American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Investigations Planned Primary Corps District Project Name Work Description - as of 5 January 10 Allocation State ($) Issue contract for State of Alaska Regional Harbor AK Alaska Alaska Regional Ports, AK 240,000 Development Study Award contract for hydraulic analysis and participation AK Alaska Anchorage Harbor Deepening, AK 150,000 in ship simulation modeling. Award contract for design analysis to include wave AK Alaska Kenai River Bluff , AK 300,000 hindcast and revetment design Award contract for economic analysis, environmental AK Alaska Little Diomede Harbor, AK 250,000 studies and geotechnical investigations Issue contracts for airborne laser mapping surveys in conjunction with US Geologic Survey, AK Alaska Matanuska River Watershed, AK mapping in conjunction with Fish and Service, 372,000 wetlands delineation assessment, and data gap analysis. Fully obligate incrementally funded Architect/Engineer Va Shly-Ay Akimel Salt River contract to complete final Plans and Specifications and AZ Los Angeles 645,000 Restoration, AZ the Detailed Design Report for the first construction contract award on Phase 1 of the project. Fully funded Architect/Engineer contract to complete CA Los Angeles Carpinteria Shoreline Study, CA the draft Environmental Impact Statement associated 130,000 with the Feasibility Report. Complete Independent Technical Review and fund Coast of CA, South Coast Region (Los CA Los Angeles Architect Engineer contract to complete draft Final 162,258 Angeles Co) Report Fully fund Architect/Engineer contract to prepare plans CA Los Angeles Lower Mission Creek, CA and specifications for the construction on the lower half 600,000 of project Award an option for the High Flow Bypass Facility CA Los Angeles Matilija , CA 250,000 Design. Award contract to complete Draft Environmental Impact CA San Fransisco Pajaro River, CA Statement associated with the General Reevaluation 92,933 Feasibility Report. Award contract for preparation of the Environmental Basin West CA Sacramento Assessment for the alternatives and the recommended 85,707 Stanislaus, Orestimba, CA plan. Fund remaining contract for completion of Reallocation Study and Environmental Impact Statement. Fund Chatfield, Cherry And Bear Creek, CO Omaha another contract for Independent Peer Review 160,000 Reservoirs, CO Management and panel for review of Reallocation Study and Environmental Impact Statement. Complete /closure design and document current environmental and economic information to allow a DC Washington D.C. & Vicinity construction contract to be awarded early of FY 2010. 900,000 The completed project will reduce the risk of flooding in the downtown Washington, DC area. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Investigations Planned Primary Corps District Project Name Work Description - as of 5 January 10 Allocation State ($) Funding will allow the General Reevaluation phase of this project to continue without interruption. A major portion of the work including modeling, geotechnical investigations, and environmental surveys would be FL Jacksonville Jacksonville Harbor, FL contracted out to private industry creating job 1,485,000 opportunities. Ultimately this study for harbor improvements could justify a deeper Port, creating an avenue for Port expansion and ultimately more jobs in the area. Funding will allow the feasibility phase of this project to continue without interruption. A major portion of the work including external peer review, will be contracted FL Jacksonville Mile Point, FL 144,832 out creating job opportunities. Ultimately this study for channel improvements could lead to a more efficient use of the harbor and more cargo transits. Funding will allow the feasibility phase of this project to continue without interruption. A major portion of the work, the environmental survey update, will be FL Jacksonville Port Everglades Harbor, FL contracted out creating job opportunities. Ultimately 135,212 this study for harbor improvements could justify a deeper Port, creating an avenue for Port expansion and ultimately more jobs in the area. Funding will allow the feasibility phase of this project to continue without interruption. A major portion of the work, including resource surveys and a Draft Environmental Impact Statement, will be contracted out FL Jacksonville St Johns County, FL 189,000 creating job opportunities. Ultimately this shore protection project stands to reduce storm damages while protecting upland structures and could potentially save lives. FY 2010 funds will allow completion of feasibility study needed to facilitate recovery from FY 2008 Midwest IA Rock Island Cedar River Check Area, IA . Recovery is not able to proceed without 3,365,000 Federal recommendations on risk management measures. Award contract to conduct hydrologic analysis, and ID Walla Walla Boise River, Boise, ID 150,000 prepare floodplain mapping for the lower Boise River. Award a contract to prepare topographic data for a FPMS (SS Warm Springs Creek Vic of ID Walla Walla future update to floodplain maps. Cluster County will 25,000 Challis, ID) use this information to aid in the reduction of flood risk. Award and complete Independent External Peer Review contract. Funds will be used to complete mandatory Independent External Peer Review for this large study. This will expedite completion of the study IL Chicago Des Plaines River, IL (Phase II) 482,000 and review processes for this project, which will serve to reduce $27M in average annual damages and the risks associated with flooding in the Chicago Metropolitan Area. Funds will be used to complete Feasibility report, including awarding and completing the economic IL Chicago Illinois Shoreline Erosion 525,000 analysis contract, which will serve to reduce $55M in average annual damages. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Investigations Planned Primary Corps District Project Name Work Description - as of 5 January 10 Allocation State ($) Issue a contract to expand the use of tools developed under the Great Lakes Habitat Initiative by updating the John Glenn Gr Lakes Basin Strat database and developing additional features to foster IL Buffalo 200,000 Plan,IL,IN,MI,MN,NY,OH,PA&WI collaboration and identification of funding sources, and developing a system to track completed projects and their associated environmental benefits.

Award a contract to perform sediment sampling and Blackstone River Watershed MA New England testing of accumulated material behind impoundments 150,000 Restoration, MA & RI along the Blackstone River in .

Award contract to complete the Technical Guide to be Chesapeake Bay Shoreline, Maryland used by state and local agencies to restore and protect MD Baltimore 60,000 Coastal Management, MD the Chesapeake Bay shoreline infrastructure, resources, and aquatic ecosystem habitat. Issue a contract to complete a general re-evaluation report to determine the feasibility of constructing a flood MI Detroit Ecorse Creek, MI damage reduction project in Dearborn Heights, MI, to 1,569,000 reduce damages associated with frequent flooding in an urbanized area. Funds will be used for a contract to collect airborne laser mapping Light Detection and Ranging Red River Of The North Basin, MN, data and develop a digital elevation model. The model MN St. Paul 278,000 ND, SD, & Manitoba Canada will be used to plan water resource projects, including flood risk management and ecosystem restoration projects, and local development decisions. Award contracts for fishery study with MT Fishery Coop; economics study with Headwaters Economics; MT Omaha Yellowstone River Cooridor, MT floodplain mapping in Sweetgrass County; hydrologic 435,000 model for Tongue River Basin; and a website for public outreach. Award two Architect/Engineer Contracts to complete coastal analysis and economics using Beach FX model, NC Wilmington Bogue Banks, NC a comprehensive analytical framework for evaluating 165,000 the physical performance and economic benefits and costs of shore-protection projects. Funds will be used for a contract to complete subsurface investigations and hydrologic for the Fargo, Fargo, ND - Moorhead, MN Metro ND - Moorhead, MN metro area flood risk management ND St. Paul 222,000 Study (Rrn Basin Auth) study. Fargo is the largest city in North Dakota and is threatened from overland flooding from the Red River of the North. Funds will be used to prepare a regional/systems type study for the coast of New Jersey; develop a regional New Jersey Shoreline Alternative Long sediment budget and an improved understanding of NJ Philadelphia 265,097 Term Nourishment, NJ regional coastal processes; and implement an efficient regional sediment management and monitoring program to reduce long term nourishment costs. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Investigations Planned Primary Corps District Project Name Work Description - as of 5 January 10 Allocation State ($) Award contract for geotechnical exploration data collection along the Truckee River and proposed areas NV Sacramento Truckee Meadows, NV 629,758 for levee and ecosystem restoration for design of the proposed recommended plan. Funds would be used to accelerate progress on the Buffalo River Environmental Dredging, NY Buffalo Buffalo River Environmental Dredging Feasibility Study, 200,000 NY through the use of Architect/Engineer contracts. Award an External Peer Review (EPR) contract to an NY New York Jamaica Bay, NY 400,000 Architect/Engineer firm. Award and execute a modification to an existing contract to prepare a report summarizing the Onondaga Lake Progress Assessment and Actions strategy NY Buffalo Onondaga Lake, NY 74,500 technical report in lay terms. The State of the Lake report will be made available to partners, other agencies and the public through electronic media.

Complete the Feasibility Report including Environmental Impact Statement by March 2010. Award Task Orders for Main Report Preparations, NY New York South Shore Of Staten Island, NY Economics Appendix, Draft Environmental Impact 750,000 Statement, and an Engineering Appendix. Subsequent to the completion of Feasibility Report, contract for various External Peer Review related tasks. Award Architect/Engineer contract to accelerate Western Lake Erie Basin, OH, IN, & progress on the Blanchard River Flood Risk OH Buffalo 262,000 MI Management and Ecosystem Restoration Feasibility study. Conduct analysis to refine water supply demands by municipal, industrial, agricultural sectors and comparing Oklalhoma Comprehensive Water OK Tulsa that to ground water and surface water sources by 500,000 Plan, OK - PAS watershed area in the eastern portion of the state of Oklahoma. Contract award to complete Feasibility Study and Programmatic EA. Completion of this phase will lead to OR Portland Amazon Creek, OR design and construction of up to 18 ecosystem 438,000 restoration projects along Amazon and Cedar Creeks within the cities of Eugene and Springfield.

Award contract to survey and create bench marks at all long-term Crest Stage Gages within Portland District. This program captures peak flood information on rivers OR Portland FPMS Floodplain Data 255,000 and is used to develop river simulation models or to help communities with flood planning. Funding will also complete all surveys within Portland District. Contract work will use existing site information to evaluate successful shallow water habitat sites. Results of this effort will identify the optimal number of Lower Columbia River Ecosystem OR Portland shallow water habitat sites for implementation that will 150,000 Restoration, WA & OR support threatened and endangered salmon for 146 miles of the Lower Columbia River, from the mouth to Bonneville Dam. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Investigations Planned Primary Corps District Project Name Work Description - as of 5 January 10 Allocation State ($) Award contract to complete a Planning Report evaluating alternatives to alleviate flooding issues at the OR Portland PAS Nehalem Flood Model City of Vernonia, which suffered extensive losses 100,000 during a Dec 2007 flood event. The report will aid in developing plans for flood damage reduction. Award contract to complete study alternatives. Supports Willamette River Environmental development of 35 ecosystem restoration projects on OR Portland 615,000 Dredging, OR the Lower Willamette River mainstem, as well as tributaries. Award an Architect/Engineer contract to complete the Feasibility Study Scoping documentation. This documentation would include definition of the existing Schuylkill River Basin, WIssahickon PA Philadelphia conditions, the without project conditions, and the site 293,703 Creek Basin, PA selection screening process to continue the Feasibility study of this critical urban watershed for ecosystem quality improvements. Funds will be used to complete a study of three unreliable Lock and Dam projects with a high risk of PA Pittsburgh Upper Ohio Navigation Study, PA unscheduled closures up to 1 year in duration. 490,000 Estimated annual transportation savings from 2002- 2007 were $202 million. Contract to evaluate water supply alternatives in 2 regions of Tennessee hit extremely hard by the 2007 drought. The regions are also home to numerous endangered aquatic species which can be harmed by South Cumberland Plateau Water some alternatives. The study is needed to balance TN Nashville Supply, TN (Planning Assistance to human and ecological needs. It is being done in 100,000 States) partnership with Tennessee Nature Conservancy, Geological Survey, University of Tennessee-Knoxville, Tennessee Association Utility Districts, Tennessee Department of Environment Conservancy Award an Architect/Engineer contract to complete the Dallas Floodway, Upper Trinity River Environmental Impact Statement for the Balance Vision TX Fort Worth 1,125,000 Basin, TX Plan to reduce the risk of flooding, and improve public safety. Funding will be used to award a task order under an Architect/Engineer contract; work to be performed would include: Update the roadway design to incorporate changes that have occurred over the past 8 VA Norfolk AIWW Bridge At Deep Creek, VA years within the project foot print; complete design of 879,000 Bridge, identify all Lands, Easements, Rights-of-Way and Relocations required due to project impacts, prepare construction plans and specifications, and move the project closer to the Ready to Advertise point. River Ecosystem Award a contract to survey possible ecosystem VT New England 50,000 Restoration CT, MA, NH, & VT restoration sites within the watershed. Funds will be used to hire a contractor for 6 months to WA Seattle Green River PAS 2009 study adult salmon habitat on the Stillaguamish and 42,000 Green Rivers and to complete a report. Funds will be used to hire a contractor for 5 months to WA Seattle PAS Hood Canal study marine organisms in the Hood Canal and to 35,000 complete a report. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Investigations Planned Primary Corps District Project Name Work Description - as of 5 January 10 Allocation State ($) Funds will be used to hire a contractor for 5 months to WA Seattle PAS South Puget Sound monitor adult salmon habitat in the South Puget Sound 75,000 and to complete a report. Award a contract to provide Architect/Engineer services to develop a scope of work and drilling plan for WA Seattle Skagit River, WA geotechnical investigations of the levee system along 308,000 the Skagit River. Data results will be used in the Levee Failure Analysis. CFDC - A Coastal Field Data Award a contract for MORPHOS development of an XXX ERDC 1,050,000 Collection engineering hurricane model (Coastal Modeling system)

Flood Plain Management Services Award a contract for purchase/distribution of American XXX HQ 20,000 Program Society of Flood Plain Managers publications. Navigation Investment Model(NIM) Award a contract for Inland Navigation Investment XXX Huntington Certification (Ohio River Main Stem 350,000 Model documentation and certification. Systems Study) Award a contracts for certification of national planning Mississippi XXX Planning Support Program models (Review of Regional Ecosystem Planning 800,000 River Division Models Harbor Sym) Award a contracts for certification of national planning Southwestern XXX Planning Support Program models (Review of Regional Ecosystem Planning 50,000 Division Models Harbor Sym) Award a contracts for certification of national planning South Pacific XXX Planning Support Program models (Review of Regional Ecosystem Planning 150,000 Division Models Harbor Sym) Award a contract to produce a GIS-based database and analytic tool for characterizing relative flood risks at the national scale. The supporting work involves collecting, reconciling, and georeferencing available Wise Use Of Floodplains Study XXX HQ data to populate the database and then processing the 500,000 (FEMA/MAP MOD Coordination ) data to produce flood risk characterizations. The resulting product will be a significant step forward in flood damage risk reduction through a better understanding of flood risks within the floodplain. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Award construction contract for mitigation features AK Alaska Seward Harbor, AK and breakwater extension, completing 4,522,000 construction of project. Contract for collection of wave, current, and dock AK Alaska Sitka Harbor, AK motion data, wave hindcast, collection of 1,522,000 economic data, and preparation of report. AL Mobile Mobile Harbor, AL Award and complete Turning Basin contract. 24,985,000 Funds required to complete last modification for rehabilitation of 4 hydropower units. Delaying Walter F George Lock AL Mobile funding to complete this project will result in 2,486,000 and Dam, AL & GA reduced contractor hired labor needs during the stimulus period. Award contract for the design, purchase, Walter F George Lock AL Mobile construction, and installation of and removal of 13,316,000 and Dam, AL & GA existing transformers. Aquatic Plant Control Award contracts for invasive aquatic plant control ALL ERDC 500,000 Program demonstration test Ozark-Jeta Major Rehab, Fully fund rehabilitation of the Unit 1 turbine to AR Little Rock 7,200,000 AR provide clean, renewable energy for the nation. Ozark-Jeta Major Rehab, Fully fund rehabilitation of the Unit 2 turbine to AR Little Rock 7,900,000 AR provide clean, renewable energy for the nation. Award construction contract to modify bulkheads, Minimum AR Little Rock construct valves and siphons at Norfork Lake. 2,156,000 Flows, AR Completes this separate element of the project. Complete construction of the large environmental AZ Los Angeles Tres Rios, AZ 11,946,945 wetlands on the Salt River. Award construction contract for the final section AZ Los Angeles Tres Rios, AZ (Phase 1C) of the flood protection levee 1,500,000 component for the Tres Rios, AZ, project. Construction of a large pump station integrated into the regional wastewater treatment plant for AZ Los Angeles Tres Rios, AZ the City of Phoenix and other surrounding 19,930,000 communities as part of the Tres Rios Environmental Restoration project. CA Sacramento Watershed (Common Contract efforts for WRDA 96 Phase 1 and 2 sites 14,012,000 Features), CA A contract to provide environmental mitigation for American River Folsom Bridge that would restore approximately CA Sacramento Watershed (Folsom Dam 2,630,000 50 acres of oak and riparian habit along the Raise), CA American River Parkway. Award 2 contracts to evaluate a desalination plant in order to ensure an adequate water supply. Cambria Seawater Contract would evaluate site characteristics for the CA Los Angeles 530,000 Desalination, CA proposed Salt Water intake and brine return line, and prepare environmental documentation in preparation for a Design-Build contract.

Contract would complete a Design Documentation Cambria Seawater CA Los Angeles Report and Plans and Specifications for the 2,000,000 Desalination, CA construction of the desalination plant. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Farmington Recharge Contract to a firm that will secure environmental CA Sacramento 115,000 (Sec 502) clearances for future ground water recharge sites. Farmington Recharge Construct ground water recharge site to restore CA Sacramento 350,000 (Sec 502) ground water levels. CA Sacramento Guadalupe River, CA Award and complete Mitigation contract. 1,500,000 CA Sacramento Guadalupe River, CA Construct one bridge and complete project. 4,000,000 Award a construction contract for construction of Harbor/South Bay Water the Lateral 7 (Dominguez lateral) Phase I and CA Los Angeles Recycling Study, Los 3,000,000 Phase II) pipeline for the West Basin Municipal Angeles, CA Water District's water reclamation project.

Harbor/South Bay Water Award a construction contract for construction of CA Los Angeles Recycling Study, Los the Pump Stations for the West Basin Municipal 1,000,000 Angeles, CA Water District's water reclamation project. Award a construction contract for construction of Harbor/South Bay Water the Anza Lateral pipeline for the West Basin CA Los Angeles Recycling Study, Los 129,000 Municipal Water District's water reclamation Angeles, CA project. Award a construction contract for construction of Harbor/South Bay Water the Carson Mall Lateral pipeline for the West CA Los Angeles Recycling Study, Los 1,000,000 Basin Municipal Water District's water reclamation Angeles, CA project. Complete the final construction related Los Angeles County CA Los Angeles documentation activities and perform the financial 245,000 Drainage Area, CA close out the project. Napa Creek Engineer Service during construction - CA Sacramento , CA 485,000 Architect-Engineer contract. Initiate and complete segment 2E construction CA Sacramento Napa River, CA 350,000 repairs. Complete construction of segment one, Napa CA Sacramento Napa River, CA 3,803,347 Valley project. Napa Valley Flood Control project Construction CA Sacramento Napa River, CA 2,500,000 management for Phase I. Complete Construction Napa Valley Flood Control CA Sacramento Napa River, CA 13,855,000 project. Engineering and Design and Supervision and CA Sacramento Napa River, CA Administration for Napa Creek Construction 200,000 contract Phase 2. Complete design of Oxbow Bypass so CA Sacramento Napa River, CA 2,025,983 construction can occur. Napa Valley Flood Control project Engr Svc during CA Sacramento Napa River, CA 113,428 const AE Architect-Engineer contract Initiate and complete a Preliminary Design for the Oxbow Pump Station to determine the CA Sacramento Napa River, CA 304,799 configuration, site layout, and estimated construction costs of this facility. Contract out for engineering services for the Napa CA Sacramento Napa River, CA 334,733 Valley Flood Control segment during construction. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Initiate and complete South Soscol track/ped. work. Continued construction of Dry Bypass CA Sacramento Napa River, CA 10,000,000 Bridge. Start on First Street utility relocations/construction. Continue of construction of Dry Bypass Railroad CA Sacramento Napa River, CA Bridge features, which elevates the train tracks 10,000,000 out of the dry bypass. Complete First Street reconstruction, initiate and CA Sacramento Napa River, CA complete North Soscol reconstruction and restore 10,000,000 730 acres of estuary. Complete construction of Napa River Bridge and CA Sacramento Napa River, CA 10,000,000 Dry Bypass Bridge. Initiate and complete construction of Napa Creek CA Sacramento Napa River, CA 35,840,000 site. North Valley Regional Section RW1 - Fully Funded construction contract CA Los Angeles 7,000,000 Water Infrastructure, CA for recycled water pipe line. Oakland Harbor (50 Foot Fully Funded construction contract for recycled CA San Francisco 1,000,000 Project), CA water pipe line. Oakland Harbor (50 Foot Complete dredging for 3F, option 8, including full CA San Francisco 2,200,000 Project), CA operation of both the Inner and Outer Harbors. Complete dredging for contract 3e, option 6, Oakland Harbor (50 Foot CA San Francisco including full operation of both the Inner and Outer 4,600,000 Project), CA Harbors. Complete Plans & Specifications and award Port Of Long Beach CA Los Angeles dredging contract to deepen the turning basin 2,455,000 (Deepening), CA within the Port of Long Beach. San Ramon Valley Complete contract award package for 2nd CA San Francisco 3,477,000 Recycled Water, CA segment of pipeline and complete the project. Santa Ana River Construct environmental mitigation measures CA Los Angeles 1,393,733 Mainstem, CA downstream of Seven Oaks Dam. Santa Ana River CA Los Angeles Complete Reach 9 improvements. 500,000 Mainstem, CA Santa Ana River Complete contract for channel improvements to CA Los Angeles 26,050,000 Mainstem, CA Reach 9 Phase 2B of the lower Santa Ana River. Complete a construction contract for the third CA Los Angeles Santa Maria Leeves, CA 25,000,000 Increment of the Santa Maria River project. Complete construction contract for the first & CA Los Angeles Santa Maria Leeves, CA second increment of the Santa Maria River 8,000,000 project. Funds will be used to award 4 fully funded construction contracts to construct fish passage, CA Los Angeles Santa Paula Creek, CA 7,500,000 complete required documentation, and complete project. Complete final Plans & Specifications for the CA Los Angeles South Perris, CA 41,000 South Perris desalter project. South Sacramento CA Sacramento Construct 3,000 ft levee 4,000,000 County Streams, CA American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Complete Plans and Specifications and award a CA Los Angeles Upper Newport Bay, CA fully funded construction project that will complete 17,363,000 the environmental restoration Construction to stabilize and prevent under CA Sacramento Yuba River Basin, CA 13,020,000 seepage at the Marysville Ring Levee. Construction of Hop Brook Dam safety CT New England Hop Brook Lake, CT 4,564,000 improvements. Washington D.C. and Award contract and complete construction of the DC Baltimore 5,840,000 Vicinity 17th Street Closure Structure. Update project design and execute an agreements with the non-Fed sponsor. Approximately 82 acres of degraded tidal marsh Restoration Of Grass habitat by stabilizing eroding embankment, DE Philadelphia 125,000 Dale, DE creating open water areas with shallow water habitats, improving tidal circulation, and controlling invasive species and will positively affect 172 acres. Award an AE Contract to monitor Canaveral FL Jacksonville Canaveral Harbor, FL 200,000 Harbor Sand Bypass for an environmental permit. Canaveral Harbor Sand Bypass Monitoring for the FL Jacksonville Canaveral Harbor, FL environmental permit by Architect-Engineer 200,000 contract. Initiate and complete contract for the Canaveral FL Jacksonville Canaveral Harbor, FL 10,500,000 Harbor Sand Bypass contract. Funding for adaptive assessment and monitoring, conduct a benthic survey of the Caloosahatchee, St. Lucie, Loxahatchee and Lake Worth Lagoon Estuaries, improve data management for the Central and South FL Jacksonville Everglades Depth Estimation Network project, and 1,100,000 Florida conduct field and lab studies of salinity, Submerged Aquatic Vegetation, and fishes. Work is part of the Comprehensive Everglades Restoration Plan. Eradicate invasive Melaleuca eradication as part Central and South FL Jacksonville of the Comprehensive Everglades Restoration 2,886,000 Florida Plan Construct L-31 North Seepage Management Pilot Central and South FL Jacksonville as part of the Comprehensive Everglades 5,668,000 Florida Restoration Plan. Construct Merritt Pump Station for the Picayune Central and South FL Jacksonville area as part of the Comprehensive Everglades 40,771,000 Florida Restoration Plan. Comprehensive Award Site One construction contract to FL Jacksonville Everglades Restoration reinforce/upgrade the L-40 Levee portion of the 38,000,000 Plan project. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Complete Basins 2&3 of Seminole big Cypress, awarding contract for irrigation storage cells, water Everglades and South resource areas, pump station for transferring FL Jacksonville Florida Ecosystem 4,170,000 water, canals for distribution and inverted siphons Restoration to carry effluent under West Feeder Canal into the reservation's Native Range. Florida Keys Water Reimburse various municipalities in the Florida FL Jacksonville Quality Improvements, Keys needed improvements to wastewater and 408,000 FL storm water facilities in their area. Florida Keys Water Reimburse various municipalities in the Florida FL Jacksonville Quality Improvements, Keys needed improvements to wastewater and 25,000,000 FL storm water facilities in their area. Award base contract for the last segment of the FL Jacksonville Jacksonville Harbor, FL 4,420,000 40’ deepening. Award first construction contract option for Phase FL Jacksonville Jacksonville Harbor, FL I completion of the last segment of the 40’ 14,000,000 deepening. Award second construction contract option for FL Jacksonville Jacksonville Harbor, FL Phase II completion of the last segment of the 40’ 14,715,000 deepening of this major harbor. Award contract 2B1 to complete Reach C-37 FL Jacksonville Kissimmee River, FL 7,516,000 Widening. Award contract for this ecosystem restoration Virginia Beach Key, FL project, improving environmental habitat and FL Jacksonville 17,700 (Sec. 1135) allowing the area to progress to a more natural state. Complete design and execute the construction of Environmental GA Mobile a priority storm water sewer capacity relief project 5,682,000 Infrastructure, GA in this region. J Strom Thurmond Lake, Advertise and award carbon dioxide Fire GA Savannah 1,835,000 GA & SC Suppression System. J Strom Thurmond Lake, Advertise and award Asbestos Tray Replacement GA Savannah 2,350,000 GA & SC contract. J Strom Thurmond Lake, Advertise and award Oil-Filled Busswork GA Savannah 2,500,000 GA & SC replacement contract. Complete the 02 System to mitigate thermal impacts to the fishery. The Underwater diffuser Richard B Russell Dam system will complete the Cryogenic O2 facility. GA SAS 6,300,000 and Lake, GA & SC Above Ground Cryogenics will be completed in FY2010. This third phase will complete the O2 requirements. Contract for "The Above Ground Cryogenics" Richard B Russell Dam GA Savannah facility to mitigate thermal impacts to striped bass 3,093,500 and Lake, GA & SC habitat. Raise the dikes for Disposal Area 14A by 6 feet to Savannah Harbor regain lost capacity in order to support the GA Savannah 4,200,000 Disposal Areas, GA, SC maintenance dredging of the Savannah Harbor 2nd largest container facility on the east coast. Modify existing contract to include Independent Savannah Harbor GA Savannah External Review along with draft report, final 1,100,000 Expansion, GA report and printing. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Fully fund construction contract for aquatic IA Rock Island Clear Lake, IA 990,000 restoration project Construction Contract for Flood damage Des Moines and IA Rock Island reduction for the Des Moines and Raccoon Rivers 3,336,000 Raccoon Rivers, IA , Des Moines, IA ( & Flood walls.) Ia Rvr, IA City, Johnson IA Rock Island Fully fund construction contract 194,000 Co., IA Lock and Dam 11, Award Stage IIIb contract Dam concrete repairs IA Rock Island , IA 4,138,000 and administer Stage III contracts. (Major Rehab) Missouri R Fish And Construct shallow water habitat and emergent Wildlife Recovery, IA, IA Omaha sandbar habitat for threatened and endangered 6,900,000 KS, MO, MT, NE, ND & species SD Upper Mississippi River Odessa habitat restoration on the Mississippi IA Rock Island Restoration, IL, IA, MN, River. Complete construction of interior water 150,000 MO & WI control and revegetation of bottom land. Dworshak Dam And Repair of failed water stops, repair and upgrade ID Walla Walla 2,000,000 Reservoir, ID instrumentation and complete Report. Complete the design and construction of a stream Paradise Creek, City Of ID Walla Walla restoration project on Paradise Creek, in Moscow, 3,890,650 Moscow, ID Idaho. Environmental Infrastructure design and construction assistance for water-related ID Seattle Rural Idaho, ID 1,065,000 environmental infrastructure and resource protection and development projects in Idaho. Environmental Infrastructure Reimbursement to complete the eastern interceptor design for ID Walla Walla Rural Idaho, ID 2,750,000 Shelley Regional Wastewater Treatment System and initiate the interceptor construction. Environmental Infrastructure Reimbursement to ID Walla Walla Rural Idaho, ID design and construct resource protection and 5,965,000 development projects in Idaho. Chain Of Rocks Canal, IL St. Louis MIssissippi River, IL (Def Construct relief wells along the south levee berms. 1,180,000 Corr) Chain Of Rocks Canal, Complete dredging operations for the north levee IL St. Louis MIssissippi River, IL (Def berms to reduce the risk of failure of the Chain of 1,827,000 Corr) Rocks levee in Madison County, Illinois. Chain Of Rocks Canal, IL St. Louis MIssissippi River, IL (Def Complete rehabilitation of the north levee berms. 4,500,000 Corr) Complete construction of mitigation measures Chain Of Rocks Canal, associated with improvements, to reduce the risk IL St. Louis MIssissippi River, IL (Def 500,000 of failure, of the Chain of Rocks levee in Madison Corr) County, Illinois. Chain Of Rocks Canal, IL St. Louis MIssissippi River, IL (Def Complete relief wells construction. 2,500,000 Corr) American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Fully fund a contract to construct the control Chicago Sanitary and building for Barrier IIB, including the building IL Chicago Ship Canal, Dispersal 3,500,000 enclosure and electrical & mechanical support Barriers, IL systems. Chicago Sanitary and Award a contract to fabricate and install the IL Chicago Ship Canal, Dispersal electric field generating equipment and hydro 3,500,000 Barriers, IL acoustic monitoring system for Barrier IIB. Cook County Complete design and construction for Flossmoor IL Chicago 400,000 Infrastructure, IL Water. Complete Levee 37 Pump Station #2 at Mount IL Chicago Des Plaines River, IL 1,620,000 Prospect, IL Complete stage II of the Peoria island-building project. Project restores protective island and Illinois River Basin IL Rock Island approximately 45 acres of deep overwintering 3,200,000 Restoration , IL backwater habitat and wetlands for the benefit of fisheries and migratory waterfowl. Illinois River Basin Construction contract for Waubonsie fish IL Rock Island 2,098,000 Restoration , IL passage. Rehabilitate the Lockport Controlling Works. The Illinois Waterway, project would entail significant rehabilitation of the IL Rock Island Lockport Lock and Dam, existing structure or abandonment of the existing 25,000,000 IL (Replacement) structure and replacement with a modern structure. Illinois Waterway, Award Stage III contract option for rehab of canal IL Rock Island Lockport Lock and Dam, 22,000,000 walls. IL (Replacement) Illinois Waterway, IL Rock Island Lockport Lock and Dam, Award Stage III contract for rehab of Canal Walls. 22,000,000 IL (Replacement) Illinois Waterway, IL Rock Island Lockport Lock and Dam, Develop Plans & Specs for Stage III Canal Walls. 2,500,000 IL (Replacement) Lock and Dam 27, IL St. Louis MIssissippi River, IL Construct Tied owns for Locks 27. 10,000,000 (Major Rehab) Lock and Dam 27, Prepare plans and specifications for the IL St. Louis MIssissippi River, IL fabrication of new Main Lock Miter Gates for 200,000 (Major Rehab) Locks 27. Lock and Dam 27, IL St. Louis MIssissippi River, IL Install Main Lock Miter Gates at Locks 27. 1,500,000 (Major Rehab) Lock and Dam 27, IL St. Louis MIssissippi River, IL Install the Main Lock Lift Gate for Locks 27. 1,500,000 (Major Rehab) Lock and Dam 27, Install Culvert Valves and Culvert Valve Machinery IL St. Louis MIssissippi River, IL 2,000,000 at Locks 27. (Major Rehab) Lock and Dam 27, Contract to construct Upstream Protection Cell at IL St. Louis MIssissippi River, IL 2,500,000 Locks 27. (Major Rehab) Lock and Dam 27, Contract to fabricate new Culvert Valve Machinery IL St. Louis MIssissippi River, IL 5,000,000 for Locks 27. (Major Rehab) American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Lock and Dam 27, Contract to fabricate the Main Lock Miter Gates IL St. Louis MIssissippi River, IL 7,000,000 for Locks 27. (Major Rehab) Complete Phase I construction on the Eagle Park Madison and St. Clair IL St. Louis Acres sanitary sewer collector system in Madison 850,000 Counties, IL County, Illinois. Madison and St. Clair Complete the third phase of the rehabilitation of a IL St. Louis 906,000 Counties, IL combined sewer system in Belleville, Illinois. Complete Phase II construction of the Eagle Park Madison and St. Clair IL St. Louis Acres sanitary sewer collector system in Madison 1,250,000 Counties, IL County, Illinois. Madison and St. Clair Complete the second phase of the rehabilitation of IL St. Louis 1,650,000 Counties, IL a combined sewer system in Belleville, Illinois. Melvin Price Lock and Navigation Main Lock Culvert Valve Machinery IL St. Louis 200,000 Dam, IL & MO Repair Contract. Melvin Price Lock and Navigation tainter gate debris shields installation IL St. Louis 200,000 Dam, IL & MO contract. Melvin Price Lock and Navigation Main Lock Upstream Lift Gate Leaf On- IL St. Louis 200,000 Dam, IL & MO Sill Indicator Installation Contract. Melvin Price Lock and Navigation Service Bridge Crane Rail Connectors IL St. Louis 300,000 Dam, IL & MO Installation Contract. Melvin Price Lock and Navigation tainter gate debris shields fabrication IL St. Louis 500,000 Dam, IL & MO contract.. Melvin Price Lock and Navigation direct acting cylinders installation IL St. Louis 600,000 Dam, IL & MO contract. Miss River Btwn The Contract to remove natural rock outcropping from IL St. Louis Ohio and Mo Rivers (Reg within navigation channel and correct areas of 2,114,000 Works), MO & IL hazardous channel conditions. Miss River Btwn The Initiate & Complete Dogtooth Bend Phase 3 D&R IL St. Louis Ohio and Mo Rivers (Reg contract to correct areas of repetitive maintenance 4,810,000 Works), MO & IL dredging & hazardous channel conditions. Miss River Btwn The Contract to remove natural rock outcropping from IL St. Louis Ohio and Mo Rivers (Reg within navigation channel and correct areas of 2,113,000 Works), MO & IL hazardous channel conditions. Miss River Btwn The Contract to remove natural rock outcropping from IL St. Louis Ohio and Mo Rivers (Reg 2,113,000 within navigation channel. Works), MO & IL Miss River Btwn The Initiate & Complete Devil's Island Phase 4 Dike & IL St. Louis Ohio and Mo Rivers (Reg 3,400,000 Revetment contract. Works), MO & IL Miss River Btwn The Initiate & Complete Red Rock Landing Phase 5 IL St. Louis Ohio and Mo Rivers (Reg 3,400,000 Dike and Revetment contract. Works), MO & IL Complete ongoing construction for emergency IL Chicago North Park stream bank protection project for protecting North 580,000 Park University Administration Building. Olmsted Locks and Dam, Place tainter gate shells in the river to complete IL Louisville 4,906,000 Ohio River, IL & KY low water activates. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Upper Mississippi River Complete ecosystem models, data assessment IL Rock Island Restoration, IL, IA, MN, projects, and continues collection of LIDAR & 2,900,000 MO & WI bathymetry data contracts. Upper Mississippi River Geospatial Information system (GIS) Landscape IL Rock Island Restoration, IL, IA, MN, 300,000 analysis contract. MO & WI Upper Mississippi River Award additional design contract for Rip Rap IL Rock Island Restoration, IL, IA, MN, Landing side channel restoration project on the 325,000 MO & WI Mississippi River. Upper Mississippi River Fully fund Batchtown options for habitat IL Rock Island Restoration, IL, IA, MN, 1,000,000 improvement on Mississippi River. MO & WI Upper Mississippi River Planning, engineering, and design contracts on 3 IL Rock Island Restoration, IL, IA, MN, 1,044,000 additional projects. MO & WI Upper Mississippi River Fully fund Swan Lake options for habitat IL Rock Island Restoration, IL, IA, MN, improvement. 1,160,000 MO & WI Upper Mississippi River Award options Construction Batchtown habitat IL Rock Island Restoration, IL, IA, MN, improvement at various sites on Mississippi River. 2,000,000 MO & WI

IL St. Louis Wood River Levee, IL Complete phase 1 gravity drain repairs. 1,545,000 Complete phase 1 construction and rehabilitation IL St. Louis Wood River Levee, IL of pump stations in the Wood River Levee District 2,123,000 in Madison County, Illinois. Construct additional relief wells to reduce the risk IL St. Louis Wood River Levee, IL of failure of the Wood River levee in Madison 2,436,000 County, Illinois. Complete phase 1 construction on closure IL St. Louis Wood River Levee, IL structures located within the Wood River Levee 2,724,000 District in Madison County, Illinois. IL St. Louis Wood River Levee, IL Complete phase 2 gravity drain repairs. 3,000,000 Construct relief wells and/or berms to reduce the IL St. Louis Wood River Levee, IL risk of failure of the Wood River levee in Madison 3,485,000 County, Illinois. Hovey Lake Habitat Initiate and Complete ecosystem restoration IN Louisville 987,300 Development, IN project to benefit migratory waterfowl. John T Myers Locks and Award construction contract for the Resident IN Louisville 2,800,000 Dam, IN & KY Engineers Building for the Lock Extension Project

John T Myers Locks and Award construction contract for Upper Approach IN Louisville 5,500,000 Dam, IN & KY Widening for the Lock Extension Project Continue and complete Jackson Street Pump as IN Chicago Little Calumet River, IN 3,000,000 part of Pumps 2B contract. Ohio River Greenway Award construction contracts to complete three IN Louisville 3,643,000 Public Access, IN additional segments of the project. Award construction contract to complete the flood IN Louisville Ohio River Shoreline, IN 750,000 damage reduction project American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Stranger Creek, Award Construction Contract to protect east-west KS Kansas City 700,000 City (At K-32), KS road artery in Kansas City Metropolitan area. Turkey Creek Basin, KS KS Kansas City Railroad Bridge relocation as part of project 1,500,000 & MO Turkey Creek Basin, KS KS Kansas City Walled channel construction contract 12,000,000 & MO KS Kansas City , KS Complete the ground repair contract. 7,500,000

KS Kansas City Tuttle Creek Lake, KS Complete repair the riprap protection phase. 10,500,000 Continue ground modification work for the dam KS Kansas City Tuttle Creek Lake, KS 20,500,000 safety rehabilitation. Complete work leading up to relocating a two lane Kentucky Lock and Dam, U.S. Highway and a single track railroad on new KY Nashville 7,600,000 Tennessee River, KY 3000 foot long bridges across the Tennessee River. Award Upstream Monolith Construction Contract on Kentucky Lock Addition project to construct Kentucky Lock and Dam, partial height monoliths for upstream one-third of KY Nashville 46,500,000 Tennessee River, KY the new lock, which will create a more stable configuration for the existing lock than presently exists. Kentucky Lock and Dam, Complete the majority of remaining design efforts KY Nashville 3,900,000 Tennessee River, KY on the project. Fabrication of a custom milling machine and Markland Locks and associated hardware to be used on site for milling KY Louisville Dam, KY & IN (Major 1,636,000 lock embedded metals in preparation for Rehab) installation of new miter gates Markland Locks and Award contraction contract for a miter gate KY Louisville Dam, KY & IN (Major assembly pier to support installation and 2,081,000 Rehab) maintenance of new lock miter gates. Markland Locks and Fabricate and install new lock filling and emptying KY Louisville Dam, KY & IN (Major 4,083,000 valves. Rehab) Southern and Eastern Continue to provide design and construction Kentucky Envronmental KY Huntington assistance for non-Federal sponsors for 1,000,000 Infrastructure, KY environmental infrastructure projects (Section 531) Install a protective concrete embankment wall Wolf Creek Dam, Lake KY Nashville Technique Areas 1 and 2, and construct a secant 18,000,000 Cumberland, KY pile wall in Critical Area 1 East Baton Rouge Parish Award construction contract for the Sewer Force LA New Orleans Environmental Main along West Roosevelt Rd in Baton Rouge, 750,000 Infrastructure LA. Iberia Parish, LA Award construction contract for the tertiary LA New Orleans Environmental treatment facility with an effluent discharge into 4,050,000 Infrastructure the Spanish Lake Wetlands. Larose To Golden Award a contract to inventory and analyze the LA New Orleans Meadow, LA (Hurricane residential and commercial structures located 2,200,000 Protection) within the project area. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Larose To Golden Award contracts for the borings and surveys for LA New Orleans Meadow, LA (Hurricane 4,000,000 design. Protection) Award construction contract to complete Tidal MD Baltimore Poplar Island, MD 910,000 Inlet and Spillways to create 40 acres of wetlands.

Initiate preparation of plans and specifications to Bass Harbor, Tremont, ME New England dredge an 8-foot anchorage and expand the upper 69,300 ME 6-foot anchorage for commercial fishing fleet. Prepare plans and specifications to deepen and Bucks Harbor, ME New England enlarge anchorage area for commercial fishing 49,250 Machiasport, ME fleet. Quoddy Narrows, South Construct shoreline protection project to protect ME New England 181,000 Lubec Road, Lubec, ME life and property.

Oakland County Section Issue an option on an existing contract option for MI Detroit 75,000 219 video inspection of sewer transmission lines.

Oakland County Section Issue a contract for design of the Red Run Drain MI Detroit 210,000 219 Shoal Removal and Bank Stabilization project.

