Solar Site, Llanwern, Newport

Total Page:16

File Type:pdf, Size:1020Kb

Solar Site, Llanwern, Newport Solar Site, Llanwern, Newport Historic Landscape Assessment (ASIDOHL2) March 2015 GGAT report no. 2015/016 Project no.P1737 A report for Energy My Way National Grid Reference: by Rob Dunning BSc MCIfA ST 37811 84203 CONTRACTORS HEALTH & SAFETY ASSESSMENT SCHEME Accredited Contractor www.chas.gov.uk The Glamorgan-Gwent Archaeological Trust Ltd Heathfield House Heathfield Swansea SA1 6EL Solar Site, Llanwern, Newport: Historic Landscape Assessment (ASIDOHL2) Contents Page Summary ............................................................................................................................. 3 Acknowledgements .............................................................................................................. 3 Copyright Notice ................................................................................................................. 3 Abbreviations ...................................................................................................................... 3 1 Project background ......................................................................................................... 4 2 The affected historic landscapes ..................................................................................... 7 3 Assessment methodology ............................................................................................... 11 3.1 The Guidelines ......................................................................................................... 11 3.2 Summary of ASIDOHL2 stages .............................................................................. 11 3.3 Quantification of results ........................................................................................... 11 3.4 The ASIDOHL2 Stages ........................................................................................... 11 4 Historic Landscape Assessment .................................................................................... 17 4.1 Introduction .............................................................................................................. 17 4.2 Assessment of direct impacts on the historic landscape by the proposed development (ASIDOHL2 Stage 2) ..................................................................................... 35 4.3 Assessment of indirect impacts on the historic landscape by the proposed development (ASIDOHL2 Stage 3) ..................................................................................... 39 4.4 Evaluation of relative importance (ASIDOHL2 Stage 4) ........................................ 46 4.5 Assessment of the overall significance of the impact of the development (ASIDOHL2 Stage 5) .......................................................................................................... 60 5 ASIDOHL2 Concluding Statement .............................................................................. 65 References ........................................................................................................................ 66 Appendix I ....................................................................................................................... 67 Historic Landscape Characterisation ........................................................................... 67 Appendix II ...................................................................................................................... 68 Photographic Catalogue ............................................................................................... 68 1 Solar Site, Llanwern, Newport: Historic Landscape Assessment (ASIDOHL2) Figures Figure 1. Location of development areas (red) and the Gwent Levels Historic Landscape (blue) .........................................................................................................5 Figure 2. Location of development areas (red) and HLCAs (blue) ........................................6 Figure 3. Nash/Goldcliff Coastal Zone (HLCA001)...............................................................20 Figure 4. Christchurch/Nash/Whitson Back-Fen (HLCA002) .............................................22 Figure 5. Whitson (HLCA003).................................................................................................24 Figure 6. Porton (HLCA004) ...................................................................................................26 Figure 7. Redwick/Magor/Undy (HLCA006) .........................................................................28 Figure 8. Redwick Broadmead (HLCA007) ...........................................................................30 Figure 9. Northern Redwick (HLCA008) ...............................................................................32 