PETRONAS’ Deployment of ISO 15926 (Towards Integrated Operations)
SEMANTIC DAYS 2008 21 – 23 April 2008, Stavanger, Norway
Wan Hassan Wan Mamat GM/Custodian, I & C Engineering PETRONAS Carigali Sdn Bhd, Malaysia
PETRONAS Twin Towers Kuala Lumpur, Malaysia World’s tallest twin towers
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway Order of Presentation
Introduction to PETRONAS
PETRONAS PCIM Initiatives
PCIM AND ISO15926 Deployment
Integrated Engineering Tools
Integrated Operations Initiatives
Current Activities
Conclusion
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway Introduction
Petroliam Nasional Berhad (PETRONAS) Holding company
PETRONAS CARIGALI SDN BHD (PCSB) Wholly-owned subsidiary of PETRONAS (Nature of business: Oil and Gas Exploration & Production)
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway Introduction - PETRONAS BUSINESS
Myanmar RetailingRetailing && MarketingMarketing ExplorationExploration
Sudan ProductionProductionVietnam
LNGLNG Approx. 33,600 employees, 28 nationalities in over 30 countries OilOil RefiningRefining
LogisticsLogistics && MaritimeMaritime
Petro-Petro- GasGas ProcessingProcessing chemicalschemicals && TransmissionTransmission
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway PETRONAS – A Global Player Turkmenistan Uzbekistan
RUSSIA Cuba Yemen TURKMENISTAN Myanmar Algeria UZBEKISTAN Morocco MORROCO PAKISTAN North Korea Mauritania EGYPT IRAN CUBA MYANMAR Egypt ALGERIA INDIA SUDAN Philippines VIETNAM PHILIPPINES Sudan MAURITANIA ETHIOPIA Vietnam THAILAND Cameroon CHAD CAMEROON Malaysia – Thailand INDONESIA EQUATORIAL GUINEA Joint DevelopmentTIMOR LESTE Authority Chad BENIN MOZAMBIQUE Indonesia Pakistan Niger Ethiopia Equatorial Guinea Benin
Angola Mozambique
Our expanding multinational workforce drives PETRONAS’ operations in both Upstream and Downstream Businesses in more than 30 countries* (Note: Above map indicates only the countries where our global E & P Business are located) *as of Dec 2007
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway FORTUNE GLOBAL 500 (23 July 2007)
15.4
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway Industry Ranking 2007 – Petroleum Refining World’s Top 10 Most Profitable Petroleum Companies
USD Billion
39.5 40.0
35.0
30.0 25.4 25.0 22.0 20.0 17.1 15.6 15.0 14.8 13.3 12.86 12.83 11.6 10.0
5.0
0
Source: Fortune Global 500 (23 July 2007) PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway ISO 15926 Deployment
Why PETRONAS is supporting the development and deployment of ISO 15926 ?
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway Integrated Engineering and PCIM Initiative - The history
PCIM: PETRONAS Carigali Information Management 2006 Started PCIM Initiative
2005
2004 Published ANGSI Platform Engineering Data in VFDC Intelligent PID’s (Sumandak Project Phase I) 2003 Implementation of Web Portal (VFDC) 2002 Introduction of Integrated Engineering Tools
1998 Common PDMS Cat’s & Spec’s for all Design Contractors (first step towards standardisation) 1996 1995 Utilization of PDMS (for Resak Gas Field Development Project)
Proposed Utilization of 3D CAD System
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway PETRONAS Carigali Information Management Vision
Common Costs ISO 15926 Reduction PCIM Data Model
Engineering Vision Productivity Excellence Improvement
Structured Data Process Interoperability Access and Re-use Optimization
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway PETRONAS (PCSB) POSC CAESAR Member
Standard Data Model Open & Industry Application Standards POSC CAESAR Neutral Exchange Standards and Formats FIATECH Open Standards
for ISO 15926 ENERGISTICS Attributes (RDL) Classification Datasheets Common Handover Requirements
PETRONAS supports POSC CAESAR, FIATECH and ENERGISTICS ISO 15926 and Industry Standard Data Model Vision
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway PCIM Initiative Opportunities – the PCIM impact on the Life Cycle of our Facilities
CONCEPT ENGINEERING FABRICATION INSTALLATION COMMISIONING O&M DECOM
Concept Development
