Watts Bar Nuclear Plant, Unit 2 and Bellefonte Nuclear Plant, Unit 1, 2

Total Page:16

File Type:pdf, Size:1020Kb

Watts Bar Nuclear Plant, Unit 2 and Bellefonte Nuclear Plant, Unit 1, 2 A Tennessee Valley Authority, Post Office Box 2000, Spring City, TN 37381-2000 June 7, 2010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 Bellefonte Nuclear Plant Docket No. 50-391 Units 1, 2, 3, and 4 Subject: WATTS BAR NUCLEAR PLANT (WBN) UNIT 2 AND BELLEFONTE NUCLEAR PLANT - DISTRIBUTION LISTS FOR TVA NUCLEAR GENERATION DEVELOPMENT AND CONSTRUCTION (NGDC) PROJECTS Reference: 1) TVA letter to the NRC dated November 1, 2007, "Distribution Lists for TVA Nuclear Generation Development and Construction Projects" 2) TVA Letter to the NRC dated December 10, 2009, "Changes to Correspondence Addressee and Service List Update" The purpose of this letter is to provide the Nuclear Regulatory Commission (NRC) an update to the Watts Bar Unit 2 and Bellefonte Units 1, 2, 3 and 4 distribution lists enclosed in Reference 1. This letter supplements the information contained in Reference 2 by replacing the information for Watts Bar Unit 2 and Bellefonte Units 1, 2, 3 and 4. The other information in Reference 2 remains valid and unchanged. The single point of contact for correspondence to TVA projects under the control of the NGDC organization (i.e., Watts Bar Unit 2 and Bellefonte Units 1, 2, 3 and 4) remains unchanged. All correspondence for the Watts Bar Unit 2 and Bellefonte Units 1, 2, 3 and 4 dockets and projects should be addressed to: Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801 Printed on recycled paper I) U.S. Nuclear Regulatory Commission Page 2 June 7, 2010 The information contained in this letter and the enclosed distribution lists are effective immediately. If you have questions concerning this information, please contact me at (423) 365-2338. Sincerely eoP. Arent, neral Manager New Generation Licensing Enclosure: Distribution lists for Correspondence to TVA Projects under NGDC cc (w/enclosure): U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 .I U.S. Nuclear Regulatory Commission Page 3 June 7, 2010 bcc (w/enclosure): Lakshminarasimh Raghavan U.S. Nuclear Regulatory Commission MS 08H4A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Stephen Campbell U.S. Nuclear Regulatory Commission MS 08H4A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Patrick D. Milano, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08H4 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Loren R. Plisco, Deputy Regional Administrator for Construction U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 ENCLOSURE WATTS BAR NUCLEAR PLANT UNIT TWO DOCKET NO. 50-391 Mr. G. P. Arent, Manager Mr. M. J. Hellstern, General Manager New Generation Licensing NGDC Governance & Oversight Nuclear Generation Development Tennessee Valley Authority and Construction 3A Blue Ridge Place 5A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801 Chattanooga, Tennessee 37402-2801 Mr. Masoud Bajestani Mr. R. M. Krich, Vice President Vice President, Watts Bar Unit Two Nuclear Licensing Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 3R Lookout Place P.O. Box 2000 1101 Market Street Spring City, Tennessee 37381 Chattanooga, Tennessee 37402-2801 Mr. W. C. Bearden Mr. P. D. Swafford, Chief Nuclear Officer Senior Resident Inspector and Executive Vice President Watts Bar Nuclear Plant Unit 2 Tennessee Valley Authority U.S. NRC 3R Lookout Place 1260 Nuclear Plant Road 1101 Market Street Spring City, Tennessee 37381-2000 Chattanooga, Tennessee 37402-2801 Mr. G. A. Boerschig Mr. E. J. Vigluicci, Assistant General Counsel Plant Manager Tennessee Valley Authority Watts Bar Nuclear Plant 6A West Tower Tennessee Valley Authority 400 West Summit Hill Drive P.O. Box 2000 Knoxville, Tennessee 37902 Spring City, Tennessee 37381 Mr. Lawrence E. Nanney, Director Mr. M. K. Brandon, Manager Tennessee Department of Environmental Site Licensing and Industry Affairs Health & Conservation Watts Bar Nuclear Plant Division of Radiological Health Tennessee Valley Authority 3 rd Floor, L&C Annex P.O. Box 2000 401 Church Street Spring City, Tennessee 37381 Nashville, Tennessee 37243-1532 Mr. W. R. Crouch, Manager County Executive WBN Unit 2 Licensing 375 Church Street Watts Bar Nuclear Plant Suite 215 Tennessee Valley Authority Dayton, Tennessee 37321 P.O. Box 2000 Spring City, Tennessee 37381 County Mayor P.O. Box 156 Mr. D. E. Grissette Decatur, Tennessee 37322 Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 BELLEFONTE NUCLEAR PLANT UNITS ONE AND TWO PROJECT NO. 740 Mr. G. P. Arent, Manager Mr. E. J. Vigluicci, Assistant General Counsel New Generation Licensing Tennessee Valley Authority Nuclear Generation Development 6A West Tower and Construction 400 West Summit Hill Drive Tennessee Valley Authority Knoxville, Tennessee 37902 5A Lookout Place Chattanooga, Tennessee 37402-2801 State Health Office Alabama Department of Public Health Mr. J. A. Bailey, Vice President P.O. Box 30317 Nuclear Generation Development Montgomery, Alabama 36130-3017 Nuclear Generation Development and Construction Chairman, Jackson County Commission Tennessee Valley Authority Courthouse 5A Lookout Place Scottsboro, Alabama 35752-0200 1101 Market Street Chattanooga, Tennessee 37402-2801 Mr. R. M. Krich Vice President, Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801 Mr. D. P. Pratt, General Manager Bellefonte Nuclear Plant Project Nuclear Generation Development and Construction 2744 Bellefonte Road, OSB 1A Hollywood, Alabama 35752 Mr. Z. W. Rad, Manager, Licensing Units 1-and 2, Bellefonte Nuclear Plant Nuclear Generation Development and Construction 2744 Bellefonte Road, OSB 1A Hollywood, Alabama 35752 Mr. P. D. Swafford Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801 BELLEFONTE NUCLEAR PLANT UNITS THREE AND FOUR PROJECT NO. 740 Mr. G. P. Arent, Manager Mr. P. D. Swafford, Chief Nuclear Officer New Generation Licensing and Executive Vice President Nuclear Generation Development Tennessee Valley Authority and Construction 3R Lookout Place Tennessee Valley Authority 1101 Market Street 5A Lookout Place Chattanooga, Tennessee 37402-2801 Chattanooga, Tennessee 37402-2801 Mr. E. J. Vigluicci, Assistant General Counsel Mr. J. A. Bailey, Vice President Tennessee Valley Authority Nuclear Generation Development 6A West Tower Nuclear Generation Development 400 West Summit Hill Drive and Construction Knoxville, Tennessee 37902 Tennessee Valley Authority 5A Lookout Place State Health Office 1101 Market Street Alabama Department of Public Health Chattanooga, Tennessee 37402-2801 P.O. Box 30317 Montgomery, Alabama 36130-3017 Mr. M. J. Hellstern, General Manager NGDC Governance & Oversight Chairman, Jackson County Commission Tennessee Valley Authority Courthouse 3A Blue Ridge Place Scottsboro, Alabama 35752-0200 1101 Market Street Chattanooga, Tennessee 37402-2801 Mr. R. M. Krich, Vice President Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801 Mr. T. E. Spink, Manager Bellefonte Nuclear Plant, Units 3 and 4 Nuclear Generation Development and Construction Tennessee Valley Authority 5A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801.
Recommended publications
  • Watts Bar Nuclear Plant (Wbn) - Unit 1 - Technical Specification (Ts) Change Ts-03-16, "Revision of Ultimate Heat Sink (Uhs) Temperature"
    Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 William R. Lagergren, Jr. Site Vice President, Watts Bar Nuclear Plant APR 0 7 2004 TVA-WBN-TS-03-16 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen: In the Matter of ) Docket No. 50-390 Tennessee Valley Authority ) WATTS BAR NUCLEAR PLANT (WBN) - UNIT 1 - TECHNICAL SPECIFICATION (TS) CHANGE TS-03-16, "REVISION OF ULTIMATE HEAT SINK (UHS) TEMPERATURE" Pursuant to 10 CFR 50.90, TVA is submitting a request for an amendment to WBN's License NPF-90 to change the Technical Specifications for Unit 1. The proposed TS change (TS 03-16) will revise the limiting condition for operation for TS Section 3.7.9, "Ultimate Heat Sink." The maximum essential raw cooling water (ERCW) temperature limit associated with Surveillance Requirement (SR) 3.7.9.1 will be annotated with a note allowing an occasional increase from 85 degrees Fahrenheit (0F) to 880F. This proposed change is based on recent evaluations of the ERCW system and the UHS functions and maximum temperatures that will satisfy the associated safety functions. In addition, an administrative change is proposed to clarify the maximum allowable internal containment pressure. Corresponding TS Bases changes are also included for the temperature increase for UHS and the containment pressure clarification including a minor change in the maximum calculated containment pressure resulting from the increased UHS temperature. 1--~56 Pa0ted.]n ,Ededpa U.S. Nuclear Regulatory Commission Page 2 APR 0 7 2004 TVA discussed its plans for this proposal in a meeting with NRC staff in August 2003.
