhani 935 L157 L157-Rajliya to Bichilo Ki New -- 3.000 3.750 Complete 2 56.36 37.58 93.94 8.46 (0 , 0 , 1 , 0 , 1) Dhani 936 L161 L161-Bhagwanpura to New -- 1.500 3.750 Complete 1 29.91 19.94 49.85 4.49 (0 , 0 , 1 , 0 , 1) Puniyo Ki Dhani 937 L162 L162-SH-19 to Ralya Ki New -- 2.100 3.750 Complete 1 40.15 26.76 66.91 6.02 (0 , 0 , 1 , 0 , 1) Dhani 938 L158 L158-Panchota to Bijarniya New -- 3.000 3.750 Complete 2 56.23 37.48 93.71 8.44 (0 , 0 , 1 , 0 , 1) Ki Dhani 939 L148 L148-SH-19 to Bhagasro Ki New -- 1.700 3.750 Complete 1 32.61 21.74 54.35 4.90 (0 , 0 , 1 , 0 , 1) Dhani 940 L154 L154-SH-2C-Lunwa to Syoji New -- 2.800 3.750 Complete 2 52.53 35.02 87.55 7.86 (0 , 0 , 1 , 0 , 1) Ki Dhani 941 L163 L163-Manglodi to Sundariyo New -- 3.500 3.750 Complete 2 66.19 44.13 110.32 9.94 (0 , 0 , 1 , 0 , 1) Ki Dhani 942 L156 L156-Mithari to Bagriyo Ki New -- 1.500 3.750 Complete 1 29.25 19.50 48.75 4.39 (0 , 0 , 1 , 0 , 1) Dhani 943 L150 L150-Mandawara to Kuldiyo New CELL Filled 1.300 3.750 Complete 0 29.23 19.48 48.71 4.37 (0 , 0 , 1 , 0 , 1) Ki Dhani Concrete 944 L160 L160-Mega High Way to New CELL Filled 1.300 3.750 Complete 0 29.03 19.36 48.39 4.34 (0 , 0 , 1 , 0 , 1) Nawado Ki Dhani Concrete 945 L152 L152-Thikariy Kalla to New CELL Filled 1.400 3.750 Complete 0 31.62 21.08 52.70 4.74 (0 , 0 , 1 , 0 , 1) Nitharwalo Ki Dhani Concrete 946 L149 L149-Chosala to Jhajro Ki New CELL Filled 1.100 3.750 Complete 0 25.40 16.93 42.33 3.81 (0 , 0 , 1 , 0 , 1) Dhani Concrete Block Kuchaman City Total 32.100 18 628.43 418.95 1,047.38 94.25 (0 , 0 , 15 , 0 , 15)

Page 72 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Makrana

947 L098 L098-Makrana Manglana New -- 1.500 3.750 Complete 1 29.13 19.42 48.55 4.37 (0 , 0 , 1 , 0 , 1) Road to Nayko Ki Dhani 948 L140 L140-Budsu-Bharnai Road to New -- 3.000 3.750 Complete 3 62.26 41.50 103.76 9.34 (0 , 0 , 1 , 0 , 1) Keriya Nadi Ki Dhani 949 L096 L096-Joosari to Chopro Ki New -- 4.350 3.750 Complete 3 84.65 56.43 141.08 12.70 (0 , 0 , 1 , 0 , 1) Dhani 950 L142 L142-Manana-Loroli Road to New Marble Slurry 2.250 3.750 Complete 3 42.23 28.16 70.39 6.33 (0 , 0 , 1 , 0 , 1) Jaro Ki Dhani 951 L116 L116-Harnawa-Toshina to New -- 2.000 3.750 Complete 3 40.01 26.67 66.68 6.00 (0 , 0 , 1 , 0 , 1) Tetarwalo Ki Dhani 952 L141 L141-Budsu-Bharnai Road to New -- 3.000 3.750 Complete 3 60.82 40.54 101.36 9.11 (0 , 0 , 1 , 0 , 1) Kankariya Bera 953 L135 L135-Jiwadiya to Rahado Ki New -- 1.750 3.750 Complete 2 43.15 28.77 71.92 6.47 (0 , 0 , 1 , 0 , 1) Dhani 954 L132 L132-Joosariya to Adram Ji- New Marble Slurry 2.500 3.750 Complete 3 51.62 34.41 86.03 7.75 (0 , 0 , 1 , 0 , 1) Dharniya-Ka Bera 955 L110 L110-Kalwa to Sundariya Ki New -- 2.500 3.750 Complete 3 49.33 32.88 82.21 7.41 (0 , 0 , 1 , 0 , 1) Dhani 956 L112 L112-Borawar-Bhichawa New -- 3.000 3.750 Complete 3 60.68 40.45 101.13 9.11 (0 , 0 , 1 , 0 , 1) Road to Tejmal Ki Dhani 957 L133 L133-Gedha Kalla-Ramsiya New -- 2.000 3.750 Complete 0 39.61 26.41 66.02 5.94 (0 , 0 , 1 , 0 , 1) Road to Der Ki Dhani 958 L120 L120-Dabriya to Dujod Ki New -- 2.000 3.750 Complete 0 39.97 26.64 66.61 5.99 (0 , 0 , 1 , 0 , 1) Dhani 959 L124 L124-Bhaiy Kalla to Gujaron New -- 4.300 3.750 Complete 0 77.16 51.44 128.60 11.57 (0 , 0 , 1 , 0 , 1) Ki Dhani 960 L122 L122-Kucheepla to Natho Ki New -- 2.300 3.750 Complete 0 52.52 35.01 87.53 7.88 (0 , 0 , 1 , 0 , 1) Dhani 961 L129 L129-Noondara to Chhabon New -- 3.000 3.750 Complete 0 60.83 40.56 101.39 9.13 (0 , 0 , 1 , 0 , 1) Ki Dhani

Page 73 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

962 L127 L127-Sarnawda to Beniwalo New -- 3.000 3.750 Complete 0 47.71 31.81 79.52 7.16 (0 , 0 , 1 , 0 , 1) Ki Dhani Block Makrana Total 42.450 27 841.67 561.11 1,402.78 126.26 (0 , 0 , 16 , 0 , 16) Block- Merta

963 L119 L119-Lamba Jatan to New Marble Slurry 4.100 3.750 Complete 2 90.45 60.30 150.75 13.57 (0 , 0 , 1 , 0 , 1) Kumaharon ki Dhani. 964 L120 L120-Lamba Jatan to New -- 3.000 3.750 Complete 2 51.84 34.56 86.40 7.78 (0 , 0 , 1 , 0 , 1) Sewron ki Dhani 965 L115 L115-Gotan-Shiv to Harji New -- 1.325 3.750 Complete 1 29.41 19.60 49.01 4.41 (0 , 0 , 1 , 0 , 1) Khokher ki Dhani. 966 L117 L117-Harsolaw to Dhabayon New -- 1.620 3.750 Complete 0 30.31 20.20 50.51 4.55 (0 , 0 , 1 , 0 , 1) ki Dhani. 967 L124 L124-Riyan Shyamdas to New -- 3.800 3.750 Complete 1 52.49 34.99 87.48 7.85 (0 , 0 , 1 , 0 , 1) Karwasron ki Dhani. 968 L122 L122-Pundlu to Nayko ki New -- 4.350 3.750 Complete 4 79.07 52.72 131.79 11.87 (0 , 0 , 1 , 0 , 1) Dhani. 969 L121 L121-Nokha Chandawatan to New -- 2.250 3.750 Complete 2 44.45 29.63 74.08 6.67 (0 , 0 , 1 , 0 , 1) Mundelon ki Dhani. Block Merta Total 20.445 12 378.01 252.01 630.02 56.70 (0 , 0 , 7 , 0 , 7)

Block- Mundwa

970 L123 L123-Madpura to Meghwal New -- 3.500 3.750 Complete 0 60.49 40.33 100.82 9.07 (0 , 0 , 1 , 0 , 1) kumaron ki Dhani 971 L135 L135-Jorawar pura to Ram New -- 2.000 3.750 Complete 0 41.24 27.50 68.74 6.16 (0 , 0 , 1 , 0 , 1) Dev Mandir 972 L093 L093-A/R to Jat Rajput New -- 7.250 3.750 Complete 0 113.29 75.52 188.81 16.93 (0 , 0 , 1 , 0 , 1) Boari Nayakon ki Dhani 973 L097 L097-A/R to Meghwal New -- 5.500 3.750 Complete 0 101.16 67.44 168.60 15.12 (0 , 0 , 1 , 0 , 1) Harijon ki Dhani

Page 74 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

974 L109 L109-A/R to Dhatar walon New -- 4.650 3.750 Complete 0 76.87 51.24 128.11 11.53 (0 , 0 , 1 , 0 , 1) ki Dhani 975 L134 L134-Gudiya to Northen Bas New -- 1.500 3.750 Complete 0 26.71 17.80 44.51 4.01 (0 , 0 , 1 , 0 , 1)

976 L112 L112-A/R to Hanuman sagar New -- 5.200 3.750 Complete 0 85.71 57.14 142.85 12.86 (0 , 0 , 1 , 0 , 1) ki Dhani 977 L132 L132-A/R to Siyag Khinya New -- 2.950 3.750 Complete 0 50.44 33.62 84.06 7.57 (0 , 0 , 1 , 0 , 1) Ram ki Dhani 978 L116 L116-A/R to Kamaniyon ki New -- 3.000 3.750 Complete 0 51.30 34.20 85.50 7.69 (0 , 0 , 1 , 0 , 1) Dhani 979 L125 L125-Madpura to Sarwan New -- 4.200 3.750 Complete 0 67.82 45.21 113.03 10.17 (0 , 0 , 1 , 0 , 1) Nada Kumaron ki Dhani 980 L110 L110-Kurchi to Vishnoiyon ki New -- 2.000 3.750 Complete 0 34.33 22.89 57.22 5.15 (0 , 0 , 1 , 0 , 1) Dhani 981 L126 L126-Madpura to Rajput New -- 3.300 3.750 Complete 0 54.71 36.48 91.19 8.21 (0 , 0 , 1 , 0 , 1) kumaron ki Dhani Block Mundwa Total 45.050 0 764.07 509.37 1,273.44 114.46 (0 , 0 , 12 , 0 , 12) Block- Nagaur

982 L206 L206-NAGAUR TO Ratan New -- 5.000 3.750 Complete 0 110.08 73.38 183.46 16.50 (0 , 0 , 1 , 0 , 1) sagar Malio ki dhani 983 L126 L126-Nenav to Suthar Beldar New -- 2.950 3.750 Complete 0 48.19 32.13 80.32 7.23 (0 , 0 , 1 , 0 , 1) Ki Dhani 984 L226 L226-Budi to Rugia ki Dhani New -- 3.300 3.750 Complete 0 53.49 35.66 89.15 8.02 (0 , 0 , 1 , 0 , 1)

985 L122 L122-Nagaur Phalodi Road to New Marble Slurry 2.200 3.750 Complete 0 34.52 23.01 57.53 5.18 (0 , 0 , 1 , 0 , 1) Bhati Ki Dhani 986 L123 L123-Nagaur Phalodi Road to New Marble Slurry 4.200 3.750 Complete 0 67.66 45.10 112.76 10.15 (0 , 0 , 1 , 0 , 1) Babaji Rajpot Ki Dhani 987 L223 L223-Tankla to Jajron ki New -- 3.000 3.750 Complete 0 49.75 33.17 82.92 7.46 (0 , 0 , 1 , 0 , 1) Dhani 988 L181 L181-Gorera to Nayak Bhadu New Marble Slurry 3.500 3.750 Complete 0 55.64 37.09 92.73 8.35 (0 , 0 , 1 , 0 , 1) Meghwal Ki dhani

Page 75 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

989 L185 L185-Chau to Naiko ki dhani New -- 3.500 3.750 Complete 0 56.83 37.89 94.72 8.52 (0 , 0 , 1 , 0 , 1)

990 L134 L134-Gudha Bhagwandas New -- 2.950 3.750 Complete 0 47.88 31.92 79.80 7.18 (0 , 0 , 1 , 0 , 1) Kalri Road to Khoja ki Dhani 991 L189 L189-Khetas to Saran Siyago New -- 4.000 3.750 Complete 0 65.05 43.36 108.41 9.76 (0 , 0 , 1 , 0 , 1) ki Dhani 992 L184 L184-Gorera to Bana rajput New -- 4.000 3.750 Complete 0 64.10 42.73 106.83 9.61 (0 , 0 , 1 , 0 , 1) Nayak ki Dhani 993 L215 L215-Bhawad to Janta Sagar New -- 3.000 3.750 Complete 0 50.66 33.78 84.44 7.60 (0 , 0 , 1 , 0 , 1)

994 L180 L180-Gorera to Karmana New -- 4.000 3.750 Complete 0 64.10 42.73 106.83 9.61 (0 , 0 , 1 , 0 , 1) Nadi ki Dhani 995 L164 L164-Sewari to Sadoli ki New -- 4.000 3.750 Complete 0 63.92 42.62 106.54 9.59 (0 , 0 , 1 , 0 , 1) Dhani 996 L172 L172-Rohini to Inkiya New Marble Slurry 4.500 3.750 Complete 0 72.47 48.31 120.78 10.87 (0 , 0 , 1 , 0 , 1) Meghwal ki dhani 997 L174 L174-Rohini to North New Marble Slurry 2.000 3.750 Complete 0 34.23 22.82 57.05 5.12 (0 , 0 , 1 , 0 , 1) Pooniya ki Dhani 998 L170 L170-Rohini to Jandu Nadi Ki New Marble Slurry 3.500 3.750 Complete 0 55.94 37.30 93.24 8.39 (0 , 0 , 1 , 0 , 1) dhani 999 L175 L175-Shyamsar to Laloo New Marble Slurry 4.000 3.750 Complete 0 62.32 41.55 103.87 9.35 (0 , 0 , 1 , 0 , 1) singh ki Dhani 1000 L179 L179-Jhorda to Jaton ki New -- 4.000 3.750 Complete 0 65.92 43.94 109.86 9.89 (0 , 0 , 1 , 0 , 1) Dhani 1001 L145 L145-NH-89 to BANO KI New -- 3.500 3.750 Complete 0 58.52 39.01 97.53 8.78 (0 , 0 , 1 , 0 , 1) DHANI 1002 L186 L186-Hingonia to Banon Ki New -- 5.200 3.750 Complete 0 83.03 55.35 138.38 12.45 (0 , 0 , 1 , 0 , 1) Dhani 1003 L158 L158-Huda Nai Panwar ki New Marble Slurry 6.000 3.750 Complete 0 95.01 63.34 158.35 14.25 (0 , 0 , 1 , 0 , 1) Dhani to Tandi Puniyo ki Dhani 1004 L188 L188-Jodhiyasi to Rajput New -- 2.500 3.750 Complete 0 40.47 26.98 67.45 6.07 (0 , 0 , 1 , 0 , 1) Meghwal ki Dhani

