Social Monitoring Report

Semiannual Report (April to September 2018) August 2019

IND: Railway Sector Investment Program

Prepared by the Ministry of Railways for the Government of and the Asian Development Bank.

This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Indian Government Ministry of Railways Asian Development Bank

Multitranche Financing Facility No. 0060-IND Loans No. 2793-IND, 3108-IND and 3623-IND Railway Sector Investment Program Track Doubling and Electrification on Critical Routes

Resettlement and Rehabilitation Implementation Status Semi Annual Report April - September 2018

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Contents 1. Introduction and Project Background ...... 1 2. Legal and Policy Frame Work ...... 3 3. Institutional arrangement and implementation mechanism ...... 4 4. Grievance Rederess Committee ...... 6 5. Progress on Projects ...... 6 5.1 Global Progress ...... 6 5.2 Important events related to LA and R&R from April to September 2018 ...... 7 5.3 NGO-Assistance to RVNL ...... 8 5.3.1 NGO contract for Sambalpur-Titlagarh project ...... 8 5.3.2 NGO contract for Raipur-Titlagarh project ...... 8 5.3.3 Assistance for -Tinaighat project ...... 8 5.4 General Consultant ...... 8 5.5 Daund-Gulbarga (Maharashtra Section and Sections) ...... 9 5.6 Sambalpur-Titlagarh ...... 9 5.7 Raipur-Titlagarh ...... 20 5.8 Hospet-Tinaighat ...... 20 5.9 Pune-Wadi-Guntakal ...... 28 Annexure I: R&R nomination of Technical Member for SIA ...... 37 Annexure II: Extension of R&R consultant in Hospet-Tinaighat project ...... 38 Annexure II: Site visit of R&R expert in Hospet-Tinaighat project in June 2018 ...... 39 Annexure III: Site visit of R&R expert in Sambalpur-Titlagarh project in September 2018 ...... 40

Table Table 1: Mobilization of GC Social Expert ...... 8 Table 2: Status of private land Sambalpur-Titlagarh ...... 11 Table 3: Land Acquisition issues of ST project ...... 18 Table 4: Details of payment towards LA for Sambalpur-Titlagarh ...... 19 Table 5: Status of APs in RT project ...... 20 Table 6: Proposed Land Acquisition in Ginigera village as per SIA study...... 21 Table 7: Type of ownership of affected land at Ginigera ...... 21 Table 8: Status of land acquisition Hospet-Tinaighat ...... 23 Table 9: Progress of Direct Purchase Hospet-Tinaighat ...... 23 Table 10: Status of dispute under 6(1) notification for Hospet-Tinaighat ...... 23 Table 11: Status of land acquisition in HT ...... 24 Table 12: Financial status of compensation in HT ...... 25 ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND ii Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Table 13: Summary of Land Acquisition in HT ...... 26 Table 14: Status of land compensation paid in HT under LA Act ...... 27 Table 15: Status of land compensation paid in HT under Direct Purchase ...... 28 Table 16: Status of land Acquisition and Resettlement ...... 33 Table 17: Details regarding Rehabilitation and Resettlement ...... 36 Figure

Figure 1: Map of India showing track doubling and electrification projects ...... 2

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND iii Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Abbreviation

ADB Asian Development Bank BPL Below Poverty Line CPM Chief Project Manager DG Daund – Gulbarga DGPS Differential Global Position System DM District Magistrate DPs Displaced Persons EA Executing Agency FHH Female Headed Household GAD General Arrangement Drawing GC General Consultant GCC General Conditions of Contract GRC Grievance Redressal Cell HT Hospet – Tinaighat HHs House Holders IA Implementing Agency India Indian Government INR Indian Rupees IP Indigenous People IPP Indigenous Peoples Plan IPPF Indigenous Peoples Planning Framework IR Inception Report LAO Land Acquisition Officer MOR Ministry of Railways NEFT National Electronic Funds Transfer NGO Non-Governmental Organisation NTH Non-Title Holder OSRC Orissa Space Applications Centre PAP/APs Project Affected Persons PG Pune – Guntakal PMC Project Management Consultant PWD Public Works Department RAP Resettlement Action Plan RFCTLARR Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act R&R Resettlement and Rehabilitation RO Resettlement Officer RP Resettlement Plan RT Raipur – Titlagarh RTGS Real Time Gross Settlement RVNL Rail Vikas Nigam Limited SC Scheduled Caste ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND iv Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

SIA Social Impact Assessment SLAO Special Land Acquisition Officer ST Scheduled Tribe ST Sambalpur – Titlagarh TH Title Holder USD United States Dollars

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND v Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

1. Introduction and Project Background A Framework Financing Agreement (FFA) was signed on 8 July 2011 between the Indian Government (India) and the Asian Development Bank (ADB) for the implementation, through the Ministry of Railways (MOR), of the Railway Sector Investment Program (RSIP) which is an integral part of the investment program of MOR. A Multi Tranche Financing Facility (MFF) has been approved by ADB on 31 August 2011; MFF is intended to finance individual projects of RSIP. ADB provides finances to these projects under RSIP through tranches. The latest Tranche 3 has been executed between ADB and RVNL on 16/03/2018 and effective from 07/06/2018.

The purpose of the RSIP is to improve connectivity to the areas covered by the track doubling and electrification project. These areas are located in underdeveloped regions of the country, though rich in minerals and related industries. The projects will add to the capacity on these constrained routes. The lines carry heavy traffic such as ore, coal, and cement, which are best carried by rail instead of road. The modal shift of bulk goods from road to rail would also reduce carbon emissions.

Railway improvement component of RSIP consist of doubling of about 840 km rail routes of comprising of (a) Daund-Gulbarga (224 KM); (b) Sambalpur-Titlagarh section (182 km); (c) Raipur-Titlagarh section (203 km); and (d) Hospet-Tinaighat section (229 km) and electrification of the Pune-Wadi-Guntakal section (641 km). The scope of projects is to provide a second line along the existing single line by constructing the roadbed and either extending or constructing new bridges, provision of facilities for passenger and staff, providing and laying track, signalling and telecommunications and general electrical works. The scope of the electrification project is to provide overhead Railway electrification in the Pune-Wadi-Guntakal double line section.

Out of five projects only two, namely Sambalpur-Titlagarh and Hospet-Tinaighat doubling projects require land acquisition. The other two doubling projects (Daund-Gulbarga and Raipur-Titlagarh) involve resettlement of Non-Title Holders only. In Pune-Guntakal electrification project, there is no land acquisition or resettlement of Title holders (TH) and Non Title Holders (NTH). In general, the resettlement planning documents related to above projects were disclosed in September 2011.

The land acquisition will impact nearly 1394 APs in Hospet-Tinaighat and Sambalpur-Titlagarh doubling projects. The both project will require about 108.076 acres of private land for completion of doubling work. On completion of the detailed engineering designs, Resettlement Plans report has been prepared based on a census of the Displaced Persons (DPs) and socio economic survey of major impacted DPs. Social Impact Assessment (SIA) of the displaced persons has been undertaken so as to determine the magnitude of displacement and prospective losses, identify vulnerable groups for targeting, ascertain costs of resettlement.

The monitoring for the land acquisition is done by the consultants hired by RVNL in both the projects after demobilization of NGO in the year 2016. To meet the challenge of tedious and lengthy land acquisition process in the country, well experienced and qualified consultants have been hired to assist RVNL for monitoring involuntary resettlement and land acquisition.

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 1 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

One of the main reason for delay of the Hospet-Tinaighat and Sambalpur-Titlagarh doubling projects is because of lengthy process of acquisition of land in the country. Government takes long time to approve the notification as per act, for example 11(1) notification issued by government has to be approved then only 19(1) notification can be issued by the Collector. The Odisha and Karnataka government should speed up land acquisition process to avoid further delay of RVNL railway projects in the state, seeing the land acquisition is the responsibility of the state Government. Nevertheless, monitoring of the Resettlement Plan at each subproject is the core responsibility of RVNL, and is implemented effectively through its Project Implementation Unit (PIU).

The current report is the semiannual Social Safeguard Monitoring Report prepared to comply with the loan covenants covering the period from April to September 2018 and with the implementation arrangements under Schedule 5 of Loan agreement between ADB and RVNL.

The projects which are financed by the present ADB loan, are located in the states of Chhattisgarh, Odisha, Maharashtra, Karnataka and Andhra Pradesh. These projects are shown in red and blue in the map here under figure 1.

Figure 1: Map of India showing track doubling and electrification projects

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 2 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

2. Legal and Policy Frame Work The e ill The ‘ight to Fai Copesatio ad Taspae i Lad Auisitio, ‘ehailitatio and Resettleet Aedet Bill , also ko as Lad Bill itodued the e government in March 2015 to remove the consent clause for acquiring land for industrial corridor public-private projects, several infrastructure, affordable housing and defence did not get approval in Parliament. Since new Land Acquisition Amendment Bill 2015 has not come in force with the act of parliament, Land acquisition in India is governed by the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act (RFCTLARR) Act, 2013 and is effective from 01/01/2014. Till 2013, Land Acquisition in India was governed by Land Acquisition Act 1894. Also, Ministry of Railways has streamlined rules through circular for the acquisition of land through any existing law of State/Central Government, direct negotiation with landholders and Railways (Amendment) Act 2008.

In Sambalpur-Titlagarh project, Odisha Government is acquiring land under new act RFCTLARR, 2013 effective from 01/01/2014. In this regard, a notification was issued by Odisha Revenue and Disaster Management on 07/02/2014 clarifying award in LA cases initiated prior to 31/12/2013. According to above notification, LA proceedings initiated under the LA act 1894 in which 4(1) notification and 6(1) declaration have been issued but where no award has been passed as on 31/12/2013, the provision of the new act in relation to determination of compensation and award shall apply. A notification issued by Odisha Revenue and Disaster Management Department on 7th February 2015 for the new Land Acquisition Amendment Bill also has been inforce for land acquisition for Sambalpur-Titlagarh project by Revenue Authority.

In Hospet-Tinaighat project, Karnataka Government has partly acquired land under Land Acquisition Act 1894 for declaration 6(1) issued before enforcement of act RFCTLARR, 2013. To speed up the progress of land acquisition, State Government has notified new act to go for direct purchase from land owners under section 107/108 of RFCTLARR, 2013 by providing higher compensation and rehabilitation than stipulated in act. The new LA act (Karnataka) has come into force from 17/10/2015. Government of Karnataka has issued an order under new LA Direct Purchase Act letter no. 54/2014 under which government has permitted to direct purchase of the land for the following works, i.e for the construction of houses, Grave - yard, multiple – village water supply, electrical grid, under – drainage, road construction or widening of roads, construction of over bridge/under bridge, construction of Railway tracks, Airport. And for all their needful –public-works, the required land is limited to 100 Acres and can be purchased directly from the land owners.

