11. Bournemouth, Poole and Dorset Local Transport Plan 3 090414-1.0
Total Page:16
File Type:pdf, Size:1020Kb
Page 1 – Bournemouth, Poole and Dorset Local Transport Plan 3: Implementation Plan 2014 - 2017 Agenda I tem: Cabinet 11 Date of Meeting 9 April 2014 Cabinet Member(s) Hilary Cox – Cabinet Member for Environment Local Member(s ) All Members Lead Director(s) Mike Harries – Interim Director for Environment Bournemouth, Poole and Dorset Local Transport Plan 3: Subject of Report Implementation Plan 2014 - 2017 Executive Summary The Bournemouth, Poole and Dorset Local Transport Plan 3 (LTP3), published in April 2011, set out a strategy for transport for the Dorset sub region for the period to 2026. A separate implementation plan contains detailed proposals for the first 3 years. A second three year implementation Plan (IP2) has now been prepared containing detailed proposals for the period 2014 – 2017. IP2 does not contain any policy changes but specifically outlines changes to the funding we receive from the Department for Transport and how this will be used. This includes block funding, of which we can be reasonably certain, LTB major scheme funding, which is guaranteed, and major scheme funding from the Local Growth Fund, which is accessed competitively through the Local Enterprise Partnership Strategic Economic Plan. Impact Assessment Equalities Impact Assessment: The Bournemouth, Poole and Dorset Local Transport Plan 3 (LTP3) was the subject of an Equalities Impact Assessment (EqIA) during its production and includes an Accessibility Strategy within the appendices as a supporting strategy. The recommendation is not considered to have any negative or differential impact on the equalities of any person or group. Page 2 – Bournemouth, Poole and Dorset Local Transport Plan 3: Implementation Plan 2014 - 2017 Use of Evidence: All proposed highways improvements schemes are prioritised against the council’s key objectives for transport, as described in LTP3. The methodology for prioritising schemes includes the use of evidence such as casualty data, feasibility studies and evidence of local support from town / parish councils. For bridges and structures and for structural maintenance, evidence of asset condition is determined using a variety of techniques and equipment along with visual assessments and reported defects. This data is used to prepare a priority list. Budget: The capital budgets for 2014/15 (Integrated Transport Block and Maintenance Block) have been confirmed by the Department for Transport. Budgets for the following two years years have yet to be confirmed so the programme for these two years is provisional. Risk Assessment: Having considered the risks associated with this decision using the County Council’s approved risk management methodology, the level of risk has been identified as: Current Risk: Low Residual Risk : Low Other Implications: None Recommendation That the Cabinet approves the Bournemouth, Poole and Dorset Local Transport Plan 3: Implementation Plan 2014 – 2017 (Appendix 1) Reason for Improving delivery of the transport infrastructure of Dorset will help Recommendation support Corporate Aim 4 – safeguard and enhance Dorset’s unique environment and support its local economy. Appendices Appendix 1: Draft Bournemouth, Poole and Dorset Local Transport Plan 3: Implementation Plan 2014 - 2017 Background Papers None Officer Contact Name: Andy Shaw Tel: 01305 224237 Email: [email protected] Page 3 – Bournemouth, Poole and Dorset Local Transport Plan 3: Implementation Plan 2014 - 2017 1. Background 1.1. The Bournemouth, Poole and Dorset Local Transport Plan 3 (LTP3) was published in April 2011. LTP3 sets out a strategy for transport for the Dorset sub region for the period to 2026. A separate implementation plan contains detailed proposals for the first 3 years. A second three year implementation Plan (IP2) has now been prepared containing detailed proposals for the period 2014 – 2017. A draft version of IP2 is attached to this report at Appendix 1 and copy of the final draft IP2 has been placed in the Members room. 1.2. IP2 does not contain any changes to policies described in LTP3 and there has therefore been no requirement for public consultation. The plan does however outline changes to the funding we receive from the Department for Transport. The plan also outlines changes to the DfT’s method of major scheme funding and our approach to these changes, particularly in relation to the competitive elements of major scheme funding. 2. Major Scheme Funding 2.1. In September 2012 DfT announced that from 2015 major scheme funding would be devolved to Local Transport Bodies, consortia of local transport authorities based on the geographies of Local Enterprise Partnerships. The primary role of the LTB is to decide which major investments should be prioritised, to review and approve individual business cases for those investments, and to ensure effective delivery of the programme. In January 2013 Dorset LTB, comprising Bournemouth Borough Council, Dorset County Council and the Borough of Poole, was advised of indicative funding of £18.3m for the period 2015 – 2019. 