9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 1 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Original COUNTY PROJECTS - MOBILE Route CR-25 Project Description NEW ALIGNMENT OF CR-25 (MCFARLAND ) FROM CR-28 (OLD PASCAGOULA ROAD) TO CR-358 (THREE NOTCH ROAD) Project Length in Miles 8.000 Urban Area MOBILE Sponsor MOBILE COUNTY COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100059788 PE 2018 / 100059791 CN 2024 100059789 STPMB 4918 (250) RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2022 $4,800 $0 $1,200 $6,000 100059790 STPMB 4918 (250) UTILITIES GRADE, DRAIN, BASE AND PAVE 2023 $1,920 $0 $480 $2,400 TOTAL COST: $6,720 $0 $1,680 $8,400 Route CR-32 Project Description THREE NOTCH ROAD (CR-32) ADDITIONAL FROM SCHILLINGER ROAD TO MCDONALD ROAD. Project Length in Miles 1.000 Urban Area MOBILE Sponsor MOBILE COUNTY COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100052461 PE 2019 / 100052463 UT 2024 / 100052464 CN 2024 100052462 STPMB 4919 (250) RIGHT OF WAY ADDITIONAL ROADWAY LANES 2022 $732 $0 $183 $915 TOTAL COST: $732 $0 $183 $915 Route CR-33 Project Description WIDENING, RESURFACING AND STRIPING ON DAWES ROAD (CR-33) FROM SCOTT DAIRY LOOP ROAD SOUTH TO DIBERVILLE DRIVE WEST Project Length in Miles 1.336 Urban Area MOBILE Sponsor MOBILE COUNTY LVOE County COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100068763 RASTPAA 4915 (251) CONSTRUCTION WIDENING AND RESURFACING 2021 $483 $0 $973 $1,456 (RDWY) TOTAL COST: $483 $0 $973 $1,456 Route CR-39 Project Description MCDONALD ROAD (CR-39) ADDITIONAL LANES FROM NORTH OF I-10 TO OLD PASCAGOULA ROAD. Project Length in Miles 1.000 Urban Area MOBILE Sponsor MOBILE COUNTY COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100052447 PE 2010 / 100052448 RW 2018 100052449 STPMB 7612 (600) UTILITIES GRADE, DRAIN, BASE AND PAVE 2022 $560 $0 $140 $700 100052450 STPMB 7612 (600) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2022 $3,840 $0 $960 $4,800 TOTAL COST: $4,400 $0 $1,100 $5,500 Route CR-41 Project Description ADDITIONAL LANES ON CR-41 (CELESTE ROAD) FROM FOREST TO JUST WEST OF I-65 Project Length in Miles 3.200 Urban Area MOBILE Sponsor MOBILE COUNTY COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100069498 PE 2019 / 100069501 CN 2025 100069499 STPMB 4919 (251) RIGHT OF WAY ADDITIONAL ROADWAY LANES 2022 $1,600 $0 $400 $2,000 100069500 STPMB 4919 (251) UTILITIES ADDITIONAL ROADWAY LANES 2023 $800 $0 $200 $1,000 TOTAL COST: $2,400 $0 $600 $3,000 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 2 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Original PROJECTS - MOBILE Route CR-56 Project Description ADDITIONAL LANES WITH REALIGNMENT ON CR-56 FROM 0.28 MILE WEST OF ELIZA JORDAN ROAD TO SNOW ROAD Project Length in Miles 2.920 Urban Area MOBILE Sponsor MOBILE COUNTY COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100068532 PE 2019 / 100068535 CN 2024 100068533 STPMB 4918 () RIGHT OF WAY ADDITIONAL ROADWAY LANES 2022 $1,200 $0 $300 $1,500 100068534 STPMB 4918 () UTILITIES UNCLASSIFIED 2023 $800 $0 $200 $1,000 TOTAL COST: $2,000 $0 $500 $2,500 Route CR-656 Project Description CR-656 (ZEIGLER BLVD) ADDITIONAL LANES FROM ATHEY RD TO FOREST HILL DR Project Length in Miles 2.762 Urban Area MOBILE Sponsor CITY OF MOBILE COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100037214 PE 2004 / 100045453 RW 2014 100037215 STPMB 7550 (600) CONSTRUCTION ADDITIONAL ROADWAY LANES 2020 $14,557 $1,539 $3,718 $19,814 TOTAL COST: $14,557 $1,539 $3,718 $19,814 Route CR-656 Project Description ADDITIONAL LANES ON CR-656 (ZEIGLER BLVD) FROM CR-70 (TANNER WILLIAMS RD) TO CR-31 (SCHILLINGER RD) Project Length in Miles 4.200 Urban Area MOBILE Sponsor MOBILE COUNTY COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100055880 PE 2012 100055881 STPMB 7550 (602) RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2021 $735 $0 $184 $919 100055882 STPMB 7550 (602) UTILITIES GRADE, DRAIN, BASE AND PAVE 2022 $905 $0 $226 $1,131 100055883 STPMB 7550 (602) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2022 $4,080 $0 $1,020 $5,101 TOTAL COST: $5,720 $0 $1,430 $7,150 Route CR-NA Project Description ON DAUPHIN ISLAND BETWEEN THE I-10 AND OLD MILITARY ROAD IN MOBILE Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF MOBILE LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100067315 TAPAA TA17 (938) CONSTRUCTION 2022 $139 $0 $35 $173 TOTAL COST: $139 $0 $35 $173 Route CR-NA Project Description ADD SIDEWALK ALONG OLD SHELL ROAD FROM MYRTLEWOOD TO WEST I-65 SERVICE ROAD NORTH IN MOBILE Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF MOBILE LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100067418 TAPMB TA18 (900) CONSTRUCTION SIDEWALK 2020 $161 $0 $40 $201 TOTAL COST: $161 $0 $40 $201 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 3 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Original COUNTY HIGHWAY PROJECTS - MOBILE Route CR-NA Project Description ADD SIDEWALKS ALONG WHISTLER FROM NORTH SHELTON BEACH ROAD TO NORTH PRICE AVENUE IN PRICHARD Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF PRICHARD LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100067420 TAPMB TA18 (902) CONSTRUCTION SIDEWALK 2020 $162 $0 $41 $203 TOTAL COST: $162 $0 $41 $203 Route CR-NA Project Description