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 3 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

3. Institutional arrangement and implementation mechanism 3.1 Rail Vikas Nigam

Rail Vikas Nigam Limited (RVNL) is acting as Implementing Agency (IA) for execution of various doubling and electrification project including the resettlement and land acquisition activities under RSIP. The RVNL organisation has been fully set up for taking up RSIP programme. Five project implementation units (PIUs) have been established for managing a doubling or electrification work. Each PIU is headed by a CPM. The headquarters of CPMs are based in Mumbai, Waltair, Raipur, Bangalore and Pune. Further, under CPM there is a project director for each package. Project management consultants (PMCs) have been engaged to support IA for construction supervision as the Engineer. One of the Project Director from each PIU has been entrusted with additional charge RP implementation for all packages of a subproject and is responsible for overseeing the LAR activities on behalf of each PIU.

The RVNL is responsible for the overall implementation of the social safeguard measures recommended as per the policy and monitoring of the resettlement plan. In implementing the resettlement plan, the RVNL conducts the following activities:

(i) Ensure that the resettlement plan process, policies and principles are disclosed to the affected communities (i.e. during resettlement plan preparation and periodically during resettlement implementation) in order to maintain participation and transparency; (ii) Ensure that (a) compensation unit rates have been established at the prevailing local market value for all categories of lost assets, and (b) the appropriate rates are developed in full consultation and agreed with affected persons as estimated by the Revenue Department as per the policy in Sambalpur-Titlagarh; (iii) Periodically supervise resettlement plan progress and activities; (iv) Co-ordinate and work with the Revenue Department and concerned government authorities; (v) Conduct consultation with affected persons and local communities in case of any doubt; (vi) Establish database for affected persons for Land Acquisition by Revenue Department; (vii) Have responsibility for internal monitoring, reporting and action in response; (viii) Provide assistance to affected persons during compensation and land replacement activities; (ix) Prepare reports regularly on progress and outstanding issues.

3.2 Land Commissioner–Revenue Department

The District Commissioner is appointed as an administrator by state government for compensation, rehabilitation and resettlement of PAPs in respective districts. The District Commissioner/Collector (who is also head of Revenue Department) is responsible for administrating the cash compensation under the law for title-holders.

3.3 General Consultant A General Consultant (GC) firm has been mobilized for the overall supervision, monitoring and reporting of the investment program. The Resettlement Expert of the General Consultant has been mobilized since June 2013 and is responsible for: ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 4 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

 Monitoring the LAR activities  verify data through random checking at the field level  Identify the strengths and weaknesses and suggest corrective action plans.  prepare semi-annual monitoring reports for RVNL and ADB.  assess the adequacy of compensation and resettlement benefits given to the affected persons and whether these follow the approved entitlement matrix  assess the affeted pesos oditios of liig post-resettlement

3.4 RP Implementing NGO

M/S Sugam International Sansthan (NGO) based in Lucknow was appointed in 2011 to assist RVNL in land acquisition, resettlement and rehabilitation activities in doubling projects of Daund-Gulbarga, Hospet- Tinaighat, Sambalpur-Titlagarh and Raipur-Titlagarh project. The services of above NGO awarded with work of implementation of Resettlement Plan (RP) have not been extended after August 2016 in any of the project. There is no work of land acquisition involved in Daund–Gulbarga and Raipur-Titlagarh projects and NGO has completed all the required resettlement activities related to NTHs at above projects. Now, RVNL is directly monitoring balance land acquisition and resettlement activities by Revenue Department at Sambalpur-Titlagarh and Hospet-Tinaighat projects and has hired individual Consultants to support the PIU staff dealing with R&R.

3.5 The Asian Development Bank  The ADB is monitoring the social and environmental safeguards through its Head quarter mission. One mission including safeguards specialists is usually conducted every year.

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 5 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

4. Grievance Rederess Committee Grievance Redressal Committee (GRC) has been formed under chairmanship of District collector in each district of the sub projects where land acquisition and Resettlement activities are involved. The objective of formation of GRC is to ahiee ad failitate the esolutio of DPs a oes, oplaints or grievances related to compensation and rehabilitation or any issue related to social safeguard. The other functions of the GRC are to (i) record, categorize and prioritize the grievances; (ii) settle the grievances in consultation with complaints and other stakeholders; (iii) informed the aggrieved parties about the solutions; and (iv) forward the unresolved cases to higher authorities.

5. Progress on Projects

5.1 Global Progress

The calculated global progress of implementation of R&R activities across the various projects at the end of March 2018 is as under: S. No Name of Project Global progress 1. Doubling of Daund-Gulbarga 100% 2. Doubling of Hospet-Tinaighat 52%* 3. Doubling of Sambalpur-Titlagarh 27% 4. Doubling of Raipur-Titlagarh 100% 5. Electrification of Pune-Guntakal N/A *The revise percentage is because of disputed land records and for dispute in the family related to ownership.

At a glance (Private, Government, Reserve Forest & Revenue Forest) Land Acquisition Status upto September 2018

Hospet-Tinaighat Sambalpur-Titlagarh

Required Possessio Required Possessio area n taken Balance area n taken Balance (acres) (acres) (acres) % (acres) (acres) (acres) % Private land 10.474 1.403 9.071 78.873 9.803 69.07 Private land under 6(1) 18.729 13.3 5.429 --- Government land 1.025 1.025 0 38.305 28.788 9.517 Reserve forest land - - 0 15.339 015.339 Revenue forest land - - 0 10.407 010.407 Total 30.228 15.728 14.5 52 142.924 38.591 104.333 27

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 6 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

At a glance (Private) Land Acquisition Status upto September 2018 Total Under Under LA Private land acquired acquired Title holders Direct Amount Awarded Amount disbursed (INR) Title holders paid Act 6(1) Total Land (acres) land (LA identified Purchase Progress Project Private Acquisition act + Total TH Remarks private % land scope Under Direct Under Under land Under LA Under LA act Under Direct Under LA act Under Direct Under LA Under LA (acres) Direct purchase) Direct Direct (acres) act 6(1) 6(1) purchase 6(1) purchase act 6(1) act 6(1) purchase (acres) purchase purchase Hospet-Tinaighat 18.729 10.474 29.203 13.3 1.403 14.703 48.64 11,152,300 144,947,215 7,679,712 813,369 41 40 81 20 8 Sambalpur-Titlagarh 78.873 - 78.873 9.803 - 9.803 12.42 524,189,628 - 364,653,975 - 1313 - 1313 208 - Total 97.602 10.474 108.076 23.103 1.403 24.506 61.06 535,341,928 144,947,215 372,333,687 813,369 1354 40 1394 228 8

5.2 Important events related to LA and R&R from April to September 2018

Sambalpur-Titlagarh (ST)

 11(1) notification issued by Government of Odisha for balance 2 villages (Dhanger and Babupali) in Bargarh District on 24/04/2018.  19(1) notification approved by Bolangir Collector for four villages i.e. Naikensira, Bibina, Saintal and Karlidhua on 17.09.2018 and approved for balance 28 villages is expected by October 2018.  Deposited of Rs. 100,000,000 towards compensation of 22.65 acres of private land of Bargarh District and Rs. 150,000,000 towards compensation of 42.218 acres of private land of Balalngir District during May 2018 and August 2018 respectively.  Approval of 19(1) notification by District Collector (Bargarh) for four villages, viz., Sujia, Khemsara, Munupali and Bhatigaon on 28/09/2018 in the 1st milestone of Barapali-Bolangir (ST- 3).  Approval of 19(1) notification by District Collector (Bolangir) for four villages, viz., Naikensira, Bibina, Saintala and Karlidhua on 17.09.2018 in the 1st milestone of Bolangir-Titlagarh (ST-4).  Gramasabha conducted on 18.09.2018 in Bargarh district for issuance of FRA (Forest Right Act) certificate by District Collector pertaining to forest diversion inview of reserve forest land acquisition in 1st and 3rd milestones of Bolangir-Titlaragh (ST-4).  DGPS survey map had been authenticated by ORSAC, Bhubaneswar and DFO/Bolangir for land acquisition of revenue forest land in 2nd milestone of Barapali-Bolangir (ST-3) and all the milestones of Bolangir-Titlagarh (ST-4).

Hospet-Tinaighat (HT)

 Verification of disputed Title Holders for two villages Ginigera and Koppal.  Joint Measurement Survey for final land acquisition for village Alnavar.  Obtained written consent for direct purchase from land owners of Sompur and Bhanapur villages in Koppal District by the District Collector.  Registration and possession of Land at Gadag from the land owners under direct purchase has been completed. Compensation to the land owners was also disbursed.  Submission of SIA report on Acquisition of Land at Ginigera in Koppal District.

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 7 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

5.3 NGO-Assistance to RVNL

5.3.1 NGO contract for Sambalpur-Titlagarh project As stated through previous reports, that Resettlement work for TH is being done directly by state Revenue department. As the contract services of NGO have expired during August 2016. NGO has completed all tasks related to compensation and training for all NTH identified in Sambalpur-Titlagarh during their contract period. Further, two retired persons from state Revenue Department appointed by PIU Sambalpur are assisting the Revenue Department for land acquisition and involuntary resettlement activities.

5.3.2 NGO contract for Raipur-Titlagarh project

No land acquisition in this section and all NTH have been compensated.

The NGO had completed the R&R activities as per the approved Micro plan for NTH. As suggested through the previous reports, the GC social expert recommends closing of this project with respect to R&R.

5.3.3 Assistance for Hospet-Tinaighat project Extension of two R&R consultants has been approved by CPM upto January 2019 to assist the Revenue Department for acquiring balance land for enhancement of station yards to doubling requirements.

5.4 General Consultant

A General Consultant (GC) firm has been mobilized for the overall supervision, monitoring and reporting of the investment program. The GC social expert has provided the following input man month for monitoring R&R issues on various subprojects.

Year Month Input (days) Input (man-month) April 0 0.0 May 20 0.7 June 7 0.2 2018 July 0 0.0 August 11 0.4 September 9 0.3 Total 47 1.6 Table 1: Mobilization of GC Social Expert The global implementation of resettlement plan of monitoring was carried out by General Consultant with the help of RVNL. In this connection field visits to Hospet-Tinaighat were also carried out from 25/06/2018 to 28/06/2018 and in Sambalpur-Titlagarh from 10/09/2018 to 14/09/2018 by R&R expert of GC to review the LA progress during the above period.

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 8 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

5.5 Daund-Gulbarga (Maharashtra Section and Karnataka Sections)

No land acquisition in this section and all NTH have been compensated.

