Essential Roadworks Bulletin
Total Page:16
File Type:pdf, Size:1020Kb
Official ESSENTIAL ROADWORKS BULLETIN Week commencing 04th October 2021 Aldrington Road SW16 two-way temporary traffic signals outside number 10 for Openreach utility works commencing 09/10/2021 to 10/10/2021. Contact: Openreach, 03301 233 753. Ashbury Road SW11 is closed at the side of 88 Grayshott Road for Thames Water utility works, estimated date of completion 17/12/2021. Contact: Thames Water 0800 316 9800. Battersea High Street SW11 is closed between the junction with Simpson Street and the junction with Battersea Park Road for carriageway works, estimated date of completion 31/10/2021. Contact: Tim Addlesee 0208 871 8202. Burntwood Lane SW17 two-way temporary traffic signals next to number 234 for SGN utility works, estimated date of completion 07/10/2021. Contact: SGN, 01403 320 768. Fieldview SW18 is closed at the junction with Burntwood Lane for SGN utility works, estimated date of completion 07/10/2021. Contact: SGN, 01403 320 768. Freshwater Road SW17 will be closed at the junction with Southcroft Road. Southcroft Road will also have two-way temporary traffic signals outside numbers 71-95 for Openreach utility works commencing 09/10/2021 to 10/10/2021. Contact: Openreach, 03301 233 753. Garratt Lane SW18 multi-way temporary traffic signals at the junction with Mapleton Road for Thames Water utility works commencing 03/10/2021 to 10/10/2021, NIGHT WORKS. Contact: Thames Water, 0800 316 9800. Grayshott Road SW11 is closed outside numbers 76-78 for Thames Water utility works, estimated date of completion 26/10/2021. Contact: Thames Water 0800 316 9800. Kimber Road SW18 will be closed from the junction with Burr Road to the junction with Twilley Street for tree pruning commencing 07/10/2021 to 08/10/2021. Contact: Afe Tesfay, 0208 891 7536. Kingsley Street SW11 is closed from outside number 2 to the junction with Grayshott Road for Thames Water utility works, estimated date of completion 28/01/2022. Contact: Thames Water 0800 316 9800. Lavender Hill SW11 multi-way temporary traffic signals outside number 245 to the junction with Sisters Avenue for TfL works, estimated date of completion 16/10/2021. Contact: TfL, 0343 222 1234. Lombard Road SW11 two-way temporary traffic signals at the junction with Holman Road. Holman Road is also closed at the junction with Lombard Road for UK Power Networks utility works, estimated date of completion 26/10/2021. Contact: UK Power Networks 0800 028 0709. Please see below update provided by UKPN, with regards the difficulties and delays with these works. Director of Environment and Community Services: Paul Chadwick Deputy Director (Highways Operations and Street Scene): Kevin Power, MBA DMS Official Lombard Road UKPN works update 01.docx Montana Road SW17 will be closed outside 11 for Thames Water utility works commencing 04/10/2021 to 06/10/2021. Contact: Thames Water, 0800 316 9800. Nightingale Lane SW12 two-way temporary traffic signals outside number 29 for SGN utility works commencing 04/10/2021 to 08/10/2021. Contact: SGN, 01403 320 768. Nightingale Lane SW12 multi-way temporary traffic signals at the junction with Ravenslea Road. Bolingbroke Grove and Ravenslea Road will also have multi-way temporary traffic signals at their junctions with Nightingale Lane for Thames Water utility works commencing 09/10/2021 to 10/10/2021. Contact: Thames Water, 0800 316 9800. Silverthorne Road SW8 multi-way temporary traffic signals outside numbers 42-48 for Thames Water utility works commencing 08/10/2021 to 08/10/2021. Contact: Thames Water, 0800 316 9800. St Johns Avenue SW15 multi-way temporary traffic signals outside number 25a for sewer works commencing 04/10/2021 to 08/10/2021. Contact: R. Irwin, 0330 133 1475. Theatre Street SW11 is closed at the junction with Lavender Hill to the end of Shakespeare House for TfL works, estimated date of completion 16/10/2021, NIGHT WORKS. Contact: TfL, 0343 222 1234. Tooting Grove SW17 is closed from the junction with Tooting High Street to the junction with Effort Street for carriageway works, estimated date of completion 08/10/2021. Contact: Afe Tesfay, 0208 891 7536. Windmill Road SW18 lane closure at the junction with Trinity Road for TfL works commencing 04/10/2021 to 06/10/2021. Contact: TfL, 0343 222 1234. Windmill Road SW18 lane closure near the junction with Trinity Road for TfL works commencing 05/10/2021 to 07/10/2021, NIGHT WORKS. Contact: TfL, 0343 222 1234. Wandsworth Bridge SW18 – Works continue on the refurbishment of Wandsworth Bridge. The on footway cycle tracks are currently closed in order for pedestrians to use, due to the hoarding encroaching onto the footways both sides. There is a temporary, on carriageway, northbound cycle lane and the southbound bus lane has been widened to facilitate buses and cycles. The scope of work has recently been increased due to some additional critical works being identified on the structure and as a result the programme has been extended. Expected completion date end of Feb 2022. Contact: Sam Emmett 0208 871 6668. Hammersmith Bridge is closed indefinitely due to safety concerns. For further information please contact the London Borough of Hammersmith & Fulham via email at [email protected]. ADVANCED WARNING Garratt Lane SW18 will have the following restrictions in place between 07:00 and 22:00 on the days specified. - Southbound directional closure from the junction with Wandsworth High Street to the junction with Courthouse Way, Saturday and Sunday only (16th and 17th October). Director of Environment and Community Services: Paul Chadwick Deputy Director (Highway Operations and Street Scene): Kevin Power, MBA DMS Official - There will be a bus lane suspension from the junction with Wandsworth High Street to opposite Courthouse Way, Monday to Friday only (18th October to 22nd October). Contact: Compass Infrastructure, 07867 970 797. Old York Road SW18 will be closed from the junction with Ferrier Street to the entrance of the old Homebase for refurbishment works to the railway bridge. These works are scheduled to start on 11/10/2021 and are due to end on 24/12/2021. Contact: Dyer & Butler, 07717 861 401. SOCIAL DISTANCING MEASURES To aid with social distancing a number of road closures have been implemented in the borough as follows: Old York Road SW18 is closed from Swandon Way to Ferrier Street until further notice. Northcote Road SW11 will be closed from the junction with Battersea Rise to the junction with Broomwood Road every weekend until further notice. WATER LEAKS AND GAS ESCAPES Please do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks: WATER: 0800 714 614 GAS: 0800 111 999 All utility companies have to prioritise works across our borough as well as other boroughs in south London. The Network Management team actively monitors works on the public highway and works closely with utility companies to minimise disruption as much as possible as well as looking for opportunities to work collaboratively. For further information please contact the Engineer in the first instance or e-mail [email protected]. The bulletin is also available at www.wandsworth.gov.uk Director of Environment and Community Services: Paul Chadwick Deputy Director (Highway Operations and Street Scene): Kevin Power, MBA DMS .