SIDEWALKS ALONG THE SOUTH SIDE OF AIRPORT BETWEEN HILLCREST ROAD AND REGENTS WAY IN MOBILE Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF MOBILE LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100067749 TAPMB TA18 (903) CONSTRUCTION SIDEWALK 2022 $160 $0 $40 $200 TOTAL COST: $160 $0 $40 $200 Route CR-NA Project Description SIDEWALKS ALONG THE NORTH SIDE OF OLD SHELL ROAD FROM THE WEST SIDE OF PARKWAY DRIVE TO UNIVERSITY BOULEVARD IN MOBILE Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF MOBILE LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100067750 TAPMB TA17 (950) CONSTRUCTION SIDEWALK 2020 $192 $0 $48 $240 TOTAL COST: $192 $0 $48 $240 Route CR-NA Project Description VARIOUS ADA UPGRADES AT AND AROUND THE PRICHARD CITY HALL Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF PRICHARD LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100068379 TAPAA TA18 (922) CONSTRUCTION SIDEWALK 2021 $149 $0 $37 $186 TOTAL COST: $149 $0 $37 $186 Route CR-NA Project Description SIDEWALKS AND IMPROVEMENTS ALONG EAST STATE STREET AND EAST LEBARON AVENUE FROM NORTH 3RD STREET AND NORTH MAIN STREET Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100069029 TAPNU TA19 (923) CONSTRUCTION SIDEWALK 2022 $640 $0 $160 $800 TOTAL COST: $640 $0 $160 $800 Route CR-NA Project Description SIDEWALK ALONG OLD HIGHWAY 43 FROM CRENSHAW PARK TO BRADLEY ROAD Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF CREOLA LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100069031 TAPAA TA19 (925) CONSTRUCTION SIDEWALK 2021 $303 $76 $0 $379 TOTAL COST: $303 $76 $0 $379 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 4 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Original COUNTY HIGHWAY PROJECTS - MOBILE Route CR-NA Project Description SIDEWALKS ALONG EASTERLING STREET FROM W CLARK AVENUE TO GARRISON AVENUE, ON GARRISON AVENUE FROM EASTERLING STREET TO MAGEE STREET, AND ON MAGEE STREET FROM GARRISON AVENUE TO W CLARK AVENUE Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF PRICHARD LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100069054 TAPMB TA19 (928) CONSTRUCTION SIDEWALK 2022 $200 $0 $50 $250 TOTAL COST: $200 $0 $50 $250 Route CR-NA Project Description INSTALLATION AT CANAL STREET AND BROAD STREET Project Length in Miles 0.000 Urban Area MOBILE Sponsor ALDOT LVOE Safety COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100069797 CN 2020 100069746 HSIP 4919 (252) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2019 $36 $0 $4 $40 100069797 HSIP 4919 (252) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $1,382 $0 $154 $1,535 TOTAL COST: $1,418 $0 $158 $1,575 Route CR-NA Project Description SAFETY IMPROVEMENTS ON CELESTE ROAD FROM JANWOOD COURT TO TAYLOR ROAD Project Length in Miles 0.000 Urban Area MOBILE Sponsor ALDOT LVOE Safety COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100072714 HRRR 4921 (250) CONSTRUCTION SAFETY IMPROVEMENTS 2021 $403 $0 $45 $448 TOTAL COST: $403 $0 $45 $448 Route CR-NA Project Description DAUPHIN STREET ADDITIONAL LANES FROM SAGE AVENUE TO WEST OF I-65 AT SPRINGHILL MEMORIAL HOSPITAL. Project Length in Miles 3.300 Urban Area MOBILE Sponsor CITY OF MOBILE COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100052457 PE 2012 100052458 STPMB 7533 () RIGHT OF WAY GRADE, DRAIN, BASE, PAVE AND 2022 $216 $0 $54 $270 100052459 STPMB 7533 () UTILITIES GRADE, DRAIN,BRG BASE, PAVE AND 2023 $225 $0 $56 $281 100052460 STPMB 7533 () CONSTRUCTION GRADE, DRAIN,BRG BASE, PAVE AND 2023 $5,656 $0 $1,414 $7,070 BRG TOTAL COST: $6,097 $0 $1,524 $7,621 Route CR-NA Project Description INTERSECTION IMPROVEMENTS - CONGESTION MANAGEMENT PROCESS - DAUPHIN STREET FROM SAGE AVENUE TO SPRINGHILL HOSPITAL Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF MOBILE COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100066705 STPMB 4918 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $500 $0 $125 $625 TOTAL COST: $500 $0 $125 $625 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 5 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Original COUNTY HIGHWAY PROJECTS - MOBILE Route CR-NA Project Description INTERSECTION IMPROVEMENTS - CONGESTION MANAGEMENT PROCESS - AIRPORT BLVD FROM UNIVERSITY BLVD TO HILLCREST ROAD Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF MOBILE COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100066707 STPMB 4918 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $500 $0 $125 $625 TOTAL COST: $500 $0 $125 $625 Route CR-NA Project Description RAILROAD CROSSING IMPROVEMENTS, MARKINGS, LIGHTS, BELLS, LEGENDS, GATES, SIGNS AND SIGNALS ON FERRY AVENUE AT NORFOLK SOUTHERN RAILROAD DOT# 727825T AND ALABAMA AND GULF COAST RAILWAY DOT# 665312V IN SARALAND Project Length in Miles 0.000 Urban Area MOBILE Sponsor ALDOT LVOE Safety COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100067738 RHCH RR18 (902) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $502 $0 $56 $558 TOTAL COST: $502 $0 $56 $558 Route CR-NA Project Description RAILROAD CROSSING IMPROVEMENTS, GATES AND SIGNALS ON BAYOU AVENUE EAST IN SATSUMA AT NORFOLK SOUTHERN RAILROAD, JUST EAST OF SR-13 (US-43), AAR/DOT NO. 727820J Project Length in Miles 0.000 Urban Area MOBILE Sponsor ALDOT LVOE Safety COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100070116 