The NGO had completed the R&R activities as per the approved Micro plan for NTH. As suggested through the previous reports, the GC social expert recommends closing of this project with respect to R&R.

5.6 Sambalpur-Titlagarh

Social impact assessment (SIA)

A State unit Nabakrushna Choudhury Centre for Development Studies (NCDS), Bhubaneswar has undertaken the Social Impact Assessment (SIA) in the state of Odisha for the project.

As social impact assessment (SIA) has been made mandatory in policy provisions of LA Act 2013. Social impact assessment (SIA) required in only two districts namely Bargarh and Bolangir.

The report has been submitted in 2017 to the Government for further processing as per the Act. The Revenue department is updating the land records as per section 11(5). The revenue department has to update and complete before declaration U/S 19. The GC is closely monitoring as no involuntary displacement will take place without completion of R&R.

Mitigation Measures: Since the project is a linear project and a very less quantity of land is going to be acquired, the risks and impacts may be less than the average.

Vulnerability Status of the household

Among the 539 affected households of Bolangir district 80 (14.84%) are headed by women, 9 (1.67%) are headed by physically handicapped persons and the balance 450 (83.49%) households are headed by men. 50 (9.28%) households among them are having BPL cards belonging to 32 villages.

Regarding vulnerability status of the affected household of Bargarh district are 1283 widows, 97 women headed households, 323 physically handicapped persons, 94 destitute, 103 divorcees and 23 orphans belonging to 26 villages.

All NTHs identified at Khetajpur, Guhratikra and Balangir in Sambalpur–Titlagarh project have been paid full compensation including training programme on income restoration and skill upgradation for affected PAPs during the year 2016. The land is totally free from squatters for laying of new Railway track.

Joint Survey Committee General Manager, East Coast Railway had reviewe the progress of ongoing Sambalpur-Titlagarh doubling project with Rail Vikas Nigam Limited (RVNL). RVNL informed that the progress has been hampered due to non-availability of sufficient width of land for proposed doubling line, whereas Railways appraised that the sufficient railway land is available. Hence, a joint survey committee had been formed jointly by E.Co. Railway and RVNL to access the impact on doubling work due to non-availability of sufficient land width from Deogaon to Barapali station of ST-2 package during March 2018. The committee had visited the site and submitted the report.

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 9 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Sambalpur (SBP) District The private land of Title holders in Sambalpur district required 4.62 acres (1.869 Ha) in 5 villages. Full possession taken for 4.620 acres in 5 villages. The government land required at Sambalpur district is 21.517 acres in 5 villages. Possession taken 21.430 acres and balance 0.087 acres pending with Tahasildars.

Collector/SBP Vide letter no.1267/Rev dated 27/03/2018 clarified for payment of Rs. 3, 53, 47,950.00 towards capitalized value of land sanction vide their order no. 3276 dated 25/09/2017. Payment of Rs. 3,53,47,950.00 has been deposited with Tehsildar, Sadar, Sambalpur vide Money receipt no. 0548584 Dtd. 25/05/2018.

Bargarh (BRGA) District

Total 22.65 acres (9.25 Ha) of the private land in Bargarh district consisting of 26 villages is proposed to be acquired. 11(1) notification for all 26 villages had been issued by Government of Odisha on 31/10/2017, 01/11/2017, 02/11/2017, 09/11/2017 and 24/04/2018 for all the 26 villages. 19(1) notification approved by Bargarh Collector for four villages i.e. Sujia, Khemsara, Munupali and Bhatigaon on 28/09/2018 and approved for balance 22 villages is expected by October 2018.

There is total requirement of 3.985 acres of Government land to be acquired at 26 villages in Bargarh district, only 1.921 acres of alienation/transfer of government land has been made up to the reporting period. Balance transfer of 2.064 acres of land is pending with Tehsildars (local revenue officers at district level).

Bolangir District

Total 42.418 (17.166 Ha) acres of private land at 32 villages is to be acquired in Bolangir district. 11(1) notification have been issued by District Collector for all the villages on 24/03/2018. 19(1) notification is issued for four villages, viz., Naikensira, Bibina, Saintala and Karlidhua and yet to be issued for balance villages is expected by October 2018.

Out of total requirement of 11.022 acres of government land in 31 villages, only 4.380 acres have been sanctioned/alienated up to the reporting period. Balance acquisition of 6.642 acres is pending with Tehasildars.

Sonepur District

As per the survey details of the Title Holders of Sonepur district, 9.185 acres (3.717 Ha) of Private Land acquisition required is required in 8 villages. Total 5.183 acres of private land possession taken on 01/06/2017 and 06/06/2017. Handing over of balance land of 4.002 acres is pending with Tehasildar.

Out of 8 villages, the land owners of Sananuapali and Cherupali did not receive payment (seeking higher compensation) and since pending with Revenue department. The District Collected has referred the estimate with revised land acquisition rate for this land of 4.002 acres to State Government of Odisha for sanction in November 2017. However, the State Government of Odisha has declined this proposal for the ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 10 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018 enhancement of rate of land. At this juncture, the District Collector/Sonepur has instructed SLAO/Sambalpur in June 2018 to handover balance land of 4.002 acres to Railway as per the initially approved compensation rate. There is total requirement of 1.781 acres of Government land to be acquired in 8 villages of Sonepur district, only 1.0571 acres of sanctioned/alienated of government land has been made up to the reporting period. Balance transfer of 0.724 acres of land is pending with Tehsildars (local revenue officers at district level).

Sonepur District

As per the survey details of the Title Holders of Sonepur district, 9.185 acres (3.717 Ha) of Private Land acquisition required is required in 8 villages. Total 5.183 acres of private land possession taken on 01/06/2017 and 06/06/2017. Handing over of balance land of 4.002 acres is pending with Tehasildar.

The status of district wise acquisition of private land for ST project is as under:

Districts Private land Private land % Amount Title Title to be acquired acquired disbursed (INR) holders holders (acres) (acres) identified paid Sambalpur 4.62 4.62 100 72,323,569 Sonepur 9.185 5.183 56 156,739,985 1313 208 Bargarh 22.65 - - 114,466,146 Bolangir 42.418 - - 180,659,928 Total 78.873 9.803 12 524,189,628 1313 208 Note: Amount of SIA not included in the disbursement.

Table 2: Status of private land Sambalpur-Titlagarh Total requirement of Land against private land, government and forest land to be acquired is tabulated herewith.

Possession taken / Required Area S.No. Type of land Permissive Balance (acres) (acres) Possession (acres) 1 Private land 78.873 9.803 69.07 2 Government land 38.305 28.788 9.517 3 Reserve Forest land 15.339 Nil 15.339 4 Revenue Forest land 10.407 Nil 10.407 TOTAL 142.924 38.591 104.333 Table 2: Requirement of land acquisition as estimated under ST project Progress of Government Land acquisition: The total scope of government land acquisition was estimated as 38.305 acres. The possession for total 28.788 acres has been already taken up and the acquisition of balance 9.517 acres is still in process. The payment amounting 35,347,950 INR for acquisition of 12.059 acres of government land at Sambalpur district has been deposited with Tehsildar/Sadar, Sambalpur on 25/05/2018 and accorded permissive possession.

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 11 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Progress of Forest land acquisition:

The acquisition of remaining Forest and Revenue Forest land 15.339 acres and 10.407 acres respectively is still under process.

Reserve Forest land:

Regional Chief Conservator of Forests/Bhawani Patna (RCCF/BWPN) has sent the proposal of diversion of 15.339 acres of forest land of Bolangir district to additional Principal Chief Conservative Forest (PCCF), Odisha on 05/05/2018.

Further, Forest Right Act (FRA) certificate for diversion of forest land in Bargarh District is pending with District Collector/Bargarh. Consultants engaged by RVNL are following up the District Collector for issue of FRA certificate.

Revenue Forest land:

Pertaining to Revenue forest land acquisition, developments during the reporting period:

 Plans developed by the consultants have been submitted on 01/05/2018 to Odisha Space Applications Centre (ORSAC) for further process.  ORSAC have demanded for authentication of the submitted plans by Tehsildar.  Accordingly, plans authenticated by Tehsildar have been resubmitted to ORSAC.  ORSAC authenticated DGPS survey maps on 04.08.2018 and submitted to DFO/Balalngir for authentication.  DFO/Balangir authenticated DGPS survey maps on 30.08.2018.

The approved plans by ORSAC and DFO are being uploaded in Ministry of Forest website for online submission and further process of tree cutting.

The Summary of status of acquisition of private land, government land and forest land as received from Project Implementation Unit (PIU) of ST Project is reproduced as under:

Name of the District Private Land (a) 4.62 acres (1.869 Ha) Pvt. land acquisition required in 5 villages. Sambalpur (b) Full possession taken for 4.620 acres in 5 villages. (4.45 acres on 28/02/2014 and 0.170 acres on 08/11/2017 and 28/12/2017). (a) 22.650 acres (9.166 Ha) Pvt. land acquisition required in 26 villages. (b) Vide letter no.19343/R&DM Dtd. 16/06/2017 government has issued declaration u/s 8(2). (c) SLAO/SBP sent 11(1) proposal to government on 16/09/2017. (d) 11(1) notification issued by government of Odisha for 22.650 acres (26 Baragarh villages) on 31/10/2017, 01/11/2017, 02/11/2017, 09/11/2017 and 24/04/2018. (f) 19(1) notification approved by Bargarh Collector for four villages i.e. Sujia, Khemsara, Munupali and Bhatigaon on 28.09.2018 and approved for balance 22 villages is expected by October, 2018. Bolangir (a) 42.418 acres (17.166 Ha) Pvt. Land acquisition required in 32 villages.

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 12 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

(b) Collector/BLGR send to government for declaration U/s 8(2) and process for notification U/s 11(1) vide memo no.737 Dtd. 01/08/2017. (c) On 27/11/17 U/s 8(2) notification issued. (d) 11(1) notification issued by Collector/BLGR.on 24/03/2018. (e) 19(1) notification approved by Bolangir Collector for four villages i.e. Naikensira, Bibina, Saintal and Karlidhua on 17.09.2018 and approved for balalnce 28 villages is expected by October, 2018. (f) Top priority for land acquisition has been set by RVNL for 8 villages, viz., Ghusurimunda, Balangir-ka, Bishuuda, Naikesia, Biia, Saitala, Siletpada, Karlidhua to enable the commissioning of Loisingha-Balangir, Deogaon-Saintala and Saintala-Balmad Sections. (a) 9.185 acres (3.717 Ha) Pvt. land acquisition required in 8 villages. (b) U/s 19(1) declaration issued for 9.185 acres in 8 villages on 03/10/2016 by R & D.M. Department, government of Odisha. (c) Out of 8 villages, the land owners of Sananuapali and Cherupali did not receive. Payment seeking higher compensation and since pending with Revenue department. (d) Total 5.183 acres of private land possession taken on 01/06/2017 and 06/06/2017. Handover of balance land of 4.002 acres may please be expedited. (e) DM/District Collector, Subarnapur sent revised land acquisition estimate cost Sonepur of Cherupali and Sannuapli village for Sanction of government vide his memo no.1367/WE Dtd 21/11/2017 and 1370/WE Dtd. 22/11/2017. This propose has been rejected by the State Government of Odissa. (f) DGM (P)/BBS talked to Dy.Sec./C&T department, government of Odisha on 10/04/2018 to communicate the decision on the proposed enhanced rate of Cherupali and Sananuapali village. (g) A letter on: 27/04/2018 has given to Collector/Sonepur with copy to SALO/SBP for handover of balance land. (h) Collector/Sonepur hold a meeting with on: 16/05/2018 and instructed SLAO/SBP, to handover balance land by 15/06/2018.