Issue a contract for construction of the Red Run Drain Shoal Removal and Bank Stabilization project and issue a contract for: cleaning of South Oakland County Section MI Detroit Oakland County Sewer Disposal System; design 3,540,000 219 and construction of Southfield #2 Drain Rehabilitation; and removal of 60" diameter Combined Sanitary Sewer Connection Lock and Dam 3, Award pile-load test contract for determining MN St. Paul Mississippi River, MN characteristics of piles required for construction of 43,000 (Major Rehab) the guide wall extension. Lock and Dam 3, Acquire real estate required for the construction of MN St. Paul Mississippi River, MN 500,000 the lower embankments. (Major Rehab) Lock and Dam 3, Award upper embankment construction contract MN St. Paul Mississippi River, MN 4,000,000 for pool 3. (Major Rehab) Lock and Dam 3, Award design/ build contract for lower MN St. Paul Mississippi River, MN 25,000,000 embankments (Major Rehab) Lock and Dam 3, Award design/ build contract for remainder of MN St. Paul Mississippi River, MN project including extension of guide wall for 40,696,000 (Major Rehab) navigation safety concerns. Northeastern Minnesota Complete several new water supply & wastewater MN St. Paul Environmental 6,939,000 projects for public health and safety. Infrastructure, MN Northeastern Minnesota Complete 4 new water supply & wastewater MN Detroit Environmental 3,811,000 projects for public health and safety. Infrastructure, MN MN St. Paul Roseau, MN Award construction contract for railroad bridge. 4,600,000 American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Argosy Road Bridge, MO Kansas City Award fast track erosion Design Contract. 5,000 Riverside, MO Blue River Channel, Fully fund current Brush Creek to 53rd Street MO Kansas City 7,200,000 Kansas City, MO construction contract Blue River Channel, Award design build construction contract for 53rd MO Kansas City 10,000,000 Kansas City, MO to 63rd Street reach. Cape Girardeau MO St. Louis Completes rehabilitation of 2 pump stations. 1,419,000 (Floodwall), MO Complete phase 1 construction of floodwall Cape Girardeau MO St. Louis repairs (joint repairs, deep soil mixing, subsurface 1,140,000 (Floodwall), MO drain replacement). Cape Girardeau Complete phase 2 construction and repairs on the MO St. Louis 1,250,000 (Floodwall), MO floodwall. Complete construction of the levee and floodwall MO St. Louis Chesterfield, MO work west of Baxter Rd within the Monarch- 677,000 Chesterfield Levee District. Completes design of the Walnut Grove section of MO St. Louis Chesterfield, MO the floodwall, and the Long Road railroad closure, 400,000 within the Monarch-Chesterfield Levee District. Complete construction of Walnut Grove railroad MO St. Louis Chesterfield, MO closure located within the Monarch-Chesterfield 1,215,000 Levee District. Complete construction of the Baxter Rd floodwall MO St. Louis Chesterfield, MO for the closure structure located within the 1,500,000 Monarch-Chesterfield Levee District. Complete construction of the levee and floodwall MO St. Louis Chesterfield, MO work east of Baxter Rd within the Monarch- 2,000,000 Chesterfield Levee District Complete construction of railroad closure MO St. Louis Chesterfield, MO structure at Centaur Road within the Monarch- 2,025,000 Chesterfield Levee District. Complete construction on the Walnut Grove MO St. Louis Chesterfield, MO floodwall portion of the Monarch-Chesterfield 3,470,000 Levee District. Fully fund Phase 1b contract for exploratory MO Little Rock Clearwater Lake, MO 35,211,300 drilling. Repair scour of the river bed at the upstream side Lock & Dam 25 Dam MO St. Louis of Lock & Dam 25 on the Mississippi River near 3,800,000 Safety Study, MO Winfield, Missouri. Award contract for permanent closure of 13 St Louis Flood MO St. Louis closure structures, and repairs and replacement of 500,000 Protection, MO remaining gates. Seepage analysis, soil exploration, and design for St Louis Flood MO St. Louis relief wells associated with the St. Louis Flood 300,000 Protection, MO Protection Project. Construction of relief wells associated with the St. St Louis Flood MO St. Louis Louis Flood Protection Project, protecting the city 810,000 Protection, MO of St. Louis Missouri. St Louis Flood MO St. Louis Repair and rehabilitation of closure structures. 1,213,000 Protection, MO American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Construction of relief wells associated with the St. St Louis Flood MO St. Louis Louis Flood Protection Project, protecting the city 1,680,000 Protection, MO of St. Louis Missouri. Complete the rehabilitation of the Old Mill Creek St. Louis, MO (Combined MO St. Louis and associated combined sanitary and storm 7,000,000 Sewer Overflow) sewer in the city of St. Louis, MO. Missouri R Fish And Award contract for boundary surveys and Wildlife Recovery, IA, MO, KS Kansas City boundary marking at newly acquired mitigation 250,000 KS, MO, MT, NE, ND & sites along the SD Award construction contract and complete harbor MS Mobile Gulfport Harbor, MS 21,000,000 construction. Environmental Infrastructure reimbursement to Mississippi Waveland, MS. Sponsors will use funds to MS Vicksburg Environmental 1,772,845 contract for additional approved environmental Infrastructure, MS infrastructure projects. Environmental Infrastructure reimbursement Mississippi Pearlington, MS. Sponsors will use funds to MS Vicksburg Environmental 1,934,857 contract for additional approved environmental Infrastructure, MS infrastructure projects. Environmental Infrastructure reimbursement to Mississippi Pearl River County, MS, for improvements to it's MS Vicksburg Environmental wastewater infrastructure. Sponsors will use 525,000 Infrastructure, MS Funds to rapidly contract for additional approved environmental infrastructure projects. Environmental Infrastructure reimbursement for Mississippi Biloxi, MS. Sponsors will use funds to contract for MS Vicksburg Environmental 1,825,000 additional approved environmental infrastructure Infrastructure, MS projects. Environmental Infrastructure reimbursement Mississippi Macon, MS.Sponsors will use funds to contract for MS Vicksburg Environmental 2,148,450 additional approved environmental infrastructure Infrastructure, MS projects. Environmental Infrastructure reimbursement Mississippi Jackson County, MS. Sponsors will use funds to MS Vicksburg Environmental 5,349,125 contract for additional approved environmental Infrastructure, MS infrastructure projects. Environmental Infrastructure reimbursement Mississippi Tupelo, MS. Sponsors will use funds to rapidly MS Vicksburg Environmental 5,351,550 contract for additional approved environmental Infrastructure, MS infrastructure projects. Environmental Infrastructure reimbursement to Mississippi seven partners within the MS area. Sponsors will MS Vicksburg Environmental 12,692,173 use funds to contract for additional approved Infrastructure, MS environmental infrastructure projects. Design and construction assistance for water- related environmental infrastructure and resource MT Seattle Rural Montana, MT 2,849,000 protection and development projects in Montana at high priority sites. Design and construction assistance for water- related environmental infrastructure and resource MT Omaha Rural Montana, MT 3,010,000 protection and development projects in Montana at high priority sites. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Stanly County Award A/E design contract for the Albemarle to NC Wilmington Wastewater 275,000 Hwy 200 water main. Infrastructure, NC Construct fish passage structure at lock and dam NC Wilmington Wilmington Harbor, NC 12,000,000 #1. , Lake Procurement contract for 15 breakers at Garrison ND Omaha 4,500,000 Sakakawea, ND hydroelectric power plant Garrison Dam, Lake Station service construction contract at Garrison ND Omaha 5,500,000 Sakakawea, ND hydroelectric power plant Procurement contract for fabrication of three 230 Garrison Dam, Lake ND Omaha KV transformers at Garrison hydroelectric power 9,400,000 Sakakawea, ND plant Garrison Dam, Lake Installation contract for 3 transformers and 8 High ND Omaha 10,000,000 Sakakawea, ND Voltage breakers. Ohio And North Dakota Complete rural water systems water supply ND St. Paul Environmental 7,050,000 projects to provide safe water to rural areas. Infrastructure (Sec 594) Design and construction assistance for water- Ohio And North Dakota related environmental infrastructure and resource ND Omaha Environmental 11,250,000 protection and development projects in North Infrastructure (Sec 594) Dakota, Sand Creek Watershed, Construct sediment trap & wet lands in the upper NE Omaha Saunders County, 3,698,000 reaches of the Sand Creek watershed NEbraska Western Sarpy County Award levee construction contract for Sarpy and NE Omaha 3,300,000 And Clear Creek, NE Saunders counties along the Platte River. Award next option of levee construction contract Western Sarpy County NE Omaha for Sarpy and Saunders counties along the Platte 6,060,000 And Clear Creek, NE River Missouri R Fish And Award contract for boundary surveys and Wildlife Recovery, IA, NE, IA Kansas City boundary marking at newly acquired mitigation 250,000 KS, MO, MT, NE, ND & sites along the Missouri River SD Grover's Mill Pond, Twp Award a construction contract that will complete NJ Philadelphia Of Windsor, Mercer 500,000 this aquatic ecosystem restoration project. County,NJ Complete design of the flood risk management NJ New York Long Hill Township, NJ 52,800 project features. Raritan River Basin, Fully fund the South Closure Gate NJ New York Green Brook Sub-Basin, 13,000,000 Contract and NJ Transit Closure Gate Contract. NJ Raritan River Basin, NJ New York Green Brook Sub-Basin, Fully fund Sebrings Mills Bridge raising contract. 20,000,000 NJ Work will remove salt cedar from 37 acres of wetlands, improve water delivery to 48 acres of Bottomless Lake State wetlands by modifying the outlet channel, create NM Albuquerque 800,000 Park, NM open water habitats, and implement supplemental wetland plantings. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Award and complete Phase I & II drilling contract Middle Rio Grande Flood to determine soil characteristics to complete the NM Albuquerque Protection, Bernalillo To 1,200,000 planning and design report for the construction of Belen, NM flood control levees. New Mexico Complete design of improvements to Santa Cruz Environmental NM Albuquerque Dam to recover lost irrigation storage for northern 163,000 Infrastructure Program, NM agricultural communities. NM New Mexico Reimbursement for construction of extension of Environmental NM Albuquerque water and sewer services within the city of Deming 300,000 Infrastructure Program, NM. NM New Mexico Reimbursement for construction of extension of Environmental NM Albuquerque water and sewer services within the city of Deming 1,000,000 Infrastructure Program, NM. NM New Mexico Construction of water system replacement for the Environmental City of Questa NM. Existing water systems are NM Albuquerque 1,838,000 Infrastructure Program, bedded in mine tailings. Construction window is NM May to November due to winter climate. New Mexico Environmental Construction of new Wastewater treatment facility NM Albuquerque 5,200,000 Infrastructure Program, for the City of Eunice, NM (population 2500). NM Rio Grande Floodway, NM Albuquerque San Acacia To Bosque Award Drilling contract. 550,000 Del Apache, NM Complete construction of various sewage transport pipeline upgrades, sewage treatment NV Sacramento Sec. 595 Rural NV 4,735,500 plants, water supply lines, and storage tanks in various rural communities in Nevada. Complete the upgrade of arsenic treatment NV Sacramento Sec. 595 Rural NV facilities and sewage treatment plants in various 7,000,000 rural communities in Nevada. Construct emergency stream bank protection NY New York County Center, NY measures to protect New York State Bronx River 1,300,000 Parkway which is a vital road in the NY area Construct emergency stream bank protection NY New York Sound, NY 750,000 measures to protect Suffolk County Route 48. Award Construction contract for beneficial reuse to restore significant coastal salt marsh habitat New York and New NY New York within Jamaica Bay, Gateway National Recreation 3,873,000 Jersey Harbor, NY & NJ Area, and fully fund the navigation deepening construction contracts. Construction of Sewer Separations at Combined Sewer Overflow Basin necessary to separate and NY Buffalo Onondage Lake, NY 4,043,000 improve the Combined Sanitary and Storm Sewers in Syracuse, NY. Construct emergency stream bank protection Orient Harbor, Southold, NY New York measures to protect 1,000,000 NY which is a major artery in Suffolk County, NY American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Yonkers Ave, Tuckahoe, Construct emergency stream bank protection NY New York 1,100,000 NY measures to protect Yonkers Avenue Metropolitan Region Of Award a fully funded contract for construction of OH Louisville Cincinnati, Duck Creek, 9,384,000 the final phase of the project. OH Big Lake Ecosystem Award contract to construct critical habitat for OK Tulsa 272,000 Restoration threatened or endangered species. Award service contract for oversight of real estate OK Tulsa Lawton, Oklahoma 34,250 acquisition. OK Tulsa Lawton, Oklahoma Award construction contract and complete project 585,000 Complete the design and construction of a stream Camp Creek, Zumwalt OR Walla Walla restoration project on the Zumwalt Prairie in 560,000 Prairie Preserve, OR Wallow County, Oregon. Award various contract actions to accelerate Columbia River Fish OR Portland progress on biological work (lampreys) required 6,300,000 Mitigation, WA, OR & ID by 2008 final Fish Accord Agreements. Award various contracts to maintain progress on Columbia River Fish biological work required by 2008 Federal OR Portland 8,169,811 Mitigation, WA, OR & ID Columbia River Power System (FCRPS) Biological Opinion. Accelerate progress on biological work required Columbia River Fish by 2008 FCRPS Biological Opinion by awarding a OR Portland 2,958,000 Mitigation, WA, OR & ID construction contract for the B1 surface bypass wall removal. Columbia River Fish Advance required biological work required by OR Portland 12,520,189 Mitigation, WA, OR & ID 2008 FCRPS Biological Opinion.

Work will replace a perched culvert that prohibits fish passage through the Delta Ponds and creates OR Portland Eugene Delta Ponds, OR 2,337,000 riparian/wetland benches along the ponds.

Complete the Julia Butler Hansen National Lower Columbia River Wildlife Refuge site. Construction work consists of OR Portland Ecosystem Restoration, restoring wetlands, installing culverts with fish 989,000 OR & WA friendly tide gates, and planting 210 acres with riparian plantings. Lower Columbia River Award design/build contract for three to five tidally OR Portland Ecosystem Restoration, 1,600,000 connected wetland sites. OR & WA Complete Construction of Phase II habitat OR Portland Springfield Millrace, OR 1,400,000 restoration and removal of invasive species. Complete the construction of in-stream structures Walla Walla River OR Walla Walla to stabilize and guide flows to the fish ladder near 32,500 Section 1135, OR Milton-Freewater, Oregon. Complete emergency repair of rock fall in gate Willamette River OR Portland chamber and mechanical and electrical upgrades 3,000,000 Temperature Control, OR to diversion tunnel equipment. Emsworth Locks and Work consists of stabilizing one dam gate bay at PA Pittsburgh 3,000,000 Dam, Ohio River, PA the back channel dam. Emsworth Locks and Award contract to stabilize the back channel PA Pittsburgh 5,000,000 Dam, Ohio River, PA abutment and completing the service bridge. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Emsworth Locks and Work consists of stabilizing two dam gate bays at PA Pittsburgh 7,000,000 Dam, Ohio River, PA the back channel dam. Emsworth Locks and Work consists of stabilizing the left abutment at PA Pittsburgh 4,000,000 Dam, Ohio River, PA the back channel dam. Francis E Walter Dam, Award contract to fix seepage problem in the right PA Philadelphia 6,573,000 PA abutment that occurs at higher pool levels. Award construction contracts and contract options to complete the project’s remaining items which Lackawanna River, PA Baltimore include the levee and floodwall in lower Green 7,071,000 Scranton, PA Ridge and the relief wells in Plot.

Locks and 2, 3 Funds will be used to complete the construction of PA Pittsburgh and 4, Monongahela 27,500,000 the river wall. River, PA Locks and Dams 2, 3 Funds will be used at Charleroi Locks to construct PA Pittsburgh and 4, Monongahela an Upper Guard Wall which will guide river traffic 22,000,000 River, PA into the locks and away from the dam

Locks and Dams 2, 3 Funds will be used at Charleroi Locks to construct PA Pittsburgh and 4, MOnongahela an Upper Guard Wall which will guide river traffic 19,000,000 River, PA into the locks and away from the dam

Award a design and a construction contract to Nanticoke Creek, PA Baltimore complete aquatic ecosystem restoration which will 51,000 Luzerne County, PA improve habitat and reduces risk to the public.

PA Philadelphia Prompton Lake, PA Complete Spillway Modifications 8,000,000

PA Philadelphia Prompton Lake, PA Complete Operations Building. 2,700,000

PA Philadelphia Prompton Lake, PA Complete Access Road and Bridge Over Spillway 2,705,000 Complete plans and specifications to restore Sheraden Park & PA Pittsburgh Chartiers creek to its original state and award first 500,000 Chartiers Creek, PA contract for construction South Central Pennsylvania Complete several environmental infrastructure PA Pittsburgh Environmental 8,550,000 projects. Improvement Program, PA This project will restore Southampton Creek using South Hampton Creek, natural stream channel design to restore the PA Philadelphia Environmental 1,434,000 riparian ecosystem along approximately two miles Restoration of degraded urban stream. Cobbs Creek Habitat Restoration, PA -Funds will be used to execute a Design Agreement with the Southeastern PA Philadelphia sponsor, finalize designs and award contract to 300,000 Pennsylvania, PA begin construction for stream restoration projects within the Cobbs Creek Watershed American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Mill Creek Diversion, PA - Funds allow for the completion of an analysis which will include Southeastern PA Philadelphia preliminary designs for the Mill Creek Watershed 317,000 Pennsylvania, PA to reduce the volume and frequency of Combined Sewer Overflows into the Schuylkill River.

Funds will be used to execute a Design Agreement with the sponsor, review existing Southeastern PA Philadelphia designs and award contract to begin construction 1,280,000 Pennsylvania, PA of a stream restoration project within the Tookany- Tacony-Frankford Watershed Design improvements to the aquatic habitat of Southeastern Cobbs Creek by removing impediments, e.g. PA Philadelphia 100,000 Pennsylvania, PA dams, to the existing anadromous and semi- migratory fish species. Pennsylvania Streams in Delaware County and the portions of Chester County and Montgomery County - Conduct an analysis evaluating environmental improvement projects within Southeastern PA Philadelphia Delaware and Chester County watersheds that 250,000 Pennsylvania, PA suffer from poor aquatic habitat and aquatic ecosystem quality due to increased development and insufficiently managed surface runoff.

Three Rivers Wet Complete plans, specifications and construction of PA Pittsburgh Weather Demo Program, 2,152,000 Findlay Township infrastructure project. PA Three Rivers Wet Complete plans, specifications and construction of PA Pittsburgh Weather Demo Program, Sheraden Park environmental infrastructure 325,000 PA project. Three Rivers Wet Complete plans, specifications and construction of PA Pittsburgh Weather Demo Program, Homestead Run environmental infrastructure 1,500,000 PA project. Three Rivers Wet Complete plans, specifications and construction of PA Pittsburgh Weather Demo Program, Pine Hollow Run environmental infrastructure 3,000,000 PA project (s). Complete design, award, and construction of Wyoming Valley, PA PA Baltimore Relief Wells. 2,830,000 (Levee Raising) Complete design, award, and construction of Toby Wyoming Valley, PA PA Baltimore Creek Phase 2. 4,500,000 (Levee Raising) Award Phase IA flood damage reduction PR Jacksonville Rio De La Plata, PR 30,000,000 construction contract. PR Jacksonville Rio Puerto Nuevo, PR Complete Margarita channel. 4,000,000

PR Jacksonville Rio Puerto Nuevo, PR Continue Margarita contract. 24,000,000 Construct fish passage facilities at dams on the RI New England Ten Mile River, RI 1,190,000 ten mile river American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Lakes Marion and Award a construction contract for Elloree Reach SC Charleston 4,900,000 Moultrie, SC Ph 2 water transmission line. Lakes Marion and Award a construction contract for the Holly Hill Ph SC Charleston 4,150,575 Moultrie, SC I water transmission line. Cheyenne River Sioux Complete various aspects of Cheyenne River SD Omaha Tribe, Lower Brule Sioux, 1,000,000 sediment contamination study contract. SD Cheyenne River Sioux Complete various aspects of Cheyenne River SD Omaha Tribe, Lower Brule Sioux, 1,700,000 sediment contamination study contract. SD Cheyenne River Sioux Complete various aspects of terrestrial wildlife SD Omaha Tribe, Lower Brule Sioux, 2,129,000 restoration construction activities. SD Implementation of site specific study contracts for Missouri River conservation, protection, erosion control, water SD Omaha 1,000,000 Restoration, SD quality, and protection of cultural and historical sites along the Missouri River in South Dakota Chickamauga Lock, Continue work on several various Lock and Dam TN Nashville 10,154,000 Tennessee River, TN project features Chickamauga Lock, Continue work on structural steel gates, Valves TN Nashville 25,500,000 Tennessee River, TN and bridges. Chickamauga Lock, Construct various features of the lock approach TN Nashville 27,000,000 Tennessee River, TN walls. Award construction contract to construct Corpus Christi Ship TX Galveston Placement Area 14 to reduce future maintenance 2,250,000 Channel, TX costs. Award PH II contract to dredge Galveston Houston - Galveston TX Galveston Channel to authorized project depth. Completes 11,884,000 Navigation Channels, TX project. Award contract to rehabilitate and enlarge Mid Bay Houston - Galveston Placement Area and create 200 acres of wetland TX Galveston 24,400,000 Navigation Channels, TX marshes, which reduces future maintenance costs. Award contract to rehabilitate Placement Areas 14 Houston - Galveston TX Galveston & 15 to increase dredged material placement 49,400,000 Navigation Channels, TX capacity and reduce future maintenance costs.

Houston - Galveston Award contract for Grass Plantings at Bolivar TX Galveston 300,000 Navigation Channels, TX Marsh.

San Antonio Channel Award Construction Contract for Phase 2a of the TX Fort Worth 9,400,000 Improvement Project Mission Reach Ecosystem Restoration Project. Award construction Contract to fully fund San Antonio Channel TX Fort Worth completion of Phase 2A of the Mission Reach 16,000,000 Improvement Project, TX Ecosystem Restoration Project. Sims Bayou, Houston, TX Galveston Award contract for Plug removal . 7,767,500 TX Sims Bayou, Houston, TX Galveston Award contract for Reach 8B. 23,079,206 TX Texas City Channel (50- Award contract to dredge Main Channel. TX Galveston 44,086,000 Foot Project), TX Completes project. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Construct water supply pipeline in Brigham City, UT Sacramento Rural Utah 183,000 UT in accordance with an existing agreement. Construct wastewater treatment plant UT Sacramento Rural Utah improvements in Richmond, UT in accordance 1,497,000 with existing agreement. Construct water supply tank and associated UT Sacramento Rural Utah pipeline in Deweyville, UT in accordance with 50,000 existing agreement. Construct wastewater treatment plant UT Sacramento Rural Utah improvements in Granstville, UT in accordance 65,000 with existing agreement. Construct well and associated pipeline in Mantua, UT Sacramento Rural Utah 100,000 UT in accordance with an existing agreement. Construct well and associated pipeline for UT Sacramento Rural Utah Blanding, UT in accordance with existing 350,000 agreement. Construct water supply tank and associated UT Sacramento Rural Utah pipeline in Honeyville, UT in accordance with the 355,000 existing agreement. Construct water supply settling basin and UT Sacramento Rural Utah associated pipeline in Emery, UT in accordance 400,000 with the existing agreement. Award a contract to construct a wetlands restoration project in the drainage canal at old Cap Eliz River, Odu, VA VA Norfolk dominion university. Work consists of filling and 235,000 (206) grading with clean wetland sediments and planting with native wetland plants. Cap Elizrvr, Scuffletwn, Award construction contract for wetlands VA Norfolk 135,000 VA (206) restoration project at Scuffletown Creek. Roanoke River Upper Award construction contract for flood damage VA Wilmington Basin, Headwaters Area, 2,585,000 reduction and associated greenway trail features VA Roanoke River Upper Complete all flood damage reduction features of VA Wilmington Basin, Headwaters Area, 2,666,000 the project. VA Columbia River Channel Award a fully funded contract for navigation WA Portland 29,600,000 Improvements, OR & WA channel rock removal (blasting.) Columbia River Treaty Complete site restoration in conjunction with WA Portland Fishing Access Sites, OR 330,000 reconstruction of Celilo Indian Village, OR. & WA Columbia River Treaty Fully fund award of design/build contract for WA Portland Fishing Access Sites, OR 13,000,000 Dallesport Treaty Fishing Access Site. & WA Columbia River Treaty Fully fund award of design/build contract for the WA Portland Fishing Access Sites, OR 15,000,000 Wyeth Treaty Fishing Access Site. & WA Duwamish And Green Upper Springbrook - Complete Plans & WA Seattle 180,000 River Basin, WA Specifications Duwamish And Green Award contract for Main Stem Levee Restoration WA Seattle 600,000 River Basin, WA Phase 1 Plans & Specifications. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Duwamish And Green Big Spring Creek - Complete Plans & WA Seattle 150,000 River Basin, WA Specifications Duwamish And Green Riverview Park - Complete Plans & Specifications WA Seattle 150,000 River Basin, WA J359 Duwamish And Green Mill Creek Wetland - Complete Plans & WA Seattle 240,000 River Basin, WA Specifications. Duwamish And Green WA Seattle Upper Springbrook - Award fully funded contract. 800,000 River Basin, WA Duwamish And Green WA Seattle Riverview Park-Award fully funded contract. 2,200,000 River Basin, WA Mt St Helens Sediment WA Portland Dredge sediment from the lower Cowltiz river. 2,900,000 Control, WA Complete 1,700 feet of improvements to the Mt St Helens Sediment WA Portland Castle Rock levee along the Cowlitz River for 1,500,000 Control, WA flood protection. Implement measures to control sediment above Mt St Helens Sediment WA Portland the Toutle Sediment Retention 3,000,000 Control, WA Structure. Puget Sound And Initiate and complete Feasibility and Design of WA Seattle Adjacent Waters Phase II of this ecosystem restoration project 800,000 Restoration, WA located within Seahurst Park, Burien, WA. Northern Wisconsin Carryout several new water supply and WI St. Paul Environmental wastewater projects for public health, safety and 1,310,000 Assistance, WI the environment. Upper Mississippi River Award additional options in Pool 8 and Phase 3 WI Rock Island Restoration, IL, IA, MN, 1,000,000 construction of Islands on the Mississippi River. MO & WI Upper Mississippi River Initiate Stage 3 Pool 8 construction contract for WI Rock Island Restoration, IL, IA, MN, 3,700,000 construction of Islands on the Mississippi River. MO & WI Install additional anchors in critical sections of the WV Huntington Bluestone Lake, WV 29,566,701 dam to increase the flood control capacity. Installation of approximately 10 anchors in critical WV Huntington Bluestone Lake, WV monoliths to provide an increase in the flood 11,000,000 storage elevation by approximately 7 feet. Provide design & construction assistance to non- Federal interests to carry out various water related environmental infrastructure and resource Central West Virginia, protection/development projects, to include WV Huntington 3,565,000 WV wastewater treatment and related facilities; water supply, storage, treatment, & distribution facilities; surface water resource protection & development; and environmental restoration. Robert C Byrd Locks and WV Huntington Dam, Ohio River, WV & Complete mitigation for project. 69,000 OH American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Construction Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($) Provide design & construction assistance to non- Federal interests to carry out various water related Southern WV environmental infrastructure and resource Environmental protection/development projects, to include WV Huntington 4,789,000 Infrastructure Program, wastewater treatment and related facilities; water WV supply, storage, treatment, & distribution facilities; surface water resource protection & development; and environmental restoration.

Walker Ln, Washington, Design and implement project to protect public WV Huntington 758,000 WV (Sec 14) facilities. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Anchorage Harbor, Dredging in front of new intermodal dock facilities to -35 ft AK Alaska 23,499,000 AK MLLW. Remodel Project office to comply with American w/ Chena River Lakes, Disabilities Act; perform energy upgrades; replace AK Alaska 4,600,000 AK underground fuel tank and heating system to meet Environmental Compliance requirements. Chena River Lakes, Repair/replace non functioning relief wells and tie in well AK Alaska 900,000 AK elevations to dam crest. Award option to existing dredging contract to remove a AK Alaska Cordova Harbor, AK 700,000 shoal blocking the entrance to the Cordova harbor. Remove additional sediments from sediment trap to keep AK Alaska Nome Harbor, AK entrance channel clear through 90% of the open water 200,000 season. Project Condition Update vertical datum at approximately 10 Alaska coastal AK Alaska 1,000,000 Surveys, AK projects to meet CEPD requirements. Perform sediment chemical characterization analysis for AK Alaska Seward Harbor, AK in-water disposal approval and remove entrance channel 900,000 and inner harbor sediments to provide access to facilities. American Disability Act accessibility renovation of Millers Alabama River Ferry Resource Office and Visitor Center. Reduces AL Mobile 630,000 Lakes, AL future maintenance costs. Provides safer recreational experience for visitors. As part of overall maintenance at Alabama river Lakes, replace playgrounds in East Bank Beach (Millers Ferry), Bridgeport Beach, Six Mile Creek day use, and Gunter Alabama River AL Mobile Hill Campground, including site work, to provide 200,000 Lakes, AL American Disability Act compliance. Provides safer recreational experience for visitors and reduces future maintenance. Award 8A contract to construct new HVAC system Miller's Alabama River Ferry PH. The current system is at the end of its useful AL Mobile 1,000,000 Lakes, AL life and requires excessive maintenance. Reduces future maintenance costs. Award 8A contract to construct new prefab warehouse at Jones Bluff PH The Jones Bluff powerhouse needs Alabama River AL Mobile additional space to properly store and maintain plant 500,000 Lakes, AL maintenance equipment, supplies and spare parts. This facility will reduce future maintenance costs

Field surveys of Alabama river federally listed threatened Alabama River AL Mobile and endangered fish and mussel populations to support 380,000 Lakes, AL continuing water management operations . Fully fund Alabama-Coosa-Tallapoosa (ACT) Water Control Manual (WCM). Award Contracts to complete Alabama River ACT WCM and required EIS. These activities are key to AL Mobile 2,800,000 Lakes, AL proper management of the ACT Basin, including balancing water supply, hydropower and flood damage reduction. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Hire additional contract employees to provide increased maintenance support for project facilities. These activities Alabama River AL Mobile will provide the public a safer and more enjoyable 300,000 Lakes, AL recreational experience at the project. These activities will allow more general public access. Invasive Species and Aquatic weeds - Control cogon Alabama River grass on upland disposal areas and other project lands. AL Mobile 300,000 Lakes, AL Required in order to prevent spread to adjacent lands and avoid adverse impacts to native ecosystems.

Issue Contract for Replacement of Plant Motor Control Alabama River Centers - Jones - Aging Motor Control Centers are AL Mobile 320,000 Lakes, AL reaching the end of their serviceable life. New Motor Control Centers will improve reliability and availability.

Issue Contract for Replacement of Plant Motor Control Alabama River Centers - Millers - Aging Motor Control Centers are AL Mobile 320,000 Lakes, AL reaching the end of their serviceable life. New Motor Control Centers will improve reliability and availability.

Issue Contract for Replacement of 13.8kV Switchgear - Alabama River Millers Ferry. This project improves generator reliability by AL Mobile 250,000 Lakes, AL replacing unit breakers and other components which are nearing the end of their useful life. Issue contract to perform Arc Flash Study and implement recommendations - Jones - Improve plant safety by Alabama River AL Mobile identifying power plant arc flash hazards and developing 100,000 Lakes, AL PPE requirements and procedures. Brings plant into compliance with NFPA 70E. Issue Contract to Perform Arc Flash Study and implement recommendations - Millers - Improve plant safety by Alabama River AL Mobile identifying power plant arc flash hazards and developing 100,000 Lakes, AL PPE requirements and procedures. Brings plant into compliance into compliance with NFPA 70 Modification of contract to accelerate production of the Alabama River Environmental Impact Statement in support of the AL Mobile 998,000 Lakes, AL Alabama Coosa Tallapoosa river Water Control Manual Update. Perform critical maintenance of Claiborne L&D, Miller's Alabama River and R.F. Henry. Lock Closures. This work would reduce AL Mobile 3,800,000 Lakes, AL the risk of lock gate failures and will properly maintain the equipment. Perform critical paved roads repairs in recreational areas and at site offices and operate recreation areas at normal Alabama River AL Mobile service levels by hiring additional temp and term 3,000,000 Lakes, AL employees. These activities will provide the public a safer and more enjoyable recreation experience American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Perform maintenance at Gunter Hill Campground and Swift Creek to include upgrade of underground electrical Alabama River AL Mobile service, reconfiguration and renovation of campsites, raw 3,000,000 Lakes, AL water supply lines, sanitary systems, and critical paving. Reduces future maintenance costs. Perform maintenance dredging of the navigation channel Alabama River and replace aging survey boat with a more efficient and AL Mobile 4,000,000 Lakes, AL reliable model. Activity increases the reliability of the inland waterway system. Alabama River Provide life jacket loaner station, to improve boater AL Mobile 15,000 Lakes, AL safety. Provide waterborne restroom facilities at heavily used Alabama River boat ramps in Ellis Landing, Holy Ground Battlefield Park, AL Mobile 450,000 Lakes, AL and Swift Creek Park. Provides safer recreational experience for visitors. Purchase and Install accelerometer to monitor for Alabama River trunnion rod failures at Jones Bluff. Critical dam safety AL Mobile 75,000 Lakes, AL issue and activity will monitor the structure for additional rod failures. Repair/rehab project buildings in order to improve energy efficiency, climate control, and sanitary conditions. Alabama River AL Mobile Repairs/rehab includes insulation, insulated glass, solar 2,000,000 Lakes, AL water heaters, roofing, etc. These activities will reduce future operation and maintenance.

Replace park attendant sites (12 total) in Six Class A Alabama River AL Mobile campgrounds. Upgrades campsite infrastructure to 200,000 Lakes, AL current standards and reduces future maintenance costs. Trunion Rod Failure Mitigation - award contract to fabricate a second set of stoplogs for spillway gates for Alabama River AL Mobile use should additional Trunnion rod failures occur leaving 10,000,000 Lakes, AL two gates inoperable. Prepare Restricted Reservoir Operation Plan. Update sediment range surveys and upgrades to increase reliability of equipment and improve Water Alabama River AL Mobile Management functions. This will provide more accurate 150,000 Lakes, AL data for flood risk management decision making, but also help to insure water supply. Upgrade equipment and supplies to provide 50 amp service at Prairie Creek, Millers Ferry, Six Mile Creek, Alabama River and Chilatchee Creek Campgrounds. Reduces future AL Mobile 1,000,000 Lakes, AL maintenance costs, risk of failure and damage to recreational vehicles. Brings projects up to current standards. Upgrade or replace aging construction equipment utilized Alabama River AL Mobile throughout large site for facilities maintenance. Reduces 185,000 Lakes, AL future maintenance costs. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Alabama River Upgrade or replace aging construction equipment utilized AL Mobile 250,000 Lakes, AL throughout large site. Reduces future maintenance costs. Black Warrior and Acquire imagery and Light Detection and Ranging of the AL Mobile Tombigbee Rivers, 300,000 project to increase management efficiency and accuracy. AL As part of the overall maintenance of Black Warrior and Tombigbee rivers, install and/or replace aging playground Black Warrior and equipment with compliant equipment at Service, Oliver AL Mobile Tombigbee Rivers, 250,000 Fishing Pier Park, Burchfield Branch Park. Reduces AL future maintenance costs. Provides safer recreational experience for visitors. Black Warrior and Conduct Arc Flash studies and implement safety AL Mobile Tombigbee Rivers, measures at locks and other facilities in accordance with 500,000 AL new safety manual requirements Construct and/or replace sanitary facilities with small Black Warrior and waterborne toilet facilities in Belmont Park, Service Park, AL Mobile Tombigbee Rivers, Old Lock 5 Park, Deerlick Creek Park and Demopolis, 1,000,000 AL Lower Pool Park. Reduces future maintenance costs. Provides safer recreational experience.

Construct upland disposal area at Buena Vista Site AA - Black Warrior and Crucial dredging reach and existing sites are full. NEPA AL Mobile Tombigbee Rivers, documentation is completed. Project will ensure a reliable 2,500,000 AL channel for the high-use inland waterway system while minimizing future maintenance.

Dewater Selden, Coffeeville, Bankhead, Holt and Oliver Black Warrior and and Demopolis Locks and repair miter gates. Repairs to AL Mobile Tombigbee Rivers, rusted/failing steel on the miter gates and/or lock 4,300,000 AL anchorage assemblies. Repairs will reduce risk of future failure on a major high-use inland waterway. Dry Dock and make critical repairs to floating plant. Black Warrior and Repairs to barges and other floating plant on project AL Mobile Tombigbee Rivers, include: replacement of rusted/failing steel on the hull, 1,000,000 AL handrails, and/or deck; electrical and/or mechanical repairs; painting, etc. Install new water service line and replace aging Black Warrior and galvanized water line at Deerlick Creek Park. Reduces AL Mobile Tombigbee Rivers, 800,000 future maintenance costs. Provides safer recreational AL experience for visitors. Invasive Species Control - Cogon Grass and aquatic Black Warrior and weeds. Addresses an invasive of regional significance by AL Mobile Tombigbee Rivers, implementing sanitation and control measures on infested 500,000 AL sites and implementing a program for reestablishing native species. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Pave access roads in recreational areas and at site offices, replace control station and improve American Black Warrior and Disability Act access at Service Park and hire additional AL Mobile Tombigbee Rivers, 2,500,000 temporary rangers and term employees. These activities AL will provide the public a safer and more enjoyable recreational experience. Perform additional maintenance dredging to provide full Black Warrior and channel dimensions. Activity will increase the reliability AL Mobile Tombigbee Rivers, 980,000 and safety of a critical high-use inland waterway system AL and reduce future maintenance costs. Perform Engineering and Design for valves, spillway Black Warrior and gates and miter gates on Holt L&D, Coffeevile L&D and AL Mobile Tombigbee Rivers, Selden L&D. Activity required to upgrade aging 2,000,000 AL infrastructure and increase reliability of a critical high-use inland waterway system. Black Warrior and Provide life jacket loaner station, to improve boater AL Mobile Tombigbee Rivers, 15,000 safety. AL Purchase another set of stoplogs, Valve bulkheads, and Black Warrior and replace aging survey boats with more efficient and AL Mobile Tombigbee Rivers, reliable ones. Increase efficiency of lock closures by 4,000,000 AL being able to close multiple locks at the same time. This will reduce time that system is unavailable.

Repair and Paint Holt, Coffeeville and Bankhead Black Warrior and Spillways and fabricate and install new handrails at AL Mobile Tombigbee Rivers, navigation locks for safety. The spillway paint is in poor 6,300,000 AL condition with rust and corrosion and gate seals leak severely. Will result in improved gate performance. Repair and pave internal roads, boat ramp approach, Black Warrior and parking lot and overlook at Lower Pool Park. Activity will AL Mobile Tombigbee Rivers, 1,000,000 increase roadway safety within the project and reduce AL future maintenance costs. Repair/rehab project buildings in order to improve energy Black Warrior and efficiency, climate control, and sanitary conditions. AL Mobile Tombigbee Rivers, Replace outdated manual lever controls with PLC touch 3,000,000 AL screen controls to achieve reliability and enhance safety with interlocks and indicators. Replace aging aluminum wiring and upgrade 30amp to Black Warrior and 50 amp service at Forkland, Deerlick Creek and Service AL Mobile Tombigbee Rivers, campgrounds. Upgrades electrical system to current 800,000 AL industry standard. Reduces future maintenance cost, risk of failure and damage to recreational vehicles. Replace control station and improve American Disability Black Warrior and Act access at Service Park. These activities will provide AL Mobile Tombigbee Rivers, the public a safer and more enjoyable recreational 1,200,000 AL experience at the project. Reduces maintenance costs of the facility. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Update sediment range surveys and upgrades to Black Warrior and increase reliability of equipment and improve Water AL Mobile Tombigbee Rivers, 900,000 Management functions. This will provide more accurate AL data for navigation forecasting on major inland waterway.

Procure new survey boat. Increases the reliability of the critical waterway system by providing the resources to Gulf Intracoastal AL Mobile properly operate and maintain the project. Reduces the 300,000 Waterway, AL response and recovery time following a natural disaster (hurricanes) or other type emergency. Upgrade tide gauge equipment to increase reliability and improve Water Management functions. Newer Gulf Intracoastal AL Mobile equipment will result in lower maintenance costs and 300,000 Waterway, AL more reliable tide information which is critical to determining project depths. Perform Phase II of the Dredged Material Management Plan. This plan will develop alternate disposal methods AL Mobile Mobile Harbor, AL which will increase channel reliability as well as reduce 500,000 future maintenance costs by determining which dredge disposal alternatives are the most efficient. Perform sediment testing for ocean disposal. Ensures compliance with EPA standards, protects the AL Mobile Mobile Harbor, AL 550,000 environment and validates the ocean disposal option for maintenance of the 10th largest port in the U.S. Award contract to produce downscaled projections of global climate to support consistent local and regional ALL IWR Actions for Change evaluation of potential climate change impacts to public 35,000 safety and water resources management and infrastructure. The project will expand current USACE regional Actions for Change - economic models for application across all USACE Civil Performance Based Works business lines. These models will provide ALL IWR 1,500,000 Budget Support accurate and defendable estimates of local job creation Program and other economic measures such as income and savings Implementation of Accelerate data collection for a watershed investment the O&M Plan of decision tool for use by all USACE business lines. This Improvements - ALL HQ project will integrate over 55 databases from a variety of 1,000,000 Budget/Mgt Support sources into a single GIS decision support tool for use in For O&M Business planning and managing ecos Lines Inland Waterway ERDC Navigation R&D Project - Improve Throughput and ALL ERDC 6,200,000 Navigation Charts Safety of the Marine Transportation System Expand the Corps Water Management System (CWMS) National Portfolio to enable regulation of reservoir flows on a real-time ALL HQ Assessment For basis for both authorized reservoir purposes and flood 5,000,000 Reallocation risk management. Analyze selected watersheds, locate or develop required data, and through the in American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award construction contract to clean spillway foundation AR Little Rock Beaver Lake, AR 150,000 drains to reduce the risk of failure and increase safety. Award Construction Contract to modernize Damsite river AR Little Rock Beaver Lake, AR Park day use and campground areas to improve 1,000,000 recreation safety. Award Construction Contract to rehabilitate gate chain AR Little Rock Beaver Lake, AR assembly and repair gates to reduce the risk of gate 500,000 failure. Award Construction Contract to repair Powerhouse roof. AR Little Rock Beaver Lake, AR Replacing the roof would protect the equipment from 1,000,000 failure. O&M contractor to maintain campground availability will allow the continued safety and providing an economical Blakely Mt Dam, AR Vicksburg means of recreation for the nation. Increases the 450,000 Lake Ouachita, AR economy of the area thereby allowing the retention of jobs in the area and the temporary hiring. O&M contractor to rehab water treatment facility ensuring Blakely Mt Dam, AR Vicksburg the human health and safety transportation of human 54,000 Lake Ouachita, AR waste and . Blakely Mt Dam, Service contract to Install piezometer in backfill area of AR Vicksburg 125,000 Lake Ouachita, AR the dam which contributes to safety of lives and property. Service contract to Replace 115 KVA disconnect switch Blakely Mt Dam, AR Vicksburg gear at power plant. Allows the production of more 325,000 Lake Ouachita, AR efficient electricity. Award Construction Contract to Repair/replace roofs on Blue Mountain Lake, AR Little Rock project park facilities to prevent deterioration, resulting in 250,000 AR reduced future maintenance costs. Award construction contract to seal concrete intake Blue Mountain Lake, structure bridge deck and paint steel bridge AR Little Rock 32,000 AR superstructure. Repairs will reduce future maintenance costs. Award Construction Contract to clean spillway foundation AR Little Rock Bull Shoals Lake, AR 250,000 drains. Reduces the risk of failure and increases safety. Award Construction Contract to Procure & install Motor AR Little Rock Bull Shoals Lake, AR Control Centers and wiring to replace obsolete 4,200,000 components & deteriorated wiring. Award construction contract to repair deteriorated AR Little Rock Bull Shoals Lake, AR spillway bridge. Reduces the risk to the public and 6,420,000 reduced future maintenance costs. Award Construction Contract to Survey & monument 50 AR Little Rock Bull Shoals Lake, AR miles of project boundary, reducing costs in resolution of 1,400,000 trespasses and encroachments. Award construction contract to clean spillway foundation Dardanelle Lock & AR Little Rock drains to extend life, which reduces the risk of failure and 250,000 Dam, AR increases safety. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award construction contract to purchase secondary Dardanelle Lock & gearboxes to replace the existing gearboxes in AR Little Rock 750,000 Dam, AR powerhouse. Failed gearbox renders gate inoperable. Replacement reduces the risk of failure. Award construction contract to repair powerhouse roof. Dardanelle Lock & AR Little Rock Replacing the roof would protect the equipment from 700,000 Dam, AR failure and reduce future maintenance costs. Indefinite Delivery-Indefinite Quantity contract to AR Vicksburg Degray Lake, AR pave/repair roads to provide safe access for the public to 1,500,000 the recreation sites. O&M contract to maintain campground availability will AR Vicksburg Degray Lake, AR 450,000 allow the continued safety. O&M contractor to paint and repair bridge in order to AR Vicksburg Degray Lake, AR 107,000 ensure the safety of the public. O&M contractor to replace piezometers using contractors AR Vicksburg Degray Lake, AR for accurate dam readings to ensure the safety of lives 60,000 and property. Service contract to initiate rewind of Unit 2 generators will AR Vicksburg Degray Lake, AR 5,000,000 allow the production of more efficient electricity. Award AE contract to upgrade & develop new models for the Corps Water Management System (CWMS). This AR Little Rock Dequeen Lake, AR information is shared with other federal and local 140,000 agencies, and the general public to assist in emergency management and flood fights. Award AE contract to upgrade & develop new models for the Corps Water Management System (CWMS). This AR Little Rock Dierks Lake, AR information is shared with other federal and local 141,000 agencies, and the general public to assist in emergency management and flood fights. Award Construction Contract to clean spillway foundation drains, hone risers to remove calcification, replace AR Little Rock Gillham Lake, AR 150,000 damaged risers, and install sleeves to extend life, which reduces the risk of failure and increases safety. Award construction contract to replace failed gate tower roof and modify emergency access. At completion, the AR Little Rock Gillham Lake, AR 213,000 tower will be in compliance with confined space regulations, reducing safety risks. Award Construction Contract to clean spillway foundation Greers Ferry Lake, drains, hone risers to remove calcification, replace AR Little Rock 300,000 AR damaged risers, and install sleeves to extend life to reduce the risk of failure and increases safety. Award Construction Contract to Construct tainter gate Greers Ferry Lake, bulkhead closure structure to enable repairs to the tainter AR Little Rock 3,500,000 AR gates, reducing the risk of failure and reduced future maintenance costs. Award Construction Contract to Repair Powerplant Roof Greers Ferry Lake, AR Little Rock and Rehab Elevator to protect the equipment from 1,000,000 AR failure, and to increase safety during operation. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Contract dredge the harbor channel, approx 154,000 cu Helena Harbor, yds to ensure year round access to barge transportation. AR Memphis 500,000 Phillips County, AR Loss of project depth would have significant impact on the port and the regional economy.

Mcclellan-Kerr Award Construction Contract to clean spillway foundation Arkansas River drains, hone risers to remove calcification, replace AR Little Rock 1,500,000 Navigation System, damaged risers, and install sleeves to extend life, which AR reduces the risk of failure and increases safety. Mcclellan-Kerr Arkansas River Award Construction Contract to Construct warehouse for AR Little Rock 2,000,000 Navigation System, storage of critical spare parts. AR Mcclellan-Kerr Award Construction Contract to Paint and Rehab Gates, Arkansas River Murray L/D (gates 8-14), to include replacing severely AR Little Rock 6,000,000 Navigation System, corroded members and repainting the steel, resulting in a AR reduction to risk of failure and future maintenance costs.

Mcclellan-Kerr Award Construction Contract to Paint and Rehab Gates, Arkansas River Toad Suck L/D (gates 9-16), to include replacing severely AR Little Rock 7,000,000 Navigation System, corroded members and repainting the steel, resulting in a AR reduction to risk of failure and future maintenance costs. Award Construction Contract to Paint and Rehabilitate Mcclellan-Kerr Gates, Murray L/D (gates 1-7), to include replacing Arkansas River AR Little Rock severely corroded members and repainting the steel, 6,900,000 Navigation System, resulting in a reduction to risk of failure and future AR maintenance costs. Award Construction Contract to Paint and Rehabilitate Mcclellan-Kerr Gates, Toad Suck L/D (gates 1-8), to include replacing Arkansas River AR Little Rock severely corroded members and repainting the steel, 7,700,000 Navigation System, resulting in a reduction to risk of failure and future AR maintenance costs. Mcclellan-Kerr Award Construction Contract to Procure critical Arkansas River AR Little Rock specialized spare parts to enable repairs. Reduces future 1,000,000 Navigation System, maintenance costs and delays in navigation. AR Mcclellan-Kerr Award Construction Contract to Procure new stop logs Arkansas River AR Little Rock (temporary closure structures) and lifting beam. Reduce 6,000,000 Navigation System, future maintenance costs. AR Mcclellan-Kerr Award Construction Contract to Purchase secondary Arkansas River AR Little Rock gearboxes to replace the existing gearboxes. 8,500,000 Navigation System, Replacement reduces the risk of failure. AR Mcclellan-Kerr Award Construction Contract to repair cracking caused by Arkansas River Alkalai-Silica Reaction (ASR) on 9 piers at David D Terry AR Little Rock 6,500,000 Navigation System, L/D with post-tensioned rods and crack sealant. Repairs AR will reduce risk of failure of the piers and loss of pool. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Mcclellan-Kerr Award Construction Contract to Replace faded and Arkansas River obsolete navigation safety signs with new signs meeting AR Little Rock 5,000,000 Navigation System, current USACE standard. Will reduce number of AR accidents. Mcclellan-Kerr Award Construction Contract to stabilize bank along over Arkansas River 300 miles of MKARNS to reduce shoaling at several AR Little Rock 4,000,000 Navigation System, locations, reducing the need for dredging and thus AR reducing future maintenance costs. Award Construction Contract to clean spillway foundation drains, hone risers to remove calcification, replace AR Little Rock Millwood Lake, AR 166,000 damaged risers, and install sleeves to extend life, which reduces the risk of failure and increases safety. Narrows Dam, Lake Contract to maintain campground availability allowing for AR Vicksburg 400,000 Greeson, AR continued safety. Contract to rehab sewage treatment system and replace Narrows Dam, Lake AR Vicksburg storm drains ensuring the human health and safety 332,000 Greeson, AR transportation of human waste and water quality. Narrows Dam, Lake Rehab main power transformer which allows the AR Vicksburg 400,000 Greeson, AR production of more efficient electricity. Narrows Dam, Lake Service contract to rehab oil containment and crane AR Vicksburg 300,000 Greeson, AR controls for hydropower. Narrows Dam, Lake Service contract to repair roads and bridges to comply AR Vicksburg 315,000 Greeson, AR with modern traffic design safety standards. Narrows Dam, Lake Service contract to Resurface roads and parking areas to AR Vicksburg 500,000 Greeson, AR provide safe access for the public to the recreation sites.