RHCH RR19 (909) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $297 $0 $33 $330 TOTAL COST: $297 $0 $33 $330 Route CR-NA Project Description RR XING HAZARD ELIMINATION IMPROVEMENTS FOR THE INSTALLATION OF TWO CANTILEVERS W/ BELLS, GATES AND SIGNALS ON SPRINGHILL AVENUE AT ALABAMA EXPORT RAILROAD IN MOBILE; REF # 2105HE, DOT# 304230T Project Length in Miles 0.000 Urban Area MOBILE Sponsor ALDOT LVOE Safety COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100073585 RHCH RR21 (924) CONSTRUCTION RR CROSSING IMPROVEMENTS 2022 $466 $0 $52 $518 TOTAL COST: $466 $0 $52 $518 Route CR-NA Project Description RR XING HAZARD ELIMINATION IMPROVEMENTS FOR THE INSTALLATION OF BELLS, GATES AND SIGNALS, SURFACE PANELS, SIGNS, MARKINGS AND LEGENDS ON MAIN STREET AT ALABAMA EXPORT RAILROAD IN MOBILE; REF# 2108HE, DOT# 304233N Project Length in Miles 0.000 Urban Area MOBILE Sponsor ALABAMA STATE PORT AUTHORITY LVOE Safety COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100073586 RHCH RR21 (925) CONSTRUCTION RR CROSSING IMPROVEMENTS 2022 $180 $0 $20 $200 TOTAL COST: $180 $0 $20 $200 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 6 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Original COUNTY HIGHWAY PROJECTS - MOBILE Route I-065 Project Description RESURFACING ON I-65 FROM 0.56 MILE NORTH OF SR-158 TO 2.39 MILE NORTH OF SR-13(US-43) Project Length in Miles 7.970 Urban Area MOBILE Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100069061 CN 2022 100069090 IM I065 (512) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE 2020 $222 $25 $0 $247 LEVEL 1 TOTAL COST: $222 $25 $0 $247 Route I-10 Project Description RESURFACING ON I-10 FROM 1.36 MILES EAST OF SR-193 TO THE WALLACE Project Length in Miles 16.563 Urban Area MOBILE Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100069062 CN 2022 100069091 IM I010 (349) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE 2020 $491 $55 $0 $546 100069062 IM I010 (349) CONSTRUCTION PREVENTATIVELEVEL MAINTENANCE 1 2022 $6,584 $732 $0 $7,315 LEVEL 1 TOTAL COST: $7,075 $786 $0 $7,861 Route I-10 Project Description RESURFACE WALLACE TUNNEL AND APPROACHES ON I-10 Project Length in Miles 1.680 Urban Area MOBILE Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100070821 CN 2021 100071432 IM I010 (348) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE 2020 $68 $8 $0 $75 100070821 IM I010 (348) CONSTRUCTION PREVENTATIVELEVEL MAINTENANCE 2 2021 $1,896 $211 $0 $2,107 LEVEL 2 TOTAL COST: $1,964 $218 $0 $2,182 Route I-10 Project Description ADDITIONAL LANES ON I-10 FROM CR-39 TO CR-59 (CAROL PLANTATION RD) Project Length in Miles 4.460 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100064147 NH I010 (346) PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2020 $400 $100 $0 $500 TOTAL COST: $400 $100 $0 $500 Route I-10 Project Description RESURFACING ON I-10 FROM .28 MILE WEST OF CAROL PLANTATION ROAD TO 1.36 MILES EAST OF SR-193 Project Length in Miles 6.913 Urban Area MOBILE Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100069088 PE 2020 / 100069060 CN 2020 100069060 IM I010 (345) CONSTRUCTION PREVENTATIVE MAINTENANCE 2020 $3,893 $433 $0 $4,326 100069088 IM I010 (345) PRELIMINARY ENGINEERING PREVENTATIVELEVEL MAINTENANCE 1 2020 $60 $7 $0 $67 LEVEL 1 TOTAL COST: $3,953 $439 $0 $4,393 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 7 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Original COUNTY HIGHWAY PROJECTS - MOBILE Route I-65 Project Description PAINTING ON ALONG I-65. ON I-65 OVER AL GULF COAST RR (10195,10196) ON I-65/I-65 NB OFF RAMP OVER US-43 (10197,10198,10199) ON I-65 OVER 1-65 NB OFF RAMP/NORFOLK SO. RR (10200,10201) ON I-65 OVER GUNNISON CRK (10202,10203) Project Length in Miles 0.000 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100069478 CN 2025 100069460 BR I065 (515) PRELIMINARY ENGINEERING BRIDGE PAINTING 2022 $82 $21 $0 $103 TOTAL COST: $82 $21 $0 $103 Route I-65 Project Description BRIDGE RESTRIPING ON I-65 NORTH BOUND LANE AND SOUTH BOUND LANE (MP. 24.309 TO 30.389) AT DELTA (BINS 012321 AND 012322) Project Length in Miles 6.080 Urban Area MOBILE Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100073448 IM I065 (523) CONSTRUCTION TRAFFIC STRIPING 2022 $2,711 $301 $0 $3,012 TOTAL COST: $2,711 $301 $0 $3,012 Route I-65 Project Description RESURFACING ON I-65 FROM 0.56 MILE NORTH OF SR-158 TO 2.39 MILE NORTH OF SR-13(US-43) Project Length in Miles 7.970 Urban Area MOBILE Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100069090 PE 2020 / 100069061 CN 2022 100069061 IM I065 () CONSTRUCTION PREVENTATIVE MAINTENANCE 2022 $2,266 $252 $0 $2,518 LEVEL 1 TOTAL COST: $2,266 $252 $0 $2,518 Route I-65 Project Description RESURFACING ON I-65 FROM I-10 TO MAIN STREET Project Length in Miles 8.976 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100069167 PE 2019 / 100069170 CN 2020 100069170 IM I065 (508) CONSTRUCTION PREVENTATIVE MAINTENANCE 2020 $6,034 $670 $0 $6,704 LEVEL 1 TOTAL COST: $6,034 $670 $0 $6,704 Route NA Project Description OLD SHELL ROAD SIDEWALK IMPROVEMENTS IN THE CITY OF MOBILE Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF MOBILE LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100065881 TAPMB TA16 (947) CONSTRUCTION SIDEWALK 2020 $192 $0 $48 $240 TOTAL COST: $192 $0 $48 $240 Route NA Project Description SIDEWALKS ON OLD SHELL ROAD BETWEEN DURANT STREET AND UNION AVENUE IN MOBILE Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF MOBILE LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100067397 TAPMB TA17 (947) CONSTRUCTION SIDEWALK 2022 $200 $0 $50 $251 TOTAL COST: $200 $0 $50 $251 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 8 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Original COUNTY HIGHWAY PROJECTS - MOBILE Route NA Project Description TRAIL LOCATED ON THE NORTH SIDE OF THREE MILE CREEK FROM THE UNIVERSITY OF SOUTH ALABAMA MEDICAL CENTER TOWARDS STRICKLAND YOUTH CENTER Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100068380 TAPAA TA18 (923) CONSTRUCTION SIDEWALK 2021 $555 $0 $139 $694 TOTAL COST: $555 $0 $139 $694 Route NA Project Description ADA COMPLIANT RAMPS WITHIN KINGS BRANCH ESTATES NORTH OF SR-42 (US-98) AND WEST OF JARRETT ROAD, ALSO IN WOODBRIDGE PLACE AND CUMBERLAND SUBDIVISIONS SOUTH OF COTTAGE HILL ROAD AND EAST OF SCHILLINGER ROAD S Project Length in Miles 0.000 Urban Area MOBILE Sponsor MOBILE COUNTY COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100069055 TAPMB TA19 (929) CONSTRUCTION SIDEWALK 2019 $240 $0 $60 $300 TOTAL COST: $240 $0 $60 $300 Route NA Project Description SIDEWALKS ALONG WEST LEE AVENUE, WEST HAMM AVENUE, WEST BROADWAY AVENUE, NORTHWEST FOURTH STREET, SOUTHWEST SECOND STREET AND NORTHWEST FIRST STREET Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100072668 TAPNU TA21 (908) CONSTRUCTION SIDEWALK 2022 $640 $0 $160 $800 TOTAL COST: $640 $0 $160 $800 Route NA Project Description IMPROVEMENTS TO THE TAYLOR HARPER HIKING AND BIKING TRAIL ALONG THE SOUTH SIDE OF BIENVILLE BOULEVARD Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100072671 TAPNU TA21 (911) CONSTRUCTION SIDEWALK 2022 $316 $0 $79 $395 TOTAL COST: $316 $0 $79 $395 Route NA Project Description 78 ADA CURB RAMPS LOCATED TROUGHOUT PECAN POINTE, BROOKLYNS WAY, TORRINGTON PLACE, RAPHAEL COURT, STONE HEDGE, IRONGATE, RACHAEL PLACE AND CARRINGTON PLACE Project Length in Miles 0.000 Urban Area MOBILE Sponsor MOBILE COUNTY LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100072735 TAPMB TA21 (935) CONSTRUCTION SIDEWALK 2022 $200 $0 $50 $250 TOTAL COST: $200 $0 $50 $250 Route NA Project Description 80 ADA COMPLIANT CURB RAMPS LOCATED TROUGHOUT CHESTERFIELD PLACE, BROWNING PLACE, SUMMERLAKE, HUNTER'S PARK, WOODBERRYFOREST, AUGUSTA PLACE, CHARLANDA ESTATES, BRADSHIRE AND BRADBURY UNIT ONE Project Length in Miles 0.000 Urban Area MOBILE Sponsor MOBILE COUNTY LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100072733 TAPMB TA21 (934) CONSTRUCTION SIDEWALK 2022 $200 $0 $50 $250 TOTAL COST: $200 $0 $50 $250 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 9 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Original COUNTY HIGHWAY PROJECTS - MOBILE Route NA Project Description CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES 13, 16, 17, 42, 163, I-10 SERVICE ROAD AND I-65 SERVICE ROAD IN MOBILE Project Length in Miles 0.000 Urban Area MOBILE Sponsor MOBILE COUNTY COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100060121 PE 2013 100060122 STPAA NR13 (910) CONSTRUCTION SIDEWALK 2022 $667 $167 $0 $833 TOTAL COST: $667 $167 $0 $833 Route NA Project Description RESURFACING, 2' SAFETY WIDENING, AND STEEL BLOCKOUT REPLACEMENT ON I-65 SERVICE FROM SR-16 (US-90) TO SR-17 (US-45) Project Length in Miles 6.598 Urban Area MOBILE Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100071917 STPAA MR22 (900) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE 2022 $4,140 $1,035 $0 $5,175 LEVEL 2 TOTAL COST: $4,140 $1,035 $0 $5,175 Route SR-13 Project Description BRIDGE REPLACEMENT (BIN 005712 AND BIN 005856) ON SR-13 (US-43) OVER COLD CREEK Project Length in Miles 0.100 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100068528 CN 2025 100068526 BR 0013 (614) PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2020 $404 $101 $0 $505 TOTAL COST: $404 $101 $0 $505 Route SR-13 Project Description RESURFACING ON SR-13 (US-43) FROM SR-158 TO PLATEAU AVENUE Project Length in Miles 4.501 Urban Area MOBILE Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100069458 NH 0013 (621) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE 2022 $2,106 $526 $0 $2,632 LEVEL 2 TOTAL COST: $2,106 $526 $0 $2,632 Route SR-13 Project Description RESURFACING ON SR-13 (US-43) FROM JARVIS ROAD TO SHORT STREET Project Length in Miles 0.840 Urban Area MOBILE Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100073277 NH 0013 (623) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE 2022 $534 $133 $0 $667 LEVEL 2 TOTAL COST: $534 $133 $0 $667 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 10 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Original COUNTY HIGHWAY PROJECTS - MOBILE Route SR-158X Project Description SR-158 EXTENSION LOTT ROAD AND JUG HANDLE. GRADE, DRAIN, BASE, PAVE AND BRIDGE (EB SEABURY CREEK TRIBUTARY AND PARTIAL LOTT ROAD) Project Length in Miles 3.863 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100043116 PE 2003 / 100042207 RW 2006 / 100067136 UT 2018 / 100060152 CN 2018 / 100060155 CN 2024 / 100060482 CN 2024 / 100060483 CN 2026 / 100060484 CN 2026 100068084 NHF 0158 (505) UTILITIES GRADE, DRAIN, BASE, PAVE