Government Land Sambalpur District (a) Total government land required: 38.305 acres (64 villages). Sambalpur District (5 villages) (a) Total requirement 21.517 acres (b) Possession taken 21.430 acres. (c) ROR issued / Possession taken=3.412. On this possession taken land of 2.310 acres in kalamati village there are 3 encroachments. Letter given to District Collector and Tehsildar/SBP on: 14/07/2017 along with joint inspection report. Eviction of encroachments may be expedited. (d) Physical possession taken for 0.087 acres near JT-25 in Barpali on: 28/12/2017 with eviction of encroachment. ROR to be corrected. (e) For 5.885 acres payment of 2, 16, 27,375 INR has been deposited with Tehsildar, Sadar, Sambalpur vide money receipt no.0548539 Dtd. 23/03/2018.

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 13 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

(f) For 0.074 acres payment of 9, 55,710 INR has been deposited with Tahsildar, Sadar, Sambalpur vide money receipt no.0548539 Dtd. 23/03/2018. (g) Permissive possession-12.059 acres (25/09/2017). However for payment as per latest policy guide lines of government of Odisha, 12.059 acres has been reduced to 1.93Ac letter given to Tehsildar/SBP on: 16/10/2017 and In response Tehsildar/SBP has given letter to Collector/SBP on: 27/10/2017 for decision. Collector/SBP Vide letter no.1267/Rev Dtd. 27/03/2018 clarified for payment of Rs. 3,53,47,950.00 towards capitalized value of land sanction vide their order no.3276 Dtd. 25/09/2017. (h) For 12.059 acres payment of Rs.3,53,47,950.00 has been deposited with Tehsildar, Sadar, Sambalpur vide Money receipt no.0548584 Dtd. 25/05/2018 Bargarh District (20 villages) Total requirement- 3.985 acres Sanctioned/Alienated -1.921 acres Balance-2.064 acres pending with Tehsildars. Matter was discussed during review meeting taken by Secy to RDC on 13/07/2018 at Collectorate/BRGA. Balangir District (31 villages) Total requirement- 11.022 acres Sanctioned/Alienated 4.380 acres Balance 6.642 acres pending with Tehsildars. Sonepur District (8 villages) Total requirement- 1.781 acres Sanctioned/Alienated -1.057 acres Balance 0.724 acres pending with Tehsildar/Rampur Matter was discussed during review meeting in Sonepur/Collectorate on 12/07/2018.

Forest Land (A) 15.339 Acres (6.208 Ha) of Forest Land diversion is required in 4 villages for the entire Sambalpur – Titlagarh Doubling Railway Project, Bargarh Bolangir and Sampalpur.

(B) In compliance to observations made by Nodal/Officer of PCCF office, hard copies are submitted with concerned DFOs & District Collectors on 04/05/2016.

(C) RCCF/BWPN (DFO/BLGR) & (DFO/Sonepur)

(1) All the observations of DFO/BLGR & RCCF/BWPM are compiled since 11/01/2017.

2) As required DFO/Sonepur uploaded part-II (nil statement) on 02/08/2017.

3) Part-III uploaded by RCCF/BWPM on: 24/10/2017 and hard copy submitted to PCCF on: 27/10/2017 & Pending with PCCF/BBSR.

4) Additional PCCF raised some observations for compliance on 24/11/2017 and returned file.

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 14 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

5) FRA certificate issued by collector/BLGR on 08/12/2017 for 5.768 Ha of forest land.

6) Lettes has ee issued to DFOs & Tehsildars fo joit TE o plots of No foest lad.

7) Tree enumeration completed in Bolangir & Sonepur District & obtained signature of all concerned authority.

8) Land schedule of Non forest Govt. land of Bolangir & Soenpur district (9 Tehsils) authenticated by Tehsildars.

9) The observation of Additional PCCF, Odisha of Subarnapur Division complied & submitted to DFO/ Subarnapur on: 19/03/18.

10) The observation of Additional PCCF, Odisha of Balangir Division complied & submitted to DFO/BLGR on:20/04/18.

11) DFO/ Sonepur & DFO/ BLGR submitted to RCCF/ BWPN on: 05/05/2018.

12) RCCF/BWPN vide his letter Dtd. 05/05/2018 sent the diversion proposal to Additional PCCF, BBS, Odisha.

13) Additional PCCF raised some observations of Sonepur & Bolangir district for compliance on 26/05/2018 & 02/06/2018. Compliance under process.

(D) RCCF/SBP (DFO/BRGA) & (DFO/SBP)

(1) All the observations of DFO/BRGA & DFO/SBP have been complied on: 16/08/2017 and 14/09/2017.

(2) DFO/BRGA & DFO/SBP submitted the proposal to RCCF/SBP on: 28/08/2017 and 09/10/2017

(3) Part-III uploaded by RCCF/SBP & hard copy submitted to PCCF on: 17/10/2017

4) Additional PCCF raised some observations for compliance on 22/11/2017 and returned file.

5) Gramsabha conducted on 23/10/2017. Collecter BRGA yet to issue FRA certificate in spite of regular follow up.

6) Tree enumeration completed in Sambalpur & Bargarh District. Signature of all concerned authority completed.

7) The observation of Additional PCCF, Odisha of Sambalpur Division complied & submitted to DY CE/SBP on: 11/04/2018 for signature & Submitted to DFO/SBP on: 20/04/2018.

8) DFO/SBP submitted to RCCF/SBP on 01/06/2018.

9) On date: 16/04/2018 and 08/05/2018 met with District collector & DWO to chase the FRA issue.

10) On 05/06/2018 and 11/07/2018 consultant (LA) met with DWO/BRGA & Sub-Collector/BRGA on FRA issue.

11) Matter was apprised to RDC on 04/07/2018. Also FRA issue was discussed at BRGA/Collectorate ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 15 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

on 13/07/2018 during review meeting hold by Secy to RDC.

12) Gramsabha conducted for Bargarh District on 18/09/2018.

(E) Revenue forest land

(1) 10.407 acres of Revenue Forest Land diversion is required in 9 villages of Balangir District for the entire Sambalpur – Titlagarh Doubling Railway Project.

(2) DGPS Survey completed. DFO/BLGR forwarded the same to ORSAC/BBS for authentication, on: 02/11/2017.

(3) SM Consultant reported that ORSAC has issued new format for submission of Survey report. The same has been complied & submitted to ORSAC. Performance of Agency seems to be very poor hence a letter has been issued on 05/02/2018 to expedite the work progress.

4) On 17/04/2018 followed up the issue in ORSAC office along with SM consultant. ORSAC officials observed that there is mismatch of area on 3 nos of plots which require carrying out of DGPS survey again. SM consultant did the job and submitted to ORSAC on 01/05/2018.

5) Again ORSAC asked for authentication of plots by Tehsildars which was complied and submitted on 06/07/2018.

6) ORSAC vide his letter dated 27/07/2018 informed to deposit Rs. 99,120/- for authentication of DGPS survey report. Payment made on: 02/08/2018.

7) ORSAC authenticated DGPS survey maps on 04/08/2018 and sent to DFO, Balangir for authentication and same had been authenticated on 30/08/2018

Section wise details of acquisition of land in ST project wise is described in tabular form as under:

Section wise LA Issue (As on: 30.09.2018) RESERVE REVENUE SECTION PVT LAND ISSUE DISTRICT REMARKS FOREST LAND FOREST LAND

3103 m (Between Br. (1) 11(1) notification issued by No. 152 to Br. No. 153, 288 m (0.635 Govt.of Odisha for 22.850 SUKTAPALI - Br. No. 156 to Br. No. acres) (Between acres (26 Villages) on: BARGARH 157, Br. No. 160 to Br. No. 160 and Nil BARGARH 31.10.17, 1.11.17, 2.11.17, (3rd milestone level crossing no. JT -43 level crossing 09.11.17 and 24.04.18. of ST-2) and Br. No 171 to Br. no. JT -43) (2) 19(1) notification expected No. 175) by October 2018.

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 16 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

4496 m (Between Br. (1) 11(1) notification issued by No. 180 and Br. No. Govt.of Odisha for 22.850 BARGARH - 186) , Near Br. No. 192, acres (26 Villages) on: BARPALI (Between Br. No. 206 Nil Nil BARGARH 31.10.17, 1.11.17, 2.11.17, (3rd milestone to Br. No. 208) and 09.11.17 and 24.04.18. of ST-2) between Br. No. 219 (2) 19(1) notification expected and level crossing no. by October 2018. JT-60)

(1) 11(1) notification issued by Govt.of Odisha for 22.850 acres (26 Villages) on: 31.10.17, 1.11.17, 2.11.17, Barpali to Km 635 BARGARH 09.11.17 and 24.04.18. BARPALI =2190 m – (2) 19(1) notification issued DUNGIRIPALI Nil Nil for four villages on 28.09.18 (1st milestone and balance expected by of ST-3) October 2018. 19(1) notification issued on: km : 635 To Dungripali 3.10.16. Partly possession SONEPUR = 1705 m given. Balance possession is Urgently required 19(1) notification issued on: Dungripali-KM : 647/5 3.10.16. Partly possession SONEPUR DUNGRIPALI- =3150 m given. Balance possession is KHALIAPLI Urgently required (1st milestone Nil Nil 1) 11(1) notification issued by of ST-3) 647/5 to Khaliapli = Collector/BLGR on 24.03.18. BALNGIR 715 m (2) 19(1) notification expected by October 2018. KHALIAPLI - 1)DGPS Survey duly LOISINGA 0.244 acres authenticated by ORSAC on 2480 M Nil BALNGIR (2nd milestone (Bendra) 04.08.18 followed by DFO on of ST-3) 30.08.18. 1)DGPS Survey duly LOISINGA - authentication of plots by BALANGIR 0.107 acres 4805 m Nil BALNGIR Tahasildars submitted to (2nd milestone (Hirapur) ORSAC on 06.07.2018 for of ST-3) revenue forest. 1) 11(1) notification issued by Collector/BLGR.on:24.03.18. BALANGIR - 210 mtr (0.534 (2) 19(1) notification issued DEOGAON Ac) Mathakahi (5.291 acres) during October, 2018. 2160 m BALNGIR (1st milestone Reserve Forest, 1240 m, Raeipali 3)DGPS Survey duly of ST-4) Narayanpur authenticated by ORSAC on 04.08.18 followed by DFO on 30.08.18.