Award Construction Contract to clean spillway foundation drains, hone risers to remove calcification, replace AR Little Rock Norfork Lake, AR 152,000 damaged risers, and install sleeves to extend life, which reduces the risk of failure and increases safety. Award Construction Contract to Procure & install motor control centers and wiring to replace obsolete AR Little Rock Norfork Lake, AR 2,500,000 components & deteriorated wiring, thus reducing the risk of failure. Contract dredge the harbor channel, approx 550,000 cu AR Memphis Osceola Harbor, AR 1,876,000 yds to ensure year round access to barge transportation. Award Construction Contract for Bank Stabilization at Ozark - Jeta Taylor Ozark holding pool to reduce shoaling at several AR Little Rock 225,000 Lock and Dam, AR locations, reducing the need for dredging and thus reducing future maintenance costs. Award Construction Contract for New Intake and Ozark - Jeta Taylor Bulkhead Gates. Reduces future maintenance costs, AR Little Rock 2,000,000 Lock and Dam, AR and provides increased power plant availability and safety. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award Construction Contract to clean spillway foundation Ozark - Jeta Taylor drains, hone risers to remove calcification, replace AR Little Rock 250,000 Lock and Dam, AR damaged risers, and install sleeves to extend life, which reduces the risk of failure and increases safety. Award Construction Contract to Procure & install motor control centers and wiring to replace obsolete Ozark - Jeta Taylor AR Little Rock components & deteriorated wiring. Replacement reduces 500,000 Lock and Dam, AR risk of arc flash explosion and fire hazard to the facility, and reduces lock outages. Award Construction Contract to Purchase secondary Ozark - Jeta Taylor gearboxes to replace the existing gearboxes. Failed AR Little Rock 750,000 Lock and Dam, AR gearbox renders gate inoperable. Replacement reduces the risk of failure. Quachita and Black Construction contract to Replace roof Jonesville structure AR Vicksburg 100,000 Rivers, AR and LA to increase the safety of the facility. Quachita and Black Construction contract to initiate cutting slots at Felsenthal AR Vicksburg 4,600,000 Rivers, AR and LA L&D to ensure the safe operation of the locks and dams. Quachita and Black Construction contractor to repave and repair access road AR Vicksburg 140,000 Rivers, AR and LA at Felsenthal L&D. Quachita and Black Repair tainter gates at Felsenthal L&D to ensure the safe AR Vicksburg 795,000 Rivers, AR and LA operation of the locks and dams. Quachita and Black Repair tainter gates at Thatcher L&D to ensure the safe AR Vicksburg 796,000 Rivers, AR and LA operation of the locks and dams. Quachita and Black Repair tainter valves at Thatcher L&D to ensure the safe AR Vicksburg 160,000 Rivers, AR and LA operation of the locks and dams. Quachita and Black Upgrade PLCs at the L&Ds to ensure the safe operation AR Vicksburg 200,000 Rivers, AR and LA of the locks and dams. Contract to dredge the White river. Approx 1,076,000 cu AR Memphis White River, AR yds. This work will significantly reduce future 4,128,000 maintenance costs. Contract for dredging to provide project depth for AR Vicksburg Yellow Bend Port, AR 160,000 navigation enabling the facilities to stay open. Contract to grade and asphalt access road to dam outlet. The road to the dam outlet structure has deteriorated and AZ Los Angeles Alamo Lake, AZ 1,000,000 fallen into disrepair making it unsafe to descent to the outlet structure of the dam. Contractor to revise master plan to update local Whitlow Ranch Dam, conditions regarding recreation development. Provides AZ Los Angeles 271,000 AZ information used to make informed, economically viable, and environmentally sensitive land use decisions. As part if the Black Butte Lake project, replace 2 dilapidated wooden playground structures with new modular American Disability Act accessible, low CA Sacramento Black Butte Lake, CA 50,000 maintenance playgrounds with approved impact absorbing play surface. New structures will reduce maintenance cost and potential injuries. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) As part if the Black Butte Lake project, replace rip rap to CA Sacramento Black Butte Lake, CA control erosion of shoreline around water control tower 28,000 bridge pier # 1. Maintenance required for dam safety. Chip and seal 30 year old primary access road to CA Sacramento Black Butte Lake, CA 296,069 Buckhorn Campground. Install new American Disability Act waterborne restroom CA Sacramento Black Butte Lake, CA with showers in the Group area. Proposed showers will 200,000 greatly improve publics recreational experience. Provide critical labor and contract work for education, prevention and management of rapidly expanding CA Sacramento Black Butte Lake, CA invasive zebra/quagga mussels. These invasive species 100,000 have a negative impact on project's ability to fulfill it's primary flood control mission. Purchase and install 10 security barriers (K-rails) near the control tower and dam. Barriers will prevent unauthorized CA Sacramento Black Butte Lake, CA 10,375 vehicles from gaining access to critical water control facilities. Purchase and install 4 American Disability Act accessible concrete vault toilets at various locations throughout the CA Sacramento Black Butte Lake, CA park. New restroom facilities will improve health and 70,000 sanitation, reduce noxious odors from portable toilets and reduce effluent pumping cost. Purchase and install a 20 Kilowatt per Hour photovoltaic system at park office. System will generate a significant CA Sacramento Black Butte Lake, CA 195,000 portion of the Administration Office electrical requirements. Repair deteriorating recreational access roads in CA Sacramento Black Butte Lake, CA 235,000 Buckhorn Campground. Replace 30 year old fish cleaning station. New station will CA Sacramento Black Butte Lake, CA reduce future operating cost by grinding scrapes and 60,000 diverting waste to existing sewer system. Buchanan Dam, Hv CA Sacramento Install two vault and one waterborne restroom. 200,000 Eastman Lake, CA Provide critical labor and contract work for education, prevention and management of rapidly expanding Buchanan Dam, Hv CA Sacramento invasive zebra/quagga mussels. These invasive species 100,000 Eastman Lake, CA have a negative impact on project's ability to fulfill it's primary flood control mission. Purchase and install a 20 Kilowatt per Hour photovoltaic Buchanan Dam, Hv system at park office. System will generate a significant CA Sacramento 195,000 Eastman Lake, CA portion of the Administration Office electrical requirements. Repair badly deteriorated roads, reducing future costly Buchanan Dam, Hv CA Sacramento replacement and improving staff and visitor health and 200,000 Eastman Lake, CA safety. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Repair badly deteriorated roads, reducing future costly Buchanan Dam, Hv CA Sacramento replacement and improving staff and visitor health and 1,793,501 Eastman Lake, CA safety. Buchanan Dam, Hv Upgrade electrical service to campsites improving visitor CA Sacramento 220,000 Eastman Lake, CA health and safety. As part of the Coyote Valley Dam project, construct renovations and improvements of 50 year old recreation Coyote Valley Dam, facilities. Activities include installation of code-compliant CA San Francisco 3,332,000 Lake Mendocino, CA playground equipment, repaving/restriping parking lots, renovating the trail system, renovating campsites, and relocating boat-in campsite

Coyote Valley Dam, Conduct a vegetation survey to comply with CA San Francisco 60,000 Lake Mendocino, CA environmental regulations.

Coyote Valley Dam, Contract operation of fish imprinting facility for CA San Francisco 125,000 Lake Mendocino, CA endangered species. Improvements at 50 year old recreation facilities. Coyote Valley Dam, Improvements include installation of a potable water CA San Francisco 3,600,000 Lake Mendocino, CA system and reroofing the Visitor Center and picnic shelters. Installation and rehabilitation of project facilities including Coyote Valley Dam, replacement of emergency generator, installation of CA San Francisco 630,000 Lake Mendocino, CA security fencing for dam areas, and boundary marker survey replacement. Installation of "green" improvements at recreation Coyote Valley Dam, facilities which will significantly reduce future utility costs. CA San Francisco 2,375,000 Lake Mendocino, CA Improvements include solar lighting for parking lots and solar water heaters for restrooms/showers. Coyote Valley Dam, Installation of security devices including lighting and CA San Francisco 295,000 Lake Mendocino, CA fencing.

Coyote Valley Dam, Re-construct inlet access road for flood risk reduction CA San Francisco 4,000,000 Lake Mendocino, CA purposes.

Coyote Valley Dam, Repair of dam crest road for the health and safety of CA San Francisco 370,000 Lake Mendocino, CA project personnel.

Coyote Valley Dam, Re-roof 50 year old park Headquarters and maintenance CA San Francisco 183,000 Lake Mendocino, CA buildings. Upgrade of 50 year old recreation facilities for the health Coyote Valley Dam, and safety of visitors. Upgrades include repairs to CA San Francisco 595,000 Lake Mendocino, CA wastewater plant tanks, replacement leach fields, and relocation of wastewater lift station. Coyote Valley Dam, Upgrade of fish imprinting facility settling pond in order to CA San Francisco 300,000 Lake Mendocino, CA continue mitigation of endangered species. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Comprehensive condition survey of 7,750 feet of Dana Point Harbor, CA Los Angeles navigation structures that protect the harbor to assess 500,000 CA structural integrity and functionality. Dry Creek (Warm Conduct a Spillway Erodibility Study critical to project CA San Francisco Springs) Lake & 150,000 performance. Channel, CA Dry Creek (Warm Contract operation of fish hatchery for endangered CA San Francisco Springs) Lake & 500,000 species. Channel, CA Fish Hatchery improvements including installation of a Dry Creek (Warm water filtration system and replacement of the generator. CA San Francisco Springs) Lake & 2,693,000 Equipment purchases to support park and hatchery Channel, CA operations. Dry Creek (Warm Genetic analysis, monitoring, and evaluation of CA San Francisco Springs) Lake & endangered species per recent Russian river Biological 600,000 Channel, CA Opinion issued by National Marine Fisheries Service. Dry Creek (Warm Improvements to Headquarters and shop buildings for the CA San Francisco Springs) Lake & 16,000 health and safety of project personnel. Channel, CA Dry Creek (Warm Paving various recreation areas for the health and safety CA San Francisco Springs) Lake & 807,000 of visitors. Channel, CA Dry Creek (Warm Reevaluation of Spillway Capacity to determine probable CA San Francisco Springs) Lake & maximum flood which could affect possible flooding 100,000 Channel, CA downstream. Revision of existing project Master Plan. Master Plan Dry Creek (Warm was completed in 1979, has never been revised and CA San Francisco Springs) Lake & 90,000 therefore does not reflect current or future conditions of Channel, CA the project facilities. Structural repairs to several facilities, including fish Dry Creek (Warm hatchery improvements (emergency water supply line CA San Francisco Springs) Lake & rerouting, new fish tanks, etc.), repair of inlet and outlet 6,442,000 Channel, CA channel erosion, and improvements at recreation facilities (replacing boat ramps, new Study of existing control tower shaft seepage (which is Dry Creek (Warm corroding electrical and mechanical equipment) and CA San Francisco Springs) Lake & repairs. Will prevent continued equipment failure and 1,500,000 Channel, CA potential downstream flooding or impact to endangered species. Dry Creek (Warm Update of inundation maps as required for flood risk CA San Francisco Springs) Lake & 120,000 reduction purposes. Channel, CA Dry Creek (Warm CA San Francisco Springs) Lake & Update of Structural Design Analysis. 200,000 Channel, CA Provide security fencing around the downstream toe for CA Sacramento Farmington Dam, CA security of the water control facilities (project is 220,000 unmanned). American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Pump test relief wells and install seepage drains CA Sacramento Farmington Dam, CA downstream from the dam to, which will allow for safe 155,000 operation of dam. Hidden Dam, Install electric controlled entrance gate in Buck ridge CA Sacramento 20,000 Hensley Lake, CA recreation area. Hidden Dam, Install vault restrooms eliminating need for portable CA Sacramento 78,000 Hensley Lake, CA restrooms and reducing use of sewage pumping. Provide critical labor and contract work for education, prevention and management of rapidly expanding Hidden Dam, CA Sacramento invasive zebra/quagga mussels. These invasive species 100,000 Hensley Lake, CA have a negative impact on project's ability to fulfill it's primary flood control mission. Purchase and install a 20 Kilowatt per Hour photovoltaic Hidden Dam, system at park office. System will generate a significant CA Sacramento 195,000 Hensley Lake, CA portion of the Administration Office electrical requirements. Repair badly deteriorated roads, reducing future costly Hidden Dam, CA Sacramento replacement and improving staff and visitor health and 853,901 Hensley Lake, CA safety. Hidden Dam, Replace siding on restrooms protecting structure from CA Sacramento 40,000 Hensley Lake, CA wind and water damage. Hidden Dam, Replace unserviceable electric restroom fixtures CA Sacramento 10,000 Hensley Lake, CA improving efficiency and reducing electrical usage. Hidden Dam, Upgrade electrical service to campsites improving visitor CA Sacramento 185,000 Hensley Lake, CA health, safety and electrical efficiency. Inspection Of Perform pre-flood inspections, complete vertical datum CA San Francisco Completed Works, corrective action plans, Section 14 Inspections, and O&M 900,000 CA Manual updates. Purchase and install a 20 Kilowatt per Hour photovoltaic system at park office. System will generate a significant CA Sacramento Isabella Lake, CA 135,000 portion of the Administration Office electrical requirements. Jack. D. Maltester Funding will accomplish maintenance dredging to provide CA San Francisco Channel (San 1,000,000 full utilization of federal channels. Leandro Marina), CA Los Angeles - Long Condition survey of San Pedro Breakwater to assess CA Los Angeles 400,000 Beach Harbors, CA structural integrity and functionality. Perform additional maintenance dredging of the Los Los Angeles - Long CA Los Angeles Angeles river Estuary to provide full utilization of the 1,580,000 Beach Harbors, CA authorized channel. Clearing of palm trees and arondo (Non-native vegetation) to increase capacity of the channel during Los Angeles County CA Los Angeles large flood events. This work will remove several miles of 1,200,000 Drainage Area, CA large non-native vegetation in the center of the soft bottom areas of the LA river. Compton creek debris removal, fence repair, and concrete pop out repair. This work will repair the Los Angeles County CA Los Angeles concrete pop outs, extend the structural integrity of the 75,000 Drainage Area, CA creek, and lower the probability/risk of a public health and safety issue along the creek. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Hire consultant to revise 4 master plans to update local conditions regarding recreation development. The Los Angeles County CA Los Angeles master plans provide information used to make informed, 800,000 Drainage Area, CA economically viable, and environmentally sensitive land use decisions. Removal of graphitti. Graffiti abatement on the channel walls of the Santa Ana river Basin is an exponentially Los Angeles County CA Los Angeles growing manpower and resource requirement which 600,000 Drainage Area, CA cannot be met with current resources and directly affects the communities along the flood drainage area Remove sediment from Verdugo Wash to improve the Los Angeles County capacity of the drainage system and decrease the CA Los Angeles 500,000 Drainage Area, CA probability/risk of a public health and safety issue during large flood events. Repair Burbank western channel wall which is currently in danger of failing. This work will prevent the possible Los Angeles County CA Los Angeles functional failure of the channel wall, extend the structural 700,000 Drainage Area, CA integrity of this portion of the LA river drainage system, and lower the probability of flooding Repair San Gabriel Rvr drop structure to prevent the possible functional failure, extend the structural integrity Los Angeles County CA Los Angeles of this portion of the San Gabriel river system, and lower 1,700,000 Drainage Area, CA the probability/risk of a public health and safety issue during large flood events This work will assess the current structural integrity of the Los Angeles County CA Los Angeles sub drain system and flush areas that are blocked due to 600,000 Drainage Area, CA sediment and debris in the sub drain system. Los Angeles County Vegetation removal Heel & Toe of dams to reduce a CA Los Angeles 300,000 Drainage Area, CA safety risk to dam maintenance personnel.

As part of overall maintenance of Martis Creek Lake Martis Creek Lake, Project and replace 25 campsite picnic tables. Project CA Sacramento 25,000 NV & CA will reduce backlog maintenance by replacing dry rotted wooden tables with recycled plastic lumber tables. Martis Creek Lake, Backlog maintenance for cleaning of critical relief wells. CA Sacramento 110,000 NV & CA This will allow for safe operation of dam. Clean and seal water storage tank. Project will insure Martis Creek Lake, CA Sacramento sanitation of potable water system and reduce backlog 20,000 NV & CA maintenance. Install a staff gauge in the stilling basin area. Project will Martis Creek Lake, CA Sacramento reduce backlog maintenance and provide critical 10,000 NV & CA information on water releases. Provide critical labor and contract work for education, prevention and management of rapidly expanding Martis Creek Lake, CA Sacramento invasive zebra/quagga mussels. These invasive species 100,000 NV & CA will have a negative impact on project's ability to fulfill it's primary flood control mission. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Renovate old substandard office restrooms and meet Martis Creek Lake, CA Sacramento minimal American Disability Act standards and expand 150,000 NV & CA office. Repair roadway and curbing along entrance road. Project Martis Creek Lake, CA Sacramento will reduce backlog maintenance on primary entrance to 102,245 NV & CA Recreation and Dam. Morro Bay Harbor, Funding will allow for additional maintenance dredging in CA Los Angeles 5,240,000 CA the harbor to provide full authorized channel availability.

As part of overall New Hogan Lake project, install New Hogan Lake, playground in Acorn campground. Provide centralized CA Sacramento 50,000 CA play area for children away from lake shoreline. Project will provide increased safety and visitor satisfaction. As part of overall New Hogan Lake project, install shade New Hogan Lake, CA Sacramento shelters in Oak Knoll Campground. Shade trees are 215,000 CA lacking due to water fluctuations. As part of overall New Hogan Lake project, place New Hogan Lake, boulders in Whiskey Creek Recreation Area. Boulders CA Sacramento 75,000 CA will be used to line the area roads to prevent illegal off- road travel and prevent environmental degradation. As part of overall New Hogan Lake project, place New Hogan Lake, boulders in Wrinkle Cove Recreation Area. Boulders will CA Sacramento 50,000 CA be used to prevent illegal off-road travel during low lake levels. As part of overall New Hogan Lake project, plant native New Hogan Lake, trees and install irrigation system. This project will CA Sacramento 40,000 CA replace much needed trees that have been damaged in the campgrounds. As part of overall New Hogan Lake project, renovate picnic tables. New table tops made of recycled plastic New Hogan Lake, CA Sacramento lumber will replace existing rotten, splintered and 50,000 CA vandalized tops. Project will reduce future maintenance and enhance visitor satisfaction. Install additional well to meet recreational and New Hogan Lake, CA Sacramento environmental demands that currently exceed water 100,000 CA production capabilities. Install flush restroom at beginning of bike and hike trail New Hogan Lake, CA Sacramento near Observation Point. Project will eliminating portable 150,000 CA toilets. Install new boarding float and extend existing docks at New Hogan Lake, CA Sacramento Fiddleneck and Acorn Campground boat launch facilities. 55,000 CA Safety issue. Install new security cameras. Additional cameras will New Hogan Lake, CA Sacramento provide views of the outlet works for remote gate 25,000 CA operation, launch ramps and administrative office area. Install/replace damaged bollards in campground. Project New Hogan Lake, CA Sacramento will reduce backlog maintenance and protect 100,000 CA environmental features by preventing off-road travel. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Provide critical labor and contract work for education, prevention and management of rapidly expanding New Hogan Lake, CA Sacramento invasive zebra/quagga mussels. These invasive species 100,000 CA have a negative impact on project's ability to fulfill it's primary flood control mission. Purchase and install a 20 Kilowatt per Hour photovoltaic New Hogan Lake, CA Sacramento system at park office. System will generate 60% of the 195,000 CA Admin. Office electrical requirements. Renovate 5 park host camp sites used to attract New Hogan Lake, CA Sacramento additional volunteers and reduce operating cost from 35,000 CA services provided. Repaint and repair dry rot wood on 11 restrooms in New Hogan Lake, CA Sacramento recreation areas. Project will reduce backlog 14,200 CA maintenance and enhance visitor safety and sanitation. New Hogan Lake, CA Sacramento Replace administrative office vinyl siding. 100,000 CA Road striping of entire project roads. Project will reduce New Hogan Lake, CA Sacramento backlog maintenance and improve visitor safety and 101,824 CA satisfaction. Slurry seal project roads at the dam, administrative areas New Hogan Lake, and recreation areas. Project will reduce backlog CA Sacramento 519,479 CA maintenance on roads that have not been sealed in 30 years. Trim hazardous trees and tree limbs in recreation areas. New Hogan Lake, CA Sacramento Project will increase visitor safety in the high use camping 29,000 CA and recreational areas. Ailanthus Altissima removal and chemical treatment at New Melones Lake, recreation areas. Project will control infestation of exotic CA Sacramento Downstream 87,000 invasive species thereby improving natural environment Channel, CA and visitor satisfaction. Arundo Donax removal and chemical treatment in New Melones Lake, recreation areas. Project will control infestation of exotic CA Sacramento Downstream 48,000 invasive species thereby improving natural environment Channel, CA and visitor satisfaction. New Melones Lake, Crack fill and slurry seal maintenance facility. Project will CA Sacramento Downstream reduce backlog maintenance and prevent future 27,000 Channel, CA replacement cost. New Melones Lake, Gravel road/parking area repair in recreation areas. CA Sacramento Downstream Project will reduce backlog maintenance and improve 202,000 Channel, CA visitor satisfaction by eliminating numerous pot holes. New Melones Lake, Purchase and install a 20 Kilowatt per Hour photovoltaic CA Sacramento Downstream system at park office. System will generate 100% of the 195,000 Channel, CA Admin. Office electrical requirements. Repair flood damaged access roads at Oakdale and New Melones Lake, Horseshoe Recreation areas. High water levels in 1997 CA Sacramento Downstream damaged access roads and parking areas. Project will 335,000 Channel, CA reduce backlog maintenance and improve visitor safety and satisfaction. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) New Melones Lake, Repair/re-stripe Knights Ferry, Orange Blossom, CA Sacramento Downstream McHenry roads. Project will reduce backlog maintenance 108,000 Channel, CA and improve visitor safety and satisfaction. New Melones Lake, Trim hazardous trees and tree limbs in recreation areas. CA Sacramento Downstream Project will increase visitor safety in the high use camping 7,650 Channel, CA and recreational areas. Urinal replacement at recreation areas. Existing facilities New Melones Lake, have been subject to past vandalism and have exceeded CA Sacramento Downstream 10,000 their useful lifespan. Project will improve visitor sanitation Channel, CA and satisfaction. Funding will allow for additional maintenance dredging CA San Francisco Oakland Harbor, CA providing full authorized channel availability at this 4,000,000 commercial port. To award contract to perform conditional survey of the channel, collection and analysis of contaminated CA San Francisco Oakland Harbor, CA sediment, National Environment Policy Act 3,000,000 documentation and complete engineering designs and specifications for dredging. Install 4 vault restrooms near park entrance eliminating CA Sacramento , CA need for portable restrooms and reducing sewage 170,000 pumping. Install pre-fabricated concrete entrance station improving CA Sacramento Pine Flat Lake, CA 40,000 efficiency of heating and cooling systems. Provide critical labor and contract work for education, prevention and management of rapidly expanding CA Sacramento Pine Flat Lake, CA invasive zebra/quagga mussels. These invasive species 100,000 have a negative impact on project's ability to fulfill it's primary flood control mission. Purchase and install a 20 Kilowatt per Hour photovoltaic system at park office. System will generate a significant CA Sacramento Pine Flat Lake, CA 93,000 portion of the Administration Office electrical requirements. Replace defective carports at Park Office Building CA Sacramento Pine Flat Lake, CA 30,000 protecting service vehicle fleet. Replace leaking roof on Park Office Building protecting CA Sacramento Pine Flat Lake, CA 25,000 structure and health and safety of staff and visitors. Upgrade electrical service to campsites improving visitor CA Sacramento Pine Flat Lake, CA 185,000 health and safety and electrical efficiency. Funding will accomplish maintenance dredging of the Redwood City CA San Francisco Port entrance channel and turning basins providing full 7,500,000 Harbor, CA authorized channel availability. As part of the overall Sacramento River And Tributaries CA Sacramento And Tributaries (Debris Control) project, construct pull-off lane at launch 10,000 (Debris Control), CA ramp. Project will improve visitor safety. As part of the overall Sacramento River And Tributaries Sacramento River (Debris Control) project, purchase courtesy docks at CA Sacramento And Tributaries 35,000 Narrows and Joe Miller launch ramps. Project will (Debris Control), CA enhance visitor safety. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Construct concrete parking area for emergency vehicles Sacramento River and American Disability Act pathway to restroom and CA Sacramento And Tributaries 10,000 picnic. Project will improve visitor safety and access to (Debris Control), CA facilities. Provide critical labor and contract work for education, Sacramento River prevention and management of rapidly expanding CA Sacramento And Tributaries invasive zebra/quagga mussels. These invasive species 100,000 (Debris Control), CA will have a negative impact on project's ability to fulfill it's primary flood control mission. Sacramento River Purchase and install a 20 Kilowatt per Hour photovoltaic CA Sacramento And Tributaries system at park office. System will generate 100% of the 195,000 (Debris Control), CA Admin. Office electrical requirements. Sacramento River Repair and restripe roads. Project will reduce backlog CA Sacramento And Tributaries 230,381 maintenance and improve visitor safety. (Debris Control), CA Sacramento River Purchase and install wing dam buoys. Buoys are CA Sacramento Shallow Draft necessary to ensure navigation hazards are marked 8,240 Channel, CA appropriately and allow for safe navigation of channel. San Diego River And Funding to accomplish maintenance dredging to allow full CA Los Angeles 5,400,000 Mission Bay, CA utilization of the authorized Federal Channel. To award a conditional survey contract to complete the final design effort of the jetty. Then award a construction San Diego River And CA Los Angeles contract to rebuild the outer 300 feet of the middle jetty at 5,100,000 Mission Bay, CA the entrance of Mission Bay Harbor. The jetty is below the waterline and the Improvements to recreation facilities, including San Francisco Bay, completing the update of old exhibits initiated over 5 CA San Francisco Delta Model years ago, installation of climate control and lighting to 1,355,000 Structure, CA preserve artifacts, and upgrade of the multi-language audio tour. San Francisco Bay, Improvements to Visitor Center for the health and safety CA San Francisco Delta Model 370,000 of visitors, including new carpeting and painting. Structure, CA San Francisco Bay, Rehabilitation and repair of physical model that is CA San Francisco Delta Model approximately 50 years old. Roof and sewer upgrades 6,977,000 Structure, CA directly related to preserving bay model. Roof replacement on Visitor Center building and San Francisco Bay, installation of a roof mounted solar system. CA San Francisco Delta Model 4,200,000 Improvements which will significantly reduce future utility Structure, CA costs. San Francisco Bay, Visitor Center improvements for the health and safety of CA San Francisco Delta Model visitors, including upgrading lighting and replacing the 339,000 Structure, CA front entrance deck. San Francisco Funding will accomplish maintenance painting and CA San Francisco Harbor And Bay, CA 145,000 structural repairs to project owned vessels. (Drift Removal) And Funding will allow for additional maintenance dredging of CA San Francisco Strait, critical navigation channels that will provide access to 5,891,500 CA ports in , Sacramento and Stockton. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Construct log boom at Fullerton Dam to keep debris from reaching the intake tower, improve drainage in the dam Santa Ana River CA Los Angeles reservoir and prevent large debris from entering the trash 815,000 Basin, CA racks and/or flood control gates at the intake tower and causing a possible stoppage Hire consultant to revise 4 master plans to update local conditions regarding recreation development. The master Santa Ana River CA Los Angeles plans for the dams in the Santa Ana river Basin provide 700,000 Basin, CA information used to make informed, economically viable, and environmentally sensitive Remove graffiti along the Santa Ana river System. This is an exponentially growing manpower and resource Santa Ana River CA Los Angeles requirement which cannot be met with current resources 300,000 Basin, CA and directly affects the communities along the flood drainage system. Remove sediment from Carbon Canyon to improve pool capacity in the reservoir, prevent the possible functional Santa Ana River CA Los Angeles failure of the dam during large flood events, assure 1,800,000 Basin, CA continued performance and safety of the dam, and lower the probability/risk of a public health Remove sediment from Prado Dam to improve pool capacity in the reservoir, prevent the possible functional Santa Ana River CA Los Angeles failure of the dam during large flood events, assure 1,500,000 Basin, CA continued performance and safety of the dam, and lower the probability/risk of a public health Vegetation removal heal and toe of SARB dams to protect the integrity of the dam and employees who Santa Ana River CA Los Angeles perform preventive maintenance and vegetation removal 150,000 Basin, CA on the heel and toe (slopes) of the dam, as well as improve the ability to assess any erosion or seepage As part of the overall Success Lake project, install Modular American Disability Act playgrounds replacing CA Sacramento Success Lake, CA 60,000 hazardous playground equipment improving health and safety of park visitors. Install cement curbing for 10 campsites in Tule CA Sacramento Success Lake, CA Recreation Area reducing erosion and improving visitor 60,000 health and safety. Install new entrance station/lake patrol building improving CA Sacramento Success Lake, CA 126,000 efficiency of heating and cooling systems. Install tractor/equipment carport type shelter protecting CA Sacramento Success Lake, CA maintenance equipment and reducing long term 30,000 maintenance requirements. Install vault restroom in Wildlife Management Area CA Sacramento Success Lake, CA eliminating the need for portable restrooms and to reduce 26,000 sewage pumping. Pave access road and parking area near group sites in CA Sacramento Success Lake, CA Tule Recreation Area reducing erosion and improving 1,209,035 visitor and staff health and safety. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Provide critical labor and contract work for education, prevention and management of rapidly expanding CA Sacramento Success Lake, CA invasive zebra/quagga mussels. These invasive species 100,000 have a negative impact on project's ability to fulfill it's primary flood control mission. Remove hazardous trees in lake improving boating safety CA Sacramento Success Lake, CA 65,000 and reducing potential damage to dam intake structure. Remove vegetation on Frazier Dike allowing for CA Sacramento Success Lake, CA 100,000 inspection and reducing rodent activity. Repair badly deteriorated roads, reducing future costly CA Sacramento Success Lake, CA replacement and improving staff and visitor health and 200,000 safety. Replace irrigation system for North Tule Campground CA Sacramento Success Lake, CA 60,000 conserving water and reducing electrical usage. Replace outdated and deteriorated waterborne restrooms CA Sacramento Success Lake, CA in Tule Recreation Area improving water conservation 900,000 and reducing electrical usage. Replace severely cracked and deteriorated concrete CA Sacramento Success Lake, CA slabs under Picnic Arbors in South Tule Recreation Area 24,000 improving visitor health and safety. Upgrade electrical service to campsites improving visitor CA Sacramento Success Lake, CA 100,000 health and safety and electrical efficiency. Terminus Dam, Lake Clean and flush piezometers to allow or accurate CA Sacramento 100,000 Kaweah, CA readings and safe operation of dam. Terminus Dam, Lake Pave Slick Rock Recreation Area parking lot reducing CA Sacramento 60,000 Kaweah, CA erosion and improving staff and visitor health and safety. Terminus Dam, Lake Pave storage area reducing erosion and protecting CA Sacramento 863,342 Kaweah, CA equipment. Provide critical labor and contract work for education, prevention and management of rapidly expanding Terminus Dam, Lake CA Sacramento invasive zebra/quagga mussels. These invasive species 100,000 Kaweah, CA have a negative impact on project's ability to fulfill it's primary flood control mission. Purchase and install a 20 Kilowatt per Hour photovoltaic Terminus Dam, Lake CA Sacramento system at park office. System will generate 100% of the 195,000 Kaweah, CA Admin. Office electrical requirements. Repair badly deteriorated roads, reducing future costly Terminus Dam, Lake CA Sacramento replacement and improving staff and visitor health and 1,100,000 Kaweah, CA safety. Terminus Dam, Lake Replace damaged dam crest markers improving CA Sacramento 35,000 Kaweah, CA monitoring capability for dam safety. Terminus Dam, Lake Replace siding on Park Office Building improving heat CA Sacramento 45,000 Kaweah, CA and cooling efficiency. Terminus Dam, Lake Replace windows and add insulation in shop building CA Sacramento 25,000 Kaweah, CA improving heating and cooling efficiency. Terminus Dam, Lake Upgrade electrical service for Park Office complex CA Sacramento 102,786 Kaweah, CA improving efficiency. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Topographic mapping will be obtained for areas CO Omaha Bear Creek Lake, CO 200,000 downstream of the dam for Emergency Action Plans. Maintenance of 17 open tube piezometers by CO Omaha Bear Creek Lake, CO Engineering/Drilling firm to ensure dam safety 50,000 instruments are operating satisfactorily. Repair Low Flow Gate allowing accurate low flow water CO Omaha Bear Creek Lake, CO 25,000 releases from the dam. Acquisition of LIDAR data-Topographic mapping will be CO Omaha Chatfield Lake, CO 20,000 obtained for areas surrounding the dam Design, construct repair and purchase interpretive CO Omaha Chatfield Lake, CO panels, displays, signs, trails, mini-boats and other 50,000 interpretation materials supplies and equipment. Project Office Parking Lot & Road Rehab - Rebuild CO Omaha Chatfield Lake, CO 450,000 defective sub pavement and install new asphalt pavement Rehabilitation of Chatfield emergency & service gates. Allows water to be released from the dam during dam CO Omaha Chatfield Lake, CO 400,000 safety situations thus ensuring that safety of dam and downstream residents are maintained Topographic mapping will be obtained for areas CO Omaha Chatfield Lake, CO 250,000 downstream of the dam for Emergency Action Plans Maintenance and repairs to the intake structure at the Cherry Creek Lake, CO Omaha dam, thus increasing long term operability and service 130,000 CO life. Maintenance of 75 Open Tube Piezometers by Cherry Creek Lake, Engineering/Drilling firm to ensure dam safety CO Omaha 130,000 CO instruments are operating satisfactory thus maintaining the safety of the dam and downstream residents. Noxious Weed Control on Dam. Apply appropriate Cherry Creek Lake, CO Omaha treatment to reduce and eliminate weeds on/around the 10,000 CO dam and lake Cherry Creek Lake, Remove accumulated silt from channel, ensuring that CO Omaha 250,000 CO safety of dam and downstream residents are maintained Control introduction of harmful aquatic invasive species John Martin (Zebra and Quagga Mussels) into project lake. Mussels CO Albuquerque 118,000 Reservoir, CO can damage project facilities and adversely impact recreation interests. Overlay project roads and parking lots to improve access John Martin CO Albuquerque to all public and project facilities. Work will be performed 1,244,000 Reservoir, CO by a Small Business contractor. Packing gland repair to allow for safe operation of the John Martin CO Albuquerque service and emergency gates of the dam. Work will be 165,000 Reservoir, CO performed by a Small Business contractor. Replace Dam elevator in the Dam to allow efficient John Martin CO Albuquerque access to all levels in side the dam. Work will be 1,627,000 Reservoir, CO performed by a Small Business contractor. Issue A/E contract to complete bridge and periodic CT New England Black Rock Lake, CT 119,000 inspections to limit risk to project features. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Issue contract to repair access roadway and guardrails to CT New England Black Rock Lake, CT 228,000 improve safety for project personnel and visiting public.

Issue small contracts and/or purchase orders to replace CT New England Black Rock Lake, CT equipment and complete essential miscellaneous repair 137,000 work necessary to maintain project integrity. Colebrook River Issue A/E contract to complete bridge and periodic CT New England 121,000 Lake, CT inspections to reduce risk of structure failure. Issue small contracts and/or purchase orders to replace Colebrook River CT New England equipment and complete essential miscellaneous repair 183,000 Lake, CT work necessary to maintain project integrity.

Issue small contracts and/or purchase orders to replace Hancock Brook Lake, CT New England equipment and complete essential miscellaneous repair 113,000 CT work necessary to maintain project integrity. Issue A/E contract to complete bridge and periodic CT New England Hop Brook Lake, CT 120,000 inspections to reduce risk of structure failure. Issue small contracts and/or purchase orders to replace CT New England Hop Brook Lake, CT equipment and complete essential miscellaneous repair 259,000 work necessary to maintain project integrity. Issue A/E contract to complete evaluation of historic and Mansfield Hollow CT New England archaeological resources on project lands for eligibility of 120,000 Lake, CT listing on the national historical register. Issue A/E contract to conduct intensive cultural resource Mansfield Hollow CT New England survey of project lands for historical and archaeological 426,000 Lake, CT resources. Issue small contracts and/or purchase orders to replace Mansfield Hollow CT New England equipment and complete essential miscellaneous repair 118,000 Lake, CT work necessary to maintain project integrity. Issue A/E contract to complete bridge and periodic Northfield Brook inspections to reduce risk of structure failure, replace CT New England 145,000 Lake, CT equipment and complete essential miscellaneous repair work necessary to maintain project integrity. Issue contract to complete required repairs to hurricane Stamford Hurricane CT New England barrier gates including corrosion mitigation, painting lift 195,000 Barrier, CT arms, and electrical service improvements Stamford Hurricane Issue contract to replace tide gages at project required for CT New England 75,000 Barrier, CT proper operation of project Issue small contracts and/or purchase orders to replace Stamford Hurricane CT New England equipment and complete essential miscellaneous repair 144,000 Barrier, CT work necessary to maintain project integrity Issue small contracts and/or purchase orders to complete mandated bridge inspections, replace equipment and CT New England Thomaston Dam, CT 254,000 complete essential miscellaneous repair work necessary to maintain project integrity. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Issue A/E contract to complete evaluation of historic and West Thompson CT New England archaeological resources on project lands for eligibility of 130,000 Lake, CT listing on the national historical register. Issue A/E contract to conduct intensive cultural resource West Thompson CT New England survey of project lands for historical and archaeological 333,000 Lake, CT resources. Issue small contracts and/or purchase orders to replace West Thompson CT New England equipment and complete essential miscellaneous repair 155,000 Lake, CT work necessary to maintain project integrity.

To provide for debris removal at project to allow for Potomac and emergency response to storms and high-water events. DC Baltimore Anacostia Rivers, Dc The project prevents severe damage to commercial and 84,000 (Drift Removal) recreational vessels that could result in loss of life, property damage and environmental damage Accomplish restoration activities on Federal dredged Delaware River, material disposal areas serving the project. This is a 40 DE Philadelphia Philadelphia To The 2,437,000 foot deep draft project, which provides safe navigation for Sea, NJ, PA & DE large vessels Delaware River, Disposal areas restoration and chemical and sediment DE Philadelphia Philadelphia To The testing. This is a 40 foot deep draft project, which 400,000 Sea, NJ, PA & DE provides safe navigation for large vessels Award contract for maintenance dredging of critical shoal areas and placement of material in scour holes adjacent Indian River Inlet & DE Philadelphia to USCG property. Provides safe, reliable, & efficient 8,555,000 Bay, DE navigation channel for commercial, recreational and USCG use. Intracoastal Award a contract to rehab the Town Point Bulkhead. The Waterway, Delaware DE Philadelphia bulkhead supports a government tower with security 985,000 R To Chesapeake cameras and communication equipment. Bay, DE & MD Award a contract to replace the Fixed Stringer/Span Intracoastal Bearings and repair concrete decking which is de- Waterway, Delaware DE Philadelphia laminating on the St. Georges Bridge over the C&D 2,300,000 R To Chesapeake Canal. Failure to correct this matter will result in further Bay, DE & MD deterioration of project facilities, structures an Intracoastal Award contract to perform maintenance dredging to Waterway, Delaware DE Philadelphia remove critical shoals within the 35' channel which pose a 4,875,000 R To Chesapeake threat to both recreation and commercial vessels. Bay, DE & MD

Intracoastal Award contract to purchase roadway equipment Waterway, Delaware DE Philadelphia necessary to maintain roadway surfaces on St. Georges, 425,000 R To Chesapeake and other high-level bridges. Bay, DE & MD American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Intracoastal Waterway, Delaware Award contract to repair Reedy Point Jetty that protects DE Philadelphia 2,000,000 R To Chesapeake the canal entrance from severe shoaling. Bay, DE & MD Award contract to replace the approach roadways to the Intracoastal Summit Bridge and restore them to a safe condition. Waterway, Delaware DE Philadelphia Funding will also be used to award a contract to purchase 2,500,000 R To Chesapeake roadway equipment necessary to maintain roadway Bay, DE & MD surfaces on the Summit Bridge. Award contract to dredge navigation inlet to authorized depth which pose a threat to both commercial and DE Philadelphia Mispillion River, DE recreational vessels. This waterway supports the only 1,650,000 launch service that provides safe transport of personnel including Delaware river pilots, supplies and repair parts

Award contract to remove navigation hazard which poses a threat to both recreation and commercial vessels. This DE Philadelphia Mispillion River, DE waterway supports the only launch service that provides 500,000 safe transport of personnel including Delaware river pilots, supplies and repair parts Award contract to perform construction of a new cross dike at the Killcohook Disposal area. The disposal area is Wilmington Harbor, DE Philadelphia needed for placement of material dredged from the 2,000,000 DE navigation channel for this 38 ft deep draft full service port. Wilmington Harbor, Award contract to remove the most critical shoaling on DE Philadelphia 800,000 DE this 38 ft deep draft full service port. Award contracts to perform critical dike raising at project Wilmington Harbor, disposal areas. The disposal area is needed for DE Philadelphia 1,060,000 DE placement of material dredged from the navigation channel for this 38 ft deep draft full service port. Funding for Canaveral Harbor will allow award of a contract for much needed maintenance dredging of this Canaveral Harbor, FL Jacksonville major harbor, restoring this project to its authorized 1,596,000 FL dimensions. This is critical not only to commercial cargo transiting the Port, but also to the Funding will allow award of a contract for removal of Brazilian pepper and other invasive plants from the Central & Southern FL Jacksonville Caloosahatchee river system to provide/improve access 350,000 Florida, FL to obstructed critical flood control structures during routine and emergency operations. Funding will allow award of a contract for replacement of aged, failing equipment supporting critical O&M Central & Southern FL Jacksonville operations that directly influence the District's ability to 900,000 Florida, FL enhance and maintain Flood Damage Reduction capabilities and emergency response activities. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Funding will allow award of a contract for replacement of unreliable field stream gagging equipment critical to flood Central & Southern FL Jacksonville protection for S. Florida. These gages directly influence 1,000,000 Florida, FL the District's capacity to monitor water levels supporting management decisions. Funding will allow award of a contract that will implement Central & Southern FL Jacksonville new communication technologies for informing visitors of 250,000 Florida, FL hazards as well as recreational opportunities. Funding will allow award of a contract to rehabilitate recreation areas for accessibility, life safety and health Central & Southern FL Jacksonville and hire additional temp rangers and term employees. 850,000 Florida, FL The project will directly enhance the visitor experience and safety. Funding will allow award of a contract to rehabilitate Herbert Hoover Dike/Levee roads for emergency and Central & Southern FL Jacksonville routine access to critical structures. Ensuring access to 350,000 Florida, FL the dike and levee systems are critical in providing flood damage reduction and emergency rescue. Funding will allow award of a contract to remove vegetation impacting integrity of culverts, levees and Central & Southern FL Jacksonville dams. Removal of this vegetation will help to ensure that 300,000 Florida, FL the levees function as designed so as to provide flood damage reduction. Funding will allow award of a contract to replace failing culverts in levees. This project will repair a critical Central & Southern FL Jacksonville structure (C-5) that passes through the Herbert Hoover 2,000,000 Florida, FL Dike, as well as other critical culvert structures in Fish Eating Creek Levee. Funding will allow award of a contract to replace failing culverts in levees. This project will repair critical Central & Southern FL Jacksonville structures in Indian Prairie and Harney Pond Levees 2,000,000 Florida, FL adjacent to Lake Okeechobee which provides flood damage protection for over six million Americans. Funding will allow award of a contract to replace failing tainter gates. Current S-80 gate devices are unreliable Central & Southern FL Jacksonville and pose a significant threat to daily and emergency flood 2,500,000 Florida, FL damage control operations along the Okeechobee Waterway. Funding will allow for the hiring of a contractor for testing and removal of contaminants impacting surface water Central & Southern FL Jacksonville quality. Testing will determine the extent of any Federal 450,000 Florida, FL responsibility for contamination of the Caloosahatchee river. Funding will allow for the purchase and delivery of rock from suppliers in accordance with the Herbert Hoover Central & Southern FL Jacksonville Dike breech repair plan. The dike provides critical flood 6,000,000 Florida, FL damage protection to south Florida residents and past failures have led to fatalities. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Funding will allow hiring of additional, temporary manpower for oversight of invasive species removal Central & Southern FL Jacksonville projects and surveying for threatened and endangered 15,000 Florida, FL species (Manatee, Crested Cara Cara,Gopher Tortoise, Florida Panther,etc.) . Funding will provide for award of a contract for upgrades/maintenance of Manatee protection systems. Central & Southern FL Jacksonville The systems provide minimum necessary protection for a 350,000 Florida, FL threatened and endangered species during the operation of navigation structures. Funding will provide for award of a contract to repair failed, unsafe electrical services/controls and mechanical Central & Southern FL Jacksonville systems. Current devices are unreliable and pose a 3,500,000 Florida, FL significant threat to daily and emergency flood damage control operations along the Okeechobee Waterway. Funding will provide support for volunteers assisting with Central & Southern recreation activities. Volunteers provide critical safety FL Jacksonville 20,000 Florida, FL oversight, environmental stewardship, and visitor assistance. Funding would allow enhancement of Unmanned Aerial Vehicle capacity to provide emergency response and Central & Southern FL Jacksonville critical environmental data to manage/monitor invasive 217,000 Florida, FL plants and threatened and endangered species. Invasive plants impact our ability to maintain shipping channels. Funding would be used to award a contract to replace piles and fenders for life safety issues. This would Central & Southern FL Jacksonville remove a current and immediate threat to commercial 1,000,000 Florida, FL and shipping vessel traffic passing through the Port Myacca Lock. Rehabilitate toe ditch surrounding HHD. Contract to be awarded that eliminates deferred maintenance activities Central & Southern FL Jacksonville on the toe ditch which provides external control of excess 500,000 Florida, FL water affecting the Herbert Hoover Dike. Management of this ditch is a critical component. Funding for Naples to Big Marco Pass will allow for award Channel From of a contract to perform much needed maintenance of FL Jacksonville Naples To Big Marco 2,000,000 this Gulf Coast waterway, restoring this project to its Pass, FL authorized dimensions. Funding for Fernandina Harbor will allow for award of a Fernandina Harbor, contract for much needed maintenance dredging of this FL Jacksonville 1,675,000 FL harbor, restoring this project to its authorized dimensions. This is critical to commercial cargo transiting the Port. Funding will allow for inspection of an additional 203 Inspection Of miles of levee assets. Funding will provide critical FL Jacksonville Completed Works, information and data for levee assets. Assets directly 500,000 FL impact the capability of flood damage reduction structures providing protection. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Funding will allow award of a contract for the Intracoastal construction of the Dredged Material Management Area, Waterway, FL Jacksonville MSA 641. This area is needed as a disposal site for 2,000,000 Jacksonville To future maintenance of the waterway and a timely Miami, FL completion of this site will prevent delays. Intracoastal Funding will allow the award of a contract for much Waterway, needed maintenance dredging in the vicinity of Palm FL Jacksonville 4,175,000 Jacksonville To Valley, restoring this portion of the waterway to its Miami, FL authorized dimensions. Funding will allow award of a contract for centralization of controls for operational safety. Current devices are Okeechobee FL Jacksonville unreliable and pose a significant threat to daily and 150,000 Waterway, FL emergency flood damage control operations along the Okeechobee Waterway. Funding will allow award of a contract for complete major maintenance of all four sector gates at Moore Haven lock. Okeechobee FL Jacksonville The project provides for the continuation of operations 1,916,000 Waterway, FL significantly reducing the likelihood of failure for this highly utilized recreation site. Funding will allow award of a contract to remove and replace electric motors. Project will help to ensure the Okeechobee FL Jacksonville navigational readiness by reducing the likelihood of failure 200,000 Waterway, FL at the Ortona Lock by installing new variable frequency drives and motors. Funding will allow the purchase of a replacement push work boat. This vessel provides the mechanism to move Okeechobee FL Jacksonville barge platforms allowing for work on critical navigation 250,000 Waterway, FL and flood damage reduction structures to maintain or improve operational readiness. Life safety maintenance. Eliminates workplace hazards Okeechobee FL Jacksonville immediately impacting the safety of employees and 86,000 Waterway, FL visitors to federal structures. Work performed includes the snagging, clearing, and removal of fallen trees, stumps and other debris from the FL Jacksonville Oklawaha River, FL 750,000 Oklawaha river Federal Navigation Project for the purpose of ensuring navigation and public safety. Funding will allow award of a contract for maintenance Palm Beach Harbor, dredging. Typically this channel is only at full capacity FL Jacksonville 4,000,000 FL about 6 months out of the year, causing decreased traffic volumes and lost revenue for the Port. Funding will allow award of a contract for much needed Ponce De Leon Inlet, maintenance dredging of this inlet, restoring this project FL Jacksonville 2,000,000 FL to its authorized dimensions. This inlet is critical to Coast Guard search and rescue missions. Funding will allow award of a contract for the installation of replacement multi-beam transducers in Survey Boat Project Condition FL Jacksonville Jacksonville's hull. This directly supports the District's 350,000 Surveys, FL capability to provide timely and accurate information on shipping channels. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Life safety health vessel repairs. Eliminates workplace hazards immediately impacting the safety of employees Project Condition FL Jacksonville working on vessels supporting the provision of critical 450,000 Surveys, FL survey information of commercial and recreational waterways, ports and channels. Award a contract for replacement of critical equipment used to conduct invasive vegetation operations in the Removal Of Aquatic FL Jacksonville Jacksonville District. These operations include survey 225,000 Growth, FL and monitoring of vegetation in the St. Johns river and Lake Okeechobee. Control and removal of nuisance vegetation and tussock Removal Of Aquatic material from Lake Hicpochee which is located just west FL Jacksonville 125,000 Growth, FL of Moore Haven, FL. This work will keep this waterway open for navigation and ensure public safety. Control and removal of nuisance vegetation from the Removal Of Aquatic Jacksonville District Federal Navigation Projects in order FL Jacksonville 3,500,000 Growth, FL to keep the principal navigable waterways and locks open for navigation and to ensure public safety. Work performed with recovery funds includes the control and removal of nuisance vegetation from the upper St. Removal Of Aquatic FL Jacksonville Johns river which serves as a nursery area for vegetation 225,000 Growth, FL which floats downstream into the St. Johns river Federal Navigation Project. Snagging, clearing, and removal of fallen trees, stumps Withlacoochee River, and other debris from the Withlachoochee River Federal FL Jacksonville 250,000 FL navigation Project for the purpose of ensuring navigation and public safety. Hire additional contract employees to provide increased maintenance support for project facilities. These activities GA Mobile Allatoona Lake, GA will provide the public a safer and enjoyable recreational 43,000 experience at the project. These activities will allow more general public access. Issue Contract for Replacement of Plant Motor Control Centers Aging Motor Control Centers are reaching the GA Mobile Allatoona Lake, GA 440,000 end of their serviceable life. New Motor Control Centers will improve reliability and availability. Issue Contract to Perform Arc Flash Study and implement recommendations Improve plant safety by identifying GA Mobile Allatoona Lake, GA power plant arc flash hazards and developing PPE 100,000 requirements and procedures. Brings plant into compliance with NFPA 70E. Issue Contract to Upgrade Gantry Crane - This is 56 years old and is currently unable to lower the stoplogs, GA Mobile Allatoona Lake, GA which would be required for major turbine work. This 200,000 contract will return crane to full capability and reduce future maintenance costs. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Issue Contract to Upgrade Unit 4 Exciter - Unit has been in service for over 50 years and existing equipment is GA Mobile Allatoona Lake, GA obsolete increasing maintenance costs. The current 500,000 system is at the end of its useful life and requires excessive maintenance. Perform backlog maintenance and repairs to spillway gates. Repaint and replace cathodic protection and GA Mobile Allatoona Lake, GA install new gate control system. Activity will increase 4,000,000 reliability of gate operation and flow control. Upgrade of aging infrastructure. Provide life jacket loaner station, to improve boater GA Mobile Allatoona Lake, GA 25,000 safety. Repair and resurface deteriorated roads in recreation areas that are becoming a safety hazard. Activity will GA Mobile Allatoona Lake, GA 885,000 increase roadway safety within the project and reduce future maintenance costs. Repair/rehab project buildings in order to improve energy efficiency, climate control, and sanitary conditions. GA Mobile Allatoona Lake, GA Repairs/rehab includes insulation, insulated glass, solar 3,000,000 water heaters, roofing, etc. These activities will reduce future operation and maintenance costs. Update inundation mapping below project for dam safety, flood damage reduction and emergency action plans in GA Mobile Allatoona Lake, GA 350,000 order to improve emergency response to flood events and reduce risk to public. Update sediment range surveys and upgrades to increase reliability of equipment and improve Water GA Mobile Allatoona Lake, GA Management functions. This will provide more accurate 600,000 data for flood risk management decision-making, but also help to insure water supply. Upgrade aging campground electrical service from 30 amps to 50 amps and critical repairs to sanitary facilities. GA Mobile Allatoona Lake, GA Reduces future maintenance costs, risk of failure and 854,000 damage to recreational vehicles. Brings project up to current National standard. Perform maintenance dredging of the Chattahoochee Apalachicola, river. This dredging will provide a reliable waterway Chattahoochee and GA Mobile segment for the Inland Waterway System and will restore 1,500,000 Flint Rivers, GA, AL authorized project depths eliminating navigation safety & FL hazards. Existing delivery order contracts

