Colossus1 Eurocentral 1 Brittain Way Motherwell Ml4 4Xj

Total Page:16

File Type:pdf, Size:1020Kb

Colossus1 Eurocentral 1 Brittain Way Motherwell Ml4 4Xj COLOSSUS1 EUROCENTRAL 1 BRITTAIN WAY MOTHERWELL ML4 4XJ WAREHOUSE & DISTRIBUTION FACILITY 94,189 SQ FT (8750 SQ M) TO LET LOCATION DESCRIPTION Eurocentral is a large mixed use business park located 11 miles to the This modern warehouse has a dedicated car park to the front of the east of Glasgow and 31 miles west of Edinburgh. It lies adjacent to property and a fully surfaced and secure delivery yard to the rear. The Junction 7 of the M8 motorway, the main central Scotland motorway building is formed from a steel frame which is clad to the walls and linking east to west, and 5.3 miles from Junction 8 of the M8, the roof with insulated metal panels. The roof contains translucent panels main intersection with the M74 and M73 motorways which in turn that provide good natural light. provide access to England and the north of Scotland. The warehouse is heated by gas warm air heaters and lit by halogen Eurocentral is one of the main logistics hubs for Scotland given the bulb lights and marshalling lights. There is a 2 storey office on-site rail freight terminal and its location adjacent to Scotland’s containing the welfare accommodation formed in span at the front of main motorway hence it is home to Eddie Stobart, DHL, Norbert the unit. There are private offices at the first floor level and further Dentressangle, Next and Sheffield Insulation Group. Other businesses private offices and a large general office at the ground floor level all include Warburtons, Lightbody, Hovis, City Link, Scottish & Southern accessed from the reception area. Energy and Mentholatum. There are ladies, gents and disabled toilets accessed off the main ground floor reception and ladies and gents toilets accessed from the warehouse. There is a drivers reception and a canteen which is SPECIFICATION accessed from the warehouse. • 12m wall head height • Fully racked for 19,000 pallets • 10 dock level loading doors • 11 charging stations for pallet TERMS (3.00m width & 3.60m height) trucks and forklifts • 4 ground level access doors • RedNet security system linked The property is held on an FRI lease expiring on the 24th June (3.00m width & 4.8m height) to the Police Station 2016. Rental information is available on request. M80 GLASGO M8 W A82 M80 COLOSSUS1 & EDINGBURGH GLASGOW ROAD D A A73 EUROCENTRAL GL O M898 M73 A8 R S ASG S OW & EDING E M8 M8 BUR N GH ROAD ’ M8 O D B 6 A A8 M8O A775 A74 R H A8 T R B7070 4 O M74 N MCN A726 EIL DRIVE A737 BR IT D TA OA A73 H R I A71 N RG A725 U 5 W ING A ED Y M77 MOTHERWELL A725 M74 A775 COLOSSUS1 TREET MAIN S EUROCENTRAL 5 A726 HAMILTON A73 A73 A723 8 A721 A71 COMMUNICATIONS DESTINATION DISTANCE Edinburgh 35 Miles Newcastle 147 Miles Leeds 206 Miles Manchester 208 Miles FURTHER INFORMATION Liverpool 213 Miles Nottingham 276 Miles Birmingham 284 Miles London 400 Miles ACCOMMODATION David Cobban Yan Stewart 0141 222 4101 [email protected] AREA SQ FT SQ M [email protected] Ground Floor Warehouse 89,320 8298.07 Ground Floor Offices/Welfare 4,870 452.39 IMPORTANCE NOTICE: Savills and James Barr give notice that: 1. They are not authorised to make or give any representations or warranties in relation to the property either here First Floor Offices 1,323 122.86 or elsewhere, either on their own or on behalf of their client or otherwise. They assume no responsibility for any statement that may be made in these particulars. These particulars do not form part of any offer or contract and TOTAL 94,189 8750.46 must not be relied upon as statements or representations of fact. Approximate Gross Internal Areas 2. Any areas, measurements or distances are approximate. The text, photographs and plans are for guidance only and are not necessarily comprehensive. It should not be assumed that the property has all necessary planning, building regulation or other consents and Savills and James Barr have not tested any services, equipment or facilities. Purchasers must satisfy themselves by inspection or otherwise. November 2012.