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 17 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

1) 11(1) notification issued by Collector/BLGR on 24.03.18. (2) 19(1) notification issued DEOGAON - for four villages on 17.09.18 125 m (1.480 SAINTALA and balance during October, 1700 m Nil acres)/ BALNGIR (1st milestone 2018. Ghuchepali of ST-4) 3)DGPS Survey duly authenticated by ORSAC on 04.08.18 followed by DFO on 30.08.18. 1)DGPS Survey duly SAINTALA- 30 m (1.625 authentication of plots by BADMAL 70 m Nil acres)/Karlidhua BALNGIR Tahasildars submitted to 2nd milestone & Saintala ORSAC on 06.07.2018 for of ST-4) revenue forest. 3350 m (13.577 1) 11(1) notification issued by BADMAL-SIKIR acres)(Barnei RF Collector/BLGR On 24.03.18. (3rd milestone 45 m Nil BALNGIR in Badmal (2) 19(1) notification issued of ST-4) Village during October, 2018. 1) 11(1) notification issued by Collector/BLGR.on:24.03.18. SIKIR- 35 m (0.142 85 m/(1.414 (2) 19(1) notification issued TITLAGARH acres)/(Barnei acres)/sikapatra during October, 2018. 2155 m BALNGIR (3rd milestone RF in Badmal pali,Manigaon & 3)DGPS Survey duly of ST-4) Village) Sagadaghat authenticated by ORSAC on 04.08.18 followed by DFO on 30.08.18. Table 3: Land Acquisition issues of ST project

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 18 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

District wise detail of payments against acquisition of land in ST project is tabulated below:

Details of Payment towards LA for SBP-TIG Doubling Project (As on:30.09.18)

Payment SL.NO.DISTRICTTAHASILPrivate/Govt/Forest Area in Acr. Amoun t paid(Rs) Remarks Done

Establishment charges for 4.45 1SBPSBPPVT4.45 4,409,579 29.06.13 Acrs

2SBPSBP PVT 4.45 40,576,255 24.11.14Towards possession of pvt LA Cost of Private Land in Two 3SBPSBPPVT0.170 27,337,735 3.11.16 villages Cost of Govt land. ROR 4SBPSBPGOVT2.31 7,461,965 04.03.14 received. Cost of Govt land. ROR 5SBPSBPGOVT1.102 11,860,275 04.03.14 received. 6SBPSBPGOVT5.885 21,627,375 23.03.18Cost of Govt land Capitalized value of Mahanadi SBPSBPGOVT12.059 35,347,950 7 River(BR-76) 8SBPSBPGOVT0.074 955,710 23.03.18Cost of Govt land 9BRGAATS,BRGA,BRPLPVT21.425 2,026,530 04.03.16SIA Study 223,978 07.03.15 10 BRGA ATS GOVT 0.563 Cost of Govt.Land 20,286 15.10.15 11 BRGABRGAGOVT0.515 357,283 07.03.15Cost of Govt.Land 12 BRGABRPLGOVT1.286 1,028,764 07.03.15Cost of Govt.Land SUBARNAPU Establishment charges for 13 R RAMPURPVT9.185 10,000,000 31.01.14 9.185 Acrs SUBARNAPU 14 R RAMPURPVT8.845 138,835,510 13.06.16Cost of Pvt.Land of 8.845 Acrs SUBARNAPU 15 R RAMPURPVT0.340 7,904,475 3.11.16Cost of Private Land SUBARNAPU 16 R RAMPURGOVT0.432 600,749 04.03.16Cost of Govt.Land SUBARNAPU 17 R RAMPURGOVT0.625 137,191 27.10.16Cost of Govt.Land AGALPUR,LSX,PUI 18 BLGR NTALA,BLGR,DEOG PVT41.448 2,418,680 26.02.16SIA Study

19 BLGRAGALPURGOVT0.100 310,485 01.05.15Cost of Govt.Land

368,555 01.05.15 Cost of Govt.Land 20 BLGR LOISINGHA GOVT 0.397 104,900 15.10.15Cost of Govt.Land 21 BLGRPUINTALAGOVT0.268 10,677 04.05.15Cost of Govt.Land 22 BLGRBLGRGOVT1.202 3,285,592 04.05.15Cost of Govt.Land 23 BLGRDEOGAONGOVT1.8 5,678 04.05.15Cost of Govt.Land 24 BLGRSAINTALAGOVT0.571 149,517 04.05.15Cost of Govt.Land

25 BLGRMURIBAHALGOVT0.582 336,622 04.05.15Cost of Govt.Land

26 BLGRTIGGOVT0.042 17,667 04.05.15Cost of Govt.Land SBP,BRGA&B 27 -RES.FOREST15.34 440,580 18.03.16DGPS Survey LGR Payment to SLAO/SBP/Estt BRGAATS,BRGA,BRPLPVT22.850 12,439,616 24.08.17 28 Charges 20% AGALPUR,LSX,PUI NTALA,BLGR,DEOG Payment to SLAO/SBP/Estt 29 BLGR PVT42.848 28,241,248 05.10.17 AON,SAINTALA,M Charges 20% for Ac 41.448 URIBAHAL,TIG Payment to 30 BRGAATS,BRGA,BRPLPVT22.850 100,000,000 19.05.18 SLAO/SBP/Compensation AGALPUR,LSX,PUI NTALA,BLGR,DEOG 31 BLGR PVT42.848 150,000,000 Cost of Private Land AON,SAINTALA,M URIBAHAL,TIG Including SIA TOTAL 608,841,427 FEE

Table 4: Details of payment towards LA for Sambalpur-Titlagarh

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 19 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

5.7 Raipur-Titlagarh

NGO has completed the entire pending task of compensation and entitlement to all the verified APs upto August 2016. There was no land acquisition in any of the subprojects of RT project NGO has completed the entire pending task in August in 2016. No task is pending as per the safeguards policy of ADB. Hence, GC recommends closing of this project with respect to R&R.

Final status of APs of RT project as furnished by NGO.

S. No Impacted project area Total number of Impact (as per NGO verification) affected persons Compensation paid 1 Kantabaji 23 Fully paid 2 Mahasamund 45 Fully paid 3 Parvati Nagar 143 Fully paid 4 Ekta Nagar 0 Vacated by District Administration and alternate accomadation provided to all APs 5 Chandinagar 50 49 PAPs fully paid. 1 AP not traceable. Total 261 -

Table 5: Status of APs in RT project

5.8 Hospet-Tinaighat

Highlights of Social Impact Assessment Report for Ginigera village

The Resettlement work for Title Holders (THs) is being done directly by state Revenue Department with the help of two consultant services hired by RVNL to support the Revenue Department after demobilization of NGO during the year 2016. Two consultants have been appointed by RVNL for HT Project from November 2016. Extension of the services of these two persons has been approved by CPM upto January 2019.

The Government of Karnataka has entrusted the work of submission of detailed SIA report to M/s Sri Sudharana Rural Development Organization (SSRDO), Bengaluru. Further the Government of Karnataka ide ode No. KE K‘‘ Dated .. ostituted the Epet Coittee headed D. Shaik Iqbal Ahamed I.R.T.S (Retd), Retired Senior Divisional Safety Officer, Bengaluru Division, South Western ‘aila as Chaia, to eaie/ ealuate the Soial Ipat Assesset epot suitted SS‘DO, Bengaluru, under Section 7 of The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013, and The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Re-Settlement (Karnataka) Rules, 2015, pertaining to the proposed acquisition of land at Ginigera village, Koppal Taluk, Koppal district, being part of the Doubling of Railway line between Hospet and Tinaighat project on South Western Railway. The Expert Committee has justified the proposed acquisition of land at Ginigera for HT doubling project on its report submitted to Commissioner, Rehabilitation and Resettlement, Bengaluru and the Deputy Commissioner, Koppal District in August 2018 with following recommendations: ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 20 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

1. That the proposed land acquisition is for the construction of Platform line at Ginigera Railway station as part of the Doubling of Railway line between Hospet and Tinaighat project on South Westen Railay sees Puli Pupose hene it is onluded that the auisition of the land to the extent of ONE acre (which includes 17 Guntas of NA land and 23 guntas of Agriculture land) is for Public Purpose. 2. That there is no Agricultural activities for a long time in the agriculture land proposed for acquisition, hence the proposed extent of land do not consist of any multi crop agriculture land as such do not have any effect/impact on food security. 3. The total number of families affected is six, which includes 3 of OBC (all belongs to Hindu community). No Schedule Caste and Schedule Tribes land or any other establishment like shope, houses etc are involved. 4. The necessary provision has been made to ameliorate the affected families. 5. The Expert Committee also concludes that the potential benefits outweigh the social costs and adverse social impacts. 6. It is reported by the acquiring body M/s RVNL and the Expert Committee concluded that the extent of land proposed to be acquired is the absolute bare-minimum needed for the project and there are no other less displacing options or alternatives available the proposed acquisition is essential in view of public purpose and unavoidable.

Survey Name Title Land S.No Village Type of the land In Acres No. holder Acquisition 1 2 3 4 5 6 Acres-Gunta- Anna Non-Agriculture 617 Sq.mt 00-6.10 1 Ginigera 269/1 Kalavati Residential

2 Ginigera 269/2 Agriculture Sanna Jambappa 2.26 Gunta 00-2.26

3 Ginigera 269/2 Agriculture Mohamed Sadiq 4.79 Gunta 00-4.79

Ginigera Amaresh Karadi 8.11 Gunta 00-8.11 4 269/4 Agriculture and others

5 Ginigera 264/B/1 Agriculture Yasim Tairali 7.87 Gunta 00-7.87

Ginigera Non-Agriculture 1174 Sq.mt 00-11.60 6 264/A2 Dinesh Kumar Commercial

Total 1-00-00

Table 6: Proposed Land Acquisition in Ginigera village as per SIA study Sl. No Type of ownership No. of families loosing land 1 Single property owner 05 2 Joint Property owner 01 Total 06* Table 7: Type of ownership of affected land at Ginigera *Out of 6 Affected persons 3 belongs to OBC and the remaining 3 belongs to minority group. ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 21 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Status of Land Acquisition

The total scope of land acquisition has been revised from 31.45 to 30.23 acres owing to stay order obtained from court by one of the TH in Koppal for 1.23 acres leading to redesigning the yard arrangements by RVNL within the available land. Out of this revised total scope of land to be acquired, 12.50 acres was proposed for direct purchase from TH and 17.73 acres was notified under clause 6(1) of old Land Acquisition Act.

