{ Meeting d Distr'ct Levet Expert Approisol Commitlee -Thone held on 15m october 201&

The 9th Meetine of District Level Expert Anpraisal Committee-l Hetd on 16th October 2018 At Samiti Sabagruha,2nd Floor, Niyojan Bhavan Building, Collector Office Campus, Thane (W)

The following members were present for the committee Meeting.

Sr. Nominated Member Oflice and Post Name Role in DEAC Present/Absent No

I Shri. U.L. Pawar Executive Engineer, Irrigation Chairman Present Department, Thane 2. Smt. Girja Desai Asst. Conservator of Forest, Member Present Thane 3. Mr. H.M. Sangnor Geologist, GSDA, Thane Member Present

4. Dr. Santoshi Shinde District Health Officer, Thane Member Present Representative 5. Shri. Sukhdeve Executive Engineer, Member Present Zila Parishad, Thane 6. Mr. Lad Regional Officer, Member Absent Pollution Control Board, Thane 7_ Dr. Pramod Salaskar Env ronmeut Expert Member Absent 8. Prof. Vinod Naravane Environment Expert Member Absent Prof. Birla College. 9. Prof. Sudesh D. Rathod Environment Expert Member Present Prof. Thana collese 10. Smt. Subhangi Mane Assistant Engineer-I, Public Member Absent Works Department, Thane ll Shri. Manoj N Meshram District Mining Officer, Thane Member Present Secretary 12. Shri. TanajiYadav Regional Officer, Maharashtra Invitee Present Pollution Control Board, Member At the outset, the Chairman welcomed all the Members present for the meeting. Thereafter the items were taken up for discussion.

o The following cases were placed before the committee for appraisal.

Sr, FiIe Name of Proposal Taluka Village Suruey. No Area in Type of No No Ha. Land I 87 Shd. G.H. Ajwani Thane Adivali 94/A (Part) 1.42 FOREST Bhtavali 2 88 Mukesh & Company Thane Adivali 94lA (Part) 1.00 FOREST Bhtavali J 90 Shd. N.G. Ajwani Thane Adivali 94lA (Part) 1.42.0 FOREST Bhtavali 4 9l Raghuvansh Stone Mines Thane Adivali 94lA (Part) 1. r 9.0 FOREST Bhtavali t L-,--- Member Secretary DEAC, Thane f Meeting ol District Levet Expeft Apprdisdl Committee - fhdne hetd on 16m odober 2ot&

Sr. File Name of Proposal Taluka Village Survey. No Area in Type of No No Ha. Land 5 92 Mahaveer Stone and Metal Supplier Thane Bhandarli 104 (part) 121.0 FOREST

6 93 UMA Stone Company Thane Adivali 94lA (Part) 1.52.0 FOREST Bhtavali 7 94 Harasiddh Stone Industries Thane Adivali 94/A (Part) 1.47.0 FOREST Bhtavali 8 95 Mukesh Stone Crushing Company Thane shil 218/B (Part) I . 17.0 FOREST

9 96 Mumbra Stone Industries Thane Kausa- 16 I (Part) I .13.0 FOREST Mumbra l0 97 Manoj Stone Crushing Company Thane Bhandarli 104 (part) 1.20.0 FOREST ll 98 Prabhat Quarry Thane Bhandarli 104 (part) 1.32.8 FOREST

t2 99 Ram Stone Quarries Thane IlthanPada 78/A 0.61.0 FOREST

l3 100 Patel Stone Company Thane shil 2181A I . 16.0 FOREST

t4 101 Mangalsing & Company Thane IlthanPada 78lA 1.00.0 FOREST l5 102 B.M. Yadav Thane Shilgaon 2t8tA 1.04.0 FOREST

t6 103 IWs. Patel Quarries W.P. Forest Thane Chinchwali 102 (Part) I . 16.5 FOREST