Engineering Efficiency
Working Relations (Contractors & Suppliers)
Information Values
Standardization
Commissioning Efficiency
Handover
Operation Efficiency
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway PCSB Information Management PCIM Data Model Pyramid
PCIMmyCIS Data PCIM Model Data Model 10 % project specific Project Configuration • Structures specific • Structures • Standards • Standards 90 % pre-configured • Content • Content PETRONAS PCIM Data Model ••WorkflowsWorkflows Requirements ••FormsForms (PCIM Guideline, PTS) ••FormatsFormats
myCIS IEA Data Model (International, National, Industry Standards)
ISO 15926, RDL
PCIM Information Model Benefits: Neutral, No Customization, Accelerated Implementation
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway PCSB Information Management PCIM Information Stack for Integrated Engineering Applications (IEA)
PCIM Solution
PCIM Data Model (Structure, Content, Workflows, Form, Formats)
Integrated Engineering Application Platform
CAD Application Platform
Database Layer
Operation System Layer
IT Infrastructure
PCIM Data Model Mandatory for all Vendors and Contractors!
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway PCSB Information Management Requirements PCIM Guideline
Information Information Information Information Document Structured Document Management Systems Technology Handover Management Data Models Content/Form
PCIM Guide
Standardized Information Specification for Vendors and Contractors
based on ISO 15926, PETRONAS Technical Standards (PTS) (Processes, Structures, Data Models, Content, Forms, Formats)
Information Information Design EPC/I/C Production Service System Consultants/ Contractors Sharing Provider Vendors Contractors Fabricators Contractors
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway PCIM Initiative Main Objective for Integrated Engineering
FEED myCIS PCIM • 2D data centric Engineering ISO 15926 – FEED Central – Process Process Data Model – Electrical – Instrumentation & Control Electrical
• 3D data centric Engineering Instrumentation – Plant Design – Structural Design, Civil Data Model Comparison – Piping Analysis ISO 15926
• Integration between 2D – 3D Engineering Piping Design – XML Data Exchange (ISO 15926) – XML Data Model Comparison Plant Design 3D Plant Design • Document Centric Business Process Central Structural Design Data Model
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway PETRONAS (PCSB) ISO 15926 XML 3D Data Exchange
ISO 15926 3D-Data Model Translation
3D AutoPlant 3D AutoPlant ISO 15926 3D PlantSpace XML 3D PlantSpace Data Exchange Infrastructure 3D PDMS XMpLant 3D PDMS (Interface)
3D PDS 3D PDS
Neutral ISO 15926 3D XML Archive 3D
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway PETRONAS (PCSB) ISO 15926 XML 2D Data Exchange
ISO 15926 2D-Data Model Conversion
2D AutoPlant 2D AutoPlant PID PID
2D PlantSpace 2D PlantSpace PID ISO 15926 PID XML Data Exchange 2D VPE PID 2D VPE PID Infrastructure XMpLant 2D PDS PID (Interface) 2D PDS PID
2D SP PID 2D SP PID
Neutral 2D ISO 15926 2D XML Archive
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway PETRONAS (PCSB) Overview - Information System Integration and Interoperability
Integrating Applications
Exchange Infrastructure ERP ERP O&M O&M Doing Material Project Applications Management Management
Enterprise Engineering O&M Enterprise Portals Portals Portals Informing Applications Data Document Viewing Warehouse Control
Integrated Data Model 3D Engineering 2D Comparison Integrated Integrated Doing Engineering Engineering Applications ISO 15926
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway General Requirements by PCIM on Information Systems
General Requirements by PCIM on Information Systems
• Software Vendor neutral (no preference)
• Common PCIM Data Model
• Common PCIM Break Down Structures
• Common Exchange Formats (XML)
• Neutral Archive Formats (XML)
• Interoperability between all Information Systems
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway PETRONAS (PCSB) Overview - Information System
