Plot Allotted for Ulwe Police Station Lying Vacant for Five Years
Total Page:16
File Type:pdf, Size:1020Kb
The Dynamic Daily Newspaper of Navi Mumbai Wednesday, 14 October 2020 www.newsband.in Pages 8 • Price 2 VOL. 14 • ISSUE 108 RNI No. MAHEN/2007/21778 POSTAL REGN. No. NMB/154/2020-22/VASHI MDG POST OFFICE New building of Plot allotted for Ulwe Belapur fire station MLA Ganesh Naik police station lying to be ready in 2021 demands permanent Pranab Jyoti Bhuyan take to complete that monsoon shed for Navi Mumbai project,” he said. buildings in NMMC’s vacant for five years he old building A senior officer from jurisdiction Pranab Jyoti Bhuyan order problems. stations are five to ten Tof the fire station the engineering depart- MLA Ganesh Naik Navi Mumbai At present, certain kilometers away from was constructed on the ment of NMMC said, in his weekly meeting he City and Devel- sectors of the node falls those sectors. same plot around two “The construction of the on Monday with the Topment Corporation under the jurisdiction of Deepa Mane, a resi- decades ago and that four-storied building at Navi Mumbai Munici- (Cidco) had allotted a had developed a lot of Belapur is now going pal (NMMC) Commis- plot for constructing a issues. The old build- on in full swing. It will sioner Abhijit Bangar police station at Ulwe ing was demolished in have all required facili- demanded that the in early 2015. That plot early, 2019 to develop ties required for the fire- temporary weather has been lying vacant as the new one. men. Close to the main sheds that are put on the police department According to the building a shed is also the buildings during has done nothing in this the monsoon season direction in the past five be regularized. years. (More on page 3) With the inaugura- tion of the Nerul-Be- Temporary lapur-Kharkopar railway augmentation of corridor, a huge number coach in special of people from across trains via KR route Mumbai and Navi Mum- Northern Rail- bai have migrated to the way in coordination Ulwe node. However, the NRI police station, dent of Ulwe said, “A with Konkan Railway that node has no inde- while some others come huge number of people have decided to aug- pendent police station to under the Nhava Sheva ment an extra Second take care of the law and police. Both these police CONTINUED ON page... 2 Sleeper Class coach on a temporary basis on Ernakulam Jn. – H. NMMC officials, the being constructed, and Nizamuddin Duranto Residents of Vashi clean work of the new build- that will accommodate Weekly Special ex. Er- ing commenced in at least six fire engines nakulam Jn. on Tues- gardens themselves March, 2019. The civic and water tanks.” day 13 October, 2020. Allege negligence by NMMC body had allocated an Presently, the The same will arrive at amount of Rs 6.73 crore NMMC has five fire Panvel Jn at 22.45 hrs By Chandrashekhar Hendve for it. stations at Vashi, Nerul, the next day (Wednes- Navi Mumbai Purushottam Jadhav, CBD Belapur, Airoli day) and Vasai Road at isgusted with the in-charge of the fire and Kopar Khairane. 00.00hrs (midnight of Dcondition of the department said, “The Last year the fire de- Thursday). Passengers gardens in sectors 15, engineering depart- partment also hired over are requested to kindly 16 and 16 A Vashi, the ment could not meet the 200 employees for fill- avail the services. residents from the node deadline (September, ing up different vacant decided to clean the 2020) due to the pan- posts. garden themselves. It demic. Now it has been is alleged that the con- extended by a couple of dition of Krantisinha months.” Nana Patil Udyan at “We also had plans Sector-15, Vashi; Sant to reconstruct the prem- Dnyaneshwar Udyan in ises of the fire station at Sector 15-16 Vashi and Airoli. However, noth- Karmaveer Bhaurao Pa- bai Municipal Corpora- garbage can be seen ly- ing has been done at til Udyan in Sector 16A, tion (NMMC) towards ing unattended and dried the site till now for the Vashi is deplorable and their maintenance. The leaves are scattered all same reason (pandem- no attention is being gardens have no proper ic). Thus, we cannot say given by the Navi Mum- walking track, piles of CONTINUED ON page... 2 how much time it will 2 Wednesday, 14 October 2020 Various organizations stage protest How to file complaint before against the Hathras incident in Airoli Lokayukta/Upa Lokayukta? Navi Mumbai public servant; t has been more than a month Grievance:- "Grievance" means Isince Sanjay Bhatia took over the a claim by a person that he sustained responsibility of Upa-Lokayukta of injustice or undue hardship in con- Maharashtra. He observed that there sequence of maladministration. The is not enough awareness among the ‘Allegations’ and ‘Grievance’ which public how