Remembering Wangi Power Station
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Project Energyconnect Review of Economic Assessment
Project EnergyConnect Review of economic assessment 31 March 2021 Project EnergyConnect Review of economic assessment Copyright and Disclaimer Copyright in this material is owned by or licensed to ElectraNet. Permission to publish, modify, commercialise, or alter this material must be sought directly from ElectraNet. Reasonable endeavours have been used to ensure that the information contained in this report is accurate at the time of writing. However, ElectraNet gives no warranty and accepts no liability for any loss or damage incurred in reliance on this information. Revision Record Date Version Description Author Checked By Approved By 31 Mar 2021 1.0 For submission to the Brad Harrison Simon Appleby Rainer Korte AER and publication Hugo Klingenberg Page 1 of 12 Project EnergyConnect Review of economic assessment Project EnergyConnect material change in circumstances assessment Executive Summary On 14 September 2020, ElectraNet submitted an updated economic cost benefit analysis for Project EnergyConnect (PEC) to the AER for approval. The AER confirmed on 28 September 2020 that: “…the AER considers that the updated cost benefit analysis provides a not unreasonable basis for ElectraNet’s opinion that PEC remains the preferred option. We expect both ElectraNet and TransGrid to submit full and complete contingent project applications for PEC as soon as possible.” On 29 September 2020, the ElectraNet Board approved submission of a contingent project application (CPA) based on the AER’s confirmation and the CPA was submitted to the AER on 30 September 2020. This note reviews several subsequently announced policies and other changes in the National Electricity Market (NEM) and considers the impact that these could have on the benefits of PEC. -
Imagine Lake Mac
IMAGINE LAKE MAC OUR PLAN TO 2050 AND BEYONDIMAGINE LAKE MAC 2050 AND BEYOND 1 CITY VISION Bringing our City Vision WE BALANCE to life, Imagine Lake Mac OUR CHERISHED helps us to look ahead ENVIRONMENTS with purpose WITH OUR NEED FOR GREAT SPACES TO Its goal is to fulfil the LIVE AND VISIT, SMART City’s potential TRANSPORT OPTIONS …To be one of the most AND A THRIVING productive, adaptable, ECONOMY; WHICH sustainable and highly ADAPT AND STRIVE TO liveable places in Australia BE FAIR FOR ALL. Acknowledgement Lake Macquarie City Council acknowledges the Awabakal People, the traditional custodians of the land over which this document was prepared. We pay respect to knowledge holders and community members of the land and acknowledge and pay respect to Elders, past, present and future. We would also like to acknowledge staff, Councillors and community members involved in preparing this strategy. 2 IMAGINE LAKE MAC 2050 AND BEYOND IMAGINE LAKE MAC 2050 AND BEYOND 3 Message from the Mayor Message from the CEO I am pleased to present Imagine Lake Lake Macquarie City is a vibrant place to Mac, a long-term strategy that will guide work, live and invest. the evolution of the City. Its natural landscape, particularly the Imagining Lake Macquarie in 2050, I lake and coastline, shape our lifestyle see a dynamic and productive city and and love of the outdoors. The nine a place that enables its community to major centres strategically spread thrive. across the City are focal points for It is a progressive city, well known for its employment, recreation, retail and innovation, investment opportunities, services. -
Commissioners of Inquiry 1
Contents Commissioners of Inquiry 1 Letter to the Minister 2 Chairperson's Statement 3 The Commissioners and Their Role 4 Management and Structure 6 Local Government Inquiries 8 Performance Review 9 Year in Review - Report of Operations 10 Environmental Planning Issues 24 Appendices 26 Operating Statement 26 The Commissioners and Senior Staff 27 Schedule of Inquiries and Hearings 30 Inquiries and Hearings Reported in 1998-99 Cooranbong Colliery Extension, Morisset 10 Wynella Homestead, Goulburn 11 Sand and Gravel Quarry, Byron 11 Blue Mountains Draft LEP 12 Perisher Range Village Master Plan 13 Underground Coal Mine, Tahmoor North 15 Cowal Gold Project, West Wyalong 16 Donaldson Coal Mine, Cessnock/Maitland 17 Mushroom Substrate Facili ty, Hawkesbury 18 Landuse Planning, Illawarra Escarpment 19 