Recreation 2020-21
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Matthew Poole – Publications & Projects
MATTHEW POOLE – PUBLICATIONS & PROJECTS WEBSITE: www.kynastonmcshine.org.uk PUBLICATIONS: Allography and the Baroque Agency of the Objectile, by Matthew Poole, in Beech, Amanda & Mackay, Robin (eds.), Construction Site for Possible Worlds, [Falmouth: Urbanomic Press, 2020] Marcel Duchamp’s Diagrammatics of Love, Sex and Erotics, by Matthew Poole, in Glass Bead Journal Site 2: Dark Room – Somatic Reason and Synthetic Eros, published April 2019 [Paris, France: Glass Bead, 2019] - https://www.glass-bead.org/article/marcel-duchamps-diagrammatics-of- love-sex-and-erotics/?lang=enview [last accessed: 26th Aug 2020] The AGMOAS is Now a Corporate Audit, by Terry Atkinson, edited by Matthew Poole, [Los Angeles: kynastonmcshine Press, 2017]. What is a Vector?, in Miranda-Bilbao, Jasone, Ideas Travel Faster Than Light, exhibition catalogue, curated by Jasone Miranda-Bilbao, [New Delhi, India: NIV Art Centre & India Habitat Center, 2016]. The Politics of Parametricism, Poole, Matthew & Shvartzberg, Manuel (eds.) [London: Bloomsbury Press, 2015]. Contributors: Phil Bernstein, Benjamin Bratton, Christina Cogdell, Teddy Cruz, Peggy Deamer, Andrés Jaque, Laura Kurgan, Neil Leach, Reinhold Martin, Matthew Poole, Patrik Schumacher, and Manuel Shvartzberg. Specificities of Sitedness, in Mackay, Robin, & Negarestani, Reza (eds.), Plot-Site – New Visions of Site-Specific Art, [Falmouth: Urbanomic Press, 2015]. “Parametricism” - Questions for a Case Study in Aesthetics and Politics, by Matthew Poole & Manuel Shvartzberg, in Constelaciones, la nueva revista de arquitectura, [San Pablo, Spain: EPS de la Universidad CEU San Pablo, April/May 2014] The Idiot Paradigm, in Malik, Suhail, Zolgadr, Tirdad, & Cox, Christoph, (eds.), Materialisms, Realisms, Art, [Annadale-on-Hudson: Bard CCS & Sternberg Press, 2013] Promises, Catastrophe, Derivatives, in Corris, M. -
SUBJECT: Agreement Under Section 75 of National Health Service Act
DECISION OF COUNCILLOR NIGEL ASHTON LEADER OF NORTH SOMERSET COUNCIL WITH ADVICE FROM THE DIRECTOR OF PEOPLE AND COMMUNITIES DECISION NO: 86 - 2013/2014 SUBJECT: Agreement under section 75 of National Health Service Act 2006 between North Somerset Council and Avon Wiltshire Mental Health Partnership Trust to deliver social care within an integrated service 1. BACKGROUND 1.1 For well over ten years, Avon Wiltshire Mental Health Partnership Trust (AWP) has been managing North Somerset Council social care staff who have been deployed into an integrated mental health and social care service. Although this is an established service, there has never been a clear defined basis on which the council or AWP were operating. This meant that it was difficult for the council to hold AWP to account for delivery of social care or to be included transparently within AWP service developments. The service has been maintained purely through managing the working relationships between both organizations. 1.2 The council has 31.3 fte staff within the integrated service and in addition has 0.4 of a services manager and 1 JM3 to provide professional social care oversight, quality assurance, support and guidance to AWP to ensure adherence to council’s processes, ethos and procedures, including the focus on People and Communities strategic direction. There are also 1.6 Managers who lead the council’s Approved Mental Health Professional service. 1.3 AWP, as commissioned by North Somerset Clinical Commissioning Group (CCG), undertook a redesign three years ago and this was follow up by a further restructure on the appointment of a new chief executive in November 2012. -
Bridgwater and Taunton Canal- Maunsel Lock to Creech St Michael
