OKI REGIONAL Moving the Region Forward What OKI Heard from the Public:

Improve Rehabilitate Existing Outdated Maintain Create More Decrease Transit and Infrastructure Existing Bike/Ped Congestion Add Additional The Brent Roadways. Options. and Traffic. Transit Modes. Spence Bridge.

In response, the 2040 Project List includes:

Both the ($1.2 billion) and Out of the 92 roadway ($1.7 billion) recommendations included in the 20 transit shares of the cost to improve our Project List, related improvements worth an Bridge These are the two most expensive future 79 or 86% estimated are improvements to transportation investments included in the existing roadways. list and with These 79 existing roadway projects $529 million A few of the 23 projects are: every passing year total a potential Oasis Rail Transit Line it is delayed, the more expensive it becomes. TANK CVG Hub $5.3 billion Dixie Highway and Madison Ave/KY 17 Bus Rapid Transit TANK I-71/75 corridor Bus on 17 Bike and/or Pedestrian Shoulders related projects at a cost estimate total of NKY Streetcar (Newport)

Extension of BCRTA bus service $191 million Numerous brand new Park & Rides and Transit Hubs located Almost every one of the 92 roadway recommendations included in in our urban and suburban the Project List work to address congestion. In addition, all 20 the communities to enhance transit recommendations provide a feasible alternative to single transit service and accessibility occupancy vehicular traffic, thereby addressing our region’s traffic congestion.

more information at 2040.oki.org BUTLER COUNTY OH Survey 2010 Census OKI REGIONAL 10% | 16% Moving the Region Forward 6% | 15% Butler Warren WARREN COUNTY OH Survey 2010 Census 4% | 9% 6% | 8% Hamilton CLERMONT COUNTY OH Survey 2010 Census 4% | 9% 6% | 6%

HAMILTON COUNTY OH Survey 2010 Census 55% | 40% Dearborn 56% | 51%

Boone DEARBORN COUNTY IN Campbell Kenton Clermont Survey 2010 Census 4% | 2% THE OKI REGION 6% | 2% OKI received over 2300 surveys during our fall/winter public outreach for the 2040 plan. Members of the public who BOONE COUNTY KY completed the survey prove to have been a really good Survey 2010 Census sample of our overall regional demographics. 4% | 6% HOW DOES the REGION TRAVEL? 6% | 8% Bus 5% WALK 6% Bus 2% WALK 2%

KENTON COUNTY KY Survey 2010 Census 15% | 13% DRIVE THEIR DRIVE THEIR CARS ALONE CARS ALONE 89% 96% 8% | 7%

2040 SURVEY 2009-2013 American Community Survey data CAMPBELL COUNTY KY Survey 2010 Census There are a total of 132 projects in the 2040 Final Project 4% | 5% List at an estimate total of $6,545,310,000! The list represents a potential investment in our eight-county 6% | 2% region of over $6.5 BILLION!

MORE INFORMATION AT 2040.OKI.ORG OHIO PROJECTS State County Facility Location Description YOE_Cost (M) Project_Type

Intelligent Transportation Ohio TBD Per OKI ITS Plan recommendations $62.44 ITS System (ITS) Projects

South of Oxford widening/ Ohio Butler US 27 between SR 732 and New 2‐lane US 27 parkway connector west $6.39 relocation US 27 Williams Ave to St widening/ Ohio Butler River Rd Widen by one lane with safety upgrades $6.39 Clair Ave relocation

Butler‐ New 5 lane facility from Cox Rd to Gateway widening/ Ohio Butler Warren/Cox Bethany Rd to SR 63 $79.93 Blvd Extension relocation Connector Rd

New interchange & widening of Milliken Rd widening/ Ohio Butler I‐75 Milliken Rd $79.93 from Cin‐Day to Butler‐Warrren Rd relocation Holden Blvd to widening/ Ohio Butler N. Gilmore Rd Widen to 3 lanes $3.12 Symmes Rd relocation traffic Ohio Butler I‐75 Union Centre Blvd Interchange modification $15.99 operations ‐ Milliken Rd to Monroe widening/ Ohio Butler Widen by one lane $12.79 Dayton Rd South Corp Line relocation Rossgate Ct to widening/ Ohio Butler SR 128 Cincinnati‐Brookville Widen to 3 lanes $23.98 relocation Rd Milliken Rd to SR 4 (N. Widen to 5 lanes with landscaped median and widening/ Ohio Butler SR 747 $25.10 Jct) 10' multi use path relocation State County Facility Location Description YOE_Cost (M) Project_Type SORTA Liberty Utilize ODOT/BCTID Liberty Twp P&R; extend Vicinity of SR 129 and Ohio Butler Twp Park & Ride Rt 42X to new location. Replaces leased $1.87 transit Cincinnati‐Dayton Rd Lot facility