Mount Pleasant Coal Mine, Muswellbrook 20 Commissioners ofInquiry Commissioners of Inquiry for Environment and Plan y appointed under the Environmental rlanning and Assessment Act 1979 to enable Public Inquiries into a range of environmental, planning and development issues, and conservation matters under the Heritage Act 1977. The Commissioners make findings and recommendations in their written reports to the Minister which are openly available to the public under planning legislation. The publication "Commissiom ofInquiry for Environment and Planning- How They WtJrk" is available from the Office. A Public Inquiry • Undertakes environmental, planning and conservation assessment of issues prior to State government decisions. • Affords equal opportunity for all interested parties to make submissions. • Enables thorough canvassing of all relevant issues in a public forum. • Provides independent advice in a written report to the Minister. The Commissioners' Objectives • To undertake Inquiries commissioned by the Minister consistent with legislative requirements, public participation objectives and the principles of natural justice and fairness. -
Distribution Loss Factor Calculation Methodology Paper 2021-22
Distribution Loss Factor Calculation Methodology Paper March 2021 Distribution Loss Factor Calculation Methodology Paper March 2021 CONTENTS 1 INTRODUCTION .......................................................................................................................... 1 1.1 Requirements of the National Electricity Rules .................................................................. 1 1.2 Ausgrid’s general approach in deriving non-site specific DLFs ......................................... 2 1.3 Energy entering the distribution network ............................................................................ 4 1.4 Energy exiting the distribution network .............................................................................. 4 1.5 Proposed approach to loss estimation for financial year 2021-22 ..................................... 4 2 BREAKDOWN OF TECHNICAL LOSSES ................................................................................. 5 2.1 Calculation of site specific loss factors............................................................................... 5 2.2 Calculation of loss load factors .......................................................................................... 5 2.3 Sub-transmission network series losses ............................................................................ 5 2.4 Sub-transmission network shunt losses ............................................................................. 5 2.5 High voltage network series losses ................................................................................... -
Bays West Draft Place Strategy
Draft Bays West Place Strategy NSW Department of Planning, Industry and Environment March 2021 Welcome to Country The stretch of Country now known as Bays West Welcome to Country provided by Shannon Foster, has been known for millennia as Gari Gurad/ D'harawal Sydney Traditional Owner and Knowledge Nura (Saltwater Country) and Nattai Gurad/ Keeper. Artwork titled 'Guriwal Dreaming' by Shannon Nura (Freshwater Country). This Country is Foster. celebrated for vast expanses of garaban (rock Within the Bays West Place Strategy, you will and sandstone) which in some places provides encounter stories of the Bays West location gibbaragunya (stone/cave shelters), and in other specifically. These are a small selection of the places creates yiningmah (steep cliffs) where D'harawal stories of this place. They are shared by a ceremony can be performed privately without contributor to this document, D'harawal Knowledge uninitiated onlookers. Keeper Shannon Foster, whose Ancestors kept these knowledges alive, and whose Elders and Knowledge For thousands of generations, local Aboriginal Keepers still celebrate, live by and share them today. people have lived an abundant and sustainable lifestyle within a complex kinship system of The cultural Intellectual Property (IP) of all Aboriginal numerous families and clans on this Country peoples, including the cultural IP of these stories, including the D’harawal, Dharug, Eora, Gai- remains with the people they belong to and can never maragal, Gundangara and Guringai peoples, be vested or assigned. In this case the stories belong among others. We pay our respects to their to the D'harawal people of the Sydney region who Ancestors and Elders past, present and know themselves as Iyora here, and these stories emerging and acknowledge that through may not be duplicated or used without the express honouring Country, we also honour their timeless permission of Sydney D'harawal Elders or Knowledge connections to Country. -
