9/29/2021 DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 1 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route CR-25 Project Description NEW ALIGNMENT OF CR-25 (MCFARLAND ROAD) FROM CR-28 (OLD PASCAGOULA ROAD) TO CR-358 (THREE NOTCH ROAD)

Project Length in Miles 12.000 Type of Work GRADE, DRAIN, BASE AND PAVE Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100059789 STPMB 4918 (250) RIGHT OF WAY Approved in a STIP Plan 2022 $4,800 $1,200 $6,000 100059790 STPMB 4918 (250) UTILITIES Approved in a STIP Plan 2023 $1,920 $480 $2,400 100059791 STPMB 4918 () CONSTRUCTION 2024 $10,480 $2,620 $13,100 TOTAL COST: $17,200 $4,300 $21,500 Route CR-27 Project Description ADDING TURN LANE TO CR-27 (MCCRARY ROAD) ONTO ACCESS ROAD, INCLUDING RESURFACING AND EXTENDING THE EXISTING ACCESS ROAD

Project Length in Miles 0.000 Type of Work UNCLASSIFIED Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100073182 RALG-49-2021-528 () CONSTRUCTION Approved in a STIP Plan 2022 $0 $500 $500 TOTAL COST: $0 $500 $500 Route CR-32 Project Description THREE NOTCH ROAD (CR-32) ADDITIONAL LANES FROM SCHILLINGER ROAD TO MCDONALD ROAD.

Project Length in Miles 3.000 Type of Work ADDITIONAL ROADWAY LANES Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100052462 STPMB 4919 (250) RIGHT OF WAY Approved in a STIP Plan 2022 $732 $183 $915 100052463 STPMB 4919 (250) UTILITIES 2024 $360 $90 $450 100052464 STPMB 4919 () CONSTRUCTION 2024 $3,600 $900 $4,499 TOTAL COST: $4,691 $1,173 $5,864 Route CR-39 Project Description MCDONALD ROAD (CR-39) ADDITIONAL LANES FROM NORTH OF I-10 TO OLD PASCAGOULA ROAD.

Project Length in Miles 1.000 Type of Work GRADE, DRAIN, BASE AND PAVE Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100052449 STPMB 7612 (600) UTILITIES Approved in a STIP Plan 2022 $560 $140 $700 100052450 STPMB 7612 (600) CONSTRUCTION Approved in a STIP Plan 2022 $3,840 $960 $4,800 TOTAL COST: $4,400 $1,100 $5,500 9/29/2021 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 2 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route CR-41 Project Description ADDITIONAL LANES ON CR-41 (CELESTE ROAD) FROM FOREST AVENUE TO JUST WEST OF I-65

Project Length in Miles 4.800 Type of Work ADDITIONAL ROADWAY LANES Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100069499 STPMB 4919 (251) RIGHT OF WAY Approved in a STIP Plan 2022 $1,600 $400 $2,000 100069500 STPMB 4919 (251) UTILITIES Approved in a STIP Plan 2023 $800 $200 $1,000 100069501 STPMB 4919 () CONSTRUCTION 2025 $10,909 $2,727 $13,637 TOTAL COST: $13,309 $3,327 $16,637 Route CR-56 Project Description ADDITIONAL LANES WITH REALIGNMENT ON CR-56 FROM 0.28 MILE WEST OF ELIZA JORDAN ROAD TO SNOW ROAD

Project Length in Miles 4.380 Type of Work ADDITIONAL ROADWAY LANES Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100068533 STPMB 4918 () RIGHT OF WAY Approved in a STIP Plan 2022 $1,200 $300 $1,500 100068534 STPMB 4918 () UTILITIES Approved in a STIP Plan 2023 $800 $200 $1,000 100068535 STPMB 4918 () CONSTRUCTION 2024 $7,920 $1,980 $9,900 TOTAL COST: $9,920 $2,480 $12,400 Route CR-56 Project Description INTERSECTION IMPROVEMENTS - CONGESTION MANAGEMENT PROCESS - ON CR-56 (AIRPORT BOULEVARD) FROM CODY ROAD TO HILLCREST ROAD

Project Length in Miles 1.200 Type of Work INTERSECTION IMPROVEMENTS Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100071555 STPMB 4920 () CONSTRUCTION Approved in a STIP Plan 2022 $500 $125 $625 TOTAL COST: $500 $125 $625 Route CR-656 Project Description ADDITIONAL LANES ON CR-656 (ZEIGLER BLVD) FROM CR-70 (TANNER WILLIAMS RD) TO CR-31 (SCHILLINGER RD)

