Statewide Transportation Improvement Program 1996 - 1998

Department of Transportation and Public Facilities May 1996 How to contact us:

This Statewide Transportation Improvement Program (STIP) was prepared by the Division of Statewide Planning, Department of Transportation and Public Facilities. Additional copies of this document or further information about the selection process can be obtained by calling or writing this office. To receive further information or to send us your comments about this document please contact us: Tom Brigham, Director Statewide Planning Division Alaska Department of Transportation and Public Facilities 3132 Channel Drive Juneau, AK 99801-1798 Phone: (907) 4654070 (907) 465-6984 gq. (907) 465-3652 Toll free: (888) PLAN DOT 752-6368 EMail: [email protected] WVW: http://www.dot.state.ak.us/

Photo Credits: Top - Canyon Creek Bridge, Seward Highway will be rebuilt in 1996 and 1997 as part of the National Highway System. Bruce Freitag Center - Capital Transit Bus on Franklin Street, Juneau, Alaska. Replacement buses will be purchased as part of the Community Transportation Program in 1996. Jeff Ottesen Bottom - Whale Park overlook constructed as part of Transportation Enhancement Program in Sitka, Alaska. City and Borough of Sitka Alaska Department of Transportation and Public Facilities Statewide Transportation Improvement Program Federal Fiscal Years 1996 - 1998 Contents

Introduction and Summary Purpose of the STIP ...... 1 The New Transportation Initiative...... 2 What the New Process Includes...... 3 Why Geographic Allocation is Not Used...... -3 How Projects Are Selected for the STIP ...... 4 Major Projects and Priorities Within the STIP ...... 5 Air Quality Conformity Findings...... 8 STIP Public Involvement...... 8 Amending the STIP and Project Selection Criteria...... 9 Adequacy of Transportation Funding...... 9 Special Status of Anchorage (AMATS)...... 9 How to Reach Us...... 11 Glossary of Terms ...... -12

Funding Sources and Estimate Federal Transit 49 USC 5310 (Section 16(b)(2))...... 14 49 USC 5311 (Section 18)...... 14 49 USC 5307 (Section 9)...... 14 49 USC 5309 (Section 3)...... 14 Transfers from Federal Highway State Apportionment Program to Transit ...... 15 Federal Highways Federal Lands Highway Program ...... 15 Surface Transportation Funding Sources Interstate Maintenance...... 16 State Planning and Research...... 16 Metropolitan Planning...... 16 Bridge Rehabilitation and Replacement...... 16 National Highway System...... 16 Congestion Management/Air Quality...... 16 Safety ...... 17 Transportation Enhancements...... 17 Surface Transportation Program...... 17 Scenic Byways ...... 17 Ferry Boat Discretionary Funds ...... 17 Estimated Apportionments...... 18

i Program Listings Project Tables ...... 18 Table 1 Estimate of Available Funds ...... 19 Explanation of Terms ...... 19 National Highway System Program...... 24 Community Transportation Program ...... 38 Trails and Recreational Access for Alaska Program ...... 50

Appendices A - Changes in Proposed Program Between Draft and Final 1996 - 1998 STIP B - Federal Lands Highway Funding

ii Alaska Department of Transportation and Public Facilities Statewide Transportation Improvement Program Federal Fiscal Years 1996 - 1998

Introduction and Summary This document is a new edition of the STIP or Statewide Transportation Improvement Program. The STIP is a plan for allocating funding for surface transportation - highways, transit, trails and ferries - for a three year period. This new STIP covers the time period from October 1995 through September 1998. An additional three year period (1999 - 2001) of preliminary project schedules is shown for information only.

This STIP is the first program based on the Transportation Initiative announced by Governor Knowles in June 1995. This initiative outlined three major categories of spending and a competitive and open project selection process. The new scoring criteria, explained in detail later, allow for different types and scales of transportation projects to be directly compared for a more fair evaluation.

The STIP only covers surface transportation projects. Funding for projects is provided by the Federal Aviation Administration and port and harbor projects are funded by the Corps of Engineers and limited state funding. The latter two types of projects are not included in this STIP.

Purpose of the STIP The STIP is a final step in deciding which projects will be selected for funding. Alaska’s STIP is prepared from a document known informally as the Needs List (Transportahvz Needs and Priorities in Alaska). Beginning in June 1995 the department began soliciting project nominations to the Needs List. Several hundred project nominations were received from various groups, local governments, state and federal agencies.

Thereafter, using the new scoring criteria, a large number of projects was ranked and scored. Only projects receiving the highest scores in the Needs List became eligible for statewide consideration and possible Priority 1 ranking-a prerequisite for inclusion in the STIP.

The STIP is a financially,constrained three-year spending program. The department must estimate the total amount of transportation funding, by category, it expects to receive for the three year period. The primary source of funds for surface transportation projects in Alaska is federal-aid highway funding received from the U.S. Department of Transportation. This estimate forms the annual limit of project allocations that the STIP can contain. Further, funding is allocated within specific categories such as safety, surface

Final Statewide Transportation Improvement Program Page 1 Tlit? ~-~~~rpos~~of thfx 5’111’ is to ;~ilov~~i’l”biik: r(?\‘icw and comment on a surface transportation sptbllding plan ~‘li~ch: 8 Is fiscally constr,lined, basc:d upon rc;llistic cstimatcs of expected funding; * Is consistent with both statewIde and local transportation plans; l Covers a period of not less than 3 years; l Is shown to be consistent with federal and state air quality requirements; l Contains all capital ,Ind noll-capital (e.g., planning, research) transportation projects; l Contains descriptive information about each project, including description, location, costs and year of funding; and, e Is developed in cooperation or consultation, as appropriate, with affected local officials and transit operators.

The New Transportation Initiative On June 6, 1995, GoLrcrnor Knowles announced a new surface transportation plan for Alaska’s future affecting roads, ferries, trails and transit. The new plan focuses transportation invtastments toward four broad categories of spending:

l Bring Alaska’s National Highway System (intercity, statewide and Alaska Marine Highway System routes) up to modern standard (approximately $120 million a year); l Develop a Community Transportation Program (CTP) that creates partnerships with local governments to build projects that serve local and regional needs (approximateiy $80 million a year); l Support the construction of Economic Development roads and transportation projects that directly contributes to the growth of Alaska’s economy (annual funding for this program is included in the Community Transportation Program); and, l Establish the Trails and Recreational Access for Alaska (TRAAK) Program to improve access and recreational opportunities (approximately $20 million a year).

Proposed funding levels for this initiative are based on current federal-aid transportation funding and required state match amounts. Should federal funding amounts change, the amount allocated to each of the transportation initiative categories would be reconsidered.

What the New Process Includes In July 1995 the department announced a new project selection process for the Needs List. This new process incorporates the following elements:

l A broad-based public involvement process that opens the entire process to public review; l Detailed and specific selection criteria for ranking projects such as safety, economic benefit and public support; l A priority on shared state-local responsibility, both for capital costs and long-term maintenance; l Equal opportunity for highway and non-highway transportation modes such as boardwalks, winter trails and transit; and, l Further priority to projects that are environmentally sound, enhance economic growth and responsibly serve communities and neighborhoods.

Why Geographic Allocation is Not Used A key change in the new process is the elimination of geographic allocations to the department’s regional entities. Alaska’s transportation needs are not well served by this method of allocation as there are no readily identifiable factors that equitably allocate funds on a geographic basis. Measurable parameters such as population, land area, vehicle miles traveled or existing road miles create one or more imbalances. Using population as an allocation tool fails to consider the need to connect far-flung communities separated by largely unpopulated regions. Using land area as a factor underserves more densely populated areas that need high-level investments in transit, or grade- separated highways. Using vehicle miles traveled or existing road miles is unfair to communities that lack roads or that need buses or ferry service.

Alaska’s extremes of climate and landscape and vast expanses require that large segments of the population rely on ferries, winter trails for sleds and snow machines, and other non-conventional means of surface transportation. In this setting it appears that the most equitable allocation method is statewide competition. The key is balancing the criteria such that projects of greatly different scale and type can be compared.

Final Statewide Transportation Improvement Program Page 3 How Projects Are Selected for the STIP Projects for the National Highway System (NHS) were considered by an internal department process and did not compete with other needs. Projects for the TRAAK and CTP programs followed a public nomination process that involved many different project sponsors.

Requests for projects in all other categories under the new transportation initiative were solicited on a widespread basis. Boroughs, cities, villages, Native organizations and other local governments, private parties, state and federal agencies as well as others interested in transportation development were all requested to make project nominations. The department also submitted projects for consideration. The result of this nomination process produced a list of more than 2,000 potential surface transportation projects for consideration.

The department selected projects for Alaska’s National Highway System based upon existing conditions, traffic levels and project development considerations. Projects were not ranked in the fashion used for other categories. Project selection of the most critical projects was undertaken by department staff with the goal of upgrading the NHS in a 14-year period. The result of this first approach is a Final Alaska National Highways Plan. It identifies the proposed sequence and timing of projects that bring Alaska’s major highways and ferry system to modern standards.

With one exception -- Whittier access -- the NHS plan contains no new roads. Its foremost goal is to bring Alaska’s system of NHS highways into a modern standard concerning width, grade, alignment and surface condition. The majority of funding earmarked for this program will be used in rehabilitation and reconstruction of NHS routes and elements of the Marine Highway System.

For the CTP and TRAAK programs the application of evaluation standards and criteria involved one of five different types of surface transportation facilities (i.e., Transit, Rural and Urban Streets and Roads, Alaska Marine Highway System, Remote Roads and TRAAK) resulted in a numeric score for every project. Each project was scored with one of the five sets of standards and criteria:

Communitv Transportation and Economic Develoument Proeram (CTP): l Rural and Urban Streets and Roads Criteria l Remote Roads and Trails Criteria l Transit Projects Criteria

l Alaska Marine Highway System Criteria

Trails and Recreational Access for Alaska (TRAAK):

Alaska Department of Transportation and Public Facilities Final Page 4 l TRAAK Criteria

Future editions of the STIP will also benefit by expanded public involvement. The recently appointed 13-member TRAAK citizens advisory board announced by Governor Knowles in February 1996 will provide a sounding board for public and agency comment statewide.

Scoring involves two steps. First the entire list of projects is scored by the appropriate departmental region or the Marine Highway System. The top- ranked projects from this step are then forwarded to the Project Evaluation Board (PEB); composed of 6 senior members of the department including:

l Deputy Commissioner

l Statewide Planning Director

l Alaska Marine Highway System Director

l Regional Directors (3)

Each member of the PEB ranks the statewide list of projects; the resulting scores are then averaged to determine how projects compare to other projects. The result is a numerically ranked list of projects from highest score to lowest. These constitute Priority 1 and 2 projects. Priority 3 and 4 projects are scored at the regional level only and are those that do not score well enough to be sent to the PEB. Projects slated for construction in 1996 are considered on-going and were not scored.

The list of Priority 1 projects is then used to assemble the STIP. Generally, the highest scoring projects are included in the earliest years of the STIP. While this general rule guides the development of the STIP, other programming criteria also influence the STIP, including the following:

l Higher scoring projects are favored;

l Projects in progress for construction in 1996 are favored;

l Complex projects involving difficult right-of-way or environmental considerations are assigned a longer time frame;

l Utilize sub-allocation funding categories such as CMAQ or safety funds; and,

l Coordinate with associated projects and other funding sources.

Major Projects and Priorities Within the STIP The STIP contains projects of a wide variety of type, size and complexity. Needs such as winter trail markings for trails used for transportation between remote villages are found in the STIP along with new highway interchanges, bus purchases and improvements to ferries. Within this diversity are a few notable themes and individual projects.

Final Statewide Transportation Improvement Program Page 5

.,_.,*___ -I -- . Mona1 Highwav Svstem Modernization. Alaska’s system of National Highways are significantly below modern development standards in many sections. This STIP contains numerous projects which address major upgrades to the NHS, including major projects on the Seward, Glenn, Dalton, Parks, Richardson, Sterling, Haines and other roads and highways. . RMHS Ocean-class Vessel. This is a continuation of a multi-year NHS project to construct a new ocean-class vessel for the Alaska Marine Highway System. The new vessel will be 380 feet long, operate at 16.75 knots and carry 120 vehicles and 750 passengers within inside waters or 1.03 vehicles and 500 passengers on ocean crossings. The current schedule calls for the vessel to be completed in early 1998. . Rural Access and Sanitation Roads. Alaska’s remote communities lack many basic facilities taken for granted in more populated areas. All-weather access to water sources, landfill sites, sewage lagoons, and other basic necessities of village life often requires road or trail improvements. The STIP contains more than 30 CTP projects involving nearly $24 million that address transportation projects of this nature. In addition, the Bureau of Indian Affairs has programmed almost $31 million for other remote surface transportation projects in the 1996-1998 time period.

The allocation of dollars within the Community Transportation Program favors local needs. Categorizing projects into one of six types illustrates that 74% of the program goes toward projects which serve a community or local transportation activity while 26% goes to projects of a statewide nature:

Projects of a Community Nature 74% Community roads and streets 59% Transit 1% Remote community roads and streets 14%

Projects of a Statewide Nature 26% State highways not on the NHS 21% Marine highways not on the NHS 2% New access between communities 3%

Community Transportation Program Allocation FY 96 - 98

ay

Alaska Department of Transportation and Public Facilities Final Page 6 The allocation of dollars within the Trails and Recreational Access for Alaska (TRAAK) program also favors local needs. When categorized into one of three project types, our evaluation of TRAAK projects illustrated that 61% of the program goes toward projects which serve a community or local transportation activity while 39% goes to projects of a statewide nature. The breakdown includes four project types: Community projects 61% Travelers 36% Remote winter trails 2% Special (water quality, archaeology) 1%

Trails and Recreational Access for Alaska Allocation FY 96 - 98 Community Win

36%

The allocation of dollars within the NHS program serves statewide needs in general, but many NHS improvements are also important to community transportation needs. When categorized into one of four project types, our evaluation of NHS projects illustrated that 77% of the program goes toward projects which serve a statewide nature, while 23% goes to projects which serve a statewide and community or local transportation purpose. The breakdown includes four project types:

Projects of a Statewide Nature 77% NHS highways between communities 53% Marine highways vessels 22% Marine highway terminals 2%

Projects of a Statewide and Community Nature 23% NHS highways within communities 23%

Final Statewide Transportation Improvement Program Page 7 National Highway System Allocation FY 96 - 98 NHS Community 23%

AMHS Vessels 22%

AMHS Terminals 2%

Air Quality Conformity Finding Projects proposed for construction within air quality non-attainment areas must undergo a conformity analysis relative to the State Implementation Plan (SIP) for each non-attainment area. This analysis is intended to ensure that all SIP requirements are fulfilled and that the STIP will: a support the attainment and maintenance of National Ambient Air Quality Standards (NAAQS); l not cause any new violations of NAAQS; l not cause any worsening of existing violations; l not contradict recommendations of the State Implementation Plan; and, a not delay the region’s efforts to attain NAAQS in a timely manner.

Further, additional conformity requirements are that the STIP provide funding for transportation control methods which are included in the SIP, and demonstrate that the “build” scenario (implementation of the STIP) provide more emissions reduction than the “no-build” scenario.

Conformity findings for the Anchorage area will be completed as part of the final TIP, which is still in progress. Conformity findings for Fairbanks have been completed and were submitted to federal authorities as supplemental information concurrent with the STIP. The findings indicate that the overall budget for on-road emissions is within the level set for Fairbanks with the build scenario, and that the Fairbanks projects in the FY 1996 - 1998 STIP will contribute to a lessening of emissions, compared to the no-build scenario. Because Fairbanks did not reach attainment in 1995, funding for one contingency measure from the SIP is contained in the FY 1996 - 1998 STIP.

STIP Public Involvement The STIP was prepared with a number of opportunities for public involvement. Beginning in July. 1995 the department notified, by mail, local

Alaska Department of Transportation and Public Facilities Final Page 8 governments, village and traditional councils and federal and state agencies of their opportunity to nominate projects. This resulted in the draft Needs List being published in November, 1995. The draft Needs List contained a tentative six-year program of projects based upon the initial scores given to projects in the Needs List. Thereafter, the department advertised the Needs List for public hearings using newspaper ads. Notices were placed in newspapers throughout the state and meetings were held in more than 20 communities. The public comment period was extended to 6 weeks because of the holiday season. Over 250 letters were received concerning the Needs List.

The department’s Project Evaluation Board or PEB prepared the draft STIP based on the comments received during the review of the draft Needs List. Notice of the draft STIP was published in newspapers throughout the state. In addition copies were mailed to a mailing list of more than 2,000 persons, organizations and agencies and additional copies were sent to those who responded to the advertisements. This mailing list is comprehensive. It includes local governments, affected public agencies, village and traditional councils, representatives of transportation employees, public and private freight and passenger transporters, interest groups and individuals. A comment period of 35 days was provided. Over 100 comments were received by mail.

Using this comment information, the PEB reconsidered a limited number of projects and adjustments were made to the STIP as warranted. A list of significant changes made between the draft and final STIP is found in Appendix A. The STIP was then forwarded to the FHWA and FTA for their approval. Approval by the federal agencies authorizes project funding and allows programming of projects to begin.

Throughout this public involvement process, the department used its .home page on the Internet to advertise the STIP process, time and place of public meetings, availability of draft documents and status of the process at key junctures. While nearly 40 e-mail messages were sent to the department’s internet web homepage during the process, we are sensitive to the fact that the internet is not a universally available medium. We will continue to use this medium as an adjunct to other methods of notifying the public such as our public notices in newspapers and mailing lists.

Amending the STIP and Project Selection Criteria Modifications to the STIP are made under rules for either minor or major amendments. Major amendments involve the same level of public notice and comment necessary for original STIP approval. Minor amendments are not subject to public notice and review. Both minor and major amendments are reviewed and approved by federal agencies before they take effect.

Final Statewide Transportation Improvement Program Page 9 The department maintains a list of both minor and major amendments to the STIP, pending and final, on the our World Wide Web home page. This list can be found at URL: http:/ /www.dot.state.ak.us/

The department will initiate a public process to review and reevaluate the project selection criteria later in 1996 and thereafter begin the cycle of Needs List nomination and STIP development for the 1998-2000 time period.

Adequacy of Transportation Funding The number and dollar value of projects within the Needs List continues to grow. Alaska, because of its small population, vast geographic expanse, difficult terrain and environment, and recent frontier age, continues to require large levels of transportation investment for the most basic of needs. Such basic requirements as access to essential health and sanitation facilities, winter trails for remote villages and upgrading highways from standards prevalent 50 years ago compete with projects to build interchanges and replace transit coaches in urban areas.

As long as the extreme imbalance between need and funding exists large numbers of deserving projects will have to wait many years for funding. The department is concerned with this growing imbalance, but expansion of either federal or state funds is not likely. We continue to seek innovative funding opportunities including tolls, shared funding with other parties and donations of rights-of-way, material sources and design services.

In light of this imbalance between needs and funds, the process of selecting projects is highly competitive. We have attempted to favor projects which bring additional funds and those which are broadly beneficial. Until new funding is found for transportation, this imbalance will continue to hamper improvement of Alaska’s transportation infrastructure.

Because of the inadequacy of funding, this program has necessarily given highest priority to highly beneficial projects. Generally speaking, highways, major arterials, transit improvements and more broadly used transportation elements compete more favorably in the scoring process than do local roads or subdivision streets. Accordingly, unless transportation funding increases appreciably, capital improvements for local streets and subdivision roads will generally remain the responsibility of local government or local improvement districts. The DOT&PF will continue to sponsor and advocate for major roads and highways that link communities together across the state.

Special Status of Anchorage (AMATS) The Anchorage Metropolitan Area Transportation Study (AMATS) holds special status under ISTEA for program development. As an urban area with greater than 200,000 population the Anchorage urban area falls under the ‘Transportation Management Area (TMA) rules. Under ISTEA, AMATS is

Alaska Department of Transportation and Public Facilities Final Page 10 empowered to determine its own priority for projects and prepare its own Transportation Improvement Program (TIP) based on funding allocated to AMATS within the STIP. In the other 49 states TMAs are allocated funds based on a statutory formula. ISTEA contains an exception to this requirement for Alaska, in that the allocation of funds for Alaska TMAs is determined by DOT&PF within the STIP.

In order to determine the AMATS funding allocation, AMATS projects were scored along with projects from other communities for the six year program. The AMATS funding allocation was then based on averaging the six-year competitive program and setting a yearly funding target based on that average. This uniform yearly target allows AMATS to accomplish the long- range planning required to develop complex projects to resolve congestion and other problems in the AMATS area. Time frames for developing and constructing urban projects is typically from 5 to 7 years.

Though funding for AMATS was garnered through the PEB scoring process, based on projects submitted under both the CTP and TRAAK programs, the AMATS project selection process is not bound by this allocation to spend these funds in the same categories.

NHS projects within AMATS remain a state responsibility but are included in the AMATS TIP. The AMATS TIP will be released for public review after AMATS adopts the final Needs List for Anchorage. The AMATS TIP will then be incorporated by amendment into the Alaska 1996 - 1998 STIP in its entirety.

How to Reach Us Please contact us if you have comments about the Statewide Transportation Improvement Program or any other aspect of transportation in Alaska.

Tom Brigham, Director Phone: (907) 465-4070 Division of Statewide Planning Fax: (907) 465-6984 3132 Channel Drive TTY: (907) 465-3652 Juneau, Alaska 99801 E-mail: [email protected] Alaska toll free: (888) PLAN DOT or 752-6368

Internet and World Wide Web Access You can send a comment, request further information, or view updated information about the Needs List and STIP via the Internet World Wide Web at the department’s home page URL: http: / /www.dot.state.ak.us/

If you do not have access to or are not familiar with using the Internet World Wide Web, you can learn more about this new method of seeking information from your local public library.

