B21FH0113S.Pdf BID DATA SHEET ITB Clause 1.1 The Procuring Entity is DPWH–CATANDUANES DEO, SAN ISIDRO VILLAGE, VIRAC, CATANDUANES The scope of Works under this Contract is PHASE 1 – CONSTRUCTION OF 3-STOREY BUILDING - GROUND FLOOR (FULLY FURNISHED) – SECOND FLOOR HALF FURNISHED (MAYOR’S OFFICE) The Contract Name is 21FH0113 - BUILDINGS AND OTHER STRUCTURES- MULTIPURPOSE/FACILITIES-RENOVATION/IMPROVEMENT OF PANGANIBAN MUNICIPAL HALL, PANGANIBAN, CATANDUANES The Procurement/Contract ID is 21FH0113 2 The Approved Budget for the Contract is P 29,492,387.12 for 240 C.D. Any bid with a financial component exceeding this amount and exceeding every sub-total of projects in a cluster shall not be accepted. In the event that the contractor offered a discount, said discount will be computed based on their bid amount. The Funding Source is the Government of the Philippines through CY 2021 GAA The Name of the Project is 21FH0113 - BUILDINGS AND OTHER STRUCTURES- MULTIPURPOSE/FACILITIES-RENOVATION/IMPROVEMENT OF PANGANIBAN MUNICIPAL HALL, PANGANIBAN, CATANDUANES 5 - 8.1 N/A 8.3 N/A 9.1 The date and time of the Pre-Bid Conference is on APRIL 7, 2021; 10:00 A.M. @ BAC OFFICE, DPWH-CATANDUANES DEO, SAN ISIDRO VILLAGE, VIRAC, CATANDUANES 9.4 N/A 11.1 The Procuring Entity’s address is: DPWH-CATANDUANES DEO, SAN ISIDRO VILLAGE, VIRAC, CATANDUANES JOEL B. TURADO – BAC CHAIRPERSON 14.2.a (2) (a) In cases of recently expired Mayor’s/Business Permits, it shall be accepted together with the official receipt as proof that the bidder has applied for renewal within the period prescribed by the concerned local government unit, provided that the renewed permit shall be submitted as a post qualification requirement in accordance with Section 34.2 of the IRR 14.2.a (4) (b) The minimum work experience requirements for the Key Personnel are the following: Minimum Years of Minimum Years of Key Personnel Similar Experience Similar and Related (Same Position) Experience Project Manager 3 3 Project Engineer 2 2 Materials Engineer 2 2 Construction Foreman 2 2 Construction Safety & Health Personnel 14.2a (4) c 1.) The minimum major equipment requirements are the following: Construction Equipment Required Minimum Capacity/Unit No. of Units One Bagger Concrete Mixer 1 Concrete Vibrator 1 Backhoe 1 0.80 cu.m. Portalift 1 2.) Laboratory Equipment Required No. of Units Minimum Capacity/Unit Strictly comply the requirements prescribed under DO#9 series of 2012 dated February 27, 2012 and DO#58 series of 2012 dated August 12, 2012. Also to include the requirements prescribed under DO#11 series of 2017 dated January 1 24, 2017 – Inclusion of the Minimum Materials Testing Equipment in the Technical Component of the Bid. 14.3a No further instructions 14.3b N/A 17.1 Bids will be valid until one hundred twenty (120) days from the date set for bid opening 18.2 The Bid Security shall be valid until one hundred twenty (120) days from the date set for bid opening 19.1 N/A 20.4 The Bidder shall submit one (1) original and one (1) copy of the first (Technical) and second (Financial) components of its bid. 21.4d The specific identification of this bidding process is 21FH0113 - BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES- RENOVATION/IMPROVEMENT OF PANGANIBAN MUNICIPAL HALL, PANGANIBAN, CATANDUANES 