Network Vision 2056 Is Prepared and in All Cases, Anyone Proposing to Rely on Or Use Made Available Solely for Information Purposes
Disclaimer and copyright The Network Vision 2056 is prepared and In all cases, anyone proposing to rely on or use made available solely for information purposes. the information in this document should: Nothing in this document can be or should be taken as a recommendation in respect of any 1. Independently verify and check the currency, possible investment. accuracy, completeness, reliability and suitability of that information The information in this document reflects the forecasts, proposals and opinions adopted by 2. Independently verify and check the currency, TransGrid as at 30 June 2016 other than where accuracy, completeness, reliability and suitability otherwise specifically stated. Those forecasts, of reports relied on by TransGrid in preparing this proposals and opinions may change at any document time without warning. Anyone considering this 3. Obtain independent and specific advice from document at any date should independently seek appropriate experts or other sources the latest forecasts, proposals and opinions. Accordingly, TransGrid makes no representations This document includes information obtained or warranty as to the currency, accuracy, from the Australian Energy Market Operator reliability, completeness or suitability for particular (AEMO) and other sources. That information purposes of the information in this document. has been adopted in good faith without further enquiry or verification. Persons reading or utilising this Network Vision 2056 acknowledge and accept that TransGrid This document does not purport to contain all and/or its employees, agents and consultants of the information that AEMO, a prospective shall have no liability (including liability to any investor, Registered Participant or potential person by reason of negligence or negligent participant in the National Electricity Market misstatement) for any statements, opinions, (NEM), or any other person or Interested Parties information or matter (expressed or implied) may require for making decisions. -
Melrose Park Southern Precinct Structure Plan August 2019 Prepared for City of Parramatta, August 2019
Melrose Park Southern Precinct Structure Plan August 2019 Prepared for City of Parramatta, August 2019 Prepared By Holdmark Property Group Goodman 2/2-4 Giffnock Avenue, Level 17, 60 Castlereagh Street Macquarie Park, NSW 2113 Sydney NSW 2000 P: (02) 9889 5540 P: (02) 9230 7400 www.holdmark.com.au www.goodman.com Cox Architecture City Plan Services L6, 155 Clarence Street 120 Sussex Street Sydney NSW 2000 Sydney NSW 2000 P: (02) 9267 9599 P: (02) 8270 3500 www.coxarchitecture.com.au www.cityplan.com.au MELROSE PARK SOUTHERN PRECINCT II STRUCTURE PLAN Contents VOLUME 1 Illustrative Response 27 1.0 Introduction 1 1.0 Movement Network 28 1.1 Background 2 1.1 Indicative Road Network 28 1.2 Purpose of the Southern Structure Plan 2 1.2 Indicative Cycle Network 29 1.3 Site Context 3 2.0 Built Form 30 1.4 Waterfront Renewal 4 2..1 Illustrative Plan 30 1.5 Southern Precinct Land Ownership 5 2.2 Floor Space Distribution 31 1.6 Precinct Extent 6 2.3 Waterfront Scale 32 1.8 City of Parramatta Priorities 7 2.4 Precinct Wide Built Form 33 1.9 Planning Processes 7 2.5 Street Form and Setbacks 34 2.6 Solar Access to Communal Open Space 35 2.0 Precinct Assessment 9 2.7 Built Form Orientation 36 2.1 Existing Uses 10 2.8 Overshadowing 37 2.2 Existing Controls 12 2.3 Site Conditions 13 Appendix 1 - Supporting Studies Summary 39 2.3.1 Landform 13 A1.1 Traffic 40 2.3.2 Vegetation 14 A1.2 Services 41 2.3.3 Access 15 A1.2.1 Power 41 2.3.4 Services 16 A1.2.2 Water 42 2.4 Northern Precinct Structure Plan 17 A1.2.3 Sewer 43 A1.2.4 Telecom 43 3.0 Structure Plan 19 -
21 Years of EWON Then & Now