t7 104 M/s. Sanjay Stones Mines R.F. Thane Digha 2030 (Part) 1.00.0 FOREST

l8 105 Shri. Ram Daji kasbe R.F. Thane Adivali- 94lA 1.00.0 FOREST Bhutavali

t9 106 M/s. Bombay Quarries Thane Chinchwali 102 (Part) 1.29.0 FOREST

20 83 M/s. Abhishek Stone Crusher Amne Gut No-I1/2, PVT. ShriVasant D. Taware Part l2l113, 2.16 tznl4.t2lU5 2l 108 Shyam Sunder Stone Industries Ambernath Chikhloli 177 part 1.00 Forest 22 109 Sou. Jayshree Dinesh Patil Kalvan Kunde 7713 Ae\ 1.00 PVT. 23 ll0 Ek Tu Hi Nirankar EnterDrises Kalyan Kamba 5812 3.20ha PVT. 24 l06F M/s. Sainath Stone Crusher Kalvan Kamba 9ll3c,3D,3E 1.41.5 PVT. & 3F (Part) 25 85 M/s. Prabhat Stone Shri. Amrutlal Bhiwandi 1013,1015, & 2.00 PVT. Narsibhai Patel ll14 (Part\ 26 86 M/s. Rutvi Enterprises Bhiwandi Paye 137,139 Part l.93 PVT. Shri Bhimsinsh C. Chatriava 27 ln7 M Elhiurenrli Pave I3]JJB-_ -404+ -I\ZI'X 28 go lWs. Mahesh Stone Crusher Bhiwandi Paye 159t6 & 170 2.67 PVT. Comoanv Pafi 29 Paye Stone Shri. Himmatlal Bhiwandi Paye l 50/5 PVT. gL Quarry 2.80 Ganeshlal Kachhara 30 IWs Ashtavinayak Stone Bhiwandi Khandwal Ktrasara No. 3.85 PVT. '++ Crusher 3/9l11ll, 3/8/5 + Company 91811, 3l7K + 81311, 3l7K+ 812/1,3/ 7B + 8/1fi.3/6K+7/3/t 2 \-N--- Member Secretary DEAC, Thane { Meeting o! District Level Expei Apptoisal Commitlee -Thane held on 15s october 201&

Sr. File Name of Proposal Taluka Village Survey. No Area in Type of No No Ha. Land 3l ill Yogesh Ramesh Patil Bhiwandi 8t/yc &S1UD 1.88.0 PVT. 32 112 M/s. Saket lnfraporiects Ltd. Bhiwandi Pise 81 (Part) 1.07 PVT. JJ ll3 Vishwajeet Ramdas Kene Bhiwandi Amne 216/3lAand 1.62 PVT. 201613/B 34 l14 IWs. D.G. Enterprises Shri. Clive Bhiwandi Vape t35lt, 3.30 PVT. F. Gonsalves 135I2IA,B,C,D, 13513, and 13514 35 I t5 M/s. K.T.N Infra Bhiwandi Paye t59, t59lt & 2.95 PVT. t6Ut 36 l16 Shri. Ganesh Kripa Stone Bhiwandi Talavali tr8l4 & 1.76 PVT. Supplies 87|9(oaft\ 37 117 IWs. Shree Sai Dhara Stone Kalyan Kamba 8213 1.50 PVT. Quarry Shri. Chandra Bahadur Jaikaran Sineh 38 I l8 Dashmesha Stone Crusher Kalyan Kamba 8012 2.00 PVT. 39 l19 Maharal Stone Shri. Kalyan Mahral 35fit, 351t2, 4.95 PVT. Quarry 35159, 37/4, 3719, Kanheyalal M. Chandanani 3713A\3718 40 120 M/s. Deepak Stone Supplies Kalyan Kamba 9U2lC 1.74 PVT. 4t t2t Shri. Mahesh Sadashiv Banote Ambernath shil 11512 (Part\ 2.00 PVT. 42 122 Tanish Stone Crushers Pvt. Ltd Ambernath Usatne 130,133/7 A\ t33lB, 4.07 PVT. l33l8A\ l34llL t34ltB & 13412 43 123 Shri. Mohan Sanjiv Shetty Murbad Bramhan 445,45611, 3.26 PVT. gaon 4s612

Sr. No. 1 to 19 - File No. 87 to 88 and 90 to 106. Stone Quarries Situated in Forest Land at Thane and Navi Mumbai. Adivali-Bhutavali, Shil, Kausa-Mumbra, Bhandarli, I Shilsaon. Chinchwali All proposal in serial no I to 19 are fatling under forest land which already have obtained Forest NOC with validity period of 20 years. During site visit dated 03'd October 2018, it is noted that all the quarries are located adjoining to some other quarries on the single or different hillock. Committee felt that during operation phase of these quarries, the environment will be adversely affected. As per S.O. 141@) Dated 15th January,2016,, a cluster shall be formed when the distance between the peripheries of one lease is less than 500 meters from the periphery of other lease in a homogenous mineral area. While as per Appendix -XI of S.O. 14f (E) Dated 15"' January, 2016 pubtished by MoEF, the quarrying activity with cluster of mine leases of area >25 ha with individual leases size < 50 Ha are to be considered as Category B-1. As per tf,-e directive given by DEAC in the 2nd meeting Dated l't June 2017rand communication dated 06.10.2017 received from SEAC-I regarding previous similar cases, the exclusion Ministry of Environment, Forest and 'Cli-ut"provided in the Notification dated OllOTl2OlT issued by the Change for the leases or quarry licenses granted before 9th September, 2013 for being not treated as cluster and the appraisal of the Environment Impact to be considered by the DEAC

i, !