Figure 10. Green Moor (HLCA009) ........................................................................................34 Figure 11. Location of development areas (red), HLCAs (blue) and Plates 1-14 (green) ........................................................................................................................75 Plates Plate 1. View to the west of Goldcliff Moated Site (MM092/307860/00273g) ......................68 Plate 2. View to the southeast of Moated site east of Grangefield Farm (MM205/406/54452/02313g) (NGR ST 38950 84960) ............................................68 Plate 3. View to the southeast of Development Area 1 ..........................................................69 Plate 4. View to the southwest of Development Area 2 .........................................................69 Plate 5. View to the east of Development Area 4 ....................................................................70 Plate 6. View to the southeast of Development Area 4 ..........................................................70 Plate 7. View to the northeast of Development Area 6 ..........................................................71 Plate 8. View to the southwest of Development Area 6 .........................................................71 Plate 9. View to the south of HLCA002 ..................................................................................72 Plate 10. View to the north of HLCA003 ................................................................................72 Plate 11. View to the east of HLCA004 ...................................................................................73 Plate 12. View to the northwest of HLCA006.........................................................................73 Plate 13. View to the southeast of HLCA008 ..........................................................................74 Plate 14. View to the northwest of HLCA009.........................................................................74 2 Solar Site, Llanwern, Newport: Historic Landscape Assessment (ASIDOHL2) Summary The proposed development consists of the construction of a solar farm on land near Chestnut Farm, Llanwern, Newport (Planning Application no. for screening 14/0419). In response to a screening opinion the archaeological advisors to the LPA (GGAT Curatorial) recommended that a desk-based assessment and ASIDOHL2 be completed for the proposed development. The ASIDOHL2, carried out to the latest guidelines issued by Cadw, forms the subject of the current report. The overall significance of the impact of the development on the Gwent Levels (HLW (Gt) 1) landscape of outstanding historic interest is considered to be ‘Severe’. There will be a direct physical impact on six Historic Landscape Character Areas and an indirect, visual impact on eight HLCAs. It is considered that the development will have no permanent indirect physical impact on any of the Character Areas within the Historic Landscape. It is considered that the overall effect of the development can be mitigated by the use of appropriate screening measures to limit the visual impact of the development. This will reduce the visual impact on both the settings and view shares of sites of national and regional importance, as well as the HLCAs themselves. It should also be noted that a number of the buildings within the Historic Landscape have existing solar panels, thereby partially reducing the inherent visual intrusion. It is also important to note that the indirect visual effect of the development will be transitory in nature, with the majority of solar sites having an economic lifetime of less than 25 years. Additionally the sympathetic placement of individual units within the development, so as to avoid unnecessary damage to inherent landscape characteristics, will reduce the direct physical impact of the development. This is in addition to the watching brief, hedgerow survey and earthwork survey recommended by the desk-based assessment (Sherman 2015). Acknowledgements This project has been managed by Richard Lewis BA MCIfA (Head of Projects) and the report was compiled by Rob Dunning BSc MCIfA (Project Manager) of GGAT Projects. The illustrations were prepared by Charlotte James-Martin BA ACIfA (Assistant Project Officer). Copyright Notice The copyright of this report is held by the Glamorgan-Gwent Archaeological Trust Ltd, which has granted an exclusive licence to Energy My Way and their agents to use and reproduce material it contains. Maps are based on Ordinance Survey data, License Number AL 1000320693, unless otherwise stated. Annotations are GGAT copyright. Abbreviations The following abbreviations have been used in this report: MMxxx: Schedule Ancient Monument HER: Historic Environment Record NGR: National Grid Reference
Recommended publications
