FORM 1 (I) Basic Information Sr. No. Item Details 1. Name of the Project/S
Total Page:16
File Type:pdf, Size:1020Kb
APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information Sr. Item Details No. 1. Name of the project/s Environment Clearance for Proposed Hotel & Convention Centre Project to be developed by M/s Lulu Convention Center Calicut (Pvt.) Ltd. 2. S. No. in the schedule 8 (a), Construction Project with built-up area of about 29,572.88 sq.m. which is more than 20,000 sq. m. and less than 1,50,000 sq.m. 3. Proposed capacity / area / length / Total Plot Area =3.856 ha. (38,565.30 sq. m.) tonnage to be handled/command Total Built-up Area = 29,572.88 sq. m. area/lease area/ number of wells to be drilled 4. New/Expansion/Modernization New 5. Existing capacity/area etc., N.A. 6. Category of Project i.e. ‘A’ or ‘B’ Category ‘B’ 7. Does it attract the general NO condition? If yes, please specify 8. Does it attract the specific NO condition? If yes, please specify 9. Location Sy. Nos. 271, 272, 282, 283, 285, 286, 287, 288, 290, 291/1A, 291/1B, 321/2, 364, 367/2, 368, 369/2, 370, 372/1, 488/1A1A, 488/2, Valayanad Village, Kozhikode Municipal Corporation, Kozhikode Taluk & District, Kerala. Plot/Survey/Khasra No. Sy. Nos. 271, 272, 282, 283, 285, 286, 287, 288, 290, 291/1A, 291/1B, 321/2, 364, 367/2, 368, 369/2, 370, 372/1, 488/1A1A, 488/2 Village Valayanad Tehsil Kozhikode District Kozhikode State Kerala 10. Nearest railway station/airport The nearest railway station is Calicut along with distance in Kms Railway Station which is at about 3.5 km. (NW) and Calicut Int. Airport, Karipur is at about 25 km. (SE) away from the project site. 11. Nearest Town, city, District Kozhikode town/city (the project site is Headquarters along with distance within the town/city area) in Kms Kozhikode Civil Station - about 6.5 km (N) 12 Village Panchayats, Zilla Parishad, Village Office Address :- Municipal Corporation, Local body Village Officer, (complete postal addresses with Valayanad Village, telephone nos. to be given) Mankav Junction, Mankave P.O., Calicut, Kerala-673007. Municipality Office address :- Corporation Address :- Kozhikode Municipal Corporation Office, Calicut Beach Road, Near Akashvani, Kozhikode, Kerala-673032. Ph. No. 0495-2362100. 13 Name of the applicant M/s Lulu Convention Center Calicut (Pvt.) Ltd. 14 Registered Address M/s Lulu Convention Center Calicut (Pvt.) Ltd. 24/826A, P.O. Mankavu, P.B. No. 1240, Calicut, Kerala-673007. Address for correspondence : M/s Lulu Convention Center Calicut (Pvt.) Ltd. 24/826A, P.O. Mankavu, P.B. No. 1240, Calicut, Kerala-673007. Name Mr. Packer Koya P.P. Designation (Owner/Partner/CEO) Director Address M/s Lulu Convention Center Calicut (Pvt.) Ltd. 24/826A, P.O. Mankavu, P.B. No. 1240, Calicut, Kerala-673007. Pin Code Kerala-673007 E-Mail [email protected] [email protected] Telephone No. 0495-2330012 Mobile No. 09495564555 Fax No. Nil 16 Details of Alternative Sites Not Applicable examined, if any. Location of these Village-District-State sites should be shown on a topo 1. sheet 2. 17 Interlinked Projects Not applicable 18 Whether separate application of Not applicable interlinked projects has been submitted? 19 If yes, date of submission Not applicable 20 If no, reason Not applicable 21 Whether the proposal involves approval/clearance under: If yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? NO (b) The Wildlife (Protection) Act, 1972? NO (c) The C.R.Z Notification, 2011 ? NO 22 Whether there is any Government NO Order/Policy relevant/relating to the site? 23 Forest land involved (hectares) NO 24 Whether there is any litigation NO pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes Details thereof (with approximate No. confirmation / No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change Yes There will be permanent change in land in land use, land cover or use, land cover or topography including topography including increase in increase in intensity of land use. intensity of land use (with The project proponent is intending to respect to local land use plan) construct a hotel & convention centre complex project located in Municipal Corporation limits of Kozhikode Municipal Corporation, Kozhikode District, Kerala. During construction phase, about 125 workers (average) will be at site. During operation phase, on full occupancy of proposed project, the maximum population expected is 2,751 persons (including staff, floating population on full occupancy) and hence there is increase in the intensity of land use. (Source: population is calculated based on NBC). 