Project Length in Miles 2.800 Type of Work GRADE, DRAIN, BASE AND PAVE Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100055882 STPMB 7550 (602) UTILITIES Approved in a STIP Plan 2022 $905 $226 $1,131 100055883 STPMB 7550 (602) CONSTRUCTION Approved in a STIP Plan 2022 $4,080 $1,020 $5,101 TOTAL COST: $4,985 $1,246 $6,232 9/29/2021 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 3 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route CR-70 Project Description INTERSECTION IMPROVEMENTS ALONG UNIVERSITY BOULEVARD FROM TO USA DRIVE AND ALONG OLD SHELL ROAD FROM MITCHELL CENTER DRIVE TO UNIVERSITY BOULEVARD

Project Length in Miles 1.000 Type of Work INTERSECTION IMPROVEMENTS Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100071557 STPMB 4920 () CONSTRUCTION Approved in a STIP Plan 2022 $500 $125 $625 TOTAL COST: $500 $125 $625 Route CR-NA Project Description AIRPORT BLVD FR CODY RD TO REGIONAL AIRPORT

Project Length in Miles 9.200 Type of Work ADDITIONAL ROADWAY LANES Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100004837 NH 7500 () PRELIMINARY ENGINEERING 2048 $462 $231 $694 100004838 NH 7500 () RIGHT OF WAY 2050 $155 $78 $233 100004839 NH 7500 () UTILITIES 2050 $78 $39 $116 100004836 NH 7500 () CONSTRUCTION 2052 $6,427 $3,213 $9,640 TOTAL COST: $7,122 $3,561 $10,683 Route CR-NA Project Description FLORIDA ST, GOVERNMENT BLVD TO AIRPORT BLVD (MOBILE)

Project Length in Miles 1.280 Type of Work GRADE, DRAIN, BASE AND PAVE Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100007701 STPMB 7522 () RIGHT OF WAY 2028 $256 $64 $320 100007697 STPMB 7522 () CONSTRUCTION 2029 $1,948 $487 $2,435 TOTAL COST: $2,204 $551 $2,755 Route CR-NA Project Description FLORIDA ST, AIRPORT BLVD TO SPRINGHILL AVE (MOBILE)

Project Length in Miles 2.780 Type of Work GRADE, DRAIN, BASE AND PAVE Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100007702 STPMB 7522 () RIGHT OF WAY 2028 $856 $214 $1,069 100007698 STPMB 7522 () CONSTRUCTION 2029 $1,948 $487 $2,435 TOTAL COST: $2,803 $701 $3,504 9/29/2021 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 4 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route CR-NA Project Description DAUPHIN STREET ADDITIONAL LANES FROM SAGE AVENUE TO WEST OF I-65 AT SPRINGHILL MEMORIAL HOSPITAL.

Project Length in Miles 3.300 Type of Work GRADE, DRAIN, BASE, PAVE AND BRG Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100052458 STPMB 7533 () RIGHT OF WAY Approved in a STIP Plan 2022 $216 $54 $270 100052459 STPMB 7533 () UTILITIES Approved in a STIP Plan 2023 $225 $56 $281 100052460 STPMB 7533 () CONSTRUCTION Approved in a STIP Plan 2023 $5,656 $1,414 $7,070 TOTAL COST: $6,097 $1,524 $7,621 Route CR-NA Project Description MCGREGOR AVENUE WIDENING FROM AIRPORT BOULEVARD TO DAUPHIN STREET AND INSTALLATION OF A ROUNDABOUT AT DAUPHIN STREET

Project Length in Miles 0.490 Type of Work GRADE, DRAIN, BASE AND PAVE Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100052602 STPMB 7508 (600) CONSTRUCTION Approved in a STIP Plan 2022 $6,882 $1,720 $8,602 TOTAL COST: $6,882 $1,720 $8,602 Route CR-NA Project Description SIDEWALKS ON DAUPHIN ISLAND PARKWAY BETWEEN THE I-10 INTERCHANGE AND OLD MILITARY ROAD IN MOBILE

Project Length in Miles 0.000 Type of Work SIDEWALK Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100067315 TAPAA TA17 (938) CONSTRUCTION Approved in a STIP Plan 2022 $139 $35 $173 TOTAL COST: $139 $35 $173 Route CR-NA Project Description SIDEWALKS ALONG THE SOUTH SIDE OF AIRPORT BOULEVARD BETWEEN HILLCREST ROAD AND REGENTS WAY IN MOBILE

Project Length in Miles 0.000 Type of Work SIDEWALK Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100067749 TAPMB TA18 (903) CONSTRUCTION Approved in a STIP Plan 2022 $160 $40 $200 TOTAL COST: $160 $40 $200 9/29/2021 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 5 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route CR-NA Project Description INTERSECTION IMPROVEMENTS - CONGESTION MANAGEMENT PROCESS - DAUPHIN STREET FROM SAGE AVENUE TO SPRINGHILL HOSPITAL

Project Length in Miles 0.000 Type of Work INTERSECTION IMPROVEMENTS Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100066705 STPMB 4918 () CONSTRUCTION Approved in a STIP Plan 2022 $500 $125 $625 TOTAL COST: $500 $125 $625 Route CR-NA Project Description INTERSECTION IMPROVEMENTS - CONGESTION MANAGEMENT PROCESS - AIRPORT BLVD FROM UNIVERSITY BLVD TO HILLCREST ROAD