    [Show full text]
  • Sequoyah Nuclear Plant
    i Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402-2801 JUL 2 72004 10 CFR 50.54(f) U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Gentlemen: In the Matter of ) Docket No. 50-327 Tennessee Valley Authority ) 50-328 50-390 SEQUOYAH NUCLEAR PLANT (SQN) UNITS 1 AND 2 AND WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 - SIXTY-DAY RESPONSE TO NRC BULLETIN 2004-01, "INSPECTION OF ALLOY 82/182/600 MATERIALS USED IN THE FABRICATION OF PRESSURIZER PENETRATIONS AND STEAM SPACE PIPING CONNECTIONS AT PRESSURIZED-WATER REACTORS," DATED MAY 28, 2004 The purpose of this letter is to submit TVA's 60-day response to the subject bulletin for SQN and WBN, with the exception of that portion of the response identified by TVA in it.s extension request dated June 14, 2004. Specifically, as stated in the June 14 letter, TVA committed to sending a response within 60 days addressing Items (1)(a) through (1)(d) for SQN and WBN. TVA's response to Item (1)(a) would include the available information (e.g., Alloy 600/82/182 locations, joint configuration and design, etc.,) retrieved from plant records. The balance of the requested information would be obtained from the original equipment manufacturer (Westinghouse Electric Company [Westinghouse]). Westinghouse has projected that a comprehensive report would be provided to TVA by November 24, 2004. Accordingly, as committed to in the June 14 letter, TVA will submit a supplemental response within two weeks following receipt and subsequent confirmation of the information received from Westinghouse.
    [Show full text]
  • TVA Labor Relation Supplements
    Revised 01-31-2013 PROJECT AGREEMENT LABOR RELATIONS SUPPLEMENTS (LRSs not listed have been deleted) Number Subject Page LRS-2 Arbitrator Limitation Relative to Jurisdictional Issues ................................................................ 1 LRS-3 Call-By-Name ............................................................................................................................. 2 LRS-4 Staffing - Contractor vs. TVA ..................................................................................................... 3 LRS-5 Wage Determination .................................................................................................................. 4 LRS-16 Apprenticeship Programs ........................................................................................................... 5 LRS-17 Defined Incidental Work, Maintenance, & Office Work .............................................................. 8 LRS-21 Certified Apprenticeship Programs Approved to Receive Contributions From Contractors .... 11 LRS-24 Project Agreement Rates of Pay .............................................................................................. 13 LRS-25 Foremen Rates of Pay (Supervising Other Crafts) .................................................................. 14 LRS-26 Definition of First, Second, and Third Shifts (replaced 8/3/99 with Interpretation No. 21) ....... 15 LRS-27 Payroll Deductions for Political Action Committees ................................................................. 16 LRS-32 Injury - Pay
    [Show full text]
  • Savannah River Site, 700/A Area, Site Administration, Safety, Security, And
    SAVANNAH RIVER SITE COLD WAR HISTORIC PROPERTY DOCUMENTATION 700/A AREA SITE ADMINISTRATION, SAFETY, SECURITY, AND SUPPORT Aiken County, South Carolina NEW SOUTH ASSOCIATES 6150 East Ponce de Leon Avenue Stone Mountain, Georgia 30083 SAVANNAH RIVER SITE COLD WAR HISTORIC PROPERTY DOCUMENTATION NARRATIVE AND PHOTOGRAPHY 700/A AREA – SITE ADMINISTRATION, SAFETY, SECURITY, AND SUPPORT Aiken County, South Carolina Report submitted to: Washington Savannah River Company • Aiken, SC Report prepared by: New South Associates • 6150 East Ponce de Leon Avenue • Stone Mountain, Georgia 30083 Terri Gillett Mary Beth Reed Mark T. Swanson Steven Gaither May 25, 2007 • Final Report New South Associates Technical Report 1433 ii ABSTRACT ABSTRACT This documentation was prepared in accordance with a Memorandum of Agreement (MOA) signed by the Department of Energy–Savannah River (DOE-SR) and the South Carolina Historic Preservation Office (SHPO) dated February 17, 2004, as well as the Consolidated MOA of August 2004. The MOA stipulated that a thematic study and photographic documentation be undertaken on A Area historic properties 703-A and 708-A. In addition, a Cultural Resource Management Plan was accepted and signed by DOE-SR and the SHPO on December 9, 2004 calling for documentation of the remainder of the A Area buildings that were deemed eligible for listing in the National Register of Historic Places (NRHP) as contributing resources to a Savannah River Site (SRS) Cold War Historic District. The impetus for the study was the imminent decommissioning and/or dismantling of the majority of NRHP eligible buildings in A Area. The resulting narrative is based on field analysis, oral history, primary documentation and research.
