Awarded Solar Projects As of 31 December 2017

Total Page:16

File Type:pdf, Size:1020Kb

Awarded Solar Projects As of 31 December 2017 AWARDED SOLAR PROJECTS as of December 31, 2017 POTENTIAL INSTALLED CITY / ISLAND / GRID REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY MUNICIPALITY (MW) (MW) 1. Work Program - Not compliant NorthWind Power 2. Performance Bond - Not compliant Bangui Solar Power LUZON I Ilocos Norte Burgos Development 3. Reportorial Obligations - Not compliant 2.50 Project Corporation 4. RESHERR - Not compliant 5. ATP - Not compliant 1. Compliant with Work Plan 2. Not applicable Performance Bond Burgos Solar Power Energy Development 3. Compliant Reportorial Obligations 2.66 Project Phase 2 Corporation 4. Compliant with RESHERR 5. Compliant with ATP 1. Work Program - Compliant 2. Performance Bond - Compliant Burgos Solar Power Energy Development 3. Reportorial Obligations - Compliant 4.10 Project Phase I Corporation 4. RESHERR - Compliant 5. ATP - Compliant 1. Work Plan - Compliant 2. Performance Bond - Not applicable Currimao Solar Power Mirae Asia Energy Currimao 3. Reportorial Obligations - Compliant 20.00 Project Corporation 4. RESHERR - Compliant 5. ATP - Compliant 1. Work Program - Not compliant 2. Performance Bond - Expired Ilocos Norte Phase I Solar Del Sol Energy Primera, Paoay 3. Reportorial Obligations - Not compliant 40.00 Power Project Inc. 4. RESHERR - Not compliant 5. ATP - Not compliant 1. Work Program - Not compliant 2. Performance Bond - Expired Ilocos Norte Phase II Solar Del Sol Energy Primera, 3. Reportorial Obligations - Not compliant 40.00 Power Project Inc. 4. RESHERR - Not compliant 5. ATP - Not compliant AWARDED SOLAR PROJECTS as of December 31, 2017 POTENTIAL INSTALLED CITY / ISLAND / GRID REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY MUNICIPALITY (MW) (MW) 1. Work Program - Not compliant 2. Performance Bond - Expired Paoay II Solar Power Del Sol Energy Segunda, LUZON I Ilocos Norte Paoay 3. Reportorial Obligations - Not compliant 40.00 Project Inc. 4. RESHERR - Not compliant 5. ATP - Not compliant 1. Work Program - Not compliant 2. Performance Bond - Expired Paoay III Solar Power Del Sol Energy Tercera, 3. Reportorial Obligations - Not compliant 40.00 Project Inc. 4. RESHERR - Not compliant 5. ATP - Not compliant 1. Work Program - Not compliant 2. Performance Bond - Not compliant Pasuquin East Solar Power Energy Logics Philippines, Pasuquin, Burgos 3. Reportorial Obligations - Compliant 4.00 Project Inc. 4. RESHERR - Compliant 5. ATP - Compliant 1. Reportorial Obligations - Non-compliant Sarrat Sarrat Solar Power Project Bosung Solartec, Inc. 1.00 2. RESHERR -under evaluation 1. Delayed Work Program 2. Valid Performance Bond Bulacan 1 Solar Power Cleantech Global Bulacan San Ildefonso 3. No submission of Reportorial Obligations 15.00 Project Renewables, Inc. 4. Not compliant with RESHERR 5. No submission of ATP 1. Work Program - Not compliant 2. Performance Bond - Not compliant Bulacan 2 Solar Power Cleantech Global 3. Reportorial Obligations - Not compliant 40.00 Project Renewables, Inc. 4. RESHERR - Not compliant 5. ATP - Not compliant 1. Work Program - On-going 2. Performance Bond - Compliant Bugallon & San Bugallon Solar Power Phinma Energy Pangasinan 3. Reportorial Obligations - Compliant 0.00 Carlos City Project Corporation 4. RESHERR -Non-compliant 5. ATP -Non-compliant AWARDED SOLAR PROJECTS as of December 31, 2017 POTENTIAL INSTALLED CITY / ISLAND / GRID REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY MUNICIPALITY (MW) (MW) 1. On-going implementation of Work Program 2. Non-posting of Performance Bond Sitio Papallasen Solar Luminar Technology and LUZON I Pangasinan Burgos and Dasol 3. No submission of Reportorial Obligations 50.00 Power Project Management Center Inc. 4. On-going compliance with RESHERR 5. No submission of ATP 1. Delayed Work Program 2. Valid Performance