Page 76 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1005 L176 L176-Shyamsar to Khandai New Marble Slurry 5.000 3.750 Complete 0 79.04 52.69 131.73 11.86 (0 , 0 , 1 , 0 , 1) Nadi 1006 L136 L136-Kalri Sr. Sec. School to New -- 4.500 3.750 Complete 0 71.46 47.64 119.10 10.72 (0 , 0 , 1 , 0 , 1) Jani Meghwal ki Dhani 1007 L150 L150-Chheela to CHUDALA New -- 4.000 3.750 Complete 0 64.08 42.72 106.80 9.61 (0 , 0 , 1 , 0 , 1) MEGH. KI DHANI 1008 L149 L149-BUKARAM SOTAN to New -- 4.000 3.750 Complete 0 66.28 44.19 110.47 9.94 (0 , 0 , 1 , 0 , 1) DUDI HARDU KI DHANI 1009 L138 L138-Kalri to Godara Ki New -- 5.000 3.750 Complete 0 79.62 53.08 132.70 11.94 (0 , 0 , 1 , 0 , 1) Dhani 1010 L199 L199-Malgaon to Binaniya New -- 1.500 3.750 Complete 0 25.19 16.80 41.99 3.78 (0 , 0 , 1 , 0 , 1) meghwal ki Dhani 1011 L128 L128-Bhundel Galni Road to New -- 5.550 3.750 Complete 0 89.44 59.62 149.06 13.42 (0 , 0 , 1 , 0 , 1) Raiko Jat Ki Dhani 1012 L131 L131-Guda Bhagwandas New -- 2.550 3.750 Complete 0 40.18 26.78 66.96 6.03 (0 , 0 , 1 , 0 , 1) Raidhenu Road Km 2 to Meghwal ki Dhani II 1013 L146 L146-Ali Padan Road to ANA New -- 2.000 3.750 Complete 0 33.06 22.04 55.10 4.96 (0 , 0 , 1 , 0 , 1) KISHNA BHAMBU KLI DHANI 1014 L129 L129-Gudha Bhagwandas New -- 5.000 3.750 Complete 0 81.83 54.55 136.38 12.27 (0 , 0 , 1 , 0 , 1) Suthar Nai Road to Godara Meghwal Kaswa ki Dhani 1015 L141 L141-RATRI to JANGUO KI New -- 3.000 3.750 Complete 0 48.73 32.49 81.22 7.31 (0 , 0 , 1 , 0 , 1) DHANI 1016 L157 L157-Gangolai Tal to Ratna New -- 2.500 3.750 Complete 0 40.49 27.00 67.49 6.07 (0 , 0 , 1 , 0 , 1) Hamira Godaro ki Dhani 1017 L160 L160-Dudana Tal to Loyal New -- 1.000 3.750 Complete 0 17.74 11.83 29.57 2.66 (0 , 0 , 1 , 0 , 1) Basti Block Nagaur Total 130.400 0 2,136.92 1,424.60 3,561.52 320.50 (0 , 0 , 36 , 0 , 36) Block- Parbatsar

1018 L080 L080-SH-07 km 37 to New -- 1.500 3.750 Complete 0 34.60 23.06 57.66 5.19 (0 , 0 , 1 , 0 , 1) Pungiyon ki Dhani

Page 77 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1019 L084 L084-SH-07 km 35 to Naka ki New -- 0.750 3.750 Complete 0 15.82 10.55 26.37 2.37 (0 , 0 , 1 , 0 , 1) Dhani 1020 L086 L086-Mayapur Banwal road New -- 1.650 3.750 Complete 0 34.76 23.18 57.94 5.21 (0 , 0 , 1 , 0 , 1) km 4 to Ratipal ki Dhani 1021 L085 L085-Khanpur to Ratdi Nadi New -- 2.500 3.750 Complete 2 54.20 36.13 90.33 8.13 (0 , 0 , 1 , 0 , 1)

Block Parbatsar Total 6.400 2 139.38 92.92 232.30 20.90 (0 , 0 , 4 , 0 , 4)

Block- Riyan

1022 L096 L096-Saneriya to Deri Bera New -- 1.000 3.750 Complete 1 26.44 17.63 44.07 3.97 (0 , 0 , 1 , 0 , 1) ki Dhani. Block Riyan Total 1.000 1 26.44 17.63 44.07 3.97 (0 , 0 , 1 , 0 , 1)

District Nagaur Total 338.825 74 6,222.59 4,148.36 10,370.95 933.50 (0 , 0 , 112 , 0 , 112) District- Pali

Block- Bali

1023 L102 L102-Beeroliya to Ramboari New -- 2.550 3.000 Complete 2 50.04 33.36 83.40 7.50 (0 , 0 , 1 , 0 , 1)

1024 L105 L105-Malnoo to Bhagli New -- 2.000 3.000 Complete 4 52.20 34.80 87.00 7.82 (0 , 0 , 1 , 0 , 1)

1025 L107 L107-Nana Kagdara Road New -- 2.000 3.000 Complete 2 49.32 32.88 82.20 7.40 (0 , 0 , 1 , 0 , 1) Km. 3 to Reliya 1026 L106 L106-Bhagli to Songiri New -- 1.000 3.000 Complete 2 22.76 15.18 37.94 3.41 (0 , 0 , 1 , 0 , 1)

1027 L103 L103-Jakglai to Jaitadurga New -- 2.000 3.000 Complete 4 50.51 33.67 84.18 7.57 (0 , 0 , 1 , 0 , 1)

1028 L099 L099-Kuran Sambharwara New -- 1.500 3.000 Complete 5 44.90 29.93 74.83 6.74 (0 , 0 , 1 , 0 , 1) road Km. 11 to Dokaliya 1029 L104 L104-Kuran to Sabharwara New -- 1.750 3.000 Complete 10 59.69 39.79 99.48 8.92 (0 , 0 , 1 , 0 , 1) road Km. 3 to Bhagawarla 1030 L094 L094-Amliya Bhemina New Waste Plastics 5.320 3.750 Complete 5 164.74 109.82 274.56 24.71 (0 , 0 , 1 , 0 , 1) Thandiberi Road Km. 8 to Aamriya

Page 78 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1031 L096 L096-Bheemna Upperla New -- 1.500 3.000 Complete 4 44.96 29.98 74.94 6.74 (0 , 0 , 1 , 0 , 1) Bhemana road Km. 2 to Madiyala Raja 1032 L097 L097-Dhanverli Bheemana New -- 1.500 3.000 Complete 2 33.62 22.42 56.04 5.04 (0 , 0 , 1 , 0 , 1) Rd Km 16 to Ubaripani 1033 L098 L098-Dhanverli Bhemana New Waste Plastics 2.300 3.000 Complete 4 68.95 45.97 114.92 10.34 (0 , 0 , 1 , 0 , 1) road Km. 12 to Bhaglakhuna 1034 L100 L100-Kuran Sambharwara New Waste Plastics 2.700 3.000 Complete 7 80.91 53.94 134.85 12.14 (0 , 0 , 1 , 0 , 1) road Km. 1 to Khadarafali 1035 L095 L095-Bhimana Upperla New Waste Plastics 4.000 3.000 Complete 16 119.98 79.99 199.97 18.00 (0 , 0 , 1 , 0 , 1) Bhimana road Km to Kageraupperla Bhinmana Block Bali Total 30.120 67 842.58 561.73 1,404.31 126.33 (0 , 0 , 13 , 0 , 13) Block- Desuri

1036 L074 L074-Nadol to Parkela ki New -- 1.000 3.750 Complete 0 24.74 16.49 41.23 3.71 (0 , 0 , 1 , 0 , 1) Dhani 1037 L072 L072-Desuri to Garasiya New -- 2.175 3.750 Complete 3 60.59 40.39 100.98 9.09 (0 , 0 , 1 , 0 , 1) Basti 1038 L073 L073-Narlai to Bawariyon ka New -- 1.850 3.750 Complete 3 53.96 35.97 89.93 8.13 (0 , 0 , 1 , 0 , 1) Jhupa Block Desuri Total 5.025 6 139.29 92.85 232.14 20.93 (0 , 0 , 3 , 0 , 3)

Block- Jaitaran

1039 L106 L106-Garniya to Siriya Bada New -- 3.500 3.750 Complete 1 47.37 31.58 78.95 7.10 (0 , 0 , 1 , 0 , 1) (TRACK956) 1040 L105 L105-Dewariya to Badet New -- 3.200 3.750 Complete 2 46.76 31.17 77.93 6.92 (0 , 0 , 1 , 0 , 1) (TRACK958) 1041 L100 L100-Agewa to Solankiyon ki New -- 1.000 3.750 Complete 0 14.74 9.83 24.57 2.22 (0 , 0 , 1 , 0 , 1) Dhani (TRACK953) 1042 L096 L096-Lasani to Lasani ki New -- 2.400 3.750 Complete 0 32.60 21.73 54.33 4.89 (0 , 0 , 1 , 0 , 1) Dhani (TRACK950)

Page 79 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1043 L104 L104-Chawandiya to New -- 2.000 3.750 Complete 0 28.99 19.32 48.31 4.33 (0 , 0 , 1 , 0 , 1) Sonigara ki Dhani (TRACK955) 1044 L099 L099-Nimaj to Bodi Bawari New -- 2.000 3.750 Complete 0 29.99 19.99 49.98 4.48 (0 , 0 , 1 , 0 , 1) (TRACK957) 1045 L108 L108-Baloonda to kantaliya New -- 1.000 3.750 Complete 0 16.63 11.09 27.72 2.50 (0 , 0 , 1 , 0 , 1) ki Dhani (TRACK954) Block Jaitaran Total 15.100 3 217.08 144.71 361.79 32.44 (0 , 0 , 7 , 0 , 7)

Block- Marwar Junction

1046 L113 L113-Jojawar to Guda New -- 0.700 3.750 Complete 0 18.82 12.55 31.37 2.82 (0 , 0 , 1 , 0 , 1) Padam Singh Road (VR0935) 1047 L111 L111-Auwa to Naton Ki New -- 1.650 3.750 Complete 3 47.22 31.48 78.70 7.08 (0 , 0 , 1 , 0 , 1) Dhani (VR0934) 1048 L108 L108-Siriyari to Poonamo Ka New -- 1.100 3.750 Complete 2 27.99 18.66 46.65 4.20 (0 , 0 , 1 , 0 , 1) Guda (VR0931) 1049 L107 L107-Saran Seenchiyawas to New -- 2.500 3.750 Complete 5 71.44 47.63 119.07 10.72 (0 , 0 , 1 , 0 , 1) Nichli Neembli Road (VR0933) Block Marwar Junction Total 5.950 10 165.47 110.32 275.79 24.82 (0 , 0 , 4 , 0 , 4)

Block- Pali

1050 L075 L075-Bala to Bala Ki Dhani New -- 5.300 3.750 Complete 5 95.88 63.92 159.80 14.38 (0 , 0 , 1 , 0 , 1) (VR0915) 1051 L076 L076-Denda to Bhato Ki New -- 1.250 3.750 Complete 0 22.82 15.22 38.04 3.42 (0 , 0 , 1 , 0 , 1) Dhani (VR0916) Block Pali Total 6.550 5 118.70 79.14 197.84 17.80 (0 , 0 , 2 , 0 , 2)

Block- Raipur

1052 L100 L100-Chang to Kalali Ka New -- 0.700 3.750 Complete 0 10.67 7.11 17.78 1.60 (0 , 0 , 1 , 0 , 1) Badiya 1053 L099 L099-Ram Garh to Ghati New -- 1.000 3.750 Complete 0 14.14 9.43 23.57 2.12 (0 , 0 , 1 , 0 , 1) Nichala Badiya

Page 80 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1054 L093 L093-Sumel to Dagala Ka New -- 3.000 3.750 Complete 0 39.68 26.45 66.13 5.95 (0 , 0 , 1 , 0 , 1) Khera 1055 L094 L094-Sumel to Shyampura New -- 1.000 3.750 Complete 0 14.26 9.51 23.77 2.14 (0 , 0 , 1 , 0 , 1)

1056 L097 L097-Pratap Garh to New -- 0.700 3.750 Complete 0 11.41 7.61 19.02 1.71 (0 , 0 , 1 , 0 , 1) Rajputon Ki Dhani 1057 L101 L101-Chainpura to Chowki New -- 0.700 3.750 Complete 0 8.99 6.00 14.99 1.34 (0 , 0 , 1 , 0 , 1) Tola 1058 L125 L125-Giri to Khari Vaali New -- 1.000 3.750 Complete 0 13.45 8.96 22.41 2.01 (0 , 0 , 1 , 0 , 1)

1059 L104 L104-Kalaliya to Samaliya New -- 1.500 3.750 Complete 0 21.47 14.32 35.79 3.21 (0 , 0 , 1 , 0 , 1)

1060 L105 L105-Kalaliya to Chougat New -- 3.000 3.750 Complete 0 37.07 24.71 61.78 5.56 (0 , 0 , 1 , 0 , 1)

1061 L106 L106-Bagari to Bindiya New -- 2.500 3.750 Complete 0 32.79 21.86 54.65 4.85 (0 , 0 , 1 , 0 , 1)

1062 L111 L111-Kalab Kallan to Dhola New -- 1.500 3.750 Complete 0 21.28 14.19 35.47 3.13 (0 , 0 , 1 , 0 , 1) Danta 1063 L113 L113-Sabalpura to Devasiyon New -- 1.500 3.750 Complete 0 21.06 14.04 35.10 3.15 (0 , 0 , 1 , 0 , 1) Ki Dhani 1064 L116 L116-Jhutha to Saina Bera New -- 3.000 3.750 Complete 0 37.07 24.71 61.78 5.60 (0 , 0 , 1 , 0 , 1)

Block Raipur Total 21.100 0 283.34 188.90 472.24 42.37 (0 , 0 , 13 , 0 , 13) Block- Rani

1065 L060 L060-Rani Nadol road Km 5 New -- 1.600 3.750 Complete 0 27.83 18.56 46.39 4.18 (0 , 0 , 1 , 0 , 1) to Ashapura ki Dhani 1066 L061 L061-Mandal to Raikon ki New -- 2.100 3.750 Complete 0 34.29 22.86 57.15 5.14 (0 , 0 , 1 , 0 , 1) Dhani Block Rani Total 3.700 0 62.12 41.42 103.54 9.32 (0 , 0 , 2 , 0 , 2)

District Pali Total 87.545 91 1,828.59 1,219.06 3,047.65 274.01 (0 , 0 , 44 , 0 , 44) District- Pratapgarh

Page 81 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Arnod

1067 L084 L084-SIGARON KA KHERA TO New Roller 2.100 3.750 Complete 8 61.76 41.18 102.94 9.25 (0 , 0 , 1 , 0 , 1) SEEGRON KA KHERA Compacted (VR0455) Concrete Pavement 1068 L116 L116-PADAO TO UMRIPADA New -- 1.600 3.750 Complete 8 47.98 31.99 79.97 7.20 (0 , 0 , 1 , 0 , 1) (VR48) Block Arnod Total 3.700 16 109.75 73.16 182.91 16.45 (0 , 0 , 2 , 0 , 2)

