Brent Spence Bridge These Are the Two Most Expensive Future 79 Or 86% Estimated Are Improvements to Transportation Investments Included in the Existing Roadways

Total Page:16

File Type:pdf, Size:1020Kb

Brent Spence Bridge These Are the Two Most Expensive Future 79 Or 86% Estimated Are Improvements to Transportation Investments Included in the Existing Roadways OKI REGIONAL Moving the Region Forward What OKI Heard from the Public: Improve Rehabilitate Existing Outdated Maintain Create More Decrease Transit and Infrastructure Existing Bike/Ped Congestion Add Additional The Brent Roadways. Options. and Traffic. Transit Modes. Spence Bridge. In response, the 2040 Project List includes: Both the Ohio ($1.2 billion) and Out of the 92 roadway Kentucky ($1.7 billion) recommendations included in the 20 transit shares of the cost to improve our Project List, related improvements worth an Brent Spence Bridge These are the two most expensive future 79 or 86% estimated are improvements to transportation investments included in the existing roadways. list and with These 79 existing roadway projects $529 million A few of the 23 projects are: every passing year total a potential Oasis Rail Transit Line it is delayed, the more expensive it becomes. TANK CVG Hub $5.3 billion Dixie Highway and Madison Ave/KY 17 Bus Rapid Transit TANK I-71/75 corridor Bus on 17 Bike and/or Pedestrian Shoulders related projects at a cost estimate total of NKY Streetcar (Newport) Extension of BCRTA bus service $191 million Numerous brand new Park & Rides and Transit Hubs located Almost every one of the 92 roadway recommendations included in in our urban and suburban the Project List work to address congestion. In addition, all 20 the communities to enhance transit recommendations provide a feasible alternative to single transit service and accessibility occupancy vehicular traffic, thereby addressing our region’s traffic congestion. more information at 2040.oki.org BUTLER COUNTY OH Survey 2010 Census OKI REGIONAL 10% | 16% Moving the Region Forward 6% | 15% Butler Warren WARREN COUNTY OH Survey 2010 Census 4% | 9% 6% | 8% Hamilton CLERMONT COUNTY OH Survey 2010 Census 4% | 9% 6% | 6% HAMILTON COUNTY OH Survey 2010 Census 55% | 40% Dearborn 56% | 51% Boone DEARBORN COUNTY IN Campbell Kenton Clermont Survey 2010 Census 4% | 2% THE OKI REGION 6% | 2% OKI received over 2300 surveys during our fall/winter public outreach for the 2040 plan. Members of the public who BOONE COUNTY KY completed the survey prove to have been a really good Survey 2010 Census sample of our overall regional demographics. 4% | 6% HOW DOES the REGION TRAVEL? 6% | 8% Bus 5% WALK 6% Bus 2% WALK 2% KENTON COUNTY KY Survey 2010 Census 15% | 13% DRIVE THEIR DRIVE THEIR CARS ALONE CARS ALONE 89% 96% 8% | 7% 2040 SURVEY 2009-2013 American Community Survey data CAMPBELL COUNTY KY Survey 2010 Census There are a total of 132 projects in the 2040 Final Project 4% | 5% List at an estimate total of $6,545,310,000! The list represents a potential investment in our eight-county 6% | 2% region of over $6.5 BILLION! MORE INFORMATION AT 2040.OKI.ORG OHIO PROJECTS State County Facility Location Description YOE_Cost (M) Project_Type Intelligent Transportation Ohio TBD Per OKI ITS Plan recommendations $62.44 ITS System (ITS) Projects South of Oxford widening/ Ohio Butler US 27 between SR 732 and New 2‐lane US 27 parkway connector west $6.39 relocation US 27 Williams