rvr"ru"k"t.rv DEAC, Thane { M..ahry of ol/add L.v.l fflp.ra Apprulsot com,/.tncc - TrE e ,t?H o, 15$ ocrot r 2o1G and DEIAA, Thane. Therefore, DEAC thane is considering the aforesaid proposals for recommendations over Environmental clearance of Mining leases. During the DEAC site visit dated 03/10/2018, Range officer of forest department was directed by committee members to provide details of Sr.No. I to t9 in respect of distance from high tension line, nearest habitation, tunnel, Pipeline, Water reservoir, Dam etc.

DEAC committee sent letter to forest department vide dated 06.10.2018 for the safe distance for protection of environment and the people living at nearest habitat and their safety. Also, for the sustainable mining in homogenous hill, particularly in Digha region forest department must verifo the same, before imitating the quarry operation.

It is observed that, the concemed officers ofForest Department shall ensure the protection of the forest and green belts situated in the Forest land and expeditiously report damage, if any to DEAC and DEIAA. The leamed During the DEAC 9th meeting Asst. Conservator of Forest, Thane has informed that as per their records, there is balance area for mining activity in each proposal. As per Agenda Sr. no. I to 19 & and 2l written communication will be forwarded to the committee shortly in respect of balance area for mining. The said statement of learned Asst. Conservator of Forest, Thane is accepted.

Considering the above factors, following action plans are recommended. a) Comprehensive Environment Management Plan shall be prepared considering all the environmentally affecting factors, including Industries, Quarrying/Crushers, Vehicular and or any other factors, in consultation with MPCB, Forest and Mining Department. b) Action plan on implementation of EMP shall be prepared. c) Monitoring Mechanism shall be put in place involving concemed authorities of MPCB and Forest. d) Independent third party periodic monitoring on implementation of action plan on implementation of EMP. e) The proposal of quarry sr. no. 17 Sanjay stone Quarry as per Asst. Conservator of Forest, Thane. Human Habitation nearby 140 mtrs. I The proposal of quarry sr. no. 16, 17 & 19 viz. Bombay Stone Quarry, Sanjay Stone Quarry & Patel Stone Quarry, the committee recommends to take NOC from M.S.E.B. Board for High power tension line ofelectricity supply.

In view of above said observations and recommendations, DEAC is here by recommending the 19 cases for Environment Clearance to DEIAA for Consideration.

4

\"- Member Secretary DEAC, Thane f Meeting ol Disttict Levet Expeft Apptoisol Committee -Thdne held on 766 o.aob€i 201&

Sr. No.20 File No. B-] M/s. Abhishek Stone Crusher Shri Vasant D. Taware Located at Survey no. Gut No-l l/2, Part l2l1l3, l2l1l4,l2lll5, Amne -Village, Tahsil Bhiwandi Dist: Thane. Pvt Land. Area2.16Ha.

The proposal was deffered for site visit in 8th DEAC, Thane Meeting. The site visit was conducted on 03.10.2018. During site visit it was noted that, the quarry site is fulfilling distance criteria from proposed lease boundary. No Protected areas are identified within 10 km radius from project site and is complying all requisite regulations. Considering above and approved mining plan from DGM office, Committee decided to recommend the proposal for further appraisal to DEIAA, Thane subject to conditions stipulated in (Annexure-l)

Sr. No.21 File No. 108

Shyam Sunder Stone lndustries Located at Survey no. 177 part, Chikhloli-Village, Tahsil-Ambernath Dist : Thane. Forest Land. Area 1.00 Ha. During the DEAC meeting, Learned Asst. Conservator of Forest, Thane has informed that as per records available with RFO, This site is not situated very near to habitation. The said statement is accepted. Considering the above and approved Mining Plan for dy. Director Geology & Mining Dept. Kolhapur. Committee decided to recommend the proposal for further appraisal to DEIAA, Thane subject to conditions stipulated in (Annexure-l)