22 The address for receipt of Bids is BAC CHAIRPERSON, DPWH-CATANDUANES DEO, SAN ISIDRO VILLAGE, VIRAC, CATANDUANES The deadline for receipt of Bids is until 10:00 A.M. OF APRIL 22, 2021 25 N/A 26.1 The place of opening of Bids is at BAC OFFICE, DPWH-CATANDUANES DEO, SAN ISIDRO VILLAGE, VIRAC, CATANDUANES The date and time of opening of Bids is on APRIL 22, 2021 @ 10:00 A.M. 28 N/A 33 N/A 2 Contract ID: 21FH0113 Contract Name: BUILDINGS & OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-RENOVATION/IMPROVEMENT OF PANGANIBAN MUNICIPAL HALL, PANGANIBAN, CATANDUANES Location of the Contract: PANGANIBAN,CATANDUANES BILL OF QUANTITIES page 1 of 2 ITEM NO. DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT OTHER GENERAL REQUIREMENTS B.5 PROJECT BILLBOARD piece 2.00 In Words:Pesos In Figures: Php In Figures: Pesos B.7 OCCUPATIONAL SAFETY & HEALTH PROGRAM month 8.00 In Words:Pesos In Figures: Php In Figures: Pesos PART III PART A - EARTHWORK 801 (1) REMOVAL OF EXISTING STRUCTURES AND OBSTRUCTIONS lumpsum 1.00 In Words:Pesos In Figures: Php In Figures: Pesos 803 (1)-a STRUCTURE EXCAVATION cu.m. 702.11 In Words:Pesos In Figures: Php In Figures: Pesos 804 (1) - a EMBANKMENT cu.m. 156.00 In Words:Pesos In Figures: Php In Figures: Pesos PART B - PLAIN AND REINFORCED CONCRETE WORKS 900(1) - c1STRUCTURAL CONCRETE cu.m. 801.95 In Words:Pesos In Figures: Php In Figures: Pesos REINFORCING STEEL (Deformed) 902 (1) -a1 kgs. 107,231.91 In Words:Pesos In Figures: Php In Figures: Pesos 903 (1)FORMS AND FALSEWORKS lumpsum 1.00 In Words:Pesos In Figures: Php In Figures: Pesos #REF! 1046 (2) - a2PLUMBING WORKS lumpsum 1.00 In Words:Pesos In Figures: Php In Figures: Pesos 1009(1) a WINDOWS lumpsum 65.80 In Words:Pesos In Figures: Php In Figures: Pesos 1010(2) bDOORS sq.m. 88.16 In Words:Pesos In Figures: Php In Figures: Pesos 1018 (1) GLAZED TILES AND TRIMS sq.m. 141.20 In Words:Pesos In Figures: Php In Figures: Pesos 1018 (2) UNGLAZED TILES sq.m. 334.95 In Words:Pesos In Figures: Php In Figures: Pesos 1027 (1) CEMENT PLASTER FINISH sq.m. 1,824.80 In Words:Pesos In Figures: Php In Figures: Pesos 1032 (1)a PAINTING WORKS sq.m. 1,958.32 In Words:Pesos In Figures: Php In Figures: Pesos 1046 (2) - a2CHB Non-Load Bearing (Including Reinforcing Steel) sq.m. 872.05 In Words:Pesos In Figures: Php In Figures: Pesos SUB - TOTAL - - - - - - - - - - - - - - - In Words:Pesos In Figures: Php Submitted by: DATE: Name of Bidder's Representative Position Name of the Bidder Contract ID: 21FH0113 Contract Name: BUILDINGS & OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-RENOVATION/IMPROVEMENT OF PANGANIBAN MUNICIPAL HALL, PANGANIBAN, CATANDUANES Location of the Contract: PANGANIBAN,CATANDUANES BILL OF QUANTITIES page 2 of 2 PART D- ELECTRICAL 1100 (10)Conduits, Boxes & Fittings (Conduit Works/ConduitRough-in) Lump Sum 1.00 In Words:Pesos In Figures: Php In Figures: Pesos 1101 (33) Wires and Wiring Devices Lump Sum 1.00 In Words:Pesos In Figures: Php In Figures: Pesos 1102 (1) Panelboard with Main & Branch Breakers Lump Sum 1.00 In Words:Pesos In Figures: Php In Figures: Pesos 1103 (1)Lighting Fixtures and Lamps Lump Sum 1.00 In Words:Pesos In Figures: Php In Figures: Pesos 1109(1)Grounding System Lump Sum 1.00 In Words:Pesos In Figures: Php In Figures: Pesos 1200(14) Ventilation