Ave to St widening/ Ohio Butler River Rd Widen by one lane with safety upgrades $6.39 Clair Ave relocation Butler‐ New 5 lane facility from Cox Rd to Gateway widening/ Ohio Butler Warren/Cox Bethany Rd to SR 63 $79.93 Blvd Extension relocation Connector Rd New interchange & widening of Milliken Rd widening/ Ohio Butler I‐75 Milliken Rd $79.93 from Cin‐Day to Butler‐Warrren Rd relocation Holden Blvd to widening/ Ohio Butler N. Gilmore Rd Widen to 3 lanes $3.12 Symmes Rd relocation traffic Ohio Butler I‐75 Union Centre Blvd Interchange modification $15.99 operations Cincinnati‐ Milliken Rd to Monroe widening/ Ohio Butler Widen by one lane $12.79 Dayton Rd South Corp Line relocation Rossgate Ct to widening/ Ohio Butler SR 128 Cincinnati‐Brookville Widen to 3 lanes $23.98 relocation Rd Milliken Rd to SR 4 (N. Widen to 5 lanes with landscaped median and widening/ Ohio Butler SR 747 $25.10 Jct) 10' multi use path relocation State County Facility Location Description YOE_Cost (M) Project_Type SORTA Liberty Utilize ODOT/BCTID Liberty Twp P&R; extend Vicinity of SR 129 and Ohio Butler Twp Park & Ride Rt 42X to new location. Replaces leased $1.87 transit Cincinnati‐Dayton Rd Lot facility Cincinnati Dayton Rd widening/ Ohio Butler Bethany Rd Widen to 4 lanes and add multi use path $15.99 to Butler Warren Rd relocation Liberty traffic Ohio Butler I‐ 75 Interchange modification $49.95 Interchange operations traffic Ohio Butler Tylersville Rd I‐75 ramps Interchange modification $7.49 operations Hamilton‐Mason traffic Ohio Butler at Five Points Intersection improvements $3.75 Rd operations widening/ Ohio Butler S. Gilmore Rd Resor Rd to Mack Rd Widen by one lane $6.24 relocation Augusta Blvd to widening/ Ohio Butler US 127 Widen by one lane $8.74 Patterson Blvd relocation SR 177 ‐ Main Carmen Ave to widening/ Ohio Butler Widen by one lane (Hamilton) $4.80 Street Brookwood Ave relocation Black Street Over Great Miami Ohio Butler Replace 2 lane bridge with new 4 lane bridge $39.97 bridge Bridge River widening/ Ohio Butler Grand Blvd SR 4 to Five Points Widen to 2 lanes each direction $3.75 relocation Bypass 4 to Five widening/ Ohio Butler Tylersville Rd Widen by 3 lanes $7.49 Points relocation Hamilton RR line from North B bicycle/ped‐ Ohio Butler Beltline Multi‐ Multi‐use path on abandoned CSX railway $7.49 St to Millville Ave estrian use Trail State County Facility Location Description YOE_Cost (M) Project_Type Wayne Madison traffic Ohio Butler at Trenton Rd Intersection improvement $1.87 Rd operations Regional Route Expand service hours on regional routes to Ohio Butler System‐wide $1.25 transit Expansion provide 1 hour headways during peak Hamilton Circulator bus service to feed regional routes Ohio Butler City of Hamilton $0.80 transit Circulator and improve connections BCRTA Oxford Multimodal Construct multimodal rail/bus/auto/bike Ohio Butler Chestnut St & Main St $19.18 transit Station & Transit station with transit operations facility Facility BCRTA New Service Add BCRTA service connection from Liberty Vicinity of SR 129 and Ohio Butler connecting Twp/Liberty Ctr to Market St Station in $0.46 transit Cincinnati‐Dayton Rd Hamilton and Hamilton Liberty Branch Hill ‐ SR 28 to Wards widening/ Ohio Clermont Widen to 3 lanes $7.99 Guinea Pike Corner Rd relocation Intersection with traffic Ohio Clermont US 50 Upgrade intersection, improve geometry $0.62 Roundbottom Rd operations 1000' west