Bridgwater and Taunton Canal- Maunsel Lock to Creech St Michael (and return) Easy to Moderate Trail Please be aware that the grading of this trail was set according to normal water levels and conditions. Weather and water level/conditions can change the nature of trail within a short space of time so please ensure you check both of these before heading out. Distance: 8 miles Approximate Time: 2-3 Hours The time has been estimated based on you travelling 3 – 5mph (a leisurely pace using a recreational type of boat). Type of Trail: Out and Back Waterways Travelled: Bridgewater and Taunton Canal Type of Water: Rural Canal Portages and Locks: 2 Nearest Town: Bridgewater/ Taunton Start and Finish: Maunsel Lock TA7 0DH O.S. Sheets: OS Map 182 Weston-Super-Mare OS Map Cutting in Bridgewater 193 Taunton and Lyme Regis Route Summary Licence Information: A licence is required to paddle Canoe along one of England’s best kept secrets. The on this waterway. See full details in useful information Bridgwater and Taunton Canal opened in 1827 and links below. the River Tone to the River Parrett. It is a well-kept secret Local Facilities: At the start and part way down the but a well-managed one! Local people, have set up a canal volunteer wardens scheme to look after their canal and their success can be shown in its beauty and peacefulness. This canal might be cut off from the rest of the system, but it has well-maintained towpaths and fascinating lock structures which make for idyllic walking and peaceful boating. -
Vice-Chancellor's Awards 2015
TEAM AWARDS 1. Virtual Open Day Team This award recognises Doug Poole and Sara Mailis as the creators of the University’s virtual open day. A dynamic and interactive application that supports the global growth of the University and plays a key role in our student recruitment campaigns. It allows prospective students from all over the world a chance to explore our campuses and experience what life at Southampton would be like for them, regardless of their location, time zone, or device. This is truly ground-breaking work that is having a demonstrably positive impact on the student recruitment journey both for UK and international students. Apart from creativity and excellence of delivery both Doug and Sara have had to work collaboratively with external providers and many colleagues and students across the whole University community to achieve their goal. This team and their work show that a small project, well-executed, can provide an outcome that has a global influence that benefits the whole University, not just their own area. 1 24 July 2015 2. Public Engagement with Research Unit This team award recognises that Steve and Jo have driven and coordinated the University’s public engagement in research (PER) activity since 2011. They organised and delivered the annual Bringing Research to Life roadshow programme encouraging and supporting researchers to take their science to festivals of all types: from Cheltenham to Glastonbury, Bestival to the Winchester Science Festival, the Big Bang to the University’s Science and Engineering day. The primary initiative and drive, the creativity and infectious enthusiasm, came from them. -
Rivers Parrett and Tone Dredge – Bank Profile Restoration Environmental Statement Addendum Non-Technical Summary July 2014
Rivers Parrett and Tone Dredge – Bank Profile Restoration Environmental Statement Addendum Non-Technical Summary July 2014 Rivers Parrett and Tone Dredge – Bank Profile Restoration ES Addendum v We are the Environment Agency. We protect and improve the environment and make it a better place for people and wildlife. We operate at the place where environmental change has its greatest impact on people’s lives. We reduce the risks to people and properties from flooding; make sure there is enough water for people and wildlife; protect and improve air, land and water quality and apply the environmental standards within which industry can operate. Acting to reduce climate change and helping people and wildlife adapt to its consequences are at the heart of all that we do. We cannot do this alone. We work closely with a wide range of partners including government, business, local authorities, other agencies, civil society groups and the communities we serve. Published by: Environment Agency Horizon house, Deanery Road Bristol BS1 5AH Email: enquiries@environment- agency.gov.uk www.gov.uk/environment-agency Further copies of this report are available from our publications catalogue: © Environment Agency 2013 http://publications.environment- agency.gov.uk