2.2. The Dorset LTB has used assessment criteria to establish a priority list of schemes which weights schemes against their compliance to Dorset’s Strategic Economic Plan, LTP3 policies, risks to delivery and development and construction dates for the scheme. Further weight is assigned to the amount of job creation and new homes unlocked by the delivery of the schemes . Table 3 indicates a prioritised short list of six major transport schemes which have been approved by the DLTB and the Dorset LEP in July 2013 and which have now been submitted to the DfT. Scheme Name Area Scheme Type Key LTP3 DLTB Strategy Objective Measure A338 Spur Road East Dorset/ Carriageway Managing and Access to major Christchurch Structural maintain the Jobs. Access maintenance Maintenance existing network for freight. more efficiently Poole Bridge Poole Bridge Managing and Access to Approach Spans Structural maintain the Jobs. Access Maintenance existing network for freight. more efficiently Bournemouth Christchurch Major junction Strategic Access to Airport Access improvements Infrastructure Jobs. Improvements North Bournemouth Junction Public Transport Access to Bournemouth Improvements Alternatives to Jobs/homes Quality Bus Bus Priority the car Corridor Measures, Cycle Lanes Page 4 – Bournemouth, Poole and Dorset Local Transport Plan 3: Implementation Plan 2014 - 2017 Scheme Name Area Scheme Type Key LTP3 DLTB Strategy Objective Measure Access to Port of Poole Junction Managing and Access to Poole Improvement and maintain the Jobs. Access redesign of one existing network for freight. way system more efficiently Wallisdown to Bournemouth Junction Public Transport Access to Bournemouth Improvements Alternatives to Jobs/homes Quality Bus Bus Priority the car Corridor Measures, Cycle Lanes Table 3 Major Schemes to progress during IP2 (2014 to 2017) 2.3. The June 2013 report Investing in Britain’s Future confirmed the Government’s commitment to devolved decision making on economic development, giving greater power and influence to Local Economic Partnerships (LEPs), through a number of mechanisms including: • Creating a Local Growth Fund (LGF) with over £2 billion of national b udgets from skills, housing and transport for 2015-16. • Committing a further £5 billion of transport funding to the LGF from 2016-17 to 2020-21 to enable long-term planning of priority infrastructure. 2.4. The LGF will be distributed on a competitive basis through Growth Deals, negotiated through submission and assessment of the LEPs’ Strategic Economic Plan (SEP). Dorset LEP’s SEP has been developed in parallel with IP2 for submission to Government on 31 March 2014. It recognises that investment in transport, as a key enabler of growth is critical to the region’s economic success and therefore a major element of the growth deal locally. In particular the Bournemouth/Poole conurbation, as the economic powerhouse for Dorset is seen as having its potential for growth limited by poor transport links to the north and west and by poor cross conurbation links and overloading at key junctions. The SEP identifies transport schemes for the period 2015 – 2020 valued at £170m, seeking £80m from the Growth Fund. It is however recognised that awards will be made to maximise growth in England as a whole. The DfT has specifically asked that programs can be varied in scale to ensure that funds can be distributed as effectively as possible. Specific schemes identified through the SEP continue to carry the LTB priority ranking. 2.5. To date the Dorset LTB has been awarded £12.2m Major Scheme Funding for the period 2015 – 2019. This will contribute to the first priority scheme, the A338 Bournemouth Spur Road Maintenance, the shortfall for which is being sought through the LGF. 3. Block Funding 3.1. The Funding for local smaller transport schemes will continue to be through the Local Transport Plan Integrated Transport Block (ITB). The ITB funding allocations were significantly reduced for IP1. In 2014/15 there is a 40% increase, almost returning funding to the pre 2010 level. However an element of this is now to be top sliced for transfer to the Single Growth Fund and the final allocations for years 2015/16/17 are likely to be much reduced . Page 5 – Bournemouth, Poole and Dorset Local Transport Plan 3: Implementation Plan 2014 - 2017 3.2. ITB funding used to draw up spending programmes for the 3 years from 2014/15 to 2016/17 is shown in Table 1. Allocations for 2015/16 will be announced by government in April 2014. The table therefore uses estimates for years 2 and 3 based on the announced national changes. Integrated Transport LTP3 – IP2 LTP3 – IP3 Funding Allocations (£000’s) (Figures in italics are 2014/15 2015/16 2016/17 2017/18 estimated) Dorset County £3,391 £1,950 £1,950 £1,950 Council Table 1 Integrated Transport Block funding 2014/15 – 2017/18 3.3. Overall funding for maintenance has increased compared to IP1, but this is substantially below the sum needed to halt the overall decline in road condition.