Award Contract to perform mandated Apalachicola, reallocation study, complete ACF WCM and required Chattahoochee and GA Mobile EIS. These activities are key to proper management of 3,000,000 Flint Rivers, GA,PL & the ACF Basin for project purposes including water Fl supply, recreation, hydropower, flood damage reduction American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Fabricate Spare Lock Anchorage Assemblies. Bare Apalachicola, minimum funds have been provided to operate and Chattahoochee and GA Mobile maintain the locks and spillway gates for the past four 2,500,000 Flint Rivers, GA,PL & years. This work would reduce the risk of lock gate Fl failures and correct a known structural deficiency Procure Replacement Vessel for 36 yr old MV Campbell - Apalachicola, This is only vessel on the ACF river system and low water Chattahoochee and GA Mobile conditions make it impossible for others to reach the 5,000,000 Flint Rivers, GA,PL & project at most times. Vessel would be the only one Fl available for emergency repairs. Repair/rehab project buildings in order to improve energy Apalachicola, efficiency, climate control, and sanitary conditions. Chattahoochee and GA Mobile Repairs/rehab includes insulation, insulated glass, solar 1,000,000 Flint Rivers, GA,PL & water heaters, roofing, and operate recreation areas to Fl increase customer service Replace GWA Lock Motor Control Centers. The current Apalachicola, motor control center is antiquated; spare parts are not Chattahoochee and GA Mobile available and they are reaching the end of their 50,000 Flint Rivers, GA,PL & serviceable life. Replacement with a modern system will Fl decrease unscheduled outages. Update sediment range surveys and upgrades to Apalachicola, increase reliability of equipment and improve Water Chattahoochee and GA Mobile Management functions. This will provide more accurate 150,000 Flint Rivers, GA,PL & data for flood risk management decision-making, but also Fl help to insure water supply. Dredge additional 1,700 KCY material from critically Atlantic Intracoastal shoaled areas to improve the ability to move energy GA Savannah 5,900,000 Waterway, GA related commodities and reduce the risk to commercial and recreational navigational users. Dredge 1,500 KCY of material from Entrance Channel to return the channel to authorized width and depth. This Brunswick Harbor, GA Savannah work will reduce the risk to commercial and public users 6,000,000 GA navigating the project and eliminate light loading by commercial shipping, reducing shipping costs. Buford Dam and Award contract for removal and replacement of asbestos GA Mobile Lake , containing insulation on raw water piping and air 500,000 GA handlers. Hire additional contract employees to provide increased Buford Dam and maintenance support for project facilities. These activities GA Mobile Lake Sidney Lanier, will provide the public a safer and more enjoyable 1,335,000 GA recreational experience at the project. These activities will allow more general public access. Issue Contract for Replacement of Plant Motor Control Buford Dam and Centers. Aging Motor Control Centers are reaching the GA Mobile Lake Sidney Lanier, 320,000 end of their serviceable life. New Motor Control Centers GA will improve reliability and availability. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Issue Contract to Perform Arc Flash Study and implement Buford Dam and recommendations Improve plant safety by identifying GA Mobile Lake Sidney Lanier, power plant arc flash hazards and developing PPE 100,000 GA requirements and procedures. Brings plant into compliance into compliance with NFPA 70E Buford Dam and GA Mobile Lake Sidney Lanier, Issue Contract to Repaint powerhouse. 250,000 GA Perform shoreline and natural resources management Buford Dam and activities critical to preventing the degradation of the GA Mobile Lake Sidney Lanier, 764,000 project's natural resources. Provides for management GA and conservation of natural resources. Buford Dam and Provide life jacket loaner station, to improve boater GA Mobile Lake Sidney Lanier, 25,000 safety. GA Buford Dam and Refurbish stop logs and perform annual maintenance of GA Mobile Lake Sidney Lanier, the dam and related structures to reduce the risk of 500,000 GA failure. Repair and resurface severely degraded roads that are Buford Dam and becoming a safety hazard. Activity will increase roadway GA Mobile Lake Sidney Lanier, 2,233,000 safety within the project and reduce future maintenance GA costs. Repair/rehab project buildings in order to improve energy Buford Dam and efficiency, climate control, and sanitary conditions. GA Mobile Lake Sidney Lanier, Repairs/rehab includes insulation, insulated glass, solar 1,500,000 GA water heaters, roofing, etc. Reduces future maintenance costs. Update inundation mapping below project for dam safety, Buford Dam and flood damage reduction and emergency action plans in GA Mobile Lake Sidney Lanier, 350,000 order to improve emergency response to flood events GA and reduce risk to public. Update sediment range surveys and upgrades to Buford Dam and increase reliability of equipment and improve Water GA Mobile Lake Sidney Lanier, Management functions. This will provide more accurate 400,000 GA data for flood risk management decision-making, but also help to insure water supply and environmental

Upgrade to 50amp electrical service at Shoal Creek, Old Buford Dam and Federal, Bald ridge and Bolding Mill campgrounds. GA Mobile Lake Sidney Lanier, Upgrades electrical system to current industry standard. 385,000 GA Reduces future maintenance costs, risk of failure and damage to recreational vehicles. Award contract for removal and replacement of asbestos Carters Dam and GA Mobile containing insulation on raw water piping and air 500,000 Lake, GA handlers. Connect to Public Water - Woodring and Powerplant. Carters Dam and GA Mobile Reduces future maintenance costs and provides reliable 700,000 Lake, GA potable water for visitors and employees. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Grind and resurface 2.6 miles of Carters Dam road from Carters Dam and Highway 136 to the Emergency Spillway. Activity will GA Mobile 1,000,000 Lake, GA increase roadway safety within the project and reduce future maintenance costs. Hire seasonal staff to perform visitor assistance and Carters Dam and GA Mobile administrative functions during the FY09 summer season. 120,000 Lake, GA Provides safer recreational experience for visitors. Issue a contract to perform arc flash study and implement recommendations Improve plant safety by identifying Carters Dam and GA Mobile power plant arc flash hazards and developing PPE 100,000 Lake, GA requirements and procedures. Brings plant into compliance with NFPA 70E. Issue contract to perform overhead crane repair. This Carters Dam and GA Mobile project will restore full capacity to this crane, allow for 2,000,000 Lake, GA safer operation and reduce future maintenance costs. Issue Contract to Perform turbine bearing repair. This turbine guide bearing is a spare for the pump back units. Carters Dam and GA Mobile Maintaining pumping capability is critical to meeting 100,000 Lake, GA energy and capacity obligations in the GA/AL/SC electrical system. Issue Contract to Repair/rehab project buildings in order Carters Dam and to improve energy efficiency, climate control, and sanitary GA Mobile 1,200,000 Lake, GA conditions. Repairs/rehab includes insulation, insulated glass, solar water heaters, roofing, etc.

Issue contract to replace station service air compressors. Carters Dam and GA Mobile Replacing the plants original compressors will reduce the 50,000 Lake, GA cost of future maintenance.

Issue Contracts to perform repairs to the reregulation Carters Dam and dam and bridge. Activity required to increase reliability of GA Mobile 2,500,000 Lake, GA the structure and reduce future damage to the bridge structure. Reduces future maintenance costs. Perform seismic study to identify deficiencies in rereg Carters Dam and structure and prepare retrofit P&S. Critical Dam Safety GA Mobile 500,000 Lake, GA item that will determine the overall safety and stability of the project. Carters Dam and Provide life jacket loaner station, to improve boater GA Mobile 15,000 Lake, GA safety. Repair/resurface 4.5 miles of deteriorated roads. Activity Carters Dam and GA Mobile will increase roadway safety within the project and reduce 2,500,000 Lake, GA future maintenance costs. Temporary increase of O&M staff to work on project Carters Dam and GA Mobile maintenance backlog Reduces future maintenance costs 1,000,000 Lake, GA and provides safer recreational experience for visitors. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Update inundation mapping below project for dam safety, Carters Dam and flood damage reduction and emergency action plans in GA Mobile 350,000 Lake, GA order to improve emergency response to flood events and reduce risk to public. Update sediment range surveys and upgrades to increase reliability of equipment and improve Water Carters Dam and GA Mobile Management functions. This will provide more accurate 100,000 Lake, GA data for flood risk management decision-making, but also help to insure water supply. Award contract to design and install Motor Control Hartwell Lake, GA & GA Savannah Centers, including all power and control cables back to 1,541,000 SC supply. Design and construct new station battery room. Hartwell Lake, GA & GA Savannah Reduces risks to employees. Adds safety features for 450,000 SC ventilation and spill protection. Award contract to design and install Station Service Hartwell Lake, GA & GA Savannah Switchgear equipment including all power and control 2,400,000 SC cables connecting back to supply transformers. Clean, measure and monitor water flow of foundation drains in the Hartwell Dam to reduce uplift forces on the Hartwell Lake, GA & GA Savannah concrete gravity dam by allowing the ground water an 50,000 SC escape route downstream. The drains have not been water-blast cleaned of calcium buildup. Clemson pumping station office replacement. The current office is a deteriorated trailer that is not secure, is Hartwell Lake, GA & GA Savannah susceptible to wind damage, and is not suitable for 100,000 SC housing required electronic office equipment such as computers, faxes radios and phones. Construct restroom building at Poplar Springs Recreation Area. The lack of a sufficient restroom facility near the Hartwell Lake, GA & GA Savannah ramp creates an unsanitary situation that has a negative 40,000 SC environmental impact and requires undue maintenance cleanup by project personnel. Contract for paving selected recreation areas to bring Hartwell Lake, GA & GA Savannah them up to acceptable service levels. Existing roadways 1,000,000 SC were resurfaced approximately 25 years ago. Cultural resources protection of the Tugaloo and Chauga Mounds to include subsurface radar investigations to Hartwell Lake, GA & GA Savannah further delineate the sites in order to implement improved 281,000 SC site protection measures in order to prevent degradation of these historic sites. Electrical service, Water and sewer work at Hart Group Hartwell Lake, GA & Camp. Work is intended to create 6-8 campsites to host GA Savannah 100,000 SC long term volunteer personnel in an effort to increase the Hartwell project's volunteer program. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Hire 6 summer temporary ranger personnel to provide adequate staffing during the recreation season. Ranger Hartwell Lake, GA & GA Savannah personnel are necessary to implement the project's water 300,000 SC safety program, provide adequate visitor assistance patrols of project lands and waters, Install a new accessible fishing dock at Twin Lakes Hartwell Lake, GA & Recreation Area. Installation of the dock would reduce GA Savannah 60,000 SC the risk of personal injury by providing an additional safe access facility. Monitor spawning of Shortnose sturgeon (endangered species) in the Savannah river. Identify if spawning is Hartwell Lake, GA & GA Savannah successful. Data would be used to assess conditions 30,000 SC under which flow discharges could be reduced to conserve water during the ongoing drought.

Paint Gantry Crane - This will remove the original lead primer and overcoatings of paint (the crane was originally Hartwell Lake, GA & GA Savannah fabricated and painted in 1960). This will complete the 2,400,000 SC 2007 rehab/upgrade of the gantry crane which is the only crane available to maintain the facility. Perform shoreline stabilization work to replace failing structures and protect vital infrastructure (CPAF, FY09). Hartwell Lake, GA & GA Savannah Continued erosion of the Hartwell shoreline threatens vital 350,000 SC recreation infrastructure such as roadways, campsites/picnic sites, restroom facilities. Rehab existing campsites/picnic sites and restroom access within selected recreation areas to meet Hartwell Lake, GA & GA Savannah accessibility requirements and to bring sites up to current 300,000 SC Corps standards. Activities will include increasing the size of RV and impact pads. Repair/Install courtesy docks. Repair of existing and Hartwell Lake, GA & GA Savannah installation of new docks at selected ramp access areas 100,000 SC would greatly improve safety for the boating public. Repair/replace sanitary facilities within Campgrounds. Funding would bring facilities up to standards by replacing Hartwell Lake, GA & GA Savannah outdated, inefficient structures with modern facilities. 1,000,000 SC This will reduce maintenance required to keep these older facilities operational. This package increases O&M contract requirements and employees to provide additional repair and maintenance Hartwell Lake, GA & GA Savannah services of recreation facilities. Additional mowing and 350,000 SC cleaning crews will be added to increase services to minimum Corps standards. This package is for the installation and 1-year operation of water quality monitors on the Savannah river. Data Hartwell Lake, GA & GA Savannah would be used to determine conditions under which 50,000 SC project flow discharges could be reduced to conserve water during the ongoing drought. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Hire 7 summer park rangers, 2 - 1 yr. temporary forestry Technicians, and 1- Administrative Assistant. Ranger J Strom Thurmond GA Savannah personnel are necessary to implement the project's water 400,000 Lake, GA & SC safety program and to provide adequate visitor assistance patrols of project lands Conduct delineation of DDT contaminated soil at Lake Springs Airstrip, Best Management Practices on the J Strom Thurmond GA Savannah forest road, and perform invasive species control. The 465,000 Lake, GA & SC DDT site work will bring the project into compliance with environmental regulations. J Strom Thurmond Install County water at Lake Springs Day Use & ridge GA Savannah 835,000 Lake, GA & SC Road Campground. Installation and 1-year operation of water quality monitors J Strom Thurmond on the Savannah river. Data would be used to determine GA Savannah 50,000 Lake, GA & SC conditions under which project flow discharges could be reduced to conserve water during the ongoing drought.

Monitor spawning of Shortnose sturgeon (endangered J Strom Thurmond species) in the Savannah river. Data would be used to GA Savannah 30,000 Lake, GA & SC assess conditions under which flow discharges could be reduced to conserve water during the ongoing drought. Pave roads in recreation areas, accessibility upgrades, J Strom Thurmond renovate campsites, replace 2 comfort station. Campsite GA Savannah 3,028,000 Lake, GA & SC renovations will bring sites up to current Corps facility standards. J Strom Thurmond Perform corrosion protection and weld repair on Spillway GA Savannah 4,500,000 Lake, GA & SC Gates, which reduces the risk of gate failure. Phase II remediation of DDT contaminated soil at Lake J Strom Thurmond Springs Airstrip, BMP on forest roads, invasive species GA Savannah 270,000 Lake, GA & SC control. The DDT site work will bring the project into compliance with environmental regulations. Jim Woodruff Lock Award Contract for Draft Tube Gantry Crane and Dam, Lake GA Mobile Refurbishment to return crane to full capability, reduce 400,000 Seminole, FL, AL & risk of failure and reduces future maintenance costs. GA Jim Woodruff Lock Award Contract for Stainless Steel Raw Water Piping and Dam, Lake System. This project improves generator reliability by GA Mobile 1,000,000 Seminole, FL, AL & eliminating outages due to cooling system problems and GA reduces future maintenance costs. Jim Woodruff Lock Award Contract Power Plant HVAC System. Digital and Dam, Lake generator controls could be effected by extreme GA Mobile 600,000 Seminole, FL, AL & conditions resulting from failures of the current systems, GA as well as reduced future maintenance cost. Award contract to execute existing engineered Jim Woodruff Lock recommendations to inhibit groundwater seepage. Drill and Dam, Lake GA Mobile exploratory core borings in west abutment to locate main 5,000,000 Seminole, FL, AL & seepage pathways through abutment and install GA piezometers in west abutment borings. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Install Hydro Turbine Flow meter System to accurately Jim Woodruff Lock meet IOP Flow Requirements. This project will improve and Dam, Lake GA Mobile the accuracy of water release measurements. These 500,000 Seminole, FL, AL & releases are required to meet BiOP provisions for support GA of endangered species habitat. Issue a contract to perform arc flash study and implement Jim Woodruff Lock recommendations Improve plant safety by identifying and Dam, Lake GA Mobile power plant arc flash hazards and developing PPE 100,000 Seminole, FL, AL & requirements and procedures. Brings plant into GA compliance with NFPA 70E. Jim Woodruff Lock Issue Contract for Replacement of Plant Motor Control and Dam, Lake Centers. Aging Motor Control Centers are reaching the GA Mobile 125,000 Seminole, FL, AL & end of their serviceable life. New Motor Control Centers GA will improve reliability and availability. Issue Contract for Spillway/draft tube/lock gate repainting. Jim Woodruff Lock Coating Failure on all gates and corrosion is progressing. and Dam, Lake GA Mobile Activity required to increase reliability of the structure and 2,000,000 Seminole, FL, AL & reduce future damage to structure. Reduces future GA maintenance costs. Jim Woodruff Lock and Dam, Lake Issue Contract to replace intake debris removal rake and GA Mobile 1,000,000 Seminole, FL, AL & rack system on powerplant. GA P&S and award contract for Spillway bridge. Structural Jim Woodruff Lock damage exists due to corrosion. Activity required to and Dam, Lake GA Mobile increase reliability of the structure and reduce future 3,000,000 Seminole, FL, AL & damage to the bridge structure. Reduces future GA maintenance costs. Jim Woodruff Lock and Dam, Lake GA Mobile Pave roads and parking lot at Fairchild Park. 200,000 Seminole, FL, AL & GA Jim Woodruff Lock Perform invasive species control activities. Improves and Dam, Lake GA Mobile access for recreational users and restores habitat for 750,000 Seminole, FL, AL & sport and native fishes. GA Perform repairs to recreation infrastructure including Jim Woodruff Lock upgrade of electrical system at Eastbank Campground and Dam, Lake GA Mobile and resurfacing of roads at Hales Landing and electrical 1,600,000 Seminole, FL, AL & installation and hire additional temp rangers and term GA employees. Reduces future maintenance costs. Jim Woodruff Lock and Dam, Lake Provide life jacket loaner station, to improve boater GA Mobile 15,000 Seminole, FL, AL & safety. GA Jim Woodruff Lock Rehab Elevator Controls. This project reduces downtime and Dam, Lake GA Mobile from current system failures and reduces future 150,000 Seminole, FL, AL & maintenance costs. GA American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Repair/rehab project buildings in order to improve energy Jim Woodruff Lock efficiency, climate control, and sanitary conditions. and Dam, Lake GA Mobile Repairs/rehab includes insulation, insulated glass, solar 1,500,000 Seminole, FL, AL & water heaters, roofing, etc. These activities will reduce GA future operation and maintenance. Jim Woodruff Lock and Dam, Lake Replace Site Mgt Office Roof. Reduce risk of damage GA Mobile 75,000 Seminole, FL, AL & resulting from leaks and reduce future maintenance cost. GA Jim Woodruff Lock Replace Underwater Pumps. Reduces the risk of a failure and Dam, Lake GA Mobile which could lead to plant flooding and reduces future 100,000 Seminole, FL, AL & maintenance. GA Jim Woodruff Lock Replace Emergency Generator. Reduces risk of failure of and Dam, Lake GA Mobile a critical component of plant emergency operations and 75,000 Seminole, FL, AL & reduces future maintenance cost GA Jim Woodruff Lock Replace lock hydraulic control system. These repairs will and Dam, Lake increase the reliability of the structure and reduce future GA Mobile 250,000 Seminole, FL, AL & maintenance costs. Activity upgrades aging GA infrastructure and decreases unscheduled outages. Replace Relief Well Piping. The existing piping is not able Jim Woodruff Lock to successfully relieve any foundation pore pressures. and Dam, Lake GA Mobile This piping replacement will help prevent damage to the 125,000 Seminole, FL, AL & foundation structure and increase stability and safety of GA the project structures. Survey boundary line for fee property and sloughing Jim Woodruff Lock easements. Approximately 30 miles. Provides for and Dam, Lake GA Mobile management and conservation of natural resources while 200,000 Seminole, FL, AL & providing for the long-term public access to and use of GA the project. Jim Woodruff Lock Update sediment range surveys and upgrades to and Dam, Lake increase reliability of equipment and improve Water GA Mobile 350,000 Seminole, FL, AL & Management functions. This will provide more accurate GA data for water control decision-making. Corrosion Protection and Weld Repair on (10) Tainter Richard B Russell Gates - Corrosion in this area must be addressed or the GA Savannah Dam and Lake, GA & resulting damage will require more extensive and 1,200,000 SC expensive repairs. This work will reduce the required maintenance. Draft Tube Crane Corrosion Repair(Sandblast and Paint) - Richard B Russell Corrosion in this area must be addressed or the resulting GA Savannah Dam and Lake, GA & 1,600,000 damage will require more extensive and expensive SC repairs. This work will reduce the required maintenance. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Headgate Corrosion Repair (Headgates Units 2 and 3). Richard B Russell These gates are used to prevent the passage of water GA Savannah Dam and Lake, GA & through the dam during maintenance (employee safety) 750,000 SC and during emergency conditions (downstream safety) The existing headgates are corroded. Hydropower Pumpback Fish Deterrent System Repair and Upgrade. Fish deterrent system is critical to Richard B Russell pumpback operations. Failure of system will limit ability GA Savannah Dam and Lake, GA & 350,000 to pump during times of drought. This will increase SC overall power plant reliability and reduce future operations costs. Install High Float Buoy Line System in Tailrace. This high Richard B Russell float buoy line system is critical to maintaining pumpback GA Savannah Dam and Lake, GA & capability during seasonal growth of aquatic pond grass. 150,000 SC Mats of pond grass clog pump intakes. Buoy line system will provide a barrier Install Security Gate and Perimeter Fending at Richard B Russell Powerplant. The new gate and fencing will reduce the GA Savannah Dam and Lake, GA & 250,000 risk of trespassing therefore increasing employee safety SC and facility security. Installation and 1-year operation of water quality monitors Richard B Russell on the Savannah river. Data would be used to determine GA Savannah Dam and Lake, GA & 50,000 conditions under which project flow discharges could be SC reduced to conserve water during the ongoing drought. Installation of Generator Breakers Units 1-4. Breakers Richard B Russell have been purchased. This package includes the GA Savannah Dam and Lake, GA & additional equipment needed for installation. The 1,700,000 SC breakers and associated buswork have been onsite for several years awaiting installation. Monitor spawning of Shortnose sturgeon (endangered Richard B Russell species) in the Savannah river. Identify if spawning is GA Savannah Dam and Lake, GA & successful. Data would be used to assess conditions 30,000 SC under which flow discharges could be reduced to conserve water during the ongoing drought. Richard B Russell Pave Powerplant Entrance Road. Activity will increase GA Savannah Dam and Lake, GA & roadway safety within the project and reduce future 770,000 SC maintenance costs. Penstock Corrosion Repair, Sandblast and Paint - Richard B Russell Corrosion in this area must be addressed or the resulting GA Savannah Dam and Lake, GA & 1,500,000 damage will require more extensive and expensive SC repairs. This work will reduce the required maintenance. Purchase 11 Gas Circuit Breakers in Switchyard. These Richard B Russell breakers are an environmental hazard if they fail, are GA Savannah Dam and Lake, GA & obsolete and some spare parts are no longer available. 1,900,000 SC This will increase overall power plant reliability and reduce future maintence costs. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Water/Air Piping Corrosion Repair and Paint in Penstock Richard B Russell Area. Corrosion in this area must be addressed or the GA Savannah Dam and Lake, GA & resulting damage will require more extensive and 307,000 SC expensive repairs. This work will reduce the required maintenance. Savannah Harbor, Construct a 4 acre bird island to complete remaining GA Savannah 1,000,000 GA environmental mitigation features required by the DMMP.

Dredge 1,200 KCY of additional material from Savannah river Inner Channel and Entrance. This work will reduce Savannah Harbor, GA Savannah the risk to commercial and public users navigating the 5,000,000 GA project and eliminate light loading by commercial shipping, reducing shipping costs. Erosion protection along toe of the disposal Area 13a & Savannah Harbor, 13b, to prevent further erosion of riverside dike, protect GA Savannah 7,000,000 GA disposal area capacity and protect existing environmental mitigation. Erosion protection along toe of the disposal Area 13a & Savannah Harbor, 13b, to prevent further erosion of riverside dike, protect GA Savannah 4,000,000 GA disposal area capacity and protect existing environmental mitigation. Erosion protection along toe of the disposal Area 14a, to Savannah Harbor, GA Savannah prevent further erosion of disposal area river side dike 10,000,000 GA and protect the current level of capacity. Erosion protection along toe of the disposal Area 14b, to Savannah Harbor, GA Savannah prevent further erosion of disposal area river side dike 8,500,000 GA and protect the current level of capacity. Connect Cotton Hill Campground with municipal water Walter F George and sewage. Purchase materials for lines to each GA Mobile Lock and Dam, AL & campsite. These activities will provide reliable water and 300,000 GA sewer service to the project. It will reduce the operational and maintenance costs of the facility Walter F George Hire additional contract employees to provide increased GA Mobile Lock and Dam, AL & 800,000 maintenance support for project facilities. GA Issue a contract to perform arc flash study and implement Walter F George recommendations. Improve plant safety by identifying GA Mobile Lock and Dam, AL & power plant arc flash hazards. Brings plant into 100,000 GA compliance with NFPA 70E, the standard for electrical safety in the workplace. Issue Contract for Replacement of Plant Motor Control Walter F George Centers. Aging Motor Control Centers are reaching the GA Mobile Lock and Dam, AL & 440,000 end of their serviceable life. New Motor Control Centers GA will improve reliability and availability. Issue Contract to Replace Lock Motor Control Centers. Walter F George Replaces antiquated control center, existing MCC's are GA Mobile Lock and Dam, AL & plagued with failures and replacement parts are often 160,000 GA unavailable. New Motor Control Centers will improve reliability and availability of system. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Perform additional lock maintenance. Fill and drain Walter F George tainter valves, install automatic transfer switch for GA Mobile Lock and Dam, AL & generator and rebuild lock miter gate arm bushings. 245,000 GA These activities will increase the reliability of the structure and reduce future maintenance costs. Perform backlog maintenance and repairs to spillway Walter F George gates including painting and replacing cathodic GA Mobile Lock and Dam, AL & protection. These repairs will increase the reliability of 3,000,000 GA the structure and reduce future maintenance costs of the structure. Perform Critical Repairs/Upgrades to recreation facilities Walter F George including upgrading of 30 amp electrical to 50 amps at GA Mobile Lock and Dam, AL & White Oak Campground and three other high use areas 3,800,000 GA and hire additional temp and term employees. Reduces future maintenance costs. Perform invasive species control activities to combat Walter F George hydrilla - grass carp stocking and/or herbicide treatment. GA Mobile Lock and Dam, AL & 500,000 Improves access for recreational users and restores GA habitat for sport and native fishes. Prepare Shoreline Management Plan Update. Revises Walter F George shoreline zoning allocations. Provides for more timely GA Mobile Lock and Dam, AL & decisions on public requests for land use actions. 200,000 GA Provides for management and conservation of natural resources. Walter F George Provide life jacket loaner station, to improve boater GA Mobile Lock and Dam, AL & 15,000 safety. GA Walter F George Relocate microwave tower. Reduce generator outages at GA Mobile Lock and Dam, AL & 150,000 remote plant due to communications system failures. GA Repair/rehab remaining project buildings in order to Walter F George improve energy efficiency, climate control, and sanitary GA Mobile Lock and Dam, AL & conditions. Repairs/rehab includes insulation, insulated 1,000,000 GA glass, solar water heaters, roofing, etc. These activities will reduce future operation and maintenance.

Replace 13.8kV Switchgear - This project improves Walter F George generator reliability by replacing unit breakers and other GA Mobile Lock and Dam, AL & components which are nearing the end of their useful life. 300,000 GA Problems with these breakers have impacted the availability of the generators at this project. Replace Siphons . These spillway siphons enhance Walter F George downstream water quality during times of minimum flow GA Mobile Lock and Dam, AL & by releasing water from the higher dissolved oxygen 600,000 GA portions of the lake. The project will result in reduced future maintenance cost for this system. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Replace Spillway Gate Control System. The existing Walter F George system is nearing the end of its useful life and has few GA Mobile Lock and Dam, AL & available spare parts and limited technical support. 500,000 GA Replacing this system will improve water management in this critical basin (ACF). Survey boundary line for fee property and sloughing Walter F George easements approximately 29 miles. Provides for GA Mobile Lock and Dam, AL & protection of public property by identifying boundary lines 150,000 GA to prevent encroachment. while providing for public access to and use of the project. Update sediment range surveys and upgrades to Walter F George increase reliability of equipment and improve Water GA Mobile Lock and Dam, AL & Management functions. This will provide more accurate 200,000 GA data for water control decision-making in this complex, highly controversial river basin. Issue a contract to perform arc flash study and implement recommendations Improve plant safety by identifying West Point Dam and GA Mobile power plant arc flash hazards and developing PPE 100,000 Lake, GA & AL requirements and procedures. Brings plant into compliance with NFPA 70E. Issue Contract for Replacement of Plant Motor Control West Point Dam and Centers. Aging Motor Control Centers are reaching the GA Mobile 240,000 Lake, GA & AL end of their serviceable life. New Motor Control Centers will improve reliability and availability. Perform major maintenance at recreational facilities including upgrade of electrical service from 30 amps to 50 West Point Dam and GA Mobile amps, repair/replacement of failing sanitary systems, and 3,000,000 Lake, GA & AL critical paving and hire additional temp and term employees. Reduces future maintenance. Prepare plans and specs to rehab spillway gates. Activity West Point Dam and will provide E&D to provide a cost effective and reliable GA Mobile 200,000 Lake, GA & AL repair of the spillway gate to increase the reliability of the project and reduce future maintenance costs. West Point Dam and Provide life jacket loaner station, to improve boater GA Mobile 15,000 Lake, GA & AL safety. Purchase an accelerometer to monitor trunnion anchor West Point Dam and GA Mobile rods. Critical dam safety issue and activity will monitor the 150,000 Lake, GA & AL structure for additional rod failures. Rehab/Repair Powerhouse Crane to include inspection, controls upgrade, New brake system. New access stairs, West Point Dam and GA Mobile rail alignment, New feeder rail, load testing, etc. Improves 400,000 Lake, GA & AL project safety an capability by returning crane to full performance. Reduces future maintenance costs

Repair/rehab remaining project buildings in order to improve energy efficiency, climate control, and sanitary West Point Dam and GA Mobile conditions. Repairs/rehab includes insulation, insulated 1,500,000 Lake, GA & AL glass, solar water heaters, roofing, etc. These activities will reduce future operation costs. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Replace headgate seals, inspect and paint gates. Rehab hydraulic lift system. These components have exceeded West Point Dam and GA Mobile life expectancy and leak badly. These repairs will 750,000 Lake, GA & AL increase the reliability of the structure and reduce future maintenance costs. Replace leaking powerhouse roof. Substantial investments have been made over the past few fiscal West Point Dam and GA Mobile years in rehabilitating hydropower units are at risk due to 950,000 Lake, GA & AL the potential for leaks onto main or auxiliary equipment. Reduces risk of equipment damage and repair. Replace spillway gate hydraulics. System has been in place since 1975, but has become highly unreliable and West Point Dam and GA Mobile maintenance intensive. These repairs will increase the 500,000 Lake, GA & AL reliability of the structure and reduce future maintenance costs. Trunion Rod Failure Mitigation Award contract to fabricate a second set of stoplogs for spillway gates for West Point Dam and GA Mobile use should additional Trunnion rod failures occur leaving 4,000,000 Lake, GA & AL two gates inoperable. Prepare Restricted Reservoir Operation Plan. Update inundation mapping below project for dam safety, West Point Dam and flood damage reduction and emergency action plans in GA Mobile 350,000 Lake, GA & AL order to improve emergency response to flood events and reduce risk to public. Update sediment range surveys and upgrades to increase reliability of equipment and improve Water West Point Dam and GA Mobile Management functions. This will provide more accurate 150,000 Lake, GA & AL data for flood risk management decision-making, but also help to insure water supply. Renovate 25-year old restrooms to meet American Disability Act requirements, upgrade aging fixtures and Barbers Point HI Honolulu privacy stalls. Upgrade visitor center exhibits, replace 248,000 Harbor, HI non-functioning informational kiosks. The restrooms and exhibits are critical for the safety and operations Replace air conditioner system condenser and air handling unit which is 25 years old and currently uses Barbers Point HI Honolulu obsolete refrigerant which will be unavailable after 2010. 100,000 Harbor, HI The A/C system is critical for the operation of the District's visitor center Maintenance dredging contract to dredge entrance Haleiwa Small Boat HI Honolulu channel to authorized project depth. The shoaling is a 3,100,000 Hbr, Ohau, HI navigational hazard to boaters. Maintenance dredging contract to dredge entrance Waianae Small Boat HI Honolulu channel to authorized project depth. Shoaling is a 1,514,000 Harbor, HI navigational hazard to boaters. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Construction of a storage building to increase storage of flood fighting equipment including sandbags and pumps IA Rock Island Coralville Lake, IA which will provide for a more rapid response to 225,000 communities who need these supplies. Building would also store vessels, Water safety equipment Contract to replace existing sanitary facilities at 3 IA Rock Island Coralville Lake, IA 750,000 recreation areas at Coralville Lake. Coralville Equipment Replacement of 22 year old water safety patrol boat and 18 year old tractor. Replacement IA Rock Island Coralville Lake, IA will reduce maintenance costs and provide reliable 140,000 equipment. Number of water safety patrols of the lake have been reduced due to unreliability

Coralville Sanitary Facilities. Replacement of waterborne IA Rock Island Coralville Lake, IA and vault restroom facilities 30+ years old and that do not 785,000 meet American Disabilities Act standards. Missouri River - Contract purchase of a Dump Truck to provide reliable Sioux City To The IA Kansas City transport of materials for use in maintaining the river 200,000 Mouth, IA, KS, MO & navigation channel passable to barge traffic. NE Missouri River - Contract purchase of an Inspection Boat to allow efficient Sioux City To The IA Kansas City and safe inspection of river structures to ensure that the 450,000 Mouth, IA, KS, MO & navigation channel remains passable to barge traffic. NE Perform Hydrographic Survey of the Missouri river to Missouri River - ensure that the required navigation channel exists at all Sioux City To The IA Kansas City locations, identify any areas that require specific 1,000,000 Mouth, IA, KS, MO & maintenance efforts and develop navigation maps to NE ensure safe and reliable barge traffic. Missouri River - Purchase of a 5 cubic yard Excavator to allow efficient Sioux City To The modification of river structures and emergency dredging IA Kansas City 900,000 Mouth, IA, KS, MO & to ensure that the navigation channel remains passable to NE barge traffic. Purchase rock for placement in specific trouble areas in Missouri River - maintenance of the Missouri river Bank Stabilization and Sioux City To The IA Kansas City Navigation Project to ensure the navigation channel 500,000 Mouth, IA, KS, MO & remains passable to barge traffic and that critical NE structures are protected. As part of the overall Rathbun Lake project, purchase and install safe and handicapped accessible playground sets and other related equipment, safe playground surfacing, IA Kansas City Rathbun Lake, IA 100,000 boat docks, and other equipment directly used by the recreating public to enhance safety and service to the public. Collect, Scan/Digitize, protect, archive and file project documents to allow efficient retrieval and protection of IA Kansas City Rathbun Lake, IA 30,000 historical documents to minimize future storage costs and lost effort. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Contract clearing, marking, spraying and other IA Kansas City Rathbun Lake, IA Government Property Boundary Maintenance to protect 50,000 Government property from private use. Contract for surveys to measure the amount of sediment in the lake to allow planning for water supply and other IA Kansas City Rathbun Lake, IA 100,000 water uses and engineering for flood control management to protect the safety of the dam and the public. Contract Noxious Plant Control to prevent the migration IA Kansas City Rathbun Lake, IA of weeds and invasive plants from Government land to 50,000 private property. Contract purchase of emergency response, inspection, communication and warning equipment such as radios, satellite phones, software, dialers, sirens, sonar, and IA Kansas City Rathbun Lake, IA 15,000 remote controlled surveillance equipment to allow improved emergency response, evaluation and communication Contract purchase of Global Positioning System Survey IA Kansas City Rathbun Lake, IA Equipment to provide more accurate inventory of project 10,000 equipment/facilities and minimize future survey costs.

Critical road repair on the dam to significantly damaged roads that provide primary access to facilities and IA Kansas City Rathbun Lake, IA recreation areas that will provide significant 2,037,000 enhancements of service to the public, minimize future maintenance costs and improve dam safety

Critical road repairs to significantly damaged roads that provide primary access to facilities and recreation areas IA Kansas City Rathbun Lake, IA 2,100,000 that will provide significant enhancements of service to the public and minimize future maintenance costs. Direct Hire of temporary maintenance workers to provide dam, campground, public use areas and general project IA Kansas City Rathbun Lake, IA maintenance to provide safer facilities and equipment, 60,000 enhance service to the public and reduce future maintenance costs. Direct hire of temporary Water Safety Rangers to provide enhanced safety and customer service to the recreating IA Kansas City Rathbun Lake, IA 50,000 public and purchase of water safety equipment and materials and Safety Brochures Hired contract labor to provide dam, campground, public use areas and general project maintenance to provide IA Kansas City Rathbun Lake, IA 50,000 safer facilities and equipment, enhance service to the public and reduce future maintenance costs. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Maintenance contract labor/contract mowing, Contract refuse collection and other service contracts and IA Kansas City Rathbun Lake, IA maintenance items that will minimize future maintenance, 63,000 ensure a clean and well maintained parks for the recreating public and to ensure public safety Purchase of new, or modification of existing, shower houses, campgrounds, boat ramps, boat docks, rest IA Kansas City Rathbun Lake, IA rooms, administrative buildings and other facilities and 310,000 associated equipment, sidewalks, parking areas, signs and other features to make them handicap Purchase, construction and/or modify recreation facilities The modifications will vary by lake and park depending IA Kansas City Rathbun Lake, IA 275,000 upon the existing facilities and the needs of each area to best enhance service to and safety of the public. Construct final segment of bike trail at Lake Red Rock. Red Rock Dam and IA Rock Island Remaining 4 miles of a 14-mile trail network that Lake Red Rock, IA connects 13 heavily-used recreation areas. 4,600,000 Red Rock Boundary Maintenance-Contract for Red Rock Dam and maintenance of public land boundary. Work will clearly IA Rock Island 300,000 Lake Red Rock, IA delineate public land by replacing missing monumentation and line markings on this 45-year old boundary.