AND 2020 $275 $69 $0 $344 100060154 NHF 0158 (505) CONSTRUCTION GRADE, DRAIN,BRG BASE, PAVE AND 2020 $15,542 $3,885 $0 $19,427 BRG TOTAL COST: $15,817 $3,954 $0 $19,771 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 11 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Original COUNTY HIGHWAY PROJECTS - MOBILE Route SR-16 Project Description CORRIDOR STUDY ON SR-16 (US-90) FROM 1.20 MILES SOUTH OF HAMILTON BLVD TO .66 MILES NORTH OF SR-193. Project Length in Miles 4.500 Urban Area MOBILE Sponsor ALDOT LVOE Safety COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100071607 HSIP 0016 (530) SPECIAL CORRIDOR STUDY 2021 $52 $6 $0 $58 TOTAL COST: $52 $6 $0 $58 Route SR-16 Project Description BRIDGE REPLACEMENT (BIN 003691) ON SR-16 (US-90) OVER HALLS MILL CREEK Project Length in Miles 1.400 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100068522 CN 2026 100068521 BR 0016 (531) PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2021 $734 $184 $0 $918 100068523 BR 0016 (531) UTILITIES BRIDGE REPLACEMENT 2026 $21 $5 $0 $27 TOTAL COST: $756 $189 $0 $945 Route SR-16 Project Description REPLACE BRIDGE, BIN 008714, SR-16 (US-90) WESTBOUND OVER TENSAW-. (SUFF=49.7, STATUS=SD) Project Length in Miles 0.653 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100064691 PE 2017 100049566 BRF 0016 (522) CONSTRUCTION BRIDGE REPLACEMENT 2022 $28,698 $7,175 $0 $35,873 TOTAL COST: $28,698 $7,175 $0 $35,873 Route SR-16 Project Description RESURFACING AND STEEL BLOCKOUT REPLACEMENT ON SR-16 (US-90) FROM LAWRENCE STREET TO WATER STREET AND TELEGRAPH ROAD Project Length in Miles 0.780 Urban Area MOBILE Sponsor ALDOT LVOE Safety COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100071128 NH-HSIP 0016 (529) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE 2021 $449 $112 $0 $561 LEVEL 2 TOTAL COST: $449 $112 $0 $561 Route SR-16 Project Description RESURFACING AND STEEL BLOCKOUT REPLACEMENT ON SR-16 (US-90) FROM 0.34 MI. EAST OF COCHRANE BRIDGE TO 0.36 MI. WEST OF TENSAW RIVER BRIDGE Project Length in Miles 2.935 Urban Area MOBILE Sponsor ALDOT LVOE Safety COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100068298 NH-HSIP 0016 (527) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE 2021 $1,451 $362 $0 $1,813 LEVEL 2 TOTAL COST: $1,451 $362 $0 $1,813 Route SR-163 Project Description BRIDGE REPLACEMENT ON SR-163 OVER PERCH CREEK BIN 011865 FROM MP 3.931 TO MP 3.983 Project Length in Miles 0.052 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100067045 PE 2019 100067047 BR 0163 (505) CONSTRUCTION BRIDGE REPLACEMENT 2020 $3,660 $2,000 $3,000 $8,660 TOTAL COST: $3,660 $2,000 $3,000 $8,660 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 12 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Original COUNTY HIGHWAY PROJECTS - MOBILE Route SR-17 Project Description ADDING TURN LANES AND OTHER SAFETY IMPROVEMENTS ON SR-17/SR-57 (US-45) FROM I-65 (MP 4.5) TO THE MISSISSIPPI STATE LINE Project Length in Miles 109.620 Urban Area MOBILE Sponsor ALDOT LVOE Safety COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100073895 CN 2023 100073814 HSIP 0017 (585) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2021 $180 $20 $0 $200 100073895 HSIP 0017 () CONSTRUCTION SAFETY IMPROVEMENTS 2023 $1,377 $153 $0 $1,530 TOTAL COST: $1,557 $173 $0 $1,730 Route SR-17 Project Description BRIDGE REPLACEMENT ON SR-17 (US-45) OVER BENNETT CREEK (BIN 003218) AND BRIDGE CULVERT REMOVAL (BIN 000624) Project Length in Miles 0.040 Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100063583 PE 2018 100002812 BR 0017 (574) RIGHT OF WAY BRIDGE REPLACEMENT 2021 $72 $18 $0 $90 100002811 BR 0017 (574) CONSTRUCTION BRIDGE REPLACEMENT 2021 $4,241 $1,060 $0 $5,301 TOTAL COST: $4,313 $1,078 $0 $5,391 Route SR-17 Project Description RESURFACING ON SR-17 (US-45) FROM SPRINGHILL AVE. TO I-65 Project Length in Miles 4.340 Urban Area MOBILE Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100070125 RP-NH 0017 (582) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE 2022 $1,412 $353 $0 $1,764 LEVEL 2 TOTAL COST: $1,412 $353 $0 $1,764 Route SR-17 Project Description CENTERLINE SCORING ON SR-17/SR-57 (US-45) FROM SR-158 TO THE MISSISSIPPI STATE LINE Project Length in Miles 49.319 Urban Area MOBILE Sponsor ALDOT LVOE Safety COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100073813 CN 2021 100073813 HSIP 0017 (586) CONSTRUCTION SAFETY IMPROVEMENTS 2021 $495 $55 $0 $550 TOTAL COST: $495 $55 $0 $550 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 13 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Original COUNTY HIGHWAY PROJECTS - MOBILE Route SR-188 Project Description RESURFACING ON SR-188 FROM LAKELAND DRIVE TO THE IRVINGTON BAYOU LA BATRE HIGHWAY Project Length in Miles 3.980 Urban Area MOBILE Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100067957 STPAA 0188 (505) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE 2021 $696 $174 $0 $870 LEVEL 2 TOTAL COST: $696 $174 $0 $870 Route SR-188 Project Description RESURFACING ON SR-188 FROM FRANKLIN ROAD TO LAKELAND DRIVE Project Length in Miles 4.240 Urban Area MOBILE Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100070541 STPAA 0188 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE 2020 $717 $179 $0 $897 LEVEL 2 TOTAL COST: $717 $179 $0 $897 Route SR-193 Project Description RESURFACING ON SR-193 FROM SR-163 TO HIGGINS ROAD Project Length in Miles 3.278 Urban Area MOBILE Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100068297 NH 0193 (506) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE 2020 $1,747 $437 $0 $2,184 LEVEL 2 TOTAL COST: $1,747 $437 $0 $2,184 Route SR-213 Project Description RESURFACING ON SR-213 (SHELTON BEACH ROAD) FROM SR-158 TO SR-13(US-43) Project Length in Miles 2.490 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100067959 STPAA 0213 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE 2019 $664 $166 $0 $830 LEVEL 2 TOTAL COST: $664 $166 $0 $830 Route SR-217 Project Description REPLACE BRIDGE, BIN 004471, SR-217 OVER BIG CREEK. (SUFF=50.6, STATUS=FO) Project Length in Miles 0.222 Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100049583 PE 2010 / 100058253 RW 2014 100049586 BR 0217 (501) UTILITIES BRIDGE REPLACEMENT 2022 $29 $7 $0 $37 100049584 BR 0217 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $884 $221 $0 $1,105 TOTAL COST: $913 $228 $0 $1,142 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 14 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Original COUNTY HIGHWAY PROJECTS - MOBILE Route SR-42 Project Description TRAFFIC SIGNAL/ITS UPGRADES ON SR-42 (US-98, GOVERNMENT ST) FROM BROAD ST TO WATER ST, CANAL ST FROM I-10 TO BROAD ST, BROAD ST FROM CANAL ST TO GOVERNMENT ST AND WASHINGTON AVE FROM GOVERNMENT ST TO SPRINGHILL AVE IN THE CITY OF MOBILE Project Length in Miles 1.460 Urban Area MOBILE Sponsor CITY OF MOBILE COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100066702 PE 2019 100066703 STPMB-HSIP 0016 (525) CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $1,037 $120 $114 $1,271 TOTAL COST: $1,037 $120 $114 $1,271 Route SR-42 Project Description INSTALLATION OF NEW GENERATOR TO REPLACE EXISTING GENERATOR FOR BANKHEAD TUNNEL Project Length in Miles 0.840 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100069442 NH 0042 (538) CONSTRUCTION INTELLIGENT TECHNOLOGY 2020 $1,030 $257 $0 $1,287 SYSTEMS TOTAL COST: $1,030 $257 $0 $1,287 Route SR-42R Project Description EXTEND WESTBOUND BRIDGE ON SR-42 (US-98) OVER BIG CREEK BIN # 018684 Project Length in Miles 0.010 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100004326 PE 2000 / 100052808 PE 2011 / 100052809 PE 2009 / 100040580 RW 2003 / 100040569 UT 2006 / 100040581 CN 2006 / 100066805 CN 2017 100060481 NHF 0042 () CONSTRUCTION BRIDGE 2023 $4,765 $1,191 $0 $5,956 TOTAL COST: $4,765 $1,191 $0 $5,956 Route SR-42R Project Description CONSTRUCT BRIDGE ON GLENWOOD ROAD OVER SR-42 (US-98) GRADE, DRAIN, BASE AND PAVE, BRIDGE AND RETAINING WALLS Project Length in Miles 0.010 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100066916 RW 2018 100052812 NH 0042 (517) CONSTRUCTION BRIDGE 2022 $9,231 $2,308 $0 $11,539 TOTAL COST: $9,231 $2,308 $0 $11,539 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 15 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Amendment # 1 COUNTY HIGHWAY PROJECTS - MOBILE Route SR-42R Project Description CONSTRUCT NEW BRIDGE ON (CR-63) WILMER-GEORGETOWN ROAD OVER FUTURE SR-42 (US-98) WITH INTERCHANGE ONTO THE FUTURE SR-42 (US-98) Project Length in Miles 0.010 Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100068081 PE 2018 / 100066917 RW 2018 100060480 NHF 0042 (535) CONSTRUCTION BRIDGE 2021 $7,930 $1,982 $0 $9,912 TOTAL COST: $7,930 $1,982 $0 $9,912 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 16 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Amendment # 3 COUNTY HIGHWAY PROJECTS - MOBILE Route SR-158 Project Description ADDITIONAL LANES ON SR-158 FROM MP 7.75 TO SPARTAN DRIVE Project Length in Miles 0.485 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100071115 ATRP2-49-2020-442 () CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $0 $1,825 $1,870 $3,695 TOTAL COST: $0 $1,825 $1,870 $3,695 Route SR-188 Project Description INTERSECTION IMPROVEMENTS, INCLUDING ADDING ROUNDABOUT AT SR-188 AND IRVINGTON BAYOU LA BATRE HIGHWAY Project Length in Miles 0.188 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100071087 ATRP2-49-2020-049-RW RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $0 $85 $0 $85 100071086 ATRP2-049-2020-049-CN() CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $0 $1,028 $0 $1,028 () TOTAL COST: $0 $1,113 $0 $1,113 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 17 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Amendment # 7 COUNTY HIGHWAY PROJECTS - MOBILE Route SR-42R Project Description CONSTRUCT NEW BRIDGE ON (CR-63) WILMER-GEORGETOWN ROAD OVER FUTURE SR-42 (US-98) WITH JUGHANDLE INTERCHANGE ONTO THE FUTURE SR-42 (US-98) Project Length in Miles 0.010 Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100068081 PE 2018 / 100066917 RW 2018 100071693 NHF 0042 (535) UTILITIES BRIDGE 2021 $213 $53 $0 $266 TOTAL COST: $213 $53 $0 $266 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 18 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Amendment # 10 COUNTY HIGHWAY PROJECTS - MOBILE Route CR-56 Project Description INTERSECTION IMPROVEMENTS - CONGESTION MANAGEMENT PROCESS - ON CR-56 (AIRPORT BOULEVARD) FROM CODY ROAD TO HILLCREST ROAD Project Length in Miles 1.200 Urban Area MOBILE Sponsor CITY OF