Final Statewide Transportation Improvement Program Page 11 Glossary of Terms AMHS Alaska Marine The department’s system of vessels, terminals Highway System and routes that link most of Alaska’s coastal communities from the Aleutians to Southeast. _- Apportionment(s) The division among the States of program funding levels authorized by ISTEA from the federal Highway Trust Fund. These amounts are calculated annually for each state and are available for four years. Expenditure of apportionment balance are limited by obligation authority. (See also Obligation Authority.) Programs designated in ISTEA include, Transportation Enhancements, National Highway System, Safety, Interstate Maintenance, Bridge Rehabilitation and Replacement, Surface Transportation Program, and others. -- Consultation One party confers with another identified party and, prior to taking action(s), considers that party’s views. -- Cooperation The parties involved in carrying out the planning, programming and management systems processes work together to achieve a common goal or objective. -- Coordination Comparison of the transportation plans, programs, and schedules of one agency with the related plans, programs and schedules of other agencies or entities with legal standing, and the adjustment of plans, programs and schedules to achieve general consistency. CTP Community A new program of the Alaska Department of Transportation Transportation and Public Facilities that Program addresses a wide range of community transportation modes including rural and urban roads, transit, and ferry routes. FHWA Federal Highway The federal agency of the U.S. Department of Administration Transportation responsible for funding highways, trails and ferries. FIA Federal Transit The federal agency of the U.S. Department of Administration Transportation responsible for funding transit systems. ISTEA Intermodal Surface An act of Congress providing funding Transportation authorizations for highways, safety, and mass Efficiency Act of transportation for a six-year period for federal 1991 fiscal years 1992 through 1997. MPO Metropolitan Means the forum for cooperative transportation Planning decision making for a metropolitan planning Organization area. In Alaska Anchorage is the only MPO. AMATS (Anchorage Metropolitan Area Transportation Study) is the Anchorage MPO.

Alaska Department of Transportation and Public Facilities Final Page 12 Veeds List Transportation Needs 1 A document of the Alaska Department of urd Priorities in Transportation and Public Facilities that lists all 4laska transportation and facility needs in the state, including highways, ferries, trails, transit, airports, harbors and facilities, divided into four priorities. NHS National Highway The most important highways and ferry routes System in the United States. The FHWA controls NHS designations. _- Non-attainment area A designation of the Environmental Protection Agency (EPA) indicating that a geographic region has not met the National Ambient Air Quality Standard (NAAQS) for a transportation related pollutant(s). In Alaska, portions of Juneau, Fairbanks and Anchorage are so designated. Obligation Authority The total amount of federal highway funds (Limitation) which can be authorized for projects in a given year. This amount results from annual Congressional appropriations and has historically been less than the annual total apportionments authorized by ISTEA. (See also Apportionment(s).) PEB Project Evaluation The board empowered to evaluate projects; it is Board comprised of six members of the Alaska Department of Transportation and Public Facilities: Deputy Commissioner, Statewide Planning Director, Alaska Marine Highway System Director, and three Regional Directors. SIP State Implementation A plan which shows how the State will meet air Plan quality standards as required by the 1977 Clean Air Act Amendments. STIP Statewide A staged, multi-year, statewide, intermodal Transportation program of transportation projects which is Improvement consistent with the Statewide Transportation Program Plan and planning processes as well as the metropol[tan plans: TIP and processes. SwTP Statewide The official statewide, intermodal transportation Transportation Plan plan that is developed through the statewide transportation planning process. TIP Transportation A staged, multi-year program of highway, trails Improvement and transit capital projects for an urbanized area. Program The TIP is an element of the STIP for all projects within an MPO. Transportation Urbanized area with population over 200,000. Management Area (Anchorage is Alaska’s only TMA). TRAAK Trails and A new program of the Alaska Department of Recreational Access Transportation and Public Facilities that for Alaska addresses trails, scenic highways, recreational access uoints and internretive facilities.

Final Statewide Transportation Improvement Program Page 13 Funding Sources and Estimate

Federal Transit The program amounts summarized below are estimates for Alaska based on the average levels approved by the U. S. House and Senate in recent years.

49 USC 5310 (Section 16); Elderlv and Persons with Disabilities Program This program consists of pass-through grants for nonprofit organizations for the purchase of vehicles and related equipment. These vehicles will be used to transport the elderly and persons with disabilities. This program provides funding to private non-profit agencies for capital improvements for the provision of transportation service to elderly and handicapped persons. The Alaska Department of Transportation and Public Facilities has established a committee to review the projects submitted to use these funds. ADOT&PF applies to FTA for approval of projects. The federal funds ratio is 80%.

25 000

49 USC 5311 (Section 18); Nonurbanized Area Formula Program This program authorizes funds for public transit activities outside of Anchorage. This program provides funding to enhance the access of people in non-urbanized areas to health care, shopping, education, employment, public services and recreation and to assist in the maintenance, development, improvement, and use of public transportation systems in rural and small urban areas. The Rural Transit Assistance Program (RTAP) is a component of Section 18. RTAP funds provide training and technical assistance to transit operators. The federal funds ratio is 80% for capital projects and up to 50% for operating assistance.

49 USC 5307 (Section 9); Urbanized Area Formula Prog;ram The details of this program are included in the AMATS - TIP. The federal funds ratio is 80% for capital projects and up to 50% for operating assistance.

49 USC 5309 (Section 3) Capital Discretionarv Propram - A special one-time appropriation was made for transit equipment in Alaska. These funds are

Alaska Department of Transportation and Public Facilities Final Page 14 available only to Anchorage and will be used to replace buses. The federal funds ratio is 80%.

Transfers from Federal Highwav State Apportionment Procram to Transit Some transit projects are funded by transferring federal highway funds to the transit program. Transit projects funded in this manner are included in the STIP project detail in the Community Transportation Program project table. The federal funds ratio depends on which apportionment was the source of transferred funds.

Federal Highways Federal Lands HiPhwav Prorrram Other federal surface transportation funding programs, not allocated to states for distribution, include the Federal Lands Highway Program. The Federal Lands Highway Program is made up of Park Roads and Parkways, Forest Highways and Indian Reservation Roads. Funding for these programs which is expected to be received for Alaska is outlined in the table below. Details of these programs, as they pertain to Alaska, are included in Appendix B.

Surface Transportation Funding Sources There are two major components to the state apportionment program. The Anchorage Metropolitan Area Transportation Study Transportation Improvement Program (AMATS-TIP) includes all projects within the AMATS area boundary. The development of the TIP includes its own public involvement process. After public review and final approval by AMATS, the TIP is submitted to the Federal Highway Administration and Federal Transit Administration by the ADOT&PF. The AMATS-TIP is incorporated into the STIP by reference; a placeholder is included in this STIP for the AMATS program. Thus the AMATS-TIP is both a component of the STIP and a separate document.

The other component includes all surface transportation projects for which federal funds are expected to be made available to the ADOTWF during Federal Fiscal Years 1996 - 1998.

Federal highway funds include many sub-categories of funding, called apportionments. Tentative apportionment designations are identified for proposed projects. These apportionment assignments are estimates and are subject to change. Table 1 identifies the amount of funds expected to be received and expended for each apportionment category. The following

Final Statewide Transportation Improvement Program Page 15 paragraphs describe these apportionment categories, eligible project categories, their apportionment code and the ratio of federal funds.

Interstate Maintenance (IM) 04M - Funds used for resurfacing, restoration, and rehabilitation of the Interstate Highway System. These funds cannot be used to provide new capacity to the system, nor for construction of new facilities such as rest areas, ports of entry, etc. The federal funds ratio is 93.4%.

State Planning and Research (SPR) 081/086 - These funds are designated for the mandatory planning and research tasks the department undertakes including preparation of the Statewide Transportation Plan (SwTP) and Surface Transportation Improvement Program (STIP), statistical measurements of the transportation system (traffic volumes, pavement condition, accidents locations, causes and severity, and physical characteristics of roads and highways) mapping, management systems, engineering and economic studies and applied research. The federal funds ratio is 80%.

Metropolitan Planning; 085 - In Alaska, these funds can be used in any urban area within the state. Planning processes and special planning studies are eligible activities within this program. The federal funds ratio is 90.97%.

Bridge Rehabilitation and Replacement (BRR) 117/118 - These funds are for the replacement or rehabilitation of substandard bridges both on and off the federal system. Bridges must have a span of 20 feet or more and must be listed on the Federal Register with a sufficiency rating of 80 or less for rehabilitation and 50 or less for replacement. The federal funds ratio is 80%.

National Highwav Svstem (NHS) 315 - A system of highways considered most important to interstate travel, national defense, connection with other modes of transportation, and are essential to international commerce. The system includes the current interstate highways and much of the old primary system. Alaska’s final system of NHS routes was signed into law in December, 1995. Currently 2,100 miles of highway and 1,900 miles of ferry routes, including designated terminals and all eight vessels of the Alaska Marine Highway System are eligible to receive NHS funding. The federal funds ratio varies and is either 93.4% or 90.97% depending upon the specific category of work.

Conpestion Management/Air Oualitv (CMAO) 320 - These funds are for projects which can be proven to reduce traffic congestion and/or improve air quality in federally-designated non-attainment areas. Projects such as park and ride lots, signal coordination, ride-sharing and paving for dust control qualify for these funds. Carbon monoxide related projects have priority over airborne dust related projects under the rules applicable to this apportionment. The federal funds ratio varies and is either 90.97% or 100% depending upon the specific category of work.

Alaska Department of Transportation and Public Facilities Final Page 16 Safetv 33A - Safety projects include hazard elimination, railroad crossing, and railroad protective devices. In order to qualify, the project must be identified through the Highway Safety Improvement Program which seeks to identify hazardous locations throughout the state based upon accident histories. The federal funds ratio varies and is either 90% or 100% depending upon the specific category of work.

Transportation Enhancements (TE) 33B - The Transportation Enhancement Program has been of particular interest to the general public and users of non- traditional transportation related facilities. The Governor has established a new public involvement process including a TRAAK Citizen Advisory Committee. The purpose of this committee is to recommend policy and programs to the Commissioner to bring about the implementation and operation of the Transportation Enhancement program. The federal funds ratio is 90.97%.

Enhancement projects are defined as: ” . ..provisions of facilities for pedestrians and bicycles; acquisition of scenic easements...or historic sites; scenic or historic highway programs; landscaping and other scenic beautification; historic preservation, rehabilitation and operation of historic highway buildings, structures, or facilities (including railroad facilities); preservation of abandoned railway corridors (including the conversion and use thereof for pedestrian or bicycle trails); control and removal of outdoor advertising, archaeological planning and research; and mitigation of water pollution due to highway runoff.”

Surface TransDortation Proeram (STP) 33D - Based upon a specific clause found in the ISTEA legislation these funds may be spent on any public road in Alaska, regardless of classification. The funds may be used on projects ranging from new construction to resurfacing, and may also be used for transit projects. Of the STP funds, ten percent must be spent on highway Safety projects and ten percent must be spent on Transportation Enhancement projects. The federal funds ratio varies and is either 90.97% or 93.4% depending upon the specific category of work.

Scenic Bvwavs 32C - This is a small, interim apportionment category designated for the planning, design and development of scenic byways programs on existing highways. The funds Alaska receives under this program are discretionary and were garnered through a competitive grant application. The federal funds ratio is 100%.

Ferrv Boat Discretionarv Funds 327 - Each year, the Federal Highway Administration receives applications from states for the nationwide allocation of Ferry Boat Discretionary Funds. Projects must be for the construction of ferry boats and/or ferry terminal facilities on National Highway System routes. In FFY96, the state was successful with an

Final Statewide Transportation Improvement Program Page 17 application for the Auke Bay Ferry Terminal Staging Area Expansion for $1,633,497 (fed eral). Funds are available only in the year approved. The federal funds ratio is 80%.

Estimated Apportionments The Federal Highway Administration State Apportionment Program is the largest source of capital improvement funding for the surface transportation network in Alaska. Figures shown in Table 1 are total dollars (federal funds plus state match). Previous STIP’s have shown federal funding only. Amounts are shown in thousands of dollars.

The process of accounting for apportionments is complex and often misunderstood. To help clarify the accounting of apportionments the federal rules must be explained. First, unused balances in any apportionment category can be carried forward for three additional years beyond the year received. Second, historically, the state has not received as much obligation authority as we have apportionment authority, so unused balances are inevitable. Third, the various categories have varying degrees of flexibility. For example, in Alaska Congress has authorized additional flexibility allowing the department the latitude to intermix funds from the IM, NHS and STP categories on a single project. This flexibility was provided because of the lack of a complex road system in Alaska. Finally, many projects are coded to multiple apportionments at the time of programming; the project tables show only the dominant code.

These accounting rules for apportionments should help to explain why the upper and lower tables do not match. We have shown the prior year carry- over balance in each apportionment category. This balance plus the estimated new apportionment amounts for the three fiscal years covered by the STIP, represents the target level to be spent in each category. Because the department has historically not received as much obligation authority as we have apportionment authority surpluses have built-up. However, at the present time we anticipate receiving more obligation authority than apportionments, so these surpluses will decline in the coming years.

Program Listings

Project Tables The tables beginning on page 23 contain the listing of proposed project funding for Alaska’s three Transportation Initiative programs: National Highway System, Community Transportation, and Trails and Recreational Access for Alaska. Both the three year period covered by this STIP and the following three-year period 1999 - 2001 are shown. The second three year period is preliminary and is not an official part of this STIP.

Alaska Department of Transportation and Public Facilities Final Page 18 Table 1 Estimate of Available Funds

Estimated Available Federal Funding* FFY 96 - FFY 98 Federal FFY 1996 FFY 1997 FFY1998 At3bortionments 04M - Interstate Maintenance 185.0 19,702.5 19,702.5 19,702.5 081/086 - State Planning and Research 1,831.4 4,528.2 4,528.2 4,528.2 085 - Metropolitan Planning 192.8 758.7 758.7 758.7 117/l 18 - Bridge Rehabilitation and 7,020.6 9,160.O 9.160.0, 9.160.0 Replacement - 315 - National Highway System 20,928.2 49,459.3 49,459.3 49,459.3 320 - Congestion Mitigation/ Air Quality 8,283.8 4,617.5 4,617.5 4,617.5 33A - Safety 0.0 11,613.y 11,613.j 11,613.7 338 - Transportation Enhancements 18,280.6 11,486.l 11,486.l 11,486.l 33D - Surface Transportation Program 51,929.8 98,981.g 98,981.g 98,981.g 32C - Scenic Byways 0.0 250.0 250.0 250.0

327 - Ferry Boat Discretionary 0.0 2.041.9 0.0 I 0.0 49 USC 5309 FTA Capital Program 0.0 2,500.O 0.a 0.0 Totals 108,652.2 215,099.7 210,557.g 210,557.g Estimated Obligation Limitation j : 243,500.O 239,000.0 239,000.0 I I Proposed Program FFY 98 ProDosed Program 1 FFY 1996 FFY 1997 FFY1998 : :..: I’ “i.‘, 20,590.4 9,506.d 21,613.3 381/086 - State Planning and Research ~_8.;li..;.--;:;:... . ,,,.<,, Jj 4.940.0 4.wo.d 4.940.0 i>fr:<,.,,. I: 085 - Metropolitan Planning b.. : , :: : ‘880.0 77o.c 770.0 . ;. 117/l 18 - Bridge Rehabilitation and ,;, :. :. ; 14,510.4 4,740.2 12,880.O Replacement ..-j.5: 315 - National Highway System ^,,, ! 51,096.2 52,528.8 52,001 .O .:. ..,, 320 - Congestion Mitigation/ Air Quality i I’ 3,415.q 4,790.q 1,825.O 33A - Safety ; _‘.,I 10.248.51 13.268.4 7.677.9 33B - Transportation Enhancements ;, .;. ; 17,050.o 16,457.O 17,335.o 32C - Scenic Byways 33D - Surface Transportation Program .959.3 135,495.l 121,110.0 .,,...I ;; 327 - Ferry Boat Discretionary 2,041.g 0.0 0.0 49 USC 5309 FfA Capital Program i I 2.500.0 0.0 0.0 hotals I 1 240.481 .ti 242.746.6 240.402.21 *Estimates are total dollars including state match, in thousands.

Final Statewide Transportation Improvement Program Page 19 Explanation of Terms Terminology and abbreviations used in the project tables are as follows:

Proiect DescriDtion. Names the project and generally includes both a place reference and brief explanation of the scope of the project. Abbreviations included in project descriptions are as follows:

ADA- Americans with Disabilities Act AMHS - Alaska Marine Highway System CMAQ - Congestion Management and Air Quality I/M - Inspection and Maintenance MP - Milepost Ph - Phase TE - Transportation Enhancement UAS - University of Alaska Southeast USFS - United States Forest Service

Score. This column contains the final average score as issued by the PEB for CTP and TRAAK projects. The code “A” in this column denotes projects which are being continued from the previous STIP, and the code “NA” denotes projects which were not scored because they are mandatory elements of the department’s activities. Scores were not given to NHS projects.

Phases. Although some projects include more than one phase in the sense of multiple periods of construction, each project which uses federal highway funds includes one or more of the following stages or phases of project development.

0 Phase 2 - Preliminary Engineering: This is two stages in itself. The first stage includes public and agency scoping; data compilation; conceptual planning and engineering; and environmental analysis necessary to determine project location and footprint. The first stage generally concludes with an approved environmental document. The second stage includes preparing final design plans; obtaining environmental permits; utility agreements; re-evaluation of environmental concerns; and advertising the project.

l Phase 3 - Right of Way and Utilities: This phase includes the identification and purchase of land necessary for construction of the capital improvement. This phase also includes obtaining utility agreements where a project affects public utilities.

Alaska Department of Transportation and Public Facilities Final Page 20 paragraphs describe these apportionment categories, eligible project categories, their apportionment code and the ratio of federal funds.

Interstate Maintenance (IM) 04M - Funds used for resurfacing, restoration, and rehabilitation of the Interstate Highway System. These funds cannot be used to protride new capacity to the system, nor for construction of new facilities such as rest areas, ports of entry, etc. The federal funds ratio is 93.4’140.

State Planning and Research !Sl’R) OX1/OH6 - These funds are designated for the mandatory planning and research tasks the department undertakes including preparation of the St‘ltcwide ~T’ransportalion Plan (SwTP) and Surface Transportation Impro\~em~~nt Prrjgr,jm (STlI’), statistical measurements of the transportation system (traffic ~~olumes, pavement condition, accidents locations, cause’s and stl\.tarity, and physical characteristics of roads and highways) mapping, managclment systems, engineering and economic studies and applied research. The federal funds ratio is 80%.

Metropolitan Planning 085 - In Alaska, these funds can be used in any urban area within the state. Planning processes and special planning studies are eligible activities within this program. The federal funds ratio is 90.97%.

Bridge Rehabilitation and Replacement (,BRR) 117/118 - These funds are for the replacement or rehabilitation of substandard bridges both on and off the federal system. Bridges must have a span of 20 feet or more and must be listed on the Federal Register with a sufficiency rating of 80 or less for rehabilitation and SO or less for replacement. The federal funds ratio is 80%.

National Highwav Svstem (,NHS) 315 - A system of highways considered most important to interstate travel, national defense, connection with other modes of transportation, and are essential to international commerce. The system includes the current interstate highways and much of the old primary system. Alaska’s final system of NHS routes was signed into law in December, 1995. Currently 2,100 miles of highway and 1,900 miles of ferry routes, including designated terminals and all eight vessels of the Alaska Marine Highway System are eligible to receive NHS funding. The federal funds ratio varies and is either 93.4% or 90.97% depending upon the specific category of work.

Convestion Management/Air Oualitv (CMAO) 320 - These funds are for projects which can be proven to reduce traffic congestion and/or improve air quality in federally-designated non-attainment areas. Projects such as park and ride lots, signal coordination, ride-sharing and paving for dust control qualify for these funds. Carbon monoxide related projects have priority over airborne dust related projects under the rules applicable to this apportionment. The federal funds ratio varies and is either 90.97% or 100% depending upon the specific category of work.

Alaska Department of Transportation and Public Facilities Final Page 16 l Phase 4 - Construction: This phase includes construction engineering; bidding and awarding construction contracts; and actual construction of the capital improvement including possible utility relocation.

l Phase 8 - Planning and Program Administration: This phase is used to indicate an administrative rather than construction project. This phase includes mandated planning activities such as the development of the Statewide Transportation Improvement Program.

Apportionment. Abbreviated “Appr” in the project tables, this shows the federal funding code for a specific category of funds, or program, under ISTEA. The Estimate of Available Funds - Table 1 defines these codes and shows the anticipated funding levels and anticipated obligations of these funds. Many projects will use more than one apportionment category. Only the dominant apportionment code has been depicted in the tables. The codes shown in the project tables are advisory only. The appropriate federal agency makes final eligibility determinations at the time funding is requested for each project.

Final Statewide Transportation Improvement Program Page 21 This page left blank intentionally.

Alaska Department of Transportation and Public Facilities Final Page 22 Program Tables

1996 - 1998

Statewide Transportation Improvement Program

Alaska Department of Transportation and Public Facilities

Final Statewide Transportation Improvement Program Page 23 Program Tables

1996 - 1998

Statewide Transportation Improvement Program

Alaska Department of Transportation and Public Facilities

Final Statewide Transportation Improvement Program Page 23 National Highway System Program

istimate (Total Costs in thousands of $1 FFY96 pFY97 1 FFY98 Project DescripJion ~~~~- : Parks Highway and Glenn : Highway lnterchallge ‘Whittier Access Improvements 33D :5thl6th Avenues: “L” Street- ‘AMATS .Gambell Street 315 AMATS __Anchora~NHSut~Rep_air~ 33D _~ IAMATS ~~~~~ International Airport Road 33D IMinnesota Drive: Dimond Blvd.-International Airport ~~~~ ~..___~.’ AMATS i Road Surface Rehabilitation__. - 2,Qp 33D 300.0 ‘Port Access: Ocean DockfRai AMATS Rack 2,3,4 33D jlnterstate Maintenance Bridgr ICentral Region -1 ‘Repair 2,394 118 234.6: 236.1; 250.r iCentral Region ‘Pavement Crack Se*? 2,3,4 04M ~~~ _____~~563.1 ..~ 566.5,--- 600.4 iCentral Region Pavement Seal Coat/Over+y 2,3,4 04M 2,600.O. 1,000.0~ 1,500.r .Safety Management ICentral Re@ ‘Engineering~- 2 33A Airport Way/Washington -! ~Fairbanks~~____ .-e Street~- .__Intersection ~~~~ 234 33D 93.8 2,832.7‘ 2,700.r ‘Airport Way: Cowles iIntersection Safety Fairbanks /Improvements 2,3,4 33A 283.3: i--- ! Destination and Distance i------iHeadquarters : Signing 2,3,4 j Headquarters iSafety: Required Signage ~~ -2.44 33A ; Egan Drive: Riverside Drive tc !Juneau ;iMain Street 2,3,4 iGlacier Highway: iBrotherhood Bridge at ‘Juneau ’ Mendenhall River 2,3,4 Egan Drive: Lemon Valley Juneau~ ~~ ~+: Access ~. ~~~ ~~ 2,3.+~ 315 Tongass: 3rd Avenue ,Ketchikan Extension 2,394 33D 1,126.l 1,227.5: 9,500. Tongass: 3rd Avenue Ketchikan Reconstruction 2,3& 33D 375.4 2,360.6 iKetchikan Tongass: Lane Improvements 2,3/J 33D ~~~~_ 472.1: 1,500. Tongass: Pedestrian Ketchikan Improvements 2,384 ~~~~ Ketchikan Tongass: Resurfacing 2,3,4 ~~.~ .-I- : Ketchikan.~~~ -~ .~~Tongass: ~~ Viaducts~~ 234 -118 1,000. ‘Rezanof Drive: Gibson Cove : Realignment Safety ‘Kodiak .~ jlmp-rovements 234 315 4,100.o Pavement Crack Sealing & -~ --I Northern Region Bridge 234 Northern Region Pavement SeatCoat/Overlay Z&4 Halibut Point Road: Cascade ~.Sitka- Creek Rd. to Peterson Street ZW 33D 330.0: 3,309> Kenai Spur Road: MP O-2.8 Soldotna Rehabilitation 234 33D a,970.2:

Phases: 2-design; 3-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re-evaluation.