Bond Pangasinan I Solar Power Cleantech Global Dasol 3. No submission of Reportorial Obligations 50.00 Project Renewables, Inc. 4. Not compliant with RESHERR 5. No submission of ATP 1. Work Program - Not compliant 2. Performance Bond - Compliant Labrador Solar Power Labrador IJG1 Philippines Inc. 3. Reportorial Obligations - Not Compliant 5.00 Project 4. RESHERR - Not Compliant 5. ATP - Not Compliant 1. Work Program - Not compliant 2. Performance Bond - Not compliant Pugaro Solar Power AVGarcia Power Systems Manaoag 3. Reportorial Obligations - Not compliant 2.00 Project Corp. 4. RESHERR - Not compliant 5. ATP - Not compliant 1. Work Program - Not Compliant 2. Performance Bond - Compliant Mapandan and Manaoag Solar Power SunAsia Energy Inc. 3. Reportorial Obligations - Compliant 10.14 Santa Barbara Project 4. RESHERR - Not Compliant 5. ATP - Compliant 1. Work Program - On-going 2. Performance Bond - Compliant San Manuel 1 Solar Power Pilipinas Newton Energy San Manuel 3. Reportorial Obligations - Non-compliant 70.00 Project Corp. 4. RESHERR -under evaluation 5. ATP -Compliant AWARDED SOLAR PROJECTS as of December 31, 2017 POTENTIAL INSTALLED CITY / ISLAND / GRID REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY MUNICIPALITY (MW) (MW) 1. Work Program - Compliant 2. Performance Bond - Compliant San Manuel 2 Solar Power Pilipinas Einstein Energy LUZON I Pangasinan San Manuel 3. Reportorial Obligations - Compliant 70.00 Project Corp. 4. RESHERR - On going 5. ATP - Compliant 1. Work Program - On going 2. Performance Bond - Compliant Currimao Solar Power Currimao Solar Energy Ilocos Sur Currimao 3. Reportorial Obligations - On going 0.00 Project Corp. 4. RESHERR - On going 5. ATP - Compliant 1. Work Program - Not compliant 2. Performance Bond - Compliant Magsingal Solar Power Magsingal Neoenergy Corporation 3. Reportorial Obligations - Compliant 100.00 Project 4. RESHERR - Not compliant 5. ATP - Not compliant 1. Work Program - Compliant 2. Performance Bond - Compliant Sulvec Solar Power Narvacan Neoenergy Corporation 3. Reportorial Obligations - Compliant 20.00 Project 4. RESHERR -Compliant 5. ATP - Not Compliant 1. Work Program - On-going 2. Performance Bond - Non-compliant Satrap Power Santa Santa Solar Power Project 3. Reportorial Obligations - Non-compliant 20.00 Corporation 4. RESHERR -Non-compliant 5. ATP -Non-compliant 1. Work Program - Not compliant 2. Performance Bond - Not compliant GreEnergy Power II Cagayan Aparri Aparri Solar Power Project 3. Reportorial Obligations - Not compliant 105.00 Systems Philippines, Inc. 4. RESHERR - Not compliant 5. ATP - Not compliant AWARDED SOLAR PROJECTS as of December 31, 2017 POTENTIAL INSTALLED CITY / ISLAND / GRID REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY MUNICIPALITY (MW) (MW) 1. Work Program - Not compliant Natures Renewable 2. Performance Bond - Expired Lal-lo and Lal-lo Hybrid Solar Power LUZON II Cagayan Energy Dev't. (NAREDCO) 3. Reportorial Obligations - Compliant 100.00 Gattaran Project Corporation 4. RESHERR - Not compliant 5. ATP - Not compliant 1. Work Program - With DOC (Under evaluation) 2. Performance Bond - Compliant Cordon Solar Power Isabela Cordon Greenergy Solutions Inc. 3. Reportorial Obligations - Compliant 50.00 Project 4. RESHERR - Compliant 5. ATP - Not compliant 1. Work Program - Not compliant 2. Performance Bond - Not compliant Isabela Solar Power Living Projects 4 People Ilagan 3. Reportorial Obligations - Not compliant 100.00 Project Philippines Inc. 4. RESHERR - Not compliant 5. ATP - Not compliant 1. Work Program - On-going 2. Performance Bond - Compliant Ilagan City Solar Power Ilagan City Greenergy Solutions Inc. 3. Reportorial Obligations - Non-compliant 100.00 Project 4. RESHERR -Compliant 5. ATP -Non-compliant 1. Work Program - Not compliant 2. Performance Bond - Expired Ramon Solar Power Ramon & Santiago AAESUN Corporation 3. Reportorial