or our National Customer All rights reserved. This document may be Contact Centre: T: 03708 506506 reproduced with prior permission of Email: enquiries@environment- the Environment Agency. agency.gov.uk. Rivers Parrett and Tone Dredge: - Bank Profile Restoration Non-Technical Summary Addendum 1 Non-Technical Summary Introduction This Non-Technical Summary (NTS) describes the findings of an Environmental Impact Assessment (EIA) into the likely significant effects of the dredging of a section of the Rivers Parrett and Tone, including the construction of three stockpiles to store dredged material for up to a year and bank profile restoration. -
Former Gasworks, Pitwines, Poole, Dorset
77 Former Gasworks, Pitwines, Poole, Dorset Archaeological Monitoring for Crest Nicholson Residential (South) Ltd by Andrew Mundin Thames Valley Archaeological Services Ltd Site Code PPD 03/45 June 2003 Summary Site name: Former Gasworks, Pitwines, Poole, Dorset Grid reference: SZ 018 905 Site activity: Archaeological Monitoring Date and duration of project: 10th - 18th June 2003 Project manager: Steve Ford Site supervisors: Andrew Mundin and Richard Oram Site code: PPD 03/45 Area of site: c. 4.36ha Summary of results: No archaeological finds or deposits were recorded. Archaeologically relevant levels were deeply buried by made ground/ Monuments identified: None Location and reference of archive: The archive is currently held by Thames Valley Archaeological Services Ltd, 47-49 De Beauvoir Road, Reading, Berkshire, RG1 5NR and will be deposited with Waterfront Museum, Poole in due course. This report may be copied for bona fide research or planning purposes without the explicit permission of the copyright holder Report edited/checked by: Steve Ford 2.07.03 Steve Preston 02.07.03 i Former Gasworks, Pitwines, Poole, Dorset Archaeological Monitoring by Andrew Mundin Report 03/45b Introduction This report documents the results of archaeological monitoring carried out at the site of the former gasworks, Pitwines, Poole, Dorset (SZ 018 905) (Fig. 1). The work was commissioned by Mr Malcolm Kirk, Technical Manager, for Crest Nicholson Residential (South) Ltd, Nicholson House, 41 Thames Street, Weybridge, Surrey, KT13 8JG. Planning permission is to be sought from Poole District Council for the construction of new housing on the site. A desk-based assessment (Hodgkinson and Emmett 2002) highlighted the history and the possibility of archaeological remains on the site. -
Review of Our Performance So Far
Draft: Final. APPENDIX 6: South Gloucestershire Council Climate Emergency Declaration Review of Year One of the Climate Emergency Action Plan South Gloucestershire Council Climate Emergency University Advisory Group UWE Bristol October 2020 1 Draft: Final. Index Section Page Executive Summary 3 Introduction and Context 8 South Gloucestershire’s Climate Emergency Process 10 South Gloucestershire’s Baseline 13 South Gloucestershire’s Climate Emergency Year 1 15 Action Plan Gaps in the Content of the Year 1 Plan 19 Year on Year Reduction in Emissions Required to 20 Meet the Target Areas of Focus for the Year 2 Plan 22 Recommendations for Improving Partnership Work 24 and Increasing Area Wide Engagement on the Climate Emergency Strategic Context (Political, Environmental, Social, 29 Technical, Legal, Economic) analysis Comparison of South Gloucestershire’s Climate Action 30 with that of North Somerset, Oxford, Plymouth and Wiltshire. Fit of South Gloucestershire’s Actions with the 42 National Policy Direction Summary, Conclusions and Recommendations 46 Appendix 1. 50 Setting Climate Commitments for South Gloucestershire. Quantifying the implications of the United Nations Paris Agreement for South Gloucestershire. Tyndall Centre Method Appendix 2. Oxford City Council Climate Emergency 52 Appendix 3. Wiltshire Climate Emergency 58 Appendix 4. North Somerset Climate Emergency 60 Appendix 5. Plymouth City Council Climate 62 Emergency Appendix 6. Global Warming of 1.5°C IPCC Special 64 Report. Summary Report for Policymakers Appendix 7 A Note on Terms 64 Note: All web sites accessed in September and October 2020 2 Draft: Final. Executive Summary South Gloucestershire Council asked UWE’ University Advisory Group to review Year One of the Climate Emergency Action Plan. -