Recommended publications
  • To Let (May Sell)
    TO LET (MAY SELL) MOSSBURN AVENUE HARTHILL, LANARKSHIRE ML7 5NF (JUNCTION 5/M8 MOTORWAY) NUE AVE RN SBU MOS M8 8.31 ACRE (3.36 HECTARE)SITE WITH SECURE YARD SPACE AVAILABLE FROM 0.5 ACRES UPWARDS VEHICLE MAINTENANCE UNIT OF 4,475 SQ FT (415.73 SQ M) PLOT ACRES HECTARES 1 1.26 0.51 2 4.6 1.86 3 0.51 0.21 (Exclusive of VMU) 4 1.01 0.41 5 0.78 0.32 There is potential to combine a number of plots. Please contact the agent for further information on these options. M8 VMU GATEHOUSE 3 4 2 1 MESGUEN (UK) LTD 5 WEST MAIN STREET SITE ACCESS POINTS LOCATION DRIVE TIMES Harthill Industrial Estate is located in the Central Belt of Glasgow City 30 mins Scotland on the M8 Corridor immediately to the south of Glasgow Airport 40 mins the M8 motorway between Junctions 4a and 5. Glasgow is Edinburgh City 40 mins located 25 miles to the west and Edinburgh 20 miles to the east. The site is to the south of the M8 motorway within Edinburgh Airport 30 mins a mixed use area, with the principal access via Mossburn Manchester 3 hrs 45 mins Avenue. Surrounding occupiers include Carclo Technical Birmingham 5 hrs Plastics Ltd and Mesguen (UK) Ltd. Hull 5 hrs London 7 hrs Southampton 7 hrs 20 mins Grangemouth Port 35 mins Greenock Port 1 hr SITE DESCRIPTION The aerial plan demonstrates potential splits for the site which extends to 8.31 acres, salient points as follows: • Extensive concrete surface yard • Gatehouse with security barrier entrance • Steel palisade and chain link fencing • 4 potential entrances into the site • CCTV and lighting covering the whole site
    [Show full text]
  • TORRANCE PARK, HOLYTOWN, ML1 5RU Units Available - 750 to 4,000 Sq.Ft Including 1,800Sq.Ft Drive-Thru
    AVAILABLE SPRING 2022 M8 EUROCENTRAL THE SITE HOLYTOWN A723 NEW HOUSING TORRANCE PARK, HOLYTOWN, ML1 5RU Units available - 750 to 4,000 sq.ft including 1,800sq.ft drive-thru NEIGHBOURHOOD RETAIL CENTRE - EXTENDING TO 13,000 SQ FT LOCATED OFF A723 TO MOTHERWELL - OVER 10,500 VEHICLES PASS DAILY OVER 900 HOMES PROPOSED - PHASES 1 & 2 COMPLETE LOCATION The proposed retail centre enjoys a prominent location on the A723, at the entrance to Torrance park, a new residential district, which on completion will comprise over 900 homes. The A723 is a busy arterial route linking Motherwell, Carfin and Holytown to junction 6A of the M8 Motorway. Eurocentral and Newhouse Industrial Estate are located close by to the North of the site. STIRLING M9 M80 DUNFERMLINE FALKIRKSTIRLING M90 M80 FIRTH OF FORTH DUNFERMLINE CUMBERNAULD M90 M9J4 M80 M9 M73 COATBRIDGE LINLITHGOW M8 M80 EDINBURGH M8 FIRTH OF FORTH GLASGOW J7 M77 J6 LIVINGSTON FALKIRK M74 MOTHERWELL J4 EAST KILBRIDE M9 M80 LINLITHGOW CUMBERNAULD EDINBURGH M80 LIVINGSTON M73 COATBRIDGE M8 M8 GLASGOW J7 M77 J6 Masterplan provided by EMA Architects & Masterplanners M74 MOTHERWELL EAST KILBRIDE PAGE 2 LAYOUT PLAN Accommodation schedule UNIT TENANT SIZE(Sq.M) SIZE(Sq.FT) 1 Under Oer 372 4,000 2 To Let 116 1,250 3 To Let 139 1,500 4 To Let 116 1,250 5 To Let 116 1,250 6 To Let 111 1,200 7 To Let 60 750 Drive Thru To Let 167 1,800 TOTAL 1,197 13,000 Under Oer PAGE 3 DEVELOPER Travelodge Edinburgh Crucible Developments are a property development and asset management company based in Ayr, Scotland.