Sr. No. 22File No. 109 Sou. Jayshree Dinesh Patil Located at Survey no.7713 A (P), Kunde-Village, Tahsil- Kalyan Dist : Thane. Pvt Land. Area 1.00 Ha. The proposal was differed for site visit in 8th DEAC, Thane Meeting. The site visit was conducted on 03.10.2018. During site visit it was noted that, it is a new quarry with no hilly slope. The quarry site is fulfilling distance criteria from proposed lease boundary. No Protected areas are identified within 10 km radius from project site. It was noted that electric transmission line is present at distance of 250 meters, therefore committee suggest to adopt control blasting method during mining of stone minerals. Since it is a new quarry, plantation shall be done along the periphery of the quarry site and the details of greenbelt development shall be submitted to the committee along with half yearly compliance reports. Considering above and approved mining plan from DGM office, Committee decided to recommend the proposal for further appraisal to DEIAA, Thane; subject to conditions stipulated in (Annexure-l)

Sr. No.23 File No. 110

Ek Tu Hi Nirankar Enterprises Located at Survey no. 5812, Kamba -Village, Tahsil- Kalyan Dist : Thane. Pvt Land. Area 3.20 Ha.

The proposal was differed for site visit in 8th DEAC, Thane Meeting. The site visit was conducted on 03.10.2018. During site visit it was noted that, many adjacent quarries are present along with lease boundary of the project. The quarries present near to the proposed project have already obtained EC form SEAC-I, Maharashtra on 30th November 2012. Therefore the proposed operation doesn't fall under cluster situation.

fUember Secretary DEAC, Thane f Meaing o! Dtstrict Levet Expett Appruisdl Committee - Thane held on tai october 201&

During the visit, the Committee members observed that hill cutting is involved in current operation of the project, while the quarry site is fulfilling distance criteria from proposed lease boundary and No Protected areas are identified within l0 km radius from project site. Considering above and approved mining plan from DGM office, committee decided to recommend the proposal for further appraisal to DEIAA, Thane subject to conditions stipulated in (Annexure-l)

Sr. No. 24 Fite No. 106 -A M/s. Sainath Stone Crusher Located at Survey no. 91/3C, 3D, 3E & 3F (Part), Kamba Village, Tahsil- Kalyan Dist : Thane. P'v"t Land. Area 1.41.5 Ha.

The proposal was deffered for site visit in 8ft DEAC, Thane Meeting. The site visit was conducted on 03.10.2018. During site visit it was noted that, many adjacent quarries are present along with lease boundary of the project. The quarries present near to the proposed project have already obtained EC form SEAC-I, Maharashtra. Therefore the proposed operation doesn't fall under cluster situation. Committee observed that crusher activity will be involved close to quarry site and slight hill cutting will be involved in proposed operation of the project. Along with above, the quarry site is fulfilling distance criteria from proposed lease boundary and No Protected areas are identified within 10 km radius from project site. Considering above and approved mining plan from DGM office, Committee decided to recommend the proposal for further appraisal to DEIAAT Thane subject to conditions stipulated in (Annexure-1). Further, the Committee also suggests maintaining greenbelt while fulfilling all general conditions mentioned in their CTO accorded by MPCB.

Sr. No.25 File No.85

M/s. Prabhat Stone Shri. Amrutlal Narsibhai Patel Located at Survey no. 70,t3, 1015, & lll4 (Part), Vashere-Village, Tahasil Bhiwandi Dist : Thane. Pvt Land. Area 2.00 Ha. The proposal was differed for site visit in 8th DEAC, Thane Meeting. The site visit was conducted on 03.10.2018. During site visit it was noted that, the quarry site is fulfilling distance criteria from proposed lease boundary and No Protected areas are identified within 10 km radius from project site. Apart from this, crusher activity will be involved close to quarry site. It was also noted that road connecting to the quarry site are passing through the nearest habitation/village located at aerial distance of 500 meters from the quarry site. Considering above and approved mining plan from DGM office, Committee decided to recommend the proposal for further appraisal to DEIAA, Thane subject to conditions stipulated in (Annexure-l) and to provide water sprinkling system at project site and roads to avoid dust nuisance in nearby areas and to maintain thick greenbelt along with project boundary.

6

Member Secretary DEAC, Thane { Meeting ol District Level Expert Appraisol Committee -Thane held on 16s october 201&

Sr. No.26 File No. 86 lWs. Rutvi Enterprises Shd Bhimsingh C. Chatriaya Located at Survey no. 137,139 Part, Pave Villaee, Tahasil Bhiwandi Dist : Thane. Pvt Land. Area 1.93 Ha.