    [Show full text]
  • State Nuclear Profiles 2010
    State Nuclear Profiles 2010 April 2012 Independent Statistics & Analysis U.S. Department of Energy www.eia.gov Washington, DC 20585 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA’s data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or other Federal agencies. Contacts This report was prepared by the staff of the Renewables and Uranium Statistics Team, Office of Electricity, Renewables, and Uranium Statistics. Questions about the preparation and content of this report may be directed to Michele Simmons, Team Leader, Renewables and Uranium Statistics Team, or Michael Mobilia, at [email protected]. U.S. Energy Information Administration | State Nuclear Profiles 2010 i Contents Contacts ......................................................................................................................................................... i Alabama ........................................................................................................................................................ 1 Alabama total electric power industry, summer capacity and net generation, by energy source, 2010 ........................................................................................................................................................
    [Show full text]
  • LER 12-003-00 for Watts Bar Nuclear Plant, Unit 1 Regarding Entry Into
    Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381 October 9,2012 10 cFR 50.73 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No.50-390 Subject: Licensee Event Report 390/,2012-003, Entry into Mode 4 without Meeting LCO 3.4.12, "Gold Overpressure Mitigation System (COMS)" The enclosed Licensee Event Report (LER) provides details concerning Watts Bar Nuclear Plant not meeting Limiting Condition for Operation3.4.12, "Cold Overpressure Mitigation System (COMS),' Conditions A and B on two occasions since August 10, 2009. This report is being submitted in accordance with 10 CFR 50.73(a)(2)(iXB), any operation or condition which was prohibited by the plant's Technical Specifications. There are no regulatory commitments in this letter. Please direct any questions concerning this matterto Donna Guinn, WBN Site Licensing Manager, at(23) 365-1589. Respectfully, D. E. Grissette Site Vice President Watts Bar Nuclear Plant Enclosure cc: see Page 2 U.S. Nuclear Regulatory Commission Page 2 October 9,2012 Enclosure cc (Enclosure): NRC Regional Administrator - Region ll NRC Senior Resident Inspector - Watts Bar Nuclear Plant U.S. Nuclear Regulatory Commission Page 3 October 9, 2012 DKG: TPM Enclosure bcc (Enclosure): NRC Project Manager - Watts Bar Nuclear Plant G. Arent T. J. Carter G.M. Cook S.M. Douglas B. M. Duckett K. D. Dutton D. H. Gronek D. K. Guinn D. E. Grissette D. E. Jernigan J. A. Perrel W. J. Pierce W.
    [Show full text]
  • Watts Bar, Units 1 and 2, Partial Response to NRC Request For
    Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-19-065 July 15, 2019 10 CFR 50.69 10 CFR 50.90 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket Nos. 50-390, 50-391, and 72-1048 SUBJECT: Partial Response to NRC Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Application to Adopt 10 CFR 50.69, "Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors” (WBN-TS-17-24) (EPID L-2018-LLA-0493) References: 1. TVA letter to NRC, CNL-18-068, “Watts Bar Nuclear Plant, Units 1 and 2, Application to Adopt 10 CFR 50.69, ‘Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors’ (WBN-TS-17-24),” dated November 29, 2018 (ML1834A363) 2. NRC Electronic Mail to TVA, “Watts Bar Nuclear Plant - Final Request for Additional Information Related to Application to Adopt 10 CFR 50.69 (EPID L-2018-LLA-0493),” dated June 18, 2019 (ML19169A359) In Reference 1, Tennessee Valley Authority (TVA) submitted for Nuclear Regulatory Commission (NRC) approval, a request for an amendment to Facility Operating License Nos. NFP-90 and NPF-96 for the Watts Bar Nuclear Plant (WBN), Units 1 and 2, to modify the WBN Facility Operating Licenses to allow for the implementation of the provisions of Title 10 of the Code of Federal Regulations (10 CFR) Part 50.69, “Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors.” In Reference 2, the NRC submitted a request for additional information (RAI) and requested that TVA respond by July 15, 2019, for those responses to questions not requiring uncertainty estimates and by July 29, 2019, for those responses to questions requiring uncertainty estimates.
