<<

Appendix 1 £1m parks No. Site‐priority order Short description of work/investment required Investment Consultation priority 1 Gardens ‐ Landscape improvement ‐ relandscape old Infrastructure paddling pool and surrounds with top soil and 3 DRES to project manage ‐ grass seed. project management fee Landscape Improvement ‐ relandscape redundant cricket nets, including frames/nets and create new PEOS to manage ‐ no project 3 concrete slab for 2 table tennis tables and or management fee outdoor gym. Basic facility repairs (including flood alleviation 1 Security improvements

New park furniture 1 Playground improvements and extension 5 Key consultation priorities Plumstead Gardens ‐ Soft landscape improvements including shrub 1 Climate Change removal and replanting 1 Basic facilities repairs Project Management 2 Nature and wildlife Removal of redundant or 3 damaged features 2 Charlton Park‐ Contribution to modernisation and redecoration of 6 Infrastructure sports changing rooms 4 Heritage Improvements to the playground 5 5 Play Areas Basic facility repairs 1 6 Sports and fitness New park furniture 1 Charlton Park ‐ Creation of a wildlife meadow (Friends led and Climate Change ward budget secured for Ecology Survey) 2

Project Management

3 Bostall Gardens ‐ Basic facility repairs 1 Infrastructure New park furniture 1 Bostall Gardens ‐ Wildflower seed sowing 2 Climate Change Project Management

4 Rockliffe Gardens ‐ Basic facility repairs 1 Infrastructure New park furniture 1 Rockliffe Gardens ‐ Wildflower margins 2 Climate Change Restoration/creation of wildlife pond 2 Project Management

5 Queens croft Park ‐ Minor refurbishment of former toilets to allow it to Infrastructure be used by the Friends Group. 1

Basic facility repairs 1 New park furniture 1 Playground improvements 5 Queens croft Park‐ Refurbishment/conversion of former boating pool 2 Climate Change to a wildlife pond Meadow creation/Tree Planting 2 Project Management

6 St.Mary's Gardens ‐ Basic facility repairs 1 Infrastucture New park furniture 1 St.Mary's Gardens ‐ Wildflower margins 2 Climate Change Project Management

7 Sunbury Street ‐ Playground refurbishment 5 Infrastructure New park furniture 1

8 ‐ Basic facility repairs 1 Infrastructure New park furniture 1 Shrewsbury Park ‐ Meadow creation 2 Climate Change Tree planting 2 Project Management

9Twinkle Park ‐ Basic facility repairs 1 Infrastructure New park furniture 1 Twinkle Park ‐ Meadow creation 2 Climate Change Shrub replacement and 1 new tree 2 Project Management

Page 1 £1m parks No. Site‐priority order Short description of work/investment required Investment Consultation priority

Eaglesfield Park ‐ Contribution to refurbishment of playground 10 5 Infrastructure

11 Basic facility repairs 1 Infrastructure Playground improvements 5 Contribution to ball court improvements 6 New park furniture 1 Maryon Park ‐ Tree planting 2 Climate Change Wildflower margins 2 Project Management

Consultation/ Overall design costs for branding, visuals (design of Promotional Activity GI ad, poster, social images etc.) July ‐ Aug 2020 Info Advert (consultation launch) Features throughout the year e.g. x 2 News stories e.g. x 5 Councillor Adel intro x 2 Intro from Friends Parks Chair Weekender stories e.g. x 4 A3 Posters, laminated x 50 Vinyl banners to put on railings x 10 Social Media advertising Photographer for e.g. Engagement events and before and after shots (full days@ £500 per day) etc. Printing materials for engagement events e.g. leaflets Printing materials for engagement events e.g. leaflets Version Date: 18th September 2020.

Page 2 Appendix 1

Park sites that have had investment in the last five years

21 18 16 23

5 11 12 1 7 17 10 15

20

14 13 24 9 2

4 8 3 22

6 19

Appendix 1 No. Park Ward

1 Twinkle Park Greenwich West

2 Queenscroft Park Middle Park & Sutcliffe

3 Fairy Hill Park Coldharbour & New

4 Middle Park & Sutcliffe

5 East Greenwich Pleasaunce Peninsula

6 Queens Gardens Coldharbour &

7 Glyndon

8 The Tarn Eltham South

9 Park Eltham South

10 St.Alfege Park Greenwich West

11 Maryon Wilson Animal Park Charlton

12 Winn's Common Plumstead

13 Eltham Park South Eltham North

14 Briset Road Eltham West

15 Garland Road Playground Shooters Hill

16 Villas Road Playground Glyndon

17 Charlton Park Charlton

18 Maryon Park Riverside

19 The Course Coldharbour & New Eltham

20 Shooters Hill

21 Gilbert's Pit Woolwich Riverside

22 Southwood Park Coldharbour & New Eltham

23 Bostall Gardens

24 Eltham West Appendix 1

Initial 11 parks proposed to receive investment from £1m park improvement funding

No. Park Ward 1 Plumstead Gardens Plumstead 2 Charlton Park Charlton 3 Bostall Gardens Abbey Wood 4 Rockliffe Gardens Plumstead 5 Queenscroft Park Middle Park & Sutcliffe 6 St Mary’s Gardens Woolwich Riverside 7 Sunbury Street playground Woolwich Riverside 8 Shrewsbury Park Shooters Hill 9 Twinkle Park Greenwich West 10 Eaglesfield Park Shooters Hill 11 Maryon Park Woolwich Riverside