Cincinnati Dayton Rd widening/ Ohio Butler Bethany Rd Widen to 4 lanes and add multi use path $15.99 to Butler Warren Rd relocation Liberty traffic Ohio Butler I‐ 75 Interchange modification $49.95 Interchange operations traffic Ohio Butler Tylersville Rd I‐75 ramps Interchange modification $7.49 operations

Hamilton‐Mason traffic Ohio Butler at Five Points Intersection improvements $3.75 Rd operations

widening/ Ohio Butler S. Gilmore Rd Resor Rd to Mack Rd Widen by one lane $6.24 relocation Augusta Blvd to widening/ Ohio Butler US 127 Widen by one lane $8.74 Patterson Blvd relocation SR 177 ‐ Main Carmen Ave to widening/ Ohio Butler Widen by one lane (Hamilton) $4.80 Street Brookwood Ave relocation Black Street Over Great Miami Ohio Butler Replace 2 lane bridge with new 4 lane bridge $39.97 bridge Bridge River widening/ Ohio Butler Grand Blvd SR 4 to Five Points Widen to 2 lanes each direction $3.75 relocation Bypass 4 to Five widening/ Ohio Butler Tylersville Rd Widen by 3 lanes $7.49 Points relocation Hamilton RR line from North B bicycle/ped‐ Ohio Butler Beltline Multi‐ Multi‐use path on abandoned CSX railway $7.49 St to Millville Ave estrian use Trail State County Facility Location Description YOE_Cost (M) Project_Type Wayne Madison traffic Ohio Butler at Trenton Rd Intersection improvement $1.87 Rd operations Regional Route Expand service hours on regional routes to Ohio Butler System‐wide $1.25 transit Expansion provide 1 hour headways during peak Hamilton Circulator bus service to feed regional routes Ohio Butler City of Hamilton $0.80 transit Circulator and improve connections BCRTA Oxford Multimodal Construct multimodal rail/bus/auto/bike Ohio Butler Chestnut St & Main St $19.18 transit Station & Transit station with transit operations facility Facility BCRTA New Service Add BCRTA service connection from Liberty Vicinity of SR 129 and Ohio Butler connecting Twp/Liberty Ctr to Market St Station in $0.46 transit Cincinnati‐Dayton Rd Hamilton and Hamilton Liberty Branch Hill ‐ SR 28 to Wards widening/ Ohio Clermont Widen to 3 lanes $7.99 Guinea Pike Corner Rd relocation Intersection with traffic Ohio Clermont US 50 Upgrade intersection, improve geometry $0.62 Roundbottom Rd operations 1000' west of existing Replace intersection with new grade widening/ Ohio Clermont SR 32 Herold Rd intersection $20.78 separated interchange relocation on SR 32 SR 32 (Frontage Bauer Rd to Half Acre New three‐lane frontage road with turn lanes widening/ Ohio Clermont $19.18 Rd) Rd at major intersections. PID: 82586 relocation Glen Este‐ Aicholtz Rd widening/ Ohio Clermont Withamsville Rd to New 3 lane route $20.78 Extension relocation Bach‐Buxton Rd Glen Este‐ Grade separate and widen by one lane each widening/ Ohio Clermont SR 32 Withamsville Dr to $77.53 direction to SR‐32. PID: 82370 relocation Old SR 74 State County Facility Location Description YOE_Cost (M) Project_Type SR 32/Main St Convert existing half interchange to full widening/ Ohio Clermont SR 32 interchange in Village $19.18 interchange relocation of Batavia Eastgate Blvd to Glen‐ widening/ Ohio Clermont Aicholtz Rd Widen by one lane in each direction $9.37 Este‐Withamsville Rd relocation SR 125 between CTC Park & Ride New park and ride lot to include Ohio Clermont Amelia and I‐275 $3.12 transit Lot approximately 40 parking spaces interchange CTC Fareboxes & Purchase fareboxes and electronic fare Ohio Clermont Electronic Fare System Upgrade $1.62 transit payment system and communication system Payment System CTC Bus Demand Response & Replace 4‐6 buses annually with costs ranging Ohio Clermont $1.50 transit Replacements Express Service from $80,000 to $450,000 per bus traffic Ohio Hamilton SR 264 Overlook to Boudinot Intersection improvements and turn lanes $11.24 operations Anderson Ferry Delhi Pike to Cleves Provide sidewalks both sides of road, add traffic Ohio Hamilton $3.41 Road Warsaw Rd lanes at select locations, access management operations I‐74 to Harrison (City widening/ Ohio Hamilton New Haven Rd Continuation of road widening from bridge $0.70 of Harrison) relocation Werk Rd to Rapid Run Intersection improvements, realignment, widening/ Ohio Hamilton Ebenezer Rd $16.88 Pk (Green Township) widening to three lanes relocation Westbourne Dr to traffic Ohio Hamilton Werk Rd Improve intersection with turn lanes $1.37 Glenway Ave operations Harrison Ave to US 50 Minor widening and add shoulders. Safety maintenance/ Ohio Hamilton Kilby Rd (Whitewater and $12.81 improvements at RR crossing reconstruction Harrison twps) State County Facility Location Description YOE_Cost (M) Project_Type Old Blue Rock to Additional through lane at intersection, access traffic Ohio Hamilton Blue Rock Rd Sheed Rd (Colerain $1.39 management operations Township) I‐74 to New Haven Rd maintenance/ Ohio Hamilton Dry Fork Rd Widen road, pave and grade shoulders $5.60 (City of Harrison) reconstruction Dorchester St to Improve traffic operations, remove parking as traffic Ohio Hamilton Auburn Ave William Howard Taft $6.24 necessary and improve intersection operations Rd Between Broadwell widening/ Ohio Hamilton Ancor Connector Rd and SR 32, east of New two‐lane facility with turn lanes $23.98 relocation Roundbottom Rd E Sharon Rd at the E Sharon Rd entrance to NS Sharon Realign rail yard driveway to intersect Sharon traffic Ohio Hamilton Intersection Yard and Medallion Dr $1.62 Rd at right angle. Construct EB turn lane operations Improvement in Sharonville/Evendale