Block-

1069 L032 L032-Bhandla To Choti New Roller 2.000 3.000 Complete 8 53.32 35.55 88.87 8.00 (0 , 0 , 1 , 0 , 1) Bhandla (VR1960) Compacted Concrete Pavement 1070 L077 L077-Shkarkand To Kheda New Roller 1.000 3.000 Complete 4 21.18 14.12 35.30 3.17 (0 , 0 , 1 , 0 , 1) Phala (VR1983) Compacted Concrete Pavement 1071 L099 L099-Jaglawada Road To New Roller 2.000 3.000 Complete 12 59.13 39.42 98.55 8.86 (0 , 0 , 1 , 0 , 1) Ram Garh (VR1993) Compacted Concrete Pavement 1072 L178 L178-Bansi Road To Forest New Roller 1.000 3.000 Complete 3 22.10 14.74 36.84 3.31 (0 , 0 , 1 , 0 , 1) Naka (VR2022) Compacted Concrete Pavement 1073 L151 L151-Phada To Bhagat Fala New Roller 1.000 3.000 Complete 4 29.75 19.84 49.59 4.47 (0 , 0 , 1 , 0 , 1) (VR2015) Compacted Concrete Pavement 1074 L048 L048-Gadariyawas to Garda New Roller 1.000 3.000 Complete 3 27.87 18.58 46.45 4.18 (0 , 0 , 1 , 0 , 1) Fala (VR2024) Compacted Concrete Pavement

Page 82 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1075 L165 L165-Kesariyadad To New Roller 2.500 3.000 Complete 7 55.31 36.88 92.19 8.30 (0 , 0 , 1 , 0 , 1) Dharwadiya Fala (VR2018) Compacted Concrete Pavement 1076 L176 L176-BhojpurTo Badla Fala New Roller 3.500 3.000 Complete 13 81.71 54.47 136.18 12.26 (0 , 0 , 1 , 0 , 1) (VR2021) Compacted Concrete Pavement 1077 L140 L140-Padla Baori To Barana New Roller 1.500 3.000 Complete 6 38.99 25.99 64.98 5.86 (0 , 0 , 1 , 0 , 1) Fala (VR2009) Compacted Concrete Pavement 1078 L037 L037-Mand Kala Road Km 2 New Roller 2.500 3.000 Complete 10 64.27 42.84 107.11 9.64 (0 , 0 , 1 , 0 , 1) to Ramer Talab (VR1963) Compacted Concrete Pavement 1079 L105 L105-Sewa Nagar To Talai New Roller 3.000 3.000 Complete 7 65.57 43.71 109.28 9.83 (0 , 0 , 1 , 0 , 1) Fala (VR1995) Compacted Concrete Pavement 1080 L098 L098-Jaglawada To Mata New Roller 1.000 3.000 Complete 4 21.08 14.05 35.13 3.16 (0 , 0 , 1 , 0 , 1) Sula (VR1991) Compacted Concrete Pavement 1081 L109 L109-Aad Road To Medi Fala New Roller 2.000 3.000 Complete 7 47.53 31.68 79.21 7.13 (0 , 0 , 1 , 0 , 1) (VR1997) Compacted Concrete Pavement 1082 L084 L084-Hajariguda To Pirdauji New Roller 1.500 3.000 Complete 7 42.47 28.31 70.78 6.37 (0 , 0 , 1 , 0 , 1) Fala (VR1989) Compacted Concrete Pavement 1083 L063 L063-Lodi Mandvi To New Roller 1.500 3.000 Complete 7 43.49 29.00 72.49 6.53 (0 , 0 , 1 , 0 , 1) Matatanda (VR1976) Compacted Concrete Pavement

Page 83 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1084 L115 L115-Aad To Ghata Fala New Roller 1.000 3.000 Complete 4 22.73 15.15 37.88 3.40 (0 , 0 , 1 , 0 , 1) (VR2003) Compacted Concrete Pavement 1085 L114 L114-Aad To Bhajuat Fala New Roller 0.800 3.000 Complete 4 18.38 12.26 30.64 2.76 (0 , 0 , 1 , 0 , 1) (VR2002) Compacted Concrete Pavement 1086 L062 L062-Lodi Mandvi To New Roller 4.000 3.000 Complete 16 94.28 62.86 157.14 14.65 (0 , 0 , 1 , 0 , 1) Biladiya Phala (VR1975) Compacted Concrete Pavement 1087 L190 L190-Pahara To Nichla Kota - New Roller 2.250 3.750 Complete 11 66.70 44.47 111.17 10.01 (0 , 0 , 1 , 0 , 1) Upala Kota (VR2013) Compacted Concrete Pavement 1088 L070 L070-Nad To Amli Phala New Roller 0.700 3.750 Complete 1 20.89 13.93 34.82 3.14 (0 , 0 , 1 , 0 , 1) (VR1981) Compacted Concrete Pavement 1089 L055 L055-Bajpura To Dhavari New Roller 1.650 3.750 Complete 7 42.37 28.24 70.61 6.35 (0 , 0 , 1 , 0 , 1) Fala (VR1970) Compacted Concrete Pavement 1090 L145 L145-Kesariyabad To Sata New Roller 4.000 3.750 Complete 13 99.33 66.22 165.55 14.90 (0 , 0 , 1 , 0 , 1) Tala (VR2010) Compacted Concrete Pavement 1091 L112 L112-Jaelawada To Pahad New Roller 1.800 3.750 Complete 6 41.46 27.64 69.10 6.22 (0 , 0 , 1 , 0 , 1) Fala (VR2000) Compacted Concrete Pavement 1092 L172 L172-Payara To Choti Payara New Roller 3.500 3.750 Complete 12 83.15 55.43 138.58 12.47 (0 , 0 , 1 , 0 , 1) (VR2020) Compacted Concrete Pavement

Page 84 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1093 L066 L066-Khoonta To Bhimat & New Roller 1.200 3.750 Complete 10 28.91 19.27 48.18 4.34 (0 , 0 , 1 , 0 , 1) Bharkundi Phala (VR1979) Compacted Concrete Pavement 1094 L152 L152-Pahara To Hadu Beda New Roller 1.500 3.750 Complete 9 39.62 26.42 66.04 5.94 (0 , 0 , 1 , 0 , 1) (VR2016) Compacted Concrete Pavement 1095 L045 L045-Siyad To Ghati Ghar New Roller 3.250 3.750 Complete 12 89.99 59.99 149.98 13.48 (0 , 0 , 1 , 0 , 1) (VR1964) Compacted Concrete Pavement 1096 L137 L137-Ambao To School Fala New Roller 0.800 3.750 Complete 3 21.52 14.34 35.86 3.23 (0 , 0 , 1 , 0 , 1) (VR2008) Compacted Concrete Pavement 1097 L085 L085-Hajariguda To Linba New Roller 1.600 3.750 Complete 7 47.87 31.92 79.79 7.18 (0 , 0 , 1 , 0 , 1) Patada (VR1990) Compacted Concrete Pavement 1098 L080 L080-Gothada Road To New RBI 81 4.000 3.750 Complete 8 97.21 64.80 162.01 14.57 (0 , 0 , 1 , 0 , 1) Badiya Fala (VR1986) 1099 L124 L124-Ultal To Harliya Fala New Roller 2.000 3.750 Complete 10 48.04 32.02 80.06 7.21 (0 , 0 , 1 , 0 , 1) (VR2005) Compacted Concrete Pavement 1100 L147 L147-Phada Road MDR-12B New Roller 1.100 3.750 Complete 7 26.09 17.39 43.48 3.91 (0 , 0 , 1 , 0 , 1) To Pital Fala (VR2011) Compacted Concrete Pavement 1101 L081 L081-Gothada To Gayari New Roller 2.350 3.750 Complete 2 69.49 46.33 115.82 10.43 (0 , 0 , 1 , 0 , 1) Ghaghari Fala (VR1987) Compacted Concrete Pavement

Page 85 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1102 L064 L064-Khoonta To Meghwal & New Roller 1.350 3.750 Complete 7 33.20 22.13 55.33 4.98 (0 , 0 , 1 , 0 , 1) Kalasua Fala (VR1977) Compacted Concrete Pavement 1103 L113 L113-Aad To Kakar Fala New Roller 1.400 3.750 Complete 10 35.26 23.51 58.77 5.29 (0 , 0 , 1 , 0 , 1) (VR2001) Compacted Concrete Pavement 1104 L034 L034-Bhandla To Magari Fala New Roller 1.275 3.750 Complete 8 36.99 24.66 61.65 5.55 (0 , 0 , 1 , 0 , 1) (VR1962) Compacted Concrete Pavement 1105 L050 L050-Gadariyawas To Naya New Roller 0.850 3.750 Complete 6 23.83 15.88 39.71 3.57 (0 , 0 , 1 , 0 , 1) Fala (VR1967) Compacted Concrete Pavement 1106 L079 L079-Gothada To Talab Fala New Roller 1.550 3.750 Complete 6 35.75 23.83 59.58 5.36 (0 , 0 , 1 , 0 , 1) (VR1985) Compacted Concrete Pavement 1107 L053 L053-Bajpura To Mohari Fala New Roller 3.200 3.750 Complete 8 77.02 51.34 128.36 11.56 (0 , 0 , 1 , 0 , 1) (VR1968) Compacted Concrete Pavement 1108 L049 L049-Gadariyawas To Biya New Roller 1.125 3.750 Complete 6 26.30 17.54 43.84 3.94 (0 , 0 , 1 , 0 , 1) Fala (VR1966) Compacted Concrete Pavement 1109 L083 L083-Hajariguda To New Roller 1.200 3.750 Complete 7 30.04 20.03 50.07 4.52 (0 , 0 , 1 , 0 , 1) Kumariya Fala (VR1988) Compacted Concrete Pavement 1110 L071 L071-Nad To Dewala Phala New Roller 0.700 3.750 Complete 6 20.07 13.38 33.45 3.01 (0 , 0 , 1 , 0 , 1) (VR1982) Compacted Concrete Pavement

Page 86 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1111 L078 L078-Shkarkand To Mot Pura New Roller 1.800 3.750 Complete 9 41.78 27.85 69.63 6.27 (0 , 0 , 1 , 0 , 1) (VR1984) Compacted Concrete Pavement 1112 L058 L058-Lodi Mandvi To Anat New Roller 2.675 3.750 Complete 7 59.48 39.66 99.14 8.92 (0 , 0 , 1 , 0 , 1) Fala (VR1971) Compacted Concrete Pavement 1113 T07 T07-Mandvi to Parsola New Roller 1.825 3.750 Complete 9 44.57 29.71 74.28 6.68 (0 , 0 , 3 , 0 , 3) (VR039) Compacted Concrete Pavement 1114 L081 L081-Gothada To Gayari New Roller 1.000 3.750 Complete 2 27.91 18.60 46.51 4.19 (0 , 0 , 1 , 0 , 1) Ghaghari Fala (VR1987) Compacted Concrete Pavement 1115 L085 L085-Hajariguda To Linba New Roller 2.200 3.750 Complete 4 63.67 42.44 106.11 9.55 (0 , 0 , 1 , 0 , 1) Patada (VR1990) Compacted Concrete Pavement 1116 L122 L122-Manpur To Meghwal New Roller 2.525 3.750 Complete 10 71.71 47.81 119.52 10.76 (0 , 0 , 1 , 0 , 1) Fala (VR2004) Compacted Concrete Pavement 1117 L159 L159-Bhanawata To New Roller 1.500 3.750 Complete 7 44.74 29.82 74.56 6.71 (0 , 0 , 1 , 0 , 1) Pakhariya Sag (VR1952) Compacted Concrete Pavement Block Dhariawad Total 90.675 356 2,304.11 1,536.06 3,840.17 346.12 (0 , 0 , 51 , 0 , 51)

Page 87 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Peepal Khoont

1118 L184 L184-T-01 to BHAKTO KA New Roller 2.200 3.750 Complete 3 65.66 43.78 109.44 9.84 (0 , 0 , 1 , 0 , 1) PHANLA (TRACK706) Compacted Concrete Pavement Block Peepal Khoont Total 2.200 3 65.66 43.78 109.44 9.84 (0 , 0 , 1 , 0 , 1)

Block- Pratapgarh

1119 L199 L199-T-01 to Khari Magri New -- 1.000 3.750 Complete 4 29.99 20.00 49.99 4.48 (0 , 0 , 1 , 0 , 1) (TRACK3017) Block Pratapgarh Total 1.000 4 29.99 20.00 49.99 4.48 (0 , 0 , 1 , 0 , 1)

District Pratapgarh Total 97.575 379 2,509.51 1,673.00 4,182.51 376.89 (0 , 0 , 55 , 0 , 55) District- Rajsamand

Block- Bhim

1120 L140 L140-Sameliya Titri Road New CC BLOCK 1.700 3.750 Complete 5 50.38 33.58 83.96 7.55 (0 , 0 , 1 , 0 , 1) km. 1/500 to Chandaton ka Badiya 1121 L139 L139-Bhim Badnor Road New CC BLOCK 2.000 3.750 Complete 6 59.31 39.54 98.85 8.89 (0 , 1 , 0 , 0 , 1) 12/200 to Naloi Lalpura 1122 L132 L132-Mediya to Kali Kanker New CC BLOCK 0.600 3.750 Complete 2 22.68 15.12 37.80 3.39 (0 , 0 , 1 , 0 , 1)

1123 L138 L138-Pipli to Rawli New CC BLOCK 0.625 3.750 Complete 3 25.03 16.68 41.71 3.75 (0 , 0 , 1 , 0 , 1)

1124 L135 L135-Kachbli Road to School New CC BLOCK 3.000 3.750 Complete 11 89.81 59.88 149.69 13.48 (0 , 0 , 1 , 0 , 1) ka Badiya 1125 L142 L142-A/R to Kheri New CC BLOCK 0.600 3.000 Complete 1 17.86 11.90 29.76 2.66 (0 , 0 , 1 , 0 , 1)

1126 L137 L137-Khima Khera Road to New CC BLOCK 0.510 3.000 Complete 1 12.56 8.37 20.93 1.87 (0 , 0 , 1 , 0 , 1) Bada Assan

Page 88 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1127 L141 L141-Badi Barjal to Merato New CC BLOCK 1.200 3.750 Complete 2 35.11 23.40 58.51 5.27 (0 , 0 , 1 , 0 , 1) ki Barajl Block Bhim Total 10.235 31 312.74 208.47 521.21 46.87 (0 , 1 , 7 , 0 , 8)