Alaska Department of Transportation and Public Facilities Final Page 24 National Highway System Program

Whittier Access

Gambell Street II-.--.Anchora e: NHS Rut Repair International @rl Road i 2,ooo.o’ -v Minnesota Drive: Dimond ! Blvd.-International Airport i Road Surface Rehabilitation____r. i -~..3,000~0 Port Access: Ocean Dock/Rail” .____,-____.---~_-_~Rack _._- Interstate Maintenance Bridge; Repair ; 250.0: Pavement Crack Sealing -.b i 600.0. Pavement Seal Coat/Overlay i 2,000.0 Safety Management j 50.0; Engineering 50.0 __---....--/ -- ~~-~~-.50L Airport Way/Washington Street Intersection--A-.- .-~L--.- ---A-.-- ~~~~ Airport Way: Cowles i Intersection Safety Improvements __~_ --/ Destination and Distance !

Main Street ______i 1,650. I-Glacier Highway: $

I--eHalibutPavement Point Seal Road: Coat/Ove*-em Cascade 7 2,000.0700.0 2,500.O.700.0 2,500700-

Creek____.._~~ Rd. to Peterson~__.~__. Street ~-~ ~ IKenai Spur Road: MP O-2.8 IRehabilitation

Phases: 2-design; 3-right of way; I-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re-evaluation.

Final Statewide Transportation Improvement Program Page 25 National Highway System Program

Estimate (Total Costs in thousands c Highw* Location Project Description Phases Av~ -4 ~~FFY96 r FFYFL FFYSI I ‘MP 1270 to 1314 Yaska Rehabilitation-Nonhway iighway Junction to Tok Z3A 315 5: 10.0 MP 1386 to 1398 4laska Reconstruction-Little Gerstle -&hway .~ River~~~-~ to Gerstle~~~~ River 4 33D 9,347.g: Ialton MP O-9 Reconstruction- !k!!!!cY. ~_~ ~~~ .~~_ Lived to 9 Mile Hill 2,3 - 4~ ~ 2alton MP 9-l 1 Reconstruction- 9 -iighw* ~- .ki ~~~ - ~~~~ ~-- Mile Hill-~~~ 23$ ___~ ~_. 3alton ’ : MP 22-37 Reconstruction - iighway ; Hess Creek Area 2,3,4 ~-4~ ~~~~ -- Dalton ,MP 37-49 Reconstruction- iighway .- ~-A--’ ~~ ~-4.. :Livengood to Yukon River .~ 2,314 ~_ 315 ~-, ~---~-+----- 2C )3.8 3alton MP 11 l-l 43 Reconstruction- iighway ’ _~.~~.Beaver Slide to~~~ Jim River~~-~~~~~~ #3 4 baIton ‘MP 143-175 Reconstruction- -fighwL i Jim River #3 to Coldfoot 4 315 1 _~~ 9,0( IO.0 ‘MP 235-247 Reconstruction- Dalton North Slope Borough r!l@!eY -+___ _~~~~ ~~~~-..Boundaryto Atigun Pass G!! I Dalton SAtigun Bridges MP 253 and Highway : 273 234 _ ~~~~~~~~~118 ~--~-TErTp. -A- .~~~4,5r IO.0 MP 247-274 Reconstruction- ! Dalton ; ,Atigun Pass to Galbraith Lake Highway ZAirpOrt 2,3,4 MP 274-289 Reconstruction- j Dalton to uhway :Kuparuk 33D 375.4 50.0 ~~~_~~2Ac ~~~~~_ ~FJ ‘MP 289-305 Reconstruction- Dalton .Kuparuk River to Slope Highwq Mountain 2324 33D 377.7: MP 305335 Reconstruction- Dalton Slope Mountain to Happy eighway ’ V* 234 :- i-- ---L- ---_mm ~ Dalton MP 335-359 Reconstruction- 14, .61 Highway Happy Valley to Purr@ 2,3,4 ~-~33D 469.2 Dal& Regulatory, Safety and Highway Distance Signing 2,3,4 33A 23.5 236.1’ MP O-4 Reconstruction-Fox Elliott Highway to Murphy Dome Road Z&4 ~~ ~~-~~~ ~~ Eklutna to Parks Highway Glenn Highway .Advance Right-of-Way 3 33D 389.7 Knik River Bridge #1 Deck Glenn Highway Repair 23,4 118 469.2 1 MP 53-56 Rehabilitation - GlennHighway Moose Creek Canyon Z&4 MP 56-60 Rehabilitation - Glenn Highway ‘Moose Creek/Sutton 3!4 04M 1,000.or 7,6( ‘MP 68-84 Rehabilitation- Glenn Highway. Chickaloon ZWmm, 04M 1 ,ooo.o( MP 84-92 Rehabilitation- Glenn Highway Long Lake 2,3,4 I 04M I,41

Phases: 2-design; 3-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re-evaluation.

Alaska Department of Transportation and Public Facilities Final Page 26 National Highway System Program

_____~ Estimate [T :hou sands of $1 Project Description FFY 99 z FFY 01 MP 1270 to 1314 Rehabilitation-Northway Junction to Tok 1.0. IMP 1386 to 1398 Reconstruction-Little Gerstle River-.-____ to Gerstle.-~- River.~.~~~~~ MP O-9 Reconstruction- Livegood to 9 Mile Hill 1.0: MP 9-11 Reconstruction- 9 Mile Hill I.0 MP 22-37 Reconstruction - Hess Creek Area IMP 37-49 Reconstruction- Livengood to Yukon River MP 11 l-1 43 Reconstruction- .~~-.Beaver Slide to Jim River #3 MP 143-175 Reconstruction- Jim River #3 to Coldfoot MP 235-247 Reconstruction- North Slope Borough Boundary to Atigun Pass 150. Atigun Bridges MP 253 and 273 MP 247-274 Reconstruction- Atigun Pass to Galbraith Lake Airport.~ 6,750. MP 274-289 Reconstruction- Galbraith Lake Airport to Kuparuk -. -~- MP 289-305 Reconstruction- Kuparuk River to Slope Mountain 5,200. MP 305335 Reconstruotion- Slope Mountain to Happy Valley 500. MP 335-359 Reconstruction- Happy Valley to Pump2 Regulatory, Safety and DistanGlft Signing ~. MP O-4 Reconstruction-Fox to Mur&y Dome Road- _ 1,5oc Eklutna to Parks Highway ‘Advmht-of-Way Knik River Bridge #l Deck Repair MP 53-56 Rehabilitation - Moose Creek Canyon 800. 3oc MP 56-60 Rehabilitation - .L‘ : Moose Creek/Sutton MP 68-84 Rehabilitation- Chickaloon -___.2- 1306 12,oor MP 84-92 Rehabilitation- i -Long Lake 22,5a

Phases: P-design; 3-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re-evaluation.

Final Statewide Transportation Improvement Program Page 27 National Highway System Program

-ii istimate (Tota! Costs in thousands oft 9 Highway [ Location Project Description 1 Phases 1 Apprn FFVSS 1 FFY97 1 FFY98 I 1 MP 92-97 Rehabilitation- Glenn Highway- Hicks Creek 2,3,4 04M 944.2 MP 97-100 Rehabilitation- Glenn Hjghway Pinochle Hill X3,4 04M MP 109-l 18 Rehabilitation- Glenn Highway Regional Boundary 3,4 04M Glenn Highway _ ~~ MP 174 - 189 Rehabilitation Z3,4 04M~ ‘Palmer-Wasilla Highway Glenn HAhway Intersection 2,3,4 Gambell to McCarrey Glenn t-l-lhway AMATS Reconstruction 2,3/J Haines Big Boulder Creek to North Mackenzie Loop Road Haines :Chilkat River Bridge to HiCJttwz Mosquito Lake Road Haines Mosquito Lake Road to Highway .~‘Muncaster - -~ Creek~-~ - Haines Muncaster Creek to Little Highway Boulder Creek Haines- ‘North Mackenzie Loop Road .Highway to Canadian Border I-I-. ,Haines Ferry Terminal to Junction with Union Street 2,3,4 33D

Union Street to ABort 2,334 33D

33D

_.~~Refurbishment -~ ~~~~ ~~ 2,4 33D MN Columbia/MN Aurora Highway Refrigerant Conversion 2.4 33D Marine Compliance Monitoring and Highway Communications 2,3,4 33D Marine MN LeConte Refrigerator Highway . Replacement~~~ ~~~ ~~ ~~ 2,4 33D Marine MN LeConte Solarium H!hw ay ~~~ ~. ..~Refurbishment ~~ - .~ 2,4 33D Marine Highwg MN Aurora Deck Renovation Marine MN Aurora Shipboard Waste Highway -Handling System Marine MN Aurora SOLAS Highway Compliance Fire Safety 33D Marine HiWw~. MN Bartlett Rep&cement 2 Marine MN Bartlett SOLAS Highway Compliance Fire Safety 4 315 Marine MN Columbia Hotel Highway Renovation 4 :

Phases: P-design; 3-right of way: 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re-evaluation.

Alaska Department of Transportation and Public Facilities Final Page 28 National Highway System Program

Estimate (Total Costs in thousands of $1 Project Description .-EY!!L 1 --~~i?iij 1 FFY 01 WP 92-97 Rehabilitation- -licks Creek______10,000.0~ WP 97-100 Rehabilitation- : Pinochle_____-__ Hill -.~~~~ :_-- _~~~ MP 109-l 18 Rehabilitation- ! mnal Boundax I MP 174 - 189 Rehabilitation _ --v!E1o ~~~ ~~ Palmer-Wasilla Highway Intersection Sambell to McCarrey Reconstruction ~~~ .--2 -~-~‘~oo!?.o:.-- ~~~. !-~--.. 3,400.l Big Boulder Creek to North : Mackenzie-~ Loop Road : 4,500.o Chilkat River Bridge to / 5,500.’ Mosquito Lake Road ~. -~. .~~~. ~~- ~/-- Mosquito Lake Road to i Muncaster Creek 4,500.o Muncaster Creek to Little --Boulder ______. Creek .~~~ ~- ---..---+..-..- -___--:- -~~ - North Mackenzie LOOP Road to Canadian Border ’ i 200.0;- ~-~~~-- A-- I- 6 600.- Ferry Terminal to Junction : __-with Union Street

--~-Union Street to Airport William Henry Moore Bridge Replacement 300.0 T-- Annual Vessel RehabilitatiQti ! 1,000.0 1,000.01 1,000 MN Aurora Solarium .[ -F-----I Refurbishment ~__~... --/- -+ ___- .___ MN Columbia Pbblic Space : Refurbishment ---7------MN Colu,p?bia/MN AurOtg : Refriger@@ Conversion ! Compliance NIanitoring and 1 Communications .-*---- .~~ MN LeConte Refrigerator i Repbtient MN LeConte Solarium Refur&%&nt

‘MN Aurora Deck Renovation -----: ~~._ ----L- 1 181 2. ~~~~~ ~ MN Aurora Shipboard Waste i 3aridling System 300.0 MN Aurora SOLAS (compliance Fire Safety. A~-

__----MN Bartlett Replacement i ~~~~ 1,000.0 MN Bartlett SOLAS Compliance Fire Safety : -~~~ MN Columbia Hotel Renovation 3,632.0

Phases: a-design; 3-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re-evaluation.

Final Statewide Transportation Improvement Program Page 29 National Highway System Program

istimate (Total Costs in thousands of 9 Highway FFY96 7 FFY97 lTYi8pm Marine MN Columbia SOLAS Highway ‘Co~liance-Fire Safety Marine ‘MN LeConte SOLAS Highway ,Compliance Fire Safety 1,911.l. Marine ‘MN Matanuska Deck Highway Renovation Marine MN Matanuska Life Boat and Highway ‘Structural Renewal 2,743.g Marine MN Matanuska Shipboard Highway_ 3Waste Handling System 605., Marine :MN Matanuska SOLAS Highway Compliance Fire Safety 4 33D 2,963.6: Marine MN Taku Steam/Gray Highway Water/Asbestos 2,4 Marine 1Maintenance Management Highway System 2,4 33D 235.0: Marine ‘MN Matanuska Solarium Highway Refurbishment 24 33D 95.0 ‘MN Matanusktiaku Public Marine Space Upgrade Flooring Highway Replacement 2.4 33D 138.6 Marine Multi-Purpose Replacement Highway ,Vessel 315 3,759.l 52,528.8. 14,846. Marine Prince Rupeti Mooring Highway - lmprove.mfz+ 315 -~-imp_ 2202 Marine Prince Rupert Uplands lmprovements- 315 423. Public Address System Highway ~-~~.Rehabilitation ~~ Marine Highway -Ramp Safety Coatings 33D 330.0 7 Marine Sperry Gyro System t-lHhway ‘Refurbishment Marine Stateroom Fixtures Highway Rqlacement Marine MN Taku Refrigerant Highway ‘Conversion 33D Marine MN Taku Solarium Highway Refurbishment 33D Marine :MN Tustumena Structural Highway Fire Proofing 33D Marine .Haines Mooring Highway I iaines Improvements Marine Homer Mooring Highway tiomer Improvements Marine Highway Homer Homer Terminal Building 24 33D Marine Auke Bay Staging Area Highway Juneau Expansion 2,3,4 33D/32? 4,825.5 Marine Petersburg Mooring Structure Highway Petersburg Improvements 4 Marine Petersburg Uplands IHighway Petersburg Improvements 2,4

Phases: P-design; 3-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re-evaluation.

Alaska Department of Transportation and Public Facilities Final Page 30 National Highway System Program

MN Matanuska SOLAS j Compliance Fire Safety -i- ~~ MN Taku Steam/Gray i

a Structural i

Phases: P-design; 3-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re-evaluation.

Final Statewide Transportation Improvement Program Page 3 1 National Highway System Program

stirnate/I (Total Costs in thou rsands of 9 Highway 1 Location [~-- Project Description i Phases I Awn FFY96~ 1 FFY97 FFY98 Marine Highway Valdez Valdez Terminal Replacement GM 33D 250.0 Healy Area Safety Parks Hkghway Improvements 2,3,4 33A 47.: Parks Highway: Hurricane Gulch Bridge #258 2244 118 47.2 350. MP 206 to 210 Rehabilitation- Parks Highway Summit to Cantwell ZW MP 237 Nenana River Bridge Parks Highway #1147 234 118 MP 238 Kingfisher Creek Parks Highway Bridge #697 23,4 118 MP 240 Nenana Canyon Parks Highway Slide Repair 4 MP 240 to 262 Rehabilitation- Nenana Canyon to Bear Parks Highway Creek 234 04M 415.! 5 MP 35 to 37 Glenn Highway Parks Highway to Church Street 2,3,4 33D 708.: 2 MP 37 to 44 Rehabilitation- Seward Meridian Road to Parks Highway; Church Street 315 2.500. i MP 37 to 44 Fairview Loop- GershmedHyer Road Parks Highways, Interchange MP 37 to 44 Rehabilitation- Crusev Road to Seward Parks Highway Meridian Road XV 315 1.266.9 2,500 MP 37 to 44 Rehabilitation- Parks Highway. ,-Lucus Road to Crusey Street 2,3,4 04M 300 MP 37 to 44 Seward Meridian Parks Hi$hway Interchange 2,3,+ MP 52 to 57 Rehabilitation- Big Lake Road to Little Parks Highway Susitna River ZW 33D 7,500.o Nenana Canyon Parks Highway. Safety/Access Improvements 2,4 33A 93.8; 3,000 Geist-Chena Ridge Parks Highway Fairbanks Interchange 4 315 13,607.4: Richardson Highway Klutina River Bridge #572 2,3,4 118 18.9 280. Richardson !%!T!!~~-- ~ ~~~~~~~~ Lowe River Bridge #557 2,3,4 118 94.4 800. MP 115 to129 Rehabilitation- Richardson Glennallen to Gakona Highway Junction 2,3,4 ~~- ~~~~ MP 129 to1 48 Rehabilitation-~ Richardson Gakona Junction to !W!!- ,. Sourdough- -?,3,4 ~ ~~--33D 226. MP 14 to 26 Rehabilitation- IRichardson ’ Keystone Canyon to

IHighway :Thompson Pass 2,3,4 315 - 281.5:

Phases: 2-design; 3-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re-evaluation.

Alaska Department of Transportation and Public Facilities Final Page 32 National Highway System Program

w-1 FFy99(1FFyoo]--FFyDEstimate Total Costs in thousands of Valdez Terminal Replacement Healy Area Safety Improvements i 450.0 Hurricane Gulch Bridge #258 / MP 206 to 210 Rehabilitation- i Summit to Cantwell 190.0’ -- .~~ MP 237 Nenana River Bridge / #1147 MP 238 Kingfisher Creek ! Bridge #697 .- MP 240 Nenana Canyon ! slide Repair ~~....~~7~~~1 7oo.oi MP 240 to 262 Rehabilitation-i Nenana Canyon to Bear ; Creek 4,000.0 A.. MP 35 to 37 Glenn Highway ; to Church Street -7. MP 37 to 44 Rehabilitation- Seward Meridian Road to Church Street 16,100.0/ MP 37 to 44 Fairview Loop- i GershmerRlyer Road Interchw ___~ ! .I ,E?.o: .._.__ 2,7 MP 37 to 44 Rehabilitation- Crusey Road to Seward Meridian Road 4.. g3*4oo.oi MP 37 to 44 Rehabilitation- -!- Lucus Road to Crusey Street MP 37 to 44 Seward Merfdian 1 Interchange MP 52 to 57 Rehabkitation- Big Lake Road to Llttb Susitna River Nenana Canyon Safety/Accee$ bnprovements : Geist-Chena Ridge Interchange

IMP 115 to129 Rehabilitation- Glennallen to Gakona ‘IJunction A-- -.I---4 990.0

Phases: P-design; 3-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re-evaluation.

Final Statewide Transportation Improvement Program Page 33 National Highway System Program

I ~Estimate Total Costs in tt 101u-sands of S Highwx- Location 1 Project Description Phases FFY98 i$~~-[*c-- TI

Richardson :MP 148 to159 Reconstructior lighway ‘Sourdough to Haggard Creek 2,3,4

Richardson ‘MP 173 to186 Reconstructior l- -l&hway Dick Lake to Paxson -~ 2.W .- MP 203 to 206 Richardson Reconstruction-McCallum iighway Creek to Rainbow Mountain 2,3,4 Richardson Reconstruction-Trims to Rub) I

$ghway 1 Creek 2,3,4 Richardson MP 275 North Erosion Contrc II, highway Tanana River to Boon Dox 2,3,4 315 Richardson MP 308 to 311 Rehabilitation. Highway d ‘Birch Lake to Midway 4 04M 1,800.~ MP 6 to 14 Rehabilitation- - Richardson Robe River to Lowe River

Highway -- (Keystone Canyon) 2,3,4 33D 154.8 Richardson

Highway I Salcha :Salcha River Bridge #527 Z3,4 118 47.2 850.8 Richardson

Highway _ Valdez Egan Drive ..2,3+ 33D 1,775.; Richardson ~-Valdez Glacier Stream Bridge ? Highway Valdez #556 2,3,4 118 23.5 354.1 MP 0 to 3 Capacity Seward Improvements- Seward to

Highway . . ‘Nash Road 2,3,4 33D 1,416.: Seward ‘MP 0 to 8 (Seward to Grouse , : mhway -~ Creek Canyon) Rehabilitation 2,3,4 Seward MP 13 to1 8 (Mile 13 Summit Highway to Snow River) Rehabilitation 2,3,4 315 610.0; Seward MP 18 to 25 (Snow River to Highway Falls Creek) ?,3,4 315 MP 25 to 30 (Falls Creek Seward through Moose Pass) Highway _~~~Rehabilitation Seward MP 30 to 36 (Moose Pass to Highway Sterling Wye) Rehabilitation Seward MP 53.0 to 59.3 Rehabilitatio n Highwx Canyon Creek 315 29,131.4 Seward MP 8 to13 (Grouse Creek Highway Canyon) -Rehabilitation 315 938.4 Seward Highway Windy Corner Realignment 234 33A 3,500s Seward 36th Avenue to 5thl6th H$hway AMATS Avenue Rehabilitation WA 04M 2,400.t Seward Exit Ramp Safety Highway AMATS Improvements 2,3,4 33A 337. Seward Huffman to Chester Creek Highway AMATS Reconstruction 2.3 33D 469.2; 472.’ Seward Highway AMATS Potter Valley Road 234 33A 401.3,

Phases: 2-design; 3-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re-evaluation.