  • Alway Profile 2019 Population
    2019 Community Well-being Profile Alway Population Final July 2019 v1.0 Table of Contents Table of Contents Population ................................................................................................................................................................ 2 Overview ............................................................................................................................................................... 2 Population make up .............................................................................................................................................. 3 Population Density .............................................................................................................................................10 Population Changes ............................................................................................................................................11 Supporting Information ......................................................................................................................................13 Gaps ....................................................................................................................................................................15 Alway Community Well-being Profile - Population Page 1 Alway Population Population Overview Population 8,573 % of the Newport Population 5.66% Population Density 4,855.8 Ethnic Minority Population 10.6% (population per km2) Area (km2) 1.77 Lower Super Output Areas 6 % of Newport Area 0.93%
    [Show full text]
  • Coridor-Yr-M4-O-Amgylch-Casnewydd
    PROSIECT CORIDOR YR M4 O AMGYLCH CASNEWYDD THE M4 CORRIDOR AROUND NEWPORT PROJECT Malpas Llandifog/ Twneli Caerllion/ Caerleon Llandevaud B Brynglas/ 4 A 2 3 NCN 4 4 Newidiadau Arfaethedig i 6 9 6 Brynglas 44 7 Drefniant Mynediad/ A N tunnels C Proposed Access Changes 48 N Pontymister A 4 (! M4 C25/ J25 6 0m M4 C24/ J24 M4 C26/ J26 2 p h 4 h (! (! p 0 Llanfarthin/ Sir Fynwy/ / 0m 4 u A th 6 70 M4 Llanmartin Monmouthshire ar m Pr sb d ph Ex ese Gorsaf y Ty-Du/ do ifie isti nn ild ss h ng ol i Rogerstone A la p M4 'w A i'w ec 0m to ild Station ol R 7 Sain Silian/ be do nn be Re sba Saint-y-brid/ e to St. Julians cla rth res 4 ss u/ St Brides P M 6 Underwood ifi 9 ed 4 ng 5 Ardal Gadwraeth B M ti 4 Netherwent 4 is 5 x B Llanfihangel Rogiet/ 9 E 7 Tanbont 1 23 Llanfihangel Rogiet B4 'St Brides Road' Tanbont Conservation Area t/ Underbridge en Gwasanaethau 'Rockfield Lane' w ow Gorsaf Casnewydd/ Trosbont -G st Underbridge as p Traffordd/ I G he Newport Station C 4 'Knollbury Lane' o N Motorway T Overbridge N C nol/ C N Services M4 C23/ sen N Cyngor Dinas Casnewydd M48 Pre 4 Llanwern J23/ M48 48 Wilcrick sting M 45 Exi B42 Newport City Council Darperir troedffordd/llwybr beiciau ar hyd Newport Road/ M4 C27/ J27 M4 C23A/ J23A Llanfihangel Casnewydd/ Footpath/ Cycleway Provided Along Newport Road (! Gorsaf Pheilffordd Cyffordd Twnnel Hafren/ A (! 468 Ty-Du/ Parcio a Theithio Arfaethedig Trosbont Rogiet/ Severn Tunnel Junction Railway Station Newport B4245 Grorsaf Llanwern/ Trefesgob/ 'Newport Road' Rogiet Rogerstone 4 Proposed Llanwern Overbridge
    [Show full text]
  • Newport Countryside Walks Leaflets English
    LetsWalk Newport - CountrysideWalks 10 Reasons to walk... 1. Makes you feel good 2. Reduces stress 3. Helps you sleep better 4. Reduce risk of:- • Heart disease • Stroke • High blood pressure • Diabetes • Arthritis • Osteoporosis • Certain cancers and can help with their management and recovery 5. Meet others and feel part of your community 6. See your local area and discover new places 7. Kind to the environment 8. Can be done by almost anyone 9. No special equipment required 10. Its FREE, saving money on bus fares and petrol LetsWalk Newport - CountrysideWalks How often should I walk? As often as you can Aim for at least:- 30minutes This can be in one go or 3 walks of 10 minutes or 2 walks of 15 minutes per day or more days 5 of the week How fast should I walk? Start slowly to warm up Gradually increase to a brisk pace:- • heart beating a little faster • breathing a little faster • feel a little warmer • leg muscles may ache a little • you should still be able to hold a conversation Slow down gradually to cool down Tips • Walk to the local shops • Get off the bus a stop earlier • Park a little further from your destination • Walk the children to and from school • Go for a lunchtime walk • Walk to post a letter • Use the stairs • Walk with friends/family • Explore new areas • Walk the dog • Note your progress LetsWalk Newport - CountrysideWalks What equipment will I need? The Countryside Healthy StartWalks Brochure:- Code... • Comfortable and sensible footwear (no flip-flops or high heels) The 5 golden rules are • Water 1.