MOBILE COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100071555 STPMB 4920 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $500 $0 $125 $625 TOTAL COST: $500 $0 $125 $625 Route CR-70 Project Description INTERSECTION IMPROVEMENTS ALONG UNIVERSITY BOULEVARD FROM OLD SHELL ROAD TO USA DRIVE AND ALONG OLD SHELL ROAD FROM MITCHELL CENTER DRIVE TO UNIVERSITY BOULEVARD Project Length in Miles 1.000 Urban Area MOBILE Sponsor CITY OF MOBILE COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100071557 STPMB 4920 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $500 $0 $125 $625 TOTAL COST: $500 $0 $125 $625 Route SR-42 Project Description CORRIDOR AND I-65 INTERCHANGE MODIFICATION STUDY ALONG SR-42 (US-98/MOFFATT ROAD) FROM WOLF RIDGE ROAD TO SPRINGHILL AVENUE Project Length in Miles 0.000 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100071558 STPMB 0042 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2023 $500 $0 $125 $625 TOTAL COST: $500 $0 $125 $625 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 19 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Amendment # 11 COUNTY HIGHWAY PROJECTS - MOBILE Route I-10 Project Description ADDITIONAL LANES ON I-10 FROM CR-39 TO CR-59 (CAROL PLANTATION RD) Project Length in Miles 4.460 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100033461 RACR-049-I10-007 () CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $0 $30,000 $0 $30,000 TOTAL COST: $0 $30,000 $0 $30,000 Route SR-42R Project Description SR-42 (US-98) EASTBOUND LANES FROM MISSISSIPPI LINE TO 0.5 MILE EAST OF GLENWOOD ROAD. BASE AND PAVE Project Length in Miles 8.654 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100052808 PE 2011 / 100060485 CN 2025 100040584 NH 0042 (509) CONSTRUCTION BASE AND PAVE 2022 $28,280 $7,070 $0 $35,350 TOTAL COST: $28,280 $7,070 $0 $35,350 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 20 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Amendment # 19 COUNTY HIGHWAY PROJECTS - MOBILE Route NA Project Description GOPHER TORTOISE MITIGATION, MONITORING, AND MAINTENANCE FOR US-98/SR-158 PROJECT SITES FY-2021 AND FY-2022 Project Length in Miles 0.000 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100044866 CN 2004 100072915 STPAA SP21 (904) SPECIAL UNCLASSIFIED 2021 $240 $60 $0 $300 TOTAL COST: $240 $60 $0 $300 Route SR-158 Project Description ADDITIONAL LANES ON SR-158 FROM MP 7.75 TO SPARTAN DRIVE Project Length in Miles 0.970 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100070795 ATRP2-049-2020-442-PE PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2020 $0 $160 $0 $160 100071652 ATRP2-49-2020-442-RW() RIGHT OF WAY ADDITIONAL ROADWAY LANES 2020 $0 $15 $0 $15 () TOTAL COST: $0 $175 $0 $175 Route SR-188 Project Description INTERSECTION IMPROVEMENTS, INCLUDING ADDING ROUNDABOUT AT SR-188 AND IRVINGTON BAYOU LA BATRE HIGHWAY Project Length in Miles 0.094 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100070772 ATRP2-49-2020-049-PE PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $0 $247 $0 $247 () TOTAL COST: $0 $247 $0 $247 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 21 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Amendment # 21 COUNTY HIGHWAY PROJECTS - MOBILE Route CR-27 Project Description ADDING TURN LANE TO CR-27 (MCCRARY ROAD) ONTO ACCESS ROAD, INCLUDING RESURFACING AND EXTENDING THE EXISTING ACCESS ROAD Project Length in Miles 0.000 Urban Area MOBILE Sponsor MOBILE COUNTY COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100073182 RALG-49-2021-528 () CONSTRUCTION UNCLASSIFIED 2022 $0 $250 $0 $250 TOTAL COST: $0 $250 $0 $250 Route NA Project Description FERRY RAMP REPAIRS Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100073521 FBD NR21 (916) PRELIMINARY ENGINEERING UNCLASSIFIED 2021 $156 $39 $0 $195 TOTAL COST: $156 $39 $0 $195 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 22 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Amendment # 24 COUNTY HIGHWAY PROJECTS - MOBILE Route I-10 Project Description I-10 MOBILE RIVER BRIDGE (EB MAIN SPAN AND HLA) FROM EXIT 24 (BROAD STREET) TO MOBILE COUNTY LINE (PHASE 1) Project Length in Miles 8.820 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100016416 PE 1998 / 100055750 PE 2011 / 100062413 PE 2025 / 100058679 RW 2012 / 100065672 RW 2016 / 100067521 RW 2018 100073594 NHDB I010 (350) PRELIMINARY ENGINEERING GRADE, DRAIN, BASE, PAVE AND 2021 $4,000 $1,000 $0 $5,000 100073596 NHDB I010 () CONSTRUCTION GRADE, DRAIN,BRG BASE, PAVE AND 2023 $0 $665,00 $0 $665,000 BRG TOTAL COST: $4,000 $666,000 $0 $670,000 0 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 23 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Amendment # 26 COUNTY HIGHWAY PROJECTS - MOBILE Route CR-NA Project Description CRRSAA-RESURFACING STATE DOCKS RD. FROM SHELL BELT RD. TO CITY OWNED PROPERTY, POWELL AVE. FROM LITTLE RIVER RD. TO SEAFOOD HOUSE RD., AND LOTTIE AVE. FROM E. ALBA ST. TO HEMLEY RD. IN THE CITY OF BAYOU LA BATRE Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF BAYOU LA BATRE COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100073956 CRSAMB 4921 (251) PRELIMINARY ENGINEERING RESURFACING 2021 $27 $0 $0 $27 100073661 CRSAMB 4921 () CONSTRUCTION RESURFACING 2022 $256 $0 $0 $256 TOTAL COST: $284 $0 $0 $284 Route