Uttarakhand Sl
Total Page:16
File Type:pdf, Size:1020Kb
CONSERVATION PROGRAMME IN RESPECT OF OFFICE OF THE SUPERINTENDING ARCHAEOLOGIST, ARCHAEOLOGICAL SURVEY OF INDIA, DEHRADUN CIRLCE, DEHRADUN FOR THE FINANCIAL YEAR 2011-2012 02 03 27- S.R.(PLAN) ONGOING WORKS STATE:- UTTARAKHAND SL. Name of Work Estimated Cost Expenditure Proposed Item of works. NO. With Locality and District. upto Provision March, 2011 For 2011-12 (In Lacs) ………………………………………………………………………………………………………………………………………………….………………………………………… 1. Watertightening and Repairs to Vasudev temple, 8,90,304 1,29,056 7.60 Taking out wooden members, fixing new wooden Pandukeshwar temple, District Chamoli rafters with wood preservative coats, water 2. Repairs to flooring and providing drainage system 18,56,000 10,72,354 1.75 Replacement of damaged stones, filling of cracks. At Rudranath temple, Gopeshwar.District Chamoli. 3. Repairs to shrines near Mritunjaya temple, Jageshwar 7,38,988 4,49,417 2.50 Taking out decayed stones and resetting of shrines. District. Almora 4. Repairs to group of Baleshwar temple District 13,16,000 3,231 13.13 Earth work, L.C. work, providing flooring, drainage Champawat 5. Reconstruction of fallen compound wall, Sun temple, 24,44,000 14,72,346 10.00 Earth work, C.C. and R.R. stone masonary Katarmal District Almora --------- Total Rs. 34.98 Lacs ASSTT.SUPTDG.ARCHL.ENGINEER SUPERINTENDING ARCHAEOLOGIST CONSERVATION PROGRAMME IN RESPECT OF OFFICE OF THE SUPERINTENDING ARCHAEOLOGIST, ARCHAEOLOGICAL SURVEY OF INDIA, DEHRADUN CIRLCE, DEHRADUN FOR THE FINANCIAL YEAR 2011-2012 02 03 27- O.W.(NON PLAN) ONGOING WORKS STATE:- UTTARAKHAND SL. Name of Work Estimated Cost Expenditure Proposed Item of works. NO. With Locality and District. upto Provision March, 2011 For 2011-2012 (in lacs) ………………………………………………………………………………………………………………………………………………….………………………………………… 1. Repairs and White Wash at Circle Office, Dehradun 7,00,000 5,03,394 1.96 Repair and White Wash of Circle Office ASSTT.SUPTDG.ARCHL.ENGINEER SUPERINTENDING ARCHAEOLOGIST CONSERVATION PROGRAMME IN RESPECT OF OFFICE OF THE SUPERINTENDING ARCHAEOLOGIST, ARCHAEOLOGICAL SURVEY OF INDIA, DEHRADUN CIRLCE, DEHRADUN FOR THE FINANCIAL YEAR 2011-2012 02 03 27- S.R.( PLAN) NEW WORKS STATE:- UTTARAKHAND SL. Name of Work Tentative Proposed Item of works. NO. With Locality and District. Cost provision (IN LACS) (2011-2012) ………………………………………………………………………………………………………………………………………………….………………………………………… (In lacs) 1 Repairs to the collapsed boundary wall, Baijnath group of temples, 15.00 15.00 Earth work, C.C.work, and R.R.stone masonary work Baiajath, District Bageshwar 2. Repairs to remaining portion of stone flooring, Jageshwar group of 20.00 10.00 Earth work, Lime Concrete work, flagstone flooring etc. Temples, Jageshwar District Almora 3. Repairs to the floor and providing retaining wall at Sitabani temple 5.05 5.02 Earth work, Lime Concrete work, flagstone flooring Sitabani, District Nainital and R.R.stone masonry work. 4. Repairs to the excavated structures at Purola, District Uttarkashi 3.00 3.00 Repairs to the excavated structures 5. Repairs to the floor and providing drainage system at Pandukeshwar Temple, Pandukeshwar, District Chamoli 7.00 7.00 Earth work, L.C.work, flag stone flooring etc. --------- Total Rs.40.02 Lacs SUPERINTENDING ARCHAEOLOGIST CONSERVATION PROGRAMME IN RESPECT OF OFFICE OF THE SUPERINTENDING ARCHAEOLOGIST, ARCHAEOLOGICAL SURVEY OF INDIA, DEHRADUN CIRLCE, DEHRADUN FOR THE FINANCIAL YEAR 2011-2012 02 03 27- S.R.( NON PLAN) NEW WORKS STATE:- UTTARAKHAND SL. Name of Work Tentative Proposed Item of works. NO. With Locality and District. Cost provision (IN LACS) (2011-2012) ………………………………………………………………………………………………………………………………………………….………………………………………… (In lacs) 1. Providing approach pathway at Lakhamandal temple, District Dehradun 10.00 10.00 Earth work, C.C.work, R.R.stone masonary work 2. Repairs to the retaining wall at Dandeshwar group of temples,Dandeshwar District Almora 7.00 5.00 Earth work, C.C.work, R.R.stone masonary work 3. Repairs to the retaining wall (Eastern side),Sun Temple, Katarmal District Almora 20.00 10.00 Earth work, C.C.work, and R.R.stone masonary --------- Total Rs.25.00 Lacs SUPERINTENDING ARCHAEOLOGIST CONSERVATION PROGRAMME IN RESPECT OF OFFICE OF THE SUPERINTENDING ARCHAEOLOGIST, ARCHAEOLOGICAL SURVEY OF INDIA, DEHRADUN CIRLCE, DEHRADUN FOR THE FINANCIAL YEAR 2011-2012 04 00 27- O.W.(PLAN) NEW WORKS STATE:- UTTARAKHAND SL. Name of Work Tentative Proposed Item of works. NO. With Locality and District. Cost provision (IN LACS) (2011-2012) ………………………………………………………………………………………………………………………………………………….………………………………………… (In lacs) 1. Construction of retaining wall of staff Quarter at Jageshwar 7.00 7.00 Earth work, C.C.work, stone masonry, coping District Almora pointing etc. 2. Providing pre-fabricated shed at Chandpur Fort, Adbadri, Distt.Chamoli 4.00 4.00 Providing pre fabricated shed 3. Providing pre-fabricated Toilet block at excavated site, Rishikesh District Dehradun 4.00 4.00 Providing pre fabricated toilet block --------- Total Rs. 15.00 Lacs SUPERINTENDING ARCHAEOLOGIST CONSERVATION PROGRAMME IN RESPECT OF OFFICE OF THE SUPERINTENDING ARCHAEOLOGIST, ARCHAEOLOGICAL SURVEY OF INDIA, DEHRADUN CIRLCE, DEHRADUN FOR THE FINANCIAL YEAR 2011-2012 04 00 27- O.W.(NON PLAN) NEW WORKS STATE:- UTTARAKHAND SL. Name of Work Tentative Proposed Item of works. NO. With Locality and District. Cost provision (IN LACS) (2011-2012) ………………………………………………………………………………………………………………………………………………….………………………………………… (In lacs) 1. Maintenance of Circle Office building, Dehradun 2.00 2.00 Repairs of Circle Office building 2. Repairs to the Director (Science) Office, Dehradun 6.05 6.04 Replacing damaged wooden doors and windows and maintenance. --------- Total Rs. 8.04 Lacs SUPERINTENDING ARCHAEOLOGIST .