APPENDIX A CONSULTATION RECORD MEETING REPORT Date: July 14, 2014 Project: O-Train Extension EA Date of meeting: June 26, 2014 Project Number: 3414015-000 Location: Honeywell Room, Author: E. Sangster Ottawa City Hall Purpose: Transit Design and Operations Workshop Attendees: Initial E-Mail Steven Boyle, City of Ottawa SB
[email protected] Alex Carr, City of Ottawa AC
[email protected] Vivi Chi, City of Ottawa VC
[email protected] Dennis Gratton, City of Ottawa DG
[email protected] Frank McKinney, City of Ottawa FM
[email protected] Kornel Mucsi, City of Ottawa KM
[email protected] Pat Scrimgeour, City of Ottawa PSC
[email protected] Colin Simpson, City of Ottawa CS
[email protected] Derek Washnuk, City of Ottawa DW
[email protected] Yvon Larochelle, OMCIAA YL
[email protected] Alex Stecky-Efantis, OMCIAA AS
[email protected] Paul Croft, Parsons Corporation PC
[email protected] David Hopper, Parsons Corporation DH
[email protected] Scott Bowers, MMM Group SB
[email protected] Tim Dickinson, MMM Group TD
[email protected] Paul Nimigon, MMM Group PN
[email protected] Emily Sangster, MMM Group ES
[email protected] Peter Steacy, MMM Group PST
[email protected] DISTRIBUTION: All Attendees Item Details Action By 1. Introductions CS and PST provided an introduction to the study team, objectives, process and rationale. 2. Operational Considerations DH provided an overview of the existing OC Transpo network, which the O-Train extension will support. Transit network planning principles to be considered as part of this study include coverage, capacity, reliability, and legibility.