mySAP ERP SAP XI PCIM OM Enterprise Resource Planning ISO 15926 XML Exchange Infrastructure Operation & Maintenance
PCIM MM PCIM PC Material Management & Logistic Project Control Management
mySAP NetWeaver EP IEDC Portal VFDC Portal Enterprise Portal Engineering Portal O&M Portal
PCIM WH PCIM VI PCIM DC ISO 15926 Technical Warehouse 2D/3D Viewer Document Management &Control
PCIM FD PCIM XM PCIM PD FEED XML Comparator 3D Plant Design
PCIM PR PCIM DM PCIM SD Process ISO 15926 Data Model 3D Structural Design
PCIM IN PCIM CE PCIM PS PCIM DH Instrumentation ISO 15926 Class Editor Piping Stress
Datasheets & Hookups Datasheets PCIM EL PCIM XI PCIM PA Electrical ISO 15926 XML Exchange Infrastructure Piping Analysis
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway PCSB Integrated Operations Initiative (Inspired by F1 Technology)
Photo: Angsi Platform operated by PCSB
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway PCSB Integrated Operations Initiative (Smart Field)
Our definition: S M A R T
An oil/gas field capable of self-monitoring and control remotely in real-time to facilitate production operations, production planning and reservoir management
Photo: Angsi Platform operated by PCSB
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway OUR OPERATIONAL VISION…….
SMART FIELD OPERATION CENTRE IN PETRONAS TWIN TOWERS
Photo downloaded from Energistics website
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway Our existing facility……
PViC - Engineering collaboration centre, where Engineers and Geoscientists discuss and decide
(PViC)
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway Towards SMART Field Operations (PCSB-Domestic Operations)
Control room offshore
Onshore Control room Onshore Control room e R im e -t a al l Re -t im e
e im e t l-tim l- Rea a e R
Consultancy External experts Vendor Supports (on demand) Remote Parts Management collaboration room (on demand) Photos courtesy of Energistics and PETRONAS PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway Integrated Engineering & Operations (PCSB- Domestic capital projects and operations)
Satellite links (Petronet) Peninsular Malaysia Operations
Kuala Lumpur Dial-up (Head Office) connection Sabah Operations
PDMS Server PDMS Stations
Design Consultant’s Sarawak Operations offices
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway Towards Integrated Engineering and Operations (PCSB-International Operations) Satellite
Sudan
Turkmenistan Myanmar Vietnam
Sabah Operations
Pakistan Note: Locations which are 100% operated by Kuala Lumpur Sarawak Operations PETRONAS (Head Office) Drilling operations worldwide are Peninsular Malaysia Operations monitored in real-time via RTO (Real-Time Operations) System. Indonesia
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway PCIM Initiative & ISO 15926 Ongoing Activities
• PCIM Datasheet Standards – Harmonizing and Standardizing PETRONAS Carigali Datasheets based on IDS – ISO 15926/RDL Attributes and Classification for PCIM Datasheets
• PCIM Schematics Standards – Harmonizing and Standardizing the form and format for P&ID’s based on ISO 15926/XMpLant Requirements (Pipe, PipeSegments etc.) to enable 2D-3D Data Model comparison
• PCIM 3D Standards
– Harmonizing and Standardizing the 3D Data Model Structure based on ISO 15926/XMplant Requirements (Pipe, PipeSegments etc.) to enable 3D-2D Data Model comparison
• PCIM ISO 15926 Classification Standards
– Harmonizing and Standardizing the ISO 15926 Classification for Engineering Portal (VFDC) and the Engineering tools
• PCIM Full-scale Application in Capital Project
– Tangga Barat Gas Field Development and Kumang Field Development (ongoing).
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway Conclusion
ISO 15926 facilitates PETRONAS (PCSB) in implementation of Integrated Engineering towards realising its vision in SMART Field Operations
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway Exploring tomorrow’s technology to work for us today.
PETRONAS (PCSB)’ Deployment of ISO 15926 SEMANTIC DAYS 2008, 21 – 23 April 2008, Stavanger, Norway