Block- Deogarh

1128 L115 L115-NH 8 to Hawala New CC BLOCK 2.300 3.750 Complete 8 58.67 39.11 97.78 8.80 (0 , 0 , 1 , 0 , 1)

1129 L110 L110-Tal to Samiti New CC BLOCK 2.000 3.750 Complete 3 58.10 38.74 96.84 8.71 (0 , 0 , 1 , 0 , 1) (TRACK2335) 1130 L111 L111-Tal Sohangarh to New CC BLOCK 1.000 3.750 Complete 3 25.97 17.32 43.29 3.89 (0 , 0 , 1 , 0 , 1) Sirodniya road Block Deogarh Total 5.300 14 142.74 95.17 237.91 21.41 (0 , 0 , 3 , 0 , 3)

District Rajsamand Total 15.535 45 455.48 303.64 759.12 68.27 (0 , 1 , 10 , 0 , 11) District- Sikar

Block- Danta Ramgarh

1131 L139 L139-Roopgarh To Khatolai New -- 2.350 3.750 Complete 2 52.30 34.86 87.16 7.81 (0 , 0 , 1 , 0 , 1)

1132 L121 L121-Chak To Ramsinghpura New CELL Filled 2.500 3.750 Complete 4 66.58 44.39 110.97 9.96 (0 , 0 , 1 , 0 , 1) Concrete 1133 L119 L119-Banora To Tipaniya Ki New -- 4.200 3.750 Complete 3 111.57 74.38 185.95 16.69 (0 , 0 , 1 , 0 , 1) Dhani 1134 L132 L132-Mandha Kesar Singh Ki New -- 2.900 3.750 Complete 2 65.64 43.76 109.40 9.81 (0 , 0 , 1 , 0 , 1) Dhani 1135 L137 L137-Pachar To Paniwali New -- 2.425 3.750 Complete 1 58.65 39.10 97.75 8.77 (0 , 0 , 1 , 0 , 1) Dhani 1136 L120 L120-Ramgarh Maroth Road New CELL Filled 1.900 3.750 Complete 3 49.95 33.30 83.25 7.47 (0 , 0 , 1 , 0 , 1) To Jawahar ji Ki Dhani Concrete 1137 L126 L126-Ramgarh Renwal Road New CELL Filled 2.500 3.750 Complete 1 67.12 44.75 111.87 10.03 (0 , 0 , 1 , 0 , 1) To Kumawaton Ki Dhani Concrete

Page 89 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1138 L118 L118-Khoor To Karoon Ki New -- 7.500 3.750 Complete 3 174.83 116.56 291.39 26.15 (0 , 0 , 1 , 0 , 1) Dhani 1139 L140 L140-Ladpur To Thehar Ki New -- 3.050 3.750 Complete 3 73.43 48.96 122.39 10.98 (0 , 0 , 1 , 0 , 1) Dhani 1140 L125 L125-Khandelsar Ranoll New -- 1.000 3.750 Complete 1 23.73 15.82 39.55 3.54 (0 , 0 , 1 , 0 , 1) Road To Dukiyon Ki Dhani Block Danta Ramgarh Total 30.325 23 743.81 495.87 1,239.68 111.21 (0 , 0 , 10 , 0 , 10) Block- Dhod

1141 L088 L088-Khur to Ahiro Ka Bas New -- 4.700 3.750 Complete 1 97.91 65.27 163.18 14.64 (0 , 0 , 1 , 0 , 1)

1142 L090 L090-Kundalpur to Ahiro Ki New -- 3.000 3.750 Complete 2 80.28 53.52 133.80 12.01 (0 , 0 , 1 , 0 , 1) Dhani 1143 L092 L092-Kudan to Jokhani Johri New -- 3.875 3.750 Complete 0 79.49 52.99 132.48 11.92 (0 , 0 , 1 , 0 , 1)

1144 L086 L086-Shahpura to Tanazo Ki New -- 3.875 3.750 Complete 0 79.27 52.85 132.12 11.85 (0 , 0 , 1 , 0 , 1) Dhani Block Dhod Total 15.450 3 336.95 224.63 561.58 50.42 (0 , 0 , 4 , 0 , 4)

Block- Fatehpur

1145 L116 L116-AR Meeno Ki Dhani New -- 1.200 3.750 Complete 0 31.22 20.81 52.03 4.67 (0 , 0 , 1 , 0 , 1) from Sankhu Block Fatehpur Total 1.200 0 31.22 20.81 52.03 4.67 (0 , 0 , 1 , 0 , 1)

Block- Khandela

1146 L127 L127-Paniharwas to Dhani New -- 1.000 3.750 Complete 2 25.89 17.26 43.15 3.87 (0 , 0 , 1 , 0 , 1) Kudi 1147 L116 L116-Jajod-Shri Madhopur New CELL Filled 0.700 3.750 Complete 0 18.32 12.21 30.53 2.74 (0 , 0 , 1 , 0 , 1) Km. 14.750 to Kudio Ki Concrete Dhani 1148 L120 L120-Govindpura to Dhani New CC BLOCK 2.750 3.750 Complete 1 69.86 46.58 116.44 10.45 (0 , 0 , 1 , 0 , 1) Gurjaron Ki

Page 90 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1149 L128 L128-Juglpura-Gadhi New CC BLOCK 2.750 3.750 Complete 0 65.98 43.98 109.96 9.87 (0 , 0 , 1 , 0 , 1) Khanpur Road Km. 1.450 to Dhani Lamba Ki 1150 L111 L111-SH -13 Km 27 Bamarda New -- 1.330 3.750 Complete 0 34.46 22.98 57.44 5.15 (0 , 0 , 1 , 0 , 1) Johada to Dehar Ki Dhani 1151 L109 L109-Hardas Ka Was to D.V. New CC BLOCK 3.100 3.750 Complete 7 81.33 54.22 135.55 12.17 (0 , 0 , 1 , 0 , 1) Bari 1152 L108 L108-Hathideh to Dhani New CC BLOCK 3.425 3.750 Complete 3 89.75 59.84 149.59 13.43 (0 , 0 , 1 , 0 , 1) Dolya 1153 L107 L107-Jharli to Subedar Wali New -- 1.625 3.750 Complete 5 42.94 28.63 71.57 6.42 (0 , 0 , 1 , 0 , 1) Dhani 1154 L119 L119-Govindpura Road Km New -- 1.550 3.750 Complete 2 40.80 27.20 68.00 6.10 (0 , 0 , 1 , 0 , 1) 3.750 to Bhavariyo Ki Dhani 1155 L117 L117-Jajod to Dhani Kudiyon New CC BLOCK 1.550 3.750 Complete 1 40.59 27.06 67.65 6.07 (0 , 0 , 1 , 0 , 1) Ki Block Khandela Total 19.780 21 509.92 339.96 849.88 76.27 (0 , 0 , 10 , 0 , 10) Block- Lachhmangarh

1156 L102 L102-Laxmangarh Nawalgarh New -- 2.225 3.750 Complete 0 56.62 37.74 94.36 8.47 (0 , 0 , 1 , 0 , 1) road to Nadya Johara Block Lachhmangarh Total 2.225 0 56.62 37.74 94.36 8.47 (0 , 0 , 1 , 0 , 1)

Block- Neem Ka Thana

1157 L141 L141-Natha ki Nangal to New CC BLOCK 1.500 3.750 Complete 1 38.72 25.81 64.53 5.79 (0 , 0 , 1 , 0 , 1) Dhani Rajput Wali 1158 L148 L148-Bhudoli Basri road Km New CELL Filled 1.500 3.750 Complete 1 39.63 26.42 66.05 5.92 (0 , 0 , 1 , 0 , 1) 6 to Bodi Wali Concrete 1159 L147 L147-Guhala to Udyan ki New -- 1.800 3.750 Complete 1 45.49 30.32 75.81 6.80 (0 , 0 , 1 , 0 , 1) Dhani 1160 L149 L149-Napawali to Dhani Ram New -- 1.200 3.750 Complete 0 30.43 20.29 50.72 4.55 (0 , 0 , 1 , 0 , 1) Sagar 1161 L150 L150-Patan Dabla road Km 3 New -- 0.875 3.750 Complete 1 23.27 15.52 38.79 3.48 (0 , 0 , 1 , 0 , 1) to Jogi ki

Page 91 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1162 L140 L140-Ajmeri to Dhani New -- 1.500 3.750 Complete 2 38.54 25.69 64.23 5.76 (0 , 0 , 1 , 0 , 1) Samota Wali Block Neem Ka Thana Total 8.375 6 216.07 144.06 360.13 32.30 (0 , 0 , 6 , 0 , 6)

Block- Piprali

1163 L096 L096-NH-11 to Shobha Kali New -- 1.500 3.750 Complete 2 38.26 25.50 63.76 5.72 (0 , 0 , 1 , 0 , 1) Dhani 1164 L094 L094-NH-11 to Khokharon Ki New -- 2.000 3.750 Complete 2 49.01 32.68 81.69 7.33 (0 , 0 , 1 , 0 , 1) Dhani 1165 L095 L095-NH-11 to Doli Ki Dhani New -- 1.000 3.750 Complete 0 22.16 14.78 36.94 3.31 (0 , 0 , 1 , 0 , 1)

1166 L098 L098-Beri Road to Balaji Ka New -- 2.500 3.750 Complete 0 59.72 39.81 99.53 8.93 (0 , 0 , 1 , 0 , 1) Nada 1167 L097 L097-Shyampura to Naya Ki New CELL Filled 1.000 3.750 Complete 0 25.69 17.12 42.81 3.83 (0 , 0 , 1 , 0 , 1) Dhani Concrete Block Piprali Total 8.000 4 194.84 129.89 324.73 29.12 (0 , 0 , 5 , 0 , 5)

Block- Sri Madhopur

1168 L122 L122-AR to Jakaru Ki Dhani New -- 0.750 3.750 Complete 1 14.77 9.84 24.61 2.20 (0 , 0 , 1 , 0 , 1)

1169 L082 L082-AR to Piro Ka Bas New CELL Filled 1.000 3.750 Complete 0 26.48 17.66 44.14 3.96 (0 , 0 , 1 , 0 , 1) (VR1716) Concrete 1170 L118 L118-A R to Dera Wali Dhani New -- 1.530 3.750 Complete 1 39.29 26.19 65.48 5.87 (0 , 0 , 1 , 0 , 1) (VR1752) 1171 L114 L114-AR to Jyanki Das New -- 0.970 3.750 Complete 1 22.78 15.19 37.97 3.40 (0 , 0 , 1 , 0 , 1)

Block Sri Madhopur Total 4.250 3 103.32 68.88 172.20 15.43 (0 , 0 , 4 , 0 , 4)

District Sikar Total 89.605 60 2,192.73 1,461.86 3,654.59 327.89 (0 , 0 , 41 , 0 , 41) District- Sirohi

Page 92 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Abu Road

1172 L080 L080-A-R to Modu New -- 2.000 3.750 Complete 12 59.85 39.90 99.75 8.98 (0 , 0 , 1 , 0 , 1)

1173 L109 L109-A-r to Damro ki mFali New -- 2.000 3.750 Complete 9 59.81 39.88 99.69 8.97 (0 , 0 , 1 , 0 , 1)

1174 L114 L114-A-R to Sabala Fali New -- 2.000 3.750 Complete 8 59.88 39.92 99.80 8.98 (0 , 0 , 1 , 0 , 1)

1175 L136 L136-A-R VAGA FALI New -- 3.000 3.750 Complete 15 89.79 59.86 149.65 13.47 (0 , 0 , 1 , 0 , 1)

1176 L146 L146-A-R SIBARIYA FALI New -- 3.500 3.750 Complete 14 104.83 69.89 174.72 15.72 (0 , 0 , 1 , 0 , 1)

1177 L147 L147-A-R TO TELPUR FALI New -- 3.000 3.750 Complete 12 89.90 59.94 149.84 13.49 (0 , 0 , 1 , 0 , 1)

1178 L166 L166-A-R TO CHARMIYA FALI New Waste Plastics 5.000 3.750 Complete 19 149.98 99.99 249.97 22.50 (0 , 0 , 1 , 0 , 1)

1179 L188 L188-A-R TO DHAMSARA FALI New Waste Plastics 5.700 3.750 Complete 17 170.92 113.94 284.86 25.64 (0 , 0 , 1 , 0 , 1)

1180 L193 L193-A-R TO GAON FALI New -- 5.000 3.750 Complete 20 149.96 99.98 249.94 22.49 (0 , 0 , 1 , 0 , 1)

1181 L219 L219-A-R TO BHOMIYA FALI New -- 4.600 3.750 Complete 15 137.71 91.81 229.52 20.66 (0 , 0 , 1 , 0 , 1)

1182 L269 L269-A-R to Dangio Ki Fali New -- 2.500 3.750 Complete 12 74.92 49.94 124.86 11.24 (0 , 0 , 1 , 0 , 1)

1183 L330 L330-A-R TO BHATANI New Waste Plastics 5.600 3.750 Complete 22 167.93 111.96 279.89 25.19 (0 , 0 , 1 , 0 , 1)

1184 L112 L112-A-R to Maliyo Ka Vas New -- 2.700 3.750 Complete 13 80.98 53.99 134.97 12.15 (0 , 0 , 1 , 0 , 1)

1185 L351 L351-A-R TO GAON FALI New -- 5.000 3.750 Complete 21 149.83 99.88 249.71 22.47 (0 , 0 , 1 , 0 , 1)

1186 L361 L361-A-R TO PIPAR MAL New -- 10.000 3.750 Complete 38 299.47 199.65 499.12 44.92 (0 , 0 , 1 , 0 , 1)

1187 L415 L415-A R to Nichalibore to New -- 2.000 3.750 Complete 9 59.93 39.95 99.88 8.99 (0 , 0 , 1 , 0 , 1) Nichalifali 1188 L287 L287-A-R TO GOD KI NADI New -- 3.500 3.750 Complete 12 104.72 69.81 174.53 15.71 (0 , 0 , 1 , 0 , 1)

1189 L382 L382-A-R TO GODA PAGA New -- 2.500 3.750 Complete 9 74.72 49.82 124.54 11.21 (0 , 0 , 1 , 0 , 1) FALI 1190 L291 L291-A-R TO CHOTI PATI FALI New -- 3.500 3.750 Complete 14 104.28 69.52 173.80 15.64 (0 , 0 , 1 , 0 , 1)

Page 93 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1191 L076 L076-A-R to Bhilwas New -- 1.500 3.750 Complete 6 44.60 29.74 74.34 6.69 (0 , 0 , 1 , 0 , 1)

1192 L182 L182-A-R TO BHAMBALA FALI New Waste Plastics 3.000 3.750 Complete 13 88.06 58.71 146.77 13.22 (0 , 0 , 1 , 0 , 1)

1193 L186 L186-A-R to Chauhano KI New -- 2.500 3.750 Complete 12 73.15 48.77 121.92 10.97 (0 , 0 , 1 , 0 , 1) Fali 1194 L241 L241-A-R TO NICHLA BHIL New -- 1.200 3.750 Complete 4 35.94 23.96 59.90 5.39 (0 , 0 , 1 , 0 , 1) WADA 1195 L135 L135-A-R MEGHWAL WAS New -- 1.000 3.750 Complete 3 29.85 19.90 49.75 4.48 (0 , 0 , 1 , 0 , 1)