of existing Replace intersection with new grade widening/ Ohio Clermont SR 32 Herold Rd intersection $20.78 separated interchange relocation on SR 32 SR 32 (Frontage Bauer Rd to Half Acre New three‐lane frontage road with turn lanes widening/ Ohio Clermont $19.18 Rd) Rd at major intersections. PID: 82586 relocation Glen Este‐ Aicholtz Rd widening/ Ohio Clermont Withamsville Rd to New 3 lane route $20.78 Extension relocation Bach‐Buxton Rd Glen Este‐ Grade separate and widen by one lane each widening/ Ohio Clermont SR 32 Withamsville Dr to $77.53 direction to SR‐32. PID: 82370 relocation Old SR 74 State County Facility Location Description YOE_Cost (M) Project_Type SR 32/Main St Convert existing half interchange to full widening/ Ohio Clermont SR 32 interchange in Village $19.18 interchange relocation of Batavia Eastgate Blvd to Glen‐ widening/ Ohio Clermont Aicholtz Rd Widen by one lane in each direction $9.37 Este‐Withamsville Rd relocation SR 125 between CTC Park & Ride New park and ride lot to include Ohio Clermont Amelia and I‐275 $3.12 transit Lot approximately 40 parking spaces interchange CTC Fareboxes & Purchase fareboxes and electronic fare Ohio Clermont Electronic Fare System Upgrade $1.62 transit payment system and communication system Payment System CTC Bus Demand Response & Replace 4‐6 buses annually with costs ranging Ohio Clermont $1.50 transit Replacements Express Service from $80,000 to $450,000 per bus traffic Ohio Hamilton SR 264 Overlook to Boudinot Intersection improvements and turn lanes $11.24 operations Anderson Ferry Delhi Pike to Cleves Provide sidewalks both sides of road, add traffic Ohio Hamilton $3.41 Road Warsaw Rd lanes at select locations, access management operations I‐74 to Harrison (City widening/ Ohio Hamilton New Haven Rd Continuation of road widening from bridge $0.70 of Harrison) relocation Werk Rd to Rapid Run Intersection improvements, realignment, widening/ Ohio Hamilton Ebenezer Rd $16.88 Pk (Green Township) widening to three lanes relocation Westbourne Dr to traffic Ohio Hamilton Werk Rd Improve intersection with turn lanes $1.37 Glenway Ave operations Harrison Ave to US 50 Minor widening and add shoulders. Safety maintenance/ Ohio Hamilton Kilby Rd (Whitewater and $12.81 improvements at RR crossing reconstruction Harrison twps) State County Facility Location Description YOE_Cost (M) Project_Type Old Blue Rock to Additional through lane at intersection, access traffic Ohio Hamilton Blue Rock Rd Sheed Rd (Colerain $1.39 management operations Township) I‐74 to New Haven Rd maintenance/ Ohio Hamilton Dry Fork Rd Widen road, pave and grade shoulders $5.60 (City of Harrison) reconstruction Dorchester St to Improve traffic operations, remove parking as traffic Ohio Hamilton Auburn Ave William Howard Taft $6.24 necessary and improve intersection operations Rd Between Broadwell widening/ Ohio Hamilton Ancor Connector Rd and SR 32, east of New two‐lane facility with turn lanes $23.98 relocation Roundbottom Rd E Sharon Rd at the E Sharon Rd entrance to NS Sharon Realign rail yard driveway to intersect
Recommended publications
  • City of Fort Wright Council Meeting Wednesday, May 5, 2021 – 6:00 PM
