PUBLIC WORKS DEPARTMENT Combining such a glorious traditional BUILDINGS architecture and technology with the modern concept of Green Buildings, the New Demand No. 39 Legislative Assembly building in Policy Note 2010-2011 has been constructed. A dome weighing 800 ton exhibiting Dravidian culture shall FOREWORD decorate the top of this building. Following the footsteps of our Public Works Department is one of the forefathers who had established Sangam at oldest Government Departments and has Madurai for classical Tamil many millennia celebrated its 150th year in 2008. Public back, we are now constructing Anna Works Department has constructed many Centenary Library in Chennai to encourage Government buildings and irrigation the growth of modern literary and scientific structures utilizing its expertise gained in the Tamil. past so many years. Public works Department - Buildings Organization is very proud of presenting History has recorded Tamils as the these two buildings as landmarks to our Architects of urban civilization. The Kallanai capital city of Chennai along with - Grand Anaicut Dam and the Big Government Medical College buildings at Temple stand as testimony to our Villupuram and Thiruvarur this year. engineering skills. Grand Anaicut, which was commissioned two millennia back is a lesson to the world in adopting technology for construction of dams over sandy soil. The Big Temple which carries 80 ton dome over 216 feet high tower, has completed its 1000th year.

2

PUBLIC WORKS DEPARTMENT BUILDINGS ORGANISATION 1.1. ORGANISATIONAL NETWORK - AN OVERVIEW 1.0. GENERAL Public Works Department has a The Public Works Department network of establishments as indicated Buildings Organization constructs and below:

maintains buildings of various One Chief Engineer as Head of Government Departments like School the Department in Chennai supported Education, Health & Family Welfare, by specialty units like ‘Architecture’ Home (Courts / Transport / Prisons / headed by Chief Architect and Fire & Rescue Services), Revenue, ‘Designs’ headed by Superintending , Animal Husbandry, Engineer. Dairying & Fisheries, Tourism & Culture, Labour & Employment and Eleven Circles and 41 Divisions Social Welfare. headed by Superintending Engineers and Executive Engineers respectively. Public Works Department provides quality services for Safe Three Circles at Chennai, Salem Government buildings at and Madurai and 7 Divisions under the reasonable cost utilizing modern control of Superintending Engineers technologies and experience attained and Executive Engineers respectively through years of practice. Public to execute electrical works. Works Department follows the designs and specifications stipulated in the One Special Division headed by Indian Standard Codes. Executive Engineer in Chennai for

3 4

collection and dissemination of ƒ Execution of Local Area updated technology and information of Development Scheme works latest building materials. sanctioned under MLAs’ and MPs’ Funds as deposit works A Building Research Station headed by Executive Engineer in ƒ Execution of any calamity Chennai for training the engineers in reconstruction works like advanced technologies and Emergency Tsunami Reconstruc- innovations and for carrying out tion Project building works

research activities. ƒ Renovation and restoration of Heritage buildings

1.2. MAJOR ACTIVITIES ƒ Construction of buildings for Central Public Works Department Government undertakings, State performs the following major activities Universities etc. as deposit works.

and functions: ƒ Carrying out Research and ƒ Planning, designing, construction Development in construction and maintenance of Government materials and practices. Buildings which constitute capital assets of the State. ƒ Valuation of buildings on the request of Vigilance and Anti- ƒ Construction and maintenance of Corruption Department and Monuments and Memorials under Judiciary. purview of the Government. ƒ Assessment of structural stability of public buildings and issuance of

5 6

rent reasonableness certificate for assistance, Hospital Buildings with private buildings used by World Bank / Central Assistance are Government departments. also to be undertaken.

ƒ Arrangements relating to the visits 2.1. PLAN AND NON-PLAN WORKS and Government functions of VIP’s SECTOR - WISE OUTLAY and V.V.I.P’s etc. 2010-2011 2.0. OUTLAY FOR 2010-2011 CAPITAL ACCOUNT DEMAND NO.39 During the financial year 2010- 2011, it is proposed to carry out works B.E. Sl. Name of under the following Account Heads to 2010-2011 Percentage No Department the tune of Rs.1202.02 Crore under (Rs.in Crore) Demand No.39: (Rs. in Crore) 1 Health 379.35 39.14 Capital Account (Plan & (i) : 969.15 Non Plan Schemes) 2 Public Works 366.19 37.78 (ii) Account Transfer : 82.74 Revenue Account 3 Home 150.82 15.56 (iii) (Maintenance and : 150.13 Establishment) 4 Revenue 46.30 4.78 Total : 1202.02 5 Education 4.58 0.47

In addition to this, building works 6 Other works 21.91 2.26 pertaining to other departments under remittance head such as School TOTAL 969.15 100.00 Buildings with NABARD loan