    [Show full text]
  • ROADS to RUIN TIME for CLIMATE-RESPONSIBLE TRANSPORT INVESTMENT in SCOTLAND August 2021 CONTENTS
    ROADS TO RUIN TIME FOR CLIMATE-RESPONSIBLE TRANSPORT INVESTMENT IN SCOTLAND August 2021 CONTENTS Introduction 3 1. The Scottish road-building programme 7 2. The impact of the Scottish road-building programme 25 3. Conclusions 32 4. Recommendations 35 5. Case studies 41 5.1. M74 Completion 42 5.2. A9 Dualling 44 5.3. A96 Dualling 46 Notes 48 2 INTRODUCTION WHY TRANSPORT SPENDING MATTERS Recent years have seen politicians of all the closest being business and colours recognise the severity of the climate manufacturing, which accounts for crisis and proclaim their determination to 20% of emissions. Transport Scotland reports take action. Scotland recently revised its that “motorway emissions have increased climate targets to be net zero by 2045, substantially since 1990, with the 2018 level with a 75% emissions reduction by 2030.1 81% above that of the 1990 baseline. This In transport specifically, the Scottish increase in motorway emissions since 1990 Government has now committed to a has coincided with a substantial increase target of 20% traffic reduction by 2030.2 in the length of Scotland’s motorway Yet in this key policy area where Scotland network. Between 1990 and 2017, Scotland’s has consistently failed to make progress on motorway network increased in length emissions, most mainstream politicians still from 312km to 645km. Motorway vehicle appear wedded to the further subsidy of road kilometres rose from 3242 million in 1990 use through the construction of new roads to 8518 million in 2018.”5,6 and additional road capacity. The link between the provision of additional It is indefensible, especially in light of road capacity and increased road traffic significant progress in other sectors, that levels is long established, and widely there has been nearly no progress in acknowledged by governments and experts.
    [Show full text]
  • Kelvinhaugh Residences Directions Central Train Station Train Take a Low Level Train to SECC
    Kelvinhaugh Residences Directions Central Train Station Train Take a low level train to SECC. From SECC Station walk past Peugeot garage; take the first left onto St Vincent Crescent, take the first right on to Corruna Street. At the top of the street turn left (at Ben Nevis Pub) onto Argyle Street. Take the first left onto Kelvinhaugh Street, then first right into Kelvinhaugh Place and Cairncross House. Bus Exit Central Station at the side exit onto Hope Street. Cross Hope Street and take Bus No: 2 to Argyle Street. Leave the Bus on Argyle Street (first stop after Sainsbury’s). Walk back Along Argyle Street and take first right into Kelvinhaugh Street, then first right into Kelvinhaugh Place and Cairncross House. Alternatively you can get a taxi, which will cost approximately £5 - £10. Queen Street Train Station Train Exit the Station onto George Street and follow the signs to Central Station. From Central Station take a lower level train to SSEC. From SECC Station walk past a Peugeot garage, take the first left onto St Vincent Crescent. Take the first right on to Corruna Street. At the top of the street turn left (at Ben Nevis Pub) onto Argyle Street. Take the first left onto Kelvinhaugh Street, then first right into Kelvinhaugh Place and Cairncross House. Bus Exit Queen Street Station and walk to Hope Street by turning right onto George Street, then onto West George Street. At Hope Street take Bus No: 9 or 2 to Argyle Street. Leave bus on Argyle Street (first stop after Sainsbury’s).