    City of Fort Wright Council Meeting Wednesday, May 5, 2021 – 6:00 PM CALL TO ORDER The Council Meeting was called to order at 6:03 PM by Councilman Adam Feinauer. Councilman Feinauer led the Pledge of Allegiance and a moment of silence. City Clerk Maura Russell called the roll. Councilman Abeln Present Councilman Feinauer Present Councilman Wall Present Councilman Weber Present Councilman Wessels Present Councilwoman Witt Present Also present for the meeting were: City Administrative Officer Jill Bailey City Attorney Tim Theissen Fire/EMS Chief Steve Schewe Police Chief Ed Butler Public Works Director Jeff Bethell City Clerk Maura Russell Treasurer/Senior Deputy Clerk Susan Ellis City Engineer Mark Brueggemann Councilman Feinauer said Mayor Dave Hatter will be late to the meeting. Councilman Abeln made a motion to appoint Councilman Feinauer as Interim Mayor for this Meeting until Mayor Hatter arrives. Councilman Weber made a second. Ms. Russell called the roll. Councilman Abeln Yes Councilman Feinauer Yes Councilman Wall Yes Councilman Weber Yes Councilman Wessels Yes Councilwoman Witt Yes MOTION CARRIED Councilman Feinauer requested an amendment to the agenda to move discussion about the Brent Spence Bridge from New Business to Citizen Comments. Mr. Theissen said no amendment was needed. Page 1 of 12 CITIZEN COMMENTS/GUESTS Representative Kim Banta – Session 2021 Legislative Update – Representative Banta said she dealt with questions regarding unemployment benefits every day. She said Senate Bill 146, bringing unemployment offices to regional locations, and Senate Bill 7, allowing the State of Kentucky to forgive taxes on benefits, were both passed. Rep. Banta also discussed the passage of a House Resolution to provide firefighters with access to mental health services and crisis intervention training.
    [Show full text]
  • Kentucky, Ohio Governors to Develop Cost-Saving Plan for Improving Brent Spence Bridge Corridor
    FOR IMMEDIATE RELEASE Contact: Kerri Richardson, Gov. Beshear’s Office 502.564.2611 502.330.6633 Rob Nichols, Gov. Kasich’s Office 330.760.7582 [email protected] Kentucky, Ohio governors to develop cost-saving plan for improving Brent Spence Bridge corridor Agreement would limit tolls, share cost to create fairness COVINGTON, KY (Jan. 28, 2015) – The governors of Kentucky and Ohio today directed their teams to create a cost-saving plan that limits tolls and moves forward with improving the Brent Spence Bridge corridor. The bi-state, bi-partisan commitment unveiled by Gov. Steve Beshear of Kentucky and Gov. John Kasich of Ohio includes: Lowering the project’s price tag through innovative solutions in design, construction and financing Splitting costs and toll revenues evenly between Ohio and Kentucky Providing a 50 percent discount in toll rates for frequent commuters The two states’ transportation agencies are working together to develop cost-saving solutions by March 30 and build a viable financial plan before year’s end. The plan is expected to include a public-private partnership to build, maintain and finance the project. The bi-state team will focus on the federally approved 2012 environmental plan for the corridor, which calls for building a new bridge downtown, revamping the existing Brent Spence Bridge and improving interstate approaches in Northern Kentucky and downtown Cincinnati. The current plan would double the number of interstate lanes across the river from eight to 16, relieving congestion that causes major safety, mobility and congestion problems for the region. “We simply cannot afford more delay, distraction and gridlock – on the interstate or in the halls of government,” Gov.