21 years of EWON then & now Annual Report 2018-2019 About this Report This Annual Report is published in accordance with the Energy & Water Ombudsman NSW (EWON) Charter and the Benchmarks for Industry-based Customer Dispute Resolution. The Benchmarks are Accessibility, Independence, Fairness, Accountability, Efficiency and Effectiveness. About our data Overview The data in this Report is drawn from The Energy & Water Ombudsman NSW (EWON) is an industry-based complaints received by EWON during the Ombudsman scheme which provides independent, free, informal dispute 2018/2019 financial year, unless otherwise resolution services to all NSW energy and some water customers. specified. EWON’s open complaint data varies We concentrate on achieving a fair and reasonable outcome for all in accordance with complaint progression complaints and all parties – we are not a consumer advocate, nor do we and figures in this Report reflect complaint represent industry. status as at 7 July 2019. We investigate a broad spectrum of complaints including: › disputed accounts › high bills About our case studies › disconnection or restriction of supply › payment difficulties Personal information about our customers has been changed to protect their privacy. › reliability and quality of supply › connection or transfer issues › contract terms This Report is printed on › marketing practices ecoStar Forest Stewardship Council© (FSC) certified › digital meter issues 100% recycled paper, using vegetable oil based inks and › poor customer service. an alcohol-free ISO 14001 certified printing process. Our principal responsibilities as set out in the EWON Charter are to: › handle energy and water complaints independently, fairly, informally, expeditiously and free of charge to the customer › promote EWON to consumers and small business › encourage and provide advice to members on good complaint- handling practices to assist in reducing and avoiding complaints. -
Industrial Pastoral: Lake Macquarie Coal Miners' Holidays
Industrial Pastoral: Lake Macquarie Coal Miners’ Holidays1 Russell McDougall and Julian Croft As Stephen Page and Joanne Connell note in their mapping of the field, leisure studies is a largely post-war development, evolving internationally out of geography, economics, sociology and a range of other disciplines mostly in the social sciences rather than the humanities.2 Historians have not ignored the subject – there are plenty of historical studies of sports and recreation, the development of national parks, and so on. Yet, while leisure clearly has a vital and dynamic relation to work – culturally, politically, psychologically – labour historians in Australia appear to have been less interested in this area of research.3 We, the authors of this article, are primarily literary scholars rather than historians, but we have been puzzled by this apparent neglect.4 It is not our brief to examine the contemporary meanings of ‘leisure’ in relation to ‘work’ (or ‘forced labour,’ to adopt Guy Standing’s important twenty-first century distinction).5 Instead, our own study of coal miners’ holidays around Lake Macquarie from the late nineteenth and into the second half of the twentieth century considers the bygone rituals and activities of their holidaying from the vantage point of our own present location in an age where ‘simulation and nostalgia lie at the heart of everyday life.’6 Our method draws considerably on participant-observer social anthropology, though our collaboration might be considered to result from a kind of split consciousness, one of us having grown up in the society under focus while the other, a regular visitant, remained on its periphery, looking in. -
Transgrid’S 330 Kv Cable 41; • Reduced Rating of Ausgrid 132 Kv Cables; • the Uptake of Demand Management and Energy Efficiency in the Area; And