    [Show full text]
  • Ecology and Nature Conservation
    Welsh Government M4 Corridor around Newport Environmental Statement Volume 1 Chapter 10: Ecology and Nature Conservation M4CAN-DJV-EBD-ZG_GEN--REP-EN-0021.docx At Issue | March 2016 CVJV/AAR 3rd Floor Longross Court, 47 Newport Road, Cardiff CF24 0AD Welsh Government M4 Corridor around Newport Environmental Statement Volume 1 Contents Page 10 Ecology and Nature Conservation 10-1 10.1 Introduction 10-1 10.2 Legislation and Policy Context 10-2 10.3 Assessment Methodology 10-10 10.4 Baseline Environment 10-45 Statutory Designated Sites 10-45 Non-Statutory Designated Sites 10-49 Nature Reserves 10-52 Habitats 10-52 Species (Flora) 10-76 Species (Fauna) 10-80 Invasive Alien Species 10-128 Summary Evaluation of Ecological Baseline 10-132 Ecological Units 10-135 Future Baseline Conditions 10-136 10.5 Ecological Mitigation and Monitoring 10-140 10.6 Effects Resulting from Changes in Air Quality 10-159 10.7 Assessment of Land Take Effects 10-165 Designated Sites 10-166 Rivers (Usk and Ebbw) 10-171 Reens, Ditches, Reedbeds and Ponds 10-173 Grazing Marsh 10-182 Farmland 10-187 Industrial Land 10-196 Bats 10-200 Breeding Birds 10-203 Wintering Birds 10-204 Complementary Measures 10-206 10.8 Assessment of Construction Effects 10-206 Designated Sites 10-206 Rivers (Usk and Ebbw) 10-210 Reens, Ditches, Reedbeds and Ponds 10-226 Grazing Marsh 10-245 Farmland 10-249 Industrial Land 10-260 Bats 10-263 Breeding Birds 10-291 Wintering Birds 10-292 Welsh Government M4 Corridor around Newport Environmental Statement Volume 1 Complementary Measures 10-295 10.9
    [Show full text]
  • Uskmouth Power Station Conversion Project
    USKMOUTH POWER STATION CONVERSION PROJECT ENVIRONMENTAL STATEMENT Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2017 On behalf of Simec Uskmouth Power Ltd. Volume 1 – Main Text OXF11035 V3 Final for PAC May 2020 rpsgroup.com USKMOUTH POWER STATION CONVERSION PROJECT Quality Management Version Status Authored by Reviewed by Approved by Date V1 Draft Mark Barrett Amy Robinson Dan Smyth 03/02/20 V2 Draft Mark Barrett Amy Robinson Dan Smyth 09/04/20 V3 Final for PAC Mark Barrett Amy Robinson Dan Smyth 21/05/20 Approval for issue Dan Smyth 22 May 2020 File/Model Location O:\11035 Uskmouth Power Station\Reports\EIA PAC Submission\Simec Uskmouth Document location: Power Station Conversion ES Vol 1 Main Text.docx Model / Appendices location: This report was prepared by RPS within the terms of RPS’ engagement with its client and in direct response to a scope of services. This report is supplied for the sole and specific purpose for use by RPS’ client. The report does not account for any changes relating the subject matter of the report, or any legislative or regulatory changes that have occurred since the report was produced and that may affect the report. RPS does not accept any responsibility or liability for loss whatsoever to any third party caused by, related to or arising out of any use or reliance on the report. Prepared by: Prepared for: RPS Simec Uskmouth Power Ltd. Mark Barrett Cara Donovan Associate Senior Environment and Consents Manager 20 Western Avenue Uskmouth Power Station Milton Park West Nash
    [Show full text]
  • Llanwern Solar Farm, Newport NP18 2AY Zone of Theoretical Visibility
    Christchurch 23 Gwent Farmers te si e Community th M4 m M4 o Solar Scheme fr Ringland m k 5 te si 17 Llanwern Solar Farm, e Alway th m Newport NP18 2AY o 16 fr 13 Llanwern 14 m Hill k Zone of 4 LA. 07-2 te si e Theoretical Visibility th m 15 Screening Features Analysis ro Magor/ f NEWPORT/ Magwyr m k 3 CASNEWYDD te si e Steel Works th Key m o r f Site boundary m k e 2 sit 1km Buffers from site boundary he t A4810 m o Lafarge Unitary Authority boundary fr Tarmac m k Assessment viewpoint photograph locations 1 Refer to A091650 LA15 for photographs 2 20 Bowleaze Reen Viewpoint photograph locations Refer to A091650 LA16 for photographs 3 El Sub Sta North Row 21 1 NCR 4 22 Photomontage locations NCR 4 Pye Chapel Reen Refer to A091650 LA17 