8050.00Sqm Total Built-Up Area: 32380.06Sqm 4 New/Expansion/Modernization Modernization 5 Existing Capacity/Area Etc -- 6 Category of Project I.E
Total Page:16
File Type:pdf, Size:1020Kb
Form – I for ‘Modernization of existing IT building to Hostel /Hotel Building’ FORM – I I. BASIC INFORMATION S. No. Item Details 1 Name of the project Proposed Modernization of existing IT building to Hostel/Hotel. 2 S. no. in the schedule 8 (a) 3 Proposed area Area Details: Total land area: 8050.00Sqm Total built-up area: 32380.06Sqm 4 New/Expansion/Modernization Modernization 5 Existing capacity/Area etc -- 6 Category of project i.e. ‘A’ or ‘B’ B 7 Does it attract the general No condition? If yes, please specify 8 Does it attract the specific No condition? If yes, please specify 9 Plot/Survey/Khasra No Survey No. 476/18 B1B & 476/18 B1A Village Sholinganallur Village Tehsil Sholinganallur Taluk District Kanchipuram District State Tamilnadu 10 Nearest railway station/airport Railway station : Perungudi-8.14 (towards North along with distance in kms West) Airport : Chennai International Airport- 11 Km (towards North West) 11 Nearest town, city, district Town : Sholinganallur headquarters along with distance City : Chennai in kms District head quarters :Kanchipuram 12 Village panchayats, Zilla Village panchyathu office, parishad, municipal corporation, Old Mahapalipuram Main Road, local body (Complete postal Sholinganallur, addresses with telephone nos. to Chennai, be given) Tamil Nadu 600119. 13 Name of the applicant K.SHIVASHANKAR & 2 others. 14 Registered address K.SHIVASHANKAR No.6/25, First Street Cenotaph Road, Teynampet ,Chennai - 600018 15 Address for correspondence: Form – I for ‘Modernization of existing IT building to Hostel /Hotel Building’ Name K.SHIVASHANKAR Designation Address No.6/25, First Street Cenotaph Road, Teynampet ,Chennai – 600018. Pin code E-mail Telephone No. / Fax No. 16 Details of alternative sites No examined, if any, Location of these sites should be shown on a topo sheet 17 Interlinked projects No interlinked projects 18 Whether separate application of No interlinked project has been submitted? 19 If yes, date of submission NA 20 If no, reason NA 21 Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The forest (conservation) Act, 1980? (b) The wild life (Protection) Act, 1972? (c) The CRZ Notification 1991 22 Whether there is any government No order/policy relevant/relating to the site 23 Forest land involved (hectares) No 24 Whether there is any litigation No pending against the project and/or land in which the project is propose to be set up? a) Name of the Court b) Case No c) Orders/directions of the court, if any and its relevance with the proposed project II. ACTIVITY Form – I for ‘Modernization of existing IT building to Hostel /Hotel Building’ 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies etc.) S. Information/Checkli Yes/N Details thereof (with approximate quantities /rates, No. st confirmation o wherever possible) with sources of information data 1.1 Permanent or Yes Project site comes under primary residential use Zone. temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing No -- land, vegetation and buildings? 1.3 Creation of new land No The site is exist with well established building where uses? there is no change in land use. 1.4 Pre-construction No The site is already constructed hence no soil investigations e.g. investigation has been done. bore holes, soil testing ? 1.5 Construction works? Yes As the site is already constructed only alteration work will be carried out after the Environmental Clearance. 1.6 Démolition Works? No The project site will be undergo only by alteration with the existing building hence no demolition work will be carried out. 1.7 Temporary sites used No As proposed site existing one which undergoes only for construction works alteration hence requirement of raw material and labour or housing of are very less all the item will hired from local market. construction workers? All the construction activities including stacking of raw materials will be confined within the project site only. No temporary labor hutments are proposed. Local laborers from nearby areas will be hired for the work. Proper sanitation facilities for them will be provided at site. 1.8 Above ground Yes Non FSI & Total buildings, structures Descriptio FSI Parking Free of built-up n Area Area or earthworks FSI area including linear Area structures, cut and fill Basement - 97.10 3974.17 4071.27 or excavations floor Ground 1731.55 141.04 1293.45 3166.04 floor First floor - 281.41 2916.62 3198.03 Form – I for ‘Modernization of existing IT building to Hostel /Hotel Building’ Second - 133.24 3254.76 3388.00 floor Service - - - - floor Third floor 3098.32 215.24 - 3313.56 Fourth 2761.38 283.49 - 3044.87 floor Fifth floor 2649.58 400.01 - 3049.59 Sixth floor 2649.58 400.01 - 3049.59 Seventh 2649.58 400.01 - 3049.59 floor Eigth floor 2479.16 570.36 - 3049.52 18019.1 2921.9 11439.0 32380.0 Total 5 1 0 6 1.9 Underground works No No mining or tunneling work will be carried out for the including mining or project. Excavation of earth will be carried out for tunneling? constructing basement and foundation as proposed within project site. 1.1 Reclamation Works? -- 0 1.1 Dredging? No -- 1 1.1 Offshore structures? No -- 2 1.1 Production and No It is an infrastructure project. 