    [Show full text]
  • Hard Shoulder Running E40 and Weaving Segments E314
    Arc Atlantique Traffic Management Corridor Annex 1 Evaluation reports www.easyway-its.eu TABLE OF CONTENTS 1. FL-01: Hard shoulder running E40 and weaving segments E314 2. FL-02: Hard shoulder running E19 Kleine Bareel – St.-Job-in-‘t-Goor 3. WL-03: Management and transit traffic on Walloon motorways 4. FR-05: Intelligent Truck Parking 5. FR-16: Traffic Management Plans 6. IE-01: MIU ITS Deployment 7. NL-01: Field test Amsterdam 8. PT-..: Monitoring Enhancement on critical segments – to be delivered 9. PT-03: System Enhancements 10. E01: AG-64 Traffic Control and Traffic Management ITS deployment 11. E02: AG-55 Traffic Control and Traffic Management ITS deployment 12. ES-20: Floating Car Data use 13. ES-21: Analysis and evaluation of different traffic management strategies in order to reduce the congestions in Bilbao peri-urban area 14. UK 02: M25 J 5 – 7 Variable Speed Limit, All lane Running / Hard Shoulder Running 15. UK 03: M25 J 23 – 27 Variable Speed Limit, All lane Running / Hard Shoulder Running 16. UK ..: Welsh National Traffic Data System – to be delivered Arc Atlantique Evaluation report – Annex 1 2/2 Hard Shoulder Running and Weaving Segments Belgium –E40/E314 – Brussel - Aken Project Reference: FL-01 Project Name: Hard shoulder running E40 and weaving segments E314 ITS Corridor: E40/E314 Brussel - Aken Project Location: Belgium – E40/E314 Leuven Area 1. DESCRIPTION OF THE PROBLEM ADDRESSED BY THE PROJECT 1.1 Nature of the Site The R0, E40 and E314 in this report are part of a highway connection between the cities of Brussels-Lummen (E314), and Brussels-Luik (E40).
    [Show full text]
  • 225000 Sqft JUNCTION 7 M8
    build to suit ON THE INSTRUCTIONS OF TULCHAN DEVELOPMENTS LTD OPPORTUNITIES 42,500 – 225,000 sqft Eurocentral | North Lanarkshire | ML1 4XZ JUNCTION 7 M8 WWW.ORCHARDPARK-EUROCENTRAL.CO.UK Orchard Park | Eurocentral | North Lanarkshire | Junction 7 M8 | ML1 4XZ strategically located to maximise infrastructure ABERDEEN EDINBURGH Glasgow MANCHESTER BIRMINGHAM 146 miles 31 miles 11 miles 208 miles 284 miles 3 hours 31 minutes 14 minutes 3.14 hours 4.17 hours J7 M8 Port of Leith Edinburgh Airport Orchard Park Glasgow Airport Greenock Port 45 mins 30 mins 30 mins 45 mins | 2 A90 A85 A85 Perth 11 A82 Orchard Park Eurocentral North Lanarkshire Junction 7 M89 ML1 4XZ A92 A91 | | | | St Andrews A84 A9 A91 Glenrothes 6 11 A82 A91 5 10 A92 premier distribution hub 4 Kirkcaldy A811 Stirling M90 Close to 806,000 9 Dunfermline A985 3 Dalgety Bay 3 people live within M80 7 2 North Berwick for central Scotland 1 Falkirk Helensburgh commuting distance 5 4 M9 Dumbarton 4 A80 Dunoon Greenock A73 1 31 1 EDINBURGH M8 1 3 2 A1 30 3 M80 A720 M73 M8 Livingston A78 26 29 27 Airdrie 4 24 5 A68 Haddington 1 7 6 A71 Paisley A725 Both Glasgow 3 GLASGOW Largs 5 A702 Location and Edinburgh 4 A71 6 A73 Hamilton A703 A726 A7 International Airports East Kilbride Carluke Eurocentral is the premier distribution hub for A737 8 A697 central Scotland located 11 miles to the east of can be reached M74 A721 Ardrossan Lanark Glasgow and 31 miles west of Edinburgh. within 30 minutes. A77 Kilmarnock Galashiels Irvine Peebles It has a dedicated interchange (Junction 7) of the M8 motorway, the main central motorway linking Glasgow (11 miles), M8/M74/M73 & M80 east to west and lies 4 miles east of the Baillieston A8 Eurocentral Junction 7 Interchange, linking the M8, M74(M6) and M73 Baillieston motorways.