Project Length in Miles 0.000 Type of Work INTERSECTION IMPROVEMENTS Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100066707 STPMB 4918 () CONSTRUCTION Approved in a STIP Plan 2022 $500 $125 $625 TOTAL COST: $500 $125 $625 Route CR-NA Project Description SIDEWALKS AND IMPROVEMENTS ALONG EAST STATE STREET AND EAST LEBARON AVENUE FROM NORTH 3RD STREET AND NORTH MAIN STREET

Project Length in Miles 0.000 Type of Work SIDEWALK Urban Area COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100069029 TAPNU TA19 (923) CONSTRUCTION Approved in a STIP Plan 2022 $640 $160 $800 TOTAL COST: $640 $160 $800 Route CR-NA Project Description SIDEWALKS ALONG EASTERLING STREET FROM W CLARK AVENUE TO GARRISON AVENUE, ON GARRISON AVENUE FROM EASTERLING STREET TO MAGEE STREET, AND ON MAGEE STREET FROM GARRISON AVENUE TO W CLARK AVENUE

Project Length in Miles 0.000 Type of Work SIDEWALK Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100069054 TAPMB TA19 (928) CONSTRUCTION Approved in a STIP Plan 2022 $200 $50 $250 TOTAL COST: $200 $50 $250 Route CR-NA Project Description RR XING HAZARD ELIMINATION IMPROVEMENTS FOR THE INSTALLATION OF TWO CANTILEVERS W/ BELLS, GATES AND SIGNALS ON SPRINGHILL AVENUE AT ALABAMA EXPORT RAILROAD IN MOBILE; REF # 2105HE, DOT# 304230T

Project Length in Miles 0.000 Type of Work RR CROSSING IMPROVEMENTS Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100073585 RHCH RR21 (924) CONSTRUCTION Approved in a STIP Plan 2022 $466 $52 $518 TOTAL COST: $466 $52 $518 9/29/2021 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 6 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route CR-NA Project Description RR XING HAZARD ELIMINATION IMPROVEMENTS FOR THE INSTALLATION OF BELLS, GATES AND SIGNALS, CONCRETE SURFACE PANELS, SIGNS, MARKINGS AND LEGENDS ON MAIN STREET AT ALABAMA EXPORT RAILROAD IN MOBILE; REF# 2108HE, DOT# 304233N

Project Length in Miles 0.000 Type of Work RR CROSSING IMPROVEMENTS Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100073586 RHCH RR21 (925) CONSTRUCTION Approved in a STIP Plan 2022 $180 $20 $200 TOTAL COST: $180 $20 $200 Route CR-NA Project Description CRRSAA-RESURFACING STATE DOCKS RD. FROM SHELL BELT RD. TO CITY OWNED PROPERTY, POWELL AVE. FROM LITTLE RIVER RD. TO SEAFOOD HOUSE RD., AND LOTTIE AVE. FROM E. ALBA ST. TO HEMLEY RD. IN THE CITY OF BAYOU LA BATRE Project Length in Miles 0.000 Type of Work RESURFACING Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100073661 CRSAMB 4921 () CONSTRUCTION Approved in a STIP Plan 2022 $256 $0 $256 TOTAL COST: $256 $0 $256 Route CR-NA Project Description CRRSAA-RESURFACING GRAND BLVD., HILL ST., 4TH ST., HOWELL ST., AND 5TH AVE. IN THE CITY OF CHICKASAW

Project Length in Miles 0.000 Type of Work RESURFACING Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100073662 CRSAMB 4921 () CONSTRUCTION Approved in a STIP Plan 2022 $294 $0 $294 TOTAL COST: $294 $0 $294 Route CR-NA Project Description CRRSAA-RESURFACING DEAD LAKE RD. FROM SR-13 (US-43) TO EXIT 22 OF I-65 IN THE CITY OF CREOLA

Project Length in Miles 0.000 Type of Work RESURFACING Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100073663 CRSAMB 4921 () CONSTRUCTION Approved in a STIP Plan 2022 $285 $0 $285 TOTAL COST: $285 $0 $285 9/29/2021 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 7 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route CR-NA Project Description CRRSAA-RESURFACING SHORT LOTT RD., SUGARMILL RD., OAK CLIFF DR., CLANCEY DR., GATTI AVE., MEAHER AVE., GARRISON AVE., RICH AVE., MEADOW AVE. AND SOUTH ATMORE AVE. IN THE CITY OF PRICHARD

Project Length in Miles 0.000 Type of Work RESURFACING Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100073664 CRSAMB 4921 () CONSTRUCTION Approved in a STIP Plan 2022 $610 $0 $610 TOTAL COST: $610 $0 $610 Route CR-NA Project Description CRRSAA-RESURFACING W. EVERETT AVE., RUSSELL ST., BECKMAN AVE., RUBEN AVE., PONCE DE LEON, CEDAR ST. AND LUCILLE ST. IN THE CITY OF SARALAND