Lump Sum 1.00 In Words:Pesos In Figures: Php In Figures: Pesos Pad Mounted Distrbution Transformer (OISC) with Complete 1102 (8) Lump Sum 1.00 In Words:Pesos In Figures: Php Accessories, single or three phase, Free Standing In Figures: Pesos 1102 (12)Current Transformer Lump Sum 1.00 In Words:Pesos In Figures: Php In Figures: Pesos 1111 (5)Manhole Lump Sum 1.00 In Words:Pesos In Figures: Php In Figures: Pesos SUB - TOTAL - - - - - - - - - - - - - - - In Words:Pesos In Figures: Php Submitted by: : DATE: Name of Bidder's Representative : : Position : Name of the Bidder Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CATANDUANES DISTRICT ENGINEERING OFFICE Virac, Catanduanes FY 2021 (CONSTRUCTION PLAN) BUILDNGS & OTHER STRUCTURES- MULTI - PURPOSE/FACILITIES- RENOVATION/IMPROVEMENT OFPANGANIBAN MUNICIPAL HALL, PANGANIBAN, CATANDUANES SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: NESTOR T. ROJAS NOLAND CLARO B. GUERRERO GIL AUGUSTUS A. BALMADRID ACTING CHIEF,PLANNING & DESIGN SECTION OIC-ASST. DISTRICT ENGINEER OIC-DISTRICT ENGINEER PRELIMINARY DESIGN ENGINEERING PREPARED AND APPROVED BY DISTRICT ENGINEERING OFFICE P E R S P E C T I V E PREPARED FROM THE OFFICE OF THE: PROJECT TITLE/LOCATION SHEET CONTENT: PREPARED BY: REVIEWED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO. (CONSTRUCTION PLAN) BUILDNGS & OTHER STRUCTURES- RHUIZ M. GO ENG'G ASST. Republic of the Philippines MULTI - PURPOSE/FACILITIES- PERSPECTIVE A CHECKED BY: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS RENOVATION/IMPROVEMENT 1 1 CATANDUANES DISTRICT 22 OF PANGANIBAN MUNICIPAL HALL, ROSANA T. CAMACHO NESTOR T. ROJAS NOLAND CLARO B. GUERRERO GIL AUGUSTUS A. BALMADRID 16 ENGINEERING OFFICE ABRAHAM T.PEÑA Virac, Catanduanes PANGANIBAN, CATANDUANES ARCHITECT II ENGINEER II ACTING CHIEF,PLANNING & DESIGN SECTION OIC-ASST. DISTRICT ENGINEER OIC-DISTRICT ENGINEER PRELIMINARY DESIGN ENGINEERING PREPARED AND APPROVED BY DISTRICT ENGINEERING OFFICE HINIPAAN PANAY IS. BACAK SUCHAN SUMMARY OF QUANTITIES SALVACION BABAGUAN (PANUTO) SAN RAFAEL HINIPAGAN QUANTITY BAGATABAO ITEM NO. DESCRIPTION UNIT REMARKS BAYHAN This Site PANAY AS PROG. BAGAMANOC MACULIW PANCAYANAN CAGDARAO PART II (QUEZON) TAOPON TIBO PART B - OTHER GENERAL REQUIREMENTS (BAYHAN) ALINAWAN BURABOD BAGONG BAYAN SAN ANTONIO SUMININSIM B.3 PERMITS AND CLEARANCES L.S. 1.0 BATOHONAN MABINI TAMBONGON B.5 PROJECT BILLBOARD PC. 2.0 BEGONIA CANPILI PANGANIBAN QUIRINO SAN MIGUEL CABATANGAN BUENAVISTA CANLABO B.7 OCCUPATIONAL SAFETY & HEALTH PROGRAM MNTH. 3.0 HINIPAGAN MAGSAYSAY OGBONG PART III-CIVIL, MECHANICAL, ELECTRICAL & SANITARY/PLUMBING WORKS ANANONG CABUYOAN PART A - EARTHWORK STA. ROSA MABINI SAN ROQUE VIGA (ABNI) 803(1) REMOVAL OF EXISTING STUCTURES AND OBST. L.S. 1.0 CAROTAN DEL PILAR QUEZON 803(1)-a STRUCTURE EXCAVATION CU.M. 702.11 SAN JOSE VICINITY MAP 804(1)-a EMBANKMENT CU.M. 156 PART B - PLAIN & REINFORCED CONCRETE WORKS 900(1)-c1 STRUCTURAL CONCRETE CU.M. 801.95 902(1)-a1 REINFORCING STEEL BAR (Deformed) KGS. 107,231.91 903(1) FORMS & FALSEWORKS LUMPSUM 1.0 PART D- ELECTRICAL PART C - FINISHING AND OTHER CIVIL WORKS CONDUITS, BOXES & FITTINGS 1100(10) LUMPSUM 1.0 (Conduit Works/Conduit/Rough-in) 1002(27) PLUMBING WORKS LUMPSUM 1.0 1101(33) WIRES AND WIRING DEVICES LUMPSUM 1.0 1009(1)a WINDOWS SQ.M.