Alaska Department of Transportation and Public Facilities Final Page 34 National Highway System Program

MP 148 to159 Reconstruction- ISourdough to Haggard Creek__. I 1oo.c 700.0 IMP 173 to186 Reconstruction- IDick Lake to Paxson ,-. ~~~~~~ ~. iMP203to206 preconstruction-McCallum

,Tanana River to Boon Dox IMP 308 to 311 Reim.?bilitation- ,-Birch Lake to Midway MP 6 to 14 Rehabilitation- Robe River to Lowe River j Feystone Canyon)

Salcha River Bridge #527

Egan Drive -A----. Valdez Glacier Stream Bridge ’ #556 MP 0 to 3 Capacity Improvements- Seward to / Nash Road MP 0 to 8 (Seward to +----Grouse Creek Canyon) Rehabilitation ! 800. MP 13 to18 (Mile 13 Summit : 1 to Snow River) Rehabilitation j 6,500X MP 18 to 25 (Snow Riverto Falls Creek) . 5oo.c 3,250.O MP 25 to 36 (Falls Creek through Mopse Pass) ; Rehabilitation 800.0; MP 30 to 36 (Moose Pass to ’ SterfingWye) Rehabilitation 300. MP 53.0 to 59.3 Rehabilitation, Car#on Creek MP 8 to13 (Grouse Creek / Canyon) Rehabilitation ; 10,000.0

Windy Comer Realignment ; 36$h Avenue to 5th/6th Avenue Rehabilitation Exit Ramp Safety Improvements L~~~~~~~ Huffman to Chester Creek Reconstruction ml,75q

IPotter Valley Road

Phases: P-design; &right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re-evaluation.

Final Statewide Transportation Improvement Program Page 35 National Highway System Program

Estimate (Total Costs in thousands of 9 Highway Location .-.I---- Project Des!xJtion 1 Phases -ii-i FFYg5. [ FFyg7 r -%%F~- Seward : ,Seward and Fireweed Traffic High% ,AMATS S.&nal VisibilityImprovements ~mZW ~.~ 33A 160.8-. Seward MP 90 to 97 Girdwood to Bird -highway Anchorage ‘Point Reconstruction 2,3/I _ 33DD_ ~~~~~8,000.0 18,459.l: Steese Highway ‘Fairbanks 3rd Street Intersection J’,W~~~ foci -~ Sterling ‘MP 36 to 45SterlingKeward Highway Wye_~~~~~~~ to Sunrise~~ ~- ~~~ 234 _ 33D 375.4 566.5; Sterling MP 169 to174 Rehabilitation- Highway Homer Hill ZW ~~~~~~~~~33D 11,636.6, Sterling ‘MP 45 to 60-Sunrise to Skilak Highwx- ‘Lake Road 234 Skyview High School Sterling j Entrance Capacity 33A : Highway ~~~-~ Improvements 2,3,4 300. Sterling Highway akin ~~~~~~~ Soldotna Urban 2,3,4 33D : 300.3: 755.4‘ MP 30 to 38 Reconstruction- Tok Cutoff : Christochina to Mankoman f-kg&way Lake 4 MP 0 to 30 Rehabilitation- Tok Cutoff ’ Gakona Junction to Highway Christochina W/J ~~~~~

Tok Cutoff MP 110 to 124Reconstruction- Hiaway Clearwater Creek to Tok 2 -MP 91 to 110 Rehabilitation- Tok Cutoff Little Tok River to Clearwater Highway ’ Lake 2,3,4 04M 520. Program Total1 r--- : 125,035.7[-- --126,984.41 124,992..

Phases: 2-design; 3-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re-evaluation.

Alaska Department of Transportation and Public Facilities Final Page 36 National Highway System Program

Project Description-. Seward and Fireweed Traffic cWI Visibility Improvements___-~ MP 90 to 97 Girdwood to Bird Point Reconstruction

3rd Street Intersection MP 36 to 45SterlinglSeward Wye to Sunrise MP 169 to174 Rehabilitation- Homer Hill MP 45 to 60-Sunrise to Skilak Lake Road Skyview High School Entrance Capacity Improvements

Soldotna Urban i MP 30 to 38 Reconstruction- Christochina to Mankoman Lake MP 0 to 30 Rehabilitation- Gakona Junction to Christochina .__~

MP 110 to 124Reconstruction Clearwater Creek to Tok MP 91 to 110 Rehabilitation-- Little Tok River to Clearwater

Phases: 2-design; Wight of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re-evaluation.

Final Statewide Transportation Improvement Program Page 37 Community Transportation Program

Estim ate (Total Costs in thousands of $) Project Description Score 1 Phases [ ApprA FFY96 I-Y97 1 FFY98 Akiachak: Sanitation Road Resurfacing 82.8 2,W Aleknagik: North Shore Landfill Road 106.5 2,W Aleknagik: Wood River Bridge 82.0 Allakaket: Landfill Road A 4 AMATS: Transportation Improvement Program NA 234 Annual Internal Review Audit Program NA 8 Atka: Dock Bridge/Road Rehabilitation A~ 4 Beaver: Landfill Road A 4 Bethel: Ridgecrest Drive Rehabilitation --A 4 Birch Creek: Landfill Road Construction 80.8 2,3,4 Brevig Mission: Landfill Road Constructior 90.7 2,34 Bridge Management System NA 2 Central: Dust Control/Paving -85.5 234 Chena Hot Springs Road: MP O-7 Reconstruction A 4 33D Chevak: Sanitation Access Road Construction A 2,3,4 33D Chignik Bay: Airport Access Road Rehabilitation 77.2 Chignik Lagoon: Incinerator Site Access Road -~~ __~. ~~-~ A Cordova: Ferry Terminal Building A Cordova: Ferry Terminal Staging Area- Phase B A 2,4 Cordova: Lake Avenue Upgrade 89.8 -2,3,4e _~ Cottonwood Lane Bridge Replacement A 2,3,4 Deering: Sanitation Road Construction 81.8 2,3,4 Denali Highway: MP 80-104 Resurfacing- Susitna River to Brushkana Creek 112 4 Denali Highway: MP 21-42 Resurfacing- Tangle Lakes to MacLaren River 108 4 33D Dillingham: Alegnagik Road MP O-5 Rehabilitation A 2,3$ Edger-ton Highway: Rehabilitation 101.8 2,394 Eek: Sanitation Road 105.5 ~?A4 Elliott Highway: Manley Slough-Tanana River Rehabilitation A 4 33D Elliott Highway: MP 131-l 37 Reconstruction-Eureka to Baker Creek 2,3,4 33D 400.0; 3.200.0: Emmonak: Airport Road and Erosion Control A 4 33D Fairbanks: College Road Intersection/Safety 78.2 234

Phases: P-design; 3- right of way; 4-construction Based on estimated federal program amounts, Subject to reauthorization of ISTEA and annual program re- evaluation. Alaska Department of Transportation and Public Facilities Final Page 38 Community Transportation Program

Estimate (Total Costs in thousands of $ Project Description WY99 1 FFYOO [ FFYOl Akiachak: Sanitation Road Resurfacing \ 5OO.OI t Aleknagik: North Shore Landfill Road 1 .___ Aleknagik: Wood River Bridge Allakaket: Landfill Road AMATS: Transportation Improvement ! Program 1 16,568.0/ 16,500.0/ 1&5OO.c Annual Internal Review Audit Program i j- - -A- L Atka: Dock Bridge/Road Rehabilitation / !~ ----__1 Beaver: Landfill Road I Bethel: Ridaecrest Drive Rehabilitation i[I ~~~ 7 E Birch Creek: Landfill Road Construction 75.G 250.r 1 Brevig M( t-__ I Bridae Manaaement Svstem 1.1 ., s Dust Control/Paving 25.01 Chena Hot Springs Road: MP 0-7 Reconstruction I Chevak: Sanitation Access Road L j Construction Chignik Bay: Airport Access Road Rehabilitation 6OO.r Chignik Lagoon: Incinerator Site Access Road Cordova: Ferry Terminal Building c Cordova: Ferry Terminal Staging Area- 1 ---7.- i Phase B Cordova: Lake Avenue Upgrade \ Cottonwood Lane Bridge Replacement / :i ._.--&.-. Deering: Sanitation Road mnstruction i --~ 1 70.q 175.t I -.~ Denali Highway: MP 80-104 &urfacing- i Susitna River to Brushkana Creek ; 4,500.o; j - a~----. -~ Denali Highway: MP St-42 Resurfacing- 1 Tangle Lakes to MacLaren River Dillingham: Alegnagik Road MP O-5 1 Rehabilitation I --.jpdp / .___~~_~ Edger-ton High&,&y; Rehabilitation 7 +--- _ ~-A-~- .~~ Eek: Sanitation Road Elliott Highway: Manley Slough-Tanana I River R&&ilitation -p-p+m~ .~. I---. i-m ~~~ Elliott Highway: MP 131-l 37 Reconstruction-Eureka to Baker Creek i t Emmonak: Airport Road and Erosion i ( &ntrol-- .~ p____j~_ ...~~~. ~:Fp----- .-~A-. .~~ I Fairbanks: College Road Intersection/Safety 500.0/ 1,600.l

Phases: 2-design; 3- right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation. Final Statewide Transportation Improvement Program Page 39 Community Transportation Program

Estim te (Total ( ___.osts in thousands of $) Project Description Score [ Phases 4w -____-FFY9c FFY97nFY98 -airbanks: CMAQ I/M Technician Training Zertification --____ 69.5 2,3,4 320 175.oj 175.0--. -airbanks: Holmes Road Drainaae A 4 33D 310.0: -airbanks: Illinois-Barnette & Bridge 70.2 2,3,4 j -airbanks: Old Steese Highway qeconstruction 94.8 2,3,4 33D 6,800.O’ ~------a-. ___ -~ -airbanks: Trainor Gate Road Upgrade 97.3 2,3,4 33D -~ --~~500.0r -_I_ --. 2,200.l ‘airbanks: University Avenue Widening 72 2,3,4 ‘airbanks: University/College Intersection Safety Improvements 87.8 4 -- Y--.- --- 3alena: Campion Road Landfill Access ! ?oad Resurfacing 78.2 2,3,4 ! Zrayling: Sanitation Road Construction 92.7 2,3,4 33D - ~-.-__~60.0 600.1 iaines: Klukwan Road A 2,3,4 33D -.~ 440.0:--+ iaines: Mud Bay & Beach Roads ntersection Improvements 81.7 2,3,4 iomer: East End Road MP 12.5-22 qehabilitation 79.8 2,3,4 iomer: East End Road MP 0.0-3.75 Rehabilitation 110.7 33D 600.0’-- 3,OOO.Oj 6,OOO.l-.. iomer: East End Road MP 3.75-12.5 $ Rehabilitation~.___._ 33D 500.0, ...-A--. : 3,150.l iomer: Lake Street Rehabilitation & Pioneer Avenue-Lake Street Intersection Safety._____ Improvements A 2,3,4 33A Hoonah: Ferry Terminal Ramp/Apron Upgrade A 4 330 Hoonah: Terminal Building Construction 81.5 2,4 Hooper Bay: Sanitation Road Construction 91.2 2,3,4 33D Houston: K&Arthur Road Resurface 90.8 33D Hyder: Trestle & Road Surfacing 82.8 Igiugig: Sanitation Road A ~ ~~ ~:_ ~~~~~~ Iliamna: Nondalton Road Completion 110.5 33D 75o.oi 5,000.0 Juneau Access Environmental Impact Statement 92.8 2 33D 700.01 Juneau: Capital Transit Buses 123.7 2,4 33D __ .1,040.0; Juneau: Glacier Highway Indian Point to Point Louisa 117.2 2,3,4 33D 300.0; 4,000.0 Juneau: Glacier Highway: Eagle Beach- Echo Cove Paving 2,3,4 Juneau: Mendenhall Loop Road at Stepher Richards Drive 91.7 2,3,4 33A 140.0 720. Juneau: Thane Road Ferry Terminal to Rock Dump 116.3 2,3,4 33D Juneau: Willoughby and Glacier Avenue 92.8 234 33D

Phases: 2-design; 3- right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation. Alaska Department of Transportation and Public Facilities Final Page 40 Community Transportation Program

Estimate (Total Costs in thousands of 9 Proiect Descrbtion -?=6---1 FFY 00 T-Fm Fairbanks: CMAQ I/M Technician Training i i Certification Fairbanks: Holmes Road Drainage -+~--’ .--.-- --- Fairbanks: Illinois-Barnette & Bridge ’ 3,200 Fairbanks: Old Steese Highway -+ Reconstruction Cam------..-& -j Fairbanks: Trainor Gate Road Upgrade -,--.- ~-..--~- Fairbanks: University Avenue Widening-. 1 : 2,500 Fairbanks: University/College Intersection i Safety Improvements 2,500.O; Galena: Campion Road Landfill Access i Road Resurfacing i Graylings Haines: Klukwan Road j -A-. -. ~~~~ Haines: Mud Bay & Beach Roads Intersection Improvements Homer: East End Road MP 12.5-22 Rehabilitation Homer: East End Road MP 0.0-3.75 Rehabilitation 7----- Homer: East End Road MP 3.75-12.5 Rehabilitation Homer: Lake Street Pioneer Avenue-Lake Street Inters&#on Safety Improvements j L L Hoonah: Ferry Terminal Ramp/Apron j Upgrade i. .---. - -.i-- Hoonah: Terminal Building Construction A-/ -.-----2 50.0’ ! --?-- Houston: King At$h~r Road Resurface j i. --.---~ Hyder: Trestle & Road Surfacing -- .~,~ .-. ----i---450.0: A?!z!?E-. --.-~~ Igiugig: Sanitation Road 600.0’ Iliamna: Nondalton Road Completion L Juneau Access Environmental Impact 1 Statement -+.-.-. ~~--~--~~ ?~~~ Juneau: Capital Transit Buses 4 1 Juneau:‘Glacier Highway Indian Point to i Point Lou&a ~ -,~ ----:----- ~.~. _ Juneau: Glacier Highway: Eagle Beach- : --E&ho Cove Paving -. .A - -~~~~~~- 600.01---L ~~~~. 3,450~~~~ Juneau: Mendenhall Loop Road at Stephen 8,iohards Drive ~~~~~~~~~i ~~~ ..i------Juneau: Thane Road Ferry Terminal to i Rock Dump Juneau: Willoughby and Glacier Avenue j

Phases: P-design; 3- right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation. Final Statewide Transportation Improvement Program Page 41 Community Transportation Program

Estimate (Total Costs in thousands of $) Project Description Score --II---- Phases i 1 Appr 1 FFY96 1 FFY97 1 FFYg8- Kake: Dolphin and Bridge Replacement 96.2 2,4 -t+1 118--- : 1oo.q 1,100.o; Kake: Ferry Terminal Building 82 234 Karluk: Airport Access Road Rehabilitation 91.2 - 234 Kenai River Bridge Access Road Rehabilitation 93.2 Kenai Spur/Intersection Lake Sight Distance & South Miller Loop Safety Improvements A Kenai: Forest Drive/Redoubt Avenue Rehabilitation 96.7 2,3,4 Kenai: Fort Kenay Mission Street Improvements A Kenney Lake:Willow Loop Road A Ketchikan: Herring Cove & Ketchikan Creek Bridges A 2,3,4 Ketchikan: North Tongass Highway MP 15 to Settlers Cove Paving 76.2 2,3,4 Ketchikan: North Tongass Highway: Ward Cove to Whipple Creek Widening 88.3 2,3,4 Ketchikan: Saxman Roads Improvements A 2,3,4 Kiana: Landfill Road A 4 King Cove: Airport Access Road Rehabilitation 76.3 2,3,4 &ng Cove: Lagoon Bridge Replacement 87.8 --2,3,4- Kipnuk: Sanitation Road 95.8 2,3,4 Kivalina: Sanitation Road Construction 79.2 2,3,4 Knik River Road 84.5 2,3,4 Kodiak: Chiniak Highway: Kalsin Hill Hazard Removal A ~______~Kodiak: ~~..~~Chiniak Road Rehabilitation-.~ ..- ~~ ~~~ 91.8 Kodiak: Otmeloi Way Rehabilitation 234 Kodiak: Rezanof Drive ‘Y’ Intersection Improvement A ZW Kodiak: Rezanof Drive Safety Improvements/Otmeloi Way A 4 Kodiak: Selief Lane Reconstruction 86.3 2,3,4 Koyuk: Gravel Source Road A 4 Koyukuk: Landfill Road A 4 Kwigillingok: Sanitation Road 77.3 2.3.4 Matanuska - Susitna: Seward Meridian Rd. Upgrade/Extension 78.3 2,3 Matanuska-Susitna: Big Lake/South Big Lake Reconstruction 102.2 234 Matanuska-Susitna: Church Road: Parks to Schrock Upgrade 96.2 : 2,3,4 i

Phases: 2-design; 3- right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation. Alaska Department of Transportation and Public Facilities Final Page 42 Community Transportation Program

___-. Estimate (Total Costs in thousands of $ Project Description -~i??iii 1 FFY 00 -~-I-FFy61~ Kake: Dolphin and Bridge Replacement i ___-Kake: Ferry Terminal Building --~-d 100.0; 750. Karluk: Airport Access Road Rehabilitation ! Kenai River Bridge Access Road Rehabilitation v------+ ~_~ - -...~-.~~ Kenai Spur/Intersection Lake Sight Distance & South Miller Loop Safety 1 Improvements~- i ---.--..+ : Kenai: Forest Drive/Redoubt Avenue . Rehabilitation : --~~-~------mp+ ~_~~ Kenai: Fort Kenay Mission Street Improvements -~. ~~~~~~~~~------~~~~~ ~~~_ Kenney Lake:Willow Loop Road :~. ~--p~p-m ~I .-I--- Ketchikan: Herring Cove & Ketchikan ! Creek Bridges i---~ .-.~..- . ..-_.A Ketchikan: North Tongass Highway MP 15 1 t to Settler’s Cove Paving I-- _j 2,200.BJ 2,200. Ketchikan: North Tongass Highway: Ward i Cove to Whipple Creek Widening 6,000.01 --f--- -___ Ketchikan: Saxman Roads Improvements --i Kiana: Landfill Road ~~~-.:~.. King Cove: Airport Access Road i Rehabilitation +isoo o/ 200.0; 1,125. King Cove: Lagoon Bridge Replacement-y-- - I.-“i- I Kipnuk: Sanitation Road I -.-.--I Kivalina: Sanitation Road Construciii ! 100.0; 1,000. Knik River Road 1 3OO.d -----3,200.0! ------.- -- i‘ ~ Kodiak: Chiniak Highway: Kqlsjn Hill I j Hazard-__ Removal ‘. Kodiak: Chiniak Road Rehabilitation i 1,400.o: 4,000.0, 6,000. Kodiak: Otmeloi Way Rehabilitation ! ~~ -_--. ; 200.0; 1,000. Kodiak: Rezanof Drive “Y intersection i Improvement t i Kodiak: Rezanof Drive Safety Improvements$Itr@oi Way ..--i~--L _ .-: _~ : ~ Kodiak: Selief L&e Reconstruction ( 5ooq 2,500.Oi 4,900. t---- - Koyuk: Gravel Source Road + t KoyuCiu~~andfiII Road .ym~p- mm-$._____ -:T __-_;~-- &wigillingok:‘Sanitation Road .! -~ 3,000. Mtitanuska - Susitna: Seward Meridian Rd. 1 :: Upgrade/Extension 400.0; 600. F&#nuska-Susitna: Big Lake/South Big ; Lake Reconstruction i Matanuska-Susitna: Church Road: Parkss~~i-- J to Schrock Upgrade

Phases: 2-design; 3- right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation. Final Statewide Transportation Improvement Program Page 43 Community Transportation Program

Estimate (Total Costs in thousands of $) Project Description p&&ie 1 @ha~~~~l~ Appr l-FFY96 T FFY97 l~lF~~98 Jlatanuska-Susitna: Edlund Road qehabilitation 97.8 2,3,4 33D : ~ 100.0‘---;-- ~~~~~400.0;~~-. Jatanuska-Susitna: Hatcher Pass Road 33D : AP7-14 Rehabilitation 92.7 2,3,4 ~~ -~-: .~_~ 275.0; ~~_~ Jatanuska-Susitna: Hollywood Road mprovements 95.5 2,3,4 ’ ~.330 ~~~~ ~. ~~~~ 2oo.oi. .._--*--. ~~~~~_~1,300.o_~ Jatanuska-Susitna: Old Matanuska Road i qehabilitation ’ 82.2 2,3 - ;----~ ~~~~ ~~~~~~~ Jlatanuska-Susitna: Palmer-Wasilla I iighway Extension 84.3 2,3,4 i: ~- ~~~~ -~~~~ Jlatanuska-Susitna: Trunk Road qeconstruction 98.2 234 33D 550.0; 550.0: Jatanuska-Susitna: Vine Road ; ~-84.2 2,3!4_- 33D : 300.03 1,700.o; 3 ~~~~~-- datanuska-Susitna: Wasilla Fishhook qehabilitation 84.8 2,3 : ~~ I I i--- 3 vlatanuska-Susitna: Wasilla-Fishook Road: ! Jelson-Bogard Safety Improvements 84.5 2,34 I 1 2~~~~~ ~~~~.-~ ~~~~~-~~i ~~~- --+ inccarthy Road Improvement & qesurfacing ? 92.7 2,3,4 i 33D --m--f- 500.0; illcCarthyRoad:-~ MP O-4 Reconstruction ~~_~i 80.7 ~~~~ ~- 2,3,4 1 ~.~~~~~~~~.----+- ~~-~ ~--~ uletlakatla: Ferry Terminal Pontoon j I qeplacement~- A 4 : 33D 350.01 Jetlakatla: Purchase of Buses ime98.2 :p 2!4~~; : ~_~~~33D 200.0: ~~..____.detrication ! NA 2 i 33D 50.0: 60.0 60.1 dinto: Sanitation Road ; A 1 4 [ 33D ~~_- 40.0: \labesna Road Rehabilitaiton 72.0 2 -I---~;--~ ~~~~. \laknek: 2nd Ave Reconstruction ’ 70.0 2,3,4 ; \laknek: Lake Access Road Rehabilitation 81.7 2,3,4 1~ ~~~ \laknek: Pedersen Point Road Extension ! 78.2 ,~ -2J&~- ---_~j \lapakiak: Sanitation Road Construction i 79.7 2,3,4~- $----.-i ---T--. -~~-~ --I \lational Highway Institute Training ? NA 8 ; 33D : 100.0; 70.0: 70.1 \lelson Lagoon: Airport Access Road qehabilitation 77.2 2,3,4 ~~ -A-- ~~~~. ~.~ Venana: City Streets Resurface - Phase I 73 2w : ---; ---_.--A-. ~~~. 1 ~~~ ~~~~~ Vome:- ._____- City Field Structures -~~ _~~~~~~~A 4 <- 33D 35O.Oi Vome: CityStreets-..~ 71.3 2,4 j ---.----A- I ~~ -.: Vome-Council Road: MP 4-15 i qehabilitation--______’ 78.7 2,3,4 r--: ~~- ..~~~._~~~~ Vome: Bering, Seppala & Front Street i i qehabilitation 84.8 ~_~~~f&3,4 .: ~~~_ Voorvik: Hotham Peak Road : A 4 ; 33D ;---pjoroj--.--:- -- North Pole: Santa Claus Lane Upgrade i 103.3 2,3,4 j 33A .-.-_i-2?E:P:m’ 128.0! Yorthway Road Improvement : 94.2 2,3,4 j 33D 570.0? 5,300.l .j-- -~_____~. ~. Nunapitchuk: Sanitation Road Construction i 80.5 : 2,3,4 ;