Project Length in Miles 0.000 Type of Work RESURFACING Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100073665 CRSAMB 4921 () CONSTRUCTION Approved in a STIP Plan 2022 $518 $0 $518 TOTAL COST: $518 $0 $518 Route CR-NA Project Description CRRSAA-RESURFACING OLD HWY 43 FROM BAKER RD. TO JUNIPER AVE., AND TWO INTERSECTIONS ON HARRISON AVE. AT THOMAS RD. AND AT NORTON DR. IN THE CITY OF SATSUMA

Project Length in Miles 0.000 Type of Work RESURFACING Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100073666 CRSAMB 4921 () CONSTRUCTION Approved in a STIP Plan 2022 $293 $0 $293 TOTAL COST: $293 $0 $293 Route CR-NA Project Description CRRSAA-RESURFACING SEMMES COURT, SEMMES DR. NORTH, SEMMES DR. EAST, ROWELL COURT, ROWELL LANE, WHISTESTONE DR. AND GRAYSTONE DR. IN THE CITY OF SEMMES

Project Length in Miles 0.000 Type of Work RESURFACING Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100073667 CRSAMB 4921 () CONSTRUCTION Approved in a STIP Plan 2022 $356 $0 $356 TOTAL COST: $356 $0 $356 9/29/2021 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 8 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route I-10 Project Description I-10 BRIDGE AND BAYWAY FROM EXIT 24 (BROAD STREET) TO MOBILE COUNTY LINE

Project Length in Miles 4.409 Type of Work GRADE, DRAIN, BASE, PAVE AND BRG Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100062412 NHP3 I010 () CONSTRUCTION 2023 $917,396 $458,69 $1,376,09 8 5 TOTAL COST: $917,396 $458,69 $1,376,09 8 5 Route I-10 Project Description I-10 MOBILE RIVER BRIDGE (EB MAIN SPAN AND HLA) FROM EXIT 24 (BROAD STREET) TO MOBILE COUNTY LINE (PHASE 1)

Project Length in Miles 4.410 Type of Work GRADE, DRAIN, BASE, PAVE AND BRG Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100073596 NHDB I010 () CONSTRUCTION Approved in a STIP Plan 2023 $0 $1,330,0 $1,330,00 00 0 TOTAL COST: $0 $1,330,0 $1,330,00 00 0 Route I-10 Project Description I-10 INTERCHANGE MODIFICATIONS FROM TEXAS STREET (EXIT: 25A) TO WEST TUNNEL ENTRANCE .

Project Length in Miles 1.080 Type of Work INTERCHANGE Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100055753 IMP3F AL06 (900) CONSTRUCTION 2023 $27,000 $6,000 $33,000 TOTAL COST: $27,000 $6,000 $33,000 Route I-10 Project Description ADDITIONAL MEDIAN LANES, PAVED SHOULDERS,BARRIER RAIL,AND DRAINAGE AND REPLACE BRIDGE OVER FRANKLIN CREEK ON I-10 FROM MISSISSIPPI STATE LINE TO SR-188

Project Length in Miles 8.302 Type of Work ADDITIONAL ROADWAY LANES Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100040264 NH I010 () PRELIMINARY ENGINEERING 2049 $709 $354 $1,063 100040265 NH I010 () CONSTRUCTION 2051 $58,942 $29,471 $88,414 TOTAL COST: $59,651 $29,826 $89,477 9/29/2021 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 9 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route I-10 Project Description ADDITIONAL MEDIAN LANES, PAVED SHOULDERS, BARRIER RAIL, DRAINAGE AND BRIDGE WIDENING ON I-10 FROM SR-188 TO CR-39(MCDONALD ROAD)

Project Length in Miles 6.244 Type of Work ADDITIONAL ROADWAY LANES Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100040267 NH I010 () CONSTRUCTION 2045 $42,669 $21,335 $64,004 TOTAL COST: $42,669 $21,335 $64,004 Route I-10 Project Description I-10 ADD MEDIAN LANES, PAVED SHOULDERS, BARRIER RAIL AND DRAINAGE FROM SR-188 TO CR-39 (MCDONALD RD)

Project Length in Miles 6.434 Type of Work ADDITIONAL ROADWAY LANES Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100056483 NHF I010 () PRELIMINARY ENGINEERING 2025 $616 $308 $924 TOTAL COST: $616 $308 $924 Route I-10 Project Description I-10 OVERPASSATSR-188; WIDEN BRIDGE AND APPROACHES (BIN #008448) FROM CR-1293 (INTERCHANGE DR) TO FRANKLIN CREEK BRG