for photographs Corner Broadstreet Common Public Access : 4 Wainbridge 5 Whitson Court 10 Elyer Pill Reen Public Footpaths Little NCR 4 Newra The Half Acre Public Bridleways 7 6 Wainbridge Reen Common Whitson Road Redwick 9 Wales Coast Path Pipe Lines 8 River Usk / Afon Wysg Nash 'NCR 4' National Cycle Route Power Chapel Road Station Heritage Designations : Whitson Hare's Reen 18 'Gwent Levels' 11 Landscape of Outstanding Historic Interest Great Porton Wales Coast Path Historic Parks and Gardens Newport Wetlands Goldcliff19 National Nature Reserve 12 Scheduled Monuments Listed Buildings Wales Coast Path Zone of Theoretical Visibility : Screening Features Analysis Majority of the solar farm visible Moderate part of the solar farm visible Small part of the solar farm visible Woodland included in analysis 0 200 400 800 1,200 1,600 2,000 m ZTV Note: The computer generated Zone of Theoretical Visibility (ZTV) is based on a digital surface model generated from the 5m grid interval Ordnance Survey OS Terrain 5® dataset.
    [Show full text]
  • Se,Veri\ E.Stuary Levels
    ORE Open Research Exeter TITLE The Historic Landscapes of the Severn Estuary Levels AUTHORS Rippon, Stephen DEPOSITED IN ORE 25 April 2008 This version available at http://hdl.handle.net/10036/24173 COPYRIGHT AND REUSE Open Research Exeter makes this work available in accordance with publisher policies. A NOTE ON VERSIONS The version presented here may differ from the published version. If citing, you are advised to consult the published version for pagination, volume/issue and date of publication Archaeology-in theSevern Estuary 11 (2000),1i9-i35 THE HISTORIC LANDSCAPES OF THE SE,VERI\E.STUARY LEVELS By StephenRippon The deepalluvial sequencesthat make up the SevernEstuary Levels comprisea seriesof stratified landscapesdating Jrom earlyprehi,story through to thepresent day. Most of theselandscapes are deeply buried, and, whilst exceptionally 'historic well-preserved,are largely inaccessibleand so ill-understood.It is only with the landscape',that lies on the surface of the Levels, that we can really start to reconstruct and analyse what thesepast landscapeswere like. However, although the enormously diverse historic landscapeis itself an important source of information, itsfull potential is only achievedthrough its integration with associatedarchaeological and documentatyevidence. This presentsmany challengesand whilst much has beenachieved in the last tenyears, there is a long way to go before we can write a comprehensivehistory of the SevernLevels. Two techniquesare vital. Historic landscapecharacterisation focuses on the key character
    [Show full text]
  • Allt-Yr-Yn Profile
    2017 Community Well-being Profile Allt-yr-yn Final May 2017 Table of Contents Table of Contents Preface ...................................................................................................................................................................... 2 Section 1: Allt-yr-yn Community Overview .............................................................................................................. 5 Introduction .......................................................................................................................................................... 5 The population of the community ........................................................................................................................ 7 What is the make-up of the population? ............................................................................................................. 9 What will the population be in the future? ........................................................................................................12 Section 2: Economic well-being ..............................................................................................................................13 What is the economic well-being of our community? .......................................................................................13 Job Seeker’s Allowance ......................................................................................................................................17 What do we know about the economic well-being of