1196 L281 L281-A-R TO RAMA GOLA New -- 1.000 3.750 Complete 4 29.88 19.92 49.80 4.48 (0 , 0 , 1 , 0 , 1) FALI 1197 L110 L110-A-R to Kharandiyo Ki New -- 4.500 3.750 Complete 16 134.91 89.94 224.85 20.24 (0 , 0 , 1 , 0 , 1) Fali 1198 L329 L329-A-R TO UPLA DERNA New -- 3.500 3.750 Complete 15 104.90 69.94 174.84 15.74 (0 , 0 , 1 , 0 , 1)

1199 L094 L094-A-R to Lala Patel Fali New -- 3.000 3.750 Complete 10 89.88 59.92 149.80 13.48 (0 , 0 , 1 , 0 , 1)

1200 L247 L247-A-R TO KHAER FALI New -- 4.500 3.750 Complete 20 134.24 89.50 223.74 20.14 (0 , 0 , 1 , 0 , 1)

1201 L078 L078-A-R to Gora Angriya New -- 3.000 3.750 Complete 14 89.84 59.89 149.73 13.48 (0 , 0 , 1 , 0 , 1) Fali 1202 L339 L339-A-R TO KHORA FALI New -- 2.000 3.750 Complete 8 59.94 39.96 99.90 8.99 (0 , 0 , 1 , 0 , 1)

1203 L288 L288-A-R TO KALA BHATTA New -- 1.500 3.750 Complete 6 44.86 29.91 74.77 6.73 (0 , 0 , 1 , 0 , 1)

1204 L240 L240-A-R TO JORIYA FALI New -- 3.000 3.750 Complete 11 89.81 59.87 149.68 13.47 (0 , 0 , 1 , 0 , 1)

1205 L183 L183-A-R TO BHAMRO KI FALI New -- 2.300 3.750 Complete 9 68.82 45.88 114.70 10.32 (0 , 0 , 1 , 0 , 1)

1206 L190 L190-A-R TO LIAL New -- 3.000 3.750 Complete 12 89.84 59.90 149.74 13.48 (0 , 0 , 1 , 0 , 1) CHAUHANO KI FALI 1207 L154 L154-A-R TO KHOKHARIYA New -- 3.000 3.750 Complete 12 89.96 59.98 149.94 13.49 (0 , 0 , 1 , 0 , 1) FALI 1208 L280 L280-A-R TO NAI SCHOOK New -- 2.000 3.750 Complete 9 59.78 39.86 99.64 8.97 (0 , 0 , 1 , 0 , 1)

1209 L275 L275-A-R TO PITAWA FALI New Waste Plastics 5.000 3.750 Complete 18 149.71 99.81 249.52 22.46 (0 , 0 , 1 , 0 , 1)

Page 94 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1210 L191 L191-A-R TO PISRO KI FALI New -- 3.000 3.750 Complete 14 89.77 59.85 149.62 13.47 (0 , 0 , 1 , 0 , 1)

1211 L326 L326-A-R to Pawata Fali New -- 1.200 3.750 Complete 4 35.95 23.96 59.91 5.39 (0 , 0 , 1 , 0 , 1)

1212 L180 L180-A-R TO TITWAN FALI New Waste Plastics 4.000 3.750 Complete 21 119.94 79.96 199.90 17.99 (0 , 0 , 1 , 0 , 1)

1213 L278 L278-A-R TO CHINA PITHARA New -- 4.000 3.750 Complete 15 119.72 79.81 199.53 17.96 (0 , 0 , 1 , 0 , 1) FALI 1214 L246 L246-A-R TO KHADRA FALI New -- 4.000 3.750 Complete 16 119.66 79.77 199.43 17.95 (0 , 0 , 1 , 0 , 1)

Block Abu Road Total 139.800 563 4,182.42 2,788.34 6,970.76 627.40 (0 , 0 , 43 , 0 , 43) District Sirohi Total 139.800 563 4,182.42 2,788.34 6,970.76 627.40 (0 , 0 , 43 , 0 , 43) District- Udaipur

Block- Girwa

1215 L184 L184-Rampura Dadawali New -- 1.500 3.750 Complete 7 44.95 29.96 74.91 6.74 (0 , 0 , 1 , 0 , 1) Road km23 toPola (TRACK466) 1216 L213 L213-AR Popaly to beeda New -- 4.500 3.750 Complete 21 134.73 89.82 224.55 20.21 (0 , 0 , 1 , 0 , 1) (TRACK451) 1217 L178 L178-Dantisar to Vada New -- 1.700 3.750 Complete 6 50.75 33.83 84.58 7.62 (0 , 0 , 1 , 0 , 1) (TRACK456) 1218 L224 L224-UDAIPUR KM New -- 2.000 3.750 Complete 9 59.81 39.88 99.69 8.97 (0 , 0 , 1 , 0 , 1) 32 TO BADLA FALA (TRACK438) 1219 L228 L228- to Khildi Fala New -- 1.500 3.750 Complete 6 44.54 29.70 74.24 6.68 (0 , 0 , 1 , 0 , 1) (TRACK443) 1220 L267 L267-Tidi to Tidi Nal New -- 1.700 3.750 Complete 7 50.93 33.95 84.88 7.64 (0 , 0 , 1 , 0 , 1) (TRACK460) 1221 L226 L226-Pai km30 to Gadh Fala New -- 1.000 3.750 Complete 5 29.88 19.92 49.80 4.48 (0 , 0 , 1 , 0 , 1) (TRACK431) 1222 L207 L207-AR Saroo NH 8 to hayla New -- 3.150 3.750 Complete 20 94.42 62.94 157.36 14.16 (0 , 0 , 1 , 0 , 1) kui (TRACK440)

Page 95 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1223 L185 L185-Rampura Dadawali New -- 2.000 3.750 Complete 12 59.96 39.97 99.93 9.00 (0 , 0 , 1 , 0 , 1) Road km24 to Damar Mala (TRACK445) 1224 L168 L168-Chandwara to Hari New Waste Plastics 3.500 3.750 Complete 13 104.95 69.96 174.91 15.74 (0 , 0 , 1 , 0 , 1) Fala (TRACK455) 1225 L216 L216-Jabla km10 to Nichla New -- 2.000 3.750 Complete 11 59.95 39.97 99.92 9.00 (0 , 0 , 1 , 0 , 1) Fala (TRACK450) 1226 L237 L237-BARA NH8 TO DARA New -- 1.500 3.750 Complete 7 44.93 29.95 74.88 6.74 (0 , 0 , 1 , 0 , 1) FALA (TRACK439) 1227 L144 L144-AR BACHAR TO NALA New -- 5.000 3.750 Complete 28 149.89 99.93 249.82 22.48 (0 , 0 , 1 , 0 , 1) PHALLA (VR914) 1228 L211 L211-AR SAROO NH8 TO New -- 2.700 3.750 Complete 12 80.71 53.81 134.52 12.10 (0 , 0 , 1 , 0 , 1) DABAN (TRACK448) 1229 L254 L254-Udaipur Alsigarh Road New Waste Plastics 4.000 3.750 Complete 20 117.50 78.33 195.83 17.62 (0 , 0 , 1 , 0 , 1) km30 to Kada fala (TRACK437) 1230 L021 L021-UDAIPUR New -- 3.600 3.750 Complete 19 107.65 71.76 179.41 16.15 (0 , 0 , 1 , 0 , 1) ROAD KM32 TO PARGI FALA (TRACK481) 1231 L156 L156-AR TO SEJA KI BHAGAL New -- 1.600 3.750 Complete 6 47.83 31.89 79.72 7.17 (0 , 0 , 1 , 0 , 1) (TRACK465) 1232 L146 L146-Jawar to Padliya New -- 2.800 3.750 Complete 11 83.72 55.82 139.54 12.56 (0 , 0 , 1 , 0 , 1) (TRACK488) 1233 L149 L149-AR TO JOGI FALA New -- 1.200 3.750 Complete 5 35.69 23.79 59.48 5.36 (0 , 0 , 1 , 0 , 1) (TRACK497) 1234 L153 L153-AR KHAJURI TO New -- 2.000 3.750 Complete 8 59.96 39.98 99.94 9.00 (0 , 0 , 1 , 0 , 1) BHOLWA (TRACK483) 1235 L148 L148-NH-8 Barapal to New -- 2.000 3.750 Complete 13 59.78 39.85 99.63 8.96 (0 , 0 , 1 , 0 , 1) Gamana (TRACK489) 1236 L176 L176-AR to Chotiya Magri New -- 1.100 3.750 Complete 6 32.95 21.96 54.91 4.94 (0 , 0 , 1 , 0 , 1) (TRACK494) 1237 L165 L165-Naya Guda to Mini Fala New -- 2.000 3.750 Complete 10 58.69 39.12 97.81 8.81 (0 , 0 , 1 , 0 , 1) (TRACK496)

Page 96 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1238 L141 L141-Udaipur Alsigarh km30 New -- 5.000 3.750 Complete 25 149.72 99.82 249.54 22.46 (0 , 0 , 1 , 0 , 1) to Fanda Fala (TRACK335) 1239 L145 L145-AR Bachar Road to New -- 2.000 3.750 Complete 10 59.90 39.93 99.83 9.00 (0 , 0 , 1 , 0 , 1) Bacddi Fala (TRACK480) 1240 L163 L163-BUJHDA TO UDI TALAI New -- 1.150 3.750 Complete 6 34.45 22.96 57.41 5.16 (0 , 0 , 1 , 0 , 1) (TRACK495) 1241 L164 L164-AR Naya guda to Kher New Waste Plastics 4.500 3.750 Complete 28 134.84 89.90 224.74 20.22 (0 , 0 , 1 , 0 , 1) fala (TRACK474) 1242 L187 L187-SAROO NH8 TOMOR New -- 6.000 3.750 Complete 31 179.51 119.68 299.19 26.93 (0 , 0 , 1 , 0 , 1) DUNGRI (TRACK370) 1243 L198 L198-AR Ghata Hemdari New -- 4.500 3.750 Complete 22 134.72 89.82 224.54 20.21 (0 , 0 , 1 , 0 , 1) (TRACK476) 1244 L203 L203-AR to Rama Ret New -- 3.200 3.750 Complete 12 95.41 63.61 159.02 14.31 (0 , 0 , 1 , 0 , 1) (TRACK503) 1245 L215 L215-AR Jabla km9 to New -- 2.500 3.750 Complete 13 74.76 49.84 124.60 11.22 (0 , 0 , 1 , 0 , 1) Khaniya (TRACK463) 1246 L200 L200-AR To Talava New -- 1.000 3.750 Complete 2 29.91 19.94 49.85 4.48 (0 , 0 , 1 , 0 , 1) (TRACK502) 1247 L212 L212-AR NAI TO BEDCHA New -- 2.600 3.750 Complete 14 77.81 51.88 129.69 11.66 (0 , 0 , 1 , 0 , 1) FALA (TRACK507) 1248 L233 L233-AR SARU NH-8 TO New Waste Plastics 4.000 3.750 Complete 21 119.93 79.96 199.89 18.00 (0 , 0 , 1 , 0 , 1) BHOLA FALA (TRACK482) 1249 L192 L192-Saroo NH-8 to Khedat New -- 3.000 3.750 Complete 17 89.76 59.84 149.60 13.48 (0 , 0 , 1 , 0 , 1) Fala (TRACK492) 1250 L238 L238-AR Baran km8 to New -- 3.000 3.750 Complete 13 89.75 59.84 149.59 13.47 (0 , 0 , 1 , 0 , 1) Gamat Fala (TRACK469) 1251 L270 L270-Popalty to Panakad New Waste Plastics 4.000 3.750 Complete 23 119.94 79.96 199.90 18.00 (0 , 0 , 1 , 0 , 1) fala (TRACK510) 1252 L266 L266-AR TOGOKHAR MAGRI New -- 2.000 3.750 Complete 11 59.87 39.91 99.78 8.99 (0 , 0 , 1 , 0 , 1) (TRACK478) 1253 L143 L143-AR Popalty to Rohi New -- 1.500 3.750 Complete 9 44.95 29.96 74.91 6.74 (0 , 0 , 1 , 0 , 1) Fala (TRACK454)

Page 97 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1254 L161 L161-AR Bujhra km2 to New -- 1.500 3.750 Complete 8 44.87 29.91 74.78 6.74 (0 , 0 , 1 , 0 , 1) Gameti fala (TRACK452) 1255 L157 L157-Bhraman Kyra to New -- 2.700 3.750 Complete 13 80.66 53.78 134.44 12.10 (0 , 0 , 1 , 0 , 1) Godwa (TRACK441) 1256 L235 L235-SAROO NH8 TO AAVA New -- 3.000 3.750 Complete 16 89.95 59.96 149.91 13.48 (0 , 0 , 1 , 0 , 1) FALA (TRACK447) 1257 L214 L214-AR POPALTY TO NADRA New -- 0.510 3.750 Complete 5 14.41 9.60 24.01 2.16 (0 , 0 , 1 , 0 , 1) FALA (TRACK458) Block Girwa Total 111.710 561 3,339.29 2,226.19 5,565.48 500.94 (0 , 0 , 43 , 0 , 43) Block-

1258 L174 L174-Rawachh to Dewara New -- 5.100 3.750 Complete 21 152.55 101.70 254.25 22.89 (0 , 0 , 1 , 0 , 1) Naamn (TRACK2595) 1259 L162 L162-Nandeshma to New -- 1.400 3.750 Complete 6 40.96 27.30 68.26 6.15 (0 , 0 , 1 , 0 , 1) Kadecha Was (TRACK2583) 1260 L163 L163-Bhadwi Gurha to New -- 2.000 3.750 Complete 8 59.93 39.96 99.89 9.00 (0 , 0 , 1 , 0 , 1) Bheelwara (TRACK2584) 1261 L164 L164-Badoondiya to New -- 2.400 3.750 Complete 10 71.19 47.46 118.65 10.68 (0 , 0 , 1 , 0 , 1) Kasariya Was (TRACK2585) 1262 L165 L165-Karda to Upali Patela New -- 2.000 3.750 Complete 8 59.71 39.80 99.51 8.95 (0 , 0 , 1 , 0 , 1) (TRACK2586) 1263 L169 L169-Karda to Ki New -- 1.000 3.750 Complete 4 29.25 19.50 48.75 4.39 (0 , 0 , 1 , 0 , 1) Bhagal (TRACK2590) 1264 L170 L170-Karda to Bhewadiyo Ki New -- 0.700 3.750 Complete 3 20.95 13.97 34.92 3.14 (0 , 0 , 1 , 0 , 1) Bhagal (TRACK2591) 1265 L171 L171-Karda to Salel Ki New -- 2.500 3.750 Complete 12 74.49 49.66 124.15 11.18 (0 , 0 , 1 , 0 , 1) Bhagal (TRACK2592) 1266 L175 L175-Nikor to Wala New -- 1.700 3.750 Complete 7 50.48 33.66 84.14 7.53 (0 , 0 , 1 , 0 , 1) (TRACK2596) 1267 L178 L178-Gayphal to Kanala New -- 1.000 3.750 Complete 4 29.96 19.98 49.94 4.48 (0 , 0 , 1 , 0 , 1) (TRACK2598) 1268 L179 L179-Mokhi to Diwaaliya New -- 3.000 3.750 Complete 12 94.77 63.18 157.95 13.48 (0 , 0 , 1 , 0 , 1) Ghati (TRACK2600)