The committee after a site visit to this mining site and discussion during this meeting felt that the quarry is situated within the buffer Zone of 10 Kms from the boundary of Tungareshwar Wildlife Sanctuary. The Committee directed the Project proponents/ Applicants to produce No-objection Certificate from the Competent Authority of the Tungareshwar Wildlife Sanctuary. The Application for EC in respect of this site will be considered only after submission of the said NOC by the Applicant. Till then proposal is kept in abeyance.

Sr. No. 27 File No. 107 Paye gaon Stone Quarry located at Survey No: 13llllB, Paye Village, Tal. Bhiwandi, Dist. Thane. Area : 4.04.0 Ha (Private Land

The committee after a site visit to this mining site and discussion during this meeting, felt that the quarry is situated within the buffer Zone of 10 I(ms from the boundary of Tungareshwar Wildlife Sanctuary. The Committee directed the Project proponentsi Applicants to produce No- objection Certificate from the Competent Authority of the Tungareshwar Wildlife Sanctuary. The Application for EC in respect of this site will be considered only after submission of the said NOC by the Applicant. Till then proposal is kept in abeyance.

Sr. No.28 File No.gO

IWs. Mahesh Stone Crusher Company located at Survey No: 15916 &, 170 Part, Paye Village, Tal. Bhiwandi, Dist. Thane. Area: 2.67 Ha( Private Land

The committee after a site visit to this mining site and discussion during this meeting, felt that the quarry is situated within the buffer Zote of 10 Kms from the boundary of Tungareshwar Wildlife Sanctuary. The Committee directed the Project proponents / Applicants to produce No- objection Certificate from the Competent Authority of the Tungareshwar Wildlife Sanctuary. The Application for EC in respect of this site will be considered only after submission of the said NOC by the Applicant. Till then proposal is kept in abeyance.

Sr. No.29 Fite No. €,2- Paye Stone Quarry Shri. Himmatlal Ganeshlal Kachhara located at Survey No 150/5, Paye Village, Tal. Bhiwandi. Dist. Thane. Area : 2.80 Ha ( Private

The committee after a site visit to this mining site and discussion during this meeting, committee felt that the quarry is situated within the buffer Zone of 10 Kms from the boundary of Tungareshwar Wildlife Sanctuary. The Committee directed the Project proponents / Applicants to produce No-objection Certihcate from the Competent Authority of the Tungareshwar Wildlife Sanctuary. The Application for EC in respect of this site will be considered only after submission of the said NOC by the Applicant. Till then proposal is kept in abeyance.

Member Secretary DEAC, Thane f meeting ol District Levet Expert Apprdisol Committee -Thone held on te6 octobcr 201&

Sr. No. 30 File No.77 IWs Ashtavinayak Stone Crusher Company located at Survey No. 3/9/1lll,3l8l5 + 9l8ll,3l7K+ 8l3ll, 3l7K+ 8l2ll,31 7B + 8llll,3l6K+7l3ll, Khandwal Village, Tal. Bhiwandi, Dist. Thane. Area : 3.85 Ha (Pvt.

As per MoM of 7ft DEAC Thane meeting, the proposal were differed till receiving of report showing distance of proposed quarry from upcoming establishment of PHC center at gut no : 210 in Khandwal village. In regards of this matter, committee has submitted letter to concem Tehsildar of , .

Considering above, Committee decided to keep the proposal in abeyance till receiving of distance certificate from respective authority.

Sr. No.33 Fite No. 113 Vishwajeet Ramdas Kene located at Survey No: 21613lAand20l6l3,/B, Amne - Village, Tal. Bhiwandi. Dist. Thane. Area :1.62 Ha (Private

The quarry site is fulfilling distance criteria from proposed lease boundary and No Protected areas are identified within l0 km radius from project site. Apart from this, crusher activity will be involved close to quarry site. Considering above and approved mining plan from DGM office, Committee decided to recommend the proposal for further appraisal to DEIAA, Thane subject to conditions stipulated in (Annexure-l)

Sr. No.31 File No. 111 Yogesh Ramesh Patil located at SurveyNo: gtlt/c &8lllD, Lonad- Village, Tal. Bhiwandi, Dist. Thane. Area : 1.88.0 Ha (Private Land