Red Rock Equipment Replacement. Contract for replacement of critical equipment that supports Red Rock Dam and IA Rock Island maintenance of flood structures, environmental and 500,000 Lake Red Rock, IA recreation areas. Replacement will significantly reduce downtime due to repairs and improve operator safety. Red Rock Natural Res Maintenance-Invasive Species. Contract for removal of invasive species that threaten Red Rock Dam and IA Rock Island native prairies and woodlands. Contract will perform 200,000 Lake Red Rock, IA vegetative maintenance of environmental areas, recreation areas and flood control structures. Contract vegetative clearing and boundary monumentation to complete maintenance of 200 miles of IA Rock Island Saylorville Lake, IA 500,000 boundary lines to assure government lands remain available to the public. Purchase electrical wire, pedestals and supplies to IA Rock Island Saylorville Lake, IA rehab/upgrade electrical service for 50 sites in Cherry 300,000 Glen Campground. Rehab campground sites at Prairie Flower Campground IA Rock Island Saylorville Lake, IA to include additional loop(s) to restore campsites to 300,000 current Corps standards. IA Rock Island Saylorville Lake, IA Rehab displays and modernize 35 year old visitor center 300,000 Replacement of heavy equipment that supports IA Rock Island Saylorville Lake, IA 250,000 maintenance of flood structures and recreation areas. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Saylorville Equipment Replacement. Contract for replacement of critical equipment that supports IA Rock Island Saylorville Lake, IA maintenance of flood structures, environmental and 250,000 recreation areas. Replacement will significantly reduce downtime due to repairs and improve operator safety Saylorville Modernize Interpretive Visitor Center Displays. IA Rock Island Saylorville Lake, IA 465,000 Modernization of 1970-era displays. Saylorville Neal Smith Trail Repairs Phase II. Funding would allow rehabilitation of 30+ year old multi-purpose IA Rock Island Saylorville Lake, IA trail and provide additional repairs including, correction of 1,000,000 unsafe portions of the trail, and widening to meet current standards and overlaying Saylorville Prairie Flower Campground Restore to Facility Std. Funding would allow for removal of old rotten and IA Rock Island Saylorville Lake, IA unsafe railroad ties at many campsites. Campsites would 300,000 be concreted to provide better access and a firm, level and safer campsite. Saylorville Road Repair. Contract for preventive maintenance and repaving recreation area roads. IA Rock Island Saylorville Lake, IA Repaving will allow widening in some areas to 500,000 accommodate modern vehicles and overlays will provide safer roadways within recreation areas. Saylorville Road Repair. Preventive maintenance and repaving recreation area roads that have deteriorated IA Rock Island Saylorville Lake, IA over the years. Repaving would allow widening in some 235,000 areas to accommodate modern vehicles and overlays will provide safer roadways within recreation As part of overall maintenance at Albeni Falls Dam project, contract for renovations that include trails, ID Seattle Albeni Falls Dam, ID 1,200,000 irrigation, beach areas and other improvements for riley Creek ID Seattle Albeni Falls Dam, ID Investigation into riprap at riley Creek 100,000 Maintain routine operations of 4 major recreation areas to include beach restoration and cleanup. This will be a 2 ID Seattle Albeni Falls Dam, ID 350,000 year process and is mostly increase to hired labor, to include 7 seasonal hires per year. Pave Main Access Trail/Visitor Center, to dam for public ID Seattle Albeni Falls Dam, ID 100,000 use. Renovate/replace boat ramp at Priest river, recreation ID Seattle Albeni Falls Dam, ID 20,000 site. Repairs to access road, parking lot and paint/stripe ID Seattle Albeni Falls Dam, ID 5,000 parking lot - Weather damage, asphalt damage National Fish Hatchery Effluent System Upgrade Planning and Design. Fund consulting firm to investigate Dworshak Dam And ID Walla Walla effluent system water quality in light of EPA violation to 750,000 Reservoir, Id determine what modifications and improvements to system are necessary to bring water quality American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Repair/Paving of Dent Acres Camp. Fund the contracted rehabilitation/repair and improvement of existing roads Dworshak Dam And ID Walla Walla and parking areas for access to recreation and public use 250,000 Reservoir, ID areas through new chip seal, pothole repair and paving where needed as determined by inspection. Repair/Paving of Granddad Road. Fund the contracted rehabilitation/repair and improvement of existing roads for Dworshak Dam And ID Walla Walla access to recreation and public use areas through new 750,000 Reservoir, ID chip seal, pothole repair and paving where needed as determined by inspection. Dam Safety Interim risk Reduction Measures Plan. Fund consulting firm preparation of an Interim risk Reduction ID Walla Walla Lucky Peak Lake, ID 72,000 Plan as part of Dam Safety review. Plan will address concerns, risks and potential mitigation measures. Mack's Creek Storage Building. Fund the contract procurement and construction of a pre-fabricated storage ID Walla Walla Lucky Peak Lake, Id 50,000 building for Recreation materials/equipment on site to protect items from the elements. Scan and Store Real Estate Documents for GIS database development (Jnt Exp). Fund consultant scanning of ID Walla Walla Lucky Peak Lake, Id historical and current real estate documents and 12,000 drawings so they can be protected from deterioration and the information incorporated into new drawing Issue a contract needed for one-time 4-foot height Calumet Harbor and expansion of CDF to raise the capacity 200,000 cy to IL Chicago 1,100,000 River, IL & IN keep the primary deep draft 28 ft channel open to the Port of Chicago. As part of overall maintenance at Carlyle Lake, repair remaining damages caused by 2005/2008 floods including revetment and erosion repairs. Coles Creek rec IL St. Louis Carlyle Lake, IL 240,000 area, Coles Creek point, and beach plus Boulder campground area. riprap repairs to shoreline erosion will reduce risk to public, improve water quality. Complete installation of breakwater adjacent to the Carlyle Sailing Association. North portion of harbor IL St. Louis Carlyle Lake, IL subject to damage from high wind/wave action. 412,000 Protection of harbor will improve access to lake, protect government investment, and increase public safety. Installation of pre-fab bridge to connect spillway road with existing bike trail. Partnership with city of Carlyle will IL St. Louis Carlyle Lake, IL 200,000 improve public safety and increase recreation opportunities Maintenance dredging for four high-use marina harbors. Siltation continues to reduce water depths subjecting IL St. Louis Carlyle Lake, IL 400,000 boats to groundings and damage. Removal of silt will improve public access and safety. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Modernize water/sewer systems by replacing 40 plus year old deteriorated lift stations and sewer lines. Replacement IL St. Louis Carlyle Lake, IL will protect public health and safety by eliminating 1,000,000 possible leakage and contamination, comply with public health and EPA regulations Perform maintenance to roads in recreation areas and on saddle dam structures. Repair of damaged roads, and IL St. Louis Carlyle Lake, IL 1,000,000 parking lots will provide safe public access and reduce future maintenance costs. Raise/extend breakwater at Boulder boat ramp to protect government investment and improve public safety. Boat IL St. Louis Carlyle Lake, IL ramp not adequately protected from wave damage of the 249,000 main portion of the lake. Added rip-rap rock breakwater will shelter boats using ramps.

Renew properly sized and graded riprap along lakeside faces of the main dam, saddle dam 2, as identified in Dec 2008 SPRA Critical dam safety requirement will ensure 50 year protection and integrality of the main dam and IL St. Louis Carlyle Lake, IL 15,000,000 adjacent saddle dams, Reduces risk of dam failure and subsequent flooding downstream. Will protect integrity of main dam, saddle dams and Keyesport levee during FRM operations. Replace 14 block comfort stations (over forty years old) in recreation areas, with efficient, handicap accessible units. IL St. Louis Carlyle Lake, IL Improves public health and safety. Complies with 1,500,000 American Disability Act requirements. Reduces future operation & maintenance costs. Replace safety buoys with small craft barriers at spillway. Reduces risk of water-borne attack and improves boater IL St. Louis Carlyle Lake, IL 100,000 safety at the spillway. Reduces risk of dam failure and downstream flooding. Replace trees in recreation areas lost during flooding and repair Boulder Flats Wetland Restoration area. Restored IL St. Louis Carlyle Lake, IL hardwood plantings will serve as filter strips to diminish 100,000 lake bank erosion, improve wildlife habitat, reduce lake sedimentation Replace worn out defective Project equipment and plant for Environmental Stewardship & Recreation program. IL St. Louis Carlyle Lake, IL Reliable equipment and plant improves safety to public, 150,000 volunteers, and employees. Repair costs exceed replacement of some equipment Resume operation and maintenance of all facilities at acceptable service levels. Increase level of IL St. Louis Carlyle Lake, IL environmental stewardship, and maintenance and 1,335,000 operations of facilities to meet public needs improving health and safety conditions of the areas. Perform American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Visitor Center Audio-Visual Room Expansion. Expansion will meet public needs for meeting space (local dam IL St. Louis Carlyle Lake, IL 350,000 safety, emergency preparedness, environmental spill preparedness, etc.). Fabricate and install four replacement lock gates and associated mechanical/electrical equipment replacing the IL Chicago Chicago Harbor, IL 17,600,000 current 1938 vintage gates that are unreliable with a long history of breakdowns. Issue contract to repair/stabilize the collapsing concrete cap of the critical mile-long stone filled timber crib IL Chicago Chicago Harbor, IL 3,555,000 northeast breakwater - the main structure protecting Chicago Harbor. Forest Inventory - 16,000 acres of federally managed lands will be inventoried for habitat, endangered species, Illinois Waterway IL St. Louis backlog stewardship work, and water quality 200,000 (Mvs Portion), IL & IN improvements promoting more healthy and sustainable federal lands, protection of endangered species Implementation of the Kampsville Forest Restoration project which will restore approximately 100 acres of flood Illinois Waterway IL St. Louis damaged forest to healthy and sustainable lands, 125,000 (Mvs Portion), IL & IN promote necessary habitat, and make long term improvements to water quality. Manage outgrant cabin leases for environmental/recreational restitution. Flood damaged Illinois Waterway IL St. Louis cabins pose safety and health risk to the general public. 200,000 (Mvs Portion), IL & IN This package will remove these cabins and the risk and restore these federal lands to healthy public open spaces Perform additional maintenance dredging in critical bends Illinois Waterway IL St. Louis in the river. Minimal dredging in these areas has left 247,000 (Mvs Portion), IL & IN portions of the river in high risk for closure. Perform river engineering/micro-model study to determine requirements for construction of rock dike training Illinois Waterway IL St. Louis structures to maximize dredge efficiency, provide more 160,000 (Mvs Portion), IL & IN stable navigation channel, and protect environmental habitat. Illinois Waterway, IL Contract for high mast lighting at Brandon Road Lock and IL Rock Island 1,400,000 & IN Dresden Lock Illinois Waterway, IL Contract to purchase 8 new work flats for Illinois IL Rock Island 800,000 & IN Waterway locks. Complete critical ongoing maintenance and repair to operating equipment including completion of Electrical Kaskaskia River IL St. Louis System repairs, machinery repairs, and completion of 400,000 Navigation, IL remote lock control capabilities. Completion of this work will restore system reliability to the channel Install accessible and flood proof vault toilets at upstream Kaskaskia River and downstream boat ramps. Will improve health and IL St. Louis 87,000 Navigation, IL safety of visitors, reduce operations and maintenance costs. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Open additional side channels - Removal of siltation from Kaskaskia River remnant side channels, opening mouths closed to IL St. Louis 500,000 Navigation, IL sediment. Improving fish and wildlife habitat, connecting side channels to main channel. Provide potable water supply for lock operations and associated recreation facilities by connecting to local Ellis Kaskaskia River IL St. Louis Grove water system. Will provide more efficient 216,000 Navigation, IL operations at the lock as well as healthier experience for visiting public Re-establish channel from New Athens upstream to Fayetteville to original Project Authorized width and depth Kaskaskia River IL St. Louis to provide authorized navigation capability and promote 10,000,000 Navigation, IL increase industry and economic significant growth in the area. Remove asbestos from lock and maintenance building - Safety, health, and environmental hazard improvements Kaskaskia River IL St. Louis for staff and visitors to lock facility. Control house, visitor 150,000 Navigation, IL area, restrooms and maintenance area have floor tiles, heat shield insulation Replace emergency generator for back-up power to navigation lock to improve reliability of lock and provide Kaskaskia River IL St. Louis critical control of the pool during frequent utility power 250,000 Navigation, IL failures. Existing generator is 35 years old and has low reliability and insufficient capability Replace failed miter gate springs on navigation lock Kaskaskia River restoring reliability to the project and reducing risk of IL St. Louis 295,000 Navigation, IL further damage to structural features of the gates and prolonged closures to navigation. Resurface project roads and parking lots. Improves Kaskaskia River IL St. Louis public safety and public access and will reduce future 250,000 Navigation, IL Operations and Maintenance cost. Complete Bo Wood Campground shoreline erosion repairs and recreation facility consolidation. Completed IL St. Louis Lake Shelbyville, IL project will provide improved recreational opportunity, 963,000 complies with American Disability Act standards and reduces future maintenance and operations cost. Hire 20 summer employees to perform backlog maintenance in recreation and environmental areas. Improves condition of facilities to meet customer needs, IL St. Louis Lake Shelbyville, IL 360,000 reduces safety risk to visitors, increases level of environmental stewardship and reduces future maintenance. Perform suppression of terrestrial invasive plant species on 1000 acres of project lands. Eliminating or reducing IL St. Louis Lake Shelbyville, IL 200,000 invasive plant species will improve the quality of the ecosystem and improve habitat values for wildlife. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Purchase and install three automatic fee-collection machines in recreation areas. Purchase and installation IL St. Louis Lake Shelbyville, IL of fee machines will improve efficiency and security of 180,000 collecting use fees and reduce future maintenance and operations cost. Repair and/or replace flood damaged facilities in recreation areas with a more "flood resistant" design to IL St. Louis Lake Shelbyville, IL 1,342,000 improve public health and safety, plus reduce future maintenance and operations cost. Replace deteriorating administration building with consolidated environmentally sustainable structure IL St. Louis Lake Shelbyville, IL located next to the maintenance compound. This work 4,000,000 will provide an energy efficient administrative building that meets the interpretive/education needs Replace deteriorating visitor center Groves building and consolidate next to Administration building complex. IL St. Louis Lake Shelbyville, IL Work will provide an energy efficient structure that meets 4,000,000 the interpretive/education needs of the visitors, New security, energy and American Disability Act requirement

Replace unsafe center gallery and west spiral stairway in main dam. Work will provide safe access to critical areas IL St. Louis Lake Shelbyville, IL 150,000 of the dam, insuring continued safe operations of the dam reducing risk of dam failure and downstream flooding.

Miss River Btwn Mo Additional dredging and replacement of gaging stations to River and improve reliability of navigation channel. Proper IL St. Louis 750,000 Minneapolis (Mvs management of river promotes economic benefit to Portion), IL industry through efficient transportation planning. Miss River Btwn Mo Construct interpretive Nature Trail at Calumet Creek. River and IL St. Louis Design and development of trail within Pool. No trail 200,000 Minneapolis (Mvs currently exists. Portion), IL Miss River Btwn Mo Design/construct water trails and facilities in Pool 25. River and IL St. Louis Continuation of watertrail system. Installation of mapping 300,000 Minneapolis (Mvs and signage to promote regional Corps message. Portion), IL Miss River Btwn Mo River and Develop/repair City of Clarksville riverfront erosion which IL St. Louis 1,000,000 Minneapolis (Mvs is encroaching on the lock access road and parking lot. Portion), IL Forest Inventory - 30,000 acres. Systematic collection of Miss River Btwn Mo data and forest information for assessment and analysis River and IL St. Louis to determine preventative actions, future sustainability 300,000 Minneapolis (Mvs and suitability of management practices. Outputs include Portion), IL habitat assessment, Water American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Forest/floodplain Restoration. Reestablishment of Miss River Btwn Mo integral components of MS river ecosystem (habitat, River and IL St. Louis improved water quality and groundwater discharge) 175,000 Minneapolis (Mvs through a combination of the seasonal spring pulses and Portion), IL planting to prevent erosion of habitat / island Install downstream bulkhead slots at Lock 25. Bulkhead Miss River Btwn Mo slots are required to ensure stability of the structure River and IL St. Louis during dewatering operation; dewatering the lock without 1,858,000 Minneapolis (Mvs bulkhead slots increases delays to Industry and Portion), IL compromises the structural integrity Miss River Btwn Mo Install riparian buffers to reduce sediment input into River and channels and reduce future channel maintenance IL St. Louis 1,000,000 Minneapolis (Mvs requirements. Additional project benefits include the Portion), IL improvement of aquatic habitat. Miss River Btwn Mo L/D 24, 25 - Fabricate and install critical signs to conform River and to safety standards. Consists of the procurement and IL St. Louis 900,000 Minneapolis (Mvs placement of safety critical signs at subject Locks and Portion), IL Dams and their pools. L/D 25 - Culvert Valve Machinery - Install new machinery. Miss River Btwn Mo Raises machinery above record high water level.. River and IL St. Louis Currently high water requires the pulling of machinery and 1,200,000 Minneapolis (Mvs lengthy delays in reopening the facility after closure. Portion), IL Improves maintenance and reduces hazards Miss River Btwn Mo L/D 25 - Saddledam. Stabilize shoreline to prevent loss River and IL St. Louis of pool. Shoreline is eroded; damaged to the point where 230,000 Minneapolis (Mvs probability of failure is increased. Portion), IL Miss River Btwn Mo L/D 25 - Spillway rehabilitation, vegetation removal from River and overflow dike. Addresses periodic inspection deficiency IL St. Louis 435,000 Minneapolis (Mvs to open back up and reestablish chutes for Portion), IL unencumbered flow below the spillway. Miss River Btwn Mo L/D Mel Price - Spur Dike - Rehabilitation to stabilize River and IL St. Louis existing slope damage / raise low areas on the dike to 230,000 Minneapolis (Mvs maintain authorized 100-year level of protection. Portion), IL Miss River Btwn Mo Lock Bulkhead Lifting Beam. Current beam is structurally River and IL St. Louis inadequate and is required to place bulkheads for 500,000 Minneapolis (Mvs dewatering / repair operations. Portion), IL Modifications to miter gates to correct deficiencies at Mel Miss River Btwn Mo Price Lock. Modifications will allow diagonals (ensure River and IL St. Louis proper mitering) to be tensioned in the wet instead of 1,395,000 Minneapolis (Mvs having to dewater lock chamber. Greatly reduces closure Portion), IL time, cost of repairs Miss River Btwn Mo Operate Regional Visitor Center. Exhibit maintenance River and IL St. Louis contract for public display of Corps mission at the 350,000 Minneapolis (Mvs National Great rivers Museum. Portion), IL American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Perform backlog maintenance to rock dikes, revetments, Miss River Btwn Mo and other river training structures, Upper MS river miles River and IL St. Louis 195.0 - 300.0, to improve channel conditions, gain 1,500,000 Minneapolis (Mvs efficiency in dredge planning, and increase reliability of Portion), IL navigation channel while preserving integrity Miss River Btwn Mo Perform high demand educational programming. River and IL St. Louis Promotes regional message of navigation, environmental 105,000 Minneapolis (Mvs and recreation at National Great rivers Museum. Portion), IL Procure tainter gate chains/sprockets for Dam 24 and 25. Miss River Btwn Mo Chains and sprockets, due to their age, are maintenance River and IL St. Louis intensive and failing at an expanding rate. Loss of chains 4,320,000 Minneapolis (Mvs impacts ability to retain / control navigation pool through Portion), IL operation of tainter Rehab/repair of existing Trilateration Stations to restore Miss River Btwn Mo safe access for engineers to measure and monitor River and IL St. Louis shifting of structure. Will also restore safe access to 434,000 Minneapolis (Mvs visiting public which uses these stations as overlooks to Portion), IL the canal. Miss River Btwn Mo Rehabilitate Silo Access. Safety issue. Current layout River and IL St. Louis requires redesign of entrance road, parking facility and 500,000 Minneapolis (Mvs boat ramp to prevent unsafe conditions Portion), IL Repair Concrete - Lock 25. Crack in downstream Miss River Btwn Mo landside wall needs immediate repair to prevent further River and IL St. Louis damage. Cracking discovered during 2008 flood 200,000 Minneapolis (Mvs inspection. Reducing future risk of failures and shut down Portion), IL of lock chamber. Miss River Btwn Mo Repair Lincoln Shields access. Project requires lead River and IL St. Louis abatement of government property on public overlook 450,000 Minneapolis (Mvs structure. Portion), IL Replace 4 defective Mel Price bulkheads which are Miss River Btwn Mo required for routine and emergency dewatering River and IL St. Louis operations and have been coded as structurally unstable 2,000,000 Minneapolis (Mvs by engineer experts. Replacement will reduce the down Portion), IL time of a lock closure and reduce economic risk Replace access tour control facility with upgraded Class Miss River Btwn Mo C Visitor Information Center - National Audubon River and IL St. Louis Education Partnership. riverlands Environmental 2,000,000 Minneapolis (Mvs Education Facility to promote education for the migratory Portion), IL bird sanctuary / confluence area. Replace Diesel Compressors at Lock 25. Existing Miss River Btwn Mo compressors are beyond design life, maintenance River and IL St. Louis intensive and unreliable towards their intended purpose - 200,000 Minneapolis (Mvs clearing drift and debris to facilitate proper gate mitering / Portion), IL pool retention. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Miss River Btwn Mo Replace fenders on main lock miter gate - Mel Price. River and Replaces missing, Warped, deteriorated fenders which IL St. Louis 2,000,000 Minneapolis (Mvs damper / minimize impact load through member and Portion), IL protect the structural integrity of the gate.

As part of overall project, contract to replace outdated, obsolete, and unsafe equipment. Replacement of outdated, obsolete, and unsafe equipment necessary for Miss River Btwn Mo the continued operation and maintenance of 26 IL Rock Island River and 1,377,000 recreation facilities. Equipment includes pre-fabricated Minneapolis, IL picnic tables, toilets, fee booths, and docks, playground fall-zone material, and replacement of 25 to 30 year old construction machinery.

Contract to replace outdated, obsolete, and unsafe equipment. Replacement of outdated, obsolete, and Miss River Btwn Mo unsafe equipment necessary for the continued operation IL Rock Island River and and maintenance of lock and dam facilities. Equipment 2,735,000 Minneapolis, IL includes tools, environmentally compliant recovery systems, crew transport boats, and worn out and unsafe construction machinery that is 25 to 30 years old. Miss River Btwn Mo Grant river Recreation Area Paving. Repair and repaving IL Rock Island River and of recreation area roads that have deteriorated in the 20+ 527,000 Minneapolis, IL years since last paved. L/D 11 Major Maint, Stage III Trunnion Bearing. Replace Miss River Btwn Mo damaged trunnion bearings at Dam 11. Failure of the IL Rock Island River and trunnion bearings on one or more dam gates could result 900,000 Minneapolis, IL in the inability of the dam to provide its essential function and result in closure of the dam Miss R, L/D 15 Hydropower Turbine Rehab. Contract to Miss River Btwn Mo rehabilitate the hydropower generator at Lock & Dam 15. IL Rock Island River and This generator provides power to operate the navigation 1,092,000 Minneapolis, IL facility and is over 75 years old. Impacts from floods and its advanced age have reduced

Thomson Recreation Area Sanitation Facilities Miss River Btwn Mo Modernization. Construction of one shower building, IL Rock Island River and rehabilitation of two existing shower buildings, and new 2,842,000 Minneapolis, IL sanitary sewer including lift stations and water systems hooked to local supplier. Will reduce maintenance costs As part of overall maintenance at Rend Lake, construct bike trail. Construction will complete 2 phases of the IL St. Louis Rend Lake, IL Rend Lake bike trail improving public access, recreational 1,500,000 opportunity, and supporting federal, state and local outdoor health initiatives. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Bring campground showers, restroom, and other public facilities up to Americans with Disabilities Act (American IL St. Louis Rend Lake, IL Disability Act) standards. Work will modify facilities to 175,000 comply with American Disability Act standards improving accessibility for customers. Develop South Marcum sewer system plans and specifications. Plans & specifications designing a sewer IL St. Louis Rend Lake, IL system that complies with public health and EPA 200,000 regulations while providing system improvements to reduce maintenance and operation and improved service Dredge Gun Creek, North Marcum and Ina. Siltation continues to reduce water depths subjecting boats to IL St. Louis Rend Lake, IL 700,000 grounding and damage. Removal of silt will improve public access and safety. Hire 25 summer employees, provide supplies, materials and support to perform various backlog maintenance IL St. Louis Rend Lake, IL work in recreation, environmental, and flood risk 1,350,000 management area. Improves condition of facilities to meet customer needs, reduces safety risk to vi Perform sedimentation survey. This work will confirm water storage capacities for use by the Corps, state, and IL St. Louis Rend Lake, IL partners in managing the resource to reduce potential for 300,000 over allotment of water use thus impacting public health, industry, and environment. Prepare updated inundation maps and Water Control Plan. Updated maps and plans will improve public safety IL St. Louis Rend Lake, IL downstream by increasing the effectiveness of 500,000 downstream planning and emergency operations plans and actions. Purchase and install small craft barriers at spillway and intake structure. Reduces risk of water-borne attack and IL St. Louis Rend Lake, IL improves boater safety at the spillway and intake 400,000 structure. Reduces risk of dam failure and downstream flooding. Remove 4 old wooden campground fee booths and replace with new facilities. New facilities will improve IL St. Louis Rend Lake, IL 600,000 safety and security of attendants and provide improved customer service and accessibility. Remove 8 old wooden restroom facilities, consolidate and construct new facilities in North & South Marcum and Jackie Branch. Consolidation of facilities will reduce IL St. Louis Rend Lake, IL 410,000 future maintenance and operations cost, provide American Disability Act accessible facilities and meet current standards Remove old wooden railroad bridge. Corrects public IL St. Louis Rend Lake, IL safety deficiency and restores ecological value to the 200,000 area. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Repair and modernize unlevel and small camp pad parking areas in campgrounds. Campsites will be lengthened and leveled to meet customer needs IL St. Louis Rend Lake, IL 550,000 (American Disability Act) and the requirements of modern recreation vehicles. Future maintenance and operations cost will be reduce Repair and overlay of roads and parking lots. Repairs to damaged roads, parking lots and boat ramps will improve IL St. Louis Rend Lake, IL 1,000,000 public safety and public access. Will reduce future operations and maintenance cost. Repair and paint spillway bridge. Work will consist of repairing existing structural defects and corrosion, then IL St. Louis Rend Lake, IL painting steel work to prevent future corrosion thus 790,000 ensuring the integrity of the dam structures and reducing future maintenance cost. Repair flood damaged east side shoreline revetment and breakwaters. Repairs will stabilize the shoreline and IL St. Louis Rend Lake, IL 500,000 breakwaters increasing public safety and reliability of the features to protect valuable resources. Repair flood damaged to west-side shoreline revetment and breakwaters. Repairs will stabilize the shoreline and IL St. Louis Rend Lake, IL 510,000 breakwaters increasing public safety and reliability of the features to protect valuable resources.

Replace 40+ year heating and cooling system in the maintenance compound buildings with Geo-thermal IL St. Louis Rend Lake, IL 100,000 efficient system. Work will improve energy efficiencies and reduce future maintenance and operations cost.

Replace deteriorating administration building with consolidated environmentally sustainable structure located next to the maintenance compound. Consolidate aging facilities into 1 facility that will be environmentally IL St. Louis Rend Lake, IL sustainable, energy efficient, and meet all safety and 4,000,000 security requirements. Energy efficient administrative building will meet the interpretive/education needs of the visitors, new security, energy and ADA requirements, and reduces future maintenance and operations cost.

Replace deteriorating visitor center building and consolidate next to Administration building complex providing an energy efficient structure that meets the IL St. Louis Rend Lake, IL 4,000,000 interpretive/education needs of the visitors, New security, energy and American Disability Act requirements, and reduces future maintenance and operations costs American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Replace pipes that are failing in several restroom facilities and the Sandusky water main. Replacement will protect public health and safety by eliminating possible leakage IL St. Louis Rend Lake, IL 110,000 and contamination, comply with public health and EPA regulations, and reduce future maintenance and operations cost. Resume operation and maintenance of all recreation facilities. Increase level of environmental stewardship, IL St. Louis Rend Lake, IL and maintenance and operations of facilities to meet 448,000 public needs improving health and safety conditions of the areas. South Marcum sewer system repairs and upgrade. Repairs and upgrade will protect health and safety by IL St. Louis Rend Lake, IL eliminating possible leaks and contamination, comply with 750,000 public health and EPA regulations and reduce future maintenance and operations cost. West side sewer system plans and specifications. Plans and specifications designing a sewer system that IL St. Louis Rend Lake, IL complies with public health and EPA regulations while 250,000 providing system improvements to reduce maintenance and operation and improved service for the customers Construct picnic shelter & associated facilities in the IN Louisville Brookville Lake, IN 81,000 Tailwater Recreation Area. Hire temporary additional ranger staff to augment promotion of public water safety initiatives, efforts and IN Louisville Brookville Lake, IN programming. Additional staff would allow increased 22,000 public contacts for water safety education through development of collaborative partnerships. Hire temporary additional ranger staff to promote public IN Louisville Brookville Lake, IN water safety initiatives and educational efforts with 22,000 increased public contacts on the water. Purchase needed supplies and materials to operate / IN Louisville Brookville Lake, IN 19,000 repair facilities. Hire temporary additional ranger staff to augment promotion of public water safety initiatives, efforts and IN Louisville Cagles Mill Lake, IN programming. Additional staff would allow increased 22,000 public contacts for water safety education through development of collaborative partnerships. Hire temporary additional ranger staff to promote public IN Louisville Cagles Mill Lake, IN water safety initiatives and educational efforts with 22,000 increased public contacts on the water. Purchase needed supplies and materials to operate / IN Louisville Cagles Mill Lake, IN 9,000 repair facilities Hire temporary additional ranger staff to augment promotion of public water safety initiatives, efforts and Cecil M Harden IN Louisville programming. Additional staff would allow increased 22,000 Lake, IN public contacts for water safety education through development of collaborative partnerships. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Hire temporary additional ranger staff to promote public Cecil M Harden IN Louisville water safety initiatives and educational efforts with 22,000 Lake, IN increased public contacts on the water. Cecil M Harden Purchase needed supplies and materials to operate / IN Louisville 9,000 Lake, IN repair facilities Hire temporary additional ranger staff to augment promotion of public water safety initiatives, efforts and J Edward Roush IN Louisville programming. Additional staff would allow increased 30,000 Lake, IN public contacts for water safety education through development of collaborative partnerships. Hire temporary additional ranger staff to promote public J Edward Roush IN Louisville water safety initiatives and educational efforts with 7,000 Lake, IN increased public contacts on the water. J Edward Roush Purchase needed supplies and materials to operate / IN Louisville 24,000 Lake, IN repair facilities Hire temporary additional ranger staff to augment promotion of public water safety initiatives, efforts and Mississinewa Lake, IN Louisville programming. Additional staff would allow increased 30,000 IN public contacts for water safety education through development of collaborative partnerships. Hire temporary additional ranger staff to promote public Mississinewa Lake, IN Louisville water safety initiatives and educational efforts with 7,000 IN increased public contacts on the water. Mississinewa Lake, Purchase needed supplies and materials to operate / IN Louisville 15,000 IN repair facilities Additional improvements to the public day-use recreation IN Louisville Monroe Lake, IN facilities in the Tailwater Area (picnic shelter, supplies & 100,000 materials, access improvements, trails). Hire temporary additional ranger staff to augment promotion of public water safety initiatives, efforts and IN Louisville Monroe Lake, IN programming. Additional staff would allow increased 22,000 public contacts for water safety education through development of collaborative partnerships. Hire temporary additional ranger staff to promote public IN Louisville Monroe Lake, IN water safety initiatives and educational efforts with 22,000 increased public contacts on the water. Purchase needed supplies and materials to operate / IN Louisville Monroe Lake, IN 11,000 repair facilities Hire temporary additional ranger staff to augment promotion of public water safety initiatives, efforts and IN Louisville Patoka Lake, IN programming. Additional staff would allow increased 22,000 public contacts for water safety education through development of collaborative partnerships. Hire temporary additional ranger staff to promote public IN Louisville Patoka Lake, IN water safety initiatives and educational efforts with 22,000 increased public contacts on the water. Purchase needed supplies and materials to operate / IN Louisville Patoka Lake, IN 17,000 repair facilities American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Hire temporary additional ranger staff to augment promotion of public water safety initiatives, efforts and IN Louisville Salamonie Lake, IN programming. Additional staff would allow increased 30,000 public contacts for water safety education through development of collaborative partnerships. Hire temporary additional ranger staff to promote public IN Louisville Salamonie Lake, IN water safety initiatives and educational efforts with 7,000 increased public contacts on the water. Purchase needed supplies and materials to operate / IN Louisville Salamonie Lake, IN 17,000 repair facilities As part of overall maintenance at , purchase of modern, safe and handicapped accessible playground sets and other related equipment, safe playground KS Kansas City Clinton Lake, KS 60,000 surfacing, boat docks, and other equipment directly used by the recreating public to enhance safety and service to the public. Collect, Scan/Digitize, protect, archive and file project documents to allow efficient retrieval and protection of KS Kansas City Clinton Lake, KS 30,000 historical documents to minimize future storage costs and lost effort. Complete rebuilding of Dam Toe Road to provide access to recreation areas and for dam safety activities and KS Kansas City Clinton Lake, KS 2,033,000 response to minimize future maintenance costs and enhance service to the public. Contract for Administrative Building Energy & General Upgrades to enhance security, reduce energy KS Kansas City Clinton Lake, KS 30,000 consumption and reduce future operating and maintenance costs. Contract for construction of Stop Logs to allow sealing of the intake tower of the dam to perform inspections and KS Kansas City Clinton Lake, KS maintenance to improve dam safety, reduce the risk of 400,000 failure, decrease the cost of future maintenance and reduce the risk of failure. Contract for surveys to measure the amount of sediment in the lake to allow planning for water supply and other KS Kansas City Clinton Lake, KS 100,000 water uses and engineering for flood control management to protect the safety of the dam and the public. Contract labor to provide dam, campground, public use areas and general project maintenance to provide safer KS Kansas City Clinton Lake, KS 50,000 facilities and equipment, enhance service to the public and reduce future maintenance costs. Contract purchase of emergency response, inspection, communication and warning equipment allow improved KS Kansas City Clinton Lake, KS emergency response, evaluation and communication with 15,000 law enforcement and first responders to minimize the risk of failure and protect public safety. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Contract purchase of Global Positioning System Survey KS Kansas City Clinton Lake, KS Equipment to provide more accurate inventory of project 10,000 equipment/facilities and minimize future survey costs.

Critical Road Repairs to significantly damaged roads that provide primary access to facilities and recreation areas KS Kansas City Clinton Lake, KS 1,200,000 that will provide significant enhancements of service to the public and minimize future maintenance costs. Direct Hire of temporary maintenance workers to provide dam, campground, public use areas and general project KS Kansas City Clinton Lake, KS maintenance to provide safer facilities and equipment, 140,000 enhance service to the public and reduce future maintenance costs. Direct hire of temporary Water Safety Rangers to provide enhanced safety and customer service to the recreating KS Kansas City Clinton Lake, KS 50,000 public and purchase of water safety equipment and materials and Safety Brochures General road repairs to camp loops, camp pads, parking areas, culvert replacements, paving modifications to KS Kansas City Clinton Lake, KS provide handicapped access, and access points or 400,000 aggregate surfaced roads and shoulders that will provide enhanced service to the public and reduce

Maintenance Contract Labor/Contract Mowing, Contract Refuse Collection and other Service Contracts and KS Kansas City Clinton Lake, KS maintenance items that will minimize future maintenance, 67,000 ensure a clean and well maintained parks for the recreating public and to ensure public safety Purchase of maintenance equipment to allow more efficient use of manpower to perform maintenance and KS Kansas City Clinton Lake, KS 175,000 decreasing future maintenance cost and increasing service to the public. Purchase of new, or modification of existing, shower houses, campgrounds, boat ramps, boat docks, rest KS Kansas City Clinton Lake, KS rooms, administrative buildings and other facilities and 300,000 associated equipment, sidewalks, parking areas, signs and other features to make them handicap accessible Purchase of rock to protect the dam in emergency KS Kansas City Clinton Lake, KS conditions and minimize the risk of severe damage and 153,000 public safety. Purchase, construction and/or modify Recreation Facilities. The modifications will vary by lake and park KS Kansas City Clinton Lake, KS depending upon the existing facilities and the needs of 340,000 each area to best enhance service to and safety of the public. , AE contract to conduct flood pool sedimentation survey. KS Tulsa 100,000 KS Enhances reliability of water storage estimates. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Council Grove Lake, AE contract to update forecast models, Water control KS Tulsa 100,000 KS manuals, and operational programs to reduce public risk. Council Grove Lake, Award Construction Contract to Construct new bulkhead KS Tulsa 180,000 KS to reduce future maintenance costs. Award Construction Contract to Install 50 amp service Council Grove Lake, KS Tulsa various parks. Supports current requirements for 100,000 KS recreating public to improve recreation safety. Council Grove Lake, Award construction contract to repair service bridge KS Tulsa 100,000 KS corbels to reduce the risk of failure and public safety. Council Grove Lake, Award Construction Contract to Replace electrical system KS Tulsa 175,000 KS in park to reduce the risk to the public Council Grove Lake, Award Construction Contract to Replace restroom at Kit KS Tulsa 175,000 KS Carson Cove with CXT restroom to reduce public risk.

AE contract to create real-time inundation mapping and KS Tulsa , KS 162,000 economic damages program to Reduce public risk.

AE contract to conduct flood pool sedimentation survey. KS Tulsa , KS 100,000 Enhances reliability of water storage estimates.

AE contract to create real-time inundation mapping and KS Tulsa Elk City Lake, KS 162,000 economic damages program. Reduces risk to public. AE contract to update Elk City archeological district KS Tulsa Elk City Lake, KS National Register nomination. Supports preservation of 100,000 Nations' significant cultural resources. As part of overall maintenance at Elk City Lake, award KS Tulsa Elk City Lake, KS Construction Contract to Install playground. Creates safe 45,000 playground for park visitors to improve recreation safety. Award Construction Contract to Repair gate liner and KS Tulsa Elk City Lake, KS 340,000 paint bulkhead, reduces future maintenance costs Award Construction Contract to Repair roadway and KS Tulsa Elk City Lake, KS 130,000 parking lot at Overlook Park. Reduces risk to public. Award Construction Contract to Repair service bridge KS Tulsa Elk City Lake, KS 100,000 corbels to reduce the risk of failure Award Construction Contract to Replace embankment KS Tulsa Elk City Lake, KS 314,000 guardrail to provide for public safety AE contract to conduct flood pool sedimentation survey. KS Tulsa , KS 135,000 Enhances reliability of water storage estimates. Award Construction Contract to Rehab and paint tainter KS Tulsa Fall River Lake, KS 5,500,000 gates. Reduces future maintenance costs. Award Construction Contract to Remove debris and KS Tulsa Fall River Lake, KS 1,500,000 repair dam embankment riprap, reduces risk of failure Award Construction Contract to Repair spillway road. KS Tulsa Fall River Lake, KS 240,000 Reduces accident risk to public. Award Construction Contract to Repair/resurface park KS Tulsa Fall River Lake, KS 445,000 roads various locations. Reduces risk to public. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award Construction Contract to Replace embankment KS Tulsa Fall River Lake, KS 426,000 guardrail to provide for public safety. Collect, Scan/Digitize, protect, archive and file project documents to allow efficient retrieval and protection of KS Kansas City , KS 30,000 historical documents to minimize future storage costs and lost effort. Contract for surveys to measure the amount of sediment in the lake to allow planning for water supply and other KS Kansas City Hillsdale Lake, KS 100,000 water uses and engineering for flood control management to protect the safety of the dam and the public.

Contract purchase of emergency response, inspection, communication and warning equipment allow improved KS Kansas City Hillsdale Lake, KS emergency response, evaluation and communication with 15,000 law enforcement and first responders to minimize the risk of failure and protect public safety.

Contract purchase of Global Positioning System Survey KS Kansas City Hillsdale Lake, KS Equipment to provide more accurate inventory of project 10,000 equipment/facilities and minimize future survey costs.

Critical Road Repairs to significantly damaged roads that provide primary access to facilities and recreation areas KS Kansas City Hillsdale Lake, KS 260,000 that will provide significant enhancements of service to the public and minimize future maintenance costs. Direct hire of temporary Water Safety Rangers to provide enhanced safety and customer service to the recreating KS Kansas City Hillsdale Lake, KS 50,000 public and purchase of water safety equipment and materials and Safety Brochures Hired contract labor to provide dam, campground, public use areas and general project maintenance to provide KS Kansas City Hillsdale Lake, KS 30,000 safer facilities and equipment, enhance service to the public and reduce future maintenance costs. Maintenance contracts for maintenance items that will minimize future maintenance, ensure a clean and well KS Kansas City Hillsdale Lake, KS 40,000 maintained parks for the recreating public and to ensure public safety at the lake. Purchase of new, OR modification of existing, shower houses, campgrounds, boat ramps, boat docks, rest KS Kansas City Hillsdale Lake, KS rooms, administrative buildings and other facilities and 40,000 associated equipment, sidewalks, parking areas, signs and other features to make them handicap accessible Purchase of rock to protect the dam in emergency KS Kansas City Hillsdale Lake, KS conditions and minimize the risk of severe damage and 153,000 public safety. Award Construction Contract to Construct inverted filter John Redmond Dam KS Tulsa for Hartford Levee ponding area. Reduces risk of levee 200,000 and Reservoir, KS failure. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) John Redmond Dam Award Construction Contract to Repair gate side seals, KS Tulsa 100,000 and Reservoir, KS reduces risk of failure

John Redmond Dam Award Construction Contract to Repair tainter gates, KS Tulsa 6,000,000 and Reservoir, KS reduces risk of failure

John Redmond Dam Award Construction Contract to Replace boat ramp. KS Tulsa 120,000 and Reservoir, KS Reduces risk to public. As part of overall maintenance at , purchase of modern, safe and handicapped accessible playground sets and other related equipment, safe KS Kansas City Kanopolis Lake, KS 60,000 playground surfacing, boat docks, and other equipment directly used by the recreating public to enhance safety and service to the public. Collect, Scan/Digitize, protect, archive and file project documents to allow efficient retrieval and protection of KS Kansas City Kanopolis Lake, KS 30,000 historical documents to minimize future storage costs and lost effort. Contract for Administrative Building Energy & General Upgrades to enhance security, reduce energy KS Kansas City Kanopolis Lake, KS 115,000 consumption and reduce future operating and maintenance costs. Contract for Regulatory Building Energy & General Upgrades to enhance security, reduce energy KS Kansas City Kanopolis Lake, KS 60,000 consumption and reduce future operating and maintenance costs. Contract for surveys to measure the amount of sediment in the lake to allow planning for water supply and other KS Kansas City Kanopolis Lake, KS 140,000 water uses and engineering for flood control management to protect the safety of the dam and the public.

Contract purchase of emergency response, inspection, communication and warning equipment allow improved KS Kansas City Kanopolis Lake, KS emergency response, evaluation and communication with 15,000 law enforcement and first responders to minimize the risk of failure and protect public safety.

Contract purchase of Global Positioning System Survey KS Kansas City Kanopolis Lake, KS Equipment to provide more accurate inventory of project 10,000 equipment/facilities and minimize future survey costs.

Critical Road Repairs to significantly damaged roads that provide primary access to facilities and recreation areas KS Kansas City Kanopolis Lake, KS 1,200,000 that will provide significant enhancements of service to the public and minimize future maintenance costs. Direct hire of temporary Water Safety Rangers to provide enhanced safety and customer service to the recreating KS Kansas City Kanopolis Lake, KS 50,000 public and purchase of water safety equipment and materials and Safety Brochures American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Hired contract labor to provide dam, campground, public use areas and general project maintenance to provide KS Kansas City Kanopolis Lake, KS 40,000 safer facilities and equipment, enhance service to the public and reduce future maintenance costs.

Maintenance contract to minimize future maintenance, KS Kansas City Kanopolis Lake, KS ensure a clean and well maintained parks for the 88,000 recreating public and to ensure public safety at the lake. Purchase and placement of Channel Stabilization Rock to protect the shoreline along the outlet channel and flume KS Kansas City Kanopolis Lake, KS 300,000 repair to avoid damage to recreation areas and roads and minimize future maintenance costs. Purchase of maintenance equipment to decrease future KS Kansas City Kanopolis Lake, KS 35,000 maintenance cost and increasing service to the public. Purchase of new, or modification of existing, shower houses, campgrounds, boat ramps, boat docks, rest KS Kansas City Kanopolis Lake, KS rooms, administrative buildings and other facilities and 300,000 associated equipment, sidewalks, parking areas, signs and other features to make them handicap Purchase, construction and/or modify Recreation Facilities. The modifications will vary by lake and park KS Kansas City Kanopolis Lake, KS depending upon the existing facilities and the needs of 335,000 each area to best enhance service to and safety of the public. AE contract to conduct flood pool sedimentation survey. KS Tulsa Marion Lake, KS 100,000 Enhances reliability of water storage estimates. Award Construction Contract to Modernize Cottonwood Point Public Use Area. Work will bring facilities to current KS Tulsa Marion Lake, KS 5,000,000 health and safety standards and meet American Disability Act requirements. Award Construction Contract to Repair asphalt at KS Tulsa Marion Lake, KS 250,000 Cottonwood Point Park. Reduces risk to public. Award Construction Contract to Repair asphalt at KS Tulsa Marion Lake, KS 250,000 Hillsboro Cove Park. Reduces risk to public. Award Construction Contract to Repair asphalt at Marion KS Tulsa Marion Lake, KS 120,000 Cove and FC. Reduces risk to public. Award Construction Contract to Replace restroom at KS Tulsa Marion Lake, KS 120,000 Cottonwood PUA. Reduces risk to the public. Award Construction Contract to Replace tainter gate wire, KS Tulsa Marion Lake, KS 100,000 reduces future maintenance costs As part of overall maintenance at , purchase of modern, safe and handicapped accessible playground sets and other related equipment, safe playground KS Kansas City Melvern Lake, KS 160,000 surfacing, boat docks, and other equipment directly used by the recreating public to enhance safety and service to the public. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Collect, Scan/Digitize, protect, archive and file project documents to allow efficient retrieval and protection of KS Kansas City Melvern Lake, KS 30,000 historical documents to minimize future storage costs and lost effort. Contract clearing, marking, spraying and other KS Kansas City Melvern Lake, KS Government Property Boundary Maintenance to protect 50,000 Government property from private use. Contract for Administrative Building Energy & General Upgrades to enhance security, reduce energy KS Kansas City Melvern Lake, KS 105,000 consumption and reduce future operating and maintenance costs. Contract for surveys to measure the amount of sediment in the lake to allow planning for water supply and other KS Kansas City Melvern Lake, KS 100,000 water uses and engineering for flood control management to protect the safety of the dam and the public.

Contract purchase of emergency equipment to allow improved emergency response, evaluation and KS Kansas City Melvern Lake, KS 15,000 communication with law enforcement and first responders to minimize the risk of failure and protect public safety.

Contract purchase of Global Positioning System Survey KS Kansas City Melvern Lake, KS Equipment to provide more accurate inventory of project 10,000 equipment/facilities and minimize future survey costs.

Critical Road Repairs to significantly damaged roads that provide primary access to facilities and recreation areas KS Kansas City Melvern Lake, KS 1,124,000 that will provide significant enhancements of service to the public and minimize future maintenance costs. Direct hire of temporary maintenance workers to provide KS Kansas City Melvern Lake, KS safer facilities, enhance service to the public and reduce 50,000 future maintenance costs. Direct hire of temporary Water Safety Rangers to provide enhanced safety and customer service to the recreating KS Kansas City Melvern Lake, KS 50,000 public and purchase of water safety equipment and materials and Safety Brochures Hired contract labor to provide safer facilities and KS Kansas City Melvern Lake, KS enhance service to the public and reduce future 50,000 maintenance costs. Maintenance Contract to minimize future maintenance, KS Kansas City Melvern Lake, KS ensure a clean and well maintained parks for the 76,000 recreating public and to ensure public safety at the lake.

Purchase of maintenance equipment to allow more KS Kansas City Melvern Lake, KS efficient use of manpower and decrease future 350,000 maintenance cost and increasing service to the public. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Purchase of new, OR modification of existing, shower houses, campgrounds, boat ramps, boat docks, rest KS Kansas City Melvern Lake, KS rooms, administrative buildings and other facilities and 140,000 associated equipment, sidewalks, parking areas, signs and other features to make them handicap accessible Purchase, construction and/or modify Recreation Facilities. The modifications will vary by lake and park KS Kansas City Melvern Lake, KS depending upon the existing facilities and the needs of 105,000 each area to best enhance service to and safety of the public. As part of overall maintenance at Milford Lake, purchase of modern, safe and handicapped accessible playground sets and other related equipment, safe playground KS Kansas City Milford Lake, KS 60,000 surfacing, boat docks, and other equipment directly used by the recreating public to enhance safety and service to the public. Collect, Scan/Digitize, protect, archive and file project documents to allow efficient retrieval and protection of KS Kansas City Milford Lake, KS 30,000 historical documents to minimize future storage costs and lost effort. Contract for replacement of marginal and outdated KS Kansas City Milford Lake, KS components of the Security System to protect critical 100,000 project structures and equipment. Contract for surveys to measure the amount of sediment in the lake to allow planning for water supply and other KS Kansas City Milford Lake, KS 100,000 water uses and engineering for flood control management to protect the safety of the dam and the public.