7 8

3.0. DEPARTMENT-WISE WORKS Building in Block ‘A’ and buildings for (2010-2011) other Secretariat Departments in Block ‘B’. The design of this building 3.1. PUBLIC WORKS DEPARTMENT incorporates the cultural traditions of the Tamils, features of Dravidian Construction of New architecture to match a Metropolitan Legislative Assembly Complex City like Chennai and to add glory to our State. Following the announcement made on 12.05.2007, the Government The Government accorded initiated action to construct the New Administrative Sanction for Legislative Assembly and Secretariat Rs.425.57 Crore for Block ‘A’. Block Complex in Omandurar Government ‘A’ consists of four circular buildings. Estate, Chennai and the building has In the first Circle, which is the biggest been inaugurated by the Hon’ble among the four, the Public Plaza is Prime Minister on 13.03.2010. As situated and this can be accessed by promised by this Government in the general public freely. The next Circle Policy Note for the year 2009-2010, accommodates the Legislative the Budget for 2010-2011 has been Assembly. The third Circular structure presented on 19.3.2010 in this new shall house the Library. The smallest Assembly Building. among the circular buildings shall be occupied by the office of the Chief The building plan of this seven Minister. The total plinth area of storied building is prepared and Block – ‘A’ is 86,458 Sq.mt. designed by a German Architect selected based on global tender. The The Legislative Assembly hall in entire Complex comprises of New the ground floor shall have a 100 feet Legislative Assembly and Secretariat high dome above the ceiling. This

9 10

dome, which weighs around 800 tons, fountains shall ensure cool reflects the temple car architecture of atmosphere around the complex. This Tamil Nadu. The dome construction building is a certified Gold rated consists of eight steel structural arms green building. Tamil Nadu Legislative with granite cladding connected by Assembly building is the first to attain aluminium fins. This dome is designed this distinction in the category of to withstand wind force and corrosion. Parliament and Legislative Assembly Below the dome, an opening with buildings in the whole world. 12 m diameter fitted with special glass allows natural light inside the building. The Government accorded Administrative Sanction for The building is constructed to Rs.279.56 Crore for Block ‘B’. This cause least disturbance to Block consists of seven buildings and environment adopting the concepts of shall accommodate Secretariat Green Buildings. The natural light is departments. Each building shall have harvested and energy saving electrical ground plus seven floors. The total appliances including light fixtures are plinth area will be 73,399 Sq.mt. used, thereby reducing the energy These seven buildings will be linked consumption by about 20%. The by connecting corridors. Block ‘B’ will paints, coatings, adhesives and be connected with Block ‘A’ by a link sealants used in the building have less corridor. volatile organic compounds. The thermal comfort to the occupants shall The new Secretariat and be as per international standards. The Legislative Assembly Complex is whole area is declared as non- expected to provide better facilities to smoking zone and internal air quality all including the visiting public. will be pleasant. Gardening with local species of grass and plants with

11 12

3.2. LIBRARY BUILDING WORKS gallery, digital library and also the administrative wing. The stacking Construction of Anna Centenary capacity is 11.50 lakh books and 1250 Library Building at Kotturpuram, persons can use this library at a time. Chennai A separate auditorium with a capacity of 1280 persons is constructed. During the budget session 2007- Terrace of the auditorium provides for 2008, an announcement was made on Amphitheater. This building will have the floor of the Assembly for the ground plus 2 floors. Adequate area construction of a modern State library for parking for 4 and 2 wheelers have with international standards in been provided. Chennai. For this work Government has accorded administrative sanction The works are expected to be for Rs.171.78 Crore. completed by May 2010.

This fully air-conditioned building will have ground plus eight floors with 3.3. HEALTH & FAMILY WELFARE a plinth area of 34,502 Sq.mt. This DEPARTMENT building will accommodate separate reading halls for Tamil, other Dravidian 3.3.1.Medical College Works and Indian languages and English, newspaper - periodicals section, Medical College Works, which Government documents section, were sanctioned in 2009–2010 are in separate section for visually impaired the preliminary stages such as persons, children section, conference obtaining administrative sanction and hall for 200 persons, mini conference technical sanction, calling for tenders, hall for 30 persons, Cyber cafe, food finalizing the agencies etc. These new court, audio video section, photo works are:

13 14

Amount Amount Sl. Sl. Work (Rs.in Status Work (Rs.in Status No. No. Crore) Crore) Other building 1 New Medical College 97.00 Phase I – Work works are in at Sivagangai commenced. progress. (Phase I, II, III) Target: Aug 2011 Target - 30-11-2010 Phase II & III - 2. New Medical 98.81 Out Patient and Work to be College at Administrative commenced Villupuram Blocks 2 New Medical College 97.00 Administrative inaugurated. at Perambalur approval to be G+3 Floor accorded Other building 3 Construction of New 70.20 Administrative works in different Building to Madras approval to be stages. Medical College accorded Target - 30-04-2011 3. New Medical 91.26 Phase I completed The status of works which were sanctioned College at and building in previous years are as below:- Dharmapuri. inaugurated (Phase I & II) Phase-II Tender Amount Sl. under scrutiny. Work (Rs.in Status No. Crore) 4. Expansion of 22.06 Works are in Government Rajaji completion stage 1. New Medical 92.87 Hospital building is Hospital at Madurai. College at in finishing stage. Thiruvarur 5. Construction of New 14.66 Third Floor work is Ground +3 Floor Medical Block at in progress Target: June 2010 Government Mohan Ground +4 floors Medical College Kuamaramangalam Target - Dec 2010 Buildings and Medical College at