1.2 Clearance of existing land, Yes There are some of native species of vegetation and buildings? trees and different varieties of shrubs, herbs, grass & climbers at site. Also, there are old buildings (houses) with ground floor structure. For the development of the proposed project, the existing structures, trees & different varieties of shrubs, herbs, grass & climbers will be cleared. 1.3 Creation of new land uses? Yes The new land use will be for hotel & convention centre project. 1.4 Pre-construction investigations Yes Pre-construction Soil Investigation has e.g. bore houses, soil testing? been carried out for the site. As per the soil investigat ion report, the water table is encountered between at about 0.7 m. to 1.70 m. below the existing ground level. 1.5 Construction works? Yes Construction of Hotel & Convention Centre Project . Internal roads for movement inside the complex will be constructed. 1.6 Demolition works? Yes The site having old structures. For the development of the proposed project, the existing structures will be demolished. 1.7 Temporary sites used for Yes Temporary sheds constructed for construction works or housing of housing of construction workers (about construction workers? 125 persons). 1.8 Above ground buildings, Yes It is proposed to construct hotel with structures or earthworks convention centre building block along including linear structures, cut with first aid facility within the site. The and fill or excavations max. floor of the building is Ground + 10 floors. Excavation of earthwork for foundation of structures will be carried out. The top soil which is fertile will be kept at site for landscaping work. The excavated soil will be used for back filling work and for internal road construction purposes. 1.9 Underground works including No No u nderground works including mining mining or tunneling? / tunneling required except the foundation work for the structures. 1.10 Reclamation works? No Not applicable 1.11 Dredging? No No dredging work required. 1.12 Offshore structures? No No offshore structure required. 1.13 Production and manufacturing No No production / manufacturing process processes? involved. 1.14 Facilities for storage of goods or Yes Separate raw material store of cement materials? and other construction materials is made within the project prem ises. Bricks and steel laid in open. 1.15 Facilities for treatment or Yes Construction phase :- disposal of solid waste or liquid Solid waste generation from the project effluents? during construction phase will be about 50 Kg/day and domestic sewage wi ll be about 7 KL/day. The non-biodegradable waste and other packaging material will be sold to the vendors. The bio- degradable solid waste will be disposed in a bio-bin system for microbial composting and a STP for the treatment of domestic sewage from the labour colony. Operation phase :- Solid waste generation will be about 397 Kg/day and which will be collected separately as Bio-degradable and Non- biodegradable waste as per the MSW Rules, 2000. The non-biodegradable and recyclable waste would be sold t o the vendors. The biodegradable waste along with sludge from STP would be sent to the bio-gas plant to be developed within the premises. Further, the spent oil from the D.G. sets (defined as hazardous waste) will be sold to C.P.C.B. approved recyclers. Effluent :- The domestic sewage about 102 KL/day will be generated which will be treated through proposed Sewage Treatment Plant to be installed within the project premises. 1.16 Facilities for long term housing No The proposed project is hotel with of operational workers? convention centre project and therefore no accommodation facility is proposed for the operational workers. 1.17 New road, rail or sea traffic No Not applicable during construction or operation? 1.18 New road, rail, air waterborne or No Not applicable other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not applicable transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No Not applicable lines or pipelines? 1.21 Impoundment, damming, No Not applicable culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No There is a drain abut ting the site in the north direction. Also a small water channel originating from the centre of the proposed site which is join to the drain in the north west direction of the property. 1.23 Abstraction or transfers of water Yes Water from wells. It is proposed to use form ground or surface waters? the well water for the project. 1.24 Changes in water bodies or the No For the development of the proposed land surface affecting drainage site the existing drains will be retained or run-off? and maintained during construction phase & operation phase.