Recommended publications
  • Actual Census Pop. 2015 2017 2018 2019 2020 2021 REGION V
    Total Population by Province, City, Municipality and Barangay: Actual Census Pop. 2015 2017 2018 2019 2020 2021 REGION V - BICOL REGION 5,796,989 6,266,652 6,387,680 6,511,148 6,637,047 6,766,622 ALBAY 1,314,826 1,404,477 1,428,207 1,452,261 1,476,639 1,501,348 0.033530 0.027955 0.025166 0.023484 0.022356 BACACAY 68,906 73,604 74,848 76,109 77,386 78,681 Baclayon 2,703 2,887 2,936 2,986 3,036 3,086 Banao 1,491 1,593 1,620 1,647 1,674 1,703 Bariw 625 668 679 690 702 714 Basud 1,746 1,865 1,897 1,929 1,961 1,994 Bayandong 1,650 1,763 1,792 1,822 1,853 1,884 Bonga (Upper) 7,649 8,171 8,309 8,449 8,590 8,734 Buang 1,337 1,428 1,452 1,477 1,502 1,527 Cabasan 2,028 2,166 2,203 2,240 2,278 2,316 Cagbulacao 862 921 936 952 968 984 Cagraray 703 751 764 776 790 803 Cajogutan 1,130 1,207 1,227 1,248 1,269 1,290 Cawayan 1,247 1,332 1,355 1,377 1,400 1,424 Damacan 431 460 468 476 484 492 Gubat Ilawod 1,080 1,154 1,173 1,193 1,213 1,233 Gubat Iraya 1,159 1,238 1,259 1,280 1,302 1,323 Hindi 3,800 4,059 4,128 4,197 4,268 4,339 Igang 2,332 2,491 2,533 2,576 2,619 2,663 Langaton 765 817 831 845 859 874 Manaet 836 893 908 923 939 955 Mapulang Daga 453 484 492 500 509 517 Mataas 518 553 563 572 582 591 Misibis 1,007 1,076 1,094 1,112 1,131 1,150 Nahapunan 402 429 437 444 451 459 Namanday 1,482 1,583 1,610 1,637 1,664 1,692 Namantao 778 831 845 859 874 888 Napao 1,883 2,011 2,045 2,080 2,115 2,150 Panarayon 1,848 1,974 2,007 2,041 2,075 2,110 Pigcobohan 817 873 887 902 918 933 Pili Ilawod 1,522 1,626 1,653 1,681 1,709 1,738 Pili Iraya 997 1,065 1,083 1,101
    [Show full text]
  • 2015Suspension 2008Registere
    LIST OF SEC REGISTERED CORPORATIONS FY 2008 WHICH FAILED TO SUBMIT FS AND GIS FOR PERIOD 2009 TO 2013 Date SEC Number Company Name Registered 1 CN200808877 "CASTLESPRING ELDERLY & SENIOR CITIZEN ASSOCIATION (CESCA)," INC. 06/11/2008 2 CS200719335 "GO" GENERICS SUPERDRUG INC. 01/30/2008 3 CS200802980 "JUST US" INDUSTRIAL & CONSTRUCTION SERVICES INC. 02/28/2008 4 CN200812088 "KABAGANG" NI DOC LOUIE CHUA INC. 08/05/2008 5 CN200803880 #1-PROBINSYANG MAUNLAD SANDIGAN NG BAYAN (#1-PRO-MASA NG 03/12/2008 6 CN200831927 (CEAG) CARCAR EMERGENCY ASSISTANCE GROUP RESCUE UNIT, INC. 12/10/2008 CN200830435 (D'EXTRA TOURS) DO EXCEL XENOS TEAM RIDERS ASSOCIATION AND TRACK 11/11/2008 7 OVER UNITED ROADS OR SEAS INC. 8 CN200804630 (MAZBDA) MARAGONDONZAPOTE BUS DRIVERS ASSN. INC. 03/28/2008 9 CN200813013 *CASTULE URBAN POOR ASSOCIATION INC. 08/28/2008 10 CS200830445 1 MORE ENTERTAINMENT INC. 11/12/2008 11 CN200811216 1 TULONG AT AGAPAY SA KABATAAN INC. 07/17/2008 12 CN200815933 1004 SHALOM METHODIST CHURCH, INC. 10/10/2008 13 CS200804199 1129 GOLDEN BRIDGE INTL INC. 03/19/2008 14 CS200809641 12-STAR REALTY DEVELOPMENT CORP. 06/24/2008 15 CS200828395 138 YE SEN FA INC. 07/07/2008 16 CN200801915 13TH CLUB OF ANTIPOLO INC. 02/11/2008 17 CS200818390 1415 GROUP, INC. 11/25/2008 18 CN200805092 15 LUCKY STARS OFW ASSOCIATION INC. 04/04/2008 19 CS200807505 153 METALS & MINING CORP. 05/19/2008 20 CS200828236 168 CREDIT CORPORATION 06/05/2008 21 CS200812630 168 MEGASAVE TRADING CORP. 08/14/2008 22 CS200819056 168 TAXI CORP.