Phases: 2-design; 3- right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation. Alaska Department of Transportation and Public Facilities Final Page 44 Community Transportation Program

Estimate (Total Costs in thousands of $) Project Description ------=qIWF FFY 01 Matanuska-Susitna: Edlund Road Rehabilitation Matanuska-Susitna: Hatcher Pass Road 1 MP7-14 Rehabilitation ~~~._~ i 4,OOO.Oi ..._~-J--.- ~~ _ Matanuska-Susitna: Hollywood Road ’ i Improvements Matanuska-Susitna: Old Matanuska Road ______~Rehabilitation 250.0: 25o.c Matanuska-Susitna: Palmer-Wasilla Highway Extension 450.0, 3,ooo.c Matanuska-Susitna: Trunk Road Reconstruction ..~-. ~. 6.-!--.; 000 0. ~~~i-~~-- ~ Matanuska-Susitna: Vine Road ------~~ ~-- Matanuska-Susitna: Wasilla Fishhook Rehabilitation .--i-... - --2’.~--p’.1 300 oi ‘4 000.0~ Matanuska-Susitna: Wasilla-Fishook Road:; Nelson-Bogard Safety Improvements----i----r_..:-;--- : 1 ‘650 01 mmp-*Fm McCarthy Road Improvement & ! Resurfacing I _----w0.0; 7,000.01 4,500.c McCarthy Road: MP O-4 Reconstruction 1 500.01I--. ~4,200.c j -----r Metlakatla: Ferry Terminal Pontoon Replacement Metlakatla: Purchase of Buses Metrication -+“.+---v-. _____. e- Minto: Sanitation Road ---A ____- Nabesna Road Rehabilitaiton ’ 4 600.C Naknek: 2nd Ave Reconstruction .-/ 4oo.c Naknek: Lake Access Road Rehabilitation [ 250. o/-- 1,ooo.c Naknek: Pedersen Point Road&rtension i ~--- 200.0/ 1,400.c Napakiak: Sanita#en,~J -.I E~!L!g 1,ooo.c National Highway Irkttifljte Training f /c----- Nelson Lagoon: Airport Aercess Road ; 1 Rehabilitation _-__ 200.0: Nenana: City St@ets Resurface - Phase I i i 500.0; Nome: City Fi&$Structures f -.....- ~~------+...~ Nome: City Streets j 635.C I-~-- .-... - -Lp -y -____-.--- Name-Council Road: fv@ 4-15 Rehabi$t@on -‘--..L+--.3 750 0’ ._~_~~ Nome: Ben&g, Seppala & Front Street Rehabilitation 100.0; 1 ,l OO.O] ,’ ~---Fe Noorvik: Hotham Peak Road -----< I N&th Pole: Santa Claus Lane Upgrade i N$thway Road Improvement 1 .-a-~- _____ Nunapitchuk: Sanitation Road Construction 1 1 ,ooo.oj

Phases: 2-design; 3- right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation. Final Statewide Transportation Improvement Program Page 45 Community Transportation Program

Estimate (Total Costs-in thousands of $) Score Phases] Appr -l~F’ii]-fl97 1 FFY98 1 A 2,3,4 : 118 7~?-A--. 400 0’ ---‘---- NA 8 33D 80.01 80.0. 80.1 90.7 ?,3,4 118 i 100.0 400.1 83.5 2,-34 mi B Petersburg: H Street Repaving and Intersection Improvement 87.8 234 ._ 33D 400.1 Petersburg: Haugen Drive/Nordic Drive Emeraencv Sianal A 4 33A 170.0: Petersburg: North Nordic U-Turn Route 75 2,3,4 Petersville: Road Rehabilitation/Extension 94 234 33D 250.0: 1Port Alexander: Tract B Boardwalk Reoair 85.8 234 33D 111.5 ZW 33D 3,OOO.l Prince of Wales Island: Hydaburg Highwa] Upgrade and Paving 93 234 33D 2,000.0. 2,OOO.l Prince of Wales Island: Thorne Bay Road Paving 86.8 2244 33D Program Review & Evaluation NA 2 33D Public Transportation Social Service Van Replacement 120.5 4 33D Safety Management System Workplan NA 2 33A Safety Management System/HSIP Mgt. & Eng. NA 8 33A Salcha: Johnson Road Rehabilitation 78.3 2,3,4 Sand Point: Harbor Access Road Rehabilitation/ Extension 75.2 2,3,4 Scammon Bay: Sanitation Road Construction A ?A4 33D Scenic Byways Grant NA 8 32C Seismic Bridge Retrofit Program NA -~?>p 118 Selawik: Boardwalk Phase II 73.0 2,4 Selawik: Boardwalk Improvements A 2,3,4 33D Selawik: Landfill Access Improvement 82.3 234 Shaktoolik: Landfill Road A 2,3!4~ 33D Sheldon Point: Sanitation Boardwalk 82.3 C-44 Shungnak: Community & Landfill Road Reconstruction 88.2 234 33D Sitka: Sawmill Creek Road Shoulders S? 2,3,4 33D Sitka: Sawmill Creek/Jarvis Left Turn Bay A 4 33A Small USGS Hydrologic Investigations NA 2 33D Soldotna: Funny River Road: MP 2.7-l 7 Rehabilitation 84.5 2,3,4 Soldotna: Kalifornsky Beach Road MP 16.4. 22.4 Rehabilitation and Safety Improvements A 4 33A - 2,600.O;

Phases: P-design; 3- right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation. Alaska Department of Transportation and Public Facilities Final Page 46 Community Transportation Program

Estimate (Total Costs in thousands of $) Project Description FFY99 1 FFYOO 1 FFYOl ! Old Glenn Highway: Matanuska River i I Bridge Replaceme@ On-the-Job Training Support Services j Pedro Bay: Bridge Replacement Pelican: Ferry Terminal Dolphins 75.oi 500.0~ ! { Petersburg: H Street Repaving and 1 L i .I Intersection Improvement 1,500.oi Petersburg: Haugen Drive/Nordic Drive -I---.- ! Emergency Signal / Petersburg: North Nordic U-Turn Route ’ Petersville: Road Rehabilitation/Extension Port Alexander: Tract B Boardwalk Repair : Prince of Wales Island: Big Salt Lake Road, Prince of Wales Island: Hydaburg Highway i Upgrade and Paving 3,000.ot- 6 -- -.. . .- Prince of Wales Island: Thorne Bay Road i Paving I 3,500.01 3,500.c Program Review & Evaluation --ai-----. Public Transportation Social Service Van 250*oi Replacement 4 250.0: 250.C SafetyManagement System WoWan _ ! .~~-~-.----~--. .L-. - ..---. -.L---.- ~~ Safety Management System/HSIP Mgt, & j Eng. ~ ~~~~_ Salcha: Johnson Road Rehabilitation 3 125.0; 1 --I @9.C- Sand Point: Harbor Access Road i Rehabilitation/ Extension 100.0. 1 .ooo.c Scammon Bay: Sanitati(ln Road 1 I Construction +i -. ...-.------.-~- --~ 1 j Scenic Byways Grant --A,_Ir ~~__ Seismic Bridge Retrofit Program I-- i Selawik: Boardwalk Phase II +---4- 5oo.c Selawik: Boardwalk Improvements : Selawik: Landfill Access Improvement ----3T---Jz!& Shaktoolik: Landfll Road Sheldon Point: Sanitation Boardwalk 75.0: 385.0; Shungnak: Community & Landfill Road

Small USGS Hydrologic Investigations Soldotna: Funny River Road: MP 2.7-l 7 : Rehabilitation SoIdotna: Kalifornsky Beach Road MP 16.4; 22.4 Rehabilitation and Safety Improvements

Phases: P-design; 3- right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation. Final Statewide Transportation Improvement Program Page 47 Community Transportation Program

Estin te (Total Costs in thousands of $) 1 Project Description Score Phases A!!! FFY96 l-f97 -r FFY98 Southeast Pavement Sealcoat/Overlay 87.8 Z&4 33D 15o.c 1; 4oo.i St. Mary’s: Airport Road Rehabilitation 84.2 ?,3,4 St. Michael: Sanitation Road Construction 92.3 234 33D 150.0: 9oo.t Statewide Annual Planning Work Program NA 8 D81/33D 8,000.C m>,ooo.oi 8,OOO.t Statewide Bridge Inventory and Inspection Program NA 2 118 1,330.c ~~~ 1,370.o: 1,41 O.( Statewide Research Program NA 8 086 1,940.c ~~~J940.0: 1,940.t Statewide Urban Planning Program NA 8 085 88O.C 770.0’ 77o.t Stebbins: Sanitation Road Construction 96.0 234 33D 70.0: 675.f Steese Highway: MP 128 Crooked Creek Bridge Replacement 75.5 2,3,4 Sterling: Kenai River Crossing at Funny River 76.5 Stevens Village: Sanitation Road A 33D 325.t Taylor Highway: MP 82-Border Reconstruction 88.8 ZW 33D Taylor Highway: MP 64-82 Reconstruction- Mosquito Fork to Walker Fork 88.8 2,3,4 Toksook Bay: Solid Waste Site Road 94.5 2,3,4 33D 815.C ~~ d--- ~~~~ Truck Weight Enforcement NA 2 33A 15o.c 150.0; 16O.t Unalakleet: Landfill/Airport Road Construction 91.8 2,3,4 33D 350.0: 3,100.t Unalaska: East Point/Ballyhoo Road Rehabilitation 91.7 2,3,4 33D 300.0’ Upper Kalskag~:-Sanitation Road Construction 85.8 2,3,4 USGS Flood Frequency and Analysis NA 2 33D 280.C @ldez: Dayville Road Improvements 87.2 ~~?,3,4 33D Valdez: Mineral Creek Loop Road Rehabilitation 88.3 2,3,4 33D 110.0; l,lOO.( Venetie: Sanitation Road Construction 90.5 2,3,4 33D 80.0; 3oo.t Venetie:-______-.. Village Streets Upgrade 77.2 2,3,4 Wales: Sanitation Road A ?!W 33D 3oo.c Yakutat: Bayview Drive Retaining Wall & Guardrail A 234 33A 66O.C Program Total5 i 95,366.C 95,450.01 95,250.c

Phases: P-design; 3- right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation. Alaska Department of Transportation and Public Facilities Final Page 48 Community Transportation Program

Estimate (Total Costs in thousands of $ Project Description FFY 99 1 FFY 00 1 FFY 01 Southeast-__ Pavement Sealcoat/Overlayy -1 _ 600.0! ~~ L-- ~ St. Mary’s: Airport Road Rehabilitation 320.0 ~-~3@!10_- St. Michael: Sanitation Road Construction Statewide Annual Planning Work Program i Statewide Bridge Inventory and Inspection : Program Statewide Research Progl”m ~~~i- - Statewide Urban Planning Program ~~ -1 ~- ~~ 2 ~~. ~~ ._ : ~~~~~~ ~~__ Stebbins: Sanitation Road Construction a ~~~___ -.L ~~~-~- ~ Steese Highway: MP 128 Crooked Creek j I --Bridge Replacement 140.01 1,125.l Sterling: Kenai River Crossing at Funny i _____--_-__---...~-River .~-~-__-.~-~~- (~- ~~-~~~~ I l,r?ao.cl~ _ Stevens Village: Sanitation~..__ __--Road Taylor Highway: MP 82-Border a Reconstruction -..-.------.-T. -..____, .?------~ *- ~. ~-- Taylor Highway: MP 64-82 Reconstruction- j ? Mosquito Fork to Walker Fork 6 2#f,-j -____Toksook Bay: Solid Waste Site Road i Truck Weight Enforcement zIz___.mm-p;..+ -.;--- -~. Unalakleet: Landfill/Airport Road Construction -,+,+.-L.--..--l--..--. -& ~~_~ _.. Unalaska: East Point/Ballyhoo Road j Rehabilitation__-____ ~ . ..-A--? i -.-- 5,ooo.o~~~ _ - --i-.- ~-~. - Upper Kalskag: Sanitation Road Construction___~ 315.0: USGS Flood Frequency and Analysis Valdez: Dayville Road improvements 6,600.0! Valdez: Mineral Creek Loop Road I Rehabilitation -~ L- ~-~~ ~- ~~ ~~~ ~ ~~~~ Venetie: Sanitation Road Construction i Venetie: VillageStreets_Upgrade 60.0: 1,OOO.l Wales: Sanitation, Road Yakutat: Bayview,Drive Retaining Wall & i ~ -1 ____-.Guardrail 80,290.01 79,875.Oj 79,785.1

:,, ,

Phases: P-design; 3- right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation. Final Statewide Transportation Improvement Program Page 49 Trails and Recreational Access for Alaska Program

Estimate (Tota!Costs in thousands of $) Project Description Score Phases ] I$.$~~~ I_ FFy96 1 FFY973 FFY99 Alaska Highway: MP 1348-Robertson 3iver Wayside 67.8 2.34 Uaska Marine Highway: Shipboard Jisitor Information Kiosks 52.2 2,4 3 Uaska Marine Highway: Vessel nterpretive Displays 66 2,4 33B 60 .O JMATS: Transportation Improvement ‘rogram NA 2,4 5,500.q 5,500.ot~~~~I.~ 5,500- .O Ingoon: Beachfront Staircases 234 .~ Jtmautluak: North Boardwalk Repair 53.4 2,3,4m ~~ A.-~- .~ 3erina River Train Railroad Park 56.4 2,3,4 3ering Straits Villages: Trail Staking 97.4 2,3,4 338 ~- 25.0, 150.0: 3ethel: Boardwalk Construction 66.6 2,W 33B ~~ 4 ~ - -~~ Sentral Region: ADA Pedestrian .i Iacilities 88 2,3,4 .~ ?38 -~ ~ 400.0: 600.0/ >entral Region: Winter Trail Marking 94.8 2,3$ 33B ~~_~150.0’~--* ~_ ~-. + ~~ 850~.. 0 Zentral Region: Visual Enhancement ; Vlanagement~.____~~ __ _ ~_~ .~_ ~~~~~~ ~--)-~~ ~.61 ~ ~~.~2,3,4 i Zentral Region: Scenic Byways pi ~~ fi- _~: _~~ ;1 33B 75.0; Zhena Hot Springs Road: Chena qiver State Recreation Area _~_ fggE~-- jm ?,3_& .~~~~338 ’ 1 90 1.0 Zhena Hot Springs Road: Yukon Guest Trail -<~ ~-64.2. 1 g,4 ! _-Chitina: ___-.Pedestrian/Bike ~.~--~Facility ~~~~;-i ~--..~--64 2 :__2,314-_- -I- ~_~__~. Zhitina: Visitor Wayside : 80.6 2,3,4.~ .~-~ ~~338 .-.-‘--- - ~-.--.---_. 330.0’--cm ~~~~~-. sordova: Interpretive Boardwalk 65.6._ ~_ jam.234 ‘1 _~_ ~~~~~ .~ ~-~ ~-- ! : Deadhorse Wayside 1 49.6 ~. -3v - . - ~~~ ~~~~~~.~~.. ~~ $- Dalton Highway: MP 165-Cathedral Lakes Overlook 56 2,3,4 Dalton Highway: MP 207-Bettles : i River Access 57.6 2,3,4 Dalton Highway: MP 215-Arctic Loon Ponds Overlook 60.4 2,3,4 1 Dalton Highway: MP 272-Galbraith Lake Wayside 68.8 ! ?,3,4 33B 15c 1.0 -r---~--- Dalton Highway: MP 275-Galbraith ~- Lake Campground 56.4 I~ 2,3,4 .: ~ ~~~ ~~~~ Dalton Highway: MP 286-Toolik Lake ‘-~-- ~~~ Overlook 60.2 2,3,4 ~~ ~~ + ~-~~~ ~~-~~ ~~ - -~ Dalton Highway: MP 57-Yukon Crossing Intermodal Facility 51.8 : 2,3,4 1 j-m-- - Dalton Highway: MP 57-Yukon Cross&Wayside/Interpretive Center 77 2,3,4 338 25.0; 150. .O Dalton Highway: MP 60 Dump Station : 63.8 2,3,4 ~~-~ ~ 33D-~-~ : 400.0‘ r-- - Dalton Highway: MP132-Solstice : I Point Recreation Site : 66.2 2,3,4 :

Phases: 2-design; 3-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation. Alaska Department of Transportation and Public Facilities Final Page 50 Trails and Recreational Access for Alaska Program

Estimate (Total Costs in thousands of $) Project Description -~~~I--F~]=bi~ Alaska Highway: MP 1348Robertson; River Wayside 100.0; --I5oo.oi Alaska Marine Highway: Shipboard ; Visitor Information Kiosks 220.0 Alaska Marine Highway: Vessel ~-.-I_Interpretive Displ+ AMATS: Transportation Improvement Proxam ; 5,500.o 5,500.o; 5,508.U Angoon: Beachfront Staircases I 80.0 Ahrrautluak:___-.-___ North Boardwalk Repair in_ ! 500.0 Bering River Train Railroad Park ; ~~~~ ~-~- ---.---f 75.0~._~ --___Bering Straits Villag_es: Trail Staking__ -,~ ~~ ~ - i-- -~-._ -._ _ ~~ ~~~~ Bethel: Boardwalk Construction 50.0’ 5oo.oi Central Region: ADA Pedestrian j 1 Facilities -__-~ __-- 1 Central Region: Winter Trail Marking Central Region: Visual Enhancement j 1 - 1 .~ ~~-~~- Mawement .i-..--:----y’-.- 250.0: ~-~-- Central Region: Scenic B_y_ways--__.- .-.p.--_cm-- .-Hp{-~--mpu Chena Hot Springs Road: Chena River State Recreation Area .J,.-.2u- ~ ___. I_.p--. Chena Hot Springs Road: Yukon j ! Quest Trail ~_____ 50.0. 25O.Oi Chitina: Pedestrian/Bike Facili ty ,-t 6O.Oi 200.0/ - Chitina: Visitor Wayside --.__ Cordova: Interpretive Boardwalk I / 500i--^--1- r- ---~-- Dalton Highway: Deadhorse Wayside ! ; 1 150.0 Dalton Highway: MP 165-Cathedral i i Lakes Overlook. 25.0 Dalton Highway: MP %XQBettles 1 River Acc,##s -I-. ----:--- _. -,- _ 60.0 Dalton Highw&y: MP 215-Arctic Loon Ponds Overlook _ --- i i 140.01 Dalton Highway: MP 272-Galbraith j Lake Wayside -.__--- ‘--.-.-J-~ Dalton Highwriy: MP 275-Galbraith ; 3 Lake C&rrpground- 200.0 Ualton Highway: MP 286-Toolik Lake / Overlook ~ -. --:-.-~~ soQi ..____ ~..~._ Dalton Highway: MP 57-Yukon Crossinglntermodal Facility : 500.0 Dalton Highway: MP 57-Yukon i CrossingWayside/lnterpretive Center : Dalton Hicway: MP 60 Dump Station Dalton Highway: MPl32-Solstice Point Recreation Site 25.0

Phases: 2-design; 3-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation. Final Statewide Transportation Improvement Program Page 51 Trails and Recreational Access for Alaska Program

Estimate (Total Costs in thousands of $) Project Description -~- _l---- Score-:-I-- -r &ax?;]- ~~p~~~ fW3qI%Y97 1 FFY98 Dalton Highway: MPI 50-Grayling -ake Wayside 67.8 Jo .~‘GA4 33B ~~ + ~~ --i Dalton Highway: MPl75-Coldfoot ’ flayside Interpretive Center 74.8 2,3,4 33B 50.0 200.0 Dalton Highway: MP56-Yukon River Dverlook 63 234 _~ ~~ Delta Junction: Sullivan Roadhouse 46.4 GM ~-,~ Denali Highway: MP 22-Tangle -akes/Delta Wild River Trailhead 66.2 2,3,4 .~ Denali Highway: MP 130-Information and Orientation Wayside 61 234 Denali Highway: MP 15-Tangle Lakes 6\rchaeological District Wayside 59.2 234 Denali Highway: MP 36-MacClaren ’ Summit Wayside 60.8 234 Denali Highway: MP 42-Geologic Point of Interest 61 234 ~~~$- -~ ~. D%ingham: Waskev Road Pathway 2,3,4- Dillingham: Wood River Bikepath : 39.6 2,3?4 ~~~.~~ Eagle: Restore Customs House _ ZWm { 1 Fairbanks North Star Borough: Bus i Stop Shelters I 62.6 i 2,3,4~~ ~~ :.~~ -~ -~~ .~.~ ~~ ~~~ -. _ ~~ ~~ ~ ~~ ~ ~~ Fairbanks: Auburn Drive Pedestrian i Facility A 4 33B 37o.oi Fairbanks: Brown Elementary Bike/Pedestrian Facility A 4 338 ; 165.0; Fairbanks: Chena River Bicycle Trail 85.0 2,3,4 : 338 250.01-~. + ~-I--1 000.0:pi ~-.~- ~.~~ Fairbanks: College Road Bike Path i Rehabilitation 43.6 _-’ 2R! ~. ~~ -~---.pz ~_ _ ~_iL _ ~~~ L Fairbanks: McGrath Road 2oo.oi Bike/Pedestrian Trail A : 2,3,4 ’ 338 400.0’ Fairbanks: Shannon Park-Ladd School Bike Path 73.2 2,3,4 : -~~33B _ ~~ ~----i ~~_~_ 50.01 _~.~~_~ ~~.-_ 1oo.c ~ Fairbanks: South Cushman Enhancements 50.4 234 Fairbanks: Steamship Nenana Renovation 51.2 i 2,3,4 ---in- ~~ Fairbanks: Tanana Railroad Engine #I Restoration 56.2 : 4 ~~~ ~~ --;- ~~~-_ ~ ~~ -~~ Fairbanks: University Avenue: Bridge/Bike Path Rehabilitation 68.4 234 ~~338 ~~ :.~ ~~~ ~ -~< ~~ ~~ ~~ i--~ ~~15o.c~~ ~ Fairbanks: Weller School Ped/Bike Path 2,394 Girdwood Valley: lditarod Trail ’ 68.0 2,3,4 Girdwood: Winner Creek Trail 60.6 234 :

Phases: 2-design; 3-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation.