CR-NA Project Description CRRSAA-RESURFACING GRAND BLVD., HILL ST., 4TH ST., HOWELL ST., AND 5TH AVE. IN THE CITY OF CHICKASAW Project Length in Miles 0.000 Urban Area MOBILE Sponsor CHICKASAW COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100073957 CRSAMB 4921 (252) PRELIMINARY ENGINEERING RESURFACING 2021 $32 $0 $0 $32 100073662 CRSAMB 4921 () CONSTRUCTION RESURFACING 2022 $294 $0 $0 $294 TOTAL COST: $327 $0 $0 $327 Route CR-NA Project Description CRRSAA-RESURFACING DEAD LAKE RD. FROM SR-13 (US-43) TO EXIT 22 OF I-65 IN THE CITY OF CREOLA Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF CREOLA COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100073958 CRSAMB 4921 (253) PRELIMINARY ENGINEERING RESURFACING 2021 $31 $0 $0 $31 100073663 CRSAMB 4921 () CONSTRUCTION RESURFACING 2022 $285 $0 $0 $285 TOTAL COST: $317 $0 $0 $317 Route CR-NA Project Description CRRSAA-RESURFACING SHORT LOTT RD., SUGARMILL RD., OAK CLIFF DR., CLANCEY DR., GATTI AVE., MEAHER AVE., GARRISON AVE., RICH AVE., MEADOW AVE. AND SOUTH ATMORE AVE. IN THE CITY OF PRICHARD Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF PRICHARD COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100073959 CRSAMB 4921 (254) PRELIMINARY ENGINEERING RESURFACING 2021 $65 $0 $0 $65 100073664 CRSAMB 4921 () CONSTRUCTION RESURFACING 2022 $610 $0 $0 $610 TOTAL COST: $675 $0 $0 $675 Route CR-NA Project Description CRRSAA-RESURFACING W. EVERETT AVE., RUSSELL ST., BECKMAN AVE., RUBEN AVE., PONCE DE LEON, CEDAR ST. AND LUCILLE ST. IN THE CITY OF SARALAND Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF SARALAND COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100073960 CRSAMB 4921 (255) PRELIMINARY ENGINEERING RESURFACING 2022 $53 $0 $0 $53 100073665 CRSAMB 4921 () CONSTRUCTION RESURFACING 2022 $518 $0 $0 $518 TOTAL COST: $571 $0 $0 $571 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 24 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Amendment # 26 COUNTY HIGHWAY PROJECTS - MOBILE Route CR-NA Project Description CRRSAA-RESURFACING OLD HWY 43 FROM BAKER RD. TO JUNIPER AVE., AND TWO INTERSECTIONS ON HARRISON AVE. AT THOMAS RD. AND AT NORTON DR. IN THE CITY OF SATSUMA Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF SATSUMA COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100073962 CRSAMB 4921 (256) PRELIMINARY ENGINEERING RESURFACING 2021 $31 $0 $0 $31 100073666 CRSAMB 4921 () CONSTRUCTION RESURFACING 2022 $293 $0 $0 $293 TOTAL COST: $324 $0 $0 $324 Route CR-NA Project Description CRRSAA-RESURFACING SEMMES COURT, SEMMES DR. NORTH, SEMMES DR. EAST, ROWELL COURT, ROWELL LANE, WHISTESTONE DR. AND GRAYSTONE DR. IN THE CITY OF SEMMES Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF SEMMES COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100073963 CRSAMB 4921 (257) PRELIMINARY ENGINEERING RESURFACING 2021 $38 $0 $0 $38 100073667 CRSAMB 4921 () CONSTRUCTION RESURFACING 2022 $356 $0 $0 $356 TOTAL COST: $394 $0 $0 $394 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 25 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Amendment # 27 COUNTY HIGHWAY PROJECTS - MOBILE Route CR-NA Project Description MCGREGOR AVENUE WIDENING FROM AIRPORT BOULEVARD TO DAUPHIN STREET AND INSTALLATION OF A ROUNDABOUT AT DAUPHIN STREET Project Length in Miles 0.490 Urban Area MOBILE Sponsor CITY OF MOBILE COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100052468 PE 2012 / 100052600 RW 2018 100052602 STPMB 7508 (600) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2022 $6,882 $0 $1,720 $8,602 TOTAL COST: $6,882 $0 $1,720 $8,602 Route I-65 Project Description BRIDGE WIDENING ON I-65 OVER SR-158 (BIN# 009268) Project Length in Miles 0.094 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100073698 BR I065 (522) PRELIMINARY ENGINEERING BRIDGE WIDENING 2021 $97 $24 $0 $121 100073692 BR I065 () CONSTRUCTION BRIDGE WIDENING 2022 $976 $244 $0 $1,220 TOTAL COST: $1,073 $268 $0 $1,341 9/23/2021 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 26 of 26 10/1/2019-9/30/2023 STIP PLAN: 2020 - Amendment # 28 COUNTY HIGHWAY PROJECTS - MOBILE Route SR-13 Project Description READY MIX CONCRETE PROJECT FOR THE SOUTHWEST REGION - MOBILE AREA; INTERSECTION IMPROVEMENTS, INCLUDING REMOVAL OF DETERIORATED ASPHALT AND RECONSTRUCT USING CONCRETE PAVEMENT AT SR-13 (US-43) AND JACKSON ROAD IN SATSUMA Project Length in Miles 0.400 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100074079 RACR-049-013-012 () CONSTRUCTION UNCLASSIFIED 2022 $0 $404 $0 $404 TOTAL COST: $0 $404 $0 $404 Route SR-17 Project Description READY MIX CONCRETE PROJECT FOR SOUTHWEST REGION - MOBILE AREA; INTERSECTION IMPROVEMENT, INCLUDING REMOVAL OF ASPHALT AND RESCONSTRUCT USING CONCRETE PAVEMENT AT SR-17 (US-45) AND WEST I-65 SERVICE ROAD Project Length in Miles 0.116 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100074080 RACR-049-017-005 () CONSTRUCTION UNCLASSIFIED 2022 $0 $758 $0 $758 TOTAL COST: $0 $758 $0 $758 Route SR-42R Project Description SR-42 (US-98) EASTBOUND LANES FROM MISSISSIPPI LINE TO 0.5 MILE EAST OF GLENWOOD ROAD. Project Length in Miles 8.645 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL / 100052808 PE 2011 / 100060485 CN 2025 100073973 NH 0042 (509) UTILITIES BASE AND PAVE 2022 $141 $35 $0 $177 TOTAL COST: $141 $35 $0 $177