    [Show full text]
  • Contract for Repairs to Spence Bridge Kokosing Construction Co
    FOR IMMEDIATE RELEASE Contact: Naitore Djigbenou 502.782.4829 [email protected] Contact: Chuck Wolfe 502.892.9038 [email protected] Kentucky Transportation Cabinet Awards Contract for Repairs to Spence Bridge Kokosing Construction Co. submits low bid of $3.1 million, commits to reopening by Dec. 23 FRANKFORT, Ky. (Nov. 16, 2020) – Today, Kentucky Transportation Secretary Jim Gray announced the awarding of a contract to Kokosing Construction Co. to repair and reopen the fire-damaged Brent Spence Bridge that connects Northern Kentucky and Cincinnati. Kokosing, headquartered in Westerville, Ohio, submitted a low bid of $3,127,528 and committed to having the bridge reopened to traffic by Dec. 23. There will be additional costs – the exact amount yet to be determined – for ancillary expenses such as traffic control, construction inspection and additional steel. The bridge, which carries about 160,000 vehicles per day across the Ohio River on Interstates 71 and 75, has been closed since a fiery truck crash in the early hours of Wednesday, Nov. 11. An in-depth inspection of the bridge, supported by laboratory testing, showed that damage was localized and the structural integrity of the bridge was not compromised. “The bridge is safe and sound and sturdy. The damage could have been far worse,” Secretary Gray said. “This has been confirmed through an exhaustive inspection of the bridge, supported by laboratory analysis.” The repair project would have been much more complicated if any of the critical steel support components had been compromised. “Once the lab testing told us the critical supports were still strong and not compromised, the repair job became clear from an engineering and construction standpoint,” Secretary Gray said.
    [Show full text]
  • Kentucky Hospital Research & Education Foundation Emergency
    Kentucky Hospital Research & Education Foundation Emergency Preparedness Update for December 22, 2020 Kentucky governor, lawmakers receive COVID-19 vaccine (AP) — (Press release) Kentucky Governor Andy Beshear and his wife Britainy received COVID-19 vaccinations on Tuesday, together with top state lawmakers. The Democratic governor thanked the top two Republican legislative leaders, Kentucky House Speaker David Osborne and Senate President Robert Stivers, for joining him in “setting the right example for the people of Kentucky.” The head of the Kentucky national guard, lieutenant governor, and state police commissioner will receive vaccines on Wednesday, Beshear said. Full story: https://apnews.com/article/health-robert-stivers-coronavirus-pandemic-kentucky- 152f0e02bbca96959224d071b153779d Related story - Fauci, other top health officials receive Moderna Covid-19 vaccine on camera Learn more: https://www.nbcnews.com/politics/politics-news/fauci-other-top-health-officials-receive-moderna-vaccine- camera-n1252073 ---------- Gov. Beshear Encourages Kentuckians to Stay Safe This Christmas (Press release) As of 4 p.m. Tuesday, Dec. 22, Gov. Beshear reported 3,057 new cases today: 3,057, with 1,631 hospitalized. There were 419 in an ICU, with 223 on vents. The positivity reate is 8.48%; and there were 28 new deaths to report. See all of the Kentucky Department for Public Health’s winter holiday guidance here: English full guidance, one- pager and single slide and Spanish full guidance, one-pager and single slide. ---------- Long Term Care Residents Get COVID-19 Vaccine (Press release - Monday) During the day Monday several long-term care facilities in the commonwealth began administering the Pfizer-BioNTech COVID-19 vaccine. “Again, our goal is to get everyone in long-term care facilities vaccinated by March 1,” said Gov.
    [Show full text]
  • Brent Spence Bridge Replacement/Rehabilitation Project
    Brent Spence Bridge Replacement/Rehabilitation Project PID No. 75119 HAM-71/75-0.00/0.22 KYTC Project Item Number 6-17 PUBLIC INVOLVEMENT PLAN October 2005 Prepared for the Ohio Department of Transportation and the Kentucky Transportation Cabinet Prepared by Parsons Brinckerhoff Quade & Douglas, Inc. and Dan Pinger Public Relations, Inc. October 2005 INTRODUCTION The Brent Spence Bridge and its approaches are key elements of the Interstate Highway System in the nation, carrying traffic on Interstates 75 and 71 in the Greater Cincinnati/Northern Kentucky area. This important river crossing is vital to long-distance state and national commerce and is a major thoroughfare for local and regional mobility. I-75 connects the Greater Cincinnati/Northern Kentucky region with Toledo and Detroit to the north, Atlanta and Miami to the south, and I-74 and US 50 to the east and west. I-75 and the railroads that run parallel to it through this region are among the nations’ busiest. It is the backbone of commerce and travel through the region. According to the Federal Highway Administration (FHWA) estimates, I-75 is one of the busiest trucking routes in North America, with truck traffic approaching six billion miles annually. In addition, more than 250 freight trains per day pass through or have destinations within the I-75 corridor. The interstate portions of this transportation system are nearly 50 years old. Ohio Department of Transportation (ODOT) and the Kentucky Transportation Cabinet (KYTC) are moving to resolve safety and capacity issues that exist within its corridor. As owners of the interstate and its bridges, one of the major projects ODOT and KYTC have identified to improve safety and reduce congestion is the replacement or rehabilitation of the Brent Spence Bridge.