The quarry site is fulfilling distance criteria from proposed lease boundary and No Protected areas are identified within l0 km radius from project site. Apart from this. crusher activity will be involved close to quarry site. Considering above and approved mining plan from DGM office, Committee decided to recommend the proposal for further appraisal to DEIAA, Thane subject to conditions stipulated in (Annexure-l)

Sr. No.32 File No. 112

IWs. Saket Infraporjects Ltd. located at Survey No: 8l (Part), Pise - Village, Tal. Bhiwandi, Dist. Thane. Area : 1.07 Ha (Private Land

The quarry site is fulfilling distance criteria from proposed lease boundary and No Protected areas are identified within 10 km radius from project site. Apart from this, crusher activity will be involved close to quarry site. Considering above and approved mining plan from DGM office, Committee decided to recommend the proposal for further appraisal to DEIAA, Thane subject to conditions stipulated in (Annexure-1)

\ \t-- ) Memb'er Secretary DEAC, Thane f Meeting ol Disttict Levet Expert Apprdisal committee - Thane held on ta6 octobcr 201&

Sr. No.34 File No. 114 M/s. D.G. Enterprises Shri. Clive F. Gonsalves located at Survey No: 135/1, I35I2IA,B,C,D, 13513, andl35l4, Vape - Vil Tal. Bhiwandi, Dist. Thane. Area : 3.30 Ha ivate Land

The quarry site is fulfilling distance criteria from proposed lease boundary and No Protected areas are identified within 10 km radius from project site. Apart from this, crusher activity will be involved close to quarry site. Considering above and approved mining plan from DGM office, Committee decided to recommend the proposal for further appraisal to DEIAA, Thane subject to conditions stipulated in (Annexure-l)

Sr. No.35 File No. 115 IWs. K.T.N Infra located at Survey No: 159, 15911 & 16111, Paye - Village, Tal. Bhiwandi, Dist. Thane. Area : 295Ha(Private Land

The Committee felt that the quarry is situated within the buffer Zone of l0 Kms from the boundary of Tungareshwar Wildlife Sanctuary. The Committee directed the Project proponents / Applicants to produce No-objection Certificate from the Competent Authority of the Tungareshwar Wildlife Sanctuary. The Application for EC in respect of this site will be considered only after submission of the said NOC by the Applicant. Till then proposal will be kept in abeyance.

Sr. No.36 File No. 116 itedutSurveyNo:1l8i4&87l9(part,),Talavali-Vi1lage,Tal. Bhiwandi, Dist. Thane. Area : l.76Ha(Private Land

Defferd for Site Visit.

Sr. No.37 File No. 117 tutl.. Strr"" Sai Dhara Stone Quarry Shri. Chandra Bahadur Jaikaran Singh located at Survey No: 8213, Kamba - Village, Tal. Kalyan, Dist. Thane. Area '' 1.50 Ha (Private Lmd

The quarry site is fulfilling distance criteria from proposed lease boundary and No Protected areas are identihed within 10 km radius from project site. Apart from this, crusher activity will be involved close to quarry site. Considering above and approved mining plan from DGM office, Committee decided to recommend the proposal for further appraisal to DEIAA, Thane subject to conditions stipulated in (Annexure-l)

9

I Ur*.- Member Secretary DEAC, Thane f Ueeting ol Oisttict Level Expert Apprdisdl Committee - fhone held on Leb october 2018.

Sr. No.38 FiIe No. 118

Dashmesha Stone Crusher located at Survey No: 80/2, Kamba - Village, Tal. Kalyan, Dist. Thane. Area : 2.00 Ha (Private Land

The quarry site is fulfilling distance criteria from proposed lease boundary and No Protected areas are identified within 10 km radius from project site. Apart from this, crusher activity will be involved close to quarry site. Considering above and approved mining plan from DGM office, Committee decided to recommend the proposal for further appraisal to DEIAA, Thane subject to conditions stipulated in (Annexure-l)

Sr. No.39 File No. 119

Maharal Stone Quarry Shri. Kanheyalal M. Chandanani located at Survey No: 35/1 1,35112,35158, 3714.3719.3713A.37l8. tvtahral - Villaee. Tal. Kalvan. Dist. Thane. Area : 4.95Ha (Private

The quarry site is fulfilling distance criteria from proposed lease boundary and No Protected areas are identified within 10 km radius from project site. Apart from this, crusher activity will be involved close to quarry site. Considering above and approved mining plan from DGM office, Committee decided to recommend the proposal for further appraisal to DEIAA, Thane subject to conditions stipulated in (Annexure-l)