Alaska Department of Transportation and Public Facilities Final Page 52 Trails and Recreational Access for Alaska Program

Estimate (Total Costs in thousands of $) Project Description ] FFY99 1 FFYbO-1 FFY 61 Dalton Highway: MP150-Grayling Lake Wayside 165.0 Dalton Highway: MP175-Coldfoot Wayside Interpretive Center Dalton Highway: MP56-Yukon River Overlook 250.0 Delta Junction: Sullivan Roadhouse ~~,~ --~1YS?i( Denali Highway: MP 22-Tangle ~_._____...Lakes/Delta Wild River Trailhead 60.0 250.0 Denali Highway: MP 130-Information : and Orientation Wayside 45.01 255.r Denali Highway: MP 15-Tangle Lakes Archaeological District Wayside 4o.r Denali Highway: MP 36-MacClaren Summit Wayside 55.Of Denali Highway: MP 42-Geologic Point of Interest ~~~ __T- .--j 60.01 - .~~_..~ Dillingham: WaskevlRoad Pathwx ;- __+*-. ~--: .~- 500.L- ( Dillingham: Wood River Bikepath ----:--- 1 OO.( Eagle: Restore Customs House - .--~ -I..- .----:----- 504 Fairbanks North Star Borough: Bus Stop Shelters i : 475 oy _- -s------Fairbanks: Auburn Drive Pedestrian ; Facility /--.--_--.--..-_ ~~~.~._. Fairbanks: Brown Elementary i Bike/Pedestrian Facility Fairbanks: Chena River Bicycle Trail j Fairbanks: College Road Bike Path Rehabilitation :, j 1,300.t Fairbanks: McGrath Raad Bike/Pedestrian-- Trail Fairbanks: Shannon Park-Ladd School Bike Pa& Fairbanks: South Cushman -[ Enhancements 850.1 Fairbanks: Steamship Nenana i Renovation *~-- ~20.1 Fairbankxnana Railroad Engine i 81 Restoration 65.1 Fai#qnks: University Avenue: i Bridge/Bike Path Rehabilitation ~~~i gpgy(p ~~~--i Fairbanks: Weller School Ped/Bike E Path -~~ -/~ ~~~~-..-+ ~~_~..pmmml 100 Girdwood Valley: lditarod Trail .~- 400.0; ~! ,-600.0’ Girdwood: Winner Creek Trail : 60.01 340.

Phases: 2-design; 3-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation.

Final Statewide Transportation Improvement Program Page 53 Trails and Recreational Access for Alaska Program

Estimate (Total Costs in thousands of $) Project Description ~~ I Score~-~ -- ~-II:Phases I.--V Aw -__-.FFY96FFY97--[-%% --~ - ~.~-~.-.~~. Glenn Highway: Matanuska Glacier Scenic Overlook 79.2 2,3,4 338 Haines: Ferry Terminal Interpretive Exhibit A 2,4 33B 82.0 Haines Highway: Eagle Viewing Center to Klukwan Trail 93.8 234 338 2~,OOO.Oi Hatdher Pass: Scenic Overlook & Trailheads 71.8 2244 338 400.1 Homer Spit: Mud Bay Boardwalks 59.8 4 33B 330.1 Homer Spit: Pedestrian Pathway 81.2 2,3,4 338 150.0; 1,500. Homer: Beluga Lake Trail Construction A 4 33B 205.0 Homer: Fishing Hole Handicapped Access 71 2,3,4 33B 120.1 Homer: Scenic Overlook 54 234 338 Juneau: Glacier Spur Trail A 4 338 450.@;~ Juneau: Auke Bay Ferry Terminal Enhancements 65 ZW Juneau: Glacier Highway UAS Overpass 70 234 338 120.1 Juneau: Glacier Highway-McNugget to GelRae Pedestrian Improvements 58 2,3,4 Juneau: Mendenhall River Pedestrian Crossing 82.8 234 338 150.0; 850.0’ Juneau: North Douglas Highway Trail 53.4 234 Juneau: Thane Road: Main Street to Ferry Terminal Pedestrian Facilities 82 2,3,4 338 125.0~ 600.0 _~ Kenai Spur Road: Unity Trail Pedestrian/Bike Path 69.8 234 33B 100. Kenai: lsaak Walton Campground Archaeological Investigation 46.4 234 Ketchikan: Central Business District Sidewalk Improvements 72.2 234 33B Ketchikan: North Tongass Bicycle/Pedestrian Trail Facility 37.2 VA4 KiRg Cove: Pathway Construction 45.0 2,3,4~ 33B 40. King Salmon: Pathway Construction 63.4 _ ?,3,4. Kodiak: Fort Abercrombie Historic Trail 59.4 Lake Louise Road Waysides ~~A Matanuska-Susitna: Big Lake Pedestrian/Bike Path Construction A 4 33B Matanuska-Susitna: Palmer Pedestrian/Bike Paths Construction.___..- ~_~ ~~~A ~~ A-- ~~4 ._.______g 33B ’ 555.0; : _ __~ + Matanuska-Susitna: Palmer-Wasilla 1 Pedestrian/Bike Path Construction : A 2,3,4 33B : 1,865.O;

Phases: P-design; 3-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation. Alaska Department of Transportation and Public Facilities Final Page 54 Trails and Recreational Access for Alaska Program

Estimate (Total Costs in thousands of $) Project Description ~-FFY~K~ FFY 00 1 FW 01 Glenn Highway: Matanuska Glacier : Scenic Overlook Haines: Ferry Terminal Interpretive Exhibit Gaines Highway: Eagle Viewing ’ Center to Klukwan Trail __..~. -.~__-~_- ~~- Hatcher Pass: Scenic Overlook & / Trailheads 2,700.O; 1,530.O’ Homer Spit: Mud Bay Boardwalks ?------. .~-.- --&...-- Homer Spit: Pedestrian Pathway ; ---.-r--.+-m.-- -- Homer: Beluga Lake Trail Construction in--- Homer: Fishing Hole Handicapped : Access ---- ~--~,~_ yg&540 Homer: Scenic Overlook -T.----e ---- .O Juneau: Glacier Spur Trail __,._-____.___- Juneau: Auke Bay Ferry Terminal / f I Enhancements A- %5.0! 1 ,000 .0 j I Juneau: Glacier Highway UAS / r Overpass 7oo.oi -. Juneau: Glacier Highway-McNugget 1 ; 1 to- DelRae Pedestrian Improvements j / i 1,500 .O Juneau: Mendenhall River Pedestrian. i Crossing ------T Juneau: North Douglas Hia& Trail i &SE!?: .O Juneau: Thane Road: Main St&# to i Ferry Terminal Pedestriah f%&ities : Kenai Spur Road: Unity Trail r- Pedestrian/Bike Path 200.0, LIL------1 500.01 Gnai: lsaak Walton Cenipground / Archaeolo@ql Investigation .-__ I 250 .O gtchikan: C&M@ Business District Sidewalk Improvements --.----=.---.-----.---- -.-.-~ Ketchikan: North Tongass -Bicv 160 ‘LO -King Co?&: Pathway Construction ; 210.0: -King -. Salm&‘: Pathway Construction i- 150.0~..--.. 450.01 Ksdiak: Fort Abercrombie Historic y 1.0

Matanuska-Susitna: Bin Lake ’ -___Pedestrian/Bike Path Construction Matanuska-Susitna: Palmer Pedestrian/Bike Paths Construction 1 Matanuska-Susitna: Palmer-Wasilla? ~~ Pedestrian/Bike Path Construction

Phases: 2-design; 3-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation.

Final Statewide Transportation Improvement Program Page 55 Trails and Recreational Access for Alaska Program

Estimate (Toi :al Costs in thousands of $) Project Description Score- ~-~ Phases 1 Appr :1 FFY961 FFY97 1 FFY98 Matanuska-Susitna: Wasilla-Bogard Road and Crusey Pathways A 4 : McCarthy Road/Richardson Highway Interpretive Waysides 69.2 2,3,4 33B McCarthy: Kennecott River Footbridge Construction A 4 338 McCarthy: Kennicott R. West Wayside 66.4 2,3,4 McCarthy: Kennicott River East Wayside 2,3,4mm Naknek: Pathwav 69.2 2,34 33B loo.r 50.6 2,3,4 A 4 338 250.0: Nome: Rocker Gulch Wayside 68.4 2,3,4 North Pole: Bike Trail Rehabilitation and Connections 78.6 234 33B North Pole: Hurst-Dawson Bike Trail 61.8 2,34 Northern Region: ADA Pedestrian Facilities 88 2,3,4 33B 150.0; 150.0; 150.1 _____Northern Region: Tourist Signage A 2,3,4 338 -_215.0! 235.01 Old Harbor: Beaver Lake Trail 2,3,4 Ouzinkie: Trails Rehabilitation 54.2 2,3,4 Palmer Wasilla Hwy: Ped/Bike Path Phase 2 76.6 2,3,4~-- 338 200.0: 800.r Parks Highway: Denali Park Pedestrian Access Safety i Improvements 85.6 2 54 ~~~ 33B 280.01 1 1,570.r Parks Highway: Denali View South Viewpoint 84.4 234 33B i-- -21 020.0;_~ ~. Parks Highway: MP 305-351 Fairbanks-Nenana Scenic Waysides 60.8 2,3,44 Parks Highway: MP185-East Fork Wayside 67.6 2,3,4 Petersburg: Ferry Terminal Visitor Information Sign 71 2,4 338 Portage Valley: USFS Trail System 76 2,3,4 338 Richardson Highway: MP 127 - Gulkana River Wayside 63.2 G-%4 Richardson Highway: MP 262.5 Scenic Wayside A 234 338 Richardson Highway: MP 29 - Worthington Glacier Wayside A 4 338 Seldovia: Waterfront Boardwalk 65.4 2,3,4 ~~ Seward Highway: Bird Creek Pedestrian Underpass 69.8 234 338 Seward Highway: Bird Point PathwavlWavside 81.8 2,3,4 338

Phases: P-design; I-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation. Alaska Department of Transportation and Public Facilities Final Page 56 Trails and Recreational Access for Alaska Program

Estimate (Total Costs in thousands of $) Project Description----->FY 991 FFY O~-F~~-____~ ~ Matanuska-Susitna: Wasilla-Bogard i Road and Crusey Pathways .-----,.----.~+-~-eI 555.01 McCarthy Road/Richardson Highway i 3 Interpretive Waysides 500.01:--->---- McCarthy: Kennecott River Footbridge Construction A_.-- < McCarthy: Kennicott R. West Wayside/ 500.01: 1 McCarthy: Kennicott River East ; Wayside i i .___ 125.0 Naknek: Pathway j 10000 ; Nenana: Bike Trail Construction -i- L-T?. 50.0 T---- 5 Nome: Solomon Waysides q-.-- ___- Nome: Rocker Gulch Wayside I 50.0: 270$- North Pole: Bike Trail Rehabilitationi- I :_ 1 and Connections B -& North Pole: Hurst-Dawson Bike Trail ’ f50.0’ 875.0 -+i----I-- Northern Region: ADA Pedestrian 1 $ Facilities ! Northern Region: Tourist Signage i $ Old$ 200.0 Ouzinkie: Trails Rehabilitation ! i f- 50.0 Palmer Wasilla Hwy: Ped/Bike Path i 7 I Phase 2 SL t ! Parks Highway: Denali Park I’ 1 i 2 I Pedestrian Access Safety $, 1 $ 9 i ; Improvements ., ( -+ : Parks Highway: Denali Viiw South 1 I Viewpoint ‘, 1 i L I Parks Highway: MP &J5-351 I < Fairbanks-Nenana Scer%c Waysides 1 i -75.oj 500.0 L Parks Highway: MP185East Fork 1 Wayside . : 150.4 750.~ -----v- Petersburg: Ferry Terminal Visitor j Information Sign i 1 j +-- Portage’Velley: USFS Trail System-! --j--- $ __-_- Richardson Highway: MP 127 - L $ Gulkana River Wayside.---.~..----;------~-..--.~------90.0; 510.0 f%chardson Highway: MP 262.5 ( ‘Scenic Wayside ------L.p.--c --___ RicfQrrdson Highway: MP 29 - i ] / Worthington Glacier Wayside +.--.----+------Seldovia: Waterfront Boardwalk_~.. _ L A!!*e~~ -ELOL- Seward Highway: Bird Creek j 2 Pedestrian Underpass i I 2,000.0; Seward Highway: Bird Point j Pathway/Wayside

Phases: P-design; 3-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation.

Final Statewide Transportation Improvement Program Page 57 Trails and Recreational Access for Alaska Program

mate (Tot; Project Description Score ~~ Ap_pr Seward Highway: Girdwood: Bird Point Pathway 82.8 338 Seward Highway: McHugh Creek Upper Wayside A 338 Seward Highway: Potter Marsh-lndiar Path 79.4 338 Seward Highway:____- Sixmile ~.Creek -~ - Trail- A 33B Seward Highway: Turnagain Pass Reststop 79.4 338 Seward: Pathway 67.0 Shishmaref: Trail Staking~~__ -~ ~. ~~ 98 33B Sitka: Ferry Terminal Walkway 80.6 33B Sitka: Castle Hill A 33B S-way: River Bridgeidening 56 Skagway: Klondike Highway Gold Rush Centennial Enhancements A Soldotna: Kenai River Walkway -.___Construction 65 Soldotna: Marydale Water Quality Sedimentation Basin Construction A 338 Southeast Region: ADA 150,0/ Improvements 88 338 --+.~--- 150.0 Southeast Region: Scenic--__ Viewshed ~ 64.2 338 _.-- 50.0:_;__50.01.-- 50.0 Sterling Highway: Upper Kenai River i Wayside A 338 420.01 Taylor Highway: MP 160: Ft. Egbert- ---.__Eagle Historic Site 61.6 Taylor Highway: MP 86 Wade Creek Drae Wayside 64.6 Tok Cutoff/Nabesna Road: Interpretative Waysides 61.2 Unalaska: Airport Beach Road Pathway 88.6 338 200.01 f3-~,01 LValdez: Crooked Creek Fish Viewing 47.2 Valdez: Richardson Highway: MP 8.5 Trailhead Parking 56.2 Watchable Wildlife Signs 61.4 Wrazll: Airport Loop Trail 39.6 Wrangell: Petroglyph Beach Access 78.4 338 Wrangell: Scenic Turnout Back Channel 53 Yakutat: Railroad Trail from School to Airport A 338 22o.oi ail- -~ - Program Total: 20,OOO.Oj 20,257.0] 20,135.O

Phases: P-design; 3-right of way; &construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation.

Alaska Department of Transportation and Public Facilities Final Page 58 Trails and Recreational Access for Alaska Program

Estimate (Total Costs in thousands of $) ___-- ~9!3JTFEiiqFpIFYPro’ect Description ____- 01 Seward Highway: Girdwood: Bird Point Pathway _____ ------..+ __.- Seward Highway: McHugh Creek / Upper Wayside Seward Highway: Potter Marsh- i Indian Path -______-~ 4,OOO.O’: .--~db-----__I

Seward Highway: Turnagain Pass Reststop ___ -.-t Seward: Pathway .-____-~~~~. i-- ~--~50.0 -_- ~~200.0’ .___.- Shishmaref: Trail Staking --/- Sitka: Ferry Terminal Walkway j .- .-l.--.. ~ Sitka: Castle Hill Skagway: River Bridge Widening -~-_ i 300.C Skagway: Klondike Highway Gold Rush Centennial Enhancements ---i------.i Soldotna: Kenai River Walkway 1 j t 8()0.0/ Construction -A- -&.3G??----t_-_..- Soldotna: Marydale Water Quality ) :i I Sedimentation Basin Construction j i -:v------;i F--- Southeast Region: ADA 1 I Improvements __ ; -_i-. Southeast Region: Scenic Viewshed-j 50.0’ 50.01 5o.c Sterling Highway: Upper Kena#&er i . i, Wayside .-.y,3:: ?i Taylor Highway: MP 160: Ft. Egb@rt- 1 175*o/ wle Historic Site ^ :i.: / 1 Taylor Highway: &lP 86 Wade.‘&reek [ 1 Dredge Wayside :’ ---.-----

Phases: P-design; 3-right of way; 4-construction Based on estimated federal program amounts. Subject to reauthorization of ISTEA and annual program re- evaluation.

Final Statewide Transportation Improvement Program Page 59 Appendix A Changes in Proposed Program Between Draft and Final 1996-1998 STIP

National Hiahway System Anchorage: 5th16th Avenue Surface Rehabilitation Moved out one year to better coordinate with enhancement project.

Anchorage: Glenn Hwy: Gambell to McCarrey Reconstruction Advanced from 2001 to 1999 in anticipation of completion of MIS and LRTP by AMATS.

Anchorage: Minnesota Drive: Dimond Blvd.-International Airport Road Surface Rehabilitation Advanced one year to extreme pavement rutting conditions.

Anchorage: New Seward Hwy: Tudor to Chester Cr. Reconstruction Advanced to 1999 in anticipation of completion of MIS and LRTP by AMATS.

Anchorage: Seward Highway: 36th-5th16th Surface Rehabilitation Moved forward one year to better coordinate with enhancement project.

Ketchikan: Tongass: Pedestrian Improvements Moved up one year to balance program.

Whittier: Road Access to Whittier Programming adjusted to fit latest cash flow estimates.

AMHS: Annual Vessel Rehabilitation: Matanuska Solarium Refurbishment Moved out one year to balance program.

AMHS: Aurora Deck Renovation Moved forward one year to balance program.

AMHS: Aurora Shipboard Waste Handling System Moved out one year to balance program.

AMHS: Homer Mooring Improvements Moved forward one year to balance program.

AMHS: Multi-Purpose Replacement Vessel $2.5 M added based on swap of funds with AMATS from FfA.

AMHS: Petersburg Mooring Improvements Moved forward one year to balance program.

AMHS: Taku Steam/Gray Water/Asbestos Moved forward one year to balance program.

AMHS: Tustumena Structural Fire Proofing USCG req. New project based on USCG requirement.

AMHS: Valdez Terminal Replacement Design moved to 1996 in hopes of capturing ferryboat discretionary funds from FHWA.

Elliott Hwy: MP 0 to 4 Reconstruction Moved up one year to balance program.

Glenn Hwy: MP 56 to 60 Rehabilitation, Moose Creek to Sutton Project swapped in program with MP 60-66.

Glenn Hwy: MP 60 to 68 Rehabilitation, Sutton Project swapped in program with MP 56-60.

Glenn Hwy: MP 97 to 100 Rehabilitation, Pinochle Hill Project moved out one year to balance adjustment to Whittier Access project.

Final Statewide Transportation Improvement Program Page A-l Haines Hwy: North Mackenzie Loop Road to Canadian Border All phases advanced one year to balance program.

Parks Hwy: MP 52-57 Rehabilitation Moved to 1996 by PEB.

Richardson Hwy: MP 115 to 129 Rehabilitation Moved out one year as part of changes from Whittier.

Richardson Hwy: MP 148 to 159 Reconstruction Moved forward to avoid FHWA “time trap”.

Seward Hwy: MP 18 to 25, Snow River to Falls Creek Budget and phasing changed per CR request.

Seward Hwy: MP 53.0 to 59.3, Canyon Cr. Rehabilitation Budget adjusted to reflect latest bids.

Seward Hwy: MP 8 to 13, Grouse Creek Canyon Moved forward one year to balance program.

Seward Hwy: MP 90 to 97, Girdwood to Bird Point Reconstruction Budget adjusted to reflect latest bids.

Seward Hwy: Windy Corner Realignment Project determined to be NHS and not TRAAK by PEB.

Communitv Transportation Program Aleknagik Road MP 5-8 New project based on reducing scope of original Alegnagik Road project MP 0 to 8.

Aleknagik: North Shore Landfill Road Phase 4 moved out one year to new Phase 3 (right-of way).

Aleknagik: Wood River Bridge New project. Scored by PEB and added to program

Copper River Highway: Million Dollar Bridge Rehabilitation Moved out one year to 2002 due to other projects moving forward.

Deering: Sanitatlon Road Construction Moved back due to other projects moving forward.

Denali Highway: MP 80-104 Resurfacing and Denali Highway: MP21-42 Resurfacing The funding years for these two projects were swapped at the discretion of the PEB.

Dillingham - Alegnagik Road MP O-5 Rehabilitation Originally, this project covered an 8 mile segment. It was made smaller due to an increased cost estimate. The second segment from MP 5 to MP 8 is shown as a separate project.

Fairbanks: Illinois-Barnette 81 Bridge Project budget reduced to fit remaining funds for STIP year.

Fairbanks: University/College Intersection Safety Improvements Reconstruction Moved out one year due to other projects moving forward.

Galena: Campion Road Landfill Access Road Resurfacing Phase 2 Moved forward 1 year to balance program.

Grayling: Sanitation Road Construction Moved forward based on restore by PEB.

Haines: Mud Bay 81 Beach Roads Intersection Improvements Moved back due to other projects moving forward.

Hoonah: Terminal Building Construction Moved back due to other projects moving forward.