L Contingent Projects Contingent Project Powering Sydney’s Future Contingent Project Powering Sydney’s Future Contents 1.1 Background............................................................................................................. 3 1.2 Project Description .................................................................................................. 5 1.3 Trigger Event .......................................................................................................... 5 1.4 Project Requirement ............................................................................................... 5 1.5 Contingent Capital Expenditure............................................................................... 8 1.6 Demonstration of Rules Compliance ....................................................................... 9 Page 2 of 9 Contingent Project Powering Sydney’s Future Syd ey 1.1 Background ast The capability of the inner metropolitan supply network in Sydney is defined by the combined capacity of the parallel 330 kV and 132 kV networks. Theseu ga networks have been planned to operate in unison and designed to share the network load in proportion to their respective ratings. The existing G O transmission network of the Sydney inner metropolitan area is shown in Figure 1 belowa ga . O d ed Ca g o d Figure 1 Sydney Inner Metropolitan Area Transmission Network ac to Lane Cove 928, 929, 92L, 92M ) Holroyd 90V, (2) Mason 90W Park Dalley St Rozelle Strathfield 91A, 91B, 9S6, Pyrmont Chullora 91X, 91Y 9S9 90T, Haymarket Rookwood -
9/06/2021 Dr Kerry Schott AO Chair, Energy Security Board Lodged by Email: [email protected] Dear Dr Schott
ABN 70 250 995 390 180 Thomas Street, Sydney PO Box A1000 Sydney South NSW 1235 Australia T (02) 9284 3000 F (02) 9284 3456 9/06/2021 Dr Kerry Schott AO Chair, Energy Security Board Lodged by email: [email protected] Dear Dr Schott, Submission to the Energy Security Board’s post 2025 market design options paper We welcome the opportunity to respond to the Energy Security Board’s (ESB) post 2025 market design options paper. Australia is in the midst of an energy transition and the energy system is evolving at a rapid pace. TransGrid’s responsibility during this transition and beyond is to invest in, operate and manage our transmission network safely, securely and efficiently in the long-term interests of consumers. To this end, our Board has very recently made a Final Investment Decision to proceed with the construction of Project EnergyConnect (PEC), a high voltage interconnector between New South Wales and South Australia. We strongly support the work of the ESB to ensure that the National Electricity Market (NEM) design is fit for purpose and provides for a reliable and affordable supply of electricity to consumers. Our view is that it is essential that the post 2025 market design provides consumers with reliable and secure power at lower cost through: Ensuring that a centralised transmission network continues to be the backbone of the energy system - to enable efficiently located, large scale storage and renewable generation in the NEM. The connection of large scale renewable energy zones (REZs) to the grid as well as greater interconnection between the NEM regions will deliver this. -
Production Lncrease Modification (MP 10-0080 Mod 1)
ASSESSMENT REPORT MYUNA COLLIERY Production lncrease Modification (MP 10-0080 Mod 1) 1. BACKGROUND 1.'l Overview and Regional Gontext Myuna Colliery is located within the Lake Macquarie and Wyong local government areas (LGAs), approximately 25 kilometres (km) southwest of Newcastle (see Figure 1). The mine lies mostly under Lake Macquarie and the suburbs of Arcadia Vale, Wangi Wangi, Myuna Bay, Morisset Peninsula and Point Wolstoncroft (see Figure 2). '1,*- , LEôEi¡O NdrætlFtrq¿Rd Vl$qutrçPft$ o - -Nùtô({ffirffiêF@ù*tqF.tñ + 5'Ét¡É Êd' - çtd (t *h Figure 1: Regional context of Myuna Colliery Myuna Colliery MOD I Secrefary's Environmental Assessmenf Report Cc nnhlCorl tl{t tÉn Flgure 2: Project approval and development consent boundaries 2 Myuna Colliery MOD 1 Secretary's Environmental Assessment Reporf Myuna Colliery is owned and operated by Centennial Myuna Pty Ltd (Centennial), a wholly owned subsidiary of Centennial Coal Company Pty Ltd, which is in turn a subsidiary of Banpu Public Company Limited. The mine has been in operation since 1982, and currently employs around 200 people. The mine extracts coal from the Wallarah, Great Northern and Fassifern seams. All coal extracted from Myuna supplies the nearby Eraring Power Station. The mine includes a pit-top site adjacent to the former Wangi Power Station site near Wangi Wangi (see Figure 3), which incorporates a range of ancillary infrastructure, including a Coal Handling Plant (CHP). Coal is crushed at the CHP before being transported to Origin Energy's Eraring Power Station via the Eraring Overland Conveyor, which is also owned and operated by Origin Energy.