Contract purchase of emergency response, inspection, communication and warning equipment to allow improved KS Kansas City Milford Lake, KS emergency response, evaluation and communication with 15,000 law enforcement and first responders to minimize the risk of failure and protect public safety

Contract purchase of Global Positioning System Survey KS Kansas City Milford Lake, KS Equipment to provide more accurate inventory of project 10,000 equipment/facilities and minimize future survey costs. Critical road repairs that provide primary access to KS Kansas City Milford Lake, KS 1,143,000 facilities and recreation areas. Dam Safety Modification Contract on the intake tower KS Kansas City Milford Lake, KS gate controls and other misc. equipment that will ensure 80,000 the safety of the dam and reduce the risk of failure. Direct hire of temporary Water Safety Rangers to provide enhanced safety and customer service to the recreating KS Kansas City Milford Lake, KS 50,000 public and purchase of water safety equipment and materials and Safety Brochures American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Hired contract labor to provide dam, campground, public use areas and general project maintenance to provide KS Kansas City Milford Lake, KS 50,000 safer facilities and equipment, enhance service to the public and reduce future maintenance costs.

Maintenance Contract Labor/Contract Mowing, Contract Refuse Collection and other Service Contracts and KS Kansas City Milford Lake, KS maintenance items that will minimize future maintenance, 57,000 ensure a clean and well maintained parks for the recreating public and to ensure public safety

Purchase of new, OR modification of existing, shower houses, campgrounds, boat ramps, boat docks, rest KS Kansas City Milford Lake, KS rooms, administrative buildings and other facilities and 330,000 associated equipment, sidewalks, parking areas, signs and other features to make them handicap accessible Purchase, construction and/or modify Recreation Facilities. The modifications will vary by lake and park KS Kansas City Milford Lake, KS depending upon the existing facilities and the needs of 395,000 each area to best enhance service to and safety of the public. Pearson - Skubitz Big AE contract to create real-time inundation mapping and KS Tulsa 486,000 Hill Lake, KS economic damages program. Reduces risk to public. Pearson - Skubitz Big AE contract to update reservoir sedimentation survey. KS Tulsa 100,000 Hill Lake, KS Enhances reliability of water storage estimates. Award Construction Contract to Add water and sewer Pearson - Skubitz Big lines to Mound Valley and Cherryvale PUAs. Work will KS Tulsa 140,000 Hill Lake, KS bring facilities to current health and safety standards and meet American Disability Act requirements. Award Construction Contract to Rehab eroded sites in Pearson - Skubitz Big KS Tulsa public use areas. Reduces damage to public recreation 350,000 Hill Lake, KS areas. Pearson - Skubitz Big Award Construction Contract to Repair PUA roadways. KS Tulsa 770,000 Hill Lake, KS Reduces risk to public. Pearson - Skubitz Big Award Construction Contract to Repair roads in KS Tulsa 100,000 Hill Lake, KS Cherryvale PUA. Reduces risk to the public. Award Construction Contract to Upgrade electrical service to 50 amps in Mound Valley and Cherryvale Pearson - Skubitz Big KS Tulsa PUAs. Work will bring facilities to current health and 100,000 Hill Lake, KS safety standards and meet American Disability Act requirements. As part of overall maintenance of the project, purchase of modern, safe and handicapped accessible playground sets and other related equipment, safe KS Kansas City Perry Lake, KS 80,000 playground surfacing, boat docks, and other equipment directly used by the recreating public to enhance safety and service to the public. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Collect, Scan/Digitize, protect, archive and file project documents to allow efficient retrieval and protection of KS Kansas City Perry Lake, KS 30,000 historical documents to minimize future storage costs and lost effort. Contract for surveys to measure the amount of sediment in the lake to allow planning for water supply and other KS Kansas City Perry Lake, KS 120,000 water uses and engineering for flood control management to protect the safety of the dam and the public. Contract modifications to Security features to prevent KS Kansas City Perry Lake, KS vandalism and theft to minimize future losses and 50,000 maintenance costs. Contract purchase of emergency response, inspection, communication and warning equipment to allow improved KS Kansas City Perry Lake, KS emergency response, evaluation and communication with 15,000 law enforcement and first responders to minimize the risk of failure and protect public safety

Contract purchase of Global Positioning System Survey KS Kansas City Perry Lake, KS Equipment to provide more accurate inventory of project 10,000 equipment/facilities and minimize future survey costs.

Critical road repairs to significantly damaged roads that provide primary access to facilities and recreation areas KS Kansas City Perry Lake, KS 1,136,000 that will provide significant enhancements of service to the public and minimize future maintenance costs. Direct hire of temporary Water Safety Rangers to provide enhanced safety and customer service to the recreating KS Kansas City Perry Lake, KS 50,000 public and purchase of water safety equipment and materials and Safety Brochures Hired contract labor to provide dam, campground, public use areas and general project maintenance to provide KS Kansas City Perry Lake, KS 50,000 safer facilities and equipment, enhance service to the public and reduce future maintenance costs. Maintenance contract for maintenance items that will minimize future maintenance, ensure clean and well KS Kansas City Perry Lake, KS 64,000 maintained parks for the recreating public and to ensure public safety at the lake. Planting, grading, clearing and/or construction and development of fish and/or wildlife Habitat and/or KS Kansas City Perry Lake, KS 100,000 structure to provide improved hunting and/or fishing and general fish and wildlife habitat improvement. Purchase of new, OR modification of existing, shower houses, campgrounds, boat ramps, boat docks, rest KS Kansas City Perry Lake, KS rooms, administrative buildings and other facilities and 320,000 associated equipment, sidewalks, parking areas, signs and other features to make them handicap American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Purchase, construction and/or modify Recreation Facilities The modifications will vary by lake and park KS Kansas City Perry Lake, KS depending upon the existing facilities and the needs of 444,000 each area to best enhance service to and safety of the public. As part of overall maintenance at Pomona Lake, purchase of modern, safe and handicapped accessible playground sets and other related equipment, safe KS Kansas City Pomona Lake, KS 160,000 playground surfacing, boat docks, and other equipment directly used by the recreating public to enhance safety and service to the public. Collect, Scan/Digitize, protect, archive and file project documents to allow efficient retrieval and protection of KS Kansas City Pomona Lake, KS 30,000 historical documents to minimize future storage costs and lost effort. Contract for surveys to measure the amount of sediment in the lake to allow planning for water supply and other KS Kansas City Pomona Lake, KS 100,000 water uses and engineering for flood control management to protect the safety of the dam and the public.

Contract purchase of emergency equipment to allow improved emergency response, evaluation and KS Kansas City Pomona Lake, KS 15,000 communication with law enforcement and first responders to minimize the risk of failure and protect public safety.

Contract purchase of Global Positioning System Survey KS Kansas City Pomona Lake, KS Equipment to provide more accurate inventory of project 10,000 equipment/facilities and minimize future survey costs. Critical Road Repairs to roads that provide primary access to facilities and recreation areas that will provide KS Kansas City Pomona Lake, KS 1,245,000 significant enhancements of service to the public and minimize future maintenance costs. Direct hire of temporary Water Safety Rangers to provide enhanced safety and customer service to the recreating KS Kansas City Pomona Lake, KS 50,000 public and purchase of water safety equipment and materials and Safety Brochures Hired contract labor to provide dam, campground, public use areas and general project maintenance to provide KS Kansas City Pomona Lake, KS 30,000 safer facilities and equipment, enhance service to the public and reduce future maintenance costs. Maintenance Contract for maintenance items that will minimize future maintenance, ensure clean and well KS Kansas City Pomona Lake, KS 55,000 maintained parks for the recreating public and to ensure public safety at the lake. Purchase of maintenance Equipment to allow more KS Kansas City Pomona Lake, KS efficient use of manpower and decreasing future 105,000 maintenance cost and increasing service to the public. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Purchase of new, or modification of existing, shower houses, campgrounds, boat ramps, boat docks, rest KS Kansas City Pomona Lake, KS rooms, administrative buildings and other facilities and 300,000 associated equipment, sidewalks, parking areas, signs and other features to make them handicap accessible Purchase, construction and/or modify Recreation Facilities. The modifications will vary by lake and park KS Kansas City Pomona Lake, KS depending upon the existing facilities and the needs of 305,000 each area to best enhance service to and safety of the public. AE contract to update forecast models, Water control KS Tulsa , KS manuals, stream gauging equipment, and operational 100,000 programs. Reduces risk to public. Architect-Engineer contract to conduct flood pool KS Tulsa Toronto Lake, KS sedimentation survey. Enhances reliability of water 110,000 storage estimates. Architect-Engineer contract to create real-time inundation KS Tulsa Toronto Lake, KS mapping and economic damages program. Reduces risk 162,000 to public. Award Construction Contract to Rehab and paint tainter KS Tulsa Toronto Lake, KS 4,500,000 gates and flat wire ropes, reduces risk of failure Award Construction Contract to Repair flood control KS Tulsa Toronto Lake, KS 1,000,000 gates, reduces risk of failure Award Construction Contract to Replace embankment KS Tulsa Toronto Lake, KS 277,000 guardrail, provides for public safety As part of overall maintenance at Tuttle Creek Lake, purchase of modern, safe and handicapped accessible Tuttle Creek Lake, playground sets and other related equipment, safe KS Kansas City 60,000 KS playground surfacing, boat docks, and other equipment directly used by the recreating public to enhance safety and service to the public. Collect, Scan/Digitize, protect, archive and file project Tuttle Creek Lake, documents to allow efficient retrieval and protection of KS Kansas City 30,000 KS historical documents to minimize future storage costs and lost effort. Contract clearing, marking, spraying and other Tuttle Creek Lake, KS Kansas City Government Property Boundary Maintenance to protect 25,000 KS Government property from private use. Contract for Administrative Building Energy & General Tuttle Creek Lake, Upgrades to enhance security, reduce energy KS Kansas City 30,000 KS consumption and reduce future operating and maintenance costs. Contract for surveys to measure the amount of sediment Tuttle Creek Lake, in the lake to allow planning for water supply and other KS Kansas City 100,000 KS water uses and engineering for flood control management to protect the safety of the dam and the public. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Contract purchase of emergency response, inspection, communication and warning equipment to allow improved Tuttle Creek Lake, KS Kansas City emergency response, evaluation and communication with 15,000 KS law enforcement and first responders to minimize the risk of failure and protect public safety

Contract purchase of Global Positioning System Survey Tuttle Creek Lake, KS Kansas City Equipment to provide more accurate inventory of project 10,000 KS equipment/facilities and minimize future survey costs. Contract to replace the roof on the intake tower, gate Tuttle Creek Lake, KS Kansas City straps and pumping systems to minimize future 75,000 KS maintenance costs and minimize risk of failure. Critical road repairs to significantly damaged roads that Tuttle Creek Lake, provide primary access to facilities and recreation areas KS Kansas City 1,125,000 KS that will provide significant enhancements of service to the public and minimize future maintenance costs. Cultural Resources National Register Site Testing to Tuttle Creek Lake, KS Kansas City protect a historic site with potentially significant cultural 40,000 KS resources.. Direct hire of temporary Water Safety Rangers to provide Tuttle Creek Lake, enhanced safety and customer service to the recreating KS Kansas City 50,000 KS public and purchase of water safety equipment and materials and Safety Brochures General road repairs to camp loops, camp pads, parking areas, culvert replacements, paving modifications to Tuttle Creek Lake, KS Kansas City provide handicapped access, and access points or 40,000 KS aggregate surfaced roads and shoulders that will provide enhanced service to the public and reduce

Hired contract labor to provide dam, campground, public Tuttle Creek Lake, use areas and general project maintenance to provide KS Kansas City 50,000 KS safer facilities and equipment, enhance service to the public and reduce future maintenance costs.

Maintenance contract to minimize future maintenance, Tuttle Creek Lake, KS Kansas City ensure clean and well maintained parks for the 75,000 KS recreating public and to ensure public safety at the lake. Maintenance of Dam including regrading ditches, pumps, Tuttle Creek Lake, concrete repairs, and erosion control to enhance dam KS Kansas City 209,000 KS safety, minimize risk of failure, reduce future maintenance costs and enhance public safety. Modify an existing contract painting steel bridge structure Tuttle Creek Lake, across spillway to dam to repair damage, prevent KS Kansas City 1,000,000 KS deterioration of the steel, minimize risk of failure in emergency conditions and minimize future maintenance. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Modify Locks and Improve Security system Operating Tuttle Creek Lake, Software as well as other associated modifications to KS Kansas City 10,000 KS enhance dam safety and security as well as the security of personnel and equipment. Planting, grading, clearing and/or construction and Tuttle Creek Lake, development of fish and/or wildlife Habitat and/or KS Kansas City 7,000 KS structure to provide improved hunting and/or fishing and general fish and wildlife habitat improvement. Purchase of maintenance equipment to allow more Tuttle Creek Lake, KS Kansas City efficient use of manpower and decreasing future 66,000 KS maintenance cost and increasing service to the public. Purchase of new, or modification of existing, shower houses, campgrounds, boat ramps, boat docks, rest Tuttle Creek Lake, KS Kansas City rooms, administrative buildings and other facilities and 250,000 KS associated equipment, sidewalks, parking areas, signs and other features to make them handicap Purchase of rock to protect the dam in emergency Tuttle Creek Lake, KS Kansas City conditions and minimize the risk of severe damage and 6,000 KS public safety. Purchase, construction and/or modify Recreation Facilities. The modifications will vary by lake and park Tuttle Creek Lake, KS Kansas City depending upon the existing facilities and the needs of 425,000 KS each area to best enhance service to and safety of the public. As part of overall maintenance at , purchase of modern, safe and handicapped accessible playground sets and other related equipment, safe playground KS Kansas City Wilson Lake, KS 155,000 surfacing, boat docks, and other equipment directly used by the recreating public to enhance safety and service to the public. Collect, Scan/Digitize, protect, archive and file project documents to allow efficient retrieval and protection of KS Kansas City Wilson Lake, KS 30,000 historical documents to minimize future storage costs and lost effort. Contract evaluation of water use reallocation in the lake KS Kansas City Wilson Lake, KS 300,000 to enhance service to the public. Contract for Administrative Building Energy & General Upgrades to enhance security, reduce energy KS Kansas City Wilson Lake, KS 165,000 consumption and reduce future operating and maintenance costs. Contract for Repair/Painting of the flood control Emergency & Service gates in the intake tower at the KS Kansas City Wilson Lake, KS 1,500,000 dam to minimize future maintenance and minimize the risk of failure. Contract for surveys to measure the amount of sediment in the lake to allow planning for water supply and other KS Kansas City Wilson Lake, KS 85,000 water uses and engineering for flood control management to protect the safety of the dam and the public. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Contract purchase of emergency response, inspection, communication and warning equipment to allow improved KS Kansas City Wilson Lake, KS emergency response, evaluation and communication with 15,000 law enforcement and first responders to minimize the risk of failure and protect public safety

Contract purchase of Global Positioning System Survey KS Kansas City Wilson Lake, KS Equipment to provide more accurate inventory of project 10,000 equipment/facilities and minimize future survey costs. Contract to determine the cause and repair the problems KS Kansas City Wilson Lake, KS with the Sewage Lagoon at Minooka Park to ensure 325,000 continued quality of service to park users. Critical Road Repairs to significantly damaged roads that provide primary access to facilities and recreation areas KS Kansas City Wilson Lake, KS 1,159,000 that will provide significant enhancements of service to the public and minimize future maintenance costs. Direct hire of temporary Water Safety Rangers to provide enhanced safety and customer service to the recreating KS Kansas City Wilson Lake, KS 50,000 public and purchase of water safety equipment and materials and Safety Brochures General Road Repairs to camp loops, camp pads, parking areas, culvert replacements, paving modifications KS Kansas City Wilson Lake, KS to provide handicapped access, and access points or 40,000 aggregate surfaced roads and shoulders that will provide enhanced service to the public and reduce

Hired contract labor to provide dam, campground, public use areas and general project maintenance to provide KS Kansas City Wilson Lake, KS 50,000 safer facilities and equipment, enhance service to the public and reduce future maintenance costs.

Maintenance contract to minimize future maintenance, KS Kansas City Wilson Lake, KS ensure clean and well maintained parks for the recreating 41,000 public and to ensure public safety at the lake. Purchase of maintenance equipment to allow more KS Kansas City Wilson Lake, KS efficient use of manpower and perform maintenance at 340,000 less cost. Purchase of new, or modification of existing, shower houses, campgrounds, boat ramps, boat docks, rest KS Kansas City Wilson Lake, KS rooms, administrative buildings and other facilities and 460,000 associated equipment, sidewalks, parking areas, signs and other features to make them handicap Purchase of rock to protect the dam in emergency KS Kansas City Wilson Lake, KS conditions and minimize the risk of severe damage and 768,000 public safety. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Purchase, construction and/or modify Recreation Facilities. The modifications will vary by lake and park KS Kansas City Wilson Lake, KS depending upon the existing facilities and the needs of 150,000 each area to best enhance service to and safety of the public. Multiple contracts to reduce backlog of infrastructure Barkley Dam and maintenance to replace failing components in the lock, KY Nashville Lake Barkley, KY & dam and power plant. This will reduce future 4,540,000 TN maintenance costs and also reduces risk of unscheduled outages. Hire temporary additional ranger staff to augment promotion of public water safety initiatives, efforts and Barren River Lake, KY Louisville programming. Additional staff would allow increased 68,000 KY public contacts for water safety education through development of collaborative partnerships. Hire temporary additional ranger staff to promote public Barren River Lake, KY Louisville water safety initiatives and educational efforts with 23,000 KY increased public contacts on the water. Barren River Lake, KY Louisville Phase II development of Port Oliver Rec Area. 500,000 KY Barren River Lake, KY Louisville Phase III development of Port Oliver Rec Area. 500,000 KY Provide additional law enforcement patrols; provide additional cleanings at buildings and campground/picnic Barren River Lake, KY Louisville sites; mow grass and pick up refuse at higher 775,000 KY frequencies; purchase needed supplies and materials to operate / repair facilities Big Sandy Harbor, Fully fund channel maintenance dredging to return the KY Huntington 35,000 KY channel to authorized depth Hire temporary additional ranger staff to augment promotion of public water safety initiatives, efforts and KY Louisville Buckhorn Lake, KY programming. Additional staff would allow increased 88,000 public contacts for water safety education through development of collaborative partnerships. Hire temporary additional ranger staff to promote public KY Louisville Buckhorn Lake, KY water safety initiatives and educational efforts with 22,000 increased public contacts on the water. Provide additional law enforcement patrols; provide additional cleanings at buildings and campground/picnic KY Louisville Buckhorn Lake, KY sites; mow grass and pick up refuse at higher 78,000 frequencies; purchase needed supplies and materials to operate / repair facilities Recreation improvements in the Trace Branch Recreation KY Louisville Buckhorn Lake, KY Area to include reworking the entrance area (flood-prone) 388,000 and complete additional water/electric hook-up sites. Hire temporary additional ranger staff to augment promotion of public water safety initiatives, efforts and KY Louisville Carr Creek Lake, KY programming. Additional staff would allow increased 68,000 public contacts for water safety education through development of collaborative partnerships. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Hire temporary additional ranger staff to promote public KY Louisville Carr Creek Lake, KY water safety initiatives and educational efforts with 23,000 increased public contacts on the water. Provide additional law enforcement patrols; provide additional cleanings at buildings and campground/picnic KY Louisville Carr Creek Lake, KY sites; mow grass and pick up refuse at higher 123,000 frequencies; purchase needed supplies and materials to operate / repair facilities Remove sewage treatment plant and install septic tanks KY Louisville Carr Creek Lake, KY 200,000 & lateral lines to serve office & adjacent rec areas. Hire temporary additional ranger staff to promote public water safety initiatives, efforts and programming. KY Louisville Cave Run Lake, KY Additional staff would also allow increased public contacts 45,000 for water safety education through development of collaborative partnerships. Provide additional law enforcement patrols for public safety; provide additional cleanings at buildings and KY Louisville Cave Run Lake, KY campground/picnic sites; mow grass and pick up refuse 30,000 at higher frequencies; purchase needed supplies and materials to operate / repair facilities Hire One Seasonal 12-Month Park Ranger to provide KY Huntington Dewey Lake, KY additional water safety staffing to reduce the risk of failure 100,000 and risk to the public Maintain healthy natural and cultural resources and KY Huntington Dewey Lake, KY 21,000 minimize adverse environmental impacts. Maintain recreational facilities and provide additional KY Huntington Dewey Lake, KY water safety ranger staffing to reduce the risk of failure 368,000 and risk to the public Contract dredge the harbor channel, approximately Elvis Stahr 726,000 cu yds to restore/maintain the authorized depth KY Memphis (Hickman) Harbor, 2,835,000 (9 feet) and harbor limits to ensure year round access to KY the coast guard facility and barge transportation. As part of overall maintenance at Fishtrap Lake, purchase and install playground equipment to meet safety KY Huntington Fishtrap Lake, KY 170,000 standards and provide American Disability Act accessibility. Maintain healthy natural and cultural resources and KY Huntington Fishtrap Lake, KY 101,000 minimize adverse environmental impacts. Maintain recreational facilities and provide additional KY Huntington Fishtrap Lake, KY water safety ranger staffing to reduce the risk of failure 238,000 and risk to the public Rehabilitate campground to include upgrade of electric KY Huntington Fishtrap Lake, KY 50,000 service to reduce future maintenance costs. KY Huntington Fishtrap Lake, KY Renovate spillway gates to reduce the risk of failure 600,000 Update master plan to support Environmental KY Huntington Fishtrap Lake, KY Stewardship objectives and adapt ongoing development 350,000 & land use pressure. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Maintain healthy natural and cultural resources and KY Huntington Grayson Lake, KY 197,000 minimize adverse environmental impacts. Maintain recreational facilities and provide additional KY Huntington Grayson Lake, KY water safety ranger staffing to reduce the risk of failure 228,000 and risk to the public Master plan update to support Environmental KY Huntington Grayson Lake, KY Stewardship objectives and adapt ongoing development 350,000 & land use pressures from mineral extraction. Utilize an Architect / Engineer contract to perform Green and Barren surveys, geotechnical borings and analysis to determine KY Louisville 1,000,000 Rivers, KY the stability of the Green river Lock & Dam 3 at Rochester. Funds will augment recreation budget to: provide additional Law Enforcement patrols for public safety; Green River Lake, KY Louisville provide additional cleanings at buildings and 677,000 KY campground/picnic sites; mow grass and pick up refuse at higher frequencies; purchase needed supplies Hire temporary additional ranger staff to augment promotion of public water safety initiatives, efforts and Green River Lake, KY Louisville programming. Additional staff would allow increased 88,000 KY public contacts for water safety education through development of collaborative partnerships. Hire temporary additional ranger staff to promote public Green River Lake, KY Louisville water safety initiatives and educational efforts with 23,000 KY increased public contacts on the water. Renovate the Class B Green river Lake Visitor Center Green River Lake, and construct additional parking and recreational facilities KY Louisville 750,000 KY in adjacent recreation areas at the Visitor Center and Big Oak location. Multiple contracts to reduce backlog of infrastructure maintenance. Work will be a combination of supply and Laurel River Lake, KY Nashville construction type contracts to replace failing components 1,000,000 KY in the dam and power plant. This will reduce future maintenance costs Martins Fork is a flood control project located near Harlan, KY. Economic stimulus funds will be utilized for Martins Fork Lake, contracts to reduce backlog of infrastructure KY Nashville 100,000 KY maintenance. Work will be a combination of supply and construction type contracts to replace failing components in the dam. This will reduce future maintenance costs. Dredge channel to restore flood conveyance capacity Middlesboro thus reducing flooding risk to the public. Other work KY Nashville Cumberland River 1,712,000 includes removing trees & repairing drainage structures Basin, KY associated with the levee. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Hire temporary additional ranger staff to augment promotion of public water safety initiatives, efforts and KY Louisville Nolin Lake, KY programming. Additional staff would allow increased 68,000 public contacts for water safety education through development of collaborative partnerships. Hire temporary additional ranger staff to promote public KY Louisville Nolin Lake, KY water safety initiatives and educational efforts with 23,000 increased public contacts on the water. Provide additional law enforcement patrols for public safety; provide additional cleanings at buildings and KY Louisville Nolin Lake, KY campground/picnic sites; mow grass and pick up refuse 788,000 at higher frequencies; purchase needed supplies and materials to operate / repair facilities Renovate the Dog Creek Recreation Area. Improve KY Louisville Nolin Lake, KY sewage treatment facilities and accessibility to shower 450,000 house/restroom facilities Replenish rip-rap on upstream & downstream slopes of KY Louisville Nolin Lake, KY dam utilizing construction contract. Current erosion 500,000 protection has deteriorated. Repair mooring cells & bridge protection cells at Ohio River Locks and Cannelton and McAlpine, Needed to provide safe KY Louisville Dams, KY, IL, IN & 500,000 mooring for tows approaching locks and protection of OH bridge piers. Ohio River Locks and Repair the scour area below the dam at Locks & Dam 52; KY Louisville Dams, KY, IL, IN & place rock fill to improve structural integrity of dam 679,000 OH foundation and reduce risk of failure. Ohio River Locks and Repave and minor repairs to the public highway bridge KY Louisville Dams, KY, IL, IN & 500,000 over Markland Dam. OH Ohio River Open KY Louisville Channel Work, KY, Evansville Dike Reconstruction 1,000,000 IL, IN, OH, PA & WV

Ohio River Open Perform backlog maintenance dredging at Cumberland KY Louisville Channel Work, KY, Island to improve navigation safety at the confluence of 683,000 IL, IN, OH, PA & WV Ohio and Cumberland rivers.

Ohio River Open Perform backlog maintenance dredging at Livingston KY Louisville Channel Work, KY, Point to improve navigation safety at the confluence of 900,000 IL, IN, OH, PA & WV Ohio and Tennessee rivers. Repair KY Peninsula bank protection to resist erosion and Ohio River Open reduce potential for Ohio river to change course, causing KY Louisville Channel Work, KY, 200,000 negative impact to river based infrastructure and IL, IN, OH, PA & WV businesses. KY Huntington Paintsville Lake, KY Complete construction of the lighted walkway across dam 900,000 Maintain healthy natural and cultural resources and KY Huntington Paintsville Lake, KY 10,000 minimize adverse environmental impacts. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Maintain recreational facilities and provide additional KY Huntington Paintsville Lake, KY water safety ranger staffing to reduce the risk of failure 165,000 and risk to the public Campground and other recreation renovations at North Rough River Lake, KY Louisville Fork, Axtel, Laurel Branch and Cave Creek recreation 500,000 KY areas (campground modernizations). Hire temporary additional ranger staff to augment promotion of public water safety initiatives, efforts and Rough River Lake, KY Louisville programming. Additional staff would allow increased 68,000 KY public contacts for water safety education through development of collaborative partnerships. Hire temporary additional ranger staff to promote public Rough River Lake, KY Louisville water safety initiatives and educational efforts with 23,000 KY increased public contacts on the water. Provide additional law enforcement patrols for public safety; provide additional cleanings at buildings and Rough River Lake, KY Louisville campground/picnic sites; mow grass and pick up refuse 799,000 KY at higher frequencies; purchase needed supplies and materials to operate / repair facilities Hire temporary additional ranger staff to augment promotion of public water safety initiatives, efforts and KY Louisville Taylorsville Lake, KY programming. Additional staff would allow increased 46,000 public contacts for water safety education through development of collaborative partnerships. Hire temporary additional ranger staff to promote public KY Louisville Taylorsville Lake, KY water safety initiatives and educational efforts with 22,000 increased public contacts on the water. Provide additional law enforcement patrols for public safety; provide additional cleanings at buildings and KY Louisville Taylorsville Lake, KY campground/picnic sites; mow grass and pick up refuse 22,000 at higher frequencies; purchase needed supplies and materials to operate / repair facilities Wolf Creek Dam, Replace failing components in the dam and power plant. KY Nashville Lake Cumberland, This will reduce future maintenance costs and also 4,000,000 KY reduces risk of unscheduled outages. Maintain recreational facilities and provide additional KY Huntington Yatesville Lake, KY water safety ranger staffing to reduce the risk of failure 164,000 and risk to the public Rehabilitate sluice gate hydraulic cylinders to reduce the KY Huntington Yatesville Lake, KY 210,000 risk of failure Update master plan to support Environmental KY Huntington Yatesville Lake, KY Stewardship objectives and adapt ongoing development 350,000 & land use pressures from mineral extraction. Contract to dredge Bayou Chene to alleviate potential Atchafalaya River safety and environmental issues associated with potential LA New Orleans and Bayous Chene, 9,500,000 maritime groundings and economic adversity to Morgan Boeuf & Black, LA City. Bayou Bodcau IDIQ contract for material to repair and resurface roads LA Vicksburg 1,500,000 Reservoir, LA on dams for safe access. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Supply contract to perform slide repairs thereby reducing Bayou Bodcau LA Vicksburg flood damage reduction and to ensure the safety of the 350,000 Reservoir, LA public. Supply contract to provide recreational improvements Bayou Bodcau LA Vicksburg allowing the continued safety and providing an 200,000 Reservoir, LA economical means of recreation for the nation. Supply contract to provide security improvements by Bayou Bodcau LA Vicksburg installing security lighting along the inlet and outlet 60,000 Reservoir, LA channel for safety. Contract for repair the deteriorated jetties to reduce Bayou Lafourche and shoaling and lessen the need for dredging and alleviates LA New Orleans Lafourche Jump 5,000,000 potential safety and environmental issues associated with Waterway, LA potential maritime groundings. O&M contract for operation of recreation areas allowing LA Vicksburg Caddo Lake, LA the continued safety and providing an economical means 94,000 of recreation for the nation. Award a contract to perform surveys, soil borings and Calcasieu River and engineering design associated with obtaining additional LA New Orleans 750,000 Pass, LA Dredged Material Disposal Areas to ensure the long term viability of the navigation channel. Calcasieu River and LA New Orleans Contract for foreshore protection and dikes. 10,000,000 Pass, LA Contract for maintenance of Confined AM17Disposal Calcasieu River and LA New Orleans Areas to ensure the ability to maintain a safe, navigable 3,000,000 Pass, LA channel. Purchase a tractor, boat, hoist and a sewer system Calcasieu River and LA New Orleans upgrade to increase the reliability of the Calcasieu 90,000 Pass, LA Saltwater Barrier. Dredge Wheeler Provide shore power for the Dredge Wheeler for use LA New Orleans 700,000 Ready Reserve during periods of Ready Reserve and maintenance. Purchase of Safety Security Camera System for the Dredge Wheeler LA New Orleans Dredge Wheeler. This is both for safety and security of 150,000 Ready Reserve dredge personnel. Purchase plastic whales/timber and spare parts for locks to increase lock safety, reliability, and help reduce down Gulf Intracoastal LA New Orleans time. Closure of the MRGO alternate route makes reliable 3,000,000 Waterway, LA service at the IHNC promised to the stakeholders of paramount importance to GIWW J Bennett Johnston Construction contract to repair/repave L&D access roads LA Vicksburg 210,000 Waterway, LA to ensure the safe operation of the locks and dams. Contract for additional dredging due to increased J Bennett Johnston LA Vicksburg sedimentation and debris resulting from flooding and high 800,000 Waterway, LA water. Construction contract to replace roof CMU which J Bennett Johnston LA Vicksburg contributes to the safe operation and maintenance of the 135,000 Waterway, LA project. J Bennett Johnston Extend seasonal and temporary employees for operation LA Vicksburg 875,000 Waterway, LA and maintenance of L&Ds. J Bennett Johnston Inspect tainter valve and bulkheads to ensure the safe LA Vicksburg 120,000 Waterway, LA operation of the locks and dams. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) O&M contract for dredging to enable transportation of J Bennett Johnston LA Vicksburg goods viable to the economy and national security. 1,489,000 Waterway, LA

J Bennett Johnston O&M contract to inspect tainter valves at all locks and LA Vicksburg 800,000 Waterway, LA dams to ensure the safe operation of the locks and dams. J Bennett Johnston O&M contractor to convert dam digital readouts to LA Vicksburg 110,000 Waterway, LA ensure the safe operation of the locks and dams. J Bennett Johnston O&M contractor to install winch hookup to ensure the LA Vicksburg 110,000 Waterway, LA safe operation of the locks and dams. J Bennett Johnston Repairs to lock stoplogs to ensure the safe operation of LA Vicksburg 1,077,000 Waterway, LA the locks and dams. Lake Providence O&M contract for dredging to provide project depth for LA Vicksburg 423,000 Harbor, LA navigation. Madison Parish Port, O&M contract for dredging to provide project depth for LA Vicksburg 80,000 LA navigation. Contract for replacement of a deteriorated 50-year old LA New Orleans Mermentau River, LA guidewall to provide safe passage of vessel and to 10,000,000 alleviate safety hazards to structure personnel. Purchase a crew boat to transport lock operation LA New Orleans Mermentau River, LA 100,000 personnel to and from the structure. Purchase a tractor, barge, hurricane shutters and sewer LA New Orleans Mermentau River, LA 190,000 system upgrade to increase reliability of the structure. Purchase and installation of aluminum handrails for the LA New Orleans Mermentau River, LA structure to ensure a safer work environment for lock 60,000 operations personnel. Mississippi River, Contract for additional dredging at Southwest Pass and/or LA New Orleans Baton Rouge To The 10,000,000 New Orleans Harbor will allow continued access. , LA

Mississippi River, Contract to dredge Southwest Pass and repair pile dike LA New Orleans Baton Rouge To The 30,000,000 following damages from 3 coastal storms. Gulf Of Mexico, LA

Mississippi River, Contracted for additional dredging of Southwest Pass to LA New Orleans Baton Rouge To The 10,000,000 project depth. Gulf Of Mexico, LA Service contract for additional maintenance for LA Vicksburg Wallace Lake, LA 69,000 recreational areas. Supply contract to Repair outlet Channel Bridge installing LA Vicksburg Wallace Lake, LA a low water crossing for access. Work will increase 150,000 reliability of flood control structures. MA New England Barre Falls Dam, MA Contract to complete repairs of Pines Plains bridge. 135,000 Contract to repair and paint spillway and service decks to MA New England Barre Falls Dam, MA 200,000 protect and preserve useful life of structures. Contract to repair downstream slopes of dikes 1, 2, and MA New England Barre Falls Dam, MA 360,000 3. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Contract to complete necessary repairs to project MA New England Birch Hill Dam, MA gatehouse for worker safety and improved functioning of 150,000 the facility. Contracts and/or purchase orders to complete bridge inspections, replace equipment and complete MA New England Birch Hill Dam, MA 145,000 miscellaneous repair work necessary to maintain project integrity. Issue contract to replace gate rollers and guides MA New England Birch Hill Dam, MA 260,000 necessary for proper operation of project. Issue A/E contract to complete evaluation of historic and MA New England Buffumville Lake, MA archaeological resources on project lands for eligibility of 110,000 listing on the national historical register. Issue small contracts and/or purchase orders to replace MA New England Buffumville Lake, MA equipment and complete essential miscellaneous repair 114,000 work necessary to maintain project integrity. Connect project office to town sewer system to improve MA New England Cape Cod Canal, MA office environmental conditions and reduce future 135,000 maintenance costs. Contract for additional contract work to complete analytical calculation on capacity of gusste plates on MA New England Cape Cod Canal, MA Sagamore and Bourne Highway Bridges. These bridges, 300,000 constructed in the same manner as the I-35 bridge, are the only two land access routes to and from the Cape. Contract to complete bridge deck repairs for the MA New England Cape Cod Canal, MA 2,800,000 Sagamore Highway Bridge over the Cape Cod Canal. Contract to complete paving of Buzzards Bay recreation parking area to improve access by project maintenance MA New England Cape Cod Canal, MA personnel and the visiting public to project facilities and 250,000 also to reduce project annual maintenance costs and damages to public vehicles. Contract to complete required repairs to project fencing MA New England Cape Cod Canal, MA 240,000 for improved safety and security. Charles River Natural A/E contract to complete evaluation of historic and MA New England Valley Storage Area, archaeological resources on project lands for eligibility of 110,000 MA listing on the national historical register. Charles River Natural A/E contract to conduct intensive cultural resource survey MA New England Valley Storage Area, of project lands for historical and archaeological 605,000 MA resources. Contracts and/or purchase orders to replace equipment Conant Brook Lake, MA New England and complete essential miscellaneous repair work 65,000 MA necessary to maintain project integrity. A/E contract to complete evaluation of historic and East Brimfield Lake, MA New England archaeological resources on project lands for eligibility of 110,000 MA listing on the national historical register. Contract to conduct intensive cultural resource survey of project lands for historical and archaeological resources. East Brimfield Lake, MA New England This 525 ft long dam and reservoir project has prevented 427,000 MA over $175 million in flood damages in the Quinebaug and basins. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Contracts and/or purchase orders to replace equipment East Brimfield Lake, MA New England and complete essential miscellaneous repair work 119,000 MA necessary to maintain project integrity. A/E contract to complete evaluation of historic and Hodges Village Dam, MA New England archaeological resources on project lands for eligibility of 110,000 MA listing on the national historical register. Contracts and/or purchase orders to replace equipment Hodges Village Dam, MA New England and complete essential miscellaneous repair work 123,000 MA necessary to maintain project integrity. A/E contract to complete dam safety improvements - characterize left abutment soils, perform seismic safety MA New England Knightville Dam, MA 170,000 review, install piezometers, install seepage collection system. A/E contract to perform hydrologic deficiency study to MA New England Knightville Dam, MA 120,000 insure project integrity. Contract to replace gate roller chain required for proper MA New England Knightville Dam, MA 260,000 flood operations. Contracts and/or purchase orders to replace equipment MA New England Knightville Dam, MA and complete essential miscellaneous repair work 111,000 necessary to maintain project integrity. Contract to complete repairs to project roofs and bridges MA New England Littleville Lake, MA 200,000 to improve safety and reduce project maintenance costs. Contracts and/or purchase orders to replace equipment MA New England Littleville Lake, MA and complete essential miscellaneous repair work 102,000 necessary to maintain project integrity. New Bedford A/E contract for geotechnical data and levee surveys Fairhaven and MA New England required for levee system certification and analysis of 1,000,000 Acushnet Hurricane Corps owned project. Barrier, MA New Bedford A/E contract to evaluate improving pedestrian access to Fairhaven and MA New England barrier in cooperation with city of New Bedford to provide 100,000 Acushnet Hurricane safe access to the facility. Barrier, MA New Bedford Contract replace roofs on buildings - currently the roofs Fairhaven and MA New England are leaking and buckets are used to protect sensitive 150,000 Acushnet Hurricane electrical equipment Barrier, MA New Bedford Fairhaven and Contract to rehabilitate stop log structures required for MA New England 200,000 Acushnet Hurricane proper operation of project Barrier, MA New Bedford Fairhaven and Contract to replace bearings on New Bedford side of MA New England 400,000 Acushnet Hurricane structure - necessary for proper operation of the project. Barrier, MA New Bedford Contracts and/or purchase orders to replace equipment Fairhaven and MA New England and complete essential miscellaneous repair work 101,000 Acushnet Hurricane necessary to maintain project integrity Barrier, MA American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Newburyport Harbor, MA New England Dredge entrance channel (160,000cy) 1,000,000 MA Contracts and/or purchase orders to complete mandated bridge inspections, replace equipment and complete MA New England Tully Lake, MA 182,000 essential miscellaneous repair work necessary to maintain project integrity. Contracts and/or purchase orders to replace equipment MA New England West Hill Dam, MA and complete essential miscellaneous repair work 146,000 necessary to maintain project integrity. Issue A/E contract to complete evaluation of historic and MA New England West Hill Dam, MA archaeological resources on project lands for eligibility of 110,000 listing on the national historical register. Issue A/E contract to conduct intensive cultural resource MA New England West Hill Dam, MA survey of project lands for historical and archaeological 203,000 resources. Issue A/E contract to complete evaluation of historic and MA New England Westville Lake, MA archaeological resources on project lands for eligibility of 110,000 listing on the national historical register. Issue A/E contract to complete pool testing for seepage MA New England Westville Lake, MA analysis in response to seepage issues, including 536,000 contract for subsurface investigations. Issue A/E contract to conduct intensive cultural resource MA New England Westville Lake, MA survey of project lands for historical and archaeological 161,000 resources. Issue small contracts and/or purchase orders to complete mandated bridge inspections, replace equipment and MA New England Westville Lake, MA 151,000 complete essential miscellaneous repair work necessary to maintain project integrity. Baltimore Harbor and Maintenance dredging Maryland channels to authorized MD Baltimore Channels (50 Foot), depth - Accelerated Commencement of dredging 3,000,000 MD contract on this 50 ft deep port. Baltimore Harbor and Maintenance dredging Maryland channels to authorized MD Baltimore Channels (50 Foot), depth - Additional Shoaling - 200,000 cys of material from 1,400,000 MD this 50 ft deep port. Baltimore Harbor and Maintenance dredging Maryland channels to authorized MD Baltimore Channels (50 Foot), depth - Existing Options - 900,000 cys of material from 6,400,000 MD this 50 ft deep port. Maintenance dredging is required to provide justified Honga River and Tar MD Baltimore levels of service and to restore project depth to support 483,000 Bay, MD commerce and other waterborne activities. Insulate the existing project buildings by replacing doors Jennings Randolph and windows, and adding insulation and storm doors. MD Baltimore 47,000 Lake, MD & WV This will result in considerable energy savings at the project. Pave project access roads. This will provide better Jennings Randolph access for project maintenance personnel, and the MD Baltimore 517,000 Lake, MD & WV visiting public to project facilities, and also reduce annual maintenance costs. Service contracts and hiring of seasonal employees to Jennings Randolph MD Baltimore assure the customary recreational experience to the 100,000 Lake, MD & WV visiting public. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Maintenance dredging 60,000 cys of material to restore Rhodes Point To MD Baltimore the authorized depth. Safe harbor of refuge for 1,700,000 Tylerton, MD commercial and recreational vessels. Dredging contract to restore authorized channel depths. Twitch Cove and Big MD Baltimore Safe Harbor of refuge for commercial and recreational 2,100,000 Thorofare River, MD vessels. Issue A/E contract for monitoring of additional sites of Disposal Area open water disposal areas required to keep disposal ME New England 270,000 Monitoring, ME areas open and available for use by maintenance dredging projects Issue contract to repair damage to south pier from vessel Grand Haven Harbor, strike; repairs will restore the structural integrity of the MI Detroit 400,000 MI pier, which is an important component of the harbor's navigation infrastructure. Grand Haven Harbor, Perform condition surveys and issue contract for MI Detroit 255,000 MI dredging. Harbor Beach Perform condition surveys and issue contract for MI Detroit 900,000 Harbor, MI dredging. Perform condition surveys and issue contract for MI Detroit Holland Harbor, MI 306,000 dredging. Issue a contract to perform critical lock repairs to MI Detroit Inland Route, MI 500,000 maintain safe navigation. Perform condition surveys and issue contract for MI Detroit Inland Route, MI 548,000 dredging. Modify existing dredging contract to add additional Les Cheneaux MI Detroit quantity to restore minimum functional channel 500,000 Island, MI availability. Perform condition surveys and issue contract for MI Detroit Little Lake Harbor, MI 322,000 dredging. Perform condition surveys and issue contract for MI Detroit Ludington Harbor, MI 950,000 dredging. Issue a contract to dredge critical shoals on the South MI Detroit Monroe Harbor, MI half of the navigation channel to restore channel 500,000 functionality Issue a contract to complete permanent repair of the MI Detroit Petoskey Harbor, MI Petoskey breakwater to restore safe navigation into and 4,000,000 out of harbor. Issue a contract to perform essential fill management activities on the Saginaw Bay Confined Disposal Facility MI Detroit Saginaw River, MI 1,000,000 to create additional space for placement of dredged material. Issue a dredging contract to remove some of the critical MI Detroit Saginaw River, MI backlog of dredging material that has built up in the 500,000 navigation channel. Issue a contract to construct a permanent repair to the Saugatuck Harbor, MI Detroit north and south revetments along the Kalamazoo river in 10,000,000 Kalamazoo River, MI the harbor; ensures channel remains open to navigation. Issue a contract to perform essential fill management MI Detroit St Clair River, MI activities on the Confined Disposal Facility to create 250,000 additional space for placement of dredged material. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Issue a contract to perform dredging to remove critical MI Detroit St Joseph Harbor, MI 741,000 shoal. By contract, perform critical maintenance and upgrades MI Detroit St Marys River, MI to Soo Locks including the fabrication of Emergency Stop 3,000,000 Logs for the Poe Lock. Award contract to establish real estate tract maps for Clearwater river flood damage reduction project. Contract Inspection Of is for the scanning, geo-referencing and rectifying of other MN St. Paul Completed Works, 50,000 old ICW project maps to convert them to GIS compatible MN products.

Rehabilitate East and West Dam Rec Areas - Includes: accessibility improvements, facility/restroom Lac Qui Parle Lakes, MN St. Paul modernization, access road relocation, parking lot 139,000 MInnesota River, MN improvement and expansion to better accommodate the public. Miss River Btwn Mo Construct a storage building to protect equipment stored MN St. Paul River and at the Service Base. 200,000 Minneapolis, MN Install metal siding on 4 buildings constructed in the 1930's and 1940's. Two buildings with existing exterior clay block walls deteriorating from water penetration and freeze/thaw actions and two buildings with existing steel Miss River Btwn Mo sided walls damaged through heavy use will receive new MN St. Paul River and siding. One other existing building of clay block will be 500,000 Minneapolis, MN demolished to construct a new safer entryway into the service base. These buildings provide support to staff and equipment that maintain the 13 Locks and dams and 284 miles of 9" navigation channel.