Alaska Department of Transportation and Public Facilities Final Page A-2 Hooper Bay: Sanitation Road Construction Phase 4 year moved to coincide with other construction in village.

Hughes: Landfill/Cemetery Road Moved out one year to 2002 due other projects moving forward. lgiugig Sanitation Road lgiugig was removed from draft STIP because it was thought BIA would be constructing the project. Based upon new informationthat BIA would not complete project it has been returned to program in the year necessary to coordinate with other BIA work.

Juneau: Willoughby and Glacier Avenue Phase 2 advanced one year to balance program.

Kake: Ferry Terminal Building Scored by PEB and added to program.

Kenai River Bridge Access Road Rehabilitation Moved forward based upon revised scores.

King Cove Lagoon Bridge Replacement Re-scored and moved forward one year.

Kwigillingok Airport Access Road Improvements This project has been delayed until the community decides if they will relocate the village site.

Kwigillingok: Sanitation Road Error in PEB score data entry corrected; this lowered true score for project and resulted in it moving back 5 years.

Mat-Su: Wasillia Fishhook Rehab Project partitioned to include separate right-of-way phase apart from construction.

Mat-Su: Old Matanuska Road Rehab Inadvertently omitted from draft STIP. Added by PEB in April.

Matanuska-Susitna: Seward Meridian Rd. Upgrade/Extension Mistakenly left out of STIP in January. Placed in STIP based on final score.

Matanuska-Susitna: Vine Road Construction moved forward one year, based on ability to deliver project earlier than previously anticipated.

McCarthy Road: MP O-4 Reconstruction Moved back due to other projects moving forward.

Naknek 2nd Ave Reconstruction Moved back due to other projects moving forward

Naknek: Lake Access Road Rehabilitation Moved back due to other projects moving forward.

Nenana: City Streets Resurface - Phase 1 Moved forward 1 year to balance program.

Nome City Streets Inadvertently omitted from draft STIP. Added by PEB in April

Petersville Road Rehabilitation/Extension First year of Phase 4 funding moved out one year to balance overall CTP program.

Port Alexander: Tract B Boardwalk Repair Moved out one year due to other projects moving forward.

Prince of Wales Island: Hydaburg Highway Upgrade and Paving Moved forward because Phase 2 no longer needed and construction split into three segments.

Selawik: Landfill Access Improvement Moved back due to other projects moving forward.

Selawik: Landfill Access Improvement Re-scored due to confusion with another Selawik project.

Final Statewide Transportation Improvement Program Page A-3 Shungnak: Community & Landfill Road Reconstruction Moved out one year due to other projects moving forward.

Southeast Region Pavement SealcoatIOverlay New project based on Pavement Management System recommendations.

St. Michael: Sanitation Road Construction Moved forward based on restore by PEB.

Stebbins: Sanitation Road Construction Re-scored by PEB; year of construction set to coincide with project at St. Michael for construction efficiency.

Trails and Recreational Access for Alaska Alaska Highway: MP 1348-Robertson River Wayside Moved back one year based on score and other program adjustments.

Alaska Marine Highway Vessel Interpretive Displays Moved forward to coincide with 1898 Gold Rush events.

Chena Hot Springs Road: Chena River State Recreation Area Moved forward based on restore by PEB.

Dalton Highway: MP 215Arctic Loon Ponds Overlook Moved forward one year based on readjustments to program elsewhere.

Dalton Highway: MP 286-Toolik Lake Overlook Moved forward one year based on readjustments to program elsewhere.

Dalton Highway: MP150-Grayling Lake Wayside Moved out one year based on other adjustments to program.

Fairbanks: Chena River Bicycle Trail Moved up one year as result of restore.

Girdwood Valley- lditarod Trail Moved up one year based on restore by PEB.

Hatcher Pass Scenic Overlook 81 Trailheads Moved back one year based on score and other program adjustments.

Homer Spit Pedestrian Pathway Moved forward one year as result of Denali View South Viewpoint adjustment.

Homer: Scenic Overlook In draft STIP year was assigned based on coordination with other Homer area work. PEB adjusted year to more accurately reflect score.

Juneau: Thane Road: Main Street to Ferry Terminal Pedestrian Facilities Moved forward one year as result of Denali View South Viewpoint adjustment.

Ketchikan: Central Business District Sidewalk Improvements Construction phase advanced one year based on changes elsewhere in program.

Matanuska-Susitna: Big Lake Pedestrian/Bike Path Construction Moved out one year to coordinate with other work in area.

Matanuska-Susitna: Palmer-Wasilla Pedestrian/Bike Path Construction Moved forward one year because of change in Big Lake project.

Nome: Rocker Gulch Wayside Moved back one year based on score and other program adjustments.

Parks Highway: Denali View South Viewpoint Not constructable in 1996 per DNR; moved to 1997. Alaska Department of Transportation and Public Facilities Final Page A-4 Petersburg Ferry Terminal Visitor Information Sign Moved up on year to balance program.

Seward Highway: Bird Point PathwayWayside Moved forward to coordinate construction year with other work.

Seward Highway: Girdwood: Bird Point Pathway Moved forward one year as result of Denali View South Viewpoint adjustment.

Seward Highway: Sixmile Creek Trail Trail portions of Canyon Ck. project moved from NHS to TRAAK by PEB.

Final Statewide Transportation Improvement Program Page A-5 Appendix B Preliminary Program

1999 - 2001

Statewide Transportation Improvement Program

Alaska Department of Transportation and Public Facilities INDIAN RESERVATION ROADS PROGRAM TRANSPORTATION IMPROVEMENT PLAN STATUS TITLE 23 U.S.C. 204

- TA@ FHWA STATE MQ8 Y FY 87 FY Q8 FY QQ f3IA AREA OFFICES REGloN -__- --. FUNDING DATE [ FUNDING DATE FUNDING DATE- l-FUNDING -DATE I n 1 Connecticut lOO,OC0 03/01/94 Eastern Maine 841,000 OSIOWI Eastern Massachusetts 245.000 03lO1194 Eastern New York 058,000 03101104 Eastern Rhode Island 190.900 03/01/94 Eastern

4 Alabama 8.ooO wQllQ4 Eastern florida 412,000 03/01199 Eastern Mississippi 441,000 03lOll94 Eastern North Carolina [email protected] Q3lOll94 Eastern South Carolina 0 03/01194 Eastern

5 Michigan 488,Mx) 03l2OlQ6 405,000 08/04/95 5.000 O8lO4l95 Minneapolis Minnesota 2.078.500 03l2Ol98 2945,009 08lO4l95 2945,000 08/04/05 Minneapolis Wisconsin 2.438500 03l2Ol98 2,122.oOO 08lO4l95 2.182,OOO Oa/04/05 Minneapolis

8 Louisiana 18.CC9 03lOllQ4 Eastern New Mexico 34.740,too 0411o/96 38.498,OOO 04/10/96 Albuquerque 8 Navap Oklahoma 17.104900 03lO8l98 17.938,cxXl 02/28/96 Anadarko 8 Muskogee Texas 188.000 W2OlO8 1,091.cxX 02/28/96 Anadarko & Albuquerque

7 bwa 0 03r2Ol98 75.090 03l2Oi96 Aberdeen (L Minneapolis Kansas 198.090 02/28/98 20,009 02/28/96 Anadarko Nebraska 243,200 03l2Ol98 150,500 03l2Ol98 Aberdeen 8 Anadarko

8 Cobrado 1.887900 03MOl98 1.569.700 Olll9l98 Albuquerque Montana Jj.!gQg 04llOl96 9.883,~00 04/l O/98 Portland 8 Billings North Dakota 3505.300 03/20/98 S.231,OW I 03/20/98 Aberdeen south Dakota Q,ow500 03l2Ol98 8.553.ooO 03l2Ol98 Aberdeen Utah 04/10/98 04llOl98 ‘hoenix, Navajo 8 Albuque. Wyoming fci2I I 03/20/96 !+%%zI . 03/20/98 Billings

0 Arizona Q&gwrxl 04/l o/98 04/10/98 Phoenix & Navap Calibrmia 4.140900 08/18/95 08/l 8195 Sacramento & Phoenix Nevada 3304,009 03lO8l95 03/08/95 Phoenix

10 Alaska 04/lOl98 04llOl98 Juneau & Portland Idaho 04llOl98 04/I 0198 Portland h Phoenix Oregon 04/l O/98 04llOl98 Portland 8 Phoenix Washington 04/l 0198 04/l 0198 Portland ~-

TOTALS C Changed Values ~--~ Are Underlined

APL96FUN.WKl Adckess questions regarding this program to Mr. Patick Wlaschin (202) 388-9490 I)ATE 06/26/95 INDIAN RESERVATION ROAD(IRR) TRANSPORTATION IHPROVEMENT PROGRAM FOR FISCAL YEAR 1995 3RD QTR PAGE 1

FEDERAL LANDS IIIGIIWAY PROGRAM, 23 U.S.C. 204

!XA’l t: : 0) AlAl;KA FJIA AREA CODE E-JIJNEAIJ FFS 93.J

,------‘------‘---,------,------~~~~~~~------,------I------)------1---l------) l PROJECT PRE EtJGH l CONSTR l f’tiS,SIAl STATUS I I I‘( )I IWY I Ill)uTE I ID PROJECr NUtlllER I tH ( STATE I ) l IJNITS CON ENGR l I’ROJ TWAI. l RATING ) - - - - l ntr1, IIt:!~ERVI\‘rI~wr l tJIRlIlER l IIIGIMRY (BRIDGE) PROJ NAME I TO iDIAl) I HI(ET) AtiO~JNT ($000) I lCOttST TYPl ;- ..-. ----*.------I------l------l------l m-----m ------I------l------I---l------l I Yllt:C~tl t:C,YIJKlJK I0028 I 1044 I(9000) .o I 190.0 l 23 l STRI.DEF l I KAl.‘rl\l; I 1 KALTAG i&;k2 I 144NSD I I .o I 190.0 I 1 REPIAC l

RECEIVED I’A’I t; Ob/2b/95 IHDIAN RESERVATION ROAD(IRR) TRANSPORTATIOIJ IMPROVEMENT PROGRAM FOR FISCAL YEXJ 1995 3RD QTR PAGE 1

FEDERAL LANDS IIIGIIWAY PROCRAM, 23 U.S.C. 204

!> I A’l’t. : III ALASKA UIA AREA CODE E-JUNEAt FE’S 931

,___-__-___--_------~---~~~~~ ------l------,------,------I------__-----_- I TERHINI lPROJECTl PRE ENGR CONSTR I PklS,SIA STATUS I co1 ItJ’r Y / ROUTE ID PROJECT NUMBER I EM ( STATE I ) I IJNITS I CON ENGR PROJ TOTAL I RATING - - - - I AtIll Ilt:!it:I~VA’l’l otl I NIRIIIER IIIGtIHAY (DRIffiEl PROJ NAME l TO ( RIA I ) I HIIFT)I AMOIJtJT ($000) COtJST TYY I ‘. */- ..=== _ .y___j-s-_-,_-- mm------l------l------l------______I______------1 nlll;I x JH 0001 E00020 1 TWN I 1.00 l 5.0 5:o 0 I1 01 CIV\I)AI N I nrr’;cJott 000 1 I ANGOON l PAVl HG RECON I , - .------.-- .-----_ o6~~----l------l------~------I------li)------I------_ I YllhOtl-t~;oYIJKItK I E00342. l VILLAGE I 4.50 l 35.0 4,269.8 1 01 GRAVEL I I hAl.‘TAc; 4,754.e I NEWCOtJ I ,______---__------_-~-----_,-----___ _------I Ylll;clt~ -t;l,Yllkilk’ I 2.739.0 i 01 GRAVEL f I hOYItI~.llK 2.993.0 I RECONS ( ,------,------l------l------,------l------I------_------I llllls~ro I\AY 10035 1 E00344 1 mm 1 9.50 I .O I 500.0 1 01 GRAVEL I IhI 1.1.1 tlI;ItAti 1 Dl LLINGIIAfi I NEWCON I

Al.t.lll’lAtt ISI. 31‘. f;F.Ul(l;t

I Al.t:ll’l’IAlJ ISI.

I Ill1 I SI‘OI. HAY 10043 1 E00361 l HNIOKOTAK 1 4.80 1 5.0 I .o I 01 I GMVEL I I MAHOkOl’AK I HANOKOTAK I HANAOKOTAK IITS .o I l tJEWCOtJ l ,----~------_ ------I------l------l---_-___-“r”l------_,---l------, I t:oill1t: 10001 1 E00362 I T(MN I 6.00 I 10.0 1 .o 1 01 1 GRAVEL ) I Kl)‘l’Zt:HIlE

I I1FTllt:l.

I ~‘IIAI.t;VITSIK 0001 l CHALKY ITSIK

/ h(ll~llK .o I 01 I GRAVEL I ) liOT7,ElHIE I------

JUL 1 0 1995 iVU’F: 06/26/95 INDIAJI RESERVATION ROAD(IRR) TRANSPORTATION IMPROVE.HENT PROGRAH FOR FISCAL YFAR 1995 3RD QTR PAGE 2

!ZDERAL LANDS IIIGIIWAY PRCGRAM, 23 IJ.S.C. 204

:; I’A’I t. : 02 nl.nt;KA RI A AREA CODE E-JIJNEAIJ t-E5 931

,..- -.-.._-----__-----_I-___ ---- ,------I------~~~~~~------,------coN;Tn-----,------,------I PIIO.JECT I I’IIE ENGII I. I PtiS,SIAl STATUS I (‘(IIItI’rY ) ROUTE ; I I, PROJECT NIRfIIEII Et4 I STATE I ) UNITS I CON ENGR I’ROJ TOTAL 1 MTJNG I - - - - I A\111b I~t:!;ERVn’l’lott I NIRiHER JIIIGIMAY (DRIDGE) FROJ NAME 1 TO ( DIA I 1 HI (ET) I Ati0IINT l$OOO) ICONST TYP ) =-. ~ ------I------,------,------,------______I______I______1 t.ot~iit, I0001 i E0038D I SOUTll .oo I 5.0 .o I 01 1 GRAVEL 1 t:(~I’%t.lIIJt: I 0001 I CIIITINA I NORTII I .O 5.0 I I NEWCON ,------~~~~~----~------I------______-____,____-___l______l , WlcAHGEl.1. PERE E00391, I INDIAN RIVER 10.0 I 01 I GRAVEL I I KAhF: I SITKA I ‘TOWN 10.0 I I NEWCON I I------,,,;;;------I-~s,------_ ------,------,------I 1 nt,rllt:i. looes 4.60 01 I GMVEL I I ~111 tlllAc;AK 1 QIJINIIAGEK I EAST 5:: I I NEWCON I ,------I------,------I------,------I------,------, ) YIIKOtl-KOYIJKIIH I0090 E00431 I AIRPORT 19.0 I 1,890.O I 01 I GRAVEL I 1 GA1 EtlA (LOUUEIJ) 1 GA1 EttA I LOUDEN LOOP AD 71.0 I 1,980.O I I NEWCON I ,------I------,------I------‘------:,--I--~---’------,------, i I\ARllOW tJTll SL 10042 E00451 I COLVI LLE RIVER 5.0 I 01 I GRnVEL I 1 tKX)I K!;IIT I NIJIQSUT I NIJIQSUT .o I ------I------____-,-___-_-__“Ip__f____----~_~~”-____~ ) Wl~AtJc;t:l.l, L’ERE E00460 I SOUTH 5.0 I 01 I GMVEI. I I KAKK I 0001 .o I 5:: I I NEHCON I (___.._. - _~~______---______~-~onT!-----_____-__ _------,------I------,------, I Al t.IJI’lAtl 1Sl.A E00461 I RED COVE ROAD .oo 10.0 I 01 I GMVEL I , SAttl, I’01 tlT I 0001 SAND POINT I LAND FILL .o I 10:: I I NEWCON I (.~~__~_------__--,~~~~~~-~ ------I------I------,------,------, ( t,lI.sKfIKWItI I0056 E00465 I KALSKAG IfWY 5.00 .o I 80.0 I 01 I GRAVEL I , i.t~WF.11 KAl.!;tiAG KALSYaG I ROCK QUARRY 500.0 I 560.0 I I RECONS I ------I------I------,------,------, ( AlE~J’l’lAt4 IS1.A ~0001 E00468 I SOUTH 1.00 20.0 I .o I 01 I GRAVEL I I AlCTlC VII.IN;E I 0001 ARCTIC VILLAGE I NORTII .o I 20.0 I I NEHCON I ‘------~~~~~------Eoo;;;------^-I--,------_____------I------,------,------, l Al.F,~l~l’lAN ISIJI I FIRST ST 1.10 .o I .o I 01 I GRAVEL I 1 ntxrntr I 0001 TOGIAK I AIRPORT 10.0 I 10.0 I I NEw.xN I (.------loons------~o~~~;------‘--‘------I------,------,------, I Al t.IJI’IAtt ISlA I SOUTH 50.0 I .o I 01 I GRAVEL I 1 Cl 1Ic:I.E 0001 CIRCLE I NORTH .o I 50.0 I I NEWZON I ,_---__-__---___-____I______------Eoo;;;------,------____-_------I------,------,------, I tn XlE 10055 ( SOUTH 4.20 100.0 I .o I 01 I GRAVEL I I IltiAlAt~l t.tT UNAIAKLEET I NORTII .o I 100.0 I I NEWCON I ------I------I------,------,------,

RECEIVED JIJL 1 0 1995 U.t.A. URANCIIOf I'HOCRAM OPERATIONS IRl’t: 06/16/Y5 It~I~IAN I~ESEIIVATION ROAD(IRR) TRANSPORTATION IHPROVF.MENT PROGRAM FOR FISCAL YF.AR 1995 3RD QTR PAGE 3

FEDERAL LANDS IIIGIIWAY PROGRAM, 23 U.S.C. 204

‘~l/\ll.: II,’ f\l.A!;hA III A Jwr:n CUIX L‘-Jlllit:AU t‘t s 931

I------,------,------I------,------,------,------I------,------, I I TERMINI I PROJECTI PRE ENGR I CONSTR I fflS,SIA( STATUS I I (:oIuIry ; ROUTE I ID PROJECT NUHDER I FH ( STATE I ) I 1JNITS I CON ENGR I PROJ TOTAL I RATING I - - - - I I Afll, IIt.!iEI~VA’rIIul I NlftltlER IIIIGIIWAY (DIIIDGF:) PROJ NAME I TO ( DIA I 1 I HI( AMOUNT ($000) ICONST TYPI I”_. ---“------“------,--““--“-,-“-----””-”-”------l”------””------,-““““--(“-“------”------I ----I-----I I IIt ‘I 1lF.l. .o I 01 I GMVEL I I I IlllllllfrK 000 1 I TIIIJUIIAK 1 RECON ------‘l”--l_------l------T; I trc *IL 10085 1 E00494’ 1 OCEAN 1 2.60 I .O .o I 01 I GMVEL I I WA1.E:; I WALES-TIN CITY 1 LOPP LAGOON 25.0 I 1 NEWCON 1 ,------~-----_,__-_-____------,------~------~------~~~~------I------,------, I t>FtiAI-c03K IN I ooee EOO497 I BARBARA CREEK 1 5.00 1 .O .o I 01 1 GRAVEL I I !;F.l.l*1vI A ; SEI tX)VIA I BICKFORD CIRCLE 50.0 1 1 NEWCON I ,.~-.__.__-~_------_~------,---~------,-----____--.____-_-~------~------””1”------,------,------I I WllAtk;FI.I. PF.RE .o I 01 I GRAVEL I I t:nt;t: 0001 I WRJiNGEL.1. 1 ROUSING I NEWCON I _____----“r9__~______,______, I I? _* TOTALS * -4s 3. ! 12,611.e I ,f 14.846.0 l I

RECEIVED JUL 1 0 199s B.1.A. BRAM(21OF I'II()GI{AM OPERAHONS IUll’t: U6/26/95 INDIAN RESERVATION ROAD(IRR) TRANSPORTATION IHPROVEHENT PROGRI\H FOR FISCAL YEAR 1995 3RD QTR PAGE 4

FEDERAL LANDS llIGllWAY PRCGRN4, 23 U.S.C. 204

!;‘I Al t. : 0% nln!;t:A BIA AREA COUE E-JUNEAU f’FS 932

,------I------,------,------,------,------,------,------,------, I I I TERMINI I PROJECT I PRE ENGR I CONSTR l PHS,SIAl STATUS I I c’olln’ry I I1OUTE 1 ID PROJECT MMJJER I fl4 ( STATE I 1 l UNITS l CON ENCR l PROcJ T

RECEIVED JUL 1 0 1995 DATE 03/12/96 INDIAN RESERVATION ROAD(IRR) TRANSPORTATION IMPROVEMENT PROGRAM FOR FISCAL YEAR 1996 2ND QTR PAGE 1