Auction Results 2017
Auction Results 2017 March, Sherborne 37 The Street White Roses 16 Foxcroft Guide Result 16 Foxcroft Drive, Wimborne £295,000 £325,000 69 St James Street, Shaftesbury £175,000 £185,000 Denby, Stalbridge £175,000-£200,000 £211,000 White Roses, Leweston £500,000 £560,000 Flat 2 12 Purbeck Road, Bournemouth £78,000 Not Sold 3a Old Milton Green Parade, New Milton £110,000 £120,000 1 Mount Pleasant, Kilmington Withdrawn Building Plot, Weyview Crescent, Weymouth Sold Prior to Auction Coopers Farmhouse, Marston Magna Sold Prior to Auction Nethway, Weymouth £250,000-£275,000 £356,000 84 Church Road, Three Legged Cross £275,000 Not Sold 37 The Street, Motcombe £150,000 £322,000 March, Axminster Bowditch Farm Tindle House Fourways Guide Result Bowditch Farm Lodge, Membury – 0.47 acres £180,000-£200,000 £310,000 1 Livingstone Villas, Chard £180,000-£200,000 £212,000 Tindle House, Axminster £150,000 £155,000 Lot A Southfields Farm, Wootton Fitzpaine – 5.36 acres £50,000 £60,000 Lot B Southfields Farm, Wootton Fitzpaine – 9.14 acres £80,000 £80,000 Lot C Southfields Farm, Wootton Fitzpaine – 10.21 acres £95,000 £166,000 Lot D Southfields Farm, Wootton Fitzpaine – 23 acres £180,000 £194,000 © Symonds & Sampson LLP │ 2 April, Sherborne Uplands Angel Farm Etheridge Barn Guide Result Muchelney Caravan and Camping Site £200,000-£250,000 Sold after Auction Lot A Land at Muchelney £100,000 Not Sold Lot B Land at Muchelney £80,000 £68,000 Angel Farm, Stour Provost £375,000-£395,000 £390,000 Uplands, Gaunts Common £310,000 £506,000 8 Lyons Walk, Shaftesbury -
Renewable Energy Resource for Exmoor Interim Report
CLIMATE ACTION WEST Renewable Energy Resource For Exmoor Interim Report CAW 11/5/2008 For Forum 21 Please note that this report is a working document in support of the overall Exmoor Carbon Neutral Strategy. The figures presented here were based on an initial assessment. Since first draft, peer review was sought and the figures were revised during the drafting of the strategy document. Comments have been kept in the document in the form of footnotes so that future assessments can use this as a basis for further and more accurate work. Contents 1 Introduction to the Project .........................................................................................................5 1.1 Scope ............................................................................................................................................. 5 1.2 Methodology ................................................................................................................................. 5 1.3 Outputs .......................................................................................................................................... 6 1.4 format of this report ...................................................................................................................... 6 2 Summary of the Renewable Energy Resource Assessment for Exmoor National Park ....................7 2.1 Energy Profile of Exmoor National park ........................................................................................ 7 2.2 CO2 Profile attributable to energy -
Catchment Partnerships in Operation
Catchment Partnerships in Operation 100 80 53 81 89 25 90 17 74 26 67 33 71 39 16 99 28 99 56 95 2 3 20 30 37 18 42 42 85 29 79 79 15 43 91 96 21 83 38 50 61 69 51 51 59 92 62 6 73 97 45 55 75 7 88 24 98 8 82 60 10 84 12 9 57 87 77 35 66 66 78 40 5 32 78 49 35 14 34 49 41 70 94 44 27 76 58 63 1 48 23 4 13 22 19 46 72 31 47 64 93 Legend Category No group yet established 0 20 40 80 Kilometres GSurobu cpa/gtcrhomupesn wt orking at sub catchment scale WGrhooulpe wcaotrckhinmge antt whole catchment scale © Crown Copyright and database right 2013. Ordnance Survey licence number 100024198. Map produced October 2013 © Copyright Environment Agency and database right 2013. Key to Management Catchment ID Catchment Sub/whole Joint ID Management Catchment partnership catchment Sub catchment name RBD Category Host Organisation (s) 1 