Page 98 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1269 L180 L180-Nal to Kalawa Khed New -- 2.000 3.750 Complete 7 59.46 39.64 99.10 8.92 (0 , 0 , 1 , 0 , 1) (TRACK2601) 1270 L182 L182-Madarda to Mang Pura New -- 4.000 3.750 Complete 14 119.79 79.86 199.65 17.96 (0 , 0 , 1 , 0 , 1) (TRACK2603) 1271 L185 L185-Sadra to Mogiyon Ka New -- 3.500 3.750 Complete 16 104.93 69.96 174.89 15.74 (0 , 0 , 1 , 0 , 1) Thana (TRACK2604) 1272 L186 L186- to Nichala New -- 1.500 3.750 Complete 7 59.99 39.99 99.98 9.00 (0 , 0 , 1 , 0 , 1) Was (TRACK2605) 1273 L187 L187-Karda to Brahamano Ki New -- 1.500 3.750 Complete 5 44.84 29.90 74.74 6.74 (0 , 0 , 1 , 0 , 1) Bhagal (TRACK2606) 1274 L188 L188-Karda to Kelwo Ki New -- 1.000 3.750 Complete 3 29.54 19.70 49.24 4.43 (0 , 0 , 1 , 0 , 1) Bhagal (TRACK2607) 1275 L191 L191-Chheepala to Mandi Ka New -- 1.500 3.750 Complete 6 44.13 29.42 73.55 6.62 (0 , 0 , 1 , 0 , 1) Mathara (TRACK2609) 1276 L193 L193-Paner to Thob New -- 1.500 3.750 Complete 6 44.39 29.60 73.99 6.66 (0 , 0 , 1 , 0 , 1) (TRACK2611) 1277 L196 L196-Bhaton ka Sayra to New -- 2.000 3.750 Complete 7 59.91 39.94 99.85 9.00 (0 , 0 , 1 , 0 , 1) Chawado ka Guda (VR2614) 1278 L131 L131-Sanchali to Dewaro Ka New -- 1.700 3.750 Complete 7 50.68 33.78 84.46 7.62 (0 , 0 , 1 , 0 , 1) Guda (TRACK2615) 1279 L183 L183-Didya to Kheta Was New -- 0.700 3.750 Complete 1 20.65 13.76 34.41 3.10 (0 , 0 , 1 , 0 , 1) (TRACK2616) 1280 L184 L184-Didya to Mota Wida New -- 2.000 3.750 Complete 3 59.71 39.80 99.51 8.95 (0 , 0 , 1 , 0 , 1) (TRACK2617) 1281 L189 L189-Majawari to Narsingh New -- 1.000 3.750 Complete 4 29.96 19.97 49.93 4.48 (0 , 0 , 1 , 0 , 1) Das Ka Guda (TRACK2618) 1282 L166 L166-Dhol to Khari Kui New -- 0.800 3.750 Complete 4 23.62 15.74 39.36 3.54 (0 , 0 , 1 , 0 , 1) (TRACK2587) 1283 L173 L173-Patiya to Haldu Khet New -- 1.500 3.750 Complete 5 44.97 29.98 74.95 6.70 (0 , 0 , 1 , 0 , 1) (TRACK2594) 1284 L181 L181-Nal to Nathiya Thal New -- 5.000 3.750 Complete 18 149.26 99.51 248.77 22.39 (0 , 0 , 1 , 0 , 1) (TRACK2602)

Page 99 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1285 L161 L161-Semar to Walara New -- 3.100 3.750 Complete 6 92.76 61.84 154.60 13.91 (0 , 0 , 1 , 0 , 1) (TRACK2579) 1286 L153 L153-Bokhara to Kurra New -- 5.000 3.750 Complete 28 149.40 99.60 249.00 22.41 (0 , 0 , 1 , 0 , 1) (VR2043) 1287 L152 L152-Kamba to Bheel wara New -- 1.100 3.750 Complete 3 32.78 21.85 54.63 4.91 (0 , 0 , 1 , 0 , 1) (TRACK2580) 1288 L141 L141-Karech to Upali New -- 1.600 3.750 Complete 6 47.84 31.90 79.74 7.17 (0 , 0 , 1 , 0 , 1) Kadech (TRACK2561) 1289 L146 L146-Cheetarwas to Peepal New -- 2.600 3.750 Complete 17 77.66 51.78 129.44 11.65 (0 , 0 , 1 , 0 , 1) Seri (TRACK2566) 1290 L147 L147-Karech to Depalwa New -- 2.300 3.750 Complete 9 68.79 45.86 114.65 10.31 (0 , 0 , 1 , 0 , 1) (TRACK2567) 1291 L149 L149-Rawliya Khurd to New -- 4.000 3.750 Complete 18 119.89 79.92 199.81 18.00 (0 , 0 , 1 , 0 , 1) Takari Ki Bhagal (TRACK2568) 1292 L148 L148-Kamol to Golai Ka New -- 1.100 3.750 Complete 3 32.89 21.93 54.82 4.92 (0 , 0 , 1 , 0 , 1) Guda (TRACK2569) 1293 L159 L159-Ghanawal to Guda New -- 1.500 3.750 Complete 8 44.84 29.90 74.74 6.74 (0 , 0 , 1 , 0 , 1) (TRACK2577) 1294 L154 L154-Jhalon Ka Kalwana to New -- 2.000 3.750 Complete 8 59.95 39.96 99.91 9.00 (0 , 0 , 1 , 0 , 1) Dholiya Talab (TRACK2573) 1295 L145 L145-Patiyan to Phori Ghati New -- 2.000 3.750 Complete 9 58.51 39.00 97.51 8.77 (0 , 0 , 1 , 0 , 1) (TRACK2665) 1296 L151 L151-Kamol to Jarga Amba New -- 3.200 3.750 Complete 10 95.90 63.94 159.84 14.40 (0 , 0 , 1 , 0 , 1) (TRACK2571) 1297 L156 L156-Jogiyon Ka Gurha to New -- 1.500 3.750 Complete 6 44.93 29.95 74.88 6.74 (0 , 0 , 1 , 0 , 1) Hanuman Ji Ki Bhagal (TRACK2575) 1298 L155 L155-Gogunda to Chhapara New -- 1.500 3.750 Complete 5 44.95 29.96 74.91 6.74 (0 , 0 , 1 , 0 , 1) (TRACK2582) 1299 L160 L160-Punawali to Madrecho New -- 0.600 3.750 Complete 2 17.93 11.96 29.89 2.69 (0 , 0 , 1 , 0 , 1) Ka Guda (TRACK2578) 1300 L144 L144-Morwa to Bheel Wada New -- 0.600 3.750 Complete 3 17.94 11.96 29.90 2.69 (0 , 0 , 1 , 0 , 1) (TRACK2564)

Page 100 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1301 L150 L150-Rawach to Sela Sariya New -- 3.000 3.750 Complete 13 89.68 59.78 149.46 13.45 (0 , 0 , 1 , 0 , 1) (TRACK2570) 1302 L143 L143-Hathniyawar to Bor New -- 2.500 3.750 Complete 7 74.77 49.85 124.62 11.22 (0 , 0 , 1 , 0 , 1) Garh Bheel Basti (TRACK2563) 1303 L158 L158-Chheepala to Naya New -- 1.000 3.750 Complete 7 29.94 19.96 49.90 4.48 (0 , 0 , 1 , 0 , 1) Bheelwara (TRACK2576) 1304 L167 L167-Didya to Malu New -- 2.825 3.750 Complete 7 84.65 56.43 141.08 12.69 (0 , 0 , 1 , 0 , 1) (TRACK2588) 1305 L194 L194-Patiyan to Nichala New -- 1.000 3.750 Complete 5 29.75 19.84 49.59 4.47 (0 , 0 , 1 , 0 , 1) Kheda (TRACK2613) 1306 L176 L176-Dhikoda to Koviya New -- 3.400 3.750 Complete 14 101.42 67.62 169.04 15.21 (0 , 0 , 1 , 0 , 1) (VR2013) 1307 L121 L121-Rawachh to Munda New -- 4.000 3.750 Complete 16 119.95 79.97 199.92 18.00 (0 , 0 , 1 , 0 , 1) Khet (TRACK2612) Block Gogunda Total 105.425 418 3,167.20 2,111.47 5,278.67 474.29 (0 , 0 , 50 , 0 , 50) Block- Jhadol

1308 L260 L260-OGNA PANARWA ROAD New -- 2.025 3.750 Complete 15 60.72 40.48 101.20 9.10 (0 , 0 , 1 , 0 , 1) TO KUMAHARWAS (VR2709) 1309 L266 L266-LUNAWATO KA KHEDA New -- 1.900 3.750 Complete 14 56.96 37.98 94.94 8.54 (0 , 0 , 1 , 0 , 1) TO BHUNDIYA PHALLA (VR2715) 1310 L265 L265-NANDWEL TO DHAKLA New -- 5.600 3.750 Complete 35 167.95 111.97 279.92 25.19 (0 , 0 , 1 , 0 , 1) CHORA (VR2714) 1311 L261 L261-A/R BALVI BAROLIYA TO New -- 1.225 3.750 Complete 8 36.74 24.50 61.24 5.51 (0 , 0 , 1 , 0 , 1) BOLIYA BADKA (VR2710) 1312 L262 L262-AMBASSA TO New -- 1.725 3.750 Complete 15 51.75 34.50 86.25 7.76 (0 , 0 , 1 , 0 , 1) REBARIYON KI DHANI (VR2711) 1313 L263 L263-MAKRADEO TO TATUA New -- 2.350 3.750 Complete 17 70.45 46.97 117.42 10.56 (0 , 0 , 1 , 0 , 1) PHALLA (VR2712)

Page 101 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1314 L279 L279-UPLI SINGRI TO MAGRA New -- 6.000 3.750 Complete 50 179.97 119.98 299.95 26.99 (0 , 0 , 1 , 0 , 1) PHALLA (VR2728) 1315 L278 L278-MAGWAS TO TEKARA New -- 1.225 3.750 Complete 8 36.69 24.46 61.15 5.50 (0 , 0 , 1 , 0 , 1) (VR2727) 1316 L277 L277-MALPUR TO New -- 2.300 3.750 Complete 12 60.78 40.52 101.30 9.11 (0 , 0 , 1 , 0 , 1) KHOKHARIYA PHALLA (VR2726) 1317 L276 L276-AMOD TO JAKHRA New -- 4.000 3.750 Complete 28 119.97 79.98 199.95 17.99 (0 , 0 , 1 , 0 , 1) PHALLA (VR2725) 1318 L275 L275-MOHAMMAD PHALASIYA New -- 4.700 3.750 Complete 34 141.01 94.00 235.01 21.15 (0 , 0 , 1 , 0 , 1) TO DEVLI PEEPLI (VR2724) 1319 L274 L274-BASSI TO UPALI BASSI New -- 1.750 3.750 Complete 15 52.46 34.98 87.44 7.86 (0 , 0 , 1 , 0 , 1) (VR2723) 1320 L273 L273-BIROTHI TO UPLI New -- 4.800 3.750 Complete 27 143.93 95.95 239.88 21.58 (0 , 0 , 1 , 0 , 1) BIROTHI (VR2722) 1321 L272 L272-MOHAMMAD PHALASIYA New -- 1.500 3.750 Complete 9 44.99 30.00 74.99 6.74 (0 , 0 , 1 , 0 , 1) TO SEEMBAL KHEDA (VR2721) 1322 L271 L271-AMRA TO New Waste Plastics 4.150 3.750 Complete 29 124.46 82.98 207.44 18.66 (0 , 0 , 1 , 0 , 1) PHALLA (VR2720) 1323 L270 L270-KHATI KAMDI TO BEDA New -- 5.050 3.750 Complete 40 151.45 100.96 252.41 22.71 (0 , 0 , 1 , 0 , 1) KHARDA (VR2719) 1324 L269 L269-ROHIMALA TO New -- 2.300 3.750 Complete 20 133.32 88.88 222.21 20.01 (0 , 0 , 1 , 0 , 1) BENAGIYA (VR2718) 1325 L268 L268-TALAI TO NAVAGARH New -- 2.100 3.750 Complete 12 62.98 41.98 104.96 9.44 (0 , 0 , 1 , 0 , 1) (VR2717) 1326 L267 L267-MOHAMMAD PHALASIYA New -- 2.800 3.750 Complete 23 83.96 55.98 139.94 12.59 (0 , 0 , 1 , 0 , 1) TO KAMRIYA, KUNDALIYA PHALLA (VR2716) Block Jhadol Total 57.500 411 1,780.56 1,187.04 2,967.60 266.99 (0 , 0 , 19 , 0 , 19)

Page 102 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Kherwara

1327 L296 L296-SAMDAR TO MUNDA New -- 3.500 3.750 Complete 22 104.64 69.76 174.40 15.69 (0 , 0 , 1 , 0 , 1) DARA. (TRACK3385) 1328 L297 L297-KATARWAS TO GDHATA New Waste Plastics 4.000 3.750 Complete 24 117.60 78.40 196.00 17.64 (0 , 0 , 1 , 0 , 1) FALA. (TRACK3386) 1329 L298 L298-DABAYCHA TO ASARI New -- 5.000 3.750 Complete 24 149.68 99.78 249.46 22.45 (0 , 0 , 1 , 0 , 1) FALA. (TRACK3387) 1330 L299 L299-AR SULAI KM. 3 TO New Waste Plastics 3.000 3.750 Complete 14 89.44 59.63 149.07 13.41 (0 , 0 , 1 , 0 , 1) SAMI SULAI. (TRACK3388) 1331 L300 L300-KARAJI TO CHHANIA New -- 5.000 3.750 Complete 28 147.06 98.04 245.10 22.06 (0 , 0 , 1 , 0 , 1) FALA. (TRACK3389) 1332 L304 L304-KAKAN GADAWAN New -- 6.000 3.750 Complete 30 178.58 119.05 297.63 26.79 (0 , 0 , 1 , 0 , 1) ROAD TO BALOLIYA FALA. (TRACK3393) 1333 L305 L305-CHANI JHANJHARI KM. New -- 5.000 3.750 Complete 25 149.39 99.59 248.98 22.41 (0 , 0 , 1 , 0 , 1) 7 GODALA FALA. (TRACK3394) 1334 L307 L307-N.H. 8 KM. 343 TO New -- 5.000 3.750 Complete 23 149.14 99.42 248.56 22.36 (0 , 0 , 1 , 0 , 1) BADLI. (TRACK3396) 1335 L308 L308-Chorai to nal fala. New -- 5.000 3.750 Complete 20 149.83 99.88 249.71 22.48 (0 , 0 , 1 , 0 , 1) (TRACK3397) 1336 L310 L310-DABAYCHA TO New -- 4.000 3.750 Complete 22 119.64 79.76 199.40 17.95 (0 , 0 , 1 , 0 , 1) GANESHPURA. (TRACK3399) 1337 L311 L311-KHERWARA KALYANPUR New -- 4.000 3.750 Complete 18 119.89 79.93 199.82 18.00 (0 , 0 , 1 , 0 , 1) RD. KM. 7 TO DUNGARI FALA. (TRACK3400) 1338 L313 L313-KANBAI TO KALAL New -- 3.000 3.750 Complete 18 88.98 59.32 148.30 13.34 (0 , 0 , 1 , 0 , 1) BASTI. (TRACK3402) 1339 L314 L314-KATARWAS TO New -- 5.000 3.750 Complete 23 149.57 99.71 249.28 22.43 (0 , 0 , 1 , 0 , 1) BHAGGADA. (TRACK3403) 1340 L315 L315-Khanmeen to Baveri New -- 4.000 3.750 Complete 20 119.69 79.79 199.48 17.95 (0 , 0 , 1 , 0 , 1) fala (TRACK3404)