    [Show full text]
  • Routine Maintenance Will Begin on the Brent Spence
    FOR IMMEDIATE RELEASE June 19, 2017 Media Contact: Betty Hull 859-414-5232 or [email protected] ROUTINE MAINTENANCE WILL BEGIN ON THE BRENT SPENCE BRIDGE FRIDAY, JUNE 23 Project team announces lane closures, changes in traffic patterns, and encourages public to plan their drive and use caution when traveling through work zones (Covington, KY – June 19, 2017) The Kentucky Transportation Cabinet (KYTC) today announced that routine maintenance will take place on the Brent Spence Bridge, beginning Friday, June 23, at 9 pm, weather permitting. Significant impacts to traffic on the bridge and on routes to get around the bridge are expected for approximately two months. KYTC is managing the project, which is part of an ongoing program to maintain and improve the condition of the regional transportation network. Maintenance work will take place in three coordinated phases The Brent Spence Bridge is a major thoroughfare for both local and national traffic, connecting two states that are critical to the movement of people, goods and services. The bridge carries I-71 and I-75 traffic over the Ohio River and has four lanes of traffic on each of the upper and lower decks. Maintenance work will take place in three phases, with two lanes on each deck closed at a time, beginning with the two easternmost lanes, moving across to the two middle lanes and ending with work in the two westernmost lanes. Each phase will take approximately 15-20 days, weather permitting. Some temporary overnight lane closures after this two-month period will continue for another three months. Beginning on June 23, at 9 pm, traffic will be reduced to one lane for a period of time over the weekend as traffic barriers are put into place.
    [Show full text]
  • ANNUAL REPORT 2021 Persevering and Progressing During the Pandemic MAASTO a LETTER from 2021 the PRESIDENT
    MAASTO Mid America Association of State Transportation Officials ANNUAL REPORT 2021 Persevering and progressing during the pandemic MAASTO A LETTER FROM 2021 THE PRESIDENT 2020 was a year that tested our society on every level, including our transportation system. The COVID-19 pandemic, and its impacts on the behavior of drivers and consumers, created both unprecedented challenges and opportunities. The calls for social justice and an end to oppression caused us to renew our focus on the way our organizations and our transportation projects affect issues of diversity, equity and inclusion. And as we scrambled to meet the demands of the present, we were keenly aware of the need to plan for the future of transportation, with the promise of new technologies that will transform our mobility options in profound ways. It was a year in which the value of MAASTO to its member transportation agencies and the people they serve was especially evident. When the pandemic hit, MAASTO provided the perfect platform for transportation leaders in the Midwest to compare notes on the emerging situation and share best practices for maintaining our transportation system and responding to the crisis. MAASTO established an Equity and Inclusion Committee to help us learn from each other, both on creating a more equitable workplace and to understand and promote positive outcomes for communities. And we continued to prepare for the advent of Connected and Autonomous Vehicle (CAV) technology, establishing a CAV committee and conducting the second annual MAASTO CAV Summit in October. All the Midwestern states are facing similar challenges to understand how the transportation role of state government will be affected – from changes to laws and regulations to ensuring that this new technology benefits everyone in our states.