Miss River Btwn Mo Lock and Dam 5 Entrance Road Repairs - Construction MN St. Paul River and contract to eliminate major life safety and property 1,000,000 Minneapolis, MN damage threat to railroad and roadway traffic. Locks and Dams 6 & 7 Bulkhead Slot Installation. Miss River Btwn Mo Construction contract for bulkhead slot installation and MN St. Paul River and 6,000,000 associated sill beams to establish safe means to dewater Minneapolis, MN lock chambers. Miss River Btwn Mo Maintenance of dredging equipment used for levee work. MN St. Paul River and 450,000 Minneapolis, MN Modernization of campsites in the West Loop Miss River Btwn Mo Campground at Blackhawk Park to include landscaping MN St. Paul River and and tree planting. It also includes upgrade of the 105,000 Minneapolis, MN electrical service from 20/30 amp to 50 amp, improvements to roadways, and increased turning radius. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Protect approximately 1500 linear feet of shoreline. This Miss River Btwn Mo work is necessary due to severe erosion threatening to MN St. Paul River and 100,000 impact circulation roads and will protect highly used Minneapolis, MN facilities such as restrooms, day use and camp areas. Protection of Cultural Resources - Shoreline erosion, ice Miss River Btwn Mo wedge erosion, and looting are threatening a significant MN St. Paul River and cultural resource site. Bio-engineering techniques and 100,000 Minneapolis, MN rock riprap will stabilize and protect approximately 2000 feet of shoreline. Miss River Btwn Mo Reads Landing Dredged Material Placement Site MN St. Paul River and Stabilization - Shoreline reshaping and construction of 325,000 Minneapolis, MN rock vanes to protect the shoreline from erosion. Miss River Btwn Mo Removal of Hazardous/Contaminated Tire Breakwater & MN St. Paul River and Rehab Area - The project will remove a hazard to 115,000 Minneapolis, MN recreational boaters and reduce ecological concerns. Replace crane used to lift various pieces of floating plant, Miss River Btwn Mo equipment and materials at the Corps service base. MN St. Paul River and Replacement will improve safety and allow for 1,725,000 Minneapolis, MN maintenance of equipment used at 13 locks and dams and 284 miles of the 9' navigation channel. Re-Vegetation of old dredge disposal islands. The lack of Miss River Btwn Mo vegetative cover contributes to high rates of soil erosion MN St. Paul River and sedimentation in adjacent backwaters and loss of wildlife 176,000 Minneapolis, MN species including waterfowl and neotropical migrant songbirds. Miss River Btwn Mo Teepeeota Point Dredged Material Placement Site MN St. Paul River and Stabilization - Shoreline reshaping and construction of 425,000 Minneapolis, MN rock vanes to protect the shoreline from erosion. Complete Repairs to Tainter Gate Cover. Sandblast and Paint Machinery. Repair/replace the existing corrugated MN St. Paul Orwell Lake, MN 100,000 protective skin plate on downstream side of Orwell dam tainter gate. Install New Relief Wells on DSAC II Dam (12 Wells) - Includes funds to replace relief wells below Orwell dam. MN St. Paul Orwell Lake, MN Relief wells are necessary to relieve uplift pressure below 300,000 the dam, in the tailwater and to ensure dam performs as designed. Red Lake Dam Fish Passage and Monitoring will allow Red Lake Reservoir, the tribal Department of Natural Resources (DNR) to MN St. Paul 845,000 MN monitor and manage the walleye migration from the Red Lake river to Red Lake and vice versa. Contract to construct and modernize the Fish Cleaning Reservoirs At Facility (Leech Lake). The new facility will be American MN St. Paul Headwaters Of Disability Act accessible, include a large grinding station 180,000 Mississippi River, MN that will send the Biosolids to the wastewater treatment plant Reservoirs At MN St. Paul Headwaters Of Contract to rehabilitate the Pokegama Stoplog system 2,500,000 Mississippi River, MN American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Contract to replace deteriorating Recycling Comfort Reservoirs At Station w/ Waterborne Facility (Leech). The new facility MN St. Paul Headwaters Of will be American Disability Act accessible, improve 350,000 Mississippi River, MN sanitary conditions for visitors and be large enough to adequately handle peak visitation. Reservoirs At Design and construct boat access to Leech Lake river to MN St. Paul Headwaters Of increase emergency response time and eliminate a safety 165,000 Mississippi River, MN hazard to employees and the public.

Reservoirs At Rehabilitate and construct Sandy Lake Beach renovation MN St. Paul Headwaters Of 120,000 to improve safety. Mississippi River, MN

Reservoirs At Repair camp sites and camp pads for use by modern MN St. Paul Headwaters Of camping units. The camp sites currently create a safety 95,000 Mississippi River, MN hazard for the general public, contractors and employees.

Reservoirs At Upgrade 69 Camp Pads to 50 amp Service Cross Lake to MN St. Paul Headwaters Of significantly reduce the possibility of electrical system 155,000 Mississippi River, MN failure during peak visitation. Sandblast and paint gate machinery and procure and Lake Traverse, SD & install standby generator at White Rock Dam. This dam is MN, SD St. Paul 125,000 MN a key flood control structure protecting communities along the Red river of the North. Dredge the harbor channel, approximately 352,000 cu Caruthersville yds to restore/maintain the authorized depth (9 feet) and MO Memphis 1,190,000 Harbor, MO harbor limits to ensure year round access to barge transportation. Clarence Cannon MO St. Louis Dam and Mark Twain Repair and rehab project roads in 14 recreation areas. 750,000 Lake, MO Clarence Cannon Replace dam security buoys in mouth of spillway with MO St. Louis Dam and Mark Twain small watercraft barrier. Reduces risk from water-borne 200,000 Lake, MO attack to dam structure and spillway. Replace existing visitor center structure along with Clarence Cannon exhibits. Will provide an energy efficient building, meeting MO St. Louis Dam and Mark Twain the needs of the community, public safety, American 5,500,000 Lake, MO Disability Act requirements and reducing future maintenance and operations costs. Award Construction Contract to Rehabilitate Intake Structure, concrete intake structure bridge deck, and the MO Little Rock Clearwater Lake, MO 553,000 steel bridge superstructure. Increases reliability and reduces future maintenance costs. A program for vocational rehabilitation of disabled veterans nation-wide using US Army Corps of Engineers MO St. Louis Curation Complience (USACE) managed archaeological collections and 3,500,000 records coordinated with the Department of Veterans Affairs to facilitate future employment in the private sector American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) As part of overall maintenance at Harry S. Truman Dam and Reservoir, purchase of modern, safe and handicapped accessible playground sets and other Harry S Truman Dam MO Kansas City related equipment, safe playground surfacing, boat 160,000 And Reservoir, MO docks, and other equipment directly used by the recreating public to enhance safety and service to the public. Collect, Scan/Digitize, protect, archive and file project Harry S Truman Dam documents to allow efficient retrieval and protection of MO Kansas City 30,000 And Reservoir, MO historical documents to minimize future storage costs and lost effort. Contract clearing, marking, spraying and other Harry S Truman Dam MO Kansas City Government Property Boundary Maintenance to protect 40,000 And Reservoir, MO Government property from private use. Contract for Administrative Building Energy & General Harry S Truman Dam Upgrades to enhance security, reduce energy MO Kansas City 60,000 And Reservoir, MO consumption and reduce future operating and maintenance costs. Contract for Regulatory Building Energy & General Harry S Truman Dam Upgrades to enhance security, reduce energy MO Kansas City 50,000 And Reservoir, MO consumption and reduce future operating and maintenance costs. Contract for surveys to measure the amount of sediment Harry S Truman Dam in the lake to allow planning for water supply and other MO Kansas City 350,000 And Reservoir, MO water uses and engineering for flood control management to protect the safety of the dam and the public.

Contract purchase of emergency response, inspection, communication and warning equipment such as radios, Harry S Truman Dam MO Kansas City satellite phones, software, dialers, sirens, sonar, and 25,000 And Reservoir, MO remote controlled surveillance equipment to allow improved emergency response, evaluation and

Contract purchase of Global Positioning System Survey Harry S Truman Dam MO Kansas City Equipment to provide more accurate inventory of project 10,000 And Reservoir, MO equipment/facilities and minimize future survey costs. Critical Inspection and welding and painting repair of Hydraulic Steel Structures that hold back water from work Harry S Truman Dam MO Kansas City areas within the water passages of the dam that will allow 50,000 And Reservoir, MO maintenance to be performed that will minimize the potential for failure, minimize Critical Road Repairs to significantly damaged roads that Harry S Truman Dam provide primary access to facilities and recreation areas MO Kansas City 2,665,000 And Reservoir, MO that will provide significant enhancements of service to the public and minimize future maintenance costs. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Direct Hire of temporary maintenance workers to provide dam, campground, public use areas and general project Harry S Truman Dam MO Kansas City maintenance to provide safer facilities and equipment, 40,000 And Reservoir, MO enhance service to the public and reduce future maintenance costs. Direct hire of temporary Water Safety Rangers to provide Harry S Truman Dam enhanced safety and customer service to the recreating MO Kansas City 75,000 And Reservoir, MO public and purchase of water safety equipment and materials and Safety Brochures Equipment, maintenance and repair of equipment in Harry S Truman Dam support of clean Hydroelectric power generation including MO Kansas City 415,000 And Reservoir, MO worker safety evaluation, clothing and equipment, heat exchangers, pumps, switches, relays, heaters, etc.

Hired contract labor to provide dam, campground, public Harry S Truman Dam use areas and general project maintenance to provide MO Kansas City 75,000 And Reservoir, MO safer facilities and equipment, enhance service to the public and reduce future maintenance costs.

Maintenance Contract Labor/Contract Mowing, Contract Refuse Collection and other Service Contracts and Harry S Truman Dam MO Kansas City maintenance items that will minimize future maintenance, 335,000 And Reservoir, MO ensure a clean and well maintained parks for the recreating public and to ensure public safety Planting, grading, clearing and/or construction and Harry S Truman Dam development of fish and/or wildlife Habitat and/or MO Kansas City 25,000 And Reservoir, MO structure to provide improved hunting and/or fishing and general fish and wildlife habitat improvement. Purchase of maintenance Equipment (tractor, boat, metal shear, backhoe) to allow more efficient use of manpower Harry S Truman Dam MO Kansas City to perform maintenance and allow maintenance to be 250,000 And Reservoir, MO performed faster, with less risk to personnel and with less maintenance cost on the equipment

Purchase of new, OR modification of existing, shower houses, campgrounds, boat ramps, boat docks, rest Harry S Truman Dam MO Kansas City rooms, administrative buildings and other facilities and 450,000 And Reservoir, MO associated equipment, sidewalks, parking areas, signs and other features to make them handicap accessible Purchase of rock for Dam Safety purposes to protect the Harry S Truman Dam MO Kansas City dam in emergency conditions and minimize the risk of 216,000 And Reservoir, MO severe damage and public safety. Purchase, construction and/or modify Recreation Harry S Truman Dam MO Kansas City Facilities such as fire pits, lantern holders, hand rails, 175,000 And Reservoir, MO picnic tables, etc. Collect, Scan/Digitize, protect, archive and file project Little Blue River MO Kansas City documents to allow efficient retrieval and protection of 60,000 Lakes, MO historical documents American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Contract for surveys to measure the amount of sediment Little Blue River MO Kansas City in the lake to allow planning for water supply and other 160,000 Lakes, MO water uses and engineering for flood control management

Contract purchase of emergency response, inspection, Little Blue River communication and warning equipment such as radios, MO Kansas City 15,000 Lakes, MO satellite phones, software, dialers, sirens, sonar, and remote controlled surveillance equipment Contract purchase of Global Positioning System Survey Little Blue River MO Kansas City Equipment to provide more accurate inventory of project 10,000 Lakes, MO equipment/facilities Contract Purchase of sand bag filling machine to improve Little Blue River Emergency Flood Fight Response on levees and dams MO Kansas City 50,000 Lakes, MO and dramatically speed up filling of sandbags in emergency conditions Little Blue River Critical Road Repairs to significantly damaged roads that MO Kansas City 450,000 Lakes, MO provide primary access to facilities and recreation areas Direct Hire of temporary maintenance workers to provide Little Blue River MO Kansas City dam, campground, public use areas and general project 50,000 Lakes, MO maintenance Direct hire of temporary Water Safety Rangers to provide Little Blue River MO Kansas City enhanced safety and customer service to the recreating 50,000 Lakes, MO public Hired contract labor to provide dam, campground, public Little Blue River MO Kansas City use areas and general project maintenance to provide 30,000 Lakes, MO safer facilities and equipment Maintenance Contract Labor/Contract Mowing, Contract Little Blue River MO Kansas City Refuse Collection and other Service Contracts and 50,000 Lakes, MO maintenance items that will minimize future maintenance Contract replacement of the antiquated heating Long Branch Lake, ventilation and air conditioning system with a new high MO Kansas City 200,000 MO efficiency system that will improve visitor comfort, minimize the risk of system failure Collect, Scan/Digitize, protect, archive and file project Long Branch Lake, MO Kansas City documents to allow efficient retrieval and protection of 30,000 MO historical documents Contract purchase of emergency response, inspection, communication and warning equipment such as radios, Long Branch Lake, MO Kansas City satellite phones, software, dialers, sirens, sonar, and 15,000 MO remote controlled surveillance equipment to allow improved emergency response, evaluation and Contract purchase of Global Positioning System Survey Long Branch Lake, MO Kansas City Equipment to provide more accurate inventory of project 10,000 MO equipment/facilities American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Critical Road Repairs to significantly damaged roads that Long Branch Lake, provide primary access to facilities and recreation areas MO Kansas City 157,000 MO that will provide significant enhancements of service to the public Hired contract labor to provide dam, campground, public Long Branch Lake, use areas and general project maintenance to provide MO Kansas City 30,000 MO safer facilities and equipment, enhance service to the public Maintenance Contract Labor/Contract Mowing, Contract Long Branch Lake, MO Kansas City Refuse Collection and other Service Contracts and 43,000 MO maintenance items that will minimize future maintenance Purchase of maintenance Equipment (dump truck tractor) to allow more efficient use of manpower to perform Long Branch Lake, MO Kansas City maintenance and allow maintenance to be performed 75,000 MO faster, with less risk to personnel and with less maintenance cost on the equipment Purchase of new, or modification of existing, shower houses, campgrounds, boat ramps, boat docks, rest Long Branch Lake, MO Kansas City rooms, administrative buildings and other facilities and 75,000 MO associated equipment, sidewalks, parking areas, signs and other features L/D 27 - Rehab/repair of existing Trilateration Stations to Miss River Btwn The restore safe access for engineers to measure and Ohio and Mo Rivers MO St. Louis monitor shifting of structure. Will also restore safe access 592,000 (Reg Works), MO & to visiting public which uses these stations as overlooks IL to the canal. Miss River Btwn The L/D 27 Repair concrete to include repairs and sealing of Ohio and Mo Rivers MO St. Louis the top of lock walls to improve safety to employees and 520,000 (Reg Works), MO & integrity of lock wall. IL Perform backlog maintenance to rock dikes, revetments, Miss River Btwn The and other river training structures, Upper MS river miles Ohio and Mo Rivers MO St. Louis 0.0-195.0, to improve channel conditions, gain efficiency 1,500,000 (Reg Works), MO & in dredge planning, and increase reliability of navigation IL channel while preserving Miss River Btwn The Rehabilitate shoreline at Chain of Rocks Canal to include Ohio and Mo Rivers repair of flood damaged revetments to prevent increased MO St. Louis 500,000 (Reg Works), MO & deterioration of shoreline, Movement of materials, and IL sluffing of rock. 4,000 acres of federally managed lands will be Miss River Btwn The inventoried for habitat, endangered species, backlog Ohio and Mo Rivers MO St. Louis stewardship work, and water quality improvements 100,000 (Reg Works), MO & promoting more healthy and sustainable federal lands, IL protection of habitat and endangered species, Additional Dredging in high problematic areas and Miss River Btwn The replacement of gaging stations to improve reliability of Ohio and Mo Rivers MO St. Louis navigation channel and risk of closure promoting 750,000 (Reg Works), MO & economic benefit to industry through transportation IL planning. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Miss River Btwn The Design and construct American Bottoms forest/floodplain Ohio and Mo Rivers restoration project to obtain regional systemic forestry MO St. Louis 250,000 (Reg Works), MO & goals for healthy and sustainable lands, protect project IL habitat, and improve water quality Miss River Btwn The Fabricate 3 culvert valve bulkheads for Locks 27 to Ohio and Mo Rivers replace condemned structures and restore ability for MO St. Louis 300,000 (Reg Works), MO & maintenance and repair of project culvert valves and IL increase reliability Miss River Btwn The L/D 27 replace I-Wall primary control house to improve Ohio and Mo Rivers MO St. Louis project efficiency, meet safety and sanitary codes, and 459,000 (Reg Works), MO & increase reliability of navigation. IL Miss River Btwn The Rehabilitate Low Water Dam/West Levee Access area Ohio and Mo Rivers restoring safe access to high visitation area of project. MO St. Louis 400,000 (Reg Works), MO & Repairs to access roads, trails, parking lots, and day use IL features Miss River Btwn The Repair Maple Island public access areas to improve Ohio and Mo Rivers public safety and access to high visitation project MO St. Louis 300,000 (Reg Works), MO & features. Repair boat ramp, road access, parking lot, and IL day use areas Miss River Btwn The Replace failed Locks 27 walkway bridge machinery to Ohio and Mo Rivers MO St. Louis remove critical safety hazard for operations as well as 567,000 (Reg Works), MO & increased efficiency to busiest lock on the river. IL Compliance activities and equitable treatment of Native American human remains associated with Native NAGPRA MO St. Louis American Graves Protection and Repatriation Act 1,200,000 Compliance (NAGPRA), resulting in repatriation of remains and cultural objects. Stone supply contract and labor to perform scour repairs on the bank of the harbor to protect and stabilize the bank New Madrid County MO Memphis and protect the loading facilities and loading dock and 280,000 Harbor, MO additional contract dredging of the harbor channel at New Madrid Co. Harbor, MO at Mississippi river mile 885.

Contract dredge the harbor channel at Mississippi river New Madrid Harbor, mile 889. Approx 239,000 cu yds to restore/maintain the MO Memphis 400,000 MO (Mile 889) authorized depth (9 feet) and harbor limits to ensure year round access to barge transportation.

National Historic Preservation Act Section 110 NHPA Section 110 Compliance through surveys and assessments that will MO St. Louis 25,000,000 Compliance employ specialists. Compiled data in a Corps-wide share- point site will reduce future planning costs.

Maintenance Contract Labor/Contract Mowing, Contract Pomme De Terre MO Kansas City Refuse Collection and other Service Contracts and 52,000 Lake, MO maintenance items that will minimize future maintenance American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) As part of overall maintenance at Pomme De Terre Lake, purchase of modern, safe and handicapped accessible Pomme De Terre MO Kansas City playground sets and other related equipment, safe 60,000 Lake, MO playground surfacing, boat docks, and other equipment directly used by the recreating public Collect, Scan/Digitize, protect, archive and file project Pomme De Terre documents to allow efficient retrieval and protection of MO Kansas City 30,000 Lake, MO historical documents to minimize future storage costs and lost effort. Contract clearing, marking, spraying and other Pomme De Terre MO Kansas City Government Property Boundary Maintenance to protect 25,000 Lake, MO Government property from private use. Contract for surveys to measure the amount of sediment Pomme De Terre MO Kansas City in the lake to allow planning for water supply and other 110,000 Lake, MO water uses and engineering for flood control management

Contract purchase of emergency response, inspection, Pomme De Terre communication and warning equipment such as radios, MO Kansas City 15,000 Lake, MO satellite phones, software, dialers, sirens, sonar, and remote controlled surveillance equipment Contract purchase of Global Positioning System Survey Pomme De Terre MO Kansas City Equipment to provide more accurate inventory of project 10,000 Lake, MO equipment/facilities Contract to minimize future maintenance and minimize the risk of failure by construction of outlet works Stilling Pomme De Terre MO Kansas City Basin lining, Walls, rock anchoring, wall construction and 5,000,000 Lake, MO related construction to repair existing damage and prevent rock from falling into Critical Road Repairs to significantly damaged roads that Pomme De Terre provide primary access to facilities and recreation areas MO Kansas City 1,148,000 Lake, MO that will provide significant enhancements of service to the public Direct hire of temporary Water Safety Rangers to provide Pomme De Terre MO Kansas City enhanced safety and customer service to the recreating 50,000 Lake, MO public and purchase of water safety equipment Hired contract labor to provide dam, campground, public Pomme De Terre MO Kansas City use areas and general project maintenance to provide 48,000 Lake, MO safer facilities and equipment Hired contract labor to provide dam, campground, public Pomme De Terre use areas and general project maintenance to provide MO Kansas City 50,000 Lake, MO safer facilities and equipment, enhance service to the public Purchase of maintenance Equipment (loader bucket, skid loader and dump truck) to allow more efficient use of Pomme De Terre MO Kansas City manpower to perform maintenance and allow 175,000 Lake, MO maintenance to be performed faster, with less risk to personnel American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Purchase of new, or modification of existing, shower Pomme De Terre MO Kansas City houses, campgrounds, boat ramps, boat docks, rest 310,000 Lake, MO rooms, administrative buildings and other facilities Purchase of rock for Dam Safety purposes to protect the Pomme De Terre MO Kansas City dam in emergency conditions and minimize the risk of 175,000 Lake, MO severe damage and public safety. Purchase, construction and/or modify Recreation Pomme De Terre MO Kansas City Facilities such as fire pits, lantern holders, hand rails, 45,000 Lake, MO picnic tables, picnic shelters, etc. Contract for Repair/Painting of the flood control MO Kansas City Smithville Lake, MO Emergency & Service gates in the intake tower at the 700,000 dam to minimize future maintenance Direct Hire of temporary maintenance workers to provide dam, campground, public use areas and general project MO Kansas City Smithville Lake, MO 60,000 maintenance to provide safer facilities and equipment, enhance service to the public Direct hire of temporary Water Safety Rangers to provide enhanced safety and customer service to the recreating MO Kansas City Smithville Lake, MO 50,000 public and purchase of water safety equipment and materials and Safety Brochures Hired contract labor to provide dam, campground, public use areas and general project maintenance to provide MO Kansas City Smithville Lake, MO 50,000 safer facilities and equipment, enhance service to the public Purchase of rock for Dam Safety purposes to protect the MO Kansas City Smithville Lake, MO dam in emergency conditions and minimize the risk of 400,000 severe damage and public safety. Collect, Scan/Digitize, protect, archive and file project documents to allow efficient retrieval and protection of MO Kansas City Smithville Lake, MO 30,000 historical documents to minimize future storage costs and lost effort. Contract for Administrative Building Energy & General MO Kansas City Smithville Lake, MO Upgrades to enhance security, reduce energy 100,000 consumption Contract for surveys to measure the amount of sediment MO Kansas City Smithville Lake, MO in the lake to allow planning for water supply and other 100,000 water uses and engineering for flood control management

Contract purchase of emergency response, inspection, communication and warning equipment such as radios, MO Kansas City Smithville Lake, MO satellite phones, software, dialers, sirens, sonar, and 15,000 remote controlled surveillance equipment to allow improved emergency response, evaluation and Contract purchase of Global Positioning System Survey MO Kansas City Smithville Lake, MO Equipment to provide more accurate inventory of project 10,000 equipment/facilities Contractual purchase of rock for placement along the shoreline to minimize erosion, protect fish habitat, Water MO Kansas City Smithville Lake, MO 100,000 quality and sedimentation to improve the level of service to the public. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Critical Road Repairs to significantly damaged roads that provide primary access to facilities and recreation areas MO Kansas City Smithville Lake, MO 1,159,000 that will provide significant enhancements of service to the public FY09 Purchase, construction and/or modify Recreation MO Kansas City Smithville Lake, MO Facilities such as fire pits, lantern holders, hand rails, 170,000 picnic tables, and picnic shelters General Road Repairs to camp loops, camp pads, parking areas, culvert replacements, paving modifications MO Kansas City Smithville Lake, MO to provide handicapped access, and access points or 55,000 aggregate surfaced roads and shoulders that will provide enhanced service to the public Maintenance Contract Labor/Contract Mowing, Contract Refuse Collection and other Service Contracts and MO Kansas City Smithville Lake, MO maintenance items that will minimize future maintenance, 41,000 ensure a clean and well maintained parks for the recreating public Purchase of maintenance Equipment (backhoe, tractor and like equipment) to allow more efficient use of manpower to perform maintenance and allow MO Kansas City Smithville Lake, MO 75,000 maintenance to be performed faster, with less risk to personnel and with less maintenance cost on the equipment itself Purchase of new, or modification of existing, shower MO Kansas City Smithville Lake, MO houses, campgrounds, boat ramps, boat docks, rest 40,000 rooms, etc. Critical Inspection and welding and painting repair of Hydraulic Steel Structures that hold back water from work MO Kansas City Stockton Lake, MO areas within the water passages of the dam that will allow 100,000 maintenance to be performed that will minimize the potential for failure Generator Rewind to increase generator efficiency, MO Kansas City Stockton Lake, MO reduce future maintenance and reduce the risk of failure 5,000,000 when the restored turbine is repaired Installation of water level monitoring Instrumentation in MO Kansas City Stockton Lake, MO the dam to protect public safety and reduce the risk of 150,000 failure. Maintenance Contract Labor/Contract Mowing, Contract Refuse Collection and other Service Contracts and MO Kansas City Stockton Lake, MO maintenance items that will minimize future maintenance, 508,000 ensure a clean and well maintained parks for the recreating public Repair/replacement of the damaged Turbine to allow MO Kansas City Stockton Lake, MO 17,475,000 resumption of more efficient clean hydroelectric power Archeology investigation of historic Human Remains to MO Kansas City Stockton Lake, MO 50,000 protect cultural resources. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) As part of overall maintenance at Stockton Lake, purchase of modern, safe and handicapped accessible playground sets and other related equipment, safe MO Kansas City Stockton Lake, MO 60,000 playground surfacing, boat docks, and other equipment directly used by the recreating public to enhance safety and service to the public. Collect, Scan/Digitize, protect, archive and file project documents to allow efficient retrieval and protection of MO Kansas City Stockton Lake, MO 30,000 historical documents to minimize future storage costs and lost effort. Contract for surveys to measure the amount of sediment in the lake to allow planning for water supply and other MO Kansas City Stockton Lake, MO 130,000 water uses and engineering for flood control management to protect the safety of the dam and the public. Contract purchase of emergency response, inspection, communication and warning equipment such as radios, MO Kansas City Stockton Lake, MO satellite phones, software, dialers, sirens, sonar, and 15,000 remote controlled surveillance equipment to allow improved emergency response Contract purchase of enhanced Security cameras and MO Kansas City Stockton Lake, MO 10,000 equipment to provide better security on the project. Contract purchase of Global Positioning System Survey MO Kansas City Stockton Lake, MO Equipment to provide more accurate inventory of project 10,000 equipment/facilities and minimize future survey costs. Contract replacement of the existing Transformer to MO Kansas City Stockton Lake, MO 9,000,000 ensure compatibility with the restored turbine Contract to Repair and test Bulkheads that seal off water MO Kansas City Stockton Lake, MO from inside the dam and other misc. equipment to allow 450,000 repairs on the turbine Contract to repair/replace the turbine/gates governor to MO Kansas City Stockton Lake, MO 1,500,000 allow compatibility with the restored turbine Critical Inspection and welding and painting repair of Hydraulic Steel Structures that hold back water from work MO Kansas City Stockton Lake, MO areas within the water passages of the dam that will allow 375,000 maintenance to be performed that will minimize the potential for failure Critical Road Repairs to significantly damaged roads that provide primary access to facilities and recreation areas MO Kansas City Stockton Lake, MO 2,492,000 that will provide significant enhancements of service to the public Direct hire of temporary Water Safety Rangers to provide enhanced safety and customer service to the recreating MO Kansas City Stockton Lake, MO 50,000 public and purchase of water safety equipment and materials and Safety Brochures Dive contract to Recover the Broken Turbine Blade from MO Kansas City Stockton Lake, MO inside the dam to allow testing to determine how to repair 75,000 the blades and return the turbine to work American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Hired contract labor to provide dam, campground, public use areas and general project maintenance to provide MO Kansas City Stockton Lake, MO 50,000 safer facilities and equipment, enhance service to the public Planting, grading, clearing and/or construction and development of fish and/or wildlife Habitat and/or MO Kansas City Stockton Lake, MO 338,000 structure to provide improved hunting and/or fishing and general fish and wildlife habitat improvement. Purchase of maintenance Equipment (dump truck, backhoe and flatbed trailer ) to allow more efficient use of MO Kansas City Stockton Lake, MO manpower to perform maintenance and allow 160,000 maintenance to be thus decreasing future maintenance cost and increasing service to the public.

Purchase of new, OR modification of existing, shower houses, campgrounds, boat ramps, boat docks, rest MO Kansas City Stockton Lake, MO rooms, administrative buildings and other facilities and 450,000 associated equipment, sidewalks, parking areas, signs and other features to make them handicap Purchase of rock for Dam Safety purposes to protect the MO Kansas City Stockton Lake, MO dam in emergency conditions and minimize the risk of 395,000 severe damage and public safety. Purchase, construction and/or modify Recreation MO Kansas City Stockton Lake, MO Facilities such as fire pits, lantern holders, hand rails, 465,000 picnic tables, picnic shelters, etc. Repair and maintenance of hydropower equipment including generator breaker retro fill, steel repairs, MO Kansas City Stockton Lake, MO 205,000 electrical safety inspection, electrical safety clothing and equipment and load testing of cranes Award Construction Contract to clean spillway foundation Table Rock Lake, drains, hone risers to remove calcification, replace MO Little Rock 233,000 MO & AR damaged risers, and install sleeves to extend life, which reduces the risk of failure and increases safety. Award Construction Contract to construct a new Dewey Short Visitor Center to include replacing the antiquated Table Rock Lake, MO Little Rock interpretive displays. The new facility will increase the 9,000,000 MO & AR visitation, thus increasing the tourism and the economic impact on the area. Award Construction Contract to Procure & install motor Table Rock Lake, control centers and wiring to replace obsolete MO Little Rock 3,000,000 MO & AR components & deteriorated wiring, thus reducing the risk of failure. Award Construction Contract to Repair and replace Table Rock Lake, MO Little Rock existing guardrail and approach to meet current safety 100,000 MO & AR criteria to improve public safety. Award Construction Contract to Replace Powerhouse Table Rock Lake, MO Little Rock roof. Replacing the roof would protect the equipment 765,000 MO & AR from failure and reduces future maintenance costs. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Periodic Inspections of Levees - to evaluate operational USACE Levee Safety MO St Louis adequacy/structural stability and improve ability to 90,000,000 Program communicate the overall condition. Perform Maintenance Dredging for the Lateral and Ott Bayou channels. Dredging will increase the availability of MS Mobile Biloxi Harbor, MS the coastal port ensuring continued navigational 1,000,000 commerce to this coastal community and will return project to its authorized depths. O&M contract for dredging to provide project depth for Claiborne County MS Vicksburg navigation to enable transportation of goods viable to the 59,000 Port, MS economy and national security. Improve flows on the East Fork, Tombigbee river. Effort East Fork, would clear debris and snags to ensure adequate flows MS Mobile Tombigbee River, AL 49,000 for five species of downstream endangered mussels and & MS two threatened species. East Fork, Perform critical additional maintenance to restore flood MS Mobile Tombigbee River, AL 200,000 damage reduction benefits of the project. & MS Perform maintenance dredging of bar channels to project dimensions. Activity restores the channel to authorized MS Mobile Gulfport Harbor, MS 6,045,000 depths and increases the reliability and safety of the deep draft port. Accelerate National Coastal Mapping With current Lidar MS Mobile funding rates, seven years are required to survey the 10,000,000 Bathymetery/Shoals entire coastline of the continental United States. Issue contract to implement the National Coastal Data Bank to provide a systematic mechanism for organizing, Lidar MS Mobile sharing and preserving data collected annually, on the 10,000,000 Bathymetery/Shoals geophysical and climatologically characteristics of the shores of the US. Procure two backup CZMIL sensors in order to increase Lidar MS Mobile coastal mapping schedule reliability, allowing for a swap 7,000,000 Bathymetery/Shoals out capability in the field, with a third system as backup. O&M contract for dredging to provide project depth for Mouth Of Yazoo MS Vicksburg navigation to enable transportation of goods viable to the 55,000 River, MS economy and national security. Perform additional maintenance/rehabilitation of recreation areas and hire additional temp and term MS Mobile Okatibbee Lake, MS 695,000 employees.

Perform baseline environmental study to document impacts of a 75-acre strip mine. This will allow the project MS Mobile Okatibbee Lake, MS to identify adverse impacts associated with the new 250,000 development and implement corrective actions that will benefit management and conservation organization. Provide life jacket loaner station, to improve boater MS Mobile Okatibbee Lake, MS 15,000 safety. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Repair/rehab project buildings in order to improve energy efficiency, climate control, and sanitary conditions. MS Mobile Okatibbee Lake, MS 500,000 Repairs/rehab includes insulation, insulated glass, solar water heaters, roofing, etc. Repair/Rehab Sluice Gate and Toe Drain on Dam - Dam MS Mobile Okatibbee Lake, MS Safety. Activity increases the safety and stability of the 500,000 aging structure. Update sediment range surveys and upgrades to increase reliability of equipment and improve Water MS Mobile Okatibbee Lake, MS Management functions. This will provide more accurate 100,000 data for flood risk management decision-making, but also help to insure water supply. Pascagoula Harbor, Perform maintenance dredging of the Upper Pascagoula MS Mobile 1,370,000 MS river Channel and/or Horn Island Pass area. O&M contract for dredging to provide project depth for Rosedale Harbor, MS Vicksburg navigation to enable transportation of goods viable to the 581,000 MS economy and national security. Correct Aberdeen Sedimentation Problem. Activity Tennessee - increases the reliability of the critical inland waterway MS Mobile Tombigbee system. Reduces future maintenance costs of the project 4,000,000 Waterway, AL & Ms by preventing material from entering channel, thereby reducing future dredging. Correct Bevill Cross Current Problem. Funding of this Tennessee - work will help eliminate a navigation safety hazard for MS Mobile Tombigbee waterway users. It will reduce equipment damage costs 4,000,000 Waterway, AL & Ms due to collisions and ensure safety of the navigation community. Critical repairs to floating plant. Repairs to barges and Tennessee - other floating plant on project include: replacement of MS Mobile Tombigbee rusted/failing steel on the hull, handrails, and/or deck; 2,000,000 Waterway, AL & Ms electrical and/or mechanical repairs; painting, etc. Repairs will reduce future maintenance.

Invasive Species Control - Cogon Grass. Addresses an Tennessee - invasive of regional significance by implementing MS Mobile Tombigbee 500,000 sanitation and control measures on infested sites and Waterway, AL & Ms implementing a program for reestablishing native species.

Maintenance and repair of eroding slopes on the whole Tennessee - project. Increases reliability of the critical inland waterway MS Mobile Tombigbee system. Reduces risk of slope failures that could cause 1,500,000 Waterway, AL & Ms complete blockage of the waterway. Reduces sedimentation into the channel from eroding slopes. Make critical road repairs/paving across project and Tennessee - operate recreation areas at normal service levels by MS Mobile Tombigbee hiring additional temp and term employees. These 5,000,000 Waterway, AL & Ms activities will provide the public a safer and more enjoyable recreational experience at the project. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Tennessee - Perform invasive species control. Improves access for MS Mobile Tombigbee recreational users and restores habitat for sport and 1,000,000 Waterway, AL & Ms native fishes.

Perform additional maintenance dredging and prevent Tennessee - width and depth restrictions in the summer. Activity will MS Mobile Tombigbee increase reliability of the critical inland waterway system 8,000,000 Waterway, AL & Ms and restore project dimensions of this high use waterway. Activity will reduce future maintenance.

Perform intensive lock and disposal area maintenance. Tennessee - Activities will increase the reliability of the critical inland MS Mobile Tombigbee waterway system by ensuring disposal capacity is 1,000,000 Waterway, AL & Ms available when needed for urgent dredging requirements and ensuring lock facilities are maintained.

Tennessee - Provide life jacket loaner station, to improve boater MS Mobile Tombigbee 15,000 safety. Waterway, AL & Ms Repair ring levee at Mahannah - part of TTW Wildlife Tennessee - Mitigation Lands. Reduces future maintenance costs by MS Mobile Tombigbee stabilizing levee that periodically fails at several problem 400,000 Waterway, AL & Ms spots. The work is required to maintain the integrity of the levee. Repair/rehab remaining project buildings in order to Tennessee - improve energy efficiency, climate control, and sanitary MS Mobile Tombigbee conditions. Repairs/rehab includes insulation, insulated 3,000,000 Waterway, AL & Ms glass, solar water heaters, roofing, etc. These activities will reduce future operation and maintenance.

Update sediment range surveys and upgrades to Tennessee - increase reliability of equipment and improve Water MS Mobile Tombigbee 1,600,000 Management functions. This will provide more accurate Waterway, AL & Ms data for navigation forecasting on major inland waterway.

Upgrade electrical system to 50 amps in campgrounds Tennessee - including Piney Grove Class A Campground. Upgrade MS Mobile Tombigbee sanitary facilities at Columbus East Bank Boat Ramp. 1,000,000 Waterway, AL & Ms Reduces operational and maintenance costs, risk of failure and damage to recreational vehicles.

Tennessee - Upgrade SCADA system for lock. Activity increases the MS Mobile Tombigbee 500,000 reliability of the critical inland waterway system. Waterway, AL & Ms O&M contract to perform clearing and snagging to MS Vicksburg Yazoo River, MS provide safe navigation to enable transportation of good 99,000 viable to the economy and national security. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Ft Peck Dam And Rebuild defective sub pavement and install new asphalt MT Omaha 300,000 Lake, MT pavement to ensure the safety of the public is maintained

Baseline Monitoring/Inventory - Complete fieldwork and Ft Peck Dam And report documenting CR sites on Corps lands in Multiple MT Omaha 200,000 Lake, MT Counties surrounding and Lake, MT. Required by the National Historic Preservation Act Boundary Survey - Surveys, monumentation, boundary Ft Peck Dam And MT Omaha marking, fencing and other requirements will be 150,000 Lake, MT completed Ft Peck Dam And Environmental Compliance Corrective Actions - Complete MT Omaha 50,000 Lake, MT identified corrective actions and required training

Ft Peck Dam And Fix welds on Spillway Stoplogs - Rehabilitates stoplogs MT Omaha 300,000 Lake, MT used for maintenance operations on generators.

Ft Peck Dam And GIS - Spatial Data Extension - Develop and implement a MT Omaha 200,000 Lake, MT tool bar that allows easy access to stored data

Ft Peck Dam And GIS - Web Data Services - Upgrade and convert existing MT Omaha 150,000 Lake, MT data to allow for use through a web-based application

GIS - Web Interface Customization - Develop and Ft Peck Dam And MT Omaha implement a web-based application that is user-friendly 200,000 Lake, MT and performs all functions provided by ArcView 3.X Level I and II Natural Resources Inventories - Complete Ft Peck Dam And report(s) to determine plant, animal, soil and land use MT Omaha 400,000 Lake, MT composition and types. Implement recommendations when feasible. Nitrogen cabinet upgrade in the switchyards to ensure Ft Peck Dam And MT Omaha operational system for transmitting electrical power to the 40,000 Lake, MT customer Ft Peck Dam And Paleo Site Protection - Fence known paleo site to protect MT Omaha 75,000 Lake, MT from destruction and adverse impacts Purchase remote racking device to ensure operational Ft Peck Dam And system for transmitting electrical power to the customer MT Omaha 30,000 Lake, MT thus Hydroelectric plant is able to continue to produce electrical power. Purchase station service relays to ensure operational Ft Peck Dam And system for transmitting electrical power to the customer MT Omaha 60,000 Lake, MT thus Hydroelectric plant is able to continue to produce electrical power. Ft Peck Dam And Reactor in Switchyard #1 - to ensure operational system MT Omaha 400,000 Lake, MT for transmitting electrical power to the customer Ft Peck Dam And Rebuild Crooked Creek boat ramp - Repair and rebuild MT Omaha 160,000 Lake, MT existing boat ramp Ft Peck Dam And Rebuild defective roads to ensure the safety of the public MT Omaha 700,000 Lake, MT is maintained American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Replace crawler type excavator. Will allow timely Ft Peck Dam And MT Omaha response time for dam emergencies with reduced 220,000 Lake, MT number of employees. Replace D7 bull dozer, a key dam safety piece of Ft Peck Dam And MT Omaha equipment that currently requires high level of 180,000 Lake, MT maintenance to remain serviceable. Replace Dam Safety Instrumentation - Replace defective Ft Peck Dam And MT Omaha instrumentation to ensure continued Safety of the Dam 150,000 Lake, MT and downstream population Ft Peck Dam And Replace Relay Test Set - to ensure relays are tested thus MT Omaha 100,000 Lake, MT Hydroelectric plant Replace stake and platform truck. Replaces key piece of Ft Peck Dam And MT Omaha equipment that currently requires high level of 85,000 Lake, MT maintenance to remain serviceable. Upgrade Vault Toilets to Univ. Access Standards - Ft Peck Dam And MT Omaha Upgrade vault toilets so that they meet American 100,000 Lake, MT Disability Act standards Patrol/Work Boat needed to patrol of the downstream MT Seattle Libby Dam, MT 45,000 areas of the river and enable deployment of oil boom. MT Seattle Libby Dam, MT Technical Center Office Space-High Priority 175,000 Atlantic Intracoastal Perform design and dike construction along AIWW from NC Wilmington Waterway to St Morehead City to the Virginia state line and dredging from 1,400,000 Johns River, NC Morehead City to little river. Atlantic Intracoastal Perform maint dredging of inlet crossings from Morehead NC Wilmington Waterway to St City to the South Carolina state line small business set 3,000,000 Johns River, NC aside for maintenance dredging. Hire additional temp ranger employees and term B Everett Jordan employees--hl. This activity will provide additional visitor NC Wilmington 100,000 Dam and Lake, NC assistance during the peak recreation season, which will improve public safety and security. Perform debris removal from trash racks, maint on 3 remaining water quality gates, repairs to monuments and B Everett Jordan NC Wilmington piezometers. This activity will improve operations of outlet 576,000 Dam and Lake, NC works and improve precision of releases from Jordan Dam critical to flood releases. Repair eroded riprap toe on the downstream side of dam and to perform maint on the three water quality gates. B Everett Jordan NC Wilmington This activity will help to maintain structural integrity by 500,000 Dam and Lake, NC replacing severely eroded riprap on the downstream toe of the dam that eroded in 1996. Cape Fear River Perform maintenance dredging in the vicinity of the Cape NC Wilmington Above Wilmington, Fear Lock structures to ensure lock operation is 500,000 NC uninhibited. Cape Fear River Perform repairs to large submerged scour hole adjacent NC Wilmington Above Wilmington, 4,000,000 to cape fear lock & dam structure #1. NC American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Repair recreation facilities 3 locks & dams - restroom Cape Fear River renovation, road repaving and boat ramp repairs. Project NC Wilmington Above Wilmington, will correct severely deteriorated roadways and boat 747,000 NC ramps, improving visitors experience and maintaining the viability of these unique public facilities.

Channel From Back Perform hydrographic surveys, environmental NC Wilmington Sound To Lookout coordination and geotechnical investigation necessary to 50,000 Bight, NC produce plans and specifications for contract solicitation. Hire additional temp ranger employees and term employees--hl. This activity will provide additional visitor NC Wilmington Falls Lake, NC 100,000 assistance during the peak recreation season, which will improve public safety and security. Initiate update of master plan. Use of service contract to initiate critical update to the comprehensive master plan NC Wilmington Falls Lake, NC dated 1982. This package will provide funding to conduct 100,000 necessary NEPA documentation and provide an opportunity for public input. Perform shoreline erosion control and landscaping. This activity will stop advance of erosion, preventing loss of NC Wilmington Falls Lake, NC public lands and faculties. Landscaping will help stabilize 150,000 eroded areas while enhancing visitors experience to heavily visited sites. Remove debris from trash racks ---this activity will improve operations of outlet works and improve precision NC Wilmington Falls Lake, NC 176,000 of releases from falls dam critical to flood releases and dialing in during periods of drought. Renovate and upgrade tailrace area rec. Facilities project will provide creek side stabilization, improve public NC Wilmington Falls Lake, NC access, correct failing roadway culvert and provide paving 400,000 to maintain and enhance public access to this recreation and operational area. Conduct characterization and remediation of hazardous waste sites. Contract will thoroughly evaluate extent of John H Kerr Lake, NC Wilmington environmental contamination and provide necessary 2,100,000 VA & NC remediation to known DDT and dioxin sites at John H. Kerr Reservoir, improving environmental health.

Hire additional temp ranger employees and term John H Kerr Lake, employees--hl. . This activity will provide additional visitor NC Wilmington 200,000 VA & NC assistance during the peak recreation season, which will improve public safety and security for the visiting public. Perform shoreline stabilization and land acquisition of John H Kerr Lake, highly eroded areas. The john h. Kerr shoreline is NC Wilmington 1,500,000 VA & NC suffering from sever erosion and some areas of the reservoir have eroded onto private property. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Rehabilitate rec and campground facilities at north bend park - this activity will provide additional funds for John H Kerr Lake, NC Wilmington continued renovations at the Wilmington districts largest 1,200,000 VA & NC corps operated recreation area. Contract will repair deteriorated park facilities. Rehabilitate rec and campground facilities at north bend park inclusive of campsites, roadways and restrooms . John H Kerr Lake, NC Wilmington Contract will repair deteriorated public park facilities and 750,000 VA & NC correct non-compliance with modern design standards inclusive of the American Disability Act. Repave entrance roads and parking lots for 4 recreation John H Kerr Lake, areas. Contract will repair deteriorated park roadways, NC Wilmington 1,000,000 VA & NC improving and maintaining access and ensuring safe ingress and egress into the facility. Start update of master plan and shoreline mgmt plan. The master plan was last updated in 1980. Contract will John H Kerr Lake, NC Wilmington initiate revisions to comprehensive planning documents 400,000 VA & NC that guide limited development and land use allocations on over 50 thousand acres of public Update of natural and cultural resources data for geographic information system (GIS) database including John H Kerr Lake, NC Wilmington level one inventory data. Contract will provide critical 100,000 VA & NC data to enhance Corps and state partner management of natural resources of nearly 50,000 acres. Conduct hydrographic surveys, perform disposal island improvements and perform maintenance dredging of Lockwoods Folly NC Wilmington Lockwoods Folly river (inlet portion of the project) with 600,000 River, NC disposal to the adjacent shoreline (beneficial use of dredged material). Perform upland disposal island improvements for future disposal of dredged material from the Lockwoods river. Lockwoods Folly NC Wilmington This activity will also provide unrestricted navigation from 570,000 River, NC Ocean to the protected waters of the Atlantic Intracoastal Waterway. Continue work on the Manteo (Shallowbag) bay, NC dredged material management plan. Development of this Manteo (Shallowbag) NC Wilmington plan will identify and ascertain environmental clearances 155,000 Bay, NC necessary for disposal of dredged material for a 20-year duration. Initiate work on the Manteo (Shallowbag) bay, NC dredged material management plan. Development of this Manteo (Shallowbag) NC Wilmington plan will identify and ascertain environmental clearances 155,000 Bay, NC necessary for disposal of dredged material for a 20-year duration. Perform maintenance dredging within the Oregon Inlet Manteo (Shallowbag) NC Wilmington Ocean Bar (vicinity of Herbert C Bonner Bridge) to a half 4,000,000 Bay, NC channel width. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Perform Maintenance Dredging Within The Oregon Inlet Manteo (Shallowbag) NC Wilmington Ocean Bar (Vicinity Of Herbert C Bonner Bridge) To The 4,200,000 Bay, NC Full Channel Dimensions And A 200-Ft Channel Widener.