    [Show full text]
  • Monklands Independent Review Report
    An independent review of the process followed by NHS Lanarkshire Monklands Replacement/Refurbishment Project (MRRP) Report of the Independent Review Panel June 2019 Contents 1. INTRODUCTION .................................................................................................................... 5 1.1. Monklands District General Hospital: Background ........................................................ 5 1.2. The Need for Replacement/Refurbishment of the Monklands Hospital ........................ 5 1.3. NHS Lanarkshire ‘Monklands Replacement/Review Project’ (MRRP) ............................ 5 1.4. Call for Independent Review ......................................................................................... 6 2. LAY SUMMARY .................................................................................................................... 7 3. EXECUTIVE SUMMARY ......................................................................................................... 9 3.1. Recommendations for action (1): MRRP Team ............................................................ 10 3.2. Recommendations (2): General Guidance ................................................................... 11 4. PROCESS FOLLOWED BY THE INDEPENDENT REVIEW PANEL AND GUIDANCE USED ............ 14 4.1. Remit of the Independent Review .............................................................................. 14 4.2. Summary of the Independent Review Panels Process ................................................. 14 4.3. Relevant Guidance
    [Show full text]
  • CONTACT LIST.Xlsx
    Valuation Appeal Hearing: 27th May 2020 Contact list Property ID ST A Street Locality Description Appealed NAV Appealed RV Agent Name Appellant Name Contact Contact Number No. 24 HILL STREET CALDERCRUIX SELF CATERING UNIT £1,400 £1,400 DEIRDRE ALLISON DAVID MUNRO 01698 476054 56 WEST BENHAR ROAD HARTHILL HALL £18,000 £18,000 EASTFIELD COMMUNITY ACTION GROUP DAVID MUNRO 01698 476054 BUILDING 1 CENTRUM PARK 5 HAGMILL ROAD COATBRIDGE WORKSHOP £44,000 £44,000 FULMAR PROPERTIES LTD DAVID MUNRO 01698 476054 BUILDING 2 CENTRUM PARK 5 HAGMILL ROAD COATBRIDGE STORE £80,500 £80,500 FULMAR PROPERTIES LTD DAVID MUNRO 01698 476054 BLDG 4 PART CENTRUM PARK 5 HAGMILL ROAD COATBRIDGE OFFICE £41,750 £41,750 FULMAR PROPERTIES LTD DAVID MUNRO 01698 476054 5 HAGMILL ROAD COATBRIDGE OFFICE £24,000 £24,000 FULMAR PROPERTIES LTD DAVID MUNRO 01698 476054 BUILDING 7 CENTRUM PARK 5 HAGMILL ROAD COATBRIDGE WORKSHOP £8,700 £8,700 FULMAR PROPERTIES LTD DAVID MUNRO 01698 476054 1 GREENHILL COUNTRY ESTATE GREENHILL HOUSE GOLF DRIVING RANGE £5,400 £5,400 GREENHILL GOLF CO CHRISTINE MAXWELL 01698 476053 CLIFTONHILL SERVICE STN 231 MAIN STREET COATBRIDGE SERVICE STATION £41,000 £41,000 GROVE GARAGES INVESTMENTS LIMITED ROBERT KNOX 01698 476072 UNIT B3 1 REEMA ROAD BELLSHILL OFFICE £17,900 £17,900 IN-SITE PROPERTY SOLUTIONS LIMITED DAVID MUNRO 01698 476054 UNIT B2 1 REEMA ROAD BELLSHILL OFFICE £18,600 £18,600 IN-SITE PROPERTY SOLUTIONS LIMITED DAVID MUNRO 01698 476054 2509 01 & 2509 02 42 CUMBERNAULD ROAD STEPPS ADVERTISING STATION £3,600 £3,600 J C DECAUX CHRISTINE MAXWELL
    [Show full text]
  • For Sale Development Opportunity 359 Sauchiehall Street Glasgow