Subsequent to the disagree by 8 No of THs (2 from Alnavar and 6 from Ginigera) pertaining to 2.03 acres in the middle of the process of direct purchase (12.50 acres land proposed under direct purchase), proposal has been revised for acquisition under new Land Acquisition Act of 2013. Hence, the scope of land purchase under direct purchase has been reduced from 12.50 acres to 10.47 acres and the scope of land purchase under Land Acquisition Act 2013 has been increased to 19.7535 acres.

Owing to the scope of land acquisition under direct purchase of 10.47 acres with 48 TH at various locations under different District Colelctors, viz., Koppal, Gadag, Belgum and Dharwad districts, 9.050 acres have been finalized by Revenue Department at Koppal, Gadag and (Devarayi and Khurdagosh villages) districts and negotiations are in progress for the remaining 1.4238 acres at districts viz., Belgaum (Londa and Akralli villages) and Koppal (Soampur, Banapur, Kampasagar and Munirabad villages). Out of the finalized acquisitions, compensation for 1.4032 acres have been disbursed to 8 THs and disbursement for the balance area of 7.6468 acres is in progress.

Thus, the scope of acquisition under LA Act has been increased from 17.72 acres to 19.75 acres with 33 TH, because of failure of negotiations between landowners and Revenue department in Ginigira and Alnavar district through direct purchase. The landowners were demanding unjustified price of their land from Revenue Department. Under direct purchase, notifications 6(1) have been issued for the area of 17.72 acres, SIA is in progress and yet to be submitted to District Collector / Dharwad for the area of 1.025 acres at Alnavar village and SIA for the area of 1.0035 acres at Ginigera village has been submitted to District Collector / Koppal. The land of area 13.30 acres have been finalized and compensation has also been disbursed for 20 out of 25 THs identified. Further, the land of 3.4 acres is under dispute like ownership, family dispute, updated ownership details.

Various table showing latest detail of land acquisition through old act, direct purchase and amount disbursement etc. have been tabulated as under.

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 22 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Table 8: Status of land acquisition Hospet-Tinaighat

Table 9: Progress of Direct Purchase Hospet-Tinaighat

Table 10: Status of dispute under 6(1) notification for Hospet-Tinaighat

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 23 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

The present status of land acquisition for preparation of compensation done at various district in Hospet- Tinaighat project after Joint Measurement Survey (JMS) is tabulated below:

Paid

Paid

Paid Two TH Two Paid

as on Sep-2018 on as

Direct purchase Amount Amount purchase Direct

Finalised and given to TH's TH's givento Finalised and

₹ , ₹ , ₹

₹ ,, ₹

₹ ,, ₹ ,, ₹

10 11

Cheque given to DC. Cheque givento

by DC. Railways /RVNL /RVNL Railways DC. by

Finalised as on Sep 2018 2018 Sep on Finalised as

Direct purchase Amount Amount purchase Direct

9

Remarks Remarks

Remarks as on Sep-2018 on as Remarks

rates .

failed, Due to the huge failed,gaphuge the in Due to asking as LA Act. per

Land Owners given consent to DC. Land givenOwners to consent DC. Land givenOwners to consent DC. Land givenOwners to consent DC. Land givenOwners to consent DC. Land givenOwners to consent DC negotiations Under DC. Land givenOwners to consent DC Negotiations Faild.Land owners DC. Land givenOwners to consent DC. Land givenOwners to consent DC Negotiations Under DC Negotiations Under negotiations Direct purchase

0 0

0 0

0

0

0

0

0

a a

G G

38

12 24

27 28 12

25

23

22

4.6035

24.95 0

25.6238

Sep 2018 Sep

8=5 + 6 + 8=5

5 5 0

2

1 1 0

A A

25

After Revised Grand Total Total RevisedGrand After

(LA+ Direct Purchase) as on on as Purchase) Direct (LA+

0 0

0 0 00 0 0

0 2 1 0

0

0

0 9

a a

0

0 4 24.140 0

7

38

27 28 12

G G

16

34

18

29

15

27

7.3750 1.6750

as on Sep 2018 Sep on as

0

0 0 0

0

A A

Direct Purchase Finalised Purchase Direct

0 0

0 0 00 0 0 0 0 0 0 0 0 0 0 0 0

0 0

0

0 4

0

a a

0 1

6

G G

38

27 28 12 12 24

16

34

18

29

23

7.8988 2.5750

on Sep 2018 Scope 2018 Sep on

0

0 0 0 0 0 0 1 1 0

0 0 0 0 0 0 1

A A

Total Direct Purchase as as Purchase Direct Total

New proposals New proposals

0 0

0 0 0

0 0

0 7 35.95 0 7

a a

0

5

25

22 31

G G

16

Status of land acquisition in HT as on September as HT in acquisition Status - 2018 land of

17.7250

1 1 0 0 0 0

0 0 0 2

A A

for Land acquisition Land for

17 29

Notification 6(1) issued 6(1) Notification

a a

0

4

G G

Fail ) Fail

2.02850

0 0 0 0 0 0

0 0 0

A A

LA Act as on Sep 2018 2018 Sep on as Act LA

(Due to Direct Purchase Purchase Direct to (Due

0

0 0 00 00 0 00 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 1 0 0 1

0 0 0 0 5 5 0 4

a a

3

G G

38

27 28 12 12 24 22 25

23

24.95 0 0 0 0

4.6035

25.6238

Sep 2018 Sep

0

290000290000000290

4 24.14 0 2 1.14 0

0 20.95 0 0 0 0 0 0 0 0 20.95 0 0 0 0 0 20.950 0

1 1 0 1 1 0 0 0 0

0 0 0 0 0 1 2

2 1 0 0 0 0 1 1 0.140 0 1 0.14 0 0 0 0 0 0.000 0 0 0 0 1 0.140 0

9

1 1 0

5 5 0 0 0 0 4

A A

25

scope( LA + DP ) as on on as ) DP + scope(LA

Total land acquisition acquisition land Total

HT

HT

HT-3

HT-2 HT-1 HT-3 HT-2 HT-3 HT-3 HT-3

HT-1

HT-1

1 2

Details

Total area in acres Total area in acres

Table 1 Table

1.Total as per Sep 2018

NAME OF THE VILLAGE VILLAGE THE OF NAME no Package

Table 2 (Table New Proposals)

2.Total as per new proposals as on Sep 2018

KAMPASAGAR (Munirabad) (Koppal) (Munirabad) KAMPASAGAR HT-1

TALABALA (Bhanapur) (Koppal) (Bhanapur) TALABALA HT-1

Munirabad Additional (Koppal) Additional Munirabad HT-1

Alnawar new proposal (Darwad DT ) DT (Darwad proposal new Alnawar

ANNIGERI (Darwad) (Darwad) ANNIGERI (Koppal) BHANAPUR (Koppal) (Munirabad) HOSSALLI HT-1 (Gadag) ,Gadag Betigri DT) (Belgaum proposal new Devarai DT) Villageproposal(Belgaum new GhoseKhurdagosh DT) (Belgaum proposal new Village Londa ) DT (Belgaum Villageproposal new ) D.T (Koppal proposal Ginigeranew HT-1

KOPPAL (Koppal) KOPPAL ANNIGERI (Darwad Govt. Agriculture University) Agriculture Govt. (Darwad ANNIGERI HT-2 (Koppal) SOMAPUR Table 11: Status of land acquisition in HT

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 24 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Remarks

Finalised. Amount (Rs 8,78,173/-).

Under DC Negotiations

Finalised

Finalised

Finalised

Finalised

finalisations from DC office not received. finalisations from DC office not received. TH (Rs 26,46,353/-) (Rs TH

Land Owners given consent to DC.Amont Land Owners given consent to DC.Amont Under DC Negotiations Under DC Negotiations Finalised. Amount (Rs 7,60,000/-) . 7,60,000/-) (Rs Amount Finalised. 8,36,84,830/-). Amount(Rs Finalised. 18,59,000/-). (Rs Amount Finalised. Two 5,77,65,212/-).Paid (Rs Amount Finalised.

Finalised

Finalised

DC Negotiations Failed for DP .Proposal for LA Act. LA for .Proposal DP Failed for Negotiations DC Act. LA for .Proposal DP Failed for Negotiations DC

₹ ₹

₹ ₹

₹ ₹

₹ , ₹

₹ , ₹

₹ , ₹

₹ , ₹

₹ ₹ ,

₹,

0

9

5

0 1

3

0

18

18

Total resettlement pending resettlement Total

₹ ₹

₹ , ₹

₹ , ₹

₹ , ₹

₹ , ₹ , ₹

₹ , ₹

₹ ₹ ,

₹,

2018

11

Total Resettlement Resettlement Total

25

25

Allowance paid Allowance upto Sep-

Noof PAPs Amount Noof PAP Amount

0.30

0.70

0.725

0.850 4.450

Total Land Total

DP in acres. in DP

ttlement/Direct Purchase as on September2018on as Purchasettlement/Direct

Finalized 6(1) and Finalized

THs upto THs Sep- 2018

in Acres in

17-29-0 25-31-0 Total 6(1) Total

1.350 1.775 1.775 3

0.000 1.025 1.025 0

4.400 4.400 4.400 4

2.3001.625 5.125 1.625 5.125 1.6252.225 1 4 2.225 2.225 2 0.950 0.950

0.400 0.400

1.400 1.550 1.550

Paid

0.053168 0.675

against

14.7032 17.7250 26.7750

6(1)and

17-37.16-0

DP in Acres in DP

₹ ₹

₹ , ₹

₹ , ₹

₹ , ₹

₹ ,, ₹

₹ ,, ₹ ,, ₹ ,, ₹ ,, ₹ ,, ₹

6(1)and DP

₹ ₹ ,,

₹,,

Amount Paid per as

Total compensation Total paid againstland purchase to

20

20

Amou

No.of

nt paid nt

TH 6(1) TH

0.700

acres

30.2273

Sep 2018 in Sepin 2018

30-9.092-0

Total Land Total on as

3 0.725

8 4.450 8 0.675

26 1.025 1.00350

15

81

81

ofTH

Total nos Total

0 5 1.775 2

0 4 1.550 3

0

0

NTH

Total Total

Nosof

0 0 0 1.025 0

12

11

43

43

ofPAPS

Total nos Total

Annigeri (Govt) Annigeri

Financial status of compensation against land acquisition and rese and acquisition land against statuscompensationof Financial