Sr. No.40 File No. 120 M/s. Deepak Stone Supplies located at Survey No: 9ll2/C Kamba - Village, Tal. Kalyan, Dist. Thane. Area: l.74Ha(Private Land

The quarry site is fulfilling distance criteria from proposed lease boundary and No Protected areas are identified within 10 km radius from project site. Apart from this. crusher activity will be involved close to quarry site. Considering above and approved mining plan from DGM office, Committee decided to recommend the proposal for further appraisal to DEIAA, Thane subject to conditions stipulated in (Annexure-l)

Sr. No. 41 File No. 121

Shri. Mahesh Sadashiv Banote located at Survey No: 115/2 (Part), Shil - Village, Tal. Ambernath, Dist. Thane. Area : 2.00Ha (Private

Differed for Site Visit.

Sr. No. 42File No. 122

Tanish Stone Crushers PvL Ltd located at Survey No: 130,13 317 A, l33lB, I 33l8A, l34ll A, I34l1B & l34l2,tJsatne - Village, Tal. Ambernath, Dist. Thane. Area :4.07 Ha(Private Land

PP and Consultant was absent during meeting, therefore committee decided to defer the proposal till next meeting. 10 \ \L-l Member Secretary DEAC, Thane { M..dnE ol Otsti.t L.tel Expc.a Approisol Colr|mltt.e - het.l on 75r t).7ob.t 2or& 'hone

Sr. No.43 File No. 123 Shri. Mohan Sanjiv Shetty located at Survey No: 445,45611,456/2, Bramhan gaon - Village, Tal. Murbad, Dist. Thane. Area : 3.26 Ha The quarry site is fulfilling distance criteria from proposed lease boundary and No Protected areas are identified within 10 km radius from project site. Apart from this, crusher activity will be involved close to quarry site. Considering above and approved mining plan from DGM office, Committee decided to recommend the proposal for further appraisal to DEIAA, Thane subject to conditions stipulated in (Annexure-1)

All Proposals for Environmental clearance shall be granted subject to the directions proposed to be given by MoEF&CC and SEAC/SEIAA, Maharashtra Govt. in respect to NGT order M.A. No. 98112016, M.A. No.982/2016 & M.A. No.384/2017 dated l3th September 2018.

oistrict Mining officer, Thane Executive E ; lrrigation Department Member Secretary, DEAC Thane 'aiifan, DEAC Thane

11 The Specific and General conditions applicable for Mining of Stone: Specific conditions:

Provisions stipulated in Maharashtra Minor Minerals Extraction (development and Regulation) Rules 2013 shall be strictly adhered to. Project Proponent will be held responsible personally for noncompliance of the conditions stipulated in the Environmental clearance and shall be liable for legal action under Environment (Protection) Act of 1986.

3. To prevent dust / particulate matter pollution, the lease holder shall take up tree plantation in an area 20 m from the boundary of the leased area and also on either side of the road leading to quarry site.

Project proponent to ensure that there is no violation of the Supreme Coua/ NGT court order given in related matters. Project proponent shall prepare "Final Mine Closure Plan" and get it approved by the competent authority for all abandoned mines in the District.

Ground Tooth data (primary) and secondary (athletic data) on flora and fauna ofcore Zone and Buffer Zone should be provided by Project Proponent or consultants the data must be classified .u into different schedules as per Indian Wild Life Protection Act.

7. The environmental clearance shall be granted subject to the directions proposed to be given by MoEF&CC and SEAC/SEIAA, Maharashtra Govt in respect to NGT order M.A. No. 98112016, M.A. No.982/2016 & M.A. No.384/2017 (Item Nos 7 to 14) dated 13th September 2018.

1. Precise mining area and land belong to which Authority will be jointly demarcated at site by officials of Mining,{Revenue department prior to mining operations for all proposals under consideration. Such site plan, duly verified by competent authority shall be submitted to DEAC,DEIAA Committee.

2. All necessary statutory clearances shall be obtained before start of mining operations.

3. Mining / loading shall be limited to day hours' time only. The quarrying / loading shall not be done during night hours.

4. No mining shall be carried out in the safety zone ofany bridge and/or embankment.

Member Secretary DEAC, Thane L

5. No mining shall be carried out in the vicinity of natural/ manmade archeological sites. 6. The lease holder shall obtain necessary prior permission ofthe competent authorities to drawl the requisite quantity of water (surface water and groundwater), if required for the project.