15 16

Amount Amount Sl. Sl. Work (Rs.in Status Work (Rs.in Status No. No. Crore) Crore) Salem Royapettah progress Government 6. Construction of 56.32 Work commenced Ground + 5 floors Hospital, Chennai Building for Centre Ground + 5 floors Target - Aug 2010 of Excellence at Target - April 2011 11. Construction of 16.68 Work commenced Institute of additional buildings Obstetrics and Ground + 3 floors for Government Target - Aug 2010 Gynecology at Kilpauk Medical Egmore, Chennai College and 7. Construction of 16.65 Work commenced Hospital, Chennai Building for Centre Ground + 3 floors (Faculty Block, Casualty Block, of Excellence at Target - March Blood Bank & OP Government 2011 Kasturibai Gandhi Block) Phase II

Hospital for Women 12. Hostel buildings for 14.75 Second floor work & Children, UG 250 students in progress Triplicane, Chennai and PG 250 Ground + 3 floors 8. Additional Building 13.66 First floor work in students at Stanley Target - Oct 2010 for Government progress Medical college and Dental College, Ground + 2 floors Hospital, Chennai Chennai Target - March 13. Tower Block 41.20 Tender approved, 2011 (Phase-II) at Stanley work to be 9. Additional Building 13.83 First Floor level Medical College and commenced Hospital, Chennai for Institute of Child Ground + 8 floors Ground + 6 floors Health, Chennai Target - Jan 2011 Target - Aug 2011 10. Construction of 9.87 Third Floor work in Surgical Block for

17 18

19 - Electricity service 14. Construction of 14.50 Basement work in connection awaited Medical and progress 21- Work in progress Surgical Block at Ground + 2 floors Government Target - April 2011 Phase– III 50.00 8 Administrative approval Medical College, to be accorded Chengalpattu

15. P.G Women hostel 3.70 Tender approved , for 140 students and work to be 3.3.3.CENTRALLY SPONSORED other buildings at commenced SCHEME (NATIONAL RURAL Stanley Medical Ground + 3 floors HEALTH MISSION) College and Target - March Hospital, Chennai 2011 All works are programmed to be completed by 31.01.2011 3.3.2. TAMIL NADU HEALTH SYSTEM Amount Sl PROJECT Name of Work (Rs in Status No Addition, extension, repairs and Crore) renovation in Government taluk / 1 Construction of 30 45.2183 55 - Work headquarter hospitals Bedded Upgraded Completed and Primary Health Handed over Amount Number Centres at 75 3 - Work Completed (Rs. in of Stage places 12 - Finishing Stage Crore) Hospitals 3 - Work in Progress 34-Completed and 1 - Retender Phase – I 45.62 35 handed over 1 - Tender Under 1-work in progress Scrutiny 142 - Work completed Phase – II 196.97 and handed over 191 9 - Civil work completed

19 20

2 Construction of 30 31.00 7 - Work Completed 5 Dropped works in 16.8180 4 - Work Completed Bedded Upgraded and Handed over 2008-2009 which 1 - Finishing Stage Primary Health 9 - Work Completed were taken up 12 - Work in Centres at 50 14 - Finishing Stage now at 26 places Progress places 13 - Work in 4 - Work to be Progress Commenced 5 - Work to be 5 - Tender under Commenced Scrutiny 1 - Tender to be 6 Work Identified by 3.87 1 - Completed called for DM & RHS at 12 3 - Finishing Stage 1 - Alternate site to places be identified 5 - Work in Progress 2 - Work to be 3 Construction of 23.97 6 - Work Completed Commenced New Primary 26 - Finishing Stage 1 - Tender under Health Centres at 50 - Work in Scrutiny 110 Places Progress 7 Construction of 2.26 5 - Work Completed 10 - Work to be Pay & Use toilets & Handed Over Commenced in first referral 17 - Work 8 - Tender to be units at 45 places Completed called for 11 - Finishing Stage 10 - Alternate site to be identified 8 - Work in Progress 2 - Work to be 4 Construction of 4.42 1 - Work Completed Commenced New Primary 7 - Finishing Stage 2 - Work Dropped Health Centres at 9 - Work in Progress 20 places 8 Construction of 1.3075 3 - Work in Progress 3 - Tender to be New Primary called for 3 - Tender to be Health Centres at called for 6 places