    [Show full text]
  • Philippine-Abaca-Industry-Roadmap
    EXECUTIVE SUMMARY This roadmap sets the direction for the Philippine abaca industry. It encompasses industry analyses, benchmarking and supply/value chain. This roadmap identified the potential areas intended for planting and treatment of diseases which are the two most important factors in abaca fiber production. A broad range of private and public sector groups contributed to the production of this document which sets forth new policy, capacity and capability priorities for the Philippine abaca industry. Coordination and analysis of the inputs, organization of the workshops, and preparation of this document were carried out by PhilFIDA. Stakeholders’ meetings and workshops were hosted and facilitated by PhilFIDA Regional Offices. Where are we now? Abaca, internationally known as Manila hemp, is endemic to the Philippines. The Philippines dominates the global abaca trade as the country supplies about 87.5 percent of the world’s abaca fiber requirements and Ecuador and Costa Rica the remaining 12.5 percent as of 2016. In 2016, abaca was planted on 180,302 hectares (ha) with production reaching 72,000 metric tons (MT). The abaca farm structure is classified as a small farm which is owned and managed by individual farmers. It has an average area of 1.6 hectare for every farmer. There are only few farms established and managed by cooperatives or associations with areas ranging from 10 to 100 hectares. Almost one third of the abaca areas can be found in Region V or the Bicol Region with 52,493 hectares. The land area is comparable to combined abaca areas of Regions XIII, XI, XII and VI.
    [Show full text]
  • Solid Waste Management Sector Project (Financed by ADB's Technical Assistance Special Fund [TASF- Other Sources])
    Technical Assistance Consultant’s Report Project Number: 45146 December 2014 Republic of the Philippines: Solid Waste Management Sector Project (Financed by ADB's Technical Assistance Special Fund [TASF- other sources]) Prepared by SEURECA and PHILKOEI International, Inc., in association with Lahmeyer IDP Consult For the Department of Environment and Natural Resources and Asian Development Bank This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. All the views expressed herein may not be incorporated into the proposed project’s design. THE PHILIPPINES DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ASIAN DEVELOPMENT BANK SOLID WASTE MANAGEMENT SECTOR PROJECT TA-8115 PHI Final Report December 2014 In association with THE PHILIPPINES THE PHILIPPINES DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ASIAN DEVELOPMENT BANK SOLID WASTE MANAGEMENT SECTOR PROJECT TA-8115 PHHI SR10a Del Carmen SR12: Poverty and Social SRs to RRP from 1 to 9 SPAR Dimensions & Resettlement and IP Frameworks SR1: SR10b Janiuay SPA External Assistance to PART I: Poverty, Social Philippines Development and Gender SR2: Summary of SR10c La Trinidad PART II: Involuntary Resettlement Description of Subprojects SPAR and IPs SR3: Project Implementation SR10d Malay/ Boracay SR13 Institutional Development Final and Management Structure SPAR and Private Sector Participation Report SR4: Implementation R11a Del Carmen IEE SR14 Workshops and Field Reports Schedule and REA SR5: Capacity Development SR11b Janiuay IEEE and Plan REA SR6: Financial Management SR11c La Trinidad IEE Assessment and REAE SR7: Procurement Capacity SR11d Malay/ Boracay PAM Assessment IEE and REA SR8: Consultation and Participation Plan RRP SR9: Poverty and Social Dimensions December 2014 In association with THE PHILIPPINES EXECUTIVE SUMMARY ....................................................................................5 A.