7. Waste water, if any, shall be properly collected and heated so as to conform to the standards prescribed by MoEF/CPCB.

8. No wildlife habitat should be infringed.

9. Where, the quarrying in a hilly terrain, cutting shall be allowed only in the recharge zone to be identified by the offrcials of GSDA.

10. Environmental clearance is subject to obtain clearance under the Wildlife (Protection) Act, 1972 from the competent authority, ifapplicable to this project.

11. Green belt development shall be canied out considering CPCB guidelines including selection of plant species suitable to existing eco system in consultation with the DFO/Horticulture Officer.

12. Parking of vehicles should not be made on public places. 13. Transportation of materials shall be done by covering the trucks / tractors with tarpaulin or other suitable mechanism so that no spillage of mineral/dust takes place.

14. Appropriate mitigation measures shall be taken PP and Environment consultants to prevent any kind of pollution in consultation with the M.P.C.B. It shall be ensured that there is no leakage ofoil and grease from the vehicles used for transportation. And privative measure about Noise, Air and Water.

15. Vehicular emissions shall be kept under control and regularly monitored. The mineral shall not be overloaded.

16. Special Measures shall be adopted to prevent the impact of Mining activities on the nearby settlements.

17. Maintenance ofroads through which transportation of minor minerals is to be undertaken, shall be carried-out regularly.

18. Dispensary facilities for firslaid shall be provided at site.

19. Occupational health surveillance program ofthe workers should be undertaken periodically.

20. Provision shall be made for housing the workers at site, if required, with all necessary infrastructure and welfare facilities such as fuel for cooking, safe drinking water, medical health care and sanitation etc. V Member Secretary d" DEAC, Thane 21. Ambient air quality will be monitored at the site and the nearest habitation during pre monsoon and post monsoon. Or if required by committee Ambient air quality at the boundary of the precise mining area shall conform to the norms prescribed by MoEF, GOL

22. Measures shall be taken for control of Air, Water and Noise levels to the limits prescribed by CPCB.

23. An Environmental Audit shall be annually carried out during the operational phase and be submitted to DEAC,DELAA Committee.

24. Digital processing of the entire lease area in the district using remote sensing technique shall be done regularly once in three years for monitoring and report submitted to DEAC/DEIAA Committee. The funds earmarked for environmental protection measr.res shall be kept in separate account and shall not be diverted for other purposes. Year wise expenditure on environmental protection measures shall be reported to the DEAC/DEIAA Committee. 25. Authorities shall submit within 3 months their policy of (D Standard operating process/ procedure to bring into focus any infringement/deviation /violation of environmental norms /conditions, (ii) Hierarchical system or Administrative order to deal with environmental issues and to ensure compliance of EC conditions and (iii) System of reporting of noncompliance /violation of environmental norms to DEAC/DEIAA Committee.

26. The Project proponent or consultants shall submit six monthly reports in hard and soft copy on the status of compliance of the stipulated environmental clearance conditions including results of monitored data (both in hard & soft copies) to the DEAC/DEIAA Committee. And the resp€ctive Regional Office of the Maharashtra Pollution Control Board.

27. Arry change in mining area, survey no/khasra /Gat numbers, entailing capacity addition with change in process and or mining technology, modemization and scope of working shall again require prior Environmental Clearance as per provisions of EIA Notification, 2006 (as amended).MOEF CC Notification- dated l5,January 2016 and MoEF CC amendment lth July 2016.

28. In case of black stone quarries benches should be maintained as mentioned in the approved mining plan and prevailing rules of Minor Mineral in force and amended henceforth and conditions mentioned in the E.C letter. Non compliance of these conditions will attract legal action under law.

29. Rain water harvesting in mining areas by making pitting and trenching wherever is possible. And Plantation of Tree Shall be done. Recommended by DEAC/DEIAA Committee.

30. In any quarry area any suggestion from GSDA Geologist it must be followed strictly.

Member Secretary DEAC, Thane 31. Top soil Conservation and reclamation plan should be submiued to the DEAC/DEIAA Committee.

32. Environmental mitigation plan with restoration of Environment plan shall be submitted to the DEAC/DEIAA Committee.

33. DEAC/DEIAA Committee has power and authority to monitor AAQM and Noise pollution. Water Samples Analysis Whenever is necessary.

34. DEAC/DEIAA Committee shall remain soul Authority to Discontinue the mining Activity of consent Project proponent in case ofviolation of norms are observed.

I W*---' Member Secretary