21 22

9 Works to be taken 0.190670 1 - Work in progress up in First referral 13 - Tender under AS Sl. Amount units under Scrutiny Work Status No (Rs.in NRHM 2009-2010 6 - Tender to be Crore) at 21 places called for 1 - Work dropped Finishing work is in 1 Arani 3.97 progress 10 507 works for 35.24 All works are in providing progress. Target – Apr. 2010 Additional 2 Gudiyatham 4.40 Work Completed. amenities to hospitals. Ground floor column 3 Aruppukottai 3.83 work is in progress Works for construction of birth Target – Mar. 2011 waiting room at 15 places at a cost of Foundation Level 4 Sivagangai 7.98 Rs.2.25 crore are in various stages of Target – Oct. 2010 construction. Foundation Level 5 Cuddalore 10.02 Works for construction of Target – Oct. 2010 maternity blocks at Usilampatty at a Column Raised cost of Rs.1.12 crore are to be taken above grade beam 6 Erode 5.42 level up. Target – Aug. 2010 3.4. HOME DEPARTMENT Preliminary work is in 7 Paramakudi 2.40 progress. 3.4.1.JUDICIAL DEPARTMENT Target – Dec. 2010 Finishing Work is in Details of Combined Court Buildings 8 Karur 10.00 progress that are being constructed with Target – Sep. 2010 Ground +2 Floors are as follows:-

23 24

AS AS Sl. Amount Sl. Amount Work Status Work Status No (Rs.in No (Rs.in Crore) Crore) Grade beam laid Work to be 9 Aranthangi 3.53 17 Thirumaiyam 1.73 Target – Aug. 2010 commenced Finishing work is in 18 Bhavani 5.27 Work to be 10 Poonamallee 4.02 progress commenced Target – May 2010 19 Attur 5.67 Tender under Scrutiny Work to be Started. 11 Alandur 4.73 20 Kallakurichi 7.54 Target – Dec. 2010 Tender under Scrutiny Retender called for 21 Tiruchendur 2.60 12 9.97 Tender under Scrutiny (3rd Call) 22 Ambur 2.30 Finishing work is in Tender under Scrutiny progress 13 Namakkal 10.56 23 Arakkonam 2.82 Tender under Scrutiny Target – Sep. 2010 Lintel level 24 Valiyoor 4.69 Tender under Scrutiny 14 Thoothukudi 8.88 Target – Feb. 2011 Padmanabha- 25 4.47 Tender under Scrutiny Price Tender puram approved by Tender 26 Thiruvaiyaru 1.91 Award Committee on Tender under Scrutiny 15 Uthamapalayam 5.17 22.1.2010. Court 27 Kangeyam 2.88 Tender under Scrutiny stayed the construction 28 Tenkasi 5.28 Estimate under preparation 16 Sankari 5.62 Work to be commenced 29 Pennagaram 1.78 Tender to be called for

25 26

AS AS Sl. Amount Sl. Amount Work Status Work Status No (Rs.in No (Rs.in Crore) Crore) 30 Kulithalai 4.10 Tender to be Called Administrative for 39 Kuzhithurai 6.54 sanction yet to be accorded Tender under 31 Thiruchengode 5.29 scrutiny Administrative 40 SankaranKoil 5.06 sanction yet to be Administrative accorded 32 Mettupalayam 2.44 sanction yet to be accorded At Thirumaiyam, Mettupalayam Administrative and Thiruvaiyaru Court Buildings are 33 Rasipuram 5.23 sanction yet to be accorded built with Ground + 1 Floor.

Administrative 34 Palani 4.82 Tender accepted for construction sanction yet to be of Law officers Building in High Court accorded Campus, Chennai at an estimated Administrative 35 Trichi 21.82 cost of Rs.5.70 Crore. sanction yet to be accorded Tenders also accepted for 36 Thiruvarur 10.37 Tender Called for construction of 272 quarters for Administrative officers and staff members of Madurai 37 Katpadi 4.21 sanction yet to be Bench of Madras High Court at accorded Madurai at an estimated cost of Administrative Rs.24.75 Crore. 38 Ranipettai 2.30 sanction yet to be

accorded

27 28

3.4.2. PRISON DEPARTMENT at Coimbatore, Salem, Palayamkottai, Cuddalore, Trichy, Pudukkottai, Modernization of Prisons Scheme Vellore are taken up at an estimated cost of Rs.12.07 Crore. Out of the 2004-2005: total 72 works, 69 works have been completed and 2 works are in various The works for conversion of stages of construction. The target date Sub-jails into District jails at Attur, for completion of these 2 works is Gobi and Nagapattinam and repairs 31.07.2010. In respect of balance and renovation of prison buildings at 1 work, tender is under scrutiny. Palayamkottai and Trichy are taken up at an estimated cost of Rs.5.52 Crore. 3.4.3. FIRE & RESCUE SERVICES Out of the total 5 works, 3 works have DEPARTMENT been completed and 2 works are in various stages of construction. The 2008-2009:

target date for completion of these The works for construction of works is 30.04.2010. Fire Station buildings at 8 places in 2005-2006: Thandarampattu, Omalur, Arni, Kuttalam, Cumbum, Thiruthuraipoondi, Thuckalai & Oddanchatram are taken The works for conversion of up at a total cost of Rs.2.20 Crore. Out Sub-jails into District jails at of the total 8 works, 6 works have Virudhunagar and Ramanathapuram been completed and handed over and (balance works) and new women's Jail balance 2 works are in various stage building in Trichy (balance works) and of construction. The target date for repairs and renovation, Sanitation and completion of these 2 works is water supply works in Central Prisons 31.12.2010.