    [Show full text]
  • Citizen's Charter
    PORT MANAGEMENT OFFICE BICOL CCIITTIIZZEENN’’SS CCHHAARRTTEERR PMO BICOL, April 2017 Page 1 TABLE OF CONTENTS PAGE I PPA - PMO BICOL CITIZEN’S CHAPTER 1 II Background Information about the Philippine Ports Authority (PPA) 2 Vision, Mission, Mandate, Corporate Values, Objectives and Functions 3-6 III PPA Pledge of Performance 7 IV PPA Wide Telephone Directory 8 V Scope /Coverage and Definition of Terms 9-10 VI General Information About the PMO Bicol Ports Port Profiles, Geographical Locations, Port Facilities (Vertical and Horizontal) 11-21 VII PMO Bicol Redress and Feedback Mechanism with Directory for Complaints 22-23 VIII List of Frontline Services of PMO Bicol Ports 24-25 IX Documentary Requirements and Step by Step Procedure to Obtain a Particular Service including OPR and Maximum Time to Conclude the Process 26-67 X Feedback Form (Pananaw o Puna) [in Filipino] Annex “A” Customer Feedback Form [in English] Annex “B” PMO Bicol Telephone Directory Annex “C” “Seguridad sa Puerto, i-Text mo” Annex “D” PMO BICOL, April 2017 Page 2 THE PHILIPPINE PORTS AUTHORITY ( PPA ) A. Background Information PPA was created through Presidential Decree (PD) No. 505, otherwise known as the “Philippine Port Authority Decree of 1974”, issued on July 11, 1974. Under the said PD, PPA is given general jurisdiction and control over all persons, groups and entities that are already existing or are still being proposed to be established within the different port districts throughout the country. PPA, in coordination with other government agencies, is also mandated to prepare and update annually a “Ten-Year Philippine Port Development Program” which shall embody the integrated plan for the development of the country’s ports and harbors.
    [Show full text]
  • Catanduanes Newsletter 3Rd Quarter 2019
    3rd Quarter Issue July to September 2019 CATANDUANES PSA Catanduanes celebrates PSA CATANDUANES CELEBRATES 6TH YEAR ANNIVERSARY 1 2 6th Year Anniversary PSA CATANDUANES PSO CONDUCTS JULY 2019 LFS 2018 CENSUS OF PHILIPPINE BUSINESS AND INDUSTRY 2 AGRICULTURAL SURVEYS CORNER 3-5 ADMINISTRATIVE-BASED SURVEYS 5 CIVIL REGISTRATION CORNER 6 CIVIL REGISTRATION CORNER 7 BATCH REQUEST JULY TO SEPTEMBER 2019 7 MOBILE REGISTRATION 7 COMMUNITY SOCIAL RESPONSIBILITY 7 INFORMATION DISSEMINATION 8 PARTNERSHIP AND LINKAGES 8 The Philippine Statistics Authority (PSA) Catanduanes, Provincial Statistical Office celebrated its 6th Anniversary last September 12, 2019 with the theme “Working Smarter through Innovation”. The celebration was started around 7:30 in the morning by a motorcade from the PSA Catanduanes PSO to Barangay Calabnigan, Virac, Catanduanes. After the team arrived at Barangay Calabnigan, one of the activities done was Feeding Program to 37 Day Care pupils of the said barangay held at their barangay plaza. The children were so happy as the PSA Staffs and JOWs had their intermission number This photo was taken after the gift-giving activity to senior and provided meals/foods for them. Subsequently, the team went to the next activity, citizens of Brgy. Calabnigan, Virac, Catanduanes. (with which is the Gift Giving to Senior Citizens. This is one of the ways of PSA Catanduanes to PSA staffs and JOWs) show appreciation, spend time and enjoy with them. Moreover, the team gave a special gift that made them happier. Before noontime, all the staffs went to PSA Office and attended a mass and gave thanks to the Lord. Afterwards, regular employees, JOWs and Field Office Personnel (FOP) of UNISYS attended the training on CRVS 101, which aims the participants to have adequate knowledge on the standard concepts, definitions and procedures on civil registration.