    [Show full text]
  • Watts Bar Becomes America's 서 Rst New Nuclear Reactor of the 21St
    10/20/2016 Watts Bar becomes America's first new nuclear reactor of the 21st century [photos] | Times Free Press Watts Bar becomes America's 牦rst new nuclear reactor of the 21st century [photos] October 19th, 2016 by Dave Flessner in Business Around the Region Read Time: 5 mins. Tennessee Valley Authority Chief Nuclear O쳌cer Joe Grimes tips his hat Wednesday morning as Bill Johnson, second from right, president and CEO of TVA, announces full that Watts Bar Nuclear Plant has reached full power. Photo by Tim Barber /Times Free Press. Gallery: TVA completes first new U.S. nuclear reactor in the 21st century +12 more photos SPRING CITY, Tenn. — America's 峍rst new nuclear reactor of the 21st century was declared complete on Wednesday, helping the Tennessee Valley Authority to meet nearly half of its electricity http://www.timesfreepress.com/news/business/aroundregion/story/2016/oct/19/watts­bar­becomes­1st­new­nuclear­unit­added­us­grid­20­years/393065/ 1/4 10/20/2016 Watts Bar becomes America's first new nuclear reactor of the 21st century [photos] | Times Free Press demand with carbon-free generation as temperatures soared to a near record high on Wednesday. The Tennessee Valley Authority completed the 峍nal power ascension tests and performance measures Wednesday morning to o쳌cially declare the Unit 2 reactor at the Watts Bar Nuclear Power Plant a commercial power plant, bringing the $4.7 billion expense of 峍nishing the plant over the past four years into TVA's rate base for the 峍rst time. The achievement marks the end of a 43-year e覙ort to 峍nish what may be the last nuclear plant of its type built in the Tennessee Valley.
    [Show full text]
  • Federal Register/Vol. 85, No. 174/Tuesday, September 8, 2020
    Federal Register / Vol. 85, No. 174 / Tuesday, September 8, 2020 / Notices 55503 questions about Docket IDs in consented to the transfer of the March 24, 2021, the Transfer Order shall Regulations.gov to Jennifer Borges; LACBWR license to Dairyland Power become null and void; provided, telephone: 301–287–9127; email: Cooperative and approved a conforming however, that upon written application [email protected]. For technical license amendment in accordance with and for good cause shown, such date questions, contact the individual listed Section 50.80, ‘‘Transfer of licenses,’’ may be extended by order. in the FOR FURTHER INFORMATION and Section 50.90, ‘‘Application for This Order is effective upon issuance. CONTACT section of this document. amendment of license, construction For further details with respect to this • NRC’s Agencywide Documents permit, or early site permit,’’ of Title 10 Order, see the extension request dated Access and Management System of the Code of Federal Regulations (10 June 24, 2020, which is available (ADAMS): You may obtain publicly- CFR). By its terms, the Transfer Order electronically through ADAMS in the available documents online in the becomes null and void if the license NRC Library at https://www.nrc.gov/ ADAMS Public Documents collection at transfer is not completed within 1 year reading-rm/adams.html under https://www.nrc.gov/reading-rm/ unless, upon application and for good Accession No. ML20188A228. Persons adams.html. To begin the search, select cause shown, the Commission extends who encounter problems with ADAMS ‘‘Begin Web-based ADAMS Search.’’ For the Transfer Order’s September 24, should contact the NRC’s Public problems with ADAMS, please contact 2020, expiration date.