Western Hills viaduct Western Hills Ohio Hamilton spanning the CSX Replacement of viaduct $349.68 bridge Viaduct Queensgate Yard US 42 (Reading Dorchester St to Provide 5 lanes and intersection widening/ Ohio Hamilton $3.20 Rd) Burnet Ave improvements relocation Tallahassee Dr to widening/ Ohio Hamilton Cheviot Rd Widen by one lane $6.24 Jessup Rd relocation Kleeman Rd to Widen by one lane and improve intersection widening/ Ohio Hamilton North Bend Rd Westwood Northern $12.79 @ Westwood Northern Blvd relocation Blvd widening/ Ohio Hamilton I‐ 275 US 52 to Five Mile Rd Add 1 lane each direction $63.95 relocation State County Facility Location Description YOE_Cost (M) Project_Type Reed Hartman Hwy to IR 71 (Warren Co ‐ Lane addition, roadway rehabilitation, access widening/ Ohio Hamilton Fields Ertel Rd Butler Warren Rd to $28.78 management relocation Wilkens Rd) widen to 5 lanes North Bend Rd to widening/ Ohio Hamilton Winton Rd Widen by one lane $6.39 Timber Trail relocation Beechmont Ave to Add center turn lane and geometric widening/ Ohio Hamilton Wooster Rd $9.99 Red Bank Rd improvements relocation IR 71/IR 75 bridge Brent Spence Bridge replacement and highway Ohio Hamilton over the to $1,245.24 bridge Bridge improvements Western Hills Viaduct US 42 (Reading Clinton Springs Ave to Widen by one lane & intersection widening/ Ohio Hamilton $7.99 Rd) Paddock Rd improvements relocation Eastern Corridor Oasis Rail Line Oasis Line Ohio Hamilton (downtown Cincinnati Rail transit plus feeder bus $372.16 transit Segments 1, 2, 3 to Milford) & 4 Hopple St CSX Queensgate and Reconstruct portion of the Hopple St Viaduct Ohio Hamilton Passing Track $15.99 freight NS Gest Street Yards to provide additional horizontal clearance and Crossovers Babson/Hetzel Terminus of Babson Pl widening/ Ohio Hamilton New connection $5.74 Connector to Old Red Bank Rd relocation Medpace Dr to Erie Rebuild bridge over RR and improve roadway widening/ Ohio Hamilton Old Red Bank Rd $12.49 Ave with pedestrian facilities relocation traffic Ohio Hamilton Madison Rd Ridge Rd to Kennedy Add left turn lane $5.00 operations Edwards, Edwards, Madison, traffic Ohio Hamilton Madison, Intersection realignments $7.99 Wasson Rds operations Wasson Rds State County Facility Location Description YOE_Cost (M) Project_Type Wasson Way Montgomery Rd to Multi use path (cost includes $12M for row) bicycle/ped‐ Ohio Hamilton $33.72 Trail Wooster Pk Preserve transit option estrian M.L. King Dr (Clifton to Harvey) and bicycle/ped‐ Ohio Hamilton Uptown Multi use path/ROW improvements $7.99 Jefferson Ave (Taft to estrian M.L. King) Mill Creek Trail ‐ Winton Terrace to bicycle/ped‐ Ohio Hamilton Multi use path $1.20 Phase 5 Center Hill Rd estrian Ohio River Trail ‐ Lunken Airport to bicycle/ped‐ Ohio Hamilton Multi use path along riverfront on Oasis $24.98 East (Oasis) Sawyer Point estrian Colerain Transit Near Colerain Ave and Off‐street park and ride and bus layover with Ohio Hamilton $5.62 transit Center I‐275 new passenger amenities US 42 (Lebanon I‐275 to Crystal View Reconfigure interchange. Add NB to WB loop traffic Ohio Hamilton $12.49 Rd) Court ramp, realign WB exit ramp operations Extend northwest at Little Miami Beechmont Ave to bicycle/ped‐ Ohio Hamilton Scenic Trail connect with Lunken Multi use path ‐ Great Parks $10.39 estrian Bridge and Armleder multi use paths Extend existing trail terminus to Caldwell MillCreek bicycle/ped‐ Ohio Hamilton Park north to Multi use path $3.04 Greenway estrian Hamilton Co Fairgrounds Smale Park to Mill Ohio River Trail Creek including ORT bicycle/ped‐ Ohio Hamilton West ‐ Smale to Multi use path ‐ CincinnatiConnects $15.24 West connector estrian Mill Creek Ext bridge over Mill Creek State County Facility Location Description YOE_Cost (M) Project_Type Winton Woods West Fork Mill Connector + West bicycle/ped‐ Ohio Hamilton Multi use path $12.31 Creek Greenway Fork Mill Creek ‐ estrian Wyoming Segment Connect Winton Winton Woods Woods trail loop bicycle/ped‐ Ohio Hamilton to Great Miami northwest to Fairfield Multi use path ‐ Great Parks $13.11 estrian Trail extension of the Great Miami River Trail