Adur & Ouse Yes Whole South East England Yes Ouse and Adur Rivers Trust, Environment Agency 2 Aire and Calder Yes Whole Humber England No The Aire Rivers Trust 3 Alt/Crossens Yes Whole North West England No Healthy Waterways Trust 4 Arun & Western Streams Yes Whole South East England No Arun and Rother Rivers Trust 5 Bristol Avon & North Somerset Streams Yes Whole Severn England Yes Avon Wildlife Trust, Avon Frome Partnership 6 Broadland Rivers Yes Whole Anglian England No Norfolk Rivers Trust 7 Cam and Ely Ouse (including South Level) Yes Whole Anglian England Yes The Rivers Trust, Anglian Water Berkshire, Buckinghamshire and Oxfordshire Wildlife 8 Cherwell Yes Whole Thames England No Trust 9 Colne Yes Whole Thames England -
Halarose Borough Council
Electoral Registration Officer Election of Parish Councillors For the Area of Ashcott Parish RESULT OF UNCONTESTED ELECTION I, the undersigned, being the returning officer, do hereby certify that at the election of Parish Councillors for the above mentioned Parish, the following persons stood validly nominated at the latest time for delivery of notices of withdrawal of candidature, namely 4pm on Wednesday, 3rd April 2019 and have been duly elected Parish Councillors for the said Parish without contest. NAME OF PERSONS ELECTED HOME ADDRESS Bagg, Ian Cecil 23 High View Drive, Ashcott, TA7 9QY Howe, Adrian Malcolm 24 Ridgeway, Ashcott, Nr Bridgwater, TA7 9PP Lawrence, Jennifer Florence 7 High View Drive, Ashcott, Bridgwater, Somerset, TA7 9QY Linham, Robert Martin 5 High Street, Ashcott, Bridgwater, Somerset, TA7 9PL Smith, Emma Anne Millslade Farm, 2 Station Road, Ashcott, Bridgwater, TA7 9QP Dated: Thursday, 04 April 2019 Allison Griffin Returning Officer Electoral Registration Officer Bridgwater House King Square BRIDGWATER SOMERSET TA6 3AR Published and printed by Allison Griffin, Returning Officer, Electoral Registration Officer, Bridgwater House, King Square, BRIDGWATER, SOMERSET, TA6 3AR Electoral Registration Officer Election of Parish Councillors For the Area of Axbridge Parish RESULT OF UNCONTESTED ELECTION I, the undersigned, being the returning officer, do hereby certify that at the election of Parish Councillors for the above mentioned Parish, the following persons stood validly nominated at the latest time for delivery of notices -
South West River Basin District Flood Risk Management Plan 2015 to 2021 Habitats Regulation Assessment
South West river basin district Flood Risk Management Plan 2015 to 2021 Habitats Regulation Assessment March 2016 Executive summary The Flood Risk Management Plan (FRMP) for the South West River Basin District (RBD) provides an overview of the range of flood risks from different sources across the 9 catchments of the RBD. The RBD catchments are defined in the River Basin Management Plan (RBMP) and based on the natural configuration of bodies of water (rivers, estuaries, lakes etc.). The FRMP provides a range of objectives and programmes of measures identified to address risks from all flood sources. These are drawn from the many risk management authority plans already in place but also include a range of further strategic developments for the FRMP ‘cycle’ period of 2015 to 2021. The total numbers of measures for the South West RBD FRMP are reported under the following types of flood management action: Types of flood management measures % of RBD measures Prevention – e.g. land use policy, relocating people at risk etc. 21 % Protection – e.g. various forms of asset or property-based protection 54% Preparedness – e.g. awareness raising, forecasting and warnings 21% Recovery and review – e.g. the ‘after care’ from flood events 1% Other – any actions not able to be categorised yet 3% The purpose of the HRA is to report on the likely effects of the FRMP on the network of sites that are internationally designated for nature conservation (European sites), and the HRA has been carried out at the level of detail of the plan. Many measures do not have any expected physical effects on the ground, and have been screened out of consideration including most of the measures under the categories of Prevention, Preparedness, Recovery and Review.