    [Show full text]
  • Final Environmental Statement Related to the Operation of Watts Bar Nuclear Plant, Units 1 and 2
    NUREG-0498 Supplement No. 1 Final Environmental Statement related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 Docket Nos. 50-390 and 50-391 Tennessee Valley Authority U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation April 1995 DISTRIBUTION OF THIS DOCUMENT IS UNLIMITED AVAILABILITY NOTICE Availability of Reference Materials Cited in NRC Publications Most documents cited in NRC publications will be available from one of the following sources: 1. The NRC Public Document Room, 2120 L Street, NW., Lower Level, Washington, DC 20555-0001 2. The Superintendent of Documents, U.S. Government Printing Office, P. O. Box 37082, Washington, DC 20402-9328 3. The National Technical Information Service, Springfield, VA 22161-0002 Although the listing that follows represents the majority of documents cited in NRC publica• tions, it is not intended to be exhaustive. Referenced documents available for inspection and copying for a fee from the NRC Public Document Room include NRC correspondence and internal NRC memoranda; NRC bulletins, circulars, information notices, inspection and investigation notices; licensee event reports; vendor reports and correspondence; Commission papers; and applicant and licensee docu• ments and correspondence. The following documents in the NUREG series are available for purchase from the Government Printing Office: formal NRC staff and contractor reports, NRC-sponsored conference pro• ceedings, international agreement reports, grantee reports, and NRC booklets and bro• chures. Also available are regulatory guides, NRC regulations in the Code of Federal Regula• tions, and Nuclear Regulatory Commission Issuances. Documents available from the National Technical Information Service include NUREG-series reports and technical reports prepared by other Federal agencies and reports prepared by the Atomic Energy Commission, forerunner agency to the Nuclear Regulatory Commission.
    [Show full text]
  • Mailing List of U.S. Domestic Nuclear Utilities
    Mailing List of Domestic Nuclear Utilities ",Plant .. I Address Arkansas Nuclear One, Units 1 and 2 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 Beaver Valley Power Station, Units 1 & 2 Eric A. Larson Beaver Valley Power Station P. O. Box 4, Route 168 Shippingport, PA 15077 Browns Ferry Nuclear Plant, Units 1, 2 & 3 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801 Brunswick Steam Electric Plant Units 1 & 2 George T. Hamrick, Vice President Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461 Byron Station, Units 1 & 2/Braidwood Station, Michael J. Pacilio Units 1 & 2 Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon -Nuclear 4300 Winfield Road Warrenville, IL 60555 Callaway Plant, Unit 1 Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company Ameren Missouri P.O. Box 620 -Fulton, MO 65251 Calvert Cliffs Nuclear Power Plant Units 1 & 2 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC. Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Catawba Nuclear Station, Units 1 & 2 Mr. Kelvin Henderson Site Vice President Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road York, SC 29745 All -2- Plant Address Clinton Power Station, Unit No. 1 Michael J. Pacilio Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon Nuclear 4300 Winfield Rd. Warrenville, IL 60555 Columbia Generating Station Mr.
    [Show full text]
  • Federal Register/Vol. 85, No. 145/Tuesday, July 28, 2020/Notices
    Federal Register / Vol. 85, No. 145 / Tuesday, July 28, 2020 / Notices 45445 reproduction cost) payable to the United regulatory process for the development 1. Persons who wish to provide a States Treasury. of drugs and devices; an update on the written statement should submit an NRC’s Phase 2 revision of Regulatory electronic copy to Ms. Jamerson using Henry Friedman, Guide 8.39, ‘‘Release of Patients the contact information listed above. All Assistant Section Chief, Environmental Administered Radioactive Material’’; submittals must be received by the close Enforcement Section, Environment and and an update on the activities of the Natural Resources Division. of business on September 15, 2020, NRC’s Medical Radiation Safety Team. three business days before the meeting, [FR Doc. 2020–16299 Filed 7–27–20; 8:45 am] The agenda is subject to change. The and must pertain to the topics on the BILLING CODE 4410–15–P current agenda and any updates will be agenda for the meeting. available on the ACMUI’s Meetings and 2. Questions and comments from Related Documents web page at https:// members of the public will be permitted NATIONAL CREDIT UNION www.nrc.gov/reading-rm/doc- during the meeting, at the discretion of ADMINISTRATION collections/acmui/meetings/2020.html the Chairman. or by emailing Ms. Kellee Jamerson at 3. The draft transcript and meeting Sunshine Act Meeting the contact information below. summary will be available on ACMUI’s SUMMARY: Due to the COVID–19 Purpose: Discuss issues related to 10 website https://www.nrc.gov/reading- Pandemic, the meeting will be open to CFR part 35 Medical Use of Byproduct rm/doc-collections/acmui/meetings/ the public via live webcast only.
    [Show full text]