Clrj08042016.Pdf

Clrj08042016.Pdf

Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter - District Wise Abstract State : Rajasthan Sanction Year : 2016-2017 Batch : 1 Collaboration : Regular PMGSY Sr.No. District No of Road Length MoRD Cost State Cost (Rs Total Cost Maint. Cost Habs (1000+, 500+, 250+, <250, Total) Works (Kms) / Bridge (Rs Lacs) Lacs) (Rs Lacs) (Rs Lacs) Length (Mtrs) 1 2 3 4 5 6 7 8 9 Road Proposals 1 Ajmer 17 40.050 787.95 525.30 1,313.25 118.09 (0 , 0 , 17 , 0 , 17) 2 Banswara 64 123.435 3,022.96 2,015.31 5,038.27 453.44 (0 , 0 , 64 , 1 , 65) 3 Barmer 153 562.935 12,950.77 8,633.85 21,584.62 1,946.54 (0 , 0 , 154 , 0 , 154) 4 Bikaner 54 249.800 4,833.98 3,222.65 8,056.63 725.02 (0 , 0 , 53 , 2 , 55) 5 Churu 15 46.800 883.31 588.88 1,472.19 132.52 (0 , 0 , 15 , 0 , 15) 6 Dungarpur 137 299.110 7,914.84 5,276.52 13,191.36 1,187.59 (0 , 0 , 137 , 0 , 137) 7 Jaipur 4 8.000 216.46 144.30 360.76 32.58 (0 , 0 , 6 , 0 , 6) 8 Jaisalmer 12 83.350 1,400.68 933.78 2,334.46 209.34 (0 , 0 , 12 , 0 , 12) 9 Jalor 110 366.075 7,265.20 4,843.41 12,108.61 1,089.64 (0 , 0 , 111 , 0 , 111) 10 Jhunjhunun 123 284.130 6,244.73 4,163.20 10,407.93 936.72 (0 , 1 , 123 , 4 , 128) 11 Jodhpur 221 764.100 12,546.77 8,364.50 20,911.27 1,882.23 (0 , 0 , 221 , 0 , 221) 12 Nagaur 112 338.825 6,222.59 4,148.36 10,370.95 933.50 (0 , 0 , 112 , 0 , 112) 13 Pali 44 87.545 1,828.59 1,219.06 3,047.65 274.01 (0 , 0 , 44 , 0 , 44) 14 Pratapgarh 53 97.575 2,509.51 1,673.00 4,182.51 376.89 (0 , 0 , 55 , 0 , 55) 15 Rajsamand 11 15.535 455.48 303.64 759.12 68.27 (0 , 1 , 10 , 0 , 11) 16 Sikar 41 89.605 2,192.73 1,461.86 3,654.59 327.89 (0 , 0 , 41 , 0 , 41) 17 Sirohi 43 139.800 4,182.42 2,788.34 6,970.76 627.40 (0 , 0 , 43 , 0 , 43) 18 Udaipur 253 696.020 21,256.12 14,170.74 35,426.86 3,187.45 (0 , 0 , 253 , 0 , 253) Roads Total 1,467 4,292.690 96,715.09 64,476.70 1,61,191.79 14,509.12 (0 , 2 , 1471 , 7 , 1480) Grand Total 1,467 4,292.690 96,715.09 64,476.70 1,61,191.79 14,509.12 (0 , 2 , 1471 , 7 , 1480) Page 1 of 1 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter State : Rajasthan Sanction Year : 2016-2017 Batch : 1 Collaboration : Regular PMGSY Note : All Costs are in Lakhs and Lengths are in Kms. Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Road Proposals District- Ajmer Block- Peesangan 1 L102 L102-AR to Bhambhiyon ka New -- 2.330 3.750 Complete 5 55.45 36.96 92.41 8.32 (0 , 0 , 1 , 0 , 1) Badia 2 L099 L099-AR to Adawa Ki Dhani New RBI 81 1.750 3.750 Complete 3 38.99 25.99 64.98 5.85 (0 , 0 , 1 , 0 , 1) 3 L112 L112-AR to Rawto Ki Dhani New RBI 81 1.600 3.750 Complete 4 32.90 21.94 54.84 4.94 (0 , 0 , 1 , 0 , 1) 4 L111 L111-Ar to Maliyo Ki Badi New -- 0.700 3.750 Complete 1 20.74 13.82 34.56 3.11 (0 , 0 , 1 , 0 , 1) 5 L114 L114-Pushkar Govindgarh New -- 2.420 3.750 Complete 6 43.10 28.73 71.83 6.47 (0 , 0 , 1 , 0 , 1) Road 6 L117 L117-GANAHERA CHAWANDIA New -- 1.550 3.750 Complete 4 32.32 21.54 53.86 4.85 (0 , 0 , 1 , 0 , 1) 7 L105 L105-AR to Brahmanon Ka New -- 1.900 3.750 Complete 1 