3 manufacturing processes? 1.1 Facilities for storage Yes Separate raw material handling yard will be located 4 of goods or materials? within the project site and separated by enclosures/barricades. Cement will be separately stored under cover in bales. Sand will be stacked under tarpaulin cover. 1.1 Facilities for treatment Yes Solid Waste: Wastes generated will be collected from 5 or disposal of solid the designated locations and segregated into Bio waste or liquid degradable waste and non - bio degradable waste. The effluents? bio degradable waste will be treated in an organic waste converter, non biodegradable will be handed over to the authorized recyclers. Liquid Effluent: During the both Alteration and operation phase, sewage generated from the project will be treated in the proposed STP. Form – I for ‘Modernization of existing IT building to Hostel /Hotel Building’ 1.1 Facilities for long No -- 6 term housing of operational workers? 1.1 New road, rail or sea Yes It is expected traffic from the project site will be as the 7 traffic during site is present adjacent to service road there is no construction or abnormal traffic will not be founded. operation? 1.1 New road, rail, air No Only internal roads will be constructed for facilitating 8 waterborne or other movement of vehicles and connecting the site to the transport existing roads infrastructure including new or altered routes and stations, ports, airports etc? 1.1 Closure or diversion No None 9 of existing transport routes or infrastructure leading to changes in traffic movements? 1.2 New or diverted No -- 0 transmission lines or pipelines? 1.2 Impoundment, No -- 1 damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.2 Stream crossings? No -- 2 1.2 Abstraction or No -- 3 transfers of water from ground or surface waters? 1.2 Changes in water No -- 4 bodies or the land surface affecting drainage or run-off? 1.2 Transport of personnel Yes Transportation of personnel and material by road will 5 or materials for be necessary for the contractors during the alteration construction, phase. Form – I for ‘Modernization of existing IT building to Hostel /Hotel Building’ operation or decommissioning? 1.2 Long-term No -- 6 dismantling or decommissioning which could have an impact on the environment? 1.2 Ongoing activity No -- 7 during decommissioning which could have an impact on the environment? 1.2 Influx of people to an yes This project is new development of hostel in existing 8 area in either building which will make the temporary influx in the temporarily or area. permanently? 1.2 Introduction of alien No -- 9 species? 1.3 Loss of native species No -- 0 or genetic diversity? 1.3 Any other actions? No -- 1 2. Use of Natural resources for construction or operation of the Project (Such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S. Information/Checklist Yes/ Details thereof (with approximate quantities No. confirmation No / rates, wherever possible) with sources of information data 2.1 Land especially No The site present in commercial area. undeveloped or agricultural land (ha) 2.2 Water (expected source & Yes Construction Stage: competing users) Unit: KLD About 20 KLD of water will be required during the peak construction phase and it will be sourced through private tankers arranged by the contractor. Operation Stage: About 118.53 KLD of raw (fresh) water will be required for the project. The source of water Form – I for ‘Modernization of existing IT building to Hostel /Hotel Building’ supply is Ground water. 2.3 Minerals (MT) No Not envisaged. 2.4 Construction material – Yes Construction materials will be sourced from the stone, aggregates, and / soil local market. (expected source - cum) 2.5 Forests and timber (source– No -- MT) 2.6 Energy including electricity Yes The estimated power requirement during and fuels (source, competing operation phase is about 975KW and it will be users) Unit: fuel sourced from the nearby TNEB grid which will (litres/hour), energy (kVA) be distributed through the transformers within our premises. For emergency purposes, it is proposed to use DG sets of the following capacities 1 Nos.