    [Show full text]
  • Report on Regional Economic Developments
    REPORT ON REGIONAL ECONOMIC DEVELOPMENTS IN THE PHILIPPINES 2018 Department of Economic Research Contents Foreword ii Introduction iii BSP Regional Offices and Branches v Philippines: Regional Composition vi Key Regional Developments 1 Real Sector: Gross Regional Domestic Product (GRDP) 1 Box Article: Research Notes on Gross Regional Domestic Product (GRDP), 2009-2018 4 Agriculture, Livestock, Poultry and Fishery 10 Construction 17 Labor and Employment 20 Fiscal Sector: Receipts and Expenditures of Local Government Units (LGUs) 21 Monetary Sector: Inflation 21 External Sector: Approved Foreign Investments 23 Financial Sector: Banking and Microfinance 26 Opportunities and Challenges 30 Conclusion 70 Statistical Annexes i Foreword In June 2005, the Monetary Board approved the release of the maiden issue of the BSP’s Report on Regional Economic Developments in the Philippines. The report widens the scope of the BSP’s market surveillance, adding a geographic dimension to the economic indicators that it monitors regularly. The analysis of regional trends and developments are valuable inputs in monetary policy formulation and financial supervision. The report tracks economic developments in the regions, focusing on demand and supply conditions, monetary and price developments as well as the emerging economic outlook. It helps confirm the results of the business and consumer expectations surveys conducted by the BSP. Moreover, identifying opportunities and challenges faced by the different regions enhances further the BSP’s forward-looking and proactive approach to monetary policy. Regional performance is gauged using developments in output, prices, and employment. Selected key indicators in each of the major sectors of the economy are the focus of the surveillance.
    [Show full text]
  • Music, Dance, and Negotiations of Identity in the Religious Festivals of Bicol, Philippines
    Music, Dance, and Negotiations of Identity in the Religious Festivals of Bicol, Philippines by Marilyne Antonette Adiova A dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy (Music: Musicology) in the University of Michigan 2014 Doctoral Committee: Associate Professor Christi-Anne Castro, Chair Emeritus Professor Judith O. Becker Associate Professor Charles Hiroshi Garrett Professor Rudolf Mrazek Associate Professor EJ Westlake © Marilyne Antonette Adiova 2014 To my parents, Edison and Louella Adiova, and to my sister, Lauren Adiova, for their constant love and support. ii ACKNOWLEDGEMENTS First and foremost, I offer my sincerest gratitude and respect to Christi-Anne Castro, my mentor and dissertation advisor, for her advice, insight, and continuous support in all stages of this work. I would also like to thank the other members of my committee: Charles Garrett, Rudolf Mrazek, EJ Westlake, and Judith Becker. Their suggestions, guidance, and support have enriched this dissertation. My gratitude goes to those who provided a great deal of help while I was conducting fieldwork in the Philippines, including my aunt Lemee Oliveros Caayao, my aunt Lalaine Oliveros Rosales, and their respective families, who made me feel at home while I was far from it. I thank my relatives in Naga City, who were always willing to help me find my way and showed me great kindness. I am grateful to family friends who provided transportation to various festivals, especially Etet Mangohig and Guillermo Resuena. I would also like to thank those I met during my time in the Philippines: the various festival organizers and Department of Tourism staff who informed my research; members of the Developmental Institute for Bicolano Artists; the staff of Oliveros College, Inc.; as well as the members of PREX, the Parish Renewal Experience Seminar at St.
    [Show full text]
  • Proceedings of the United States National Museum
    : A REVIEW OF THE PHILIPPINE LAND MMIMALS IN THE UNITED STATES NATIONAL MUSEUM. By N. HOLLISTER, Assistant Curator, Division of Mammals, United States National Museum. INTRODUCTION. The Philippine mammals in the United States National Museum number 1,454 specimens. This is probably by far the largest collec- tion from the archipelago in any museum. Several papers dealing more or less fully with certain groups or describing new species in the collection have been pubUshed from time to time, but no account of the collection as a whole has ever been printed. Since many unpublished island records of great interest to workers in Philippine mammalogy will be made available by the presentation of a com- plete list of this splendid collection, the following catalogue has been prepared. More than two-thirds of the specimens from the islands have been contributed by Dr. Edgar A. Mearns alone, and many others have reached the museum from various collectors solely through his efforts. A small collection of specimens, many of special interest, sent for determination by the Philippine Bureau of Science, is listed in the present report. Material from this source, mostly collected by Richard C. McGregor and A. Celestino, is credited throughout the list by the initials "P. B. S." Following is a list of the collectors and a summary of the specimens examined and Usted in the preparation of this report Dr. Edgar A. Mearns 1, 012 Philippine Bureau of Science 98 J. B. Steere./ 87 Dr. Paul Bartsch 57 Dr. Robert B. Grubbs 35 George C. Lewis 28 Dr. Carroll Fox 26 D.