to file complaints before are beyond the jurisdiction of the Lo- the Lokayukta and Upa Lokayukta kayukta/Upa-Lokayukta are given if they come across incidents of cor- in the ‘Lokayukta/Upa-Lokayukta ruption etc. To help the citizens, here Act’ which can be accessed at http:// is a short note sent by him on the lokayukta.maharashtra.gov.in procedure of how to make a com- How to File a Complaint:- plaint to Lokayukta/Upa-Lokayukta Where to file a complaint:- A By Vikram Gaikwad raped and brutally the deceased. Office. complaint can be filed against any Navi Mumbai murdered by some vil- Dalit Panther Navi Lokayukta / Upa-Lokayukta of- public servant (as defined u/s 2 (k) ctivists of various lagers, prompting out- Mumbai Mahila Agha- fice has been entrusted through a of the Maharashtra Lokayukta and Aparties and organi- rage across the country. di president Chhabutai Statute with the task of investigating Upa-Lokayuktas Act) in Maharash- zations staged protest in The incident is also be- Jadhav, Lok Janshakti all corruption related allegations and tra either by e-mail, or on Lokayukta Airoli on Friday evening ing protested in Navi Party's Swafnil Kam- grievances against the public ser- website or by post or personally :- demanding immediate Mumbai by various ble, Vanchit Bahujan vants. Thus, Lokayukta office deals i) Email Address:- Complaint can stern action against the parties and organiza- Aghadi's Vijay Padle, with the following complaints:- be sent on any of the following perpetrators of gang tions. Officials of Dalit Lok Janshakti Party's Allegations- "allegation" in rela- e-mail addresses:- lokayukta@ rape and murder of a Panther, Lok Janshakti Airoli division presi- tion to a public servant, means any maharashtra.gov.in upalokayuk- Dalit girl from Hathras Party, Vanchit Bahujan dent Deepak Awhad, affirmation that such public servant, [email protected] upalok- village in Uttar Pradesh. Aghadi, Krantisurya Lok Janshakti party's i) has abused his position as such [email protected] They also paid homage Pratishthan and other Airoli division presi- to obtain any gain or favour to ii) Online Complaint:- Online to the deceased girl. social organizations dent Renuka Sonawane himself or to any other person or complaint can be filed on the A Dalit girl from gathered on Friday to and other prominent ac- to cause undue harm or hardship following website:- http://lok- Hathras village in Ut- protest against the inci- tivists gathered at Airoli to any other person, ayukta.maharashtra.gov.in (iii) tar Pradesh was gang- dent and pay homage to Sector-10. ii) was actuated in the discharge of Postal Address for filing a com- his functions as such public ser- plaint:- Office of the Lokayukta Plot allotted FOR unable to pay minute at- Patil, deputy commis- vant by personal interest or im- and Upa-Lokayukta, New Ad- ULwE POLICE.... tention to these issues as sioner of police (head- proper or corrupt motives, or ministrative Building, 1st Floor, CONTINUED FROM page 1 their own jurisdictions quarters) was unavail- iii) is guilty of corruption, or lack or Madame Cama Road, Opposite- from this area go to are too big for them. We able for comments. integrity in his capacity as such Mantralaya, Mumbai- 400032. work at different places don’t know why the po- Another senior offi- in Mumbai and Navi lice department is taking cer from the headquar- Mumbai and come ters however, said, RESIDENTS OF VASHI.. back late in the eve- “We had sent a pro- CONTINUED FROM page 1 ning. Due to lack posal of starting a over. With the dawn, of proper police new police station the gardens plunge into patrolling, we do at Ulwe back in darkness as there are no not feel safe here. 2015. Sources from proper lightings. Anti- Even as no major DG office have in- social elements roam street crimes have formed us that the around and play cards taken place here till proposal is now in and drink alcohol in now the possibility stage- III, which these gardens. of the same cannot means allocation of Anjali Walunj, for- be ruled out. There- manpower. As soon mer corporator of sector fore, an independent so much time to develop as we receive the final 15-16, Vashi said, “The police station should be a police station here.” order from them, the condition of all these ar- constructed here to en- Despite repeated at- new police station could eas as well as the gardens sure proper patrolling tempts, Pravin Kumar be started there.” the three gardens makes den in their node them- is pathetic. As the trash both at night and during the matter worse. As the selves,” said Walunj. is not picked up on regu- the day.” lar basis, there is always gardens remain open “The issue needs to Manish Pandey, Attention READERS: While every effort is made a foul stench.