FEDERAL LARDS HIGHWAY PROGRAM, 23 U.S.C. 204

STATE: 02 ALASKA BIA AREA CODE P-PORTLAND FFS 931

,------,------I---,------l------l------l------,------l------l------l TERMINI IPROJECT PRE ENGR l CONSTR I PMS,SIAl STATUS I I COUNTY 1 ROUTE ; ID PROJECT NUMBER I F?4 ( STATE I ) l UNITS I CON ENGR I PROJ TOTAL l RATING l - - - - l 1 AND RESERVATION I NUMBER lHIGHWAY(BRIDGE)PROJ NAME I TO 4 BIA I ) I flI(fTT) I AHOUWT ($000) ICONST TYPl ~~~~~~~~~~~~~~~~~~LI~~~~~~~~~~~~~~~~~~=---~----~~~~*~~~~~---~~~~~~~~~~~~~~*~,*~*~~~~~~~~~~~~~~~~~,~~~~~~~~~~~~*~ I ------I------=--( l OUTER KETCH1 I0002 l AIRPORT ROAD .30 I 3.0 I 147.0 I 80 I tmCP2i l ' l METLAKATLA-ANNETTE l ; AIRPORT k"::: 2(4) l AIRPORT ROAD I I RECONS I ,------,------I---l------l------l------1 - - - _____":"_~______"'Ip__I______,______---l

l TOTALS l 147.0 l

I 155.0 l I I I------_-____------_------I------)------l RECTO lP OFFICE OF l AREA ENGINEE UST RESPONSIBILITIES DATE:$&*,cy ; DERAL GHWAY AlXiINISTRATION DATE: y./z& (______--- ______-__-----_--__------____-_____ I IViL‘E 06/26/95 INDIAN RESERVATION ROAD(IRft) TIMSPORTATION IHPROVEHENT PROGRAH FX%7 FISCAL YEAR 1996 3RD QTR PAGE 1

f-EDERAL IhtiDS IllGllWAY PROGRNI, 23 U.S.C. 204

::rn1r.: II) nlJwt;n RIA AREA COI,E E-.JUtIF.AlJ f’f’S 93 1

,_~_~_____------_I______-----_ ------I------,------I------,------,------, I I TERMINI ) PROJECT PRE ENGR I CONSTR ) PtiS,SIA) STATUS I I (‘OIItJTY I IWIJTE ID PROJECT NlJt4BER fH ( STATE I ) ( UNITS CON ENGR I PROJ TOTAL I RATING I - - - - I A111B I~F.!;EI~VAT I OH I tIIIflHER IIIGIlHAY (BRIDGE) PRO.1 NAME I TO ( RIA I ) I MI (f-r) MolIt~r (Soon) I ( COtiST TY P ( I- _” ,.,_ r______,______I,------,------,------I------,------,------l 1 1\111Xr( ill IO001 I E00020 I TOWN I 1.00 120.0 I 20.0 I 01 I GRADA N I 1 Atll;rXQl 0001 I AttG0Ott ( PAVI t1G 800.0 I 940.0 I I RECON I , .._. - _^_.. - .--- - _^__ -I------I ------~-~~~~------~--~-~~------,------1--,~--~~~--,-~-~~~-~~, 1 Al.t:llrl ntr I SI. IOO3J E00352 20.0 I 4.303.0 I 10 I GRAVEL I I ST. I’AUI. I SAINT PAUL ’ I WEST 4.630.0 I I NEW ,------~------160aJ------,------j--;-B~------l------l------I 1 l\R 1 S’I’OI. UAY ZOO361 ) NANOKOTAK .o I 01 ( GRAVEL I I t!AtlcP:(lTAK I MANOKOTAK ) MANAOKOTAK UTS 5.021.0 I I NEHCON I (.~_~-_~------__--_~--~-~~~- ____-__------,------j----;o------,------,------I I Al.t.ll’l’I Ati I S1.A IO001 E00390 I T(-XiN 30.0 I 01 I CIJI.VERT I I tll t\ol.sll I 0001 I PETERSBURG I IIOIJS 1 NC 4eo.o I I NEWCON I ) ------/oa;;----I------I------I------l------l I KonltK E00382 ) TOWN 01 ( GMVEL I I KOT%EI~UE I ( KOTZEBlJE ( LANDFILL ( NEWCON I i------I------I-w,,,------,------l ------I------,------l ( I\ETIlt:l. i 0089 I E00411 I 4.60 I 3,464.0 I 01 I GRAVEL ( 1 ~11 I IJliAc;AK I QUI NIlACEK ( EAST 3,042.O I I NEHCON I I.------I------,------~------,------l------I ) [IAlUIc )W tlrll SI. 0042 600451 ( COI.VIL1.E RIVER I 3.00 I 14.0 4,146.O I 01 ( GMVEI. ) ( NtMll hl;lll I NUIQSUT ( NUIQSUT I I 352.0 4,512.0 I I NEW ______----I_--_____l______l .o I 01 ( CMVEL I 5.0 I I NEWCON ( ------l---o;---l------’ 30.0 I I GMVEL I 489.0 I I NEWCON I ------I------,------, 11.993.0 I I I 25,113.0 I I DATE 03/12/96 rtmm ftk3ERVATI0N RoADtIm) TRANSPORTATION I~e~owzkmT PRoGRAb FOR FISCAL YEAR I997 2ND QTR PAGE 1

FEDERAL LANDS HIGHWAY PROGRAM, 23 U.S.C. 204

STATE: 02 ALASKA BIA AREA CODE P-PORTLAND FFS 931 I------,------,------,------,------,------,------,------,------, I I TERMINI lPROJECTl PRF ENGR 1 CONSTR l PMS,SIAl STATUS l I ROUTE ; ID PROJECT NUMBER I EM ( STATE 4 ) l UNITS l CON ENGR I PROJ TOTAL I RATING l - - - - l I NUMBER lHIGHWAY(BRIlXElPROJ RAI4E I TO ( BIA t l I HI(FTlI AMOUNT ($000) I ICONST TYPl 1-=-----1-=5=------~1-~------,------*------======~I EIm*Ims--I--PPsE-II ; =zx==ra* ix=- saxw=ms s* ------I------I------I ------I I OUTER KETCH1 10002 l AIRPORT ROAD .o I 80 l HBCP2t l l METLAKATLA-ANNETTE l 1 AIRPORT ::"::,: 214) AIRPORT ROAD 5.0 I I RECONS I ,------l------l------,;-,--I---;;---l------' I OUTER KETCH1 10001 I WALDON POINT ROAD I 2.50 I 3.0 l CHIPSL 1 l METLAKATLA-ANNETTE l ! AIR1504 ;:':%.S I HATCHERY ROAD 100:s l 1 SEALNG 1 l------l------l------l------~------~------~~~------I------l------l

I l TOTALS l 3.0 92.0 1 -- -- q5.5 I

DATE:~-~A-~( ;

GHWAY AIMINISTRATION DATE:~*/t& - ______.__ 1 I)ATF. 06/26/95 INDIAN RESERVATION ROAD(IRR) TRANSPORTATION IHPHOVEMENT PROGRAH FOR FISCAL YEAR 1997 3RD QTR PAGE 1

FEDERAL LANDS llIGllWAY PROGRJV4, 23 [J.S.C. 204

XAI t. : 02 AlJw;n DIA AREA CODE E-JUNEAV FFS 931 ,------l------l------l------I TEIWINI l PRO.JECl’l PRE ENCR l 1 PMS,SIA) STATUS I n)tttrry 1 ROUTE 1 ID PROJECT NUMBER f?4 ( STATE I ) l UNITS I CON ENGR l PKhJ TOTAL 1 RATING l - - - - l AHIb IIF.SExIVAT1 OH 1 1wt4~~ER II lllGllHAY (BRIDGE) PROJ NAME I TO ( BIA 4 ) I HI(f-fT) I AMOlJt~ ($000) I CONST TY P l ----*------I------I’ ------l------,------l------l------I -----)------) l nll~;fNllr ~0001 EOOSOI 1 LOOP RD I .50 50.0 I 350.0 1 01 1 IlBCPZt I 1 AIlI;lK)H JUtiEAU 1 T&II SUBIJV 50.0 I 450.0 I 1 NW ------1-llo~~11------1------,------l------l------~ ) Ali(;lKJtl 10020 E00502, 40 30.0 I 340.0 1 01 I IIBcP2t l I Atl(;(xv~ AHGOON 1 SOUTH 30.0 1 400.0 I 1 NEH ,------l------l------I------I------I------~ 1 !;TF.Vt:tI!i v I l.IA 10044 EOO503 l RIVER 20.0 I 350.0 1 0: l ADDTIVE l I lll’1’t.l~ YUKOtI EVANSVI I.1.E 30.0 1 400.0 1 I RECON 1 l------.------;------l YIIKOII-KOYIJKIJK 10013 I AI.I.AKAKET ALIAMT l NEW TMlSITE I------I------

l TOTALS l I /

I /\lct.A Ill lct.‘“r(m DATE 03/ 12/96 INDIAN RESERVATION ROAD(IRR) TRANSPORTATION IMPROVEMENTPROGRAM FOR FISCAL YEAR 1998 2ND QTR PAGE 1 FEDERAL LANDS HIGHWAY PROGRAM, 23 U.S.C. 204 STATE: 02 ALASKA BIA AREA CODE P-PORTLAND FFS 931

,------,------I ------I------,------,------,------,------,------I TERMINI IPROJECTI PRE ENGR I CONSTR l PNS,SIAl STATUS 1 COUNTY I ROUTE 1 ID PROJECT NWBER I FM ( STATE I ) l UNITS 1 CON ENGR l PROJ TOTAL I RATING l - - - - l AND RESERVATION I NUMBER lHIGHMAY(BRIDGE)PROJ NAME I TO ( BIA t 1 I HI(FT) 1 AMOUNT ($000) I ICONST TYE ~*===1======-=-===~~~~~~~~~~~~~~~~~~~~~--=-=~~~=-~-~~~=*~=~~~~~~*~~*~~~~~~~~~~~~~ ~~11-=-=-----~-=---=~~~~*~~~~~~~~~~~~~~~~~~~~~. I OUTER KETCH1 10001 I WALDONPOINT RQAD l 2.50 l .o I 10.2 l 75 l CHIPSL l METLAKATLA-ANNETTE 1 1 AIR1504 i:5:kS I HATCHERY RCAD 10.0 1 20.2 1 I SEALNG ______---______I ------I------l------I ______~______--- 1------;o-;-I------l------1 + TOTALS * I 1&--... 20:2 1

I AREA ENGINEE ERAL t AREA DIRECT0 HWAYADMINISTRATION I------_------____---_____------.I

. I FORBST HIGHWAY (PHI TRANSPORTATION IMPROVBNENT PROGRAMFOR PBDBRAL FISCAL YRAR 1996 054an-96

FBDBFULL LANDS HIGHWAY PROGRAM, 23 U.S.C 204

STATB: ALASKA

Highway/Bridge Project Name

HP 0.0-2.9

PRINCE OF WALES BIG SALT LAKE ROAD I4P 14.0 TO 16.9 PFH S-1(7) RBCONST.

AUKB BAY BYPASS 2.0 MILES RBCONST

i I I I I I I I i i i I i i I i I ; ______I_------___;---__------_-_------;______-_-____ - __----;-______;______I______f ______I i ______i ______i ______Ii ______II_----_------II-----___-______II______tI____---_- __ I I I i ______I______i ______i______i ______-______I______-______) ______;______-- I I I I I,.------l------!------,_____-____----__,___--_-_-___-_-,-______I I I __ i I statewide I Total of Preliminary and Construction Bnginearing for all projects: 1,200 I I Total Program Coat for fiscal year: 12,200 Cost and Funding Summary Program Funds Available: 12,200 Balance: 0 L#+/ I Federal Lands Highway I State inclusion IProgram Approval: Date: //y?L 1 in STIP: Date: Y f - I RICHARD G. WASILL I PORBST HIGHWAY (PH) TRANSPORTATION IMPROVEMENT PROGF.AMFOR PBDERAL FISCAL YEAR 1997

FBDBWU LANDS HIGHWAY PROGRAM, 23 U.9.C 204

STATE: ALASKA

I I (Net ConstructionI I county 1 Route 1 Highway/Bridge Project Name 1 Project Limita/Tarmini 1 Type of Project lProgram Funding ) Contracting ) LBTTING I 1 Number 1 ) Amount($000) 1 Agency 1=i/== I TISE======l===l=II f 155.*=5== _I = = 13-IIILIEDP--LnlPII.liSsES11- I =IPaP===P=PP * ICIDIIIPIIIP j PIIIPsPI-.IIP==1s=II ya III===I=PI=P= l ===z= ;;;; =I===a ~2Z: ==== / I FH-16 WRANGBLL 5.0 MI RBCONST. 4,900 ) 1997 t I I------.------__----- ;--__----_- j ______I ______----- I______) ______-_ j ------I------.--- / I I / ------(--_------/ ______I______lI ______I ______------_ / __--_----__---- / ------/

;------.------.------;--_-----_- I______lI ______) I ______;___-____--__---- f ------I------[ I I I I I I ;-----~~~~.~--~~~~-~~~--;------_- I--____-____-______I ______* ______lI ______I ___-______--_ / _-______-_----- i ------l I I------.---- / --__----_- I------______I______lI ______-______- ;___-_____-___--- I---_------/ ------; I I I I I---.------; --_------I--______lI ______) ______I ______--_ / ____----_------1------j I I I I---...------/ ------;------____--______Il ______----- ;______;______--___---_ j ______---_----- / ------/ I I I / ------/ ------/ --______Il ______;______lI ______;______-__----- j ------/

I------; ------;______^___lI ______lI ______Il __--______--_ I---__------I --I ------1

I f I I I I I I------I------I------_-_--__----______;______-__---__---- I ----____-__---_----- Ii _------[_------\ ------1 f------f ------! ------______-______I______----______I ______/_---____-__----- ;_-____------/ ------/ I I 1 Statewide Total of Preliminary and Construction Engineering for all projecta: 1,700 I I L- I I I I Total Program Coat for fiecal year: 6,600 Coat and Funding Summary Program Funds Available: 7,300 I Balance: 700 I i I Federal Lands Highway 1 State inclusion IProgram Approval: Date; II Date: 1 4736 1 in STIP: i RICHARD 0: WASILL ; ------! ______------1 FOREST HIGHWAY (PH) TRANSPORTATION IMPROVBHBNT PROGRAMFOR PBDBRAL FISCAL YBAR 1998

PBDBRAL LANDS HIGHWAY PROGRAM, 23 U.8.C 204

STATB: ALASKA

I I INet ConstructionI Route 1 Highway/Bridge Project Name 1 Project Limits/Termini I Type of Project IProgram Funding 1 Contracting I Amount($OOO) I -_-**.*_IIIJ-P_I-PILDI-=111111 PRINCB OF WALBS BIG SALT LARB ROAD HP 2.4 TO 4.0 PFH S-l(a)

i i i I I i I i i I______I------I____------; -_-__-______I_-______f _____------1------f ------;

I______I______I______---______I______i ______i ______i ____._._._. i

i ______i ______i ______------j -__-----______i ______i ______i ______i ______i

Ii ______j ------j ------I------i / ------_-_------;i ------/ ------/ --___------1 I I ; __.______---I------; ------[ _-__------__------I------1--_-_------f ------___-__- ;______--1 I I i i I i I ; ______-__---_------1f __------I 1 ------_____! ------_------i ------____; ______I______[ I I statewide Total of Preliminary and Construction Bngineering for all projects: 1,700 1 I I I I Total Program Cost for fiecal year: 6.600 Coat and Funding Summary Program Funds Available: 7,300 I Balance: 700 I 3 I ( Federal Lands Highway /Program Approval: Date: /,/#/?d / ~~a~~I~?clu"io" Date: Y/ I RICHARD 6. WASILL 05-Jan-96

PARK ROAD3 AND PARKWAY3 (PR&P) TRANBPORTATION IMPROVEMENT PROGRAMFOR PBDBRAL FISCAL YBAR 1996

PBDBRAL LAND3 HIGHWAY PROGRAM, 23 U.3.C 204

STATB: ALASKA RLASKA NATIONAL PARKS

I INet Conatructionl county / Route I Project Number/Nama I Project Limite/Tsrmini I Length/Type of Work Iprogram Funding 1 Contracting I Letting 1 Amount($OOO) 1 Ag=w 1 Data ( /_ :saiiii===Ei = =ii=EES11= ~,="""":r..f I.CI.I**III-EDIPPIEtllliPS=3=I PISIPE==EIII=EI===LEllllP sDiDIIIEIIlsII=Illll LISs=II=PIPPP=IP Ps*===IPI=- _5.== 1P=P=P==IIIP 1 STATBWIDB I --_ INATION~~ PARK smvnx SPOT VARIABLB I VARIABLE LENGTH 1 Bet'd 50 I NPS (SAFBTY AND SIGN IMPROVBMBNTS I------I-----_---_ I______)______------f ______f‘B" ______I______-_ ;_-__------__--- I------1 STATEWIDE JNATIONRL PARK SBRVICB VARIABLE VARIABLB LENGTH 1 Bst'd 30 ND3 I I --- BMBRGBNCYPAVBMBNT RBPAIRS I I I I I I-_ ----__--_------__ I-_---_---_ / _-__--_---______-______I ______l ______'1""" ______/ ______-______--_ I--___-__------f ------1

I I------I------_ I------_------; ------______-______(___-______--____ I______-_ I------;------1 I I I f I 1 f I 1 ; --_------_- I-_--_----_; ------___-__--__------/ ______I ______; ______-______--_ I --__--_------_ I------1

I------1------;------j --___-______--______I______;______--- j ______--_____ /------/ I tI------_------I;_---__--__ ;-----__--__--_---___-----~----t i ______(______------I ;______j _____-----__-_- / ------/ I 1------j ------1------j ____--_-_-______-__-----j ______Il ______-__--_ / ______--- / ------j I I I ;------_..- / ------/ -_------_---_---__------;------___-___-__-______;______l _____-_-_--_____ I______-_----- j ------i

I------;------I-__------______--___------) I _-______-______Il ______) 1______II______--- I------1 I I I I I I l------j ------; ------___------.; --___* ______I ______fI ______^_ I ______-_- / ------1 I I------I------1-_---__--__--__--______I ______! ______I______f ______-__ f ------1 I statewide I Total of Preliminary and Construction Engineering for all projects: 10 I I i------l I Total Proqram Cost for fiecal year: 90 Cost and Funding Summary Program Funds Available: 90 Balance: 0 I IFederal Landa Highway I State inclusion IProgram Approval: Date: //@fi6 1 in STIP: Date: I kfCNARD G! WASILL I PARK ROADS AND PARKWAYS (PRLP) TRANSPORTATION IMPROVBMBNT PROGRAMFOR PBDBRAL BISCAL YBAR 1997

PBDBRAL LAWDS HIGHWAY PROGRAM, 23 U.9.C 204

STATB: AtAsKA ALASKA NATIONAL PARKS

I I (Nat ConstructionI I I county Route 1 Highway/Bridge Project Name 1 Project Limite/Tsnnini 1 Type of Project 1Program Funding I Contracting 1 Priority 1 Numhar 1 I Amount($000) I . . . ..*...... P...PP..P...L...... 1...... P. 1...... I...... *..I . . . . z:::: 1.1.. / . STATEWIDB ! ___ [NATIONAL PARK SBRVICB SPOT I VARIABLB 1 VARIABLE LPNGIH 1 Bst'd 50 1 NPS I I (SAFBTY AND SIGN IHPROVBMBWTS I I RBHAB I I I I -----__-----_------1------L-- I------_------I__--_____-_____------I------I______I__-^_------I------I STATBWIDB INATIONAL PARK SBRVICB VARIABLB VARIABLE LENGTH 1 Est'd 30 NPS I --- BMBRGBNCYPAVBWBNT RBPAIRS RBHAE (----_------_ I__--______------;------_____ ;------__ - ______j ______;‘;,,-I ------I------r ---- 1 RTE 10 1 KATWAINP BROOKS CAMP TO VALLBY 23.0 HI , WFLHD/PHWA 1 I VALLBY ROAD 10(l) OF 10,000 SMOKBS IMINOR GRADINQ & BA~B[ l------l ------; ------_--_------j ______l ______--~______------/ ______j

/------;------; ------______------I__ ------_------^__ I------__- /---_-______-+- _------/ ------_- /

I-- ______-__---) ------) ------l --_-______------_------I--___ - ______I______I______j ______j

I______I--_-_----- I------_____^____ I--_-____-___----_------I--______I------I------

i i i i i i i i i I-- _- ______1------I ------__---______! ______------!______[______-__---- I------* --__ /------_ 1 I I statewide I Total of Preliminary and Construction Bngineering for all projects: 240 1 I I I i i i Total Program Coat for fiscal year: 2,640 Coet and Funding Summary Program Funde Available: 2,640 Balance : 0

IFederal Lands Highway IProgram Approval: ,,a,-*: /,,&/T L / ~~;I~~C’U”i”n Data: I RICHARD 0. WASILL OS-Jan-96

PARK ROADS AND PARKWAYS (PR&P) TRANSPORTATION IMPROVBMBKP PROGRAMFOR FBDBRAL FISCAL YSAR 1998

FBDBRAL LANDS HIGHWAY PROGRAM, 23 U.9.C 204

STATE: AIASKA ALASKA NATIONAL PARKS

INat ConstructionI I I Project Numbar/Nams Project Limita/Termini Length/Type of Work IProgram Funding I Contracting I Lotting ( 1 Amount($ooo) 1 Ag=n=y Date ...... L...... P...PPP....P...P.E...... I ...... PP.....P P...EP...... P.. / ..E...... I STATEWIDE NATIONAL PARK SBRVICB SPOT VARIABLE VARIASLB LENGTH 1 Bet'd 50 I NPS ISAFBTY AND SIGN IMPROVBMBNTS RBHAS 1------l------l ------_-_-_-______;-----___---______------1------i-- ______----- ;-______j STATBWIDB INATIONAL PARK SBRVICS VARIABLE VARIABLE LBNGTH 1 Bet'd 30 NPS I --- I BMERQBNCYPAVBMBNT RBPAIRS 1 RBHAB I I______----_- I------I______--___-______I______---______i ------I____-______;______-___ I-_------1 I I I t i f I I J I______I______I______i ______------_-_---- I------_____-_--- I_--___-_------; ______1 i I f -----_-_------__I ------I___------______------(______----_--______------_ _------I--_---_-_ ------;------_------I _----, -_____I

I t I I / ----____------/ ------/ ___------______/ ------______- ;_-----______-- ;--_____--_----- I-______(

I I j ______------__; ------/ _____------____------; ------:------;------_-__------/ ______---- / ______----- 1 I I i I______I____------1------,------i i ------______;______;______;______1 I I i I f i f I I I f -----____------I------[ ___- -______-______------[______---______------_-_-~ -----______;--___---_------I_____-___-- 1

I I I I I______-______i ______i ______--______i ______------______I------;------/ I I I f I I I ------_---- -_-_-______I--_____------I______-- / i i i ,----‘------‘--‘- ,------______---l! --___------; ! ------1! I--- I I Statewide Total of Preliminary and Construction Bnginearing for all projects: 10 I 1 I I I Total Program Coat for fiecal year: so Cost and Funding Summary Program Funds Available: so I Balance: 0 I IFederal Lande Highway IProgram Approval: Date: /,i$‘& 1 ;~a:;I;:C1uaion Date: I RICHARD G. WASILL I Alaska Departmentof Transportation and Public Facilities Division of StatewidePlanning 3132 ChannelDrive Juneau,AK 99801-1798