29 30

The works for construction of Mayiladuthurai are taken up at a cost Fire and Rescue Service Stations at 5 of Rs. 1.865 Crore. These works are in places in Sankarapuram, Kudavasal, various stages of construction. The Ulundurpet, Thirukazhukundram and target date for completion is Koothanallur are taken up at a cost of 30.04.2010. Rs.196.63 lakhs. All the 5 works are in various stage of construction and they The works for laying the testing are targeted to be completed by track at Krishnagiri, Sankari, 31.01.2011. Chidambaram and Mayiladuthurai are taken up. Out of 4 works 3 have been 3.4.4.TRANSPORT DEPARTMENT completed and in the balance 1 work sand gravel mix has been laid and 2008-2009: targeted to be completed by 30.04.2010. The works for construction of Regional Transport Offices at 2009-2010: Cuddalore, Nagapattinam, Krishnagiri, Sankari and Tenkasi are taken up at a The works for construction of cost of Rs.7.135 Crore. Out of the 5 Regional Transport Offices at 2 works, 4 works are in various stages places, Ranipet and Chengalpet are to of construction. The target date for be taken up at a cost of Rs.2.85 Crore. completion of these 4 works is Pre-qualification tender has been 30.06.2010. In respect of balance 1 accepted and price tenders are under work re-tender is under scrutiny. scrutiny for the works in Ranipet Regional Transport Office. Tender is The works for construction of under scrutiny for the work in offices for Transport Department at Chengalpet Regional Transport Office. Sathyamangalam, Chidambaram and

31 32

The works for construction of over. Works in 2 places at Paramakudi offices for Transport Department at and Kariapatti are in finishing stages Harur, Rasipuram, Srivilliputur and and targeted to be completed in Vaniampadi are taken up at an 30.6.2010. The work at Kundah is to estimated cost of Rs. 2.14 Crore. Out be commenced and in respect of taluk of the 4 works 3 works are in various office at Vazhappadi, site is yet to be stages of construction and are handed over. targeted to be completed by 31.08.2010. In respect of balance 1 The work for construction of new work tender is under scrutiny. Collectorate building at Salem has been taken up at a cost of Rs.25.00 The works for laying testing track Crore. The building consists of Ground at Pollachi, Ranipet, Gudiyattam were plus four floors. Fourth floor work is in taken up at a cost of Rs.79.73 lakh. progress. The target date for These works are targeted to be completion is 30.9.2010. completed in 31.05.2010. The works for construction of 3.5. REVENUE DEPARTMENT quarters for District Revenue Officers are taken up at 4 places at a cost of 2007-2008: Rs.1.40 Crore. Out of the 4 works, works in 2 places at Tiruvannamalai The works for construction of and Krishnagiri have been completed. Taluk Offices at 11 places are taken 1 work at Nagapattinam is in finishing up at a cost of Rs.15.57 Crore. Out of stage and is targeted to be completed the 11 works, 7 works at Iluppur, by 30.04.2010. In respect of balance 1 Gangavalli, Thottiyam, Virakeralam- work at Udhagamandalam, work is to pudur, Kulitthalai, Kalkulam, Pandalur be taken up at an alternative site. have been completed and handed

33 34

The works for construction of 3 New Collectorate 12.01 First Floor roof laid quarters for Revenue Divisional building at Trichy Officers at 7 places are taken up at a Ground +3 Floors

cost of Rs.1.19 Crore. Out of the 7 Target - 30.09.2010 works, works in 6 places at Dindigul, 4 Taluk office 19.21 10-Works are in Palani, Lalgudi, Attur, Thiruchendur buildings at 12 various stages of and Ramanthapuram have been places in construction Tirutani, Target : 31.08. 2010 completed. In respect of balance 1 Thandarampattu, work at Maduranthgam construction is 1-Drawing to be Vellore, approved in basement level. The target date of Cuddalore, (Usilampatti) completion is 30.04.2010. Thittakkudi, 1- Tender accepted Trichy, Tharangampadi, (Sivagangai) 2008-2009: Sivagangai, All buildings are Tiripathur, Attur, Ground + 2 floors. Amount Usilampatt and Sl. Work Status Sankarankoil No. (Rs.in Crore) 5 Tahsildar 4.51 8 – Completed 1 Additional 2.39 Finishing work is in Quarters – 29 Nos and handed over building to the progress 10 - Completed Collectorate for Ground +1 floor 5 - Finishing Dharmapuri Target - 30.4.2010 Work 2 Collectorate for 12.88 First Floor Roof Laid 3 - Roof Level Ariyalur District Ground +2 floors Target : 30.04.2010 Target - 30.09.2010 3 - Site yet to be handed over

