Perspective investment projects

Bishkek, 2018 National Energy Hydropower potential Holding

General indicators Industry prospects •The total hydropower potential of the Kyrgyz Republic is •7 additional cascades of 27 hydroelectric power stations can be 142.5 billion kWh built on the river •The republic takes the third place in the CIS countries after Russia •The total installed capacity of the prospective cascades is and Tajikistan 5 600 MW •The percentage of capacity development is only 10% •Average long-term annual output of electricity is more than 20 billion kWh The location of the HPP on the Naryn river

Upper Naryn cascade of HPP

Kazarman cascade of HPP National Energy Perspective projects Holding

cascade of HPP  Kara-Keche thermal  Solar power plant in Installed capacity - 1 160 МW power plant Chuy region Generation - 4 661,6 million kWh Installed capacity– Installed capacity –  Upper Naryn cascade of HPP 600 МW 100 МW Installed capacity – 237,7 МW Generation – 3 900 million Generation - 150 million kWh Generation - 942,4 billion kWh kWh

Construction and operation of generating capacity National Energy Kazarman cascade of HPP Holding

Normal Installed Generation, Reservoir volume, Type of HPP headwater capacity, Million kWh mln.m3 level, МW NHL, m Alabuga HPP 1 570 600 2 358,3 2 835,5 dam Karabulun HPP-1 1 370 149 536 110 dam Karabulun HPP-2 1 370 163 852 110 diverting dam Toguztoroo HPP 1 327 248 915,3 168,5 dam Total 1 160 4 661,6

Location: The Kazarman cascade is located on the Naryn river section between its inflows Alabuga and Kokomeren river. Construction Infrastructure: The 155 km long Jalal-Abad-Kazarman automobile road provides a way out of the Naryn zone to the cities of Osh and Jalal- Abad. In addition, the construction of an alternative North-South road has been started in this area. Rainfall – 303 mm per year; The relief is mountainous; Seismic activity - 9 points. . National Energy Upper Naryn cascade HPP Holding

Normal Installed Generation, Reservoir volume, Type of HPP headwater capacity, Million kWh mln.m3 level, МW NHL, m Akbulun HPP 2 315 87,4 345,5 109,8 Naryn HPP-1 2 235 47,7 187,5 - dam-derivational Naryn HPP-2 2 188 47,6 188,8 - Naryn HPP-3 2 141 55,0 220,5 - Total 237,7 942,4

Location: The Upper-Naryn cascade is projected in the upper reaches of the Naryn River, on the site from the confluence of the Bolshoy and Maly Naryn to the Naryn city. Construction Infrastructure : The main type of transport in the area of construction is automobile. The nearest railway station Balykchi (Rybachye) is located at a distance of 183 km. Rainfall – 303 mm per year; The relief is mountainous; Seismic activity - 9 points. National Energy Upper Naryn cascade HPP Holding

The chosen scheme of the cascade allows the full use of the fall of more than 30 km of the river - the lower reaches of the overlying stations are the reservoirs of the lower parts. National Energy Advantages of HPP construction and economic importance Holding

Use of renewable energy

Ensuring the energy security of the Kyrgyz Republic, as well as the possibility of exporting electricity

Reducing the dependence of the country's energy sector on the prices of organic fuel

Creation of additional workplaces

Creation of preconditions for long-term reduction of electricity tariffs National Energy Kara-Keche thermal power plant Holding

Kara-Keche Characteristics Data thermal power Installed capacity 600 MW plant Generation 3 900 million kWh Fuel brown coal Source of technical water supply Djumgal river Kokomeren river Water consumption Summer 45 м3/s Winter 42 м3/s Chimney height 330 m National Energy Kara-Keche thermal power plant Holding

Characteristics Unit of measurement Value

Total area of thermal power plant hectare 118,01 Number of aggregates items 2 Number of boilers items 2 Number of turbines items 2 Consumption of coal per hour tons per hour 397,4 Consumption of industrial water m3/hour 1 491 Number of hours of boilers use hour 5 530 Location: The construction is planned in Jumgal, near the village of Aral, , near the coal mines, developing Kavak lignite pool. Construction Infrastructure : The main type of transport in the area of construction is automobile. The distance to the nearest railway station Balykchy along gravel-asphalt road is 230 km. Rainfall – 440 mm per year; The relief is mountainous; Seismic activity - 9 points. National Energy Advantages of thermal power plant construction and economic importance Holding

Ensuring the energy security of the republic (increase in generating capacity in the north of the republic)

Independence from natural and climatic conditions

Increase of socio-economic living standards of the population

Creation of additional workplaces

The use of modern technologies National Energy Solar power plant in Chuy region Holding

Solar power plant

Characteristics Data Installed capacity 100 МW Generation 150 million kWh

Availability of free space for the construction of solar power plants National Energy Advantages of solar power plant construction Holding

Use of renewable energy

Ecologically clean

Availability, quiet

Economical, low operating costs

Innovative technologies National Energy Prospective markets for electricity sales Holding

 The project “CASA-1000” (export of electric energy from the countries of to the countries of South Asia -Tajikistan-Afghanistan- Pakistan).

 Construction of transmission lines 500 kV "Kyrgyzstan - China". National Energy Options for cooperation Holding

 Realization in the form of the investment project (direct investments) that assumes participation of the investor in share of authorized capital of the created joint venture.

 Implementation in the form of public-private partnership (PPP), including models:BOT (Build, Operate, Transfer); • BOOT (Build, Own, Operate, Transfer). National Energy State support (preferences) Holding

Protection of foreign investments

Access to CASA-1000

Assistance in obtaining licenses, permits and approvals

Equal operating conditions for foreign and local companies

The possibilities of broad cooperation in the framework of public private partnership

Available qualified personnel National Energy The financial performance of projects Holding

Projects Installed capacity, Generation, Construction Estimated cost MW million kWh period, year

Kazrman cascade HPP 1 160 4 661,6 7 2 000,0

Upper Naryn cascade HPP 237, 7 942,4 5 727,7

Kara-Keche thermal power 600 3 900 3 778,0 plant

Solar power plant 100 150 1 70,0 National Energy Holding