    REFURBISHMENT/ FOR SALE DEVELOPMENT OPPORTUNITY 359 SAUCHIEHALL STREET GLASGOW SAT NAV: G2 3HU Glasgow • 19 self-contained flats providing 81 student beds and a management office (potentially 2 further bedrooms) requiring refurbishment • Potential alternative uses as residential / serviced apartment city centre subject to planning • Glasgow City Centre • Prominent corner block • Gross Internal area approx. 2,187 sq m (23,540 sq ft) over 4 floors • Offers invited opportunity 359 SAUCHIEHALL STREET, GLASGOW, G2 3HU PAGE 2 the Property This Grade B listed property comprises the prominent upper floors (1st, 2nd, 3rd and 4th) of a sandstone building on the southwest corner of the junction of Sauchiehall Street and Holland Street. The main access is from a doorway directly onto Sauchiehall Street leading to the first floor. The majority of the ground floor is occupied by a Wetherspoons bar and is not part of the property being marketed. The property is currently configured as 19 self-contained flats providing 81 student beds and a management office requiring refurbishment. 359 SAUCHIEHALL STREET, GLASGOW, G2 3HU PAGE 3 central location Buchanan Galleries Shopping Centre Central Station Buchanan Bus Station Cineworld Multiplex Theatre Royal M&S Primark Blythswood Hotel Boots King Tut’s Wah Wah Hut Glasgow Film Theatre Dakota Hotel Sandman Signature Hotel Sauchiehall Street IQ Elgin Place (PBSA) MODA Holland Park (BTR) Glasgow School of Art 359 Holland Street Glasgow Dental Hospital Watkin Jones and School Portcullis House (BTR) King’s Theatre Charing Cross Station Tesco Beresford Lounge M8 Motorway The Garage (nightclub) 359 SAUCHIEHALL STREET, GLASGOW, G2 3HU PAGE 4 The property is located in the Bustling heart of Glasgow City Centre in a prime position on the south side of Sauchiehall Street, at its junction with Holland Street.
    [Show full text]
  • Main Issues Report Report on Responses and Site Options Consultation
    North Lanarkshire LOCAL DEVELOPMENT PLAN Main Issues Report Report on Responses and Site Options Consultation Contents 1 Executive summary 4 2 Background 2.1 Development Plans 5 2.2 North Lanarkshire Local development Plan 5 2.3 Purpose of the Main Issues Report 5 3 Main Issues Report 3.1 Contents of the report 6 3.2 Issues identified 7 3.3 Aim and Approach issues 8 3.4 Strategic Policy issues 9 3.5 Thematic Policy issues 10 3.6 Options and alternatives 11 4 Responses to Issues 4.1 Analysis of Main Issues Report responses 13 5 Identifying sites 5.1 Site assessment activities 21 5.2 Applying the issues responses and assessment methodology 23 5.3 Sites approved January 2016 26 5.4 Urban boundary review and minor inner urban area sites March 2016 28 5.5 All potential development schedules 31 6 Next steps 6.1 Consultation 45 6.2 Proposed Plan 45 6.3 Examination and Adoption 45 7 Appendices 7.1 Call for Sites criteria and parameters 46 7.2 Site Sustainability and Deliverability Matrix 47 7.3 October 2015 draft site selection process 52 7.4 December 2015 site selection process amendments 54 7.5 January 2016 site selections 55 7.6 March 2016 urban boundary review and minor inner urban area sites 68 Page 3 of 84 1 Executive summary 1.1 The North Lanarkshire Local Plan is being 1.5 The Report on Responses and Site Options 1.8 Once the Council has considered replaced by a Local Development Plan. is accompanied by a Draft Environmental representations it will publish a Proposed Report fulfilling the Strategic Environmental Plan during 2016 addressing the spatial 1.2 The Local Development Plan will be a land Assessment requirements of the Main implications of economic, social and use strategy for North Lanarkshire that: Issues Report stage of producing the Local environmental change for North Development Plan.