35 36

3.6. SCHOOL EDUCATION 6 Revenue 1.31 4-Handed over DEPARTMENT Inspectors 6-Completed Quarters – 16 Nos 3- Finishing work is 3.6.1. NABARD LOAN ASSISTANCE in progress SCHEMES Target : 30.04.2010 3-Site yet to be Infrastructural improvements like handed over construction of additional classrooms, Target : 30.04.2010 laboratory, toilet and drinking water facilities are taken up in Government High Schools and Government Higher 2009-2010: Secondary Schools in Tamil nadu through NABARD loan assistance. Amount The following are the stages of these Sl. Work Status works. No. (Rs.in Crore) 1 Construction of 2.02 Prequalification Number Amount taluk office tender accepted Phase of (Rs. in Stage building at Schools Crore) Agastheeswaram in Kanniykumari Phase 234 161.32 223 works Completed District. VI 8 works in progress Target - 30.9.2010 2 Construction of 1.50 Tender accepted. Circuit House at 1 work - tender under Ariyalur scrutiny 2 works dropped

37 38

Phase 195 131.69 172 works completed 3.7. TAMIL DEVELOPMENT VII 8 works in progress DEPARTMENT Target - 31.10.2010 14 works tender under Construction of second floor scrutiny over the existing building at Tamil 1 work dropped Valarchi Valagam at Egmore at a cost Phase 59 63.36 1 work completed of Rs.50 lakh has been completed. VIII 51 works in progress Target - 31.12.2010 3.8. SOCIAL DEFENCE DEPARTMENT 7 works - tender under Scrutiny Administrative Sanction is to be accorded for the construction of Home Phase 362 410.74 11 works completed for Children at Attur in Kancheepuram IX 313 works in progress District and in Villupuram. Target - 28.2.2011

34 works tender under scrutiny 3.9. MLA’S OFFICE BUILDINGS 1 work estimate under preparation Construction of 234 MLA Office 3 works site to be Buildings were taken up at a cost of handed over Rs.11.35 Crore. Out of the total 234 works, 229 works have been Phase 303 247.06 Administrative Sanction X accorded. Estimate completed and handed over. In 4 prepared and tenders places, site has to be handed over. In are being received respect of the balance 1 work Revised Administrative Sanction is to be accorded.

39 40

3.10. BACKWARD CLASSES, MOST Amount BACKWARD CLASSES AND Year Name of Work (Rs. in Stage MINORITIES WELFARE Crore) DEPARTMENT 2008 Construction 25 13.68 1 work completed - BC / MBC / Amount 16 works in 2009 DNC Hostels progress Year Name of Work (Rs. in Stage each to Target – 31.12.2010 Crore) accommodate 50 students – 7 works in 2005 416 BC / MBC 131.04 340 works agreement / Tender/ - Hostel Buildings completed Ground + 1 Floor estimate stage 2006 each to 4 works finishing accommodate 1 work - site to be stage handed over 50 students – 3 works in various Ground + 1 floor stages of 2009 Construction of Rs.12.50 Estimate under construction - 25 BC / MBC preparation 2010 Hostels each to Target - 31.10.2010 accommodate 69 works in 50 students – agreement/ tender / Ground + 1 estimate / RAS Floor stage

2007 25 BC Hostels 32.15 19 works completed 3.11. TOURISM AND CULTURE - to accommodate 10 works nearing DEPARTMENT 2008 50 students – completion Ground + 1 8 works in progress 2009–2010: Floor and 25 The Revised Administrative hostels to Target - 30.11.2010 accommodate 13 works in Sanction is to be accorded for the 100 students – agreement/ tender / construction of bus Terminus at Ground + 2 floor estimate / RAS Mamallapuram at an estimated cost of stage Rs.3.66 crore.

41 42

For the works of construction of Tiruvembalapuram at a cost of Centre for Arts and Culture at Rs.68.18 Lakhs. Out of the total 4 Kancheepuram, Madurai and works 1 work has reached lintel level Tirunelveli at a cost of Rs.92.92 lakh, and is targeted to be completed by tenders were approved and works are 31.12.2010. In respect of the balance to be commenced. 3 works tenders are to be called for.

3.12. ANIMAL HUSBANDRY, DAIRYING 3.13. TAMILNADU STATE MARKETING CORPORATION (TASMAC) AND FISHERIES DEPARTMENT The construction of Godown and The works for construction of office building for TASMAC at 5 Veterinary units at 3 places at A.Sengampalayam, Pollachi Taluk Thanjavur, Uthagamandalam and taken up at a cost of Rs 1.425 crore. Hosur are taken up at a cost of The target for completion is Rs.3.05 crore. Out of these 5 works 31.03.2011. 3 works have been completed and balance 2 works are in progress. The 3.14. REGISTRATION DEPARTMENT target date of completion is 31.12.2010. 2005–2006:

CENTRALLY SPONSORED The works for construction of SCHEMES: Sub Registrar Office buildings at

The works were taken up for 10 places in Arani, Kayalpattinam, construction of Poultry farms at Cuddalore, Sathyamangalam, Kattupakkam & Abishaegapatti at a Verkizhambi, Cheyyur, Rameswaram, cost of Rs.64.50 lakhs and for building Thirupporur, Thiruvallur and improvements in Abishaegapatti and Mettupalayam were taken up at a cost

43 44

of Rs.1.50 crore. Out of the total progress and targeted to be completed 10 works, 9 have been completed and by 31.5.2010. Balance 1 work is held balance 1 work is nearing completion. up due to a Court case.