Nameof village/station

not prepared) not submited)

ANNIGERI/ (SIA proposal new Alnawar (SIA proposal new Ginigera

Total (in ) Acres

Total ( in A-G-a) in ( Total

district

Nameof

Belgaumproposal Londa new 1 0.300

Belgaumproposal new Akrali 2 0.600

1 Koppal SOMPUR/Sompur

9 Belgaumproposal new Khurdagosh 1 0.300

3 Koppal SOMPUR/Sompur 7 0 4 4.400 4

6 Darwad

12 Koppal Koppal Koppal/Koppal HOSSALLI/Munirabad5 4 6 Koppal TALABALA/Bhanapur 0 07 7 28 Koppal 3 Koppal 1.625 5.125 BHANAPUR/Bhanapur 0 7 1 32 Koppal 2.225 BHANAPUR/Bhanapur3 3 Koppal HOSSALLI/Munirabad45 Koppal Koppal Koppal Additional Munirabad 6 Koppal 4/Munirabad Kampasagar 78 Gadag 0.850 2 Belgaum Bettageri/Gadag proposal Devarainew 0.400 3 1 0.52375 0.950

4 Darwad ANNIGERI/Annigeri

10

11

4.a Darwad

SNo

Under6(1) LA Purchase Direct

Table 12: Financial status of compensation in HT

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 25 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

368,750.00 368,413.00

1,182,099.00 2,008,126.00 1,019,510.00 2,732,814.00

Total Amount Total by

Village Disbursed Village

1 0 0 3 0 1

forwhich Payment Not

Numberof Land parcels

Madedue - lackto Either

0.00

0.00

0.00

0.00

Amount

Disbursed

Date of Date

29.06.2016 177,384.00

29.06.2016 191,029.00

23.07.2016 370,731.00

23.07.2016 154,472.00

07.07.2017 308,942.00

23.07.2016 278,048.00

10.05.2016 710,568.00

10.05.2016 185,365.00

23.07.2015 336,910.00

23.07.2015 774,998.00

01.09.2015 70,191.00

17.01.2015 151,451.00

15.04.2015 85,602.00

15.04.2015 131,697.00

26.08.2016 2,732,814.00

26.09.2016 515,548.00

26.09.2016 249,084.00

26.09.2016 127,439.00

26.09.2016 127,439.00

Paymentto

Landowners

3 3 7 5 4 2

Land

Noof

Parcels Parcels

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,,. ₹

₹ ,,. ₹

Award Amount Award

₹ ₹ ,,. ₹ ,,. ₹ ,,.

Award

Date of Date

14.01.2015 07.04.2014 18.01.2013 18.01.2013 18.01.2013 18.01.2013

14.12.2011 13.06.2013 26.12.2013 28.12.2011 28.12.2011 28.12.2011 28.12.2011

Notification

Date of 4(1) Date

Summary of Land Acquisition under LA Act of Land Summary Acquisition

NA

1 NA 1

ofLand

Agriculture Agriculture Agriculture Agriculture

6 Agriculture 6

Classification Classification

4 3 7 5 4 2

Parcels Parcels

ofLand

Number

0 0 0 0 0 0

0

0

9 5

23 25 31 16

17.7250

Extent Required Extent

2 2 1 1 4 5

17 29

15 109

ACRE GUNTA ANNA

Hosalli

Koppal

Talabal

Sompur

Annigeri

Bhanapur

Village Name Village

Gunta-Anna)

1 2 3 4 5 6

Total 6(1) Total including

Govt +PravateGovt (Acr-

S.No

Total Acr-Gunta-Anna) Total Total (Acr) with Govt land (Acr) Total

Table 13: Summary of Land Acquisition in HT

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 26 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Disbursed

₹ ,. ₹ 1,182,099.00 2,732,814.00 ,. ₹

Village Village wise

₹ ,,. ₹ ,,. ₹

Awarded

₹ ,. ₹ 1,182,099.00 6,089,420.00 ,. ₹

Village Village wise

₹ ,,. ₹ ,,. ₹

₹ ,,. ₹ ,,. ₹

Total

Name

Village Village KOPPAL

HOSALLI

SOMPUR

ANNIGERI

TALABALA

BHANAPUR

₹ . ₹

₹ . ₹ ₹ . ₹

₹ . ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹ ₹ ,. ₹

₹ ,. ₹ ₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹ ₹ ,. ₹ ₹ ,. ₹

₹ ,. ₹ ,. ₹ ,. ₹

Amount

Disbursed

₹ ,,. ₹

₹ ,,. ₹

3 3 1 7 2 4

20

TH TH

Disbursed

Village wise Village

28

23

22

31

10 12 12

20 13

23 26 22

GUNTAS

1.025 3.400

13.300

aginest aginest

0 0

0

0

12 3 9

0 0 0

00 5 5

0 0

0

0 2 0 0 0

0 0

0

0 0

0 5

0 0

1 8 0 6 0 9

13 12

Paid Land

under 6(1) up to Sep 2018.Sep to up 6(1) under

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹

₹ ,. ₹ ,. ₹ ₹ ,. ₹ ,. ₹

₹ ,. ₹

₹ ,. ₹ ₹ ,. ₹

₹ ,. ₹

₹ ,. ₹ ,. ₹ ,. ₹

₹ ,. ₹

₹ ,. ₹ ,. ₹ ₹ ,. ₹

₹ ,,. ₹ ₹ ,,. ₹

Awarded

₹ ,,. ₹

Amount(In Rs)

3 3 2 7 4

25

TH Land Land TH

Finalised

Disputed

Village wiseVillage

TH Awarded Awarded TH

Total5.TH 3

family disput. family

28

23

22

31

10 12 12 33

20 13

23 26 22

1.025

16.700

0

2

0 6

1 8 00 6 0 9 0 0 6 0

16 28

Extent Aquired ACRE GUNTAS ACRE

Statement of Land Compensation received by Land Owners received Land by Compensation Land of Statement

TOTALPravateAcres in

TOTAL in Acres and TOTALAcres in Gunta

ANNIGERIGovernment Land

Owners Name

Amountnot paid Land /Disputed Acres in

Basappa neelappa nittali Basappaneelappa 0 Mallayya channayya myagalamani Mallayyachannayya 0 7

Yarashi Kukanur Bharamappa S/O Bhanapur agasara hanumappa hallikeri Yarashi Kukanur

Mahesha S/O yankappa rayaraddy yankappa S/O Mahesha W/OShankrappa basamma Lingana Dodda RajashekaraShankrappa S/O 0 sanklapur virupakshappa Sharanappa agadi sanganna Virupakshappa VeerabadrappaHuccsappaDam R/O Munirabad pamanna Padmavati Satyanarayanayamanoorappa R/O 2 0 Satyanarayanayamanoorappa R/O Eeshappa varatatnal, Paravvaningappa 0 0 5 chitavadigi sanganabasappa Gavisiddappa 5 matt lakmapur shekharaiah Aiyappayya shivavva Yamanoorappamadivala, 0 basappa Dodda S/O Somashekharappa 4 Hallikeri yellappa dodda S/O Sharanappa bisnalli javalappa Dodda S/O Hanumappa 1 2 3 9

Mahamad Rafiq Tasidar Mahamad Tulasa w/orangannavar Sesappa 0 0

Prabhuraj basappa gali basappa Prabhuraj 0 5

7bhavi suvarnaiah gowda Rudra 0

10

11 55

54

60

9A

8/1

735

212 678

81A 53A

59A

53A

84/2

1340 1340

53A1 85A1

108A

Sy no Sy

1361/16Huli Tulasaw/o Subhas 1361/19 Rasid 0

Village Village Name

BHANAPUR

BHANAPUR

SOMPUR

ANNIGERI ANNIGERI TALABALA TALABALAKOPPAL 213/4 HOSALLI HOSALLI HOSALLI HOSALLI BHANAPUR BHANAPUR BHANAPUR SOMPUR SOMPUR

HOSALLI

HOSALLI SOMPUR

HOSALLI

4

23 ANNIGERI ANNIGERI 5 7 8 1 6 TALABALA 213/3 9 KOPPAL

18

20

23

11 13 25

16

10 12 14 15 17 19 21 22 24 Sl Sl no

Table 14: Status of land compensation paid in HT under LA Act

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 27 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

HT-1 List of Land Owners Registration for Direct Purchase to Railways as on Sep-2018 Registratio Amount in S.No District Village Owner Name (TH) Sy .No Acre Gunta Anna Acres Payment Remarks n Date Rs 1 Koppal HOSALLIEshappa S/O Bharamappa horatnal 59/1 0 6 0 0.1500 10/31/2017 ₹ , Paid Total 2 TH in 2 Koppal HOSALLI Paravva W/O Ningappa Horatnal 59/2 0 10 0 0.2500 10/31/2017 ₹ , Paid HOSALLI Total 1 TH in 3 Koppal KAMPASAGART Kishor Kumar S/O JANARDHAN 190 0 38 0 0.9500 10/31/2017 ₹ ,, Paid KAMPASAGAR

Yellangouda S/0 Ramangouda 3999/B1- 4 Gadag Betgeri 0 0.743802 0 0.0186 2/28/2018 ₹ ,, Paid Hanumantagouda 2A Dyamangouda S/0 3999/B1- 5 Gadag Betgeri Ramangouda 0 0.429752 0 0.0107 2/28/2018 ₹ ,, Paid 2B Hanumantagouda 1.Sri Sunil Maluram Joshi , 4007/35- Paid in Aug 6 Gadag Betgeri 2.Smt .Madhumati Anand 0 0.165289 0 0.0041 8/2/2018 ₹ , Paid B 2018 Joshi Sameer S/O Vasant rao Paid in Aug 7 Gadag Betgeri 3999B/29 0 0.469238 0 0.0117 8/13/2018 ₹ ,, Paid Kulkarni 2018

Sameer S/O Vasant rao 3999/B1, Paid in Aug 8 Gadag Betgeri 0 0.318641 0 0.0080 8/13/2018 ₹ , Paid Kulkarni A17 2018 Total Amount paid three TH 1.403168 ₹ ,,

Table 15: Status of land compensation paid in HT under Direct Purchase

5.9 Pune-Wadi-Guntakal

No land acquisition and no TH and NTH in this project.