Obligations - Not compliant 5.00 Project 4. RESHERR - Not compliant 5. ATP - Not compliant 1. Work Program - Not compliant 2. Performance Bond - Compliant Reina Mercedes & Isabela Solar Power Daebo Green Pacific Inc. 3. Reportorial Obligations - Not Compliant 18.00 Luna Project 4. RESHERR - Not Compliant 5. ATP - Not Compliant AWARDED SOLAR PROJECTS as of December 31, 2017 POTENTIAL INSTALLED CITY / ISLAND / GRID REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY MUNICIPALITY (MW) (MW) 1. Work Program - On going 2. Performance Bond - Compliant San Pablo Solar Power Solar Valley Energy LUZON II Isabela San Pablo 3. Reportorial Obligations - On going 130.00 Project Solutions Inc. 4. RESHERR - Not Compliant 5. ATP - Not Compliant 1. Work Program - On going 2. Performance Bond - Compliant San Pablo and Limbauan Solar Power BKS Green Energy Corp. 3. Reportorial Obligations - On going 25.00 Cabagan Project 4. RESHERR - Not Compliant 5. ATP - Not Compliant 1. Work Program - Not Compliant 2. Performance Bond - Expired Sta. Maria Solar Power Sta. Maria Greenergy Solutions Inc. 3. Reportorial Obligations - Compliant 100.00 Project 4. RESHERR - Compliant 5. ATP - Not Compliant 1. Work Program - Not compliant East Coast FAS 2. Performance Bond - Not compliant Renewable Energy and 3. Reportorial Obligations - Not compliant 30.00 Industrial Corporation 4. RESHERR - Not compliant 5. ATP - Not compliant 1. Work Program - On going East Coast Asia Power 2. Performance Bond - Compliant Isabela and Santa Maria & Maria Lourdes Green Development 3. Reportorial Obligations - On going Cagayan Enrile Solar Power Project Corporation 4. RESHERR - On going 5. ATP - On going 1. Work Program - On going East Coast Asia Power 2. Performance Bond - Compliant II and Isabela and Santa Maria- Pasto Di Apolonio Solar Development 3. Reportorial Obligations
Recommended publications
  • Real Impact: Be Secure Project
    REAL IMPACT: BE SECURE WATER SECURITY FOR RESILIENT ECONOMIC GROWTH AND STABILITY USAID’s Real Impact series highlights examples of water sector projects around the world. Each issue provides from-the-field insights about successful approaches, challenges faced, and lessons learned. OVERVIEW storms. Further complicating the situation are the approximately 20 typhoons that hit the country Location: Philippines annually. Duration: 2012–2017 Total USAID Funding: $21.6 million Responding to these challenges, USAID’s Water Security for Resilient Economic Growth and Stability Primary Implementing Partner: AECOM (Be Secure) Project works in six selected sites to increase sustainable access to water and wastewater treatment services and resilience to water stress and extreme CHALLENGE weather. The Philippines has emerged as one of the fastest Province Cities / growing economies in Southeast Asia, with GDP Municipalities growth averaging 6 percent between 2010 and 2016. Basilan Isabela City, Maluso Despite the growth, poverty still persists, exacerbated by 15 million Filipinos lacking access to clean water, Leyte Tacloban City, Ormoc and 26.5 million with little or no access to sanitation City facilities. Iloilo Iloilo City Maguindanao Cotabato City Much of the population is vulnerable to changing Misamis Oriental Cagayan de Oro City weather patterns that include less rain, longer Zamboanga Peninsula Zamboanga City dry seasons, increased flooding, and more violent partnership, the water district upgraded its maintenance department and GIS division, ensuring the sustainability of the NRW program beyond the term of USAID’s support. Be Secure works with water districts to design efficient, new water systems. Equipped with project-procured feasibility studies, Cagayan de Oro and Cotabato cities can now determine the best sites to tap additional water sources as they prepare to meet future demand.
    [Show full text]
  • Kaingin in the Philippines: Is It the End of the Forest?
    RURAL DEVELOPMENT FORESTRY NETWORK FROM THE FIELD Kaingin in the Philippines: is it the end of the forest? Anna Lawrence A Synthesis of Results of the FTPP Farmer-initiated Research and Extension Practices Initiative in East Africa Christoffel den Biggelaar Slash-and-Burn in the History of the Swedish Forests Henning Hamilton Forest Genetic Resources in Central America: The Challenge of Conservation Adrian J. Barrance Network Paper 21f Summer 1997 Contents Page Kaingin in the Philippines: is it the end of the forest? Anna Lawrence 1 A Synthesis of Results of the FTPP Farmer-initiated Research and Extension Practices Initiative in East Africa Christoffel den Biggelaar 9 Slash-and-Burn in the History of the Swedish Forests Henning Hamilton 19 Forest Genetic Resources in Central America: The Challenge of Conservation Adrian J. Barrance 25 The authors may be contacted at the following addresses: Anna Lawrence, AERDD, The University of Reading, PO Box 238, Earley Gate, Reading RG6 6AL, UK. Christoffel den Biggelaar, 100 North Street, Apt 322, Columbus OH 43202, USA. Henning Hamilton, Skogens Hus, Falkvägen 22, 183 50 Täby, Sweden. Adrian Barrance, ESA Consultores, Apartado Postal 4227, Tegucigalpa, Honduras, CA. ISSN 0968-2627 (formerly Social Forestry Network ISSN 0951-1857) Kaingin in the Philippines: is it the end of the forest? Anna Lawrence Introduction Kummer (1992) writes that a lack of data and confusion over terms has given the impression that shifting cultivation, often known as kaingin (in tagalog), is the predominant form of agriculture in the Philippines, and that it is responsible for deforestation. His view is that both of these assertions are overstatements, and detailed work by Olofson (1980) shows that the word kaingin has a range of meanings which reveal the diversity of hillside farming systems in the Philippines.
    [Show full text]
  • Highlights Situation Overview
    Philippines: Typhoon Haiyan Situation Report No. 9 (as of 15 November 2013) This report is produced by OCHA Philippines in collaboration with humanitarian partners. It was issued by OCHA Philippines. It covers the period from 14 to 15 November 2013. The report is issued at 18:00 Manila time (10:00 UTC). The next report will be issued on or around 16 November. Highlights The number of people affected has increased to 12.9 million, with over 1.9 million people displaced. This represents a significant increase from the previous reporting period. An estimated 150,000 people have access to water from 28,000 water connections which have been restored in eight municipalities in Tacloban. 170,475 people received family food packs, of which over 34,000 packs were distributed on 14 November in Leyte. 12.9 million 1.9 million 285,993 Affected people People displaced Damaged houses Source: DSWD as at 18:00 (10:00 UTC) Situation Overview One week after Typhoon Haiyan (locally known as Yolanda) struck the Philippines, the Department of Social Welfare and Development (DSWD) estimates that 12.9 million people have been affected across nine regions (Eastern Visayas, Western Visayas, Central Visayas, MIMAROPA, CALABARZON, Bicol, Northern Mindanao, Davao, and Caraga). These figures continue to change as more reports are verified. The number of people displaced increased from 900,000 people on 14 November to 1.9 million people on 15 November. In the same period, the number of people living outside of evacuation centers has almost tripled from over 575,000 people to 1.4 million people.
    [Show full text]
  • 5. Disaster Risk Reduction Efforts and Resettlement: Experience of JICA Philippines
    Disaster Risk Reduction Efforts and Resettlement Experience of JICA Philippines Hayato NAKAMURA Mr. Project Formulation Advisor on DRM JICA Philippines Today’s Presentation 1. Disaster experience and ROW (right of way)/ resettlement in the Philippines 2. JICA’s Experience in Ormoc 3. Further way to go: Disaster Risk Monitoring and Resettlement EFCOS (flood warning) KAMANAVA Flood Control Pasig Marikina River Channel Improvement Manggahan Floodway West Manggahan Flood Control Flood Control and Sabo Engineering Centre Whole area is covered by MMEIRS study, Metro Manila Drainage etc… 1: Disaster Experience and ROW (right of way)/ Resettlement in the Philippines Key steps for seeing relation between urban resettlement and people’s safety/ resilience Key Disaster Events in the Philippines • 2009 Typhoon Ondoy (Ketsana) @ Metro Manila 956 Claimed their life, Net amount of damages 4,383 mil dollars (2.7% of GDP) • 2011 Typhoon Sendong (Washi) @ Cagayan de Oro 1268 Claimed their life, Net amount of damages 48.4 mil dollars • 2013 Typhoon Yolanda (Haiyan) @ Tacloban Over 6,000 peoples Claimed their life, Net amount of damages 2.68 billion dollars Metro Manila‐ Typhoon Ondoy • Informal Settlers/ settlers along the river way: easily became victims for the flood • Encroachment‐ one of the big obstacles to undermine river capacity Previous Administration started “Relocation of the when having floods peoples at the disaster prone area” (2012 and onwards) Cagayan de Oro‐ Typhoon Sendong • Isla de Oro (Sandbar in the river)/ Macasandig area washed away totally Declaration of “No Build Zone” • JICA shared the notion of “River Boundaries” at the planning stage of flood risk management project after the disaster Tacloban‐ Typhoon Haiyan • A lot of peoples were washed away‐ particularly along the coastal settlers • JICA proposed Build Back Better Thorough hazard mapping and analysis: Proposed resilient land use planning (by seeing not only worst case scenario but also more frequent disaster case) Hazard Mapping of Storm Surge Yolanda 50 yr.
    [Show full text]
  • Adaptation of Community and Households to Climate – Related Disaster
    Note: Note: Adaptation of Community and Households to Climate – Related Disaster The Case of Storm Surge and Flooding Experience in Ormoc and Cabalian Bay, Philippines Canesio Predo January, 2010 [Type the author name] [Type the company name] Economy and Environment Program for[Pick Southeast the date] Asia Climate Change Technical Reports WHAT IS EEPSEA? The Economy and Environment Program for Southeast Asia was established in May 1993 to support training and research in environmental and resource economics. Its goal is to strengthen local capacity in the economic analysis of environmental problems so that researchers can provide sound advice to policy-makers. The program uses a networking approach to provide financial support, meetings, resource persons, access to literature, publication avenues, and opportunities for comparative research across its nine member countries. These are Thailand, Malaysia, Indonesia, the Philippines, Vietnam, Cambodia, Lao PDR, China, and Papua New Guinea. EEPSEA’s structure consists of a Sponsors Group, comprising all donors contributing at least USD 100,000 per year, an Advisory Committee of senior scholars and policy- makers, and a secretariat in Singapore. EEPSEA is a project administered by the International Development Research Centre (IDRC) on behalf of the Sponsors Group. EEPSEA TECHNICAL REPORTS EEPSEA Technical Reports include studies that are either too academic and/or technical for wider circulation. It also includes research work that are based on short-term inquiries on specific topics (e.g. case studies) and those that are already published as part of EEPSEA special publications (e.g. books). Adaptation of Community and Households to Climate-Related Disaster The Case of Storm Surge and Flooding Experience in Ormoc and Cabalian Bay, Philippine and Canesio Predo ACKNOWLEDGEMENT The authors would like to thank the Economy and Environment Program for Southeast Asia (EEPSEA) and the International Development Research Center (IDRC) for providing funding support to this project.
    [Show full text]
  • AWARDED SOLAR PROJECTS As of 30 JUNE 2020
    AWARDED SOLAR PROJECTS as of 30 JUNE 2020 . ISLAND / POTENTIAL INSTALLED REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT GRID CAPACITY (MW) CAPACITY (MW) LUZON I Pangasinan Anda 1 MWp Anda Solar Power Project Pangasinan I Electric Cooperative, Inc. Pre-Development Stage 0.00 Bolinao 5 MWp Bolinao Solar PV Power Plant EEI Power Corporation Pre-Development Stage 5.00 Bugallon & San Carlos City Bugallon Solar Power Project Phinma Energy Corporation Pre-Development Stage 1.03 Labrador Labrador Solar Power Project IJG1 Philippines Inc. Development Stage 5.00 Labrador, Mabini and 90 MW Cayanga- Bugallon SPP PV Sinag Power Inc. Pre-Development Stage 90.00 Infanta Mapandan and Santa OneManaoag Solar Corporation (Formerly Sta. Barbara Solar Power Project Development Stage 10.14 Barbara SunAsia Energy Inc.) Rosales Rosales Solar Power Project C Squared Prime Commodities Corporation Pre-Development Stage 0.00 San Manuel San Manuel 2 Solar Power Project Pilipinas Einstein Energy Corp. Pre-Development Stage 70.00 San Manuel 1 Solar Power Project Pilipinas Newton Energy Corp. Pre-Development Stage 70.00 Sison and Binalonan Binalonan Solar Power Project PV Sinag Power Inc. Pre-Development Stage 50.00 Ilocos Norte Burgos Burgos Solar Power Project Phase I Energy Development Corporation Commercial Operation 4.10 Burgos Solar Power Project Phase 2 Energy Development Corporation Commercial Operation 2.66 NorthWind Power Development Bangui Solar Power Project Pre-Development Stage 2.50 Corporation Currimao Currimao Solar Power Project. Nuevo Solar Energy Corp. Pre-Development Stage 50.00 Currimao Solar Power Project.. Mirae Asia Energy Corporation Commercial Operation 20.00 .
    [Show full text]
  • Legend Bernard Tomas Anahawan Matalom Oppus San Juan
    Eastern Visayas: Road Conditions as of 7 December 2014 Sorsogon Biri Low-Lying Portions of the Road IMPASSABLE due to Flooding Lavezares Palapag San Jose Laoang Allen Rosario Catbalogan-Catarman via Allen Mondragon San PASSABLE Roque Mapanas Victoria Catarman Capul San Bobon Antonio Catubig Northern Samar Pambujan Gamay San Isidro Lapinig Lope de Vega Silvino Las Navas Lobos Jipapad Arteche Low-Lying Portions of the Road San Policarpo IMPASSABLE due to Flooding Calbayog City Matuguinao Oras Gandara Maslog Tagapul-An San Jose Dolores Catbalogan-LopeDeVega-Catarman Santa de Buan IMPASSABLE due to Margarita Landslide San Jorge Can-Avid Tacloban-Hinabangan-Taft Pagsanghan Jiabong-Tacloban Road Motiong PASSABLE Tarangnan Samar Almagro IMPASSABLESanto due to LandslideNino at Jiabong Masbate Paranas Taft Catbalogan Jiabong Taft-Borongan Road City IMPASSABLE due to Catbalogan-Jiabong Road Sulat Debris & Flooding Maripipi PASSABLE San Julian Hinabangan San Sebastian Kawayan Brgy.Buray-Taft RoadZumarraga Going In & Out of Almeria Culaba IMPASSABLE due to Calbiga Culaba, Biliran Biliran Debris & Flooding Eastern Samar INACCESSIBLE ACCESS ROADS Naval Daram Caibiran Pinabacdao Villareal Borongan City Biliran Calubian Talalora Cabucgayan Santa Rita San Maydolong Isidro Balangkayan Basey Babatngon Leyte San Llorente Tabango Hernani Barugo Miguel Tacloban City General Capoocan Tunga Balangiga Macarthur Carigara Marabut Alangalang Santa Villaba Lawaan Quinapondan Leyte Fe Tacloban to Borongan via Basey Kananga Jaro Salcedo Palo PASSABLE Giporlos All Roads
    [Show full text]
  • Support for Typhoon-Stricken Leyte Island (PDF/257KB)
    FEATURE DISASTER MANAGEMENT: EDUCATIONAL EFFORTS Flooding in Ormoc in 1991 caused by Tropical Storm Thelma (above). The Pasig River on the outskirts of Manila, where work by Japan on the banks has reduced damage from fl ooding (right). nancial resources to carry out crucial riverfront pletion. Inaugurated in December 2000, the flood-prevention projects, though, leaving the resi- 10-meter-wide Makoto Migita Street is the main dents vulnerable to flooding. Eventually, JICA ar- route to a resettlement site in the village of Lao, rived to provide assistance. With a vision of a flood- about six kilometers from the river. A monument control project for Ormoc, JICA conducted a honoring Migita’s memory stands beside the street development survey in 1993. From 1997 to 2001, that bears his name. JICA constructed four new bridges and built three In July 2003, two years after the project’s com- slit dams to reduce the danger of floating trees and pletion, Ormoc was once again battered by a major landslides. JICA also widened the rivers, created an typhoon equal in scale to Tropical Storm Thelma. entire diking system, and provided other protective As in 1991, the city endured torrential rains. But infrastructure to improve drainage of the city’s two this time, the slit dams protected the residents from major rivers. floating trees and landslides, and the city streets The bridge construction and widening of rivers were only submerged momentarily. Because of the required displacement and relocation of some of newly constructed river embankments, there were Ormoc’s citizens. The city government acquired re- no casualties.
    [Show full text]
  • Planning and Implementation
    Sub-category Definition Guidelines and standards incorporating Design guidelines (5.1) disaster and climate risk are developed and used 5 Land-use and urban plans are prepared by Land-use and urban incorporating disaster and climate risk and with planning (5.2) PLANNING AND an assessment of ecosystem services Public and private investments are channelled IMPLEMENTATION to strengthen resiliency of critical facilities, including schools, hospitals, evacuation Disaster-resilient facilities, roads and transport, river and coastal investments (5.3) dykes, reservoirs and irrigation networks, forests and retardation areas, etc., and they are implemented in a stage-wise manner Drought risk reduction measures including Drought risk reduction water saving and agricultural measures are (5.4) implemented GP-5.1a: Design guidelines incorporating climate change, Department of Public Works and Highways (DPWH), the Philippines Description of practice: The Department Order of DPWH “Upgrades on Flood Control and Road Drainage Standards” considering adaptation to climate change was issued in June 2011. This Department Order sets the minimum flood return periods to be used for the design of flood control and road drainage facilities. For rivers, it stipulates a) for principal and major rivers (40km2 drainage area and above), shall be 50 year flood with sufficient freeboard to contain the 100 year flood, b) for small rivers (below 40km2 drainage area), shall be 25 year flood with sufficient freeboard to contain the 50 year flood. Climate hazards addressed by the practice: Floods DRR and CCA benefits: Flood safety level can be improved by taking into consideration the climate change impacts. Scalability potential: There is scalability potential.
    [Show full text]
  • 2019 Regional Nutrition Situation
    2020 Regional Nutrition Situation 2020 OPERATION TIMBANG PLUS COVERAGE Local Government No. of LGUs No. of LGU with % Submission Units Submission Province 6 6 100% City 7 7 100% Municipality 136 134 98.5% Note: No 2020 OPT+ report from Matag-ob and Villaba, Leyte Total Estimated population Actual number of Percent Coverage Population 0-59 months 0-59 4,742,337 533,039 349, 946 65.7% No. of IP PS measured 4,051 Number of Number of Total Number of Total Number of Province/Independent City Cities/Municipalities with Barangays with OPT Cities/Municipalities Barangays OPT Plus Results Results (1) (2) (3) (4) (5) EASTERN SAMAR 22 22 536 536 SAMAR 24 24 737 731 NORTHERN SAMAR 24 24 569 503 LEYTE 40 37 1,196 1,106 SOUTHERN LEYTE 18 18 430 430 BILIRAN 8 8 132 132 TACLOBAN 0 0 138 129 ORMOC 0 0 110 110 BAYBAY 0 0 92 90 MAASIN 0 0 70 70 CATBALOGAN 0 0 57 57 CALBAYOG 0 0 157 129 BORONGAN 0 0 61 46 STATUS (0-59 months Preschool Children) WEIGHT FOR AGE Magnitude Prevalence Underweight 20,882 6.0% Severely Underweight 5,240 1.5% UW + SUW 26, 122 7.5% HEIGHT FOR AGE Stunted 41,887 12.0% Severely Stunted 16,962 4.8% S+SS 57,980 16.8% WEIGHT FOR LENGTH/HEIGHT Normal 319, 210 91.2% Wasted 10, 136 2.9% Severely Wasted 3, 754 1.1% Overweight 9,625 2.8% Obese 7,137 2.0% W+SW 16,417 4% OW+Ob 15,896 4.8% 2020 REGIONAL NUTRITIONAL STATUS (per age group) 25.0% 20.0% 19.5% 19.2% 18.0% 17.6% 15.0% 11.3% 9.5% 9.2% 10.0% 8.8% 8.2% 6.8% 6.3% 5.3% 4.9% 5.0% 4.9% 4.4% 4.3% 4.3% 5.0% 3.6%3.9% 3.8% 3.3% 3.2% 2.5% 0.0% 0-5 439936-11 4418812-23 24-25 36-47 48-59 UW+SUW St+SSt
    [Show full text]
  • Urban Planning Following Humanitarian Crises Supporting Local Government to Take the Lead in the Philippines Following Super Typhoon Haiyan
    Urban planning following humanitarian crises Supporting local government to take the lead in the Philippines following super typhoon Haiyan Elizabeth Parker, Victoria Maynard, David Garcia and Rahayu Yoseph-Paulus Working Paper Urban; Policy and planning Keywords: June 2017 Humanitarian response, urban planning, urban crises, local, cities, government, Philippines, Tacloban, Guiuan, Ormoc URBAN CRISES About the authors Produced by IIED’s Human Settlements Elizabeth Parker’s* work has focussed on urban resilience, Group disaster recovery and regeneration across a range of The Human Settlements Group works to reduce poverty and geographies since completing her MA in Development and improve health and housing conditions in the urban centres of Emergency practice at Oxford Brookes University. Originally Africa, Asia and Latin America. It seeks to combine this with trained as an architect, Elizabeth spent five years working for promoting good governance and more ecologically sustainable Arup, including on the Rockefeller Foundation funded Asian patterns of urban development and rural-urban linkages Cities Climate Change Resilience Network (ACCCRN). Victoria Maynard trained as an architect and has worked for organisations such as UN-Habitat and the IFRC since Acknowledgements becoming involved in post-disaster reconstruction following The authors are indebted to UN-Habitat Philippines staff – past the Indian Ocean tsunami. She is currently completing a PhD and present – who allowed us the opportunity to document and at University College London, in partnership with Habitat share their valuable work. In particular thanks go to Christopher for Humanity Great Britain, where her research focuses Rollo, Maria Adelaida Mias-Cea and all the team for their on decision-making by the Philippine government and support in undertaking the research.
    [Show full text]
  • Mpleted GBV Activities As of 24 Feb 2014
    PHILIPPINES: Ongoing and Completed GBV activities as of 24 Feb 2014 Occidental MRinedgoiroon 6 Masbate Roxas City CFSI, DSWD, FPOP, IOM, UNFPA Roxas Aklan City " Carles m DSWD, UNFPA Banga Ivisan CFSI FPOP Estancia DSWD, IOM, UNFPA Capiz Pontevedra Pilar Sigma IOM IOM FPOP Concepcion Antique DSWD, UNFPA Passi City Iloilo CFSI Palawan San Jose CFSI Bago City CFSI Negros m" Occidental Cebu Bohol m" Coordination Hub Ongoing Activities Completed Activities Data Sources: 3W data provided by IASC cluster lead agencies and compiled by OCHA. Geographic data from NAMRIA Glide Number: TC-2013-000139-PHL PHILIPPINES: Ongoing and Completed GBV activities as of 24 Feb 2014 Masbate Samar Region 7 Roxas City CFSI, DSWD, FPOP, IOM, UNFPA Carles "Roxas City DSWD, UNFPA Banga m Pilar Biliran CFSI IOM Aklan Ivisan FPOP Estancia Sigma DSWD, IOM, UNFPA Capiz FPOP Pontevedra Tacloban City IOM Leyte DSWD, IOM, PNP, UNFPA, WVI Concepcion Kananga Passi City DSWD, UNFPA Alangalang CFSI UNFPA DSWD, Iloilo m" UNFPA, WVI Ormoc Ormoc City UNFPA, WVI Bago City CFSI Cebu City Negros Cebu m" Occidental Southern Leyte Bohol m" Coordination Hub Ongoing Activities Completed Activities Data Sources: 3W data provided by IASC cluster lead agencies and compiled by OCHA. Geographic data from NAMRIA Glide Number: TC-2013-000139-PHL PHILIPPINES: Ongoing and Completed GBV activities as of 24 Feb 2014 Albay Region 8 Northern Samar Masbate Eastern Samar Samar Biliran Balangkayan UNFPA Hernani DSWD, Borongan City UNFPA Alangalang UNFPA General DSWD, Macarthur Kananga UNFPA, WVI UNFPA UNFPA Tacloban Quinapondan " DSWD, UNFPA m Lawaan UNFPA Tacloban City Mercedes DSWD, IOM, UNFPA PNP, UNFPA, WVI Julita WVI Balangiga Guiuan DSWD, UNFPA Giporlos Salcedo " m" DSWD, DSWD, UNFPAm Ormoc UNFPA Tolosa Ormoc City Guiuan DSWD, UNFPA UNFPA, WVI DSWD, PNP, UNFPA Dulag Mayorga DSWD, UNFPA, WVI WVI Leyte Cebu Southern Leyte Cebu City m" Bohol m" Coordination Hub Ongoing Activities Completed Activities Data Sources: 3W data provided by IASC cluster lead agencies and compiled by OCHA.
    [Show full text]