2009–2010: 3.16. ARCHEOLOGY DEPARTMENT

The works for construction of 2007–2008:

Integrated Registration Department Renovation of 13 temples at a buildings at 5 places were taken up at cost of Rs.1.87 Crore was taken up. a cost of Rs.7.10 crore. Out of the Out of 13 works, renovation at 10 5 works, works in Tirunelveli, temples have been completed and Nagerkoil, Tuticorin are in various balance 3 works are nearing stages of construction. For works in completion. Work for installation of 2 places at Madurai and Cuddalore enamel protection notice boards at 22 tenders are called for. All works are to places are executed by Archeology be completed by 28.2.2011. Department.

3.15. EMERGENCY TSUNAMI 2008–2009: RECONSTRUCTION PROJECT Renovation of 15 temples at a The works for Repair, cost of Rs.1.99 Crore was taken up. renovation, up-gradation and Out of these 15 works 11 works have reconstruction of buildings belonging been completed, 3 works are in to Public Works, Revenue, Animal various stages of construction and Husbandry, Health and Education balance 1 work is nearing completion Departments affected by Tsunami and are targeted to be completed in were taken up at a cost of Rs.40.13 30.09.2010. Crore. Out of total 340 works, 338 2009–2010: have been completed, 1 work is in

45 46

Renovation of 10 temples is 3.18.EMPLOYMENT AND TRAINING taken up at a cost of Rs.77.80 lakhs. DEPARTMENT Out of the 10 works, 6 works have been completed, 4 works are in 2009–2010: various stages of construction. The target date of completion is The construction of ITI buildings 31.12.2010. at Thirukkuvalai, Nagapattinam Districts is taken up at a cost of 3.17. HINDU RELIGIOUS AND Rs.1.386 crore. The work is at CHARITABLE ENDOWMENTS basement level. The targeted date of DEPARTMENT: completion is 31.12.2010.

2009–2010: The construction of new ITI buildings at Nagalapuram in Construction of Icon production Thoothukudy District is taken up at a centers at 5 places Thiruvottiyur, cost of Rs 46.00 lakh. This work is in Thiruvallur, Virudhunagar, Villupuram finishing stage. The targeted date of and Dharmapuri are taken up at a cost completion is 31.05.2010. of Rs.1.19 crore. All works are in various stages of construction. The The works for Renovation and Target date of completion is upgradation of Government ITI 31.12.2010. buildings in the following places have

been commenced.

47 48

Amount 3.19. AGRICULTURE DEPARTMENT Sl. No. Name of place (Rs. in lakhs) The works for construction of 1 Guindy 96.25 Seed Godowns at 95 places at a cost of Rs.11.25 crores have been 2 Vellore 95.18 commenced.

3 Madurai 96.55 3.20. PUBLIC (REHABILITATION) DEPARTMENT 4 Pettai, Tirunelveli 96.30 Following the announcement of 5 Guindy (Men) 100.00 this Government works were taken up 6 Chengalpattu 100.00 to provide amenities to the Srilankan Refugee camps such as repairs to 7 Cuddalore 100.00 buildings, water supply and sanitary arrangements and electrification works 8 Coimbatore 100.00 at a cost of Rs.37.33 Crore. These works are in progress. The targeted 9 Madurai 100.00 date of completion is 30.04.2010.

10 Dharmapuri 87.50 4.0. PWD BUILDINGS (PART - II SCHEMES) 11 Dharapuram 87.50 (Thiruppur district) 4.1. 2009–2010: All the works are scheduled to be completed in September, 2010 The following Part II Schemes were taken up during 2009-2010.

49 50

Amount Sl Name of Work Stage 6 Purchase of 5.51 Computers No (Rs. In Lakhs) Computers with UPS, are installed Scanner, Printers etc. and are in 1 Inspection Bungalow 40.00 Works are in for use in the Office use with 2 rooms at basement of the Director of Elagiri Hills in Vellore level Boilers, Chennai 2 Additional circuit 55.00 Works are in house with 4 suites at basement 7 Additional circuit 55.00 Work is at Vellore level house with 4 suites basement for V.V.I.P.'s at level 3 Purchase of 15.00 Computers Tirunelveli Computers with UPS, are installed Scanner, Printers, at work 8 Inspection Bungalow 23.00 Work is at etc. for use in the stations. with 2 suites at basement Office of the Chief Nagercoil in level Engineer (Buildings) Kanyakumari District in Building 9 Construction of 23.00 Works is at Organization. Inspection Bungalow lintel level 4 Procurement of 13 7.00 Machines with 2 suites at Palani Photo Copiers (Xerox purchased in Dindigul District Machines) for Circle and put to 10 Quarters for Assistant 19.49 Work is at Offices of Building use. Engineers - 2Nos. In lintel level Organization. PWD Complex at 5 Inspection Bungalow 23.00 Work is at Mettupalayam in with 2 suites at basement Coimbatore District Kadaladi in level Ramanathapuram Target date for completion 31.8.2010. District