    [Show full text]
  • Eastern Bypass of Southwest Ohio and Greater Cincinnati
    EASTERN BYPASS OF SOUTHWEST OHIO AND GREATER CINCINNATI Submitted to Ohio General Assembly December 2019 Prepared by The Ohio Department of Transportation, District 8 Eastern Bypass of Southwest Ohio and Greater Cincinnati – December 2019 ABSTRACT This document fulfills requirements of Section 755.60 (A) of the Ohio Department of Transportation (ODOT) budget. This report covers the following required topics: 1. Commentary on the study conducted by the State of Kentucky’s Transportation Cabinet pertaining to the Eastern Bypass titled Brent Spence Strategic Corridor Study. 2. Details on the extent the Ohio Department of transportation assisted and coordinated with the Kentucky Transportation Cabinet in conducting the study, including information that was provide by the Ohio Department of Transportation. 3. Details on the next steps the Ohio Department of Transportation is taking or needs to take to coordinate with the Kentucky Transportation Cabinet to plan and construct the Eastern Bypass. 2 Eastern Bypass of Southwest Ohio and Greater Cincinnati – December 2019 Contents Brent Spence Strategic Corridor Study - Commentary ............................................. 4 ODOT Assistance with Study............................................................................ 6 ODOT Coordination During Study ...................................................................... 6 Eastern Bypass of Cincinnati Next Steps.............................................................. 6 Attachments .............................................................................................
    [Show full text]
  • Economic Impact Analysis Brent Spence Bridge Replacement/Rehabilitation Project
    Economic Impact Analysis Brent Spence Bridge Replacement/Rehabilitation Project Prepared by: Janet Harrah, Senior Director Anne Gallagher. Senior Regional Economist Center for Economic Analysis and Development Haile/US Bank College of Business, Northern Kentucky University 2622 Alexandria Pike, Highland Heights, KY 41076 http://cead.nku.edu (859) 441- 0611 Prepared for: Build our new bridge now 1 Center for Economic Analysis and Development This study was conducted by the Center for Economic Analysis and Development (CEAD) housed in the Haile/US Bank College of Business at Northern Kentucky University. The study presents estimates of the economic impact of the Brent Spence Bridge Replacement/Rehabilitation Project on the Ohio, Kentucky and Cincinnati metropolitan economies. The study was prepared at the request of Build Our New Bridge Now. About CEAD The Center for Economic Analysis and Development research staff applies its knowledge and expertise to real business problems through custom research and data information services. Through its collection and analysis of economic and market data, CEAD contributes to the diversification and growth of the Northern Kentucky/Greater Cincinnati economy by helping its companies, governmental agencies, nonprofits and economic development professionals make sound business and policy decisions. 2 Summary of Results The $2.6 billion Brent Spence Bridge Replacement/Rehabilitation project is estimated to support 24,488 jobs throughout Kentucky and Ohio with most of the jobs (23,940 jobs) located in the Cincinnati MSA over the 10-year construction phase (an annual average of 2,448 jobs). These jobs will generate an estimated $1.9 billion in labor income across the two states with again most of the labor income occurring in the Cincinnati market ($1.8 billion).