Project Length in Miles 0.820 Type of Work BRIDGES AND APPROACHES Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100041624 NHF I010 () PRELIMINARY ENGINEERING 2049 $384 $192 $575 100041625 NHF I010 () CONSTRUCTION 2051 $6,269 $3,134 $9,403 TOTAL COST: $6,652 $3,326 $9,978 Route I-10 Project Description RESURFACING ON I-10 FROM 1.36 MILES EAST OF SR-193 TO THE WALLACE TUNNEL

Project Length in Miles 8.283 Type of Work PREVENTATIVE MAINTENANCE LEVEL 1 Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100069062 IM I010 (349) CONSTRUCTION Approved in a STIP Plan 2022 $6,584 $1,463 $8,047 TOTAL COST: $6,584 $1,463 $8,047 9/29/2021 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 10 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route I-65 Project Description RESURFACING ON I-65 FROM 0.56 MILE NORTH OF SR-158 TO 0.41 MILE NORTH OF SR-13(US-43)

Project Length in Miles 6.337 Type of Work PREVENTATIVE MAINTENANCE LEVEL 1 Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100069061 IM I065 (512) CONSTRUCTION Approved in a STIP Plan 2022 $2,266 $504 $2,769 TOTAL COST: $2,266 $504 $2,769 Route I-65 Project Description BRIDGE PAINTING ON BRIDGES ALONG I-65. ON I-65 OVER AL GULF COAST RR (10195,10196) ON I-65/I-65 NB OFF RAMP OVER US-43 (10197,10198,10199) ON I-65 OVER 1-65 NB OFF RAMP/NORFOLK SO. RR (10200,10201) ON I-65 OVER GUNNISON CRK (10202,10203) Project Length in Miles 1.568 Type of Work BRIDGE PAINTING Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100069460 BR I065 (515) PRELIMINARY ENGINEERING Approved in a STIP Plan 2022 $82 $41 $124 100069478 BR I065 (515) CONSTRUCTION 2025 $2,360 $1,180 $3,539 TOTAL COST: $2,442 $1,221 $3,663 Route I-65 Project Description CCTV CAMERA DEPLOYMENT (TSMO) ON I-65 FROM THE WEST END OF THE DELTA BRIDGE TO THE EAST END OF DELTA BRIDGE

Project Length in Miles 16.000 Type of Work INTELLIGENT TECHNOLOGY SYSTEMS Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100071697 STPAA I065 () PRELIMINARY ENGINEERING 2024 $111 $56 $167 100071698 STPAA I065 () CONSTRUCTION 2025 $1,122 $561 $1,684 TOTAL COST: $1,234 $617 $1,850 Route I-65 Project Description BRIDGE RESTRIPING ON I-65 NORTH BOUND LANE AND SOUTH BOUND LANE (MP. 24.309 TO 30.389) AT MOBILE RIVER DELTA (BINS 012321 AND 012322)

Project Length in Miles 6.080 Type of Work TRAFFIC STRIPING Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100073448 IM I065 (523) CONSTRUCTION Approved in a STIP Plan 2022 $2,711 $602 $3,313 TOTAL COST: $2,711 $602 $3,313 9/29/2021 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 11 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route I-65 Project Description BRIDGE WIDENING ON I-65 OVER SR-158 (BIN# 009268)

Project Length in Miles 0.047 Type of Work BRIDGE WIDENING Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100073692 BR I065 () CONSTRUCTION Approved in a STIP Plan 2022 $976 $488 $1,464 TOTAL COST: $976 $488 $1,464 Route NA Project Description 80 ADA COMPLIANT CURB RAMPS LOCATED TROUGHOUT CHESTERFIELD PLACE, BROWNING PLACE, SUMMERLAKE, HUNTER'S PARK, WOODBERRYFOREST, AUGUSTA PLACE, CHARLANDA ESTATES, BRADSHIRE AND BRADBURY UNIT ONE Project Length in Miles 0.000 Type of Work SIDEWALK Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100072733 TAPMB TA21 (934) CONSTRUCTION Approved in a STIP Plan 2022 $200 $50 $250 TOTAL COST: $200 $50 $250 Route NA Project Description CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES 13, 16, 17, 42, 163, I-10 SERVICE ROAD AND I-65 SERVICE ROAD IN MOBILE

Project Length in Miles 0.000 Type of Work SIDEWALK Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100060122 STPAA NR13 (910) CONSTRUCTION Approved in a STIP Plan 2022 $667 $333 $1,000 TOTAL COST: $667 $333 $1,000 Route NA Project Description SIDEWALKS ON OLD SHELL ROAD BETWEEN DURANT STREET AND UNION AVENUE IN MOBILE