From proposed CC Ohio River Trail trail at Millcreek west bicycle/ped‐ Ohio Hamilton West ‐ Fernbank to ORT West‐Segment Multi use path $7.24 estrian Park Extension 3 and then on to Fernbank Park Trail

Ohio River Trail Extend from existing West ‐ Shawnee trail at Fernbank to bicycle/ped‐ Ohio Hamilton Multi use path $9.91 Lookout the southern entrance estrian Extension of Shawnee Lookout North Bend Park Near North Bend Rd Ohio Hamilton Park and ride facility $1.87 transit & Ride and I‐74 Midpointe Near Seymour and Ohio Hamilton Park and ride facility $1.87 transit Transit Center Reading Fields Ertel to Hunters widening/ Ohio Warren Snider Rd Widen one lane in each direction $11.59 Green Dr relocation SR 63 to SR 123 widening/ Ohio Warren Union Rd Widen by one lane each direction $28.72 interchanges relocation widening/ Ohio Warren SR 48 Miller Rd to SR 122 Widen by one lane each direction $6.75 relocation State County Facility Location Description YOE_Cost (M) Project_Type Warren County Ohio Warren Warren County WCTS Bus Circulator System $1.25 transit Transit Bikeway City of Lebanon / City Connect Countryside YMCA Trail w/ Mason bicycle/ Ohio Warren $1.25 Connectivity of Mason Trail System at Mason Morrow Millgrove Rd pedestrian Widen one lane each direction with center widening/ Ohio Warren SR 741 Parkside Dr to US 42 $15.99 turn lane relocation Mason‐Morrow‐ widening/ Ohio Warren US 42 to Columbia Rd Widen to 5 lanes $18.06 Millgrove Rd relocation Relocate and widen by one lane each widening/ Ohio Warren SR 741 SR 63 to Greentree Rd $19.18 direction relocation Gateway Blvd Extension to widening/ Ohio Warren Gateway Blvd Five lane extension $6.39 Butler/Warren/Cox relocation Extension widening/ Ohio Warren SR 63 Union Rd to SR 741 Widen by one lane each direction $9.59 relocation widening/ Ohio Warren SR 741 SR 63 to US 42 Widen by one lane each direction $19.18 relocation Mason‐Morrow‐ Millgrove Road to widening/ Ohio Warren SR 48 Widen by one lane in each direction $23.98 Stephens Rd (south of relocation US 22/3) Gateway Blvd widening/ Ohio Warren Gateway Blvd Extension north from 2 lane extension $1.60 relocation SR 63 to Union Rd SR 123 to Cox Road widening/ Ohio Warren Greentree Rd Widen by one lane each direction $23.98 Extension relocation State County Facility Location Description YOE_Cost (M) Project_Type West Mason Corp Widen to 5 lanes and extend Bethany to widening/ Ohio Warren Bethany Rd Limit to Mason‐ $14.39 Mason‐Morrow‐Millgrove relocation Morrow‐Millgrove Rd

Mason Fields Ertel Rd to widening/ Ohio Warren Widen by one lane in each direction $9.59 Montgomery Rd Socialville Fosters Rd relocation I‐71 to Mason‐ widening/ Ohio Warren SR 48 Widen by one lane in each direction $5.76 Morrow‐Millgrove relocation widening/ Ohio Warren SR 48 I‐71 to Kingsview Dr Widen by one lane in each direction $3.34 relocation Miami 2 Miami ‐ 18.9 miles ‐ Combination of multi use path, on bicycle/ped‐ Ohio Warren Lebanon to Lebanon to Monroe $12.79 street bike lanes, and shared road estrian Monroe Miami 2 Miami ‐ 18.5 miles ‐ Combination of multi use path, on bicycle/ped‐ Ohio Warren Mason to Mason to Franklin $12.47 street bike lanes, and shared road estrian Franklin KENTUCKY PROJECTS State County Facility Location Description YOE_Cost (M) Project_Type Intelligent Transportation Per OKI ITS Plan Kentucky TBD $12.49 ITS System (ITS) recommendations Projects Greater Cincinnati and Construct a transit hub near the Kentucky Boone TANK Airport Hub Northern Kentucky $2.50 transit CVG International Airport International Airport widening/ Kentucky Boone I‐275 Graves Rd New interchange $103.43 relocation I‐275 interchange and its traffic Kentucky Boone I‐75 Upgrade interchange $151.87 system‐to‐system ramps operations

KY 536 intersection and Widen intersection approaches, traffic Kentucky Boone US 25 (Dixie Hwy) segment of US 25 from $50.52 add turn lanes operations Beesom Dr to Aristocrat Dr KY 842 US 25 to the Kentucky Boone (Richardson Replace bridge over NS railroad $14.80 bridge Boone/Kenton County line Rd) KY 842 (Houston Add approach lanes on all four traffic Kentucky Boone KY 842 Rd/Hopeful Church Rd) $51.96 legs of the intersection operations intersection Construct a transit hub (super TANK NKU Northern Kentucky Kentucky Campbell station) at or near Northern $0.31 transit Superstop University Kentucky University widening/ Kentucky Campbell I‐471 US 27 to Ohio State line Widen to four lanes $312.22 relocation

Reconstruct including multi‐ maintenance/ Kentucky Campbell US 27 KY 1892 to KY 1120 $43.16 modal needs reconstruction State County Facility Location Description YOE_Cost (M) Project_Type

maintenance/ Kentucky Campbell KY 9 (AA Hwy) I‐275 Interchange Reconstruct $130.61 reconstruction