Page 103 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1341 L321 L321-Nichla Mandwa to Dara New -- 3.000 3.750 Complete 18 89.95 59.96 149.91 13.48 (0 , 0 , 1 , 0 , 1) fala (TRACK3410) 1342 L337 L337-BHANDA TO BHANADA New -- 5.000 3.750 Complete 23 149.56 99.70 249.26 22.43 (0 , 0 , 1 , 0 , 1) KHAS PANCHAL BASTI. (TRACK3426) 1343 L329 L329-Garnala Kotra to New Waste Plastics 5.000 3.750 Complete 26 149.70 99.80 249.50 22.45 (0 , 0 , 1 , 0 , 1) Matavela (TRACK3418) 1344 L346 L346-Ranawara to Akhi wara New -- 2.000 3.750 Complete 15 59.85 39.90 99.75 8.98 (0 , 0 , 1 , 0 , 1) (TRACK3435) 1345 L347 L347-Badla to Pansat New -- 2.000 3.750 Complete 12 59.97 39.98 99.95 9.00 (0 , 0 , 1 , 0 , 1) (TRACK3436) 1346 L327 L327-Dabaycha to Hangat New -- 4.000 3.750 Complete 21 118.99 79.33 198.32 17.85 (0 , 0 , 1 , 0 , 1) fala (TRACK3416) 1347 L322 L322-Patiya to Meghwal fala New -- 3.000 3.750 Complete 17 89.21 59.48 148.69 13.39 (0 , 0 , 1 , 0 , 1) (TRACK3411) 1348 L342 L342-Ghoriyawara to New Waste Plastics 4.000 3.750 Complete 24 119.63 79.76 199.39 17.94 (0 , 0 , 1 , 0 , 1) Pipaldara (TRACK3431) 1349 L344 L344-Katevdi to Panuda fala New Waste Plastics 7.000 3.750 Complete 35 209.50 139.66 349.16 31.42 (0 , 0 , 1 , 0 , 1) (TRACK3433) 1350 L326 L326-Bhagor to Panrai fala New Waste Plastics 4.000 3.750 Complete 22 119.87 79.91 199.78 17.99 (0 , 0 , 1 , 0 , 1) (TRACK3415) 1351 L319 L319-Somawat to Dokra New -- 4.000 3.750 Complete 22 119.87 79.91 199.78 17.99 (0 , 0 , 1 , 0 , 1) mahura (TRACK3408) 1352 L343 L343-Depur to Dungari fala New Waste Plastics 3.000 3.750 Complete 20 89.97 59.98 149.95 13.48 (0 , 0 , 1 , 0 , 1) (TRACK3432) 1353 L334 L334-KHERWARA JAWAS New -- 2.000 3.750 Complete 14 59.91 39.94 99.85 8.98 (0 , 0 , 1 , 0 , 1) SUVERI KM.12 TO KHARADI FALA. (TRACK3424) 1354 L341 L341-Rishabdeo Bilakh Rd. New -- 3.500 3.750 Complete 23 104.90 69.93 174.83 15.74 (0 , 0 , 1 , 0 , 1) Km.8 to Ghata (TRACK3430) 1355 L350 L350-AR Sukhbaori to New -- 4.000 3.750 Complete 18 119.83 79.89 199.72 17.97 (0 , 0 , 1 , 0 , 1) Goyara (TRACK3439) 1356 L316 L316-Rishabdeo Bilakh Rd. New -- 4.000 3.750 Complete 24 119.52 79.68 199.20 17.93 (0 , 0 , 1 , 0 , 1) Km. 7 to Nal (TRACK3405)

Page 104 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1357 L317 L317-Larathi to Larathi B New -- 6.000 3.750 Complete 25 179.51 119.67 299.18 27.42 (0 , 0 , 1 , 0 , 1) (TRACK3406) 1358 L325 L325-Bhagor to Pal fala New -- 4.000 3.750 Complete 22 119.78 79.86 199.64 17.96 (0 , 0 , 1 , 0 , 1) (TRACK3414) 1359 L320 L320-Masaro ki Obri to New -- 3.000 3.750 Complete 19 89.97 59.98 149.95 13.48 (0 , 0 , 1 , 0 , 1) Meghwal basti (TRACK3409) 1360 L328 L328-Kalawat to Mokila New -- 6.000 3.750 Complete 30 179.19 119.46 298.65 26.88 (0 , 0 , 1 , 0 , 1) (TRACK3417) 1361 L340 L340-kalyanpur to kumhar New -- 2.500 3.750 Complete 14 74.87 49.91 124.78 11.22 (0 , 0 , 1 , 0 , 1) basti. (TRACK3429) 1362 L330 L330-Mandwa Phala to Dara New -- 5.000 3.750 Complete 25 148.63 99.09 247.72 22.29 (0 , 0 , 1 , 0 , 1) fala (TRACK3419) 1363 L332 L332-Upla mandwa to New -- 3.000 3.750 Complete 19 89.90 59.94 149.84 13.48 (0 , 0 , 1 , 0 , 1) Mahudi fala (TRACK3421) 1364 L333 L333-KHARADIWADA TO New -- 4.000 3.750 Complete 22 119.86 79.91 199.77 17.98 (0 , 0 , 1 , 0 , 1) ADIVASI, KALAL BASTI. (TRACK3422) 1365 L303 L303-BHOODAR TO New -- 5.000 3.750 Complete 30 147.68 98.46 246.14 22.15 (0 , 0 , 1 , 0 , 1) KHERAWALI FALA BORILA. (TRACK3392) 1366 L306 L306-balevdi to kharadi New -- 3.000 3.750 Complete 16 89.92 59.94 149.86 13.48 (0 , 0 , 1 , 0 , 1) fala. (TRACK3395) 1367 L309 L309-BHAGOR TO PANI New -- 5.000 3.750 Complete 22 149.84 99.89 249.73 22.48 (0 , 0 , 1 , 0 , 1) WALIA (TRACK3398) 1368 L312 L312-JHUNTRI TO RENELA New -- 4.000 3.750 Complete 20 119.62 79.74 199.36 17.94 (0 , 0 , 1 , 0 , 1) FALA. (TRACK3401) 1369 L335 L335-BHOODAR TO New -- 5.000 3.750 Complete 22 149.91 99.94 249.85 22.48 (0 , 0 , 1 , 0 , 1) NARVANIYA. (TRACK3423) 1370 L351 L351-Khanmeen to Koted New -- 4.000 3.750 Complete 18 119.30 79.53 198.83 17.89 (0 , 0 , 1 , 0 , 1) fala (TRACK3440) 1371 L339 L339-UGAMNA KOTRA TO New -- 4.000 3.750 Complete 23 119.83 79.89 199.72 17.97 (0 , 0 , 1 , 0 , 1) MATAN FALA. (TRACK3428) 1372 L338 L338-CHORAI TO NECHHALA New -- 4.000 3.750 Complete 22 117.89 78.60 196.49 17.68 (0 , 0 , 1 , 0 , 1) FALA. (TRACK3427)

Page 105 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1373 L323 L323-Chorai to Wali fala New -- 3.000 3.750 Complete 18 88.82 59.21 148.03 13.33 (0 , 0 , 1 , 0 , 1) (TRACK3412) 1374 L301 L301-RISHABDEO TO New -- 3.000 3.750 Complete 18 89.25 59.50 148.75 13.39 (0 , 0 , 1 , 0 , 1) BIJALIYA FALA BHAUWA LAMBARET. (TRACK3390) 1375 L294 L294-Chittorda to Amwala, New -- 3.000 3.750 Complete 14 89.83 59.88 149.71 13.48 (0 , 0 , 1 , 0 , 1) Palaiya fala (TRACK3383) 1376 L336 L336-KALAWAT TO AMLI New -- 5.000 3.750 Complete 25 149.51 99.68 249.19 22.42 (0 , 0 , 1 , 0 , 1) DUNGARI. (TRACK3425) Block Kherwara Total 202.500 1,069 6,046.45 4,030.97 10,077.42 907.38 (0 , 0 , 50 , 0 , 50) Block- Kotra

1377 L286 L286-UNKHALIYAT RANESH JI New -- 3.000 3.750 Complete 27 154.21 102.81 257.02 23.14 (0 , 0 , 1 , 0 , 1) ROAD TO GHATA NADI (VR2953) 1378 L290 L290-Kukar Kheda to Simla New -- 1.725 3.750 Complete 2 51.69 34.46 86.15 7.75 (0 , 0 , 1 , 0 , 1) Khet (VR2956) 1379 L285 L285-NH 76 TO SEVADIYA New -- 3.000 3.750 Complete 17 126.80 84.54 211.34 19.02 (0 , 0 , 1 , 0 , 1) (VR2952) 1380 L299 L299-TEJAWAS ROAD TO New -- 3.000 3.750 Complete 16 127.40 84.94 212.34 19.12 (0 , 0 , 1 , 0 , 1) BHUTKNI PHALLA (VR2966) 1381 L300 L300-NH 76 TO KHARADI New -- 2.000 3.750 Complete 13 80.20 53.46 133.66 12.03 (0 , 0 , 1 , 0 , 1) PHALLA (VR2967) 1382 L294 L294-CHAMPA KI NAL TO New -- 5.000 3.750 Complete 35 248.41 165.61 414.02 36.73 (0 , 0 , 1 , 0 , 1) UPLI NAL (VR2961) 1383 L297 L297-BHUTWAD ROAD TO New -- 1.500 3.750 Complete 8 88.10 58.73 146.83 13.22 (0 , 0 , 1 , 0 , 1) NATIVERI PHALLA (VR2964) 1384 L296 L296-SH 10 KM 75 TO New Waste Plastics 2.800 3.750 Complete 13 95.58 63.72 159.30 14.33 (0 , 0 , 1 , 0 , 1) BOKHRAVALI (VR2963) 1385 L295 L295-AR SAMOLI TO NICHLA New -- 2.300 3.750 Complete 9 69.21 46.14 115.35 10.38 (0 , 0 , 1 , 0 , 1) TILRWA (VR2962)

Page 106 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1386 L298 L298-AR NAYAWAS BAGAWAT New -- 3.000 3.750 Complete 10 104.75 69.84 174.59 15.71 (0 , 0 , 1 , 0 , 1) TO KAMDIYA PHALLA (VR2965) 1387 L292 L292-GARA TO REBARI New -- 4.500 3.750 Complete 17 202.66 135.11 337.77 30.47 (0 , 0 , 1 , 0 , 1) KHUNA (VR2959) 1388 L301 L301-AR ANJANI KM 0.4 TO New Waste Plastics 2.500 3.750 Complete 9 74.84 49.90 124.74 11.22 (0 , 0 , 1 , 0 , 1) DEGRI PHALLA (VR2968) Block Kotra Total 34.325 176 1,423.86 949.25 2,373.11 213.12 (0 , 0 , 12 , 0 , 12) Block- Lasadiya

1389 L195 L195-AR BACHALA FALA New -- 1.350 3.750 Complete 10 40.36 26.91 67.27 6.05 (0 , 0 , 1 , 0 , 1) (TRACK2980) 1390 L206 L206-AR JODAWAT FALA New -- 3.200 3.750 Complete 14 95.88 63.92 159.80 14.39 (0 , 0 , 1 , 0 , 1) (TRACK2978) 1391 L192 L192-AR KHEDA FALA New -- 3.800 3.750 Complete 20 113.88 75.92 189.80 17.08 (0 , 0 , 1 , 0 , 1) (TRACK2979) 1392 L191 L191-AR KARAKLIA New -- 4.000 3.750 Complete 20 119.84 79.90 199.74 17.98 (0 , 0 , 1 , 0 , 1) (TRACK2988) 1393 L198 L198-AR AMRAWAT FALA New -- 6.000 3.750 Complete 30 179.68 119.78 299.46 26.95 (0 , 0 , 1 , 0 , 1) (TRACK2983) 1394 L190 L190-AR HAVJIFALA New -- 2.400 3.750 Complete 10 71.96 47.97 119.93 10.78 (0 , 0 , 1 , 0 , 1) (TRACK2984) 1395 L200 L200-AR MANAWAT VAJAWAT New -- 4.700 3.750 Complete 24 140.91 93.94 234.85 21.14 (0 , 0 , 1 , 0 , 1) FALA (TRACK2982) 1396 L207 L207-AR BENAWAT MAGARI New -- 2.000 3.750 Complete 10 59.92 39.94 99.86 9.00 (0 , 0 , 1 , 0 , 1) (TRACK2987) Block Lasadiya Total 27.450 138 822.43 548.28 1,370.71 123.37 (0 , 0 , 8 , 0 , 8)

Block-

1397 L190 L190-AR Bhagal (VR3034) New Waste Plastics 1.850 3.750 Complete 7 55.31 36.88 92.19 8.30 (0 , 0 , 1 , 0 , 1)

1398 L193 L193-AR- Bhimawat-Pol New -- 1.100 3.750 Complete 2 32.95 21.96 54.91 4.95 (0 , 0 , 1 , 0 , 1) (VR3024)

Page 107 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1399 L227 L227-AR Moti Magari New -- 3.400 3.750 Complete 11 101.63 67.76 169.39 15.24 (0 , 0 , 1 , 0 , 1) (VR3029) 1400 L229 L229-AR Namchot (VR3031) New -- 3.525 3.750 Complete 11 105.54 70.36 175.90 15.83 (0 , 0 , 1 , 0 , 1)

1401 L189 L189-Kherad Karawali road New Waste Plastics 2.000 3.750 Complete 3 59.93 39.95 99.88 9.00 (0 , 0 , 1 , 0 , 1) to Rajawaton Ki Bhagal (VR3019) 1402 L205 L205-AR Har (VR3021) New -- 3.100 3.750 Complete 15 92.80 61.87 154.67 13.92 (0 , 0 , 1 , 0 , 1)