29.38 19.58 48.96 4.41 (0 , 0 , 1 , 0 , 1) Badia 8 L115 L115-Bidakchiawas leeri New -- 3.000 3.750 Complete 0 48.74 32.49 81.23 7.31 (0 , 0 , 1 , 0 , 1) road 9 L119 L119-Jethana Samla road to New -- 1.500 3.750 Complete 0 23.74 15.82 39.56 3.56 (0 , 0 , 1 , 0 , 1) Gola 10 L108 L108-Jethana Samla road to New -- 4.500 3.750 Complete 10 83.00 55.34 138.34 12.45 (0 , 0 , 1 , 0 , 1) Gola 11 L113 L113-Beawar gola Pisangan New -- 3.000 3.750 Complete 2 41.81 27.87 69.68 6.27 (0 , 0 , 1 , 0 , 1) road Block Peesangan Total 24.250 36 450.15 300.10 750.25 67.54 (0 , 0 , 11 , 0 , 11) Page 1 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Block- Silora (Kishangarh) 12 L091 L091-Approach road to New -- 2.000 3.750 Complete 5 54.00 36.00 90.00 7.97 (0 , 0 , 1 , 0 , 1) Kasiyon Ki Dhani 13 L095 L095-Approach Road New -- 3.000 3.750 Complete 8 64.19 42.79 106.98 9.63 (0 , 0 , 1 , 0 , 1) Umamal Ki Dhani 14 L087 L087-Sursura Thal Road New -- 4.500 3.750 Complete 11 90.90 60.60 151.50 13.64 (0 , 0 , 1 , 0 , 1) 15 L094 L094-Approach road to New -- 1.800 3.750 Complete 3 37.79 25.20 62.99 5.67 (0 , 0 , 1 , 0 , 1) Shyam Khojo Ki Dhani 16 L090 L090-Approach road to Kali New -- 3.500 3.750 Complete 8 67.30 44.86 112.16 10.09 (0 , 0 , 1 , 0 , 1) Pole Block Silora (Kishangarh) Total 14.800 35 314.18 209.45 523.63 47.00 (0 , 0 , 5 , 0 , 5) Block- Srinagar 17 L119 L119-AR TO BADLIYA New RBI 81 1.000 3.750 Complete 0 23.62 15.75 39.37 3.55 (0 , 0 , 1 , 0 , 1) Block Srinagar Total 1.000 0 23.62 15.75 39.37 3.55 (0 , 0 , 1 , 0 , 1) District Ajmer Total 40.050 71 787.95 525.30 1,313.25 118.09 (0 , 0 , 17 , 0 , 17) District- Banswara Block- Anandpuri 18 L046 L046-AR Bhameda Pada New -- 1.230 3.750 Complete 7 29.60 19.73 49.33 4.44 (0 , 0 , 1 , 0 , 1) (VR1123) 19 L029 L029-AR Kaba Pada (VR1126) New -- 1.330 3.750 Complete 12 40.92 27.28 68.20 6.14 (0 , 0 , 1 , 0 , 1) 20 L054 L054-AR Mana Pada New -- 0.930 3.750 Complete 5 21.71 14.48 36.19 3.26 (0 , 0 , 1 , 0 , 1) (VR1122) 21 L079 L079-AR Nawapada (VR1120) New Waste Plastics 2.500 3.750 Complete 21 74.93 49.95 124.88 11.24 (0 , 0 , 1 , 0 , 1) 22 L041 L041-AR Nichala Pada New -- 2.900 3.750 Complete 20 82.33 54.89 137.22 12.35 (0 , 0 , 1 , 0 , 1) (VR1108) Page 2 of 113 Generated On : 08/04/2016 04:40 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 23 L098 L098-AR Temarn Km. 1 to New Waste Plastics 1.000 3.750 Complete 7 24.71 16.47 41.18 3.71 (0 , 0 , 1 , 0 , 1) Bhabar Pada (VR1114) 24 L090 L090-AR Talab Pada New Waste Plastics 2.500 3.750 Complete 10 90.59 60.40 150.99 13.52 (0 , 0 , 1 , 0 , 1) (VR1117) 25 L094 L094-AR Badla Pada New Waste Plastics 1.630 3.750 Complete 12 58.26 38.84 97.10 8.75 (0 , 0 , 1 , 0 , 1) (VR1116) Block Anandpuri Total 14.020 94 423.05 282.04 705.09 63.41 (0 , 0 , 8 , 0 , 8) Block- Bagidora 26 L145 L145-Chouradi Chouraha - New -- 2.950 3.750 Complete 18 93.68 62.46 156.14 14.06 (0 , 0 , 1 , 0 , 1) Gangartalai Road Km.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    117 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us