Project Length in Miles 0.000 Type of Work SIDEWALK Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100067397 TAPMB TA17 (947) CONSTRUCTION Approved in a STIP Plan 2022 $200 $50 $251 TOTAL COST: $200 $50 $251 9/29/2021 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 12 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route NA Project Description RESURFACING, 2' SAFETY WIDENING, AND STEEL BLOCKOUT REPLACEMENT ON I-65 SERVICE ROADS FROM SR-16 (US-90) TO SR-17 (US-45) Project Length in Miles 6.598 Type of Work PREVENTATIVE MAINTENANCE LEVEL 2 W/ SAFETY WIDEN Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100071917 STPAA-HSIP MR22 (900) FEDERAL MAINT CN Approved in a STIP Plan 2022 $4,681 $2,203 $6,884 TOTAL COST: $4,681 $2,203 $6,884 Route NA Project Description INDEPENDENT REVIEW OF AUSTAL'S PROPOSED ROAD IMPROVEMENTS ON DUNLAP DRIVE OVER WALLACE TUNNEL AND BANKHEAD TUNNEL

Project Length in Miles 0.000 Type of Work UNCLASSIFIED Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100072350 ST-049-000-013-PE () PRELIMINARY ENGINEERING 2022 $0 $340 $340 TOTAL COST: $0 $340 $340 Route NA Project Description SIDEWALKS ALONG WEST LEE AVENUE, WEST HAMM AVENUE, WEST BROADWAY AVENUE, NORTHWEST FOURTH STREET, SOUTHWEST SECOND STREET AND NORTHWEST FIRST STREET

Project Length in Miles 0.000 Type of Work SIDEWALK Urban Area COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100072668 TAPNU TA21 (908) CONSTRUCTION Approved in a STIP Plan 2022 $640 $160 $800 TOTAL COST: $640 $160 $800 Route NA Project Description IMPROVEMENTS TO THE TAYLOR HARPER HIKING AND BIKING TRAIL ALONG THE SOUTH SIDE OF BIENVILLE BOULEVARD

Project Length in Miles 0.000 Type of Work SIDEWALK Urban Area COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100072671 TAPNU TA21 (911) CONSTRUCTION Approved in a STIP Plan 2022 $316 $79 $395 TOTAL COST: $316 $79 $395 9/29/2021 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 13 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route NA Project Description 78 ADA CURB RAMPS LOCATED TROUGHOUT PECAN POINTE, BROOKLYNS WAY, TORRINGTON PLACE, RAPHAEL COURT, STONE HEDGE, IRONGATE, RACHAEL PLACE AND CARRINGTON PLACE

Project Length in Miles 0.000 Type of Work SIDEWALK Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100072735 TAPMB TA21 (935) CONSTRUCTION Approved in a STIP Plan 2022 $200 $50 $250 TOTAL COST: $200 $50 $250 Route NA Project Description FERRY RAMP REPAIRS

Project Length in Miles 0.000 Type of Work UNCLASSIFIED Urban Area COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100074192 FBD NR21 () CONSTRUCTION 2022 $606 $303 $909 TOTAL COST: $606 $303 $909 9/29/2021 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 14 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route SR-13 Project Description BRIDGE REPLACEMENT (BIN 005712 AND BIN 005856) ON SR-13 (US-43) OVER COLD CREEK

Project Length in Miles 0.100 Type of Work BRIDGE REPLACEMENT Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100068528 BR 0013 (614) CONSTRUCTION 2025 $4,246 $2,123 $6,369 TOTAL COST: $4,246 $2,123 $6,369 Route SR-13 Project Description RESURFACING ON SR-13 (US-43) FROM JARVIS ROAD TO SHORT STREET

Project Length in Miles 0.840 Type of Work PREVENTATIVE MAINTENANCE LEVEL 2 Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100073277 NH 0013 (623) FEDERAL MAINT CN Approved in a STIP Plan 2022 $534 $267 $800 TOTAL COST: $534 $267 $800 Route SR-13 Project Description RESURFACING ON SR-13 (US-43) FROM SR-158 TO PLATEAU AVENUE

Project Length in Miles 4.501 Type of Work PREVENTATIVE MAINTENANCE LEVEL 2 Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100069458 NH 0013 (621) FEDERAL MAINT CN Approved in a STIP Plan 2022 $2,106 $1,053 $3,158 TOTAL COST: $2,106 $1,053 $3,158 Route SR-13 Project Description READY MIX CONCRETE PROJECT FOR THE SOUTHWEST REGION - MOBILE AREA; INTERSECTION IMPROVEMENTS, INCLUDING REMOVAL OF DETERIORATED ASPHALT AND RECONSTRUCT USING CONCRETE PAVEMENT AT SR-13 (US-43) AND JACKSON ROAD IN SATSUMA

Project Length in Miles 0.400 Type of Work UNCLASSIFIED Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100074079 RACR-049-013-012 () CONSTRUCTION Approved in a STIP Plan 2022 $0 $808 $808 TOTAL COST: $0 $808 $808 9/29/2021 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 15 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route SR-158 Project Description ADDITIONAL LANES ON SR-158 0.42 MILES EAST OF I-65 TO SR-13 (US-43)