    [Show full text]
  • South Wales Railway. NOTICE Is Hereby Given, That Application Is
    4005 South Wales Railway. sannor, Llanharry, Llanharrcn, Llanilitf, church otherwise Eglwys Llangrallo, Coychurch OTICE is hereby given, that application is higher, Coychurch lower, Pencoed, Peterston N intended to be made to Parliament in the super Montein otherwise Capel Llanbad, Llandy- ensuing session, for an Act or Acts to authorize fodwg otherwise Eglwys Glynn Ogwr, Saint the construction and maintenance of a railway or Mary Hill, Llangard, Treose, Penlline otherwise railways, with all proper approaches and con- Penlywynd, Colwinstone, Ewenny, Saint Brides veniences, and with such piers, basins, break- major, Saint Brides Lampha, Soutfcerndown, waters, landing plaeeBj and other works, as may Coyty, Coyty higher, Coyty lower, Saint Brides be necessary in connection therewith, commencing minor otherwise Llansaintfred, Ynisawdre, Llan- by a junction with the Cheltenham and Great gonoyd otherwise Llangynwd, Llangonoyd higher, "Western Union Railway, at or near the point Llangonoyd lower otherwise Boyder, Llangonoyd where the said railway crosses the turnpike road Middle, Cwmdu, Lalestone, Lalestone higher, from Gloucester to Stroud, at Standish, in the Lalestone lower, Trenewydd otherwise Newcastle, county of Gloucester, and terminating on the Newcastle higher, Newcastle lower, Oldcastle, north-western shore of the bay or harbour of Fish- Bridgend, Merthyr Mawr,. Tythegston, Tythegston guard, and near to a point there known by the higher, Tythegston lower, Newton Nottage, Pyle, name of Goodwic-pier, in the county of Pem- Sker, Kenfig otherwise Mawdland, Margam, broke; which said intended railway or railways, Hafod-y-poth, Brombill, Trissant, Kenfig, Abe- and other works connected therewith, will pass rafon, Michaelstone super Afon, Michaelstone from, in, through, or into, or be situate within the super Afon higher, Michaelstone super Afoii several parishes, townships, and extra-parochial lower, Baglan, Baglan higher, Baglan lower, or other places following, or some of them (that Britton Ferry, Glyn Corwg Blaengwrach, Neath, is to say), Standishs Oxlinch.
    [Show full text]
  • Welsh Government M4 Corridor Around Newport Environmental Statement Volume 1 Chapter 7: Air Quality M4CAN-DJV-EAQ-ZG GEN--REP-EN-0001.Docx
    Welsh Government M4 Corridor around Newport Environmental Statement Volume 1 Chapter 7: Air Quality M4CAN-DJV-EAQ-ZG_GEN--REP-EN-0001.docx At Issue | March 2016 CVJV/AAR 3rd Floor Longross Court, 47 Newport Road, Cardiff CF24 0AD Welsh Government M4 Corridor around Newport Environmental Statement Volume 1 Contents Page 7 Air Quality 7-1 7.1 Introduction 7-1 7.2 Legislation and Policy Context 7-1 7.3 Assessment Methodology 7-7 7.4 Baseline Environment 7-28 7.5 Mitigation Measures Forming Part of the Scheme Design 7-35 7.6 Assessment of Potential Land Take Effects 7-35 7.7 Assessment of Potential Construction Effects 7-35 7.8 Assessment of Potential Operational Effects 7-42 7.9 Additional Mitigation and Monitoring 7-49 7.10 Assessment of Land Take Effects 7-53 7.11 Assessment of Construction Effects 7-53 7.12 Assessment of Operational Effects 7-53 7.13 Assessment of Cumulative Effects 7-53 7.14 Inter-relationships 7-54 7.15 Summary of Effects 7-54 Welsh Government M4 Corridor around Newport Environmental Statement Volume 1 7 Air Quality 7.1 Introduction 7.1.1 This chapter examines the potential effect of the Scheme on local and regional air quality during both the construction and operational phases. 7.1.2 The Scheme would transfer approximately 30-45% of traffic from the existing M4, between Junctions 23A and 29, onto the new section of motorway to the south of Newport. Traffic related pollution in the urban areas adjacent to the existing M4 is therefore predicted to improve as a result of the Scheme.