    [Show full text]
  • Trivia Newer Hills
    notes NEWER TRIVIA to crossroads? HOW WELL DO YOU KNOW YOUR BRIDGES? 07 Discover more about the vision behind Crossroads and how you Match the bridge description/nickname with its correct name can get involved (if you want) by attending Context Live event this Sunday, July 19 at 1pm at Crossroads Oakley. Meet some A. The Big Mac Bridge 1. The Combs-Hehl Bridge people. Get some questions answered. Eat some (free) lunch. B. The 71/75 Bridge 2. The Newport Southbank Bridge Childcare and lunch provided. For more details and to RSVP, visit C. The 275 East Bridge 3. Carroll C. Cooper Bridge crossroads.net/contextlive. D. The 275 West Bridge 4. The Clay Wade Bailey Bridge E. The Purple People Bridge 5. The Daniel Carter Beard Bridge 18-19 F. The bridge connecting 2nd 6. The Brent Spence Bridge The Program street with Covington, next to the C&O railroad bridge Forget Lance Armstrong; you should see me out on Route 8 A/5; B/6; C/1; D/3; E/2; F/4 E/2; D/3; C/1; B/6; A/5; climbing the Christmas tree hill. HILLS time here? OR SECOND, OR THIRD, OR TENTH... we die on Welcome WE ARE COMMITTED TO: Biblical Truth Weekends here are for anyone who wants to seek Crossroads is a place for people on every part of the spiritual God, from those exploring whether or not God even journey, from those just investigating whether there is a God to exists to committed Christ-followers. We present those who have made following Christ the priority of their life.
    [Show full text]
  • Brent Spence Repair Project Update
    FOR IMMEDIATE RELEASE Contact: Naitore Djigbenou 502.782.4829 [email protected] Contact: Chuck Wolfe 502.892.9038 [email protected] Work Progressing on Brent Spence Bridge as Repair Project Timeline Reached Halfway Mark Fire-damaged section of upper traffic deck removed, crews prepare for installation of new concrete driving surface FRANKFORT, Ky. (Dec. 2, 2020) – Kentucky Transportation Secretary Jim Gray today detailed progress on the emergency repair project to reopen the closed Brent Spence Bridge. Three weeks into the six-week repair project, contractor crews have removed the fire-affected portion of the upper deck of the bridge and new steel support beams have been placed. "We literally have all hands on deck as crews work around the clock to restore the bridge to its safe and sound state," said Secretary Gray. "The project remains on track as activities continue this week to prepare for the installation of the new upper deck." Secretary Gray provided the following updates: Early this week contractors finalized installation of the beams and prepared for a new concrete driving surface. Activities this week include the installation of: - metal deck pans where concrete will be poured and serve as a platform for workers on the bridge; - rebar (a grid of steel bars) to reinforce the concrete once it is poured; - and steel connections that tie the deck and barrier wall for added durability. The work currently taking place is not temperature-sensitive and inclement weather should not affect the work schedule. While the repairs on the bridge remain a focus for contractors, KYTC staff are giving significant attention to traffic management in the surrounding area.
    [Show full text]
  • Kentucky Hospital Research & Education Foundation Emergency
    Kentucky Hospital Research & Education Foundation Emergency Preparedness Update for November 13, 2020 US States Ramp Up Seat Belt Enforcement (From IACP's The Lead) The AP (11/12) reports, “West Virginia highway enforcers are taking part in this year’s Click It or Ticket effort that begins Monday. Anyone caught traveling without a buckled seat belt or traveling with unrestrained children will be ticketed, transportation officials said in a news release.” The AP adds, “The two- week mobilization coincides with the National Highway Traffic Safety Administration’s campaign during the busy holiday travel season. ‘If you knew you would be involved in a crash, wouldn’t you want to be buckled? It’s your best defense against injury or death,’ said Bob Tipton, director of the West Virginia Governor’s Highway Safety Program. West Virginia law enforcement agencies will work with colleagues in Maryland and Virginia on Monday and in Kentucky and Ohio on Nov. 20 in a coordinated effort involving border counties.” ---------- The disturbing surge in Covid-19 hospitalizations (Vox) More Americans are currently hospitalized with Covid-19 than at any other point in the pandemic, a grim indicator that the third big wave of cases in the US may be the worst wave to date. On November 11, 65,368 people across the United States were in the hospital after testing positive for the novel coronavirus, according to data reported by the Covid Tracking Project. That’s significantly higher than the last peak of 59,940 recorded on April 15, when the New York City area was the epicenter of the US outbreak.
    [Show full text]