Project Length in Miles 4.040 Type of Work ADDITIONAL ROADWAY LANES Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100009308 NHF 7571 () UTILITIES Approved in a STIP Plan 2025 $60 $30 $90 100009302 NHF 7571 (602) CONSTRUCTION Approved in a STIP Plan 2025 $9,053 $4,526 $13,579 TOTAL COST: $9,113 $4,556 $13,669 Route SR-158X Project Description SR-158 EXTENSION ADDITIONAL LANES FROM LOTT ROAD (SR-217) TO CONNECT TO THE SCHILLINGER ROAD INTERSECTION. GRADE, DRAIN, BASE, PAVE, AND BRIDGE (WB SEABURY CREEK, WB OFF RAMP OVER SEABURY CREEK TRIBUTARY, AND EB OFF RAMP OVER SEABURY CREEK)

Project Length in Miles 4.590 Type of Work GRADE, DRAIN, BASE, PAVE AND BRG Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100060155 NHF 0158 (503) CONSTRUCTION 2024 $10,631 $5,315 $15,946 100060482 NHF 0158 (504) CONSTRUCTION 2024 $14,612 $7,306 $21,917 100060483 NHF 0158 (506) CONSTRUCTION 2026 $10,532 $5,266 $15,798 100060484 NHF 0158 (507) CONSTRUCTION 2026 $10,532 $5,266 $15,798 TOTAL COST: $46,306 $23,153 $69,459 Route SR-16 Project Description WIDENING SR-16(US-90) FROM RELOCATED CR-39 (MCDONALD RD) TO 4 LANE SOUTH OF THEODORE (0.24 MILE S OF CR-340 SWEDETOWN RD)

Project Length in Miles 17.032 Type of Work ADDITIONAL ROADWAY LANES Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100041555 NHF 0016 () PRELIMINARY ENGINEERING Approved in a STIP Plan 2025 $554 $277 $831 100041556 NHF 0016 () RIGHT OF WAY 2029 $2,841 $1,421 $4,262 100041557 NHF 0016 () UTILITIES 2030 $515 $258 $773 100041558 NHF 0016 () CONSTRUCTION 2031 $8,474 $4,237 $12,710 TOTAL COST: $12,385 $6,192 $18,577 9/29/2021 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 16 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route SR-16 Project Description REPLACE BRIDGE, BIN 008714, SR-16 (US-90) WESTBOUND OVER TENSAW-. (SUFF=49.7, STATUS=SD)

Project Length in Miles 0.653 Type of Work BRIDGE REPLACEMENT Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100049566 BRF 0016 (522) CONSTRUCTION Approved in a STIP Plan 2022 $28,698 $14,349 $43,047 TOTAL COST: $28,698 $14,349 $43,047 Route SR-16 Project Description BRIDGE REPLACEMENT (BIN 003691) ON SR-16 (US-90) OVER HALLS MILL CREEK

Project Length in Miles 1.400 Type of Work BRIDGE REPLACEMENT Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100068522 BR 0016 () CONSTRUCTION 2026 $7,376 $3,688 $11,064 100068523 BR 0016 (531) UTILITIES Approved in a STIP Plan 2026 $21 $11 $32 TOTAL COST: $7,398 $3,699 $11,097 Route SR-16 Project Description BICYCLE AND PEDESTRIAN SHARED USE PATHS ALONG SR-16 (US-90/ BOULEVARD) FROM I-165 TO SERVICE ROAD ON EAST SIDE OF AFRICATOWN BRIDGE.

Project Length in Miles 5.400 Type of Work SIDEWALK Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100070108 ST-049-016-011 () PRELIMINARY ENGINEERING 2023 $0 $150 $150 100070109 ST-049-016-011 () CONSTRUCTION 2024 $0 $14,000 $14,000 TOTAL COST: $0 $14,150 $14,150 Route SR-16 Project Description CAUSEWAY ACCESS MANAGEMENT AND SIGNALIZATION ON SR-16 (US-90/98) FROM WEST OF THE BANKHEAD TUNNEL TO THE US-98 BYPASS IN SPANISH FORT

Project Length in Miles 6.900 Type of Work INTERSECTION IMPROVEMENTS Urban Area EASTERN SHORE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100070136 STPAA 0016 () PRELIMINARY ENGINEERING 2024 $294 $147 $441 TOTAL COST: $294 $147 $441 9/29/2021 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 17 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route SR-16 Project Description CAUSEWAY ACCESS MANAGEMENT AND SIGNALIZATION ON SR-16 (US-90/98) FROM WEST OF THE BANKHEAD TUNNEL TO THE US-98 BYPASS IN SPANISH FORT

Project Length in Miles 6.900 Type of Work INTERSECTION IMPROVEMENTS Urban Area EASTERN SHORE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100070137 STPAA 0016 () CONSTRUCTION 2027 $2,166 $1,083 $3,249 TOTAL COST: $2,166 $1,083 $3,249 Route SR-17 Project Description RESURFACING ON SR-17 (US-45) FROM SPRINGHILL AVE. TO I-65