    [Show full text]
  • United States Bankruptcy Court Eastern District of New York
    Case 8-19-71020-reg Doc 178 Filed 03/22/19 Entered 03/22/19 20:59:04 UNITED STATES BANKRUPTCY COURT EASTERN DISTRICT OF NEW YORK ----------------------------------------------------------------- x In re: : Chapter 11 : Décor Holdings, Inc., et al.,1 : Case No. 19-71020 (REG) : Case No. 19-71022 (REG) Debtors. : Case No. 19-71023 (REG) : Case No. 19-71024 (REG) : Case No. 19-71025 (REG) : : Jointly Administered ---------------------------------------------------------------- x AFFIDAVIT OF SERVICE State of California ) ) ss County of Los Angeles ) I, Darleen Sahagun, being duly sworn, depose and says: 1. I am employed by Omni Management Group located at 5955 DeSoto Avenue, Suite 100, Woodland Hills, CA 91367. I am over the age of eighteen years and am not a party to the above-captioned action. 2. On March 15, 2019, I caused to be served the: a. Notice of Deadline Requiring Filing of Proofs of Claim on or Before April 17, 2019 (General Bar Date) and August 11, 2019 (Governmental Bar Date), b. Official Form 410 - Proof of Claim, c. Official Form 410 - Instructions for Proof of Claim, d. Notice of Deadline Requiring Filing of Certain Administrative Claims on or Before April 17, 2019, e. Administrative Expense Proof of Claim, f. Instructions for Filing Proof of Administrative Claim Form, g. Notice of Hearing on the Motion of the Debtors for an Order (I) Approving the Disclosure Statement, (II) Establishing Plan Solicitation and Voting Procedures, (III) Scheduling a Confirmation Hearing, and (IV) Establishing Notice and Objection Procedures for Confirmation of the Debtors’ Chapter 11 Plan of Liquidation. (2a through 2g collectively referred to as the “General/Administrative Proof of Claim Packages”) By causing true and correct copies to be served via first-class mail, postage pre-paid to the names and addresses of the parties listed as follows: ----------------------------------------------------- 1 The Debtors in these chapter 11 cases, along with the last four digits of each Debtor’s federal tax identification number, are: Décor Holdings, Inc.
    [Show full text]
  • Descent of St. Maur and Seymour Families
    -390- ST MAUR AND SEYMOUR DESCENT OF ST.MAUR FAMILY OF CO.MONMOUTH AND SEYMOUR FAMILY OF HATCH, CO.SOMERSET by Paul C. Reed1 ABSTRACT This Seymour family became renowned in the person of Jane Seymour, who died twelve days after the birth of Edward, the only legitimate son of Henry VIII to survive infancy. It is not surprising that the origins of this family came under the focus of the earliest English historians and genealogists, including Camden, Dugdale and Vincent. Brydges and others later attempted fuller accounts in their works on the peerage, but the paucity of surviving records has allowed errant conclusions and fictions to persist in the most widely available modern accounts. The purpose of this article is to present a fresh analysis of what survives and bring the subject up to current standards of scholarship. Foundations (2008) 2 (6): 390-442 © Copyright FMG and the author As is the case with so many medieval English families, our knowledge of the earliest generations of the Seymours in the century and a half after Domesday is vague and uncertain. The earliest definitely traceable ancestor appears in record because of his acquisition of land—he burst onto the scene through conquest. In a period when preserving the king’s peace would normally have forbad dispossessing anyone of a manor (whether they had been in legitimate possession or not), at this specific time it furthered the interests of the crown to have Englishmen displace the native Welsh. Even after the family acquired heritable land, the descent of the male line through the thirteenth and fourteenth centuries is not entirely certain because of the scant survival of documents concerning manors and lands in the Marches of Wales.
    [Show full text]