    [Show full text]
  • 3. Socio-Economic Background Information
    THE FEASIBILITY STUDY ON THE DEVELOPMENT OF ROAD RO-RO TERMINAL SYSTEM FOR MOBILITY ENHANCEMENT IN THE REPUBLIC OF THE PHILIPPINES - FINAL REPORT - 3. Socio-Economic Background Information 3.1 General Information 3.1.1 Population Population is one of the main indicators used to formulate socio-economic conditions. In this section, the population trend is reviewed on the basis of currently available projections. The population of the Philippines from 1799 to 2000 is shown in Table 3-1. The annual population growth rate was over 2.3% in the 1990’s. Population growth rate fluctuated between 2% and 3% in the 20th century. The size of the population increased by ten times through the century. In 2000, the Philippine population stood at 76.5 million; there has not been a new population census since that time. Current population by regions projected by POPCOM is shown in Table 3-2. It is estimated that 84.2 million persons are living in the Philippines. In The Port Master Plan, national population in 2005 is predicted as 84,214,747, almost the same as the POPCOM projection. NCR, Region III and Region IV have large populations accounting for 38.6% of the total population in 2005. Table 3-1 Population of the Philippines from 1799 to 2000 Average annual Year Population rate of increase Source of data (in percent) 1799 1,502,574 - Fr. Buzeta 1800 1,561,251 3.91 Fr. Zuniga 1812 1,933,331 1.80 Cedulas 1819 2,106,230 1.23 Cedulas 1829 2,593,287 2.10 Church 1840 3,096,031 1.62 Local officials 1850 3,857,424 2.22 Fr.
    [Show full text]
  • The Bicol Dotoc: Performance, Postcoloniality, and Pilgrimage
    The Bicol Dotoc: Performance, Postcoloniality, and Pilgrimage Jazmin Badong Llana Department of Theatre, Film and Television Studies Aberystwyth University September 2009 This thesis is submitted in partial fulfilment of the requirements for the degree of Doctor of Philosophy at Aberystwyth University. Acknowledgements Most Filipinos know at least one proverb which they try to live their lives by and I believe it is this: ‘Ang hindi lumingon sa pinanggalingan, hindi makararating sa paroroonan’ (one who does not look back to where s/he has come from will not reach her/his desired destination). The underlying idea is the very same one present in concepts of relatedness or reciprocal relations that I discuss in this thesis. And how fitting for my purposes here, since the image is that of a journey. One must look back, however hard or painful it becomes sometimes. But the wisdom of the saying is its reversal of a particular looking back that turned the looker into stone (the story of Lot’s wife in the Bible). Here one looks back so that he/she might realize the goal of the journey (it is empowering and not petrifying!). One looks back with gratitude. It is therefore with deep gratitude that I acknowledge debts and gifts that can never be repaid by any kind of labour or good intention. I will forever cherish the many contributions to this work. I thank, first of all, my supervisors Richard Gough and Adrian Kear whose insights and critical attention to my work have shaped this thesis in entirely positive ways. I always came away from supervisory meetings energized and brimming with ideas, and comforted by their care and support.
    [Show full text]
  • Factsheet Philippines
    Philip- pines Manila © Madle Timm / German Red Cross Timm © Madle Cyclones Floods Forecast-based Financing Philippines The Philippines is located both in the Pacifi c “Ring of Fire” – an area especially prone to earthquakes – and along the Pacifi c Typhoon Belt. As a consequence, the Philippines is among the countries with the highest disaster risk worldwide. Typhoons are the country’s most frequent extreme event, resulting in 80 % of the adverse economic impact and 70 % of the casualties caused by extreme weather. The Philippines experiences an average of 20 tropical storms each year, of which 4 reach the typhoon cate- gory, resulting in the loss of lives, disruptions of livelihoods and the destruction of houses. From June to December, tropical storms lead to heavy rainfall, fl oods and landslides. Half the fl ooding in the country is caused by other weather systems, such as monsoon rain or strong cold fronts. The concept of FbF Anticipation instead of reaction: with Forecast-based Financing (FbF), the International Red Cross and Red Cres- cent Movement is reshaping the future of the humanitarian system. Based on forecast information and risk anal- ysis, FbF releases humanitarian funding for pre-agreed activities, referred to as early actions. These predefi ned measures aim to minimise the impacts of extreme weather events and save human lives. For early actions to be performed quickly and effi ciently before disaster strikes, funds are allocated automatically when a trigger is reached, based on weather and climate forecasts. This is defi ned in the Early Action Protocol (EAP). A dedicated fi nancing mechanism is key for taking fast and effective action before disaster strikes: Forecast-based Action by the DREF.
    [Show full text]