Project Length in Miles 4.340 Type of Work PREVENTATIVE MAINTENANCE LEVEL 2 Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100070125 RP-NH 0017 (582) FEDERAL MAINT CN Approved in a STIP Plan 2022 $1,412 $706 $2,117 TOTAL COST: $1,412 $706 $2,117 Route SR-17 Project Description ADDING TURN LANES AND OTHER SAFETY IMPROVEMENTS ON SR-17/SR-57 (US-45) FROM I-65 (MP 4.5) TO THE MISSISSIPPI STATE LINE

Project Length in Miles 54.810 Type of Work SAFETY IMPROVEMENTS Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100073895 HSIP 0017 () CONSTRUCTION Approved in a STIP Plan 2023 $1,377 $306 $1,683 TOTAL COST: $1,377 $306 $1,683 Route SR-17 Project Description READY MIX CONCRETE PROJECT FOR SOUTHWEST REGION - MOBILE AREA; INTERSECTION IMPROVEMENT, INCLUDING REMOVAL OF ASPHALT AND RESCONSTRUCT USING CONCRETE PAVEMENT AT SR-17 (US-45) AND WEST I-65 SERVICE ROAD

Project Length in Miles 0.116 Type of Work UNCLASSIFIED Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100074080 RACR-049-017-005 () CONSTRUCTION Approved in a STIP Plan 2022 $0 $1,515 $1,515 TOTAL COST: $0 $1,515 $1,515 9/29/2021 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 18 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route SR-188 Project Description INTERSECTION IMPROVEMENTS, INCLUDING ADDING ROUNDABOUT AT SR-188 AND IRVINGTON BAYOU LA BATRE HIGHWAY

Project Length in Miles 0.094 Type of Work INTERSECTION IMPROVEMENTS Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100071086 ATRP2-049-2020-049-CN CONSTRUCTION Approved in a STIP Plan 2022 $0 $2,057 $2,057 () TOTAL COST: $0 $2,057 $2,057 Route SR-193 Project Description RAIL AND ROADWAY REPAIR ON SR-193 AT CSX CROSSING # 351-476S, MP 20.5

Project Length in Miles 0.040 Type of Work RR CROSSING IMPROVEMENTS Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100074195 STPAA 0193 (507) CONSTRUCTION 2022 $431 $215 $646 TOTAL COST: $431 $215 $646 Route SR-217 Project Description REPLACE BRIDGE, BIN 004471, SR-217 OVER BIG CREEK. (SUFF=50.6, STATUS=FO)

Project Length in Miles 0.222 Type of Work BRIDGE REPLACEMENT Urban Area COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100049586 BR 0217 (501) UTILITIES Approved in a STIP Plan 2022 $29 $15 $44 100049584 BR 0217 () CONSTRUCTION Approved in a STIP Plan 2022 $884 $442 $1,326 TOTAL COST: $913 $457 $1,370 Route SR-42 Project Description CORRIDOR AND I-65 INTERCHANGE MODIFICATION STUDY ALONG SR-42 (US-98/MOFFATT ROAD) FROM WOLF RIDGE ROAD TO SPRINGHILL AVENUE

Project Length in Miles 0.000 Type of Work INTERSECTION IMPROVEMENTS Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100071558 STPMB 0042 () PRELIMINARY ENGINEERING Approved in a STIP Plan 2023 $500 $125 $625 TOTAL COST: $500 $125 $625 9/29/2021 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 19 of 19 COUNTY HIGHWAY PROJECTS - MOBILE Route SR-42R Project Description SR-42 (US-98) FROM MISSISSIPPI LINE TO 0.5 MILE EAST OF GLENWOOD ROAD.

Project Length in Miles 22.001 Type of Work BASE AND PAVE Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100073973 NH 0042 (509) UTILITIES Approved in a STIP Plan 2022 $156 $78 $234 100040584 NH 0042 (509) CONSTRUCTION Approved in a STIP Plan 2022 $30,747 $15,373 $46,120 100060485 NH 0042 () CONSTRUCTION 2025 $14,445 $7,222 $21,667 TOTAL COST: $45,347 $22,674 $68,021 Route SR-42R Project Description EXTEND WESTBOUND BRIDGE ON SR-42 (US-98) OVER BIG CREEK BIN # 018684

Project Length in Miles 0.010 Type of Work BRIDGE Urban Area MOBILE COST IN THOUSANDS Project Fiscal State- Reference Nbr FA Number Scope of Work STIP Indicator Year Federal Other TOTAL 100060481 NHF 0042 () CONSTRUCTION Approved in a STIP Plan 2023 $4,765 $2,382 $7,147 TOTAL COST: $4,765 $2,382 $7,147