1403 L244 L244-AR Umra Fala (VR3026) New Waste Plastics 3.200 3.750 Complete 9 95.91 63.94 159.85 14.40 (0 , 0 , 1 , 0 , 1)

1404 L209 L209-AR Jaguwat Fala New -- 1.500 3.750 Complete 8 44.87 29.92 74.79 6.74 (0 , 0 , 1 , 0 , 1) (VR3030) 1405 L191 L191-AR Bhawatwara New -- 1.000 3.750 Complete 2 29.95 19.97 49.92 4.48 (0 , 0 , 1 , 0 , 1) (VR3056) 1406 L235 L235-AR Raghunathpura New -- 2.525 3.750 Complete 11 75.70 50.46 126.16 11.35 (0 , 0 , 1 , 0 , 1) (VR3057) 1407 L196 L196-AR-Dayma-Fala-Upla New -- 2.100 3.750 Complete 10 62.82 41.88 104.70 9.43 (0 , 0 , 1 , 0 , 1) (VR3039) 1408 L232 L232-AR Nichali Meghwal New -- 1.450 3.750 Complete 6 43.38 28.92 72.30 6.50 (0 , 0 , 1 , 0 , 1) Basti (VR3038) 1409 L207 L207-Hema Tanda (VR3049) New -- 3.200 3.750 Complete 19 95.87 63.92 159.79 14.38 (0 , 0 , 1 , 0 , 1)

1410 L240 L240-AR to Sarpanch Basti New -- 4.000 3.750 Complete 12 119.90 79.94 199.84 18.00 (0 , 0 , 1 , 0 , 1) (VR3033) 1411 L226 L226-AR Mogawat Kalal New -- 2.000 3.750 Complete 6 59.03 39.35 98.38 8.86 (0 , 0 , 1 , 0 , 1) (VR3044) 1412 L234 L234-AR Prem Nagar Suthar New -- 2.000 3.750 Complete 8 59.83 39.89 99.72 8.97 (0 , 0 , 1 , 0 , 1) basti (VR3045) 1413 L187 L187-AR Bemnot Kar Got New -- 2.000 3.750 Complete 10 59.89 39.93 99.82 9.00 (0 , 0 , 1 , 0 , 1) Fala (VR3050) 1414 L181 L181-AR Adiwawasi Hameri New -- 3.250 3.750 Complete 22 97.29 64.86 162.15 14.61 (0 , 0 , 1 , 0 , 1) Bhagal (VR3047) 1415 L199 L199-AR Dholi Magari New -- 1.200 3.750 Complete 7 35.95 23.96 59.91 5.40 (0 , 0 , 1 , 0 , 1) (VR3043)

Page 108 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1416 L185 L185-AR Baman Talab New -- 3.500 3.750 Complete 18 104.89 69.93 174.82 15.74 (0 , 0 , 1 , 0 , 1) (VR3036) 1417 L202 L202-AR Gameti Fala Kadip New -- 2.000 3.750 Complete 7 59.85 39.90 99.75 8.98 (0 , 0 , 1 , 0 , 1) Bhagal (VR3041) 1418 L203 L203-AR Gayari Bhagal New -- 2.000 3.750 Complete 10 59.92 39.94 99.86 9.00 (0 , 0 , 1 , 0 , 1) (VR3055) 1419 L214 L214-AR Kawadia Fala New -- 3.700 3.750 Complete 18 110.78 73.86 184.64 16.62 (0 , 0 , 1 , 0 , 1) (VR3032) 1420 L231 L231-AR Nichli Chapar New -- 1.200 3.750 Complete 4 35.95 23.96 59.91 5.40 (0 , 0 , 1 , 0 , 1) (VR3037) 1421 L213 L213-AR Kanat Fala New -- 2.000 3.750 Complete 10 59.93 39.95 99.88 9.00 (0 , 0 , 1 , 0 , 1) (VR3048) 1422 L224 L224-AR Meena Mawat Fala New -- 1.000 3.750 Complete 3 29.99 19.99 49.98 4.48 (0 , 0 , 1 , 0 , 1) (VR3051) 1423 L228 L228-AR Nad Fala (VR3035) New -- 2.600 3.750 Complete 11 77.72 51.81 129.53 11.65 (0 , 0 , 1 , 0 , 1)

Block Salumbar Total 62.400 260 1,867.58 1,245.06 3,112.64 280.23 (0 , 0 , 27 , 0 , 27) Block- Sarada

1424 L229 L229-AR Limbadi Km. 4 To New -- 2.030 3.750 Complete 7 60.70 40.47 101.17 9.11 (0 , 0 , 1 , 0 , 1) Kad Fala (TRACK3148) 1425 L230 L230-Semari Rathoda Road New -- 3.300 3.750 Complete 13 98.90 65.94 164.84 14.85 (0 , 0 , 1 , 0 , 1) Km. 6 To Dhabra Adiwasi Basti (TRACK3149) 1426 L232 L232-Sarada Baluwa Road New -- 2.400 3.750 Complete 12 71.92 47.95 119.87 10.78 (0 , 0 , 1 , 0 , 1) Km. 11 To Nada Fala (TRACK3151) 1427 L233 L233-Karma Talab To Bhagat New -- 1.500 3.750 Complete 7 44.95 29.97 74.92 6.74 (0 , 0 , 1 , 0 , 1) Fala (TRACK3152) 1428 L234 L234-Rathoda To Sedat Fala New -- 5.500 3.750 Complete 18 156.03 104.02 260.05 23.40 (0 , 0 , 1 , 0 , 1) (TRACK3153) 1429 L236 L236-AR Sarsiya To Teelawat New -- 1.000 3.750 Complete 6 29.97 19.98 49.95 4.48 (0 , 0 , 1 , 0 , 1) Fala (TRACK3155)

Page 109 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1430 L237 L237-Sarada Baluwa Road New -- 2.500 3.750 Complete 12 74.92 49.94 124.86 11.23 (0 , 0 , 1 , 0 , 1) Km. 6 To Hanna Bhatada (TRACK3156) 1431 L240 L240-Dingri Thana Chawand New -- 1.500 3.750 Complete 10 44.94 29.96 74.90 6.74 (0 , 0 , 1 , 0 , 1) Parsad Road Km. 17 To Kotadi Phala (TRACK3158) 1432 L242 L242-Devpura Jawarmines New -- 2.150 3.750 Complete 7 64.32 42.88 107.20 9.64 (0 , 0 , 1 , 0 , 1) Road To Dhoti Magari (TRACK3163) 1433 L245 L245-Nathara Bada Choraha New -- 1.300 3.750 Complete 6 38.86 25.91 64.77 5.84 (0 , 0 , 1 , 0 , 1) To Gotapani Km. 2.000 To Ramat Fala (TRACK3170) 1434 L247 L247-Palodara Kalyanpur New -- 2.400 3.750 Complete 8 69.36 46.24 115.60 10.40 (0 , 0 , 1 , 0 , 1) Road Km. 23 To Pal Kuradia Welawala (TRACK3169) 1435 L248 L248-Balua Sarada Road Km. New -- 2.300 3.750 Complete 9 68.81 45.87 114.68 10.32 (0 , 0 , 1 , 0 , 1) 11 To Batodi Fala (TRACK3162) 1436 L249 L249-Palodara Kalyanpur New -- 3.700 3.750 Complete 16 107.17 71.44 178.61 16.07 (0 , 0 , 1 , 0 , 1) Road Km. 14 To Makarwadiya (TRACK3165) 1437 L250 L250-AR Katanwada Km. New -- 1.600 3.750 Complete 8 47.99 31.99 79.98 7.20 (0 , 0 , 1 , 0 , 1) 0.800 To Mataji Katawala (TRACK3167) 1438 L251 L251-Dingri Badawali Road New -- 2.100 3.750 Complete 6 62.86 41.90 104.76 9.43 (0 , 0 , 1 , 0 , 1) Km. 28 To Aleli Fala (TRACK3161) 1439 L203 L203-AR Godasar Km. 1 To New -- 2.500 3.750 Complete 8 74.89 49.93 124.82 11.23 (0 , 0 , 1 , 0 , 1) Newa Fala (TRACK3124) 1440 L204 L204-Rishabdeo Balua New -- 1.150 3.750 Complete 5 34.42 22.94 57.36 5.16 (0 , 0 , 1 , 0 , 1) Sarada Km. 9 To Balua Pata Fala 1441 L205 L205-AR Nimboda Km. 10 To New -- 1.500 3.750 Complete 9 44.75 29.83 74.58 6.71 (0 , 0 , 1 , 0 , 1) Antari Malan Fala (TRACK3126)

Page 110 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1442 L206 L206-Balua Sarada Road Km. New -- 4.000 3.750 Complete 22 119.67 79.78 199.45 17.95 (0 , 0 , 1 , 0 , 1) 11 To Her Ghata (TRACK3127) 1443 L207 L207-AR Limbadi Km. 5 To New -- 2.775 3.750 Complete 11 81.43 54.28 135.71 12.21 (0 , 0 , 1 , 0 , 1) Bhagal Fala (TRACK3128) 1444 L208 L208-Sarada Balua Road Km. New -- 2.000 3.750 Complete 4 58.75 39.16 97.91 8.82 (0 , 0 , 1 , 0 , 1) 9 To Jodad Fala (TRACK3129) 1445 L209 L209-Salumber Chawand New -- 2.000 3.750 Complete 7 59.56 39.70 99.26 8.93 (0 , 0 , 1 , 0 , 1) Road Km. 18 To Panwa Badi Dungari (TRACK3130) 1446 L210 L210- Road Km. New -- 1.800 3.750 Complete 7 53.71 35.81 89.52 8.05 (0 , 0 , 1 , 0 , 1) 0.800 To Somawat Fala (TRACK3131) 1447 L211 L211-AR Mayar Km. 2.800 To New -- 2.500 3.750 Complete 8 67.00 44.66 111.66 10.05 (0 , 0 , 1 , 0 , 1) Joyara Fala (TRACK3132) 1448 L212 L212-MDR 11 To Rajot New -- 1.800 3.750 Complete 6 53.85 35.90 89.75 8.08 (0 , 0 , 1 , 0 , 1) Dungari (TRACK3133) 1449 L220 L220-Nathara Bada Choraha New -- 1.000 3.750 Complete 3 29.94 19.96 49.90 4.48 (0 , 0 , 1 , 0 , 1) To Gotapani Km. 2.500 To Bamaniya (TRACK3134) 1450 L228 L228-Palodara Devpura New -- 3.000 3.750 Complete 16 89.92 59.95 149.87 13.48 (0 , 0 , 1 , 0 , 1) Jawarmines To Dingadi Fala (TRACK3135) 1451 L225 L225-S.H. 32 To Ghata Talai New -- 0.950 3.750 Complete 3 28.10 18.74 46.84 4.22 (0 , 0 , 1 , 0 , 1) (TRACK3136) 1452 L213 L213-MDR Km. 63 To Guda New -- 1.100 3.750 Complete 4 32.80 21.86 54.66 4.93 (0 , 0 , 1 , 0 , 1) (TRACK3137) 1453 L222 L222-Railway Phatak Sarsiya New -- 1.850 3.750 Complete 17 55.38 36.92 92.30 8.31 (0 , 0 , 1 , 0 , 1) To Jawat Hirawat Fala (TRACK3138) 1454 L214 L214-AR Guda To Kana Kheri New -- 1.525 3.750 Complete 4 45.73 30.48 76.21 6.85 (0 , 0 , 1 , 0 , 1) (TRACK3140)

Page 111 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1455 L215 L215-Jawad Semal Road To New -- 1.400 3.750 Complete 6 41.78 27.86 69.64 6.27 (0 , 0 , 1 , 0 , 1) Moti Kankar (TRACK3141) 1456 L219 L219-Dingri Thana Chawand New -- 1.850 3.750 Complete 7 54.91 36.61 91.52 8.24 (0 , 0 , 1 , 0 , 1) Parsad Road Km. 17 To Nichala Phala (TRACK3142) 1457 L226 L226-Palodara Kalyanpur New -- 3.800 3.750 Complete 12 113.93 75.96 189.89 17.09 (0 , 0 , 1 , 0 , 1) Road Km. 11 To Otala Fala (TRACK3143) 1458 L223 L223-MDR 11 To Pahadi New -- 2.000 3.750 Complete 6 59.93 39.95 99.88 9.00 (0 , 0 , 1 , 0 , 1) Khurd (TRACK3144) 1459 L221 L221-Mandas To Ratakhet New -- 4.700 3.750 Complete 15 140.58 93.72 234.30 21.06 (0 , 0 , 1 , 0 , 1) (TRACK3145) 1460 L217 L217-AR Khodi Mahudi To New -- 1.800 3.750 Complete 9 53.96 35.98 89.94 8.10 (0 , 0 , 1 , 0 , 1) Sanga Bavji Bhamat Phala (TRACK3146) 1461 L224 L224-AR Peepaldara To New -- 2.000 3.750 Complete 16 59.77 39.85 99.62 8.84 (0 , 0 , 1 , 0 , 1) Shushila Phala (TRACK3147) 1462 L239 L239-Jawad Semal To New -- 0.580 3.750 Complete 2 17.37 11.58 28.95 2.59 (0 , 0 , 1 , 0 , 1) Patawat Thori (TRACK3159) 1463 L246 L246-Paderi To Naya Weera New -- 2.700 3.750 Complete 5 80.92 53.95 134.87 12.14 (0 , 0 , 1 , 0 , 1) (TRACK3168) 1464 L243 L243-AR Welvadi To Manila New -- 1.900 3.750 Complete 7 56.98 37.98 94.96 8.55 (0 , 0 , 1 , 0 , 1) (TRACK3166) 1465 L238 L238-Padarda Choraya To New -- 1.050 3.750 Complete 4 31.49 20.99 52.48 4.73 (0 , 0 , 1 , 0 , 1) Gada Talai (TRACK3157) 1466 L231 L231-AR Welvadi To Dhimadi New -- 1.200 3.750 Complete 6 35.79 23.86 59.65 5.36 (0 , 0 , 1 , 0 , 1) Talai Bhutwara (TRACK3150) 1467 L241 L241-M.D.R. 11 To Murdiya New -- 3.000 3.750 Complete 6 89.74 59.83 149.57 13.47 (0 , 0 , 1 , 0 , 1) Wela (TRACK3160) Block Sarada Total 94.710 380 2,808.75 1,872.48 4,681.23 421.13 (0 , 0 , 44 , 0 , 44) District Udaipur Total 696.020 3,413 21,256.12 14,170.74 35,426.86 3,187.45 (0 , 0 , 253 , 0 , 253)

Page 112 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Road Proposals Total 4,292.690 7,645 96,715.09 64,476.70 1,61,191.79 14,509.12 (0 , 2 , 1471 , 7 , 1480) Grand Total 4,292.690 7,645 96,715.09 64,476.70 1,61,191.79 14,509.12 (0 , 2 , 1471 , 7 , 1480)

Page 113 of 113 Generated On : 08/04/2016 04:40 PM