Nunn Drive to Johns Hill Widen to 3 through lanes widening/ Kentucky Campbell US 27 $1.09 Road southbound relocation NKY Streetcar Extension of Cincinnati Streetcar Kentucky Campbell Newport $103.91 transit Phase 1 to Newport (Phase 1) I‐71/I‐75 bridge over the Brent Spence Bridge replacement and highway Kentucky Kenton Ohio River to Dixie Hwy $1,667.61 bridge Bridge improvements Interchange Reconstruct on existing and new Norfolk Southern RR widening / Kentucky Kenton KY 536 alignment. (Pre‐construction $59.95 bridge to KY 17 relocation funds in TIP 6‐162.0) Riverfront Entire city of Covington Construct a multi use path and bicycle/ Kentucky Kenton Commons Multi‐ $17.73 Ohio Riverfront retaining wall pedestrian use Path Reconstruct on new alignment Staffordsburg Rd to with multi use path as widening/ Kentucky Kenton KY 536 $83.39 Campbell County line recommended by KY 536 Scoping relocation Study KY 16 (Taylor Mill KY 2047 (Senour Rd) to KY Widen to 5 lanes, including multi‐ widening/ Kentucky Kenton $101.03 Rd) 536 (Harris Pike) modal needs relocation US 25 (Main St) to KY 3090 maintenance/ Kentucky Kenton KY 8 (Fourth St) (Philadelphia St) in Minor widening $34.97 reconstruction Covington Create a high‐frequency, US 25 (Dixie Boone County Line to Kentucky Kenton enhanced bus transit corridor $5.00 transit Hwy/Pike St) Madison Avenue with specialized branding State County Facility Location Description YOE_Cost (M) Project_Type Reconstruct on existing and new KY 17 (Madison Pike) to widening/ Kentucky Kenton KY 536 alignment with bike/ped facilities $47.70 Staffordsburg Rd relocation KY 536 Scoping Study Covington Transit Center Create a high‐frequency bus Madison Ave/KY Kentucky Kenton to the TANK Fort Wright transit corridor, paint sharrows or $2.97 transit 17 Transit Hub shared lane markings Multi use path, add NB rt turn KY 1303 Dudley to US 25 (Dixie widening/ Kentucky Kenton lane at Thomas More & widen to $57.49 (Turkeyfoot Rd) Hwy) relocation 4 lanes I‐275 to US25 KY 8 (Fourth St Garrard St (Covington) to Replace the bridge including Kentucky Kenton $46.21 bridge Bridge) Fourth St (Newport) multi‐modal accommodations Crestview Hills Mall Rd and KY 1303 Relocate the intersection of widening/ Kentucky Kenton Thomas Moore Pkwy $15.97 (Turkeyfoot Rd) Crestview Hill Mall Rd relocation intersections Intersection of KY 371 KY 371 (Buttermilk Align Orphanage Rd and (Buttermilk widening/ Kentucky Kenton Pike/Orphanage Buttermilk Pike at US 25 including $15.61 Pike/Orphanage Rd) and relocation Rd) enhanced multi‐modal facilities US 25 (Dixie Hwy) Edgewood Park & Thomas More Pkwy and Construct park and ride facility Kentucky Kenton $1.25 transit Ride Lot Dudley Rd intersection with shelter and parking E 8th and Garrard Street Licking River Construct Licking River Greenway bicycle/ Kentucky Kenton to E 15th St and Eastern $0.25 Greenway Trail Trail Phase III pedestrian Ave

KY 842 Boone/Kenton County Line maintenance/ Kentucky Kenton Minor widening $11.99 (Richardson Rd) to KY 1303 (Turkeyfoot Rd) reconstruction

Brent Spence Bridge to Kentucky Kenton I‐71/75 Bus on left shoulder project $0.06 transit Boone County Line INDIANA PROJECTS State County Facility Location Description YOE_Cost (M) Project_Type Reconstruct including realignment, From US‐50 to west of traffic Indiana Dearborn SR 1 roundabouts, and widening. Includes US‐ $24.73 Ridge/Belleview operations 50 intersection Mobility improvements between the Bright 74 Indiana Dearborn Bright/I‐74 Bright/north Dearborn County area and I‐ $47.96 roadway Improvements 74