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 28 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

The current status of land acquisition and resettlement plan implementation of different projects has been summarized as under:

Sections Item Indicators Raipur-Titlagarh Sambalpur Hospet Tinaighat Daund Gulbarga Daund Gulbarga Raipur-Titlagarh – – – – No project Titlagarh project * project project (Maharashtra project (Odisha (Chhattisgarh project* (Karnataka Section) Section) Section) Section) Appointment of Contract of M/S End of contract End of contract End of contract the RP Manjunath Enterprises End of contract 1 on 31/08/2016. on 31/08/2016. on 31/08/2016 End of contract on implementation for supply of R&R on 4/1/2016. 4/1/2016. NGO expert is in process No. of displaced 2 23 238 1313 (14 NTH) 81 NIL 5 households 1313 (14 NTH) (number of TH No. of displaced 3 23 238 Displaced 81 (under process) NIL 20 persons Persons under verification) No. of physically 4 displaced 23 151 14 NTH Under process NIL NIL households No. of physically 5 23 238 14 NTH Under process NIL NIL displaced persons

No. of economically 6 23 136 1327 TH & NTH 81 (Under process) NIL NIL displaced households

No. of 7 economically 23 238 Under process Under process NIL NIL displaced persons 8 Total number of NIL NIL Under process 81 (Under process) NIL NIL

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 29 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Sections Item Indicators Raipur-Titlagarh Sambalpur Hospet Tinaighat Daund Gulbarga Daund Gulbarga Raipur-Titlagarh – – – – No project Titlagarh project * project project (Maharashtra project (Odisha (Chhattisgarh project* (Karnataka Section) Section) Section) Section) titleholders being displaced

Total number of 9 non titleholders 23 238 14 NIL NIL 5 being displaced

Entitlement 10 Yes Yes Yes Yes Yes Yes matrix disclosed

Number of Identity cards Identity cards Identity cards Identity cards identity cards released to 23 11 distributed to all distributed to all distributed to PAPs of 5 NA 5 issued to the PAPs in PAPs 238 NTH PAPs villages (25 PAPs) displaced persons Kantabanji area

After award by Micro plans Deputy Land Revised corrected micro 12 prepared for Not required Not required Acquisition plan has been approved Not required Not required titleholders Officer (DLAO). in May 2015. Not yet.

Micro plans Completed and Completed and Completed and 13 prepared for non- submitted (23 submitted (238 submitted (14 NA NA Yes titleholders NTH) NTH) NTH) Micro plans 14 NA NA NA NA NA NA prepared for CPRs

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 30 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Sections Item Indicators Raipur-Titlagarh Sambalpur Hospet Tinaighat Daund Gulbarga Daund Gulbarga Raipur-Titlagarh – – – – No project Titlagarh project * project project (Maharashtra project (Odisha (Chhattisgarh project* (Karnataka Section) Section) Section) Section) Micro plans 15 NA NA Not yet Approved NA NA approved for TH Micro plans 16 Approved Approved Approved NA Approved Approved approved for NTH Micro plans 17 approved for NA NA NA NA NA NA CPRs Quantum of 18 private land to be NIL NIL 78.873 acres 29.2023 acres NIL NIL acquired Total scope of land= to 30.23 acres, Under LA Act Total 17.72 acres issued Requisition for with 6(1) notification LA submitted and and in progress for completed for 2.023 acres. Government, Under Direct Purchase: forest and 19 Progress on LA NA NA Negotiations finalized NIL NIL private land for for land of 9.050 acres, Sambalpur, possession taken place Sonepur, for 1.4032 acres and Baragarh and procession in progess Balangir districts. for 7.6468 acres. Balance still to be processed 1.4238 acres

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 31 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Sections Item Indicators Raipur-Titlagarh Sambalpur Hospet Tinaighat Daund Gulbarga Daund Gulbarga Raipur-Titlagarh – – – – No project Titlagarh project * project project (Maharashtra project (Odisha (Chhattisgarh project* (Karnataka Section) Section) Section) Section) Full and final Distributed to 12 PAPs 1st installment of installment has under Phase-I in assistance has been been distributed December 2013. distributed on Full and final Full and final to all 238 DPs of Distributed to 8 PAPs 24/12/12. installment of instalment of Mahasumund, under Phase II in April 2nd/final installment Whether compensation compensation Parvati Nagar, 2014. has been distributed on 20 compensation has been paid to 14 nos NA Chandi Nagar & Distributed to 5 PAPs 24/08/2013. Total 5 distributed to DPs distributed to all NTHs in Ekta Nagar area. under Phase-III in Sep PAPs identified as 23 nos DPs of April/August 2015. Squatters has been Kantabaji area 2016. compensated in two installment for 858,037 INR. Whether All the PAPs are assistance working in nearby distributed to Cement factory-Hotgi DPs and are getting 10,000

INR to 15,000 INR per 21 Yes Yes Yes Not yet NA month, and they have

given in writing that the dot eed a training as they are already employed. Special Land acquisition Officer cum Assistant GRC formed at 2 Commissioner has been Whether GRC GRC formed at 1 district GRC formed in all 22 nominated as a NA Yes formed district (Balangir) (Mahasumund 4 districts Chairman of GRC and and Raipur) AGM/RVNL as member of GRC from PIU

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 32 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Sections Item Indicators Raipur-Titlagarh Sambalpur Hospet Tinaighat Daund Gulbarga Daund Gulbarga Raipur-Titlagarh – – – – No project Titlagarh project * project project (Maharashtra project (Odisha (Chhattisgarh project* (Karnataka Section) Section) Section) Section) Complaints to 23 GRC received/ NIL NIL NIL NIL NIL NIL resolved

Consultations 24 3 places 4 places 5 places 13 places NA Yes held with DPs

Completed at Mahasamund, Kantabaji 25 Relocation Ekta Nagar, Completed NA NA Completed completed Parwati Nagar and Chandi Nagar Inventory of losses of 26 Completed Completed Completed Completed Completed Completed Displaced Persons (DPs) Impact on Completed Completed Completed Completed Completed Completed 27 Indigenous People/STs with (STs not found) (STs not found) (STs not found) (STs not found) (STs not found) (STs not found) kind of impact Table 16: Status of land Acquisition and Resettlement

*Impact reported by NGO/RVNL after verification may change after conducting social impact assessment study by Revenue Department or Joint Measurement Survey findings.

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 33 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Details regarding status of R&R implementation as on 30 September 2018

Length of Length Area of section No. of S. No Name of Project of line land to be Status of R&R implementation free from HHs/PAPs (in kms) acquired R&R

Identification and verification of PAPs has been revised and completed and submitted. Joint Measure Survey (JMS) has also been completed. GRC formed. Valuation of structures have also been completed and micro plan has been prepared and has been submitted on 09/09/2013 Raipur-Titlagarh doubling by NGO at total rehabilitation cost of 87,386,088 INR for 681 HHs. 1. 99.94 98.85 kms Nil 261/261 project (Odisha section) However, R&R expert of GC advised to minimize the Right of Way (ROW) and was agreed by PMC and RVNL. Actual COI (Corridor of Impact) was work out by NGO, RVNL and Revenue Officer. Micro plan has been revised and completed on 12/11/2013 at total R&R cost of 17,697,983.5 INR for 261 HHs based on actual COI. Micro plan approved and Identity cards distribution was started in Odisha section. Revised micro plans was approved in August 2015 for Mahasamund and Kantabanji areas bringing the new total to 261 HHs. Identity card distributed to 260 PAPs in Mahasamund District in Chhattisgarh Raipur-Titlagarh doubling section, Parvati Nagar, Chandi Nagar and Ekta Nagar section. Bond 2. project (Chhattisgarh 98.01 96.60 kms Nil 261/261 paper of PAPs completed. Assistance distributed through RTGS. Paid in section) December 2015 to June 2018. Full and final installment have been paid.

TH: Requisition for LA submitted for government and private land for Sambaplur, Sonepur Bargargh and Balangir Districts TH NTH: Identification and verification and Joint measurement report Sambalpur Titlagarh 78.873 3. – 182.00 125.00 kms 1313/5252 completed on 02/07/2013. Micro Plan prepared on 27/09/2013 at total doubling project acres NTH 14/14 rehabilitation cost of 6,657,962 INR for 65 HHs. However, Revenue officer (RO) provided ac tual corridor of Impact (COI) and track plan which was reviewed by ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 34 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Length of Length Area of section No. of S. No Name of Project of line land to be Status of R&R implementation free from HHs/PAPs (in kms) acquired R&R

RVNL representative and NGO with GC. Micro plan was revised accordingly and completed and submitted on 28/10/2013 for a total R&R cost of 4,419,511 INR for 38 NTHs. Micro plan was reviewed on behalf of PIU Sambalpur. Rehabilitation cost of 4,419,511 INR for 38 NTHs reduced to 33,40,643 INR for 14 NTHs. 1st instalment of compensation has been released to all 14 NTHs in April 2016. 2nd and final installment has been paid in August 2016. Identification and verification of PAPs has been completed and data updation work has also been completed and submitted Micro plan is finalized and Identity cards have been issued to PAPs of Koppal, Hosalli, Sompur and Annigeri villages Disbursement of allowances to PAPs (12 Nos.) under phase - I was conducted during 3rd week of December 2013 and (08 Nos) under Phase – II during the first week of April 2014.

Hospet Tinaighat doubling 30.23 Under Land Acquisition Act, the area of 17.72 acres of land has been 4. – 201.31 195.31 kms 81/308 project acres issued with notification under 6(1) for acquisition out of the scope of land acquisition is 19.7535 acres. Process for balance area of land acquisition for 2.0285 acres is in progress.

Under Direct purchase, 10.4738 acres of land to be acquired through direct purchase. Negotiations are finalized for land of 9.050 acres, possession taken place for 1.4032 acres and procession in progess for 7.6468 acres. Process for acquisition of balance area of 1.4238 acres is yet to initiated. Daund Gulbarga doubling 5. – 46 46 kms 0 0 NA project (Karnataka section) Daund–Gulbarga doubling Total 5 PAPs identified as Squatters has been compensated in two 6. project (Maharashtra 179 176 kms 0 5/20 installment of 858,037 INR. All the PAPs are found working in a nearby section) Cement factory-Hotgi and are getting INR 10,000 to 15,000 per month ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 35 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Length of Length Area of section No. of S. No Name of Project of line land to be Status of R&R implementation free from HHs/PAPs (in kms) acquired R&R

ad the hae gie i itig that the dot eed a taiig. The GC social has collected all the relevant papers for final completion of this section. GC Social Expert recommends to close this project. Table 17: Details regarding Rehabilitation and Resettlement

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 36 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Annexure I: R&R nomination of Technical Member for SIA

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 37 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Annexure II: Extension of R&R consultant in Hospet-Tinaighat project

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 38 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Annexure II: Site visit of R&R expert in Hospet-Tinaighat project in June 2018

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 39 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Egis Rail – Egis India R&R Implementation Status No. 11 September 2018

Annexure III: Site visit of R&R expert in Sambalpur-Titlagarh project in September 2018

ADB Loans No. 0060-IND / 2793-IND, 3108-IND and 3623-IND 40 Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes