40 CONTENTMENT ISLAND RD. DARIEN, CONNECTICUT Fuller

Total Page:16

File Type:pdf, Size:1020Kb

40 CONTENTMENT ISLAND RD. DARIEN, CONNECTICUT Fuller E T A D Fuller Residence - Proposed Renovation 40 CONTENTMENT ISLAND RD. N O I T P I R C S E D # DARIEN, CONNECTICUT ISSUE REVISION & SCHEDULE © COPYRIGHT 2020 CHRISTOPHER PAGLIARO ARCHITECTS, LLC THIS DRAWING IS THE PROPERTY OF THE ARCHITECT, AND HAS BEEN PREPARED SPECIFICALLY FOR THE OWNER FOR THIS PROJECT AT THIS SITE, AND IS NOT INTENDED TO BE USED FOR ANY OTHER PURPOSE, LOCATION OR OWNER WITHOUT Purpose of Addition—Correcting access deficiencies to surrounding WRITTEN CONSENT OF THE ARCHITECT. portions of home DISCLAIMER 1. Correct access to/from upper garage to rest of house Why this should be approved for variance a. Currently Doorway 5-8” 1. Consistent with FEMA regarding lateral additions for Non-Substantial b. Requires two steps up, then two steps down, then 6 steps up Improvements. 2. Allow one level access to ground floor bedroom for 2. Criteria have been met for hardship SEAL & SIGNATURE elderly/wheelchair bound 3. Criteria have been met for minimum change 3. Allow correction of substandard ground floor bedroom 4. Decreasing volume in all currently non-conforming set back areas i.e. decreasing non-conformities. 4. Allow space for access to second floor DRAWING STATUS ZBA REVIEW 5. Improving “flood proofness” of home 7.15.2020 Reasons for hardship a. Removing equipment from flood areas— 1. House built in 1952-prior to flood zones and setback requirements 1. boiler and oil tanks from basement 2. house was conforming at time of original construction 2. HVAC Condensers from elevation 12-6 to elevation 13. 3. House was conforming prior to 2013 map change—including recent b. Reinforcing structure of sunroom—steel columns RENOVATION c. Raising access to home CT Darien, kitchen addition RESIDENCE FULLER 4. House is currently conforming to FEMA for elevation 13 FFE 1. Eliminating steps down further into flood plain from mudroom to enter house. Rd Contentment 40 Island Why this is the minimum change 2. Raising front patio to FEMA compliant FFE of 13. 1. All Work proposed is within existing outer boundaries of home—if one 6. Mitigation proposed for flood variance draws a string around outside corners of home -- work is inside string a. Reinforcing of Sunroom structure 2. No increase in non-conformity regarding setbacks b. Slab on grade and tile floor for new foyer. No wood below elevation 13. 3. Work is reducing volume of structure in setbacks 7. Reducing exterior perimeter length exposed to the flood plane by 35' 4. Work is conforming with FEMA FFF Elevation 5. Work is providing access to existing home PROJECT #Project Number A000 SCALE: COVER PROJECT #Project Number 7.15.2020 REVIEW ZBA DRAWING STATUS SEAL & SIGNATURE DISCLAIMER ARCHITECT. CONSENT OF THE WRITTEN WITHOUT LOCATIONPURPOSE, OR OWNER FOR OTHER BE USED ANY TO INTENDED SITE, THIS ATAND PROJECT IS NOT SPECIFICALLYTHIS FOR OWNER FOR THE AND ARCHITECT, HAS PREPARED BEEN OFTHE THIS PROPERTY ISDRAWING THE ARCHITECTS,LLC CHRISTOPHERPAGLIARO COPYRIGHT 2020 © RENOVATION ISSUE & REVISION SCHEDULE A001 # DESCRIPTION DATE 40 Contentment Island Rd Darien, CT SCALE: FEMA FULLER RESIDENCE E T A Fuller Residence - Proposed Renovation D 40 CONTENTMENT ISLAND RD. N O I T P I DARIEN, CONNECTICUT R C S E Sheet List D # ISSUE REVISION & SCHEDULE Sheet Number Sheet Name © COPYRIGHT 2020 A000 COVER CHRISTOPHER PAGLIARO ARCHITECTS, LLC A001 FEMA THIS DRAWING IS THE PROPERTY OF THE A002 SITE PLAN ARCHITECT, AND HAS BEEN PREPARED SPECIFICALLY FOR THE OWNER FOR THIS A100 BASEMENT PLAN PROJECT AT THIS SITE, AND IS NOT A101 FIRST FLOOR INTENDED TO BE USED FOR ANY OTHER PURPOSE, LOCATION OR OWNER WITHOUT A101B DIAGRAM WRITTEN CONSENT OF THE ARCHITECT. A102 SECOND FLOOR A103 ROOF PLAN A104 FRONT ELEVATION DISCLAIMER A105 REAR ELEVATION A106 LEFT SIDE ELEVATION A107 RIGHT SIDE ELEVATION A108 EX PHOTOS A108B PHOTOS A108C AERIAL A109 3D VIEW SEAL & SIGNATURE DRAWING STATUS ZBA REVIEW 7.15.2020 RENOVATION Darien, CT Darien, FULLER RESIDENCE FULLER 40 Contentment Island Rd Contentment 40 Island PROJECT #Project Number A002 SCALE: SITE PLAN E T A D C O A S T A L JU R N . O L I IN T E P I R C S E D # ISSUE REVISION & SCHEDULE © COPYRIGHT 2020 CHRISTOPHER PAGLIARO VE-14 ARCHITECTS, LLC AE-13 THIS DRAWING IS THE PROPERTY OF THE SETBACK LINE ARCHITECT, AND HAS BEEN PREPARED SPECIFICALLY FOR THE OWNER FOR THIS PROJECT AT THIS SITE, AND IS NOT INTENDED TO BE USED FOR ANY OTHER PURPOSE, LOCATION OR OWNER WITHOUT WRITTEN CONSENT OF THE ARCHITECT. DISCLAIMER 18' - 9 1/4" 2X8 16"OC 2X8 15' - 5 3/4" 15' 5 - EX PLAYROOM #001 EX CRAWL SPACE EX CRAWL SPACE 2X8 16"OC 2X8 DROP BEAM SEAL & SIGNATURE EX BOILER TO BE MOVED UP OUT OF FLOOD ZONE UP 5.5" EXISTING OUTDOOR SHOWER EX. LAUNDRY #002 5' 1" - 7' - 0" EL.6'-7 1/2" EX. CLOSET REMOVE EX OIL TANK EL.9'-6" WATER LINE DN 7" REMOVE EX OIL EX STAIR OPENING TO WASTE LINE DN 8" TANK BE FILLED IN AT EL.13 #004 EX BATH #5 EX CL. DRAWING STATUS 8' 3" - UP 6" ZBA REVIEW UP 6.5" 7.15.2020 EX.CLOSET DROP BEAM EL.8'-5 1/2" 4' - 4" NEW STEPS UP TO 1ST FL 51 SF ADDITIONAL FLOOR SPACE #009 EX GARAGE EL.5'-4 1/2" 15' - 7" 3' - 2 1/4" SLAB ON GRADE W/ UP SLEEPERS AT NEW ADDITION #003 EX FOOTPRINT OF PROPOSED ADDITION DROP BEAM NEW STEPS DN EL.9'-10 1/2" 14' - 7" 14' - BEDROOM #4 DN 8.5" DN 8.5" EL.8'-5 1/2" 3' 7" - RENOVATION Darien, CT Darien, #008 EX GARAGE/STORAGE RESIDENCE FULLER #005 EX. EXTEND PLATFORM 24" MUDROOM NOT TO EXTEND PAST DN EL.5'-4 1/2" 2" EXISTING EDGE OF 8' - EL.9'-10 1/2" 2 ' PLATFORM Rd Contentment 40 Island - 0 " EX CLOSET DN 7 3/4" SER DEN ON .13 SE C EL AI TO DN 7 3/4" R RM TFO PLA EXISTING GENERATOR #007 EX CL MUDROOM EL.5'-4 1/2" EX STAIR UP 3/4" - 6 20' EL.8'-7" R TE #006 EXISTING E REMOVE EX WALL, RAISE GRADE . M 2 CT 0 E GARAGE EL ' - 7 M EA 1 B OP / DR 4 " PROJECT #Project Number A100 1 00.BASEMENT PLAN SCALE: 3/16" = 1' -0" 3/16" = 1'-0" BASEMENT PLAN E T A D " 0 - ' 10 " 0 - ' 1 1 1 0 ' - 0 " " 0 - ' 0 1 NEW TALLER WINDOWS/DOORS IN C O A EXISTING PLACE S T A 1 L 1 ' - J 0 " U R . L IN E N O I T EXTEND WALLS TO 9'-0" PLATE HEIGHT VS. P I 6' -8" EXISTING R C S 1 1 ' - 0 " EX STEP DN. SISTER NEW 2X6 STUDS TO EXISTING EX STEP DN. E *EXISTING STRUCTURE TO REMAIN IN PLACE D # 16' - 0 1/2" ISSUE REVISION & SCHEDULE 1 2 ' 14 - VE- 0 " #104 EX © COPYRIGHT 2020 AE-13 SETBACK LINE SUNROOM CHRISTOPHER PAGLIARO ARCHITECTS, LLC EXISTING FOOTPRINT IN VE:14 : 211 SF +/ - THIS DRAWING IS THE PROPERTY OF THE (5% OF EXISTING HOUSE FOOTPRINT) ARCHITECT, AND HAS BEEN PREPARED REMOVE EX BAY SPECIFICALLY FOR THE OWNER FOR THIS WINDOW PROJECT AT THIS SITE, AND IS NOT " INTENDED TO BE USED FOR ANY OTHER 0 - ' 3 PURPOSE, LOCATION OR OWNER WITHOUT WRITTEN CONSENT OF THE ARCHITECT. " 0 - ' 4 " 0 - ' 5 " 0 - ' 6 " 0 - ' 7 DISCLAIMER " 0 - ' 8 " 0 #110 EXISTING - ' 9 OFFICE EX FIREPLACE #103 EX LIVING #101 EX FAMILY EX FIREPLACE ROOM 32' - 9" 32' - 18' - 3" 18' - ROOM 16' - 3 1/2" NEW RAILING NEW STAIR UP TO LEFT WING EL. 16' -6" 1 1' #111 EX W.I.C - 0 " FILL IN EXISTING STAIR DN. FILL IN EXISTING STAIR SEAL & SIGNATURE 5' 3" - W/FLOOR TO MATCH EX EL.13 WC DN 4' - 7" W/FLOOR TO MATCH EX EL.13 3' 4" - EXISTING FLOOR PLAN #112 LAUNDRY 5' - 3 1/4" 8' - 1 1/2" EXISITING 1ST FL EL.13'-0" #113 EXISTING EX TUB BATHROOM #2 EL.13'-0" 1/2" 4' 3 - 6' 4" - EL.16'-6" #102 MUDROOM PANTRY/MECH PANTRY/MECH 9' - 5 1/4" 2' - 1 1/4" 2' 1 - 4' - 0" 6' - 4 1/2" EXISTING FRONT DOOR CL. NEW RAILING DRAWING STATUS EX SHOWER 18' - 11 1/4" #114 EX. W.I.C ZBA REVIEW #109 #108 EXISTING 3' - 2" DN TO LOWER UP 3/4" 4' 5 - 4' - 2 1/2" PWDR. RM BATHROOM #1 7.15.2020 1 0' 1/4" 7' 1 - - 0 LEVEL " DN 6' 0" - #100 ENTRY " /2 DN 1 FOYER 3 ' - 13 EL.13'-0" EXISTING 3/4" 13' 3 - CL. 10' - 6 3/4" D #115 EX 2' 0" - N EL.16'-6" 6 #107 EXISTING " BEDROOM #2 EXISTING PROPOSED FOOTPRINT BEDROOM #1 15' - 10 1/2" DN UP EXPANSION 430 SF +/ - TERRACE DN 8' - 11 1/2" EXISITING 1ST FL 13' - 0" 13' - 4 1 EL.13'-0" #105 EX KITCHEN ' - 9 DN 6" 3 EL.18'-3 3/4" 1/2" 11' 0 - DEMO EX CLOSET /4 " LANDING 13' - 8" DN 6" ELEC. PANEL ELEC. 12' - 0" 9' - 0" #116 EX EXISTING RENOVATION BATHROOM #3 CT Darien, EXTEND PLATFORM 24" EL.18'-3 3/4" DN RESIDENCE FULLER NOT TO EXTEND PAST 2" 8' - 5' - 5 1/2" EXISTING EDGE OF 2 #106 EX DINING ' - PLATFORM 0 FILL IN EX STAIRS " EXTEND EX WALL 5' - 6" **ALL DIMENSIONS ARE +/- Rd Contentment 40 Island NEW CONDENSER EX STAIR DN TO BE VERIFIED IN FIELD PLATFORM TO BE EX CL.
Recommended publications
  • BUILDING CONSTRUCTION NOTES.Pdf
    10/21/2014 BUILDING CONSTRUCTION RIO HONDO TRUCK ACADEMY Why do firefighters need to know about Building Construction???? We must understand Building Construction to help us understand the behavior of buildings under fire conditions. Having a fundamental knowledge of buildings is an essential component of the decisiondecision--makingmaking process in successful fireground operations. We have to realize that newer construction methods are not in harmony with fire suppression operations. According to NFPA 1001: Standard for FireFighter Professional Qualifications Firefighter 1 Level ––BasicBasic Construction of doors, windows, and walls and the operation of doors, windows, and locks ––IndicatorsIndicators of potential collapse or roof failure ––EffectsEffects of construction type and elapsed time under fire conditions on structural integrity 1 10/21/2014 NFPA 1001 Firefighter 2 Level ––DangerousDangerous building conditions created by fire and suppression activities ––IndicatorsIndicators of building collapse ––EffectsEffects of fire and suppression activities on wood, masonry, cast iron, steel, reinforced concrete, gypsum wallboard, glass and plaster on lath Money, Money, Money….. Everything comes down to MONEY, including building construction. As John Mittendorf says “ Although certain types of building construction are currently popular with architects, modern practices will be inevitably be replaced by newer, more efficient, more costcost--effectiveeffective methods ”” Considerations include: ––CostCost of Labor ––EquipmentEquipment
    [Show full text]
  • Weights and Measures
    Schedule of Values Yadkin County 2009 Architectural Terms Apartment hotel a building designed for non-transient residential use, divided into dwelling units similar to an apartment house, but having such hotel apartment hotel accommodations as room furnishings, lounges, public dining room, maid service, etc. Apartment house a multi-family residence containing three or more non-transient residential living units and generally providing them with a number of common facilities and services. Attic An unfinished or semi-finished portion of a building lying between the highest finished story and the roof and wholly within the roof framing. Basement a building story which is wholly or partly below the grade level. Bay (1) a horizontal area division of a building usually defined as the space between columns or division walls. (2) an internal recess formed by causing a wall to project beyond its general line. Bay window a window, or group of continuous windows, projecting from the main wall of a building. Beam a long structural load-bearing member which is placed horizontally or nearly so and which is supported at both ends or, infrequently, at intervals along its length. Beam, spandrel a wall beam supporting the wall, above, as well as the floor. Building any structure partially or wholly above ground which is designed to afford shelter to persons, animals, or goods. See also construction. Building, fireproof a building in which all parts carrying loads or resisting stresses and all exterior and interior walls, floors, and staircases are made of incombustible materials, and in which all metallic structural members are encased in materials which remain rigid at the highest probable temperature in case its contents are burned, or which provide ample insulation from such a temperature.
    [Show full text]
  • Roof and Gutter De-Icing Cable
    ROOF AND GUTTER DE-ICING CABLE Design and Installation Guide Industrial Residential CommeWhat are Ice Dams? How Ice Dams are formed 1 Rising heat from the house melts the blanket of snow and ice on the roof from the bottom up, sending water trickling down the roof. 2 When water arrives at the cold eaves, it refreezes and forms a dam, preventing drainage. 3 Water is trapped behind the dam and backs up under the shingles. 4 The melted water can leak into the house through the windows or ceiling Snowmelt Principles and Application: Electrical Heat Trace Cable is intended to provide drain paths for the melted or flowing water to be carried away from the roof, gutters, and down spouts. This system is not intended to provide a snow free surface. Roofs in General Sun and building heat combine to melt accumulated snow at the roof/snow interface. Snow is porous and allows water to flow. Ice is not porous and will trap water. Water will flow as long as the roof surface stays above freezing. When the water runs to the roof edge it freezes, starting an “ice dam” that continues to grow and trap more water, leading to leakage problems. The objective of a snowmelt system is to ensure the water is drained off and not allowed to freeze at the roof edge forming a dam. Gutter Damage from Ice The water that enters into your rain gutters can freeze and build up an enormous amount of weight many times causing water to leak into soffits and entering into the building.
    [Show full text]
  • Flat Roof Design Guide
    FLAT ROOF DESIGN CONSIDERATIONS CONTENTS 1 Flat Roof Construction Types 04 2 Insulation and Condensation 06 3 Deck Types 07 4 Fire Protection 08 5 Wind Load Design 09 6 Falls and Drainage 10 7 Locating Equipment 11 8 Safe Access 12 Refurbishment Roofs 9 Assessing Requirements 13 10 Improving Drainage Falls 14 11 Improving Thermal Properties 15 03 bauder.co.uk 1 FLAT ROOF CONSTRUCTION TYPES Thermal Design Thermal design is concerned with the flow of both heat and water vapour through the roof construction and their subsequent effect on the performance of the roof and the various components in the system. The designer therefore needs to consider the amount of insulation required to control both heat loss and condensation. In the case of a flat roof, insulation is usually in the form of either a rigid board above the deck, or a fibrous quilt immediately above the ceiling, depending on the type of roof construction. There are three main recognised designs of flat roof construction; warm, cold and inverted. Manchester University Warm Roof In a warm roof construction the principal thermal insulation 1 layer is located above the structural decking, resulting in the structural deck and support structure being at a 2 temperature close to that of the interior of the building. It is necessary to incorporate a vapour control layer beneath 3 the insulation in order to prevent moisture vapour being 4 forced into the insulation through thermal pressure from within the building. The waterproofing membranes are placed over the insulation to completely encapsulate it. 5 7 There is no requirement for roof void ventilation, and cold bridging through the system is easier to eliminate because 6 there are no interruptions from the structural supports as there is in a cold roof construction.
    [Show full text]
  • The Householder's Guide to Flat Roofing
    THE HOUSEHOLDER’S GUIDE TO FLAT ROOFING CONTENTS INTRODUCTION 2 BASIC DESIGN 3 WARM AND COLD ROOFS 3 ESSENTIALS FOR A SUCCESSFUL FLAT ROOF 4 MAINTENANCE 5 INSPECTION CHECKLIST 5 WILL A REPAIR BE SUFFICIENT? 6 RE-ROOFING – THE OPTIONS 6 CHOOSING THE RIGHT MATERIALS 7 FOR THE STRUCTURAL DECK 7 FOR THE VAPOUR CONTROL LAYERS 7 FOR THE INSULATION MATERIALS 8 WATERPROOF COVERING 9 REINFORCED BITUMEN MEMBRANES (RBM) 9 SINGLE PLY 10 LIQUID APPLIED SYSTEMS 11 FINDING A CONTRACTOR 13 OBTAINING QUOTATIONS 13 BEFORE THE WORK STARTS 13 GUARANTEES 14 FURTHER INFORMATION 15 Every effort has been made to ensure the accuracy of the information in this publication. The National Federation of Roofing Contractors (NFRC), Single Ply Roofing Association (SPRA) and the Liquid Roofing and Waterproofing Association (LRWA) have not verified the information by independent testing nor has any control over the circumstances in which it will be used. They, their officers, employees or members cannot therefore accept any liability arising out of its use. INTRODUCTION This guide has been produced by the Industry for Householder’s with minimal roofing knowledge. By providing information on the design, materials, construction and maintenance of successful flat roofs; we hope it will assist to a satisfactory roof renewal. Traditionally, domestic flat roofs use two or more built up layers of bituminous felt as their weather proofing. Liquid applied systems such as glass fibre were introduced and are now quite widely used. Single Ply membranes are also used but are particularly suitable for larger roofs. Bitumen membranes are still the most used system and are of much higher quality than those used in previous decades and are now known as Reinforced Bitumen Membranes (RBM).
    [Show full text]
  • Study on Flat Roofing Systems
    45 Journal of Advanced Sciences and Engineering Technologies Vol. 1, No.2 (2018) ISSN: 2617-2070(Print) ;2617-2070 (Online) Journal of Advanced Sciences and Engineering Technologies Available online at: http://www.isnra.com/ojs/index.php/JASET/ Invest Bassam Abu Awwad 1 Manal O. Suliman2 Study on Flat Roofing Systems 1Department Of Architecture, College of Engineering, Jaresh University-Jaresh- Jordan *E-mail of the corresponding authors: [email protected] , 2 Civil Engineering Department, College of ABSTRACT Engineering, Jerash University, Jerash, Jordan * E-mail [email protected] Keywords: In many Buildings, the roof is a major element that gives Journal of Advanced Sciences and Engineering Technologies the Building its distinctive profile .The main purpose of a Flat roof roof is to protect the Building or the house in all types of Green Roof weather with a minimum of maintenance .a roof must Be Unventilated roof Ventilated roof strong to with stand snow and wind loads. Another consideration is appearance .a roof should add to the ARTICLE INFO attractiveness of the Building roof styles are used to create different architectural effects. This paper reports Article history: a study on flat roof systems include the layers of Received 01 august 2018 Accepted 20 august2018 structural elements of the roof, types of finish used, AvailaBle online 10 OctoBer 2018 flashing, roof edging, drainage, and other details associated with the roof. Journal of Advanced Sciences and Engineering Technologies DOI: https://doi.org/10.32441/jaset.v1i2.120 © 2018 JASET, International Scholars and Researchers Association 46 Bassam Abu Awwad. et al.. / Journal of Advanced Sciences and Engineering Technologies Introduction Layers of Structural Elements The roof is a system that separates the Flat roofs can have various functional layers building's top floor from the outdoor matched to each other.
    [Show full text]
  • Flat Roof Systems
    DELTA® protects property. Saves energy. Creates comfort. Flat Green Roof Systems for Gardens, Terraces, Walkways & Parking Planning information PREMIUM QUALITY Dörken – leading through competence. For more than 100 years. Developed from innovative ideas and manufactured in leading-edge produc- tion facilities, the top-quality products made by Dörken GmbH & Co. KG for foundation protection, waterproofing, and drainage set standards for reliability, durability, and energy conservation. Located in the Westphalian town of Herdecke, the company traditionally offers its clients top-quality products and customised solutions. Having lived ELTA® Q up to this standard for more than D U D A 100 years, Dörken is and will always L E I T T be a powerful partner for planners, Y S dealers, and craftsmen. E T conform to EN 13252 PREMIUM QUALITY ■ 2 Table of contents ■ Flat roofs offer a wealth of new design options 4 ■ More quality of life: green roofs are ‘in’ 6 ■ Green roofs made to measure: extensive or intensive 7 ■ Configuration of extensive/intensive green roofs 8 ■ DELTA®-TERRAXX in extensive green roofs 10 ■ DELTA®-TERRAXX in intensive green roofs 12 ■ DELTA®-FLORAXX TOP in warm roofs with extensive/intensive herbaceous covers 14 ■ DELTA®-FLORAXX TOP in inverted roofs with extensive/intensive herbaceous covers 16 ■ Walkable/drivable roof deck constructions 18 ■ DELTA®-TERRAXX in walkable roof decks 20 ■ DELTA®-TERRAXX in drivable roof decks 22 ■ DELTA®-FLORAXX in walkable inverted roofs 24 ■ DELTA®-FLORAXX in drivable inverted roofs 26 ■ Technical data 28 ■ Which DELTA®-System fits what application? 29 ■ Overview of technical detail solutions 30 3 ■ Flat roofs offer a wealth of new design options Inverted roofs – a special case Unlike conventional flat roofs, the arrange- ment of component layers is turned upside down in inverted roofs.
    [Show full text]
  • Illustrated Guide R30+ Effective Vaulted & Flat Roofs in Residential
    Illustrated Guide R30+ Effective Vaulted & Flat Roofs in Residential Construction in British Columbia BC Housing’s Research Centre works in collaboration with housing sector partners to foster excellence in residential construction and find innovative solutions for affordable housing in British Columbia. Sharing leading-edge research, advances in building science, and new technologies encourages best practice. The Research Centre identifies and bridges research gaps to address homelessness, housing affordability, social housing challenges and the needs of distinct populations. Mobilizing knowledge and research expertise helps improve the quality of housing and leads to innovation and adoption of new construction techniques, Building Code changes, and enhanced education and training programs. Learn more about the Research Centre at www.bchousing.org. Sign up to receive the latest news and updates at www.bchousing.org/subscribe. Copyright © 2019, all rights reserved. BC Housing 1701 – 4555 Kingsway Burnaby, British Columbia V5H 4V8 Canada To purchase printed copies of this guide, order online at: www.crownpub.bc.ca Product/Material No: 7680003588 For more information contact: Crown Publications, Queen’s Printer Toll Free: 1 800 663-6105 Email: [email protected] ii Illustrated Guide - R30+ Effective Vaulted & Flat Roof Assemblies in Residential Construction in British Columbia © BC Housing Preface Preface This guide was funded by BC Housing, the City of Vancouver, the City of New Westminster, the Canadian Wood Council, the Roofing Contractors Association of BC, and the Forestry Innovation Investment, and was prepared by RDH Building Science and Morrison Hershfield. Acknowledgment is extended to all those who participated in this project as part of the project team or as external reviewers.
    [Show full text]
  • Ventilated Attics and Un-Vented Roof Assemblies David B
    Ventilated Attics and Un-Vented Roof Assemblies David B. Strunk, P.E., C.E.M. Strunk-Albert Engineering Attic ventilation is common practice, and if installed properly, will function without a problem. However, attics and roofs can be designed and constructed without ventilation. In fact un-vented roof assemblies, such as conditioned attics and un-vented cathedral ceilings, are generating more interest and are becoming a more common construction technique. The decision to vent or not to vent is a design and construction choice not a requirement by the building code. Model building codes allow both vented and un- vented roof assemblies. The physics of heat and moisture transfer affect the design of attic or roof ventilation but does not limit the choice. The suggestion for attic ventilation first occurred in the mid 1930s and later became a BOCA code requirement in 1948. Attic ventilation has become firmly established as an important feature in sloped roof construction, most commonly found in residential and light commercial construction. Lack of attic ventilation is often the cause of moisture, mold, and rotten wood. Many asphalt shingle manufactures have requirements and guidelines for attic ventilation in their installation instructions. Providing proper attic ventilation can at times be difficult with complex roof designs. The more complex the roof geometry, the easier it is to construction the roof assembly in an un-vented manner. With complex roof designs, dormers, valleys, hips, skylights, soffits, and multiple service penetrations it is often impractical to construction a vented roof assembly with an airtight interior air barrier at the ceiling plane.
    [Show full text]
  • Builder's Guide to Trusses
    Table of Contents Roof Construction Techniques: Pro’s and Con’s . 2 Trusses: Special Benefits for Architects and Engineers . 4 Special Benefits for Contractors and Builders . 5 Special Benefits for the Owner. 5 How Does A Truss Work? . 6 Typical Framing Systems. 8 Gable Framing Variations . 11 Hip Set Framing Variations . 13 Additional Truss Framing Options Valley Sets . 15 Piggyback Trusses . 17 Typical Truss Configurations . 18 Typical Truss Shapes. 20 Typical Bearing / Heel Conditions Exterior Bearing Conditions. 21 Crushing at the Heel . 22 Trusses Sitting on Concrete Walls . 22 Top Chord Bearing. 23 Mid-Height Bearing . 23 Leg-Thru to the Bearing. 23 Tail Bearing Tray. 24 Interior Bearing Conditions . 24 Typical Heel Conditions. 25 Optional End Cosmetics Level Return. 25 Nailer . 25 Parapet. 26 Mansard . 26 Cantilever. 26 Stub . 26 Bracing Examples . 27 Erection of Trusses . 29 Temporary Bracing . 30 Checklist for Truss Bracing Design Estimates . 32 Floor Systems . 33 Typical Bearing / Heel Conditions for Floor Trusses Top Chord, Bottom Chord, and Mid-Height Bearing. 34 Interior Bearing Conditions . 35 Ribbon Boards, Strongbacks and Fire Cut Ends . 36 Steel Trusses . 37 Ask Charlie V. 38 Charlie’s Advice on Situations to Watch Out for in the Field. 41 Glossary of Terms. 42 Appendix - References. 48 1 Builders, Architects and Home Owners today have many choices about what to use in roof and floor systems Traditional Stick Framing – Carpenters take 2x6, Truss Systems – in two primary forms: 2x8, 2x10 and 2x12 sticks of lumber to the job • Metal Plate Connected Wood Trusses – site. They hand cut and fit this lumber together Engineered trusses are designed and into a roof or floor system.
    [Show full text]
  • FLAT ROOF VENTILATION Updated to 2012 Building Code
    Issue No: 71 Builder Tip Issued Jul. 2011 Revised May 2015 FLAT ROOF VENTILATION Updated to 2012 Building Code ONTARIO BUILDING CODE 9.19.1.1. Required Venting (5) Vents shall comply with CAN3-A93-M, “Natural (1) Except where it can be shown to be unnecessary, Airflow Ventilators for Buildings”. where insulation is installed between a ceiling and the underside of the roof sheathing, a space shall be provided between the insulation and the sheathing, and 9.19.1.3. Clearances vents shall be installed to permit the movement of air from the space to the exterior. (1) Except as provided in Sentence (2), where venting is provided to a roof joist space, not less than 63 mm 9.19.1.2. Required Venting (2½ in) of space shall be provided between the top of the insulation and the underside of the roof sheathing. (2) Where the roof slope is less than 1 in 6 or in roofs that are unobstructed with roof joists, the unobstructed (3) Ceiling insulation shall be installed in a manner that vent area shall be not less than 1/150 of the insulated will not restrict a free flow of air through roof vents or ceiling area. through any portion of the attic or roof space. (3) Required vents are permitted to be roof type, eave type, gable-end type or any combination of them, and OBJECTIVE shall be distributed, Cross purlins, as described in Sentence (4) are (a) uniformly on opposite sides of the building, required to ensure adequate ventilation throughout roofs without attic spaces.
    [Show full text]
  • International Building Code – Structural S1-07/08
    INTERNATIONAL BUILDING CODE – STRUCTURAL S1-07/08 1502.1 Proposed Change as Submitted: Proponent: Mike Ennis, SPRI, Inc. Revise as follows: 1502.1 General. The following words and terms shall, for the purposes of this chapter and as used elsewhere in this code, have the meanings shown herein. AGGREGATE (Supp). In roofing, crushed stone, crushed slag or water-worn gravel used for surfacing for roof coverings as defined in ASTM D 1863. Reason: This code change proposal clarifies the definition of aggregate, tying it into a current IBC reference standard: ASTM D1863–03 Specification for Mineral Aggregate Used on Built-up Roofs. Cost Impact: The code change proposal will not increase the cost of construction. Committee Action: Disapproved Committee Reason: The proposal would create a conflict between ASTM D448 and SPRI RP4 standards. Also under ASTM D 1863 ninety percent of aggregate would be finer than three-quarters on an inch. Assembly Action: None Individual Consideration Agenda This item is on the agenda for individual consideration because a public comment was submitted. Public Comment: Mike Ennis, Single Ply Roofing Industry (SPRI), requests Approval as Submitted. Commenter=s Reason: This proposed Code Change will clarify the definition of aggregate used in roofing applications. The proposal is to include ASTM D1863 Specification for Mineral Aggregate Used on Built-up Roofs, in the definition. Extensive testing and field experience has demonstrated the need to subject aggregate used as a surfacing for built-up roofing assemblies and ballast stones used to hold the roof system in place to different requirements to mitigate the potential for blow-off.
    [Show full text]