51 52

Amount 4.2. 2010-2011 : Sl Name of Work No (Rs. In The following Part II Schemes are to Lakhs) be taken up in the year 2010-2011 7 Purchase of 13 Nos of New Cars for 55.25

Amount Superintending Engineers of Sl Building Organisation on Name of Work No (Rs. In replacement basis. Lakhs) 8 Provision of 1 No.of 62.5 KVA Diesel 11.90 1 Providing additional Lifts (3Nos) for 60.00 Generator Set to new circuit house 126 Nos quarters under construction at Trichy in Government Servant Quarters Campus at Todhunter Nagar, 9 Providing Training programme on 0.95 Saidapet,Chennai-15. Revit Architecture or its equivalent to Architects (12 persons) of Building 2 Improvements to Compound Wall in 12.50 Organization Government Servant Quarters Campus at Todhunter Nagar, Total 269.85 Saidapet. 3 Special Repair to Protection Wall in 12.25 5.0. MAJOR BUILDING WORKS AT Press Workers Quarters at Tondiarpet Chennai-81 A GLANCE

4 Construction of Quarters for 24.00 5.1. Works in progress Superintending Engineer Buildings

(C&M) Circle, Salem. Estimate 5 Construction of additional circuit 70.00 Sl. Amount house with 5 suites at Tiruvarur in Name of Work Target No. Tiruvarur District. (Rs.in Crore) 6 Construction of Inspection Bungalow 23.00 with 2 suites at Mannargudi in 1 New Secretariat Building 279.56 May 2011 Tiruvarur District Block B at Chennai

53 54

Estimate Estimate Sl. Amount Sl. Amount Name of Work Target Name of Work Target No. (Rs.in No. (Rs.in Crore) Crore) 2 Anna Centenary Library 171.78 May 2010 10 School buildings with 410.74 Dec. 2010 in Kotturpuram, Chennai NABARD loan assistance 3 Additional building for 13.66 Mar. 2011 (Phase IX) total 362 Government Dental Schools College, Chennai 11 Construction of 55.98 Mar. 2011 4 Multi storied Building at 56.32 Apr. 2011 Combined Court I.O.G Campus Egmore Buildings at Chennai Aruppukkottai, Sivagangai, Cuddalore, 5 Centre of excellence 16,65 Mar. 2011 Erode, Paramakkudi, (Multi storied Building) for Aranthangi, Poonamalee, the Institute of Social Thoothukudi, Alandur, Obstetrics, at KG Uthamapalayam Hospital Triplicane. 12 New Collectorate building 25.00 Sep. 2010 6 Buildings for Operation 14.50 Apr.2011 at Salem Theater at Chengalpet Medical college 13 New Collectorate for 12.88 Sep. 2010 Ariyalur District 7 New Medical College 98.81 Apr. 2011 buildings at Villupuram 14 New Collectorate building 12.01 Sep. 2010 at Trichy 8 New Medical College 92.87 Nov. 2010 buildings at Thiruvarur Total 1324.12

9 School buildings with 63.36 Jun. 2010 NABARD loan assistance (Phase VIII) total 59 Schools

55 56

5.2. Works to be taken up 8 Construction of Combined 136.00 Court Building at Estimate Kumbakkonam, Sankari, Sl. Name of Work Amount ,Thirumaiyam,Bhavani, Attur, No. (Rs.in Crore) Kallakurichi, Tiruchendur, Ambur, Arakkonam, Valliyoor, 1 New Building for Madras 70.20 Thiruvaiyaru, Kangeyam, Medical College, Chennai. Tenkasi, Pennagaram, 2 Tower Block ( Phase-II) at 41.20 Kulithalai, Thiruchengode, Stanley Medical College and Mettupalayam, Rasipuram, Hospital, Chennai. Palani, Tiruchy, Thiruvarur, Katpadi, Ranipettai, 3 New Medical College at 97.00 Kuzhithurai, SankaranKoil. Sivagangai. 9 Tamil Nadu Health Systems 50.00 4 New Medical College at 97.00 Project Phase III Perambalur. 5 New Medical College at 43.68 Dharmapuri Phase II. Total 797.14

6 School buildings with NABARD 247.06

loan assistance (Phase X)

Total 303 Schools.

7 Multistoried building for 15.00 M.KARUNANIDHI MDPU. in Agricultural CHIEF MINISTER Engineering Department Campus at Nandanam, Chennai

57 58