    [Show full text]
  • Cisco Trilogy Business Park 11 Woodhall Eurocentral ML1 4YT
    Cisco Trilogy Business Park 11 Woodhall Eurocentral ML1 4YT ο From Glasgow Follow M8 motorway Eastbound towards Edinburgh and Carlisle M8 merges into A8 continuing towards Edinburgh At Eurocentral Interchange branch left, then at roundabout take the 2nd exit (signposted Eurocentral) At roundabout take 2nd exit onto Townhead Avenue, at next roundabout take 2nd exit remaining on Townhead Avenue At roundabout take 1st exit onto McNeil Drive, at next roundabout take 2nd exit remaining on McNeil Drive. At the next roundabout turn left into Woodhall, go straight over a mini roundabout and you’ll then come in Trilogy Business Park. Cisco is located on the left hand side ο From Edinburgh Take M8 from Edinburgh towards Glasgow At Eurocentral Interchange branch left, then at roundabout take 2nd exit onto Townhead Avenue, at next roundabout take 2nd exit remaining on Townhead Avenue At roundabout take 1st exit onto McNeil Drive, at next roundabout take 2nd exit remaining on McNeil Drive. At the next roundabout turn left into Woodhall, go straight over a mini roundabout and you’ll then come in Trilogy Business Park. Cisco is located on the left hand side ο From the South Follow M6 Northbound Then M74 Northbound towards Carlisle Follow M74 all the way North following signs for M8/M80 Glasgow and Stirling Take A725 exit for Hamilton, East Kilbride and Bellshill Keep to the outside lane on the slip off the M74 and follow right round the roundabout until 3rd exit off taking you on to the A725 towards Bellshill (A8 Edinburgh) Follow A725 towards Edinburgh At Eurocentral Interchange branch left, then at roundabout take the 2nd exit (signposted Eurocentral) At roundabout take 2nd exit onto Townhead Avenue, at next roundabout take 2nd exit remaining on Townhead Avenue At roundabout take 1st exit onto McNeil Drive, at next roundabout take 2nd exit remaining on McNeil Drive.
    [Show full text]
  • Credit Balance Report
    Year Credit Ratepayer Property Address 1 Property Address 2 Property Address 3 Property Address 4 Property Address 5 Postcode Reference 2016 -£4.61 Abr Properties Wishaw Limited 1 Young Street Wishaw ML2 8HJ N003118 2017 -£127.67 Acumen Steel Processing Ltd Unit 20, 17 & 20 Flemington Ind Park 1 Robberhall Road Motherwell ML1 N013069 2017 -£20.71 Acumen Steel Processing Ltd Unit 14a Flemington Ind Park 1 Robberhall Road Motherwell ML1 N015144 2017 -£408.57 Alwyd Ltd 155 Glencraig Street Airdrie ML6 9AS N006758 2018 -£835.99 Alwyd Ltd 155 Glencraig Street Airdrie ML6 9AS N006758 2018 -£3.78 Amg Transport Group Limited Unit 3 1 Carlisle Road Chapelhall Airdrie ML6 8RN 169313 2018 -£0.25 Amg Transport Group Limited Unit 4 1 Carlisle Road Chapelhall Airdrie ML6 8RN 169314 2016 -£670.30 Andrew Wallace Properties Ltd 19-21 19 Stirling Street Airdrie ML6 0AH 161284 2017 -£2,908.51 Anglo Scandinavian Estates 7 LLP 50 Deerdykes View Cumbernauld G68 9HN N014240 2017 -£221.19 Anglo Scandinavian Estates 7 LLP Unit 9 9 Badenheath Place Cumbernauld G68 9HX N012444 2016 -£1,249.78 Arran Aromatics Limited 2nd Floor Left 2 Parklands Avenue Eurocentral Holytown ML1 4WQ 166798 2017 -£455.79 Arran Aromatics Limited 2nd Floor Left 2 Parklands Avenue Eurocentral Holytown ML1 4WQ 166798 2016 -£318.35 Ashtenne Investments (scotland) Ltd Unit 1 Block 7 7 Chapelhall Industrial Estate Chapelhall Airdrie ML6 8QH N003586 2018 -£746.28 Asset Collections & Investigations Limit Rm 49 Grovewood Bus Centre 1 Wren Court Strathclyde Business Park Bellshill ML4 3NQ N002548
    [Show full text]