Perform Maintenance Dredging Within The Oregon Inlet Manteo (Shallowbag) NC Wilmington Ocean Bar (Vicinity Of Herbert C Bonner Bridge) To The 2,200,000 Bay, NC Full Channel Dimensions And A 400-Ft Channel Widener. Perform Maintenance Dredging Within The Oregon Inlet Manteo (Shallowbag) NC Wilmington Ocean Bar (Vicinity Of Herbert C Bonner Bridge) to the 2,000,000 Bay, NC full channel dimensions. Shoreline and biological monitoring is required for the purposes of allowing disposal of dredged material onto Manteo (Shallowbag) NC Wilmington the shoreline of pea island national wildlife refuge. A 560,000 Bay, NC portion of the funding will be provided to U.S. Fish and Wildlife. Conduct hydrographic surveys and perform maintenance NC Wilmington New River Inlet, NC dredging of new river inlet, cedar bush cut and channels 800,000 to Jacksonville, NC. Perform disposal island improvements for the purpose of NC Wilmington Shallotte River, NC 100,000 creating capacity for future maintenance dredging. Silver Lake Harbor, Perform repairs to existing navigation breakwater NC Wilmington 500,000 NC structure. Perform repairs to existing navigation breakwater structure. An inspection of the breakwater at oriental, NC Smiths Creek, NC Wilmington was performed in November 2000. It revealed that a 350,000 Pamlico County, NC section of the breakwater approximately 125 feet in length is not functioning properly. Conduct water supply study and flood damage analysis. Engineering contract will provide updated information W Kerr Scott Dam NC Wilmington necessary to properly assess flood damages and 260,000 and Reservoir, NC evaluate water supply requests in the rapidly growing triad region of NC. Hire additional temp ranger employees and term W Kerr Scott Dam employees--hl. This activity will provide additional visitor NC Wilmington 150,000 and Reservoir, NC assistance during the peak recreation season, which will improve public safety and security. Maintain dam & associated structures to full capacity. This package will improve operational reliability by W Kerr Scott Dam NC Wilmington upgrading dated controls and electrical systems, and 500,000 and Reservoir, NC award construction of additional stop log gate associated with outlet works at W. Kerr Scott.

Renovate & maintain critical recreational facilities inclusive of campsite rehab, road paving and restroom W Kerr Scott Dam NC Wilmington renovation. Contract will repair deteriorated public park 1,500,000 and Reservoir, NC facilities and correct non-compliance with modern design standards inclusive of the American Disability Act. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Replace condemned restroom at berry mtn. Park and establish municipal sewer and a water connections. W Kerr Scott Dam NC Wilmington Activity will result in improved sanitary conditions, 300,000 and Reservoir, NC increase visitor satisfaction and reduced future maintenance costs. Replace three old sinking boat houses with new three bay boat house and walkways - the current facility is W Kerr Scott Dam NC Wilmington dilapidated and is in desperate need of replacement. 300,000 and Reservoir, NC Package will contract the construction of new facility which will improve emergency response. Update historic properties management plan. Engineering contract will provide plan that thoroughly documents the W Kerr Scott Dam NC Wilmington locations and management plans for various cultural 180,000 and Reservoir, NC resource sites under the stewardship of the corps of engineers at W. Kerr Scott. Update master plan and shoreline management plan. W Kerr Scott Dam Contract will initiate revisions to comprehensive planning NC Wilmington 450,000 and Reservoir, NC documents that guide limited development and land use allocations. Perform hydrographic surveys, geotechnical sediment Ww Connecting analysis and environmental coordination necessary to NC Wilmington Pamlico Sound To 250,000 produce contract plans and specifications of future Beaufort Harbor, NC maintenance dredging of the Atlantic Harbor of refuge. Acquisition of LIDAR data - Topographic mapping will be ND Omaha Bowman Haley, ND 25,000 obtained for areas surrounding the dam Interpretive Services - Design, construction and purchase ND Omaha Bowman Haley, ND interpretive panels, displays, signs, trails, mini-boats and 50,000 other interpretation materials Prairie Restoration Project Prairie RESTORATION - ND Omaha Bowman Haley, ND Complete project(s) that promote understanding of and 25,000 protect native grasses/prairie Surveys in support of FY10 Periodic Inspection - Done by Engineering firm to ensure structures are in satisfactory ND Omaha Bowman Haley, ND 35,000 condition thus maintaining the safety of the dam and residents. Boundary Survey - Surveys, Monumentation, boundary Garrison Dam, Lake ND Omaha marking, fencing and other requirements will be 250,000 Sakakawea, ND completed Downhole Camera Inspection of Powerhouse Relief Wells - Done by Engineering firm a camera inspection Garrison Dam, Lake ND Omaha company to ensure dam safety wells that relieve pressure 25,000 Sakakawea, ND in the dam are operating satisfactory thus maintaining the safety of the dam and downstream residents Garrison Dam, Lake Fort Stevenson Marina Dock System - Complete marina ND Omaha 6,500,000 Sakakawea, ND and dock system Install New Black Start Emergency Diesel Generator - to Garrison Dam, Lake ND Omaha ensure operational system for restarting Hydroelectric 270,000 Sakakawea, ND plant so it is able to continue to produce electrical power. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Instrumentation Maintenance and Rehabilitation - Done Garrison Dam, Lake by Engineering/Drilling firm to ensure dam safety ND Omaha 150,000 Sakakawea, ND instruments are operating satisfactory thus maintaining the safety of the dam and downstream residents. Interpretive Services - Design, construction and purchase Garrison Dam, Lake ND Omaha interpretive panels, displays, signs, trails, mini-boats and 100,000 Sakakawea, ND other interpretation materials Level I and II Natural Resources Inventories - Complete Garrison Dam, Lake report(s) to determine plant, animal, soil and land use ND Omaha 400,000 Sakakawea, ND composition and types. Implement recommendations when feasible. Garrison Dam, Lake Noxious Weed Contracts - Apply appropriate treatment to ND Omaha 500,000 Sakakawea, ND reduce and eliminate weeds on/around the dam and lake Prairie Restoration Project - Complete project(s) that Garrison Dam, Lake ND Omaha promote understanding of and protect native 200,000 Sakakawea, ND grasses/prairie Replace Rough Terrain Mobile Crane - Replaces key Garrison Dam, Lake ND Omaha dam safety piece of equipment that currently requires 275,000 Sakakawea, ND high level of maintenance to remain serviceable. Replace V-Notch Weir - Done by Engineering firm to Garrison Dam, Lake replace dam safety flow monitoring instruments to ensure ND Omaha 45,000 Sakakawea, ND functionality and accuracy, thus maintaining the safety of the dam and downstream residents. Study of Alternatives for Winter time Maintenance of Garrison Dam, Lake ND Omaha Spillway Gates by Engineering Firm - To eliminate safety 65,000 Sakakawea, ND and dam safety concerns. Rehabilitation of Gate Operating Equipment - Rehabilitation of 55 year old Gate Operating Equipment. ND St. Paul Homme Lake, ND This is necessary to maintain the integrity of the outlet 110,000 works and assure future water regulating capabilities. Includes upgrading electrical (service) Complete boundary Monumentation remaining from pool Lake Ashtabula and raise - on property acquired for the dam/pool raise for ND St. Paul 125,000 Baldhill Dam, ND additional flood water storage. Necessary to identify corps property for management purposes. Complete Level One Inventory - Complete project natural resources Level One Inventories for vegetation, wetlands, Lake Ashtabula and ND St. Paul soils and special status species. The inventories are 176,000 Baldhill Dam, ND necessary for sound natural resource management decisions and strategies. Rehabilitate West Ashtabula Crossing Recreation area. Lake Ashtabula and Upgrade sanitary facilities to include American Disability ND St. Paul 895,000 Baldhill Dam, ND Act accessibility. Upgrade camping pads and utilities and related site work. Repair recreation asphalt roads / minor maintenance - Lake Ashtabula and Includes funds for 8,000 square yards of major road ND St. Paul 150,000 Baldhill Dam, ND repair and 3,000 square yards of asphalt road seal coating at Eggerts Landing Recreation area. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Replace Comfort Station - East Ashtabula Crossing - Lake Ashtabula and The existing building needs to be replaced due to ND St. Paul 275,000 Baldhill Dam, ND foundation movement, floor heaving, severe wall cracking, door/frames not operating properly etc. Acquisition of LIDAR data - Topographic mapping will be ND Omaha Pipestem Lake, ND 25,000 obtained for areas surrounding the dam Interpretive Services - INTERPRETIVE SERVICES - Design, construction and purchase interpretive panels, ND Omaha Pipestem Lake, ND 50,000 displays, signs, trails, mini-boats and other interpretation materials Rebuild Crest Road - Rebuild defective sub pavement ND Omaha Pipestem Lake, ND and install new asphalt pavement to ensure adequate 475,000 access and safety of the public is maintained Stilling Basin Inspection - Dewater channel below the dam for inspection to ensure structures are in satisfactory ND Omaha Pipestem Lake, ND 40,000 condition thus maintaining the safety of the dam and residents. Surveys for Inundation Mapping for Emergency Action ND Omaha Pipestem Lake, ND Plan to ensure plans are up to date and in place to warn 350,000 public in the event water has to be spilled from the lake.

Award contract to evaluate Dam 357 Operations for low flow Water Passage to comply with International ND St. Paul Souris River, ND 50,000 Agreement. This is a concern with the US Fish & Wildlife Service and is located 2 miles from the Canadian Border.

Contract for surveys to measure the amount of sediment Harlan County Lake, in the lake to allow planning for water supply and other NE Kansas City 100,000 NE water uses and engineering for flood control management to protect the safety of the dam and the public. As part of overall maintenance at Harlan County Lake, purchase of modern, safe and handicapped accessible Harlan County Lake, playground sets and other related equipment, safe NE Kansas City 60,000 NE playground surfacing, boat docks, and other equipment directly used by the recreating public to enhance safety and service to the public. Collect, Scan/Digitize, protect, archive and file project Harlan County Lake, documents to allow efficient retrieval and protection of NE Kansas City 30,000 NE historical documents to minimize future storage costs and lost effort. Contract purchase of emergency response, inspection, communication and warning equipment such as radios, Harlan County Lake, NE Kansas City satellite phones, software, dialers, sirens, sonar, and 15,000 NE remote controlled surveillance equipment to allow improved emergency response and evaluation

Contract purchase of Global Positioning System Survey Harlan County Lake, NE Kansas City Equipment to provide more accurate inventory of project 10,000 NE equipment/facilities and minimize future survey costs. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Contract rock and grading to provide Shoreline Harlan County Lake, Stabilization and erosion protection to avoid NE Kansas City 60,000 NE sedimentation, improve water quality and protect recreation facilities adjacent to the erosion. Critical Road Repairs to significantly damaged roads that Harlan County Lake, provide primary access to facilities and recreation areas NE Kansas City 1,200,000 NE that will provide significant enhancements of service to the public and minimize future maintenance costs. Direct hire of temporary Water Safety Rangers to provide Harlan County Lake, enhanced safety and customer service to the recreating NE Kansas City 50,000 NE public and purchase of water safety equipment and materials and Safety Brochures General Road Repairs to camp loops, camp pads, parking areas, culvert replacements, paving modifications Harlan County Lake, NE Kansas City to provide handicapped access, and access points or 5,200,000 NE aggregate surfaced roads and shoulders that will provide enhanced service to the public and reduce

Hired contract labor to provide dam, campground, public Harlan County Lake, use areas and general project maintenance to provide NE Kansas City 50,000 NE safer facilities and equipment, enhance service to the public and reduce future maintenance costs.

Maintenance Contract Labor/Contract Mowing, Contract Refuse Collection and other Service Contracts and Harlan County Lake, NE Kansas City maintenance items that will minimize future maintenance, 65,000 NE ensure a clean and well maintained parks for the recreating public and to ensure public safety

Purchase of new, OR modification of existing, shower houses, campgrounds, boat ramps, boat docks, rest Harlan County Lake, NE Kansas City rooms, administrative buildings and other facilities and 175,000 NE associated equipment, sidewalks, parking areas, signs and other features to make them handicap Purchase of rock for Dam Safety purposes to protect the Harlan County Lake, NE Kansas City dam in emergency conditions and minimize the risk of 296,000 NE severe damage and public safety. Purchase, construction and/or modify Recreation Harlan County Lake, NE Kansas City Facilities such as fire pits, lantern holders, hand rails, 75,000 NE picnic tables, picnic shelters, lavatories Program for routine supplies and materials currently unfunded. Allows repairs of Flood control dams and NE Omaha Papillion Creek, NE 50,000 associated structures thus ensuring that safety of dam and downstream residents are maintained Hydro Surveys & Area-Capacity Analysis Determines the NE Omaha Papillion Creek, NE capacity remaining in the lake for holding flood waters 85,000 thus ability to protect the dam and downstream residents American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Rehabilitation Dam Safety Instrumentation - Restore and make repairs to instruments located in the embankment NE Omaha Papillion Creek, NE 45,000 of the dam to increase the safety of the dam and residents. Surveys in support of Periodic inspection FY-10 - Done by Engineering/Drilling firm to ensure structures are in NE Omaha Papillion Creek, NE 25,000 satisfactory condition thus maintaining the safety of the dam and downstream residents. Salt Creeks & Tribs. Aerial Mapping - Topographic mapping will be obtained NE Omaha 315,000 NE for areas surrounding the dams Instrument Maintenance and repair - Done by Salt Creeks & Tribs. Engineering/Drilling firm to ensure instruments are NE Omaha 60,000 NE operating satisfactory thus maintain the safety of the dam and downstream residents. Issue small contracts and/or purchase orders to replace NH New England Blackwater Dam, NH equipment and complete essential miscellaneous repair 117,000 work necessary to maintain project integrity.

Edward Macdowell Issue contract to replace wooden log boom with synthetic NH New England 75,000 Lake, NH logs, to reduce future maintenance costs of the log boom. Franklin Falls Dam, Issue A/E contract to complete bridge and periodic NH New England 140,000 NH inspections to reduce risk of structure failure. Issue small contracts and/or purchase orders to replace Franklin Falls Dam, NH New England equipment and complete miscellaneous repair work 121,000 NH necessary to maintain project integrity. Issue A/E contract to complete dam safety recommendations for Everett Lake dikes - evaluate camp Hopkinton - Everett NH New England conduit in dike p-2, seepage and stability analysis of 180,000 Lakes, NH saddle dikes, update heap including new inundation mapping, update hydraulic and hydrologic analysis.

Issue small contracts and/or purchase orders to replace Hopkinton - Everett NH New England equipment and complete essential miscellaneous repair 254,000 Lakes, NH work necessary to maintain project integrity Issue A/E contract to complete bridge inspections to NH New England Otter Brook Lake, NH 10,000 reduce risk of structure failure. Issue contract to install new piezometers required to NH New England Otter Brook Lake, NH 130,000 monitor conditions at dam. Issue contract to repair erosion at borrow area which is NH New England Otter Brook Lake, NH resulting in deposition of silt and clay into the otter brook 820,000 below Otter Brook dam. Issue small contracts and/or purchase orders to replace Surry Mountain Lake, NH New England equipment and complete essential miscellaneous repair 68,000 NH work necessary to maintain project integrity American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award contract for maintenance dredging of Oyster Creek to maintain 10 ft. deep channel from the outer bar in NJ Philadelphia Barnegat Inlet, NJ Atlantic Ocean, through Oyster Creek to deepwater in 350,000 Barnegat Bay. The USCG designates this inlet as surf station, requiring special qualification Award contract to dredge the Cape May Harbor feature of NJ Philadelphia Cold Spring Inlet, NJ the project to its authorized depth to provide safe 300,000 navigation Award contract to dredge the dangerous coastal inlet to restore to this feature of the project to its authorized NJ Philadelphia Cold Spring Inlet, NJ depth to provide safe navigations for the largest fishery 340,000 landing in New Jersey. The inlet also serves a Coast Guard training facility. New Jersey Award a contract for maintenance dredging of the NJ Philadelphia Intracoastal 1,260,000 remaining critical shoal areas within the waterway. Waterway, NJ Award contract for rehab of Steel Bulkhead long the Pt New Jersey Pleasant Canal. Jetty works, bulkhead repairs, and bank NJ Philadelphia Intracoastal stabilization provides for safer navigation and also ensure 5,630,000 Waterway, NJ the integrity of the channel and adjacent structures and property Award contract for repair of the Pt. Pleasant Canal Old New Jersey Bridge Abutment. Jetty and bank stabilization provide for NJ Philadelphia Intracoastal 2,500,000 safer navigation and also ensure the integrity of the Waterway, NJ channel and adjacent structures and property Award contract to dredge Ferry Area. Project provides a New Jersey safe, reliable channel for one of the East Coast’s largest NJ Philadelphia Intracoastal & 5th most valuable commercial fishing fleet in the U.S. & 850,000 Waterway, NJ 9 USCG stations. The DRBA operates a ferry service between Cape May, NJ & Lewes, Award contract to remove up to an additional 20,000 CY New York and New of critical shoals that require costly disposal placement NJ New York 2,250,000 Jersey Channels, NY from the major shoal located at the bend in the federal channel at Tufts Point Reach. Service and upgrade twenty-year-old electronic flooding Passaic River Flood warning system protecting over 1 Million residents and NJ New York Warning Systems, 416,000 their property in the seventeen communities of the high- NJ risk flood-prone Passaic river Flood Basin. USACE-operated shallow draft navigation channels in NJ will have an annual hydrographic survey and published Project Condition NJ New York Navigation Channel Controlling Depth Report which is 120,000 Surveys, NJ critical for all channel users to reduce their risks of an accident. Execute an advance maintenance dredging contract in this high-use dangerous ocean inlet in order to reduce NJ New York Shark River, NJ 1,500,000 annual O&M costs by doubling the time between needed dredging. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Restore needed navigation channel dimensions. Remove Shrewsbury River, critical shoals at the Oceanic Bridge reach of the NJ New York 4,500,000 Main Channel, NJ Nevesink Branch to alleviate the risk currently experienced by users of the channel. Aquatic Invasive Species. Control introduction of harmful aquatic invasive species (Zebra and Quagga Mussels) NM Albuquerque Abiquiu Dam, NM into project lake. Measures to be taken include direct hire 93,000 of temporary labor for boat inspections, decontamination efforts, and public awareness Electrical System Upgrade. Life Safety and Substandard Electrical System - Rehabilitate and modernize ageing electrical distribution system and obsolete and unreliable NM Albuquerque Abiquiu Dam, NM 2,216,000 backup emergency generator both which no longer meet North American Electric Reliability Corporation requirements and are not safe Inspect, Repair, Clean, Shotcrete/Install Drains in the Adits (i.e. Tunnels on each side of the dam). Dam Safety NM Albuquerque Abiquiu Dam, NM Issue - Project will improve drainage in the adits 171,000 (drainage tunnels) which assures continued performance and safety of the dam. Aquatic Invasive Species. Control introduction of harmful aquatic invasive species (Zebra and Quagga Mussels) NM Albuquerque Cochiti Lake, NM into project lake. Measures to be taken include direct hire 103,000 of temporary labor for boat inspections, decontamination efforts, and public awareness Campground Construction Phase III. Backlog Infrastructure Maintenance Issue - The aging and obsolete existing campground no longer supports current NM Albuquerque Cochiti Lake, NM 2,380,000 recreational interests and needs and therefore must be modernized. Completion of campground is essential to public welfare Install Stationing on Dam. Dam Safety Issue - Identifying markings need to be installed to determine NM Albuquerque Cochiti Lake, NM 55,000 exact locations along the 5.5 mi long axis of the dam during dam safety inspections. Water Treatment System Replacement. Public Health and Safety Issue - Replace existing outdated system to NM Albuquerque Cochiti Lake, NM 165,000 provide a suitable water supply for the project office at the dam and public campgrounds. Aquatic Invasive Species. Control introduction of harmful aquatic invasive species (Zebra and Quagga Mussels) NM Albuquerque Conchas Lake, NM into project lake. Measures to be taken include direct hire 93,000 of temporary labor for boat inspections, decontamination efforts, and public awareness Overlay Project Roads and Parking Lots. Backlog Infrastructure Maintenance Issue - Project roads have NM Albuquerque Conchas Lake, NM 1,007,000 deteriorated and need to be resurfaced. This will improve access to all public and project facilities. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Packing Gland Repair. Dam Safety Issue - Repairs are essential to allow for safe operation of the service and NM Albuquerque Conchas Lake, NM emergency gates of the dam. If the repairs are not made, 120,000 the gates will eventually become inoperable and compromise the ability to release water

Comprehensive Evaluation of Project Datums. Backlog Inspection of Infrastructure Maintenance - This effort is needed to meet NM Albuquerque Completed Works, requirements of Executive Order that calls for the 380,000 CO standardization of the use of the most current vertical datum (North America Vertical Datum 88).

Comprehensive Evaluation of Project Datums. Backlog Inspection of Infrastructure Maintenance - This effort is needed to meet NM Albuquerque Completed Works, requirements of Executive Order that calls for the 1,000,000 NM standardization of the use of the most current vertical datum (North America Vertical Datum 88). Gauging Station Road Work Repair. Backlog Infrastructure Maintenance Issue - Repairs are needed Jemez Canyon Dam, NM Albuquerque for the unimproved road leading to the downstream 160,000 NM gauging station, which is used to measure water releases from the dam. Install Rock Fall Protection. Dam Safety and Life Safety Issues - The downstream canyon walls are unstable and Jemez Canyon Dam, NM Albuquerque requires netting to keep rocks from falling onto the 276,000 NM access roads. Work will be performed by a Small Business contractor. Jemez Canyon Dam Sediment Mobilization. ESA Compliance and BiOp Required Work and Indian Trust Jemez Canyon Dam, NM Albuquerque Responsibilities. The collection of wildlife and vegetation 600,000 NM data associated with the Jemez Canyon Dam project area is needed to meet Endangered Species Act requirements Erosion Control at Bridge Entrance. Backlog Infrastructure Maintenance Issue - Project is needed to Santa Rosa Dam NM Albuquerque control erosion near the entrance to the control tower 160,000 And Lake, NM bridge. Further erosion could compromise safe access to the bridge entrance. Aerial Photography and Model Development. Backlog Infrastructure Maintenance issue - A HEC-RAS hydraulic NM Albuquerque Two Rivers Dam, NM 296,000 model is needed to address contentious channel capacity issues with Roswell and Chaves County. Fence Project Boundary. Backlog Infrastructure Maintenance issue - A fence is needed to delineate the NM Albuquerque Two Rivers Dam, NM project boundary adjacent to private lands. This will allow 260,000 for better management of natural resources and avoid inadvertent trespassing onto private lands American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Install American Disability Act Sanitary Facility in Relocate the Day-Use Area. Maintenance Yard- Backlog Infrastructure Maintenance Issue-existing day-use area NM Albuquerque Two Rivers Dam, NM needs to be rehabilitated and will be relocated to the 126,000 project entrance to improve public recreation opportunities, meet American Disability Act requirements and improve security Install Toilet Facility at Maintenance Yard. Backlog Infrastructure Maintenance Issue - Sanitary facilities are NM Albuquerque Two Rivers Dam, NM needed for administrative and maintenance personnel 78,000 working in the yard and surrounding project area. Work will be performed by a Small Business Award And Execution Of A Maintenance Dredging Black Rock Channel Contract To Achieve Minimum Functional Channel NY Buffalo and Tonawanda 1,485,000 Requirement Resulting In Increased Navigation Safety Harbor, NY And Reduction Of Vessel Costs Due To Light Loading Engineering & Design, And Construction Contract To Black Rock Channel Repair Lower Operating Gate Sill Of The Black Rock NY Buffalo and Tonawanda 300,000 Lock To Reduce risk Of Failure, And Hazardous Harbor, NY Turbulence To Vessels Awaiting Lockage. Engineering And Design, And Construction Contract To Black Rock Channel Repair Lower Guard Gate Sill Of The Black Rock Lock To NY Buffalo and Tonawanda 305,000 Reduce risk Of Failure, And To Reduce Leakage And Harbor, NY The Costs To Dewater During Seasonal Maintenance. Structure repair of bird island pier, approximately 150 Black Rock Channel linear feet, including purchase of stone via supply NY Buffalo and Tonawanda 400,000 contract, reducing risk to public safety and shoreline Harbor, NY erosion Structure Repair Of The Buffalo Harbor South Breakwater, Approximately 100 Linear Feet, Including NY Buffalo Buffalo Harbor, NY 500,000 Purchase Of Stone Via Supply Contract, Educing risk To Public Safety And Shoreline Erosion Structure Repair Of The Confined Disposal Facility (Cdf) NY Buffalo Buffalo Harbor, NY In Buffalo Harbor, Approximately 400 Linear Feet, To 100,000 Prevent The Escape Of Contaminated Dredged Material Award And Execution Of A Maintenance Dredging Contract To Achieve Minimum Functional Channel NY Buffalo Dunkirk Harbor, NY 820,000 Requirement Resulting In Increased Navigation Safety And Reduction Of Vessel Costs Due To Light Loading Replace tractor which is utilized to maintain project roads East Sidney Lake, NY Baltimore and dam embankment. This will result in reduced annual 42,000 NY maintenance costs. Replace lawn tractor which is utilized to maintain project East Sidney Lake, NY Baltimore grounds and dam embankment. This will result in 20,000 NY reduced annual maintenance costs. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award contract to increase available capacity at the Houghtaling Island dredged material placement site to Hudson River, NY NY New York accommodate additional short term (3-5 years) dredged 575,000 (Maint) material placement while environmental and design work is performed to expand the site for longer period Demolish and dispose/recycle the unsafe 94-year-old Hudson River, NY (O former lockmaster's cottage on the Troy, NY Hudson river NY New York 350,000 & C) Federal Navigation Lock and Dam facility to the eliminate the risk of it failing. Remove all remaining asbestos insulation for workers' Hudson River, NY (O NY New York and visitors' improved safety in the Troy, NY Hudson river 400,000 & C) Federal Navigation Lock and Dam facility's buildings. Replace obsolete and substandard navigation lock Hudson River, NY (O lighting and fixtures with a modern energy-efficient NY New York 325,000 & C) system for workers' and lock users' improved safety, as well as improved energy usage and conservation Replace substandard 25-year-old 35-Ton crane for Hudson River, NY (O workers' improved safety and to reduce the risks of failing NY New York 800,000 & C) to continue to deliver critical maintenance work on the Hudson river and the Narrows to Lake Champlain. Replace substandard 35-year-old sectional work barge equipment for workers' improved safety and to reduce the Hudson River, NY (O NY New York risks of failing to continue to deliver critical maintenance 600,000 & C) work on the Hudson river and the Narrows to Lake Champlain. Award and execute a construction contract to remove debris material that accumulates behind the Mount Morris Mount Morris Dam, NY Buffalo Dam reducing the risk of failure to the dam, public safety, 225,000 NY and damages from floods to the residential areas, farmlands, and industrial development.

Award and execute a road construction contract to repair Mount Morris Dam, NY Buffalo Mount Morris Dam Visitor Center access road that is 1,000,000 NY deteriorated and presents safety hazards to the public.

Award and execute a road construction contract to repair Mount Morris Dam, NY Buffalo road access to partner buildings at the Mount Morris Dam 200,000 NY facility and improve visitor center access safety. Restore Sandy Hook Navigation Channel to full authorized dimensions for the US Navy warships, ocean- NY New York New York Harbor, NY 2,000,000 going tankers, and container ships using the channel to reduce their risks for an accident New York Harbor, NY NY New York Clean and stabilize shoreline for safety and reliability. 400,000 & NJ (Drift Removal) American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Design of Driftmaster replacement which is key vessel New York Harbor, NY NY New York used in the removal of large debris in the Port of New 950,000 & NJ (Drift Removal) York and New Jersey. Remove all remaining asbestos insulation in the Caven New York Harbor, NY NY New York Point Marine Terminal buildings at Jersey City, NJ for 1,540,000 & NJ (Drift Removal) workers' and visitors' improved safety. Replace deteriorated and cracked timber pilings supporting vessel docking piers for both workers' New York Harbor, NY NY New York improved safety and equipment reliability reasons to 100,000 & NJ (Drift Removal) reduce the risk of failing to continue to deliver critical channel survey and maintenance work. Replace obsolete and unreliable electric power generator New York Harbor, NY on Survey Vessel Moritz for both vessel safety and NY New York 60,000 & NJ (Drift Removal) reliability reasons to reduce the risk of failing to continue to deliver critical channel surveys. Replace the obsolete and substandard perimeter security New York Harbor, NY NY New York fence at the Caven Point Marine Terminal in Jersey City, 330,000 & NJ (Drift Removal) NJ for both safety and security reasons Upgrade cranes' load-sensing safety equipment on New York Harbor, NY workboats Driftmaster & Hayward for workers' improved NY New York 100,000 & NJ (Drift Removal) safety and vessel reliability reasons to reduce the risk of failing to continue to deliver critical maintenance work.

Repair 100-year-old rock breakwater to eliminate current Plattsburgh Harbor, navigation safety risk resulting from sections of the NY New York 2,450,000 NY breakwater have settled into the lake bottom causing a hazard to vessels entering and leaving Plattsburg Harbor Obtain modern side-scan sonar system for faster and Project Condition better searches for navigation obstructions in the high- NY New York 500,000 Surveys, NY use deep-draft navigation channels of NY&NJ Harbor and the Hudson river to the Port of Albany. Restore full authorized channel dimensions in this dangerous ocean inlet to reduce the risks for deep-sea NY New York Shinnecock Inlet, NY 5,000,000 commercial fishing trawlers, recreational boaters, and the USCG crews. Whitney Point Lake, Construct road to provide easier access for project NY Baltimore 40,000 NY personnel to maintain the intake control tower. Pave roads which will allow project personnel easier Whitney Point Lake, NY Baltimore access to maintain the dam and appurtenant structures, 57,000 NY also resulting in decreased maintenance costs. Replace farm tractor which is utilize to maintain project Whitney Point Lake, NY Baltimore roads and dam embankment. This will result in decrease 45,000 NY annual maintenance costs. Whitney Point Lake, Replace furnace in intake control tower to permit a much NY Baltimore 20,000 NY more efficient use of energy. Replace tank which stores fuel to run emergency Whitney Point Lake, NY Baltimore generator for the project, which permits operation of flood 7,000 NY control gates during a power outage. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Hire One Seasonal 12-Month Park Ranger to provide Alum Creek Lake, OH Huntington additional water safety staffing to reduce the risk of failure 100,000 OH and risk to the public Maintain healthy natural and cultural resources and Alum Creek Lake, OH Huntington minimize adverse environmental impacts, including 125,000 OH removal of invasive species. Maintain recreational facilities and provide additional Alum Creek Lake, OH Huntington water safety ranger staffing to reduce the risk of failure 207,000 OH and risk to the public Master plan update to support Environmental Alum Creek Lake, OH Huntington Stewardship objectives and adapt ongoing development 350,000 OH & land use pressure. Part of the Alum Creek Lake, replace East side Alum Creek Lake, playground equipment to meet playground safety OH Huntington 84,000 OH standards and provide American Disability Act accessibility Alum Creek Lake, Resurface access roads and parking areas to reduce OH Huntington 600,000 OH future maintenance costs Award and complete contract to provide enhanced OH Pittsburgh Berlin Lake, OH cleaning, grounds keeping and maintenance services for 230,000 recreation areas. Complete Tainter Crest Gate and Machinery Repairs. Award and complete contract for repairs, reduce risk of OH Pittsburgh Berlin Lake, OH 2,500,000 complete gate failure and reduce future maintenance costs. Hire 3 temporary Summer Park Rangers for water and OH Pittsburgh Berlin Lake, OH public safety patrols. Will reduce public water related 50,000 fatalities and accidents. Hire One Seasonal 10-Month Park Ranger to develop OH Pittsburgh Berlin Lake, OH partnerships/programming in reducing public water- 50,000 related fatalities. Paint Water Tower Interior and Exterior, Mill Creek Rec OH Pittsburgh Berlin Lake, OH Area. Award and complete contract and reduce future 200,000 maintenance costs. Repair and Seal Parking Lot, Mill Creek Day Use Area. OH Pittsburgh Berlin Lake, OH Award and complete contract and reduce future 100,000 maintenance costs. Repave Overflow Lot & Upgrade Trails, Mill Creek Rec OH Pittsburgh Berlin Lake, OH Area. Award and complete contract and reduce future 200,000 maintenance costs. Replace Maintenance Building Roof. Award and complete contract to replace roof and prevent total loss of use of OH Pittsburgh Berlin Lake, OH 100,000 building and equipment and reduce future maintenance costs. Services for increased shoreline management, threatened/endangered species surveillance, cultural OH Pittsburgh Berlin Lake, OH 47,000 resource protection/preservation, invasive species eradication, and protection of natural resources. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Design and construct improvements to the Caesar Creek Caesar Creek Lake, Lake Visitor Center. Existing facilities do not meet OH Louisville 600,000 OH utilization demand for educational exhibits, theatre space or classroom needs. Funds will augment recreation budget to: provide additional Law Enforcement patrols; provide additional Caesar Creek Lake, OH Louisville cleanings at buildings and picnic sites; mow grass and 252,000 OH pick up refuse at higher frequencies; purchase needed supplies and materials to operate / repair Hire temporary additional ranger staff to augment promotion of public water safety initiatives, efforts and Caesar Creek Lake, OH Louisville programming. Additional staff would allow increased 22,000 OH public contacts for water safety education through development of collaborative partnerships. Hire temporary additional ranger staff to promote public Caesar Creek Lake, OH Louisville water safety initiatives and educational efforts with 22,000 OH increased public contacts on the water. Provide improvements to the day-use recreation area Caesar Creek Lake, OH Louisville adjacent to the Regional Visitor Center (picnic shelter, 155,000 OH improved access and utilities and playground equipment.)

Funds will augment recreation budget to: provide additional Law Enforcement patrols for public safety; Clarence J Brown OH Louisville provide additional cleanings at buildings and 52,000 Dam, OH campground/picnic sites; mow grass and pick up refuse at higher frequencies; purchase needed supplies Hire temporary additional ranger staff to augment promotion of public water safety initiatives, efforts and Clarence J Brown OH Louisville programming. Additional staff would allow increased 22,000 Dam, OH public contacts for water safety education through development of collaborative partnerships. Hire temporary additional ranger staff to promote public Clarence J Brown OH Louisville water safety initiatives and educational efforts with 22,000 Dam, OH increased public contacts on the water. Award And Execute A Construction Contract For Interim Cleveland Harbor, Confined Disposal Facility Measures At The Cleveland OH Buffalo 150,000 OH Harbor To Allow For Placement Of Dredged Material Unsuitable For Open Lake Disposal Beneficial use of disposed dredged material in the Cleveland Harbor, Cleveland Harbor Confined disposal facilities (Cdf), OH Buffalo 5,000,000 OH including award and execution of a construction contract. Current Cdf's are near full capacity Complete first phase of beneficial use of disposed Cleveland Harbor, dredged material in the Cleveland Harbor confined OH Buffalo 2,250,000 OH disposal facilities (Cdf), including award and execution of a construction contract. Maintain healthy natural and cultural resources and Deer Creek Lake, OH Huntington minimize adverse environmental impacts, including 48,000 OH removal of invasive species. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Maintain recreational facilities and provide additional Deer Creek Lake, OH Huntington water safety ranger staffing to reduce the risk of failure 172,000 OH and risk to the public Deer Creek Lake, Resurface parking lots and access roads to reduce future OH Huntington 420,000 OH maintenance costs Maintain healthy natural and cultural resources and OH Huntington Delaware Lake, OH minimize adverse environmental impacts, including 50,000 removal of invasive species. Maintain recreational facilities and provide additional OH Huntington Delaware Lake, OH water safety ranger staffing to reduce the risk of failure 316,000 and risk to the public Prepare Levee Certification for Waldo Levee to meet OH Huntington Delaware Lake, OH 400,000 requirements of National Flood Insurance Program OH Huntington Delaware Lake, OH Renovate spillway gates to reduce the risk of failure 900,000 Update master plan to support Environmental OH Huntington Delaware Lake, OH Stewardship objectives and adapt ongoing development 350,000 & land use pressure. Maintain healthy natural and cultural resources and OH Huntington Dillon Lake, OH minimize adverse environmental impacts, including 141,000 removal of invasive species. Maintain recreational facilities and provide additional OH Huntington Dillon Lake, OH water safety ranger staffing to reduce the risk of failure 81,000 and risk to the public Award And Execution Of A Maintenance Dredging OH Buffalo Fairport Harbor, OH Contract To Achieve Minimum Functional Channel 400,000 Requirement Resulting In Increased Navigation Safety Structure Repair Of The Fairport East Arrowhead Breakwater, Approximately 300 Linear Feet, Including OH Buffalo Fairport Harbor, OH 590,000 Purchase Of Stone Via Supply Contract, Reducing risk To Public Safety And Shoreline Erosion Award And Execution Of A Critical Maintenance Dredging OH Buffalo Huron Harbor, OH Contract To Achieve Minimum Functional Channel 400,000 Requirement Resulting In Increased Navigation Safety Award And Execution Of An Additional Maintenance OH Buffalo Huron Harbor, OH Dredging Contract To Achieve Functional Channel 670,000 Requirement Resulting In Increased Navigation Safety Structure Repair Of The Confined Disposal Facility (Cdf) In Huron Harbor, Approximately 50 Linear Feet, Including OH Buffalo Huron Harbor, OH 150,000 Purchase Of Stone Via Supply Contract, To Prevent The Escape Of Contaminated Dredged Material Award And Execution Of A Maintenance Dredging OH Buffalo Lorain Harbor, OH Contract To Achieve Minimum Functional Channel 535,000 Requirement Resulting In Increased Navigation Safety Massillon Local Prepare Levee Certification and improve features to meet OH Huntington Protection Project, 700,000 requirements of National Flood Insurance Program OH American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Michael J Kirwan Award and complete contract to provide enhanced OH Pittsburgh Dam and Reservoir, cleaning, grounds keeping and maintenance services for 43,000 OH recreation areas. Michael J Kirwan Hire 1 temporary Summer Park Ranger for water and OH Pittsburgh Dam and Reservoir, public safety patrols. Will reduce public water related 17,000 OH fatalities and accidents. Hire One Seasonal 10-Month Park Ranger to develop Michael J Kirwan partnerships/programming in reducing public water- OH Pittsburgh Dam and Reservoir, 50,000 related fatalities. Ranger will support MJ Kirwan and OH Mosquito Lakes. Michael J Kirwan Resurface Dam Access and Crest Roadway. Award and OH Pittsburgh Dam and Reservoir, complete contract, improve road safety and reduce future 500,000 OH maintenance costs. Services for increased shoreline management, Michael J Kirwan threatened/endangered species surveillance, cultural OH Pittsburgh Dam and Reservoir, 25,000 resource protection/preservation, invasive species OH eradication, and protection of natural resources. Award and complete contract to provide enhanced Mosquito Creek OH Pittsburgh cleaning, grounds keeping and maintenance services for 45,000 Lake, OH recreation areas. Hire 1 temporary Summer Park Ranger for water and Mosquito Creek OH Pittsburgh public safety patrols. Will reduce public water related 17,000 Lake, OH fatalities and accidents. Services for increased shoreline management, Mosquito Creek threatened/endangered species surveillance, cultural OH Pittsburgh 15,000 Lake, OH resource protection/preservation, invasive species eradication, and protection of natural resources. Clean & paint and replace if necessary trash racks at Muskingum River OH Huntington Muskingum projects to reduce future maintenance costs 500,000 Lakes, OH and risk of failure Hire One Seasonal 12-Month Park Ranger to provide Muskingum River OH Huntington additional water safety staffing to reduce the risk of failure 100,000 Lakes, OH and risk to the public Muskingum River Maintain healthy natural and cultural resources and OH Huntington 90,000 Lakes, OH minimize adverse environmental impacts. Maintain recreational facilities and provide additional Muskingum River OH Huntington water safety ranger staffing to reduce the risk of failure 466,000 Lakes, OH and risk to the public Muskingum River Prepare Magnolia Levee Certification to meet OH Huntington 400,000 Lakes, OH requirements of National Flood Insurance Program Purchase and install additional Pump and backup Muskingum River OH Huntington generator at Zoar Pump Station - Dover to reduce the risk 1,500,000 Lakes, OH to the public Rehabilitate Gatehouses - Muskingum Area Projects to Muskingum River OH Huntington reduce the risk to the public and future maintenance 100,000 Lakes, OH costs Muskingum River Rip rap sections of Dam for erosion control - Beach City OH Huntington 1,200,000 Lakes, OH to reduce future maintenance costs and the risk of failure American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) North Branch Maintain healthy natural and cultural resources and OH Huntington Kokosing River Lake, 8,000 minimize adverse environmental impacts. OH North Branch Maintain recreational facilities and provide additional OH Huntington Kokosing River Lake, water safety ranger staffing to reduce the risk of failure 26,000 OH and risk to the public Maintain healthy natural and cultural resources and Paint Creek Lake, OH Huntington minimize adverse environmental impacts, including 16,000 OH removal of invasive species. Maintain recreational facilities and provide additional Paint Creek Lake, OH Huntington water safety ranger staffing to reduce the risk of failure 106,000 OH and risk to the public Paint Creek Lake, Resurface Parking lots for recreation areas and access OH Huntington 500,000 OH roads to reduce future maintenance costs Award And Execute A Critical Maintenance Dredging Sandusky Harbor, OH Buffalo Contract To Achieve Minimum Functional Channel 1,100,000 OH Requirement Resulting In Increased Navigation Safety Award And Execute A Construction Contract To Provide OH Buffalo Toledo Harbor, OH Maintenance Of The Confined Disposal Facility (Cdf) In 325,000 Toledo Harbor To Maximize Available Space In The Cdf. Award And Execute A Critical Maintenance Dredging OH Buffalo Toledo Harbor, OH Contract To Achieve Minimum Functional Channel 650,000 Requirement Resulting In Increased Navigation Safety Maintain healthy natural and cultural resources and Tom Jenkins Dam, OH Huntington minimize adverse environmental impacts, including 59,000 OH removal of invasive species. Maintain recreational facilities and provide additional Tom Jenkins Dam, OH Huntington water safety ranger staffing to reduce the risk of failure 36,000 OH and risk to the public Funds will augment recreation budget to: Provide West Fork Of Mill additional cleanings at buildings and picnic sites; mow OH Louisville 6,000 Creek Lake, OH grass and pick up refuse at higher frequencies; purchase needed supplies and materials to operate / repair facilities

As part of overall maintenance at Wm H Harsha Lake, award contract for recreation improvements at the William H Harsha OH Louisville Tailwater & Dam recreation areas with renovations such 310,000 Lake, OH as a playground, an accessible fishing pier/dock, and improvements to the existing boat ramp.

Funds will augment recreation budget to: Provide William H Harsha additional cleanings at buildings and picnic sites; mow OH Louisville 21,000 Lake, OH grass and pick up refuse at higher frequencies; purchase needed supplies and materials to operate / repair facilities Hire temporary additional ranger staff to augment promotion of public water safety initiatives, efforts and William H Harsha OH Louisville programming. Additional staff would allow increased 22,000 Lake, OH public contacts for water safety education through development of collaborative partnerships. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Hire temporary additional ranger staff to promote public William H Harsha OH Louisville water safety initiatives and educational efforts with 22,000 Lake, OH increased public contacts on the water. AE contract to conduct flood pool sedimentation survey. OK Tulsa Arcadia Lake, OK 100,000 Enhances reliability of water storage estimates.

AE contract to create real-time inundation mapping and OK Tulsa Arcadia Lake, OK 162,000 economic damages program to reduce risk to public. AE contract to update forecast models, Water control OK Tulsa Arcadia Lake, OK manuals, and operational programs to reduces risk to 100,000 public. Award Construction Contract to Repair service bridge OK Tulsa Arcadia Lake, OK 900,000 corbels, to reduce risk of failure AE contract to create real-time inundation mapping and OK Tulsa Birch Lake, OK 162,000 economic damages program. Reduces risk to public. AE contract to update reservoir sedimentation survey. OK Tulsa Birch Lake, OK 100,000 Enhances reliability of water storage estimates. Award Construction Contract to Replace embankment OK Tulsa Birch Lake, OK 242,000 guardrail to provide for public safety AE contract to mitigate Panther Creek archeological site. Broken Bow Lake, OK Tulsa Supports preservation of Nations' significant cultural 250,000 OK resources. Broken Bow Lake, AE contract to update reservoir sedimentation survey. OK Tulsa 100,000 OK Enhances reliability of water storage estimates. Broken Bow Lake, Award Construction Contract to Paint surge tank to OK Tulsa 200,000 OK reduce future maintenance costs. Broken Bow Lake, Award Construction Contract to Repair butterfly control OK Tulsa 100,000 OK valves to reduce the risk of failure. Broken Bow Lake, Award Construction Contract to Replace embankment OK Tulsa 354,000 OK guardrail to provide for public safety Award Construction Contract to Replace penstock raw Broken Bow Lake, OK Tulsa water piping in powerhouse. Reduces future 850,000 OK maintenance costs. Broken Bow Lake, Award Construction Contract to Replace tainter gate wire OK Tulsa 135,000 OK to reduce future maintenance costs. AE contract to conduct flood pool sedimentation survey. OK Tulsa Canton Lake, OK 100,000 Enhances reliability of water storage estimates.

AE contract to create real-time inundation mapping and OK Tulsa Canton Lake, OK 162,000 economic damages program. Reduces risk to public. Award Construction Contract to Plug one sluice gate to OK Tulsa Canton Lake, OK 300,000 reduce future maintenance. Award Construction Contract to Replace courtesy docks various locations. Work will bring facilities to current OK Tulsa Canton Lake, OK 100,000 health and safety standards and meet American Disability Act requirements. Award Construction Contract to Replace embankment OK Tulsa Canton Lake, OK 211,000 guardrail, provides for public safety American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) AE contract to update forecast models, Water control OK Tulsa Copan Lake, OK manuals, and operational programs. Reduces risk to 100,000 public. Award Construction Contract to Replace embankment OK Tulsa Copan Lake, OK 506,000 guardrail, provides for public safety Denison Dam, Lake AE contract to conduct flood pool sedimentation survey. OK Tulsa 125,000 Texoma, TX Enhances reliability of water storage estimates. AE contract to create GIS platform for real estate Denison Dam, Lake OK Tulsa acquisition and outgrant management. Reduces 125,000 Texoma, TX encroachment and enforcement actions. Denison Dam, Lake AE contract to create real-time inundation mapping and OK Tulsa 162,000 Texoma, TX economic damages program to reduce public risk. Denison Dam, Lake AE contract to prepare plans and specs for turbine OK Tulsa 400,000 Texoma, TX replacement to increase efficiency of turbines. Denison Dam, Lake AE contract to update forecast models, Water control OK Tulsa 100,000 Texoma, TX manuals, and operational programs to reduce public risk. Award Construction Contract to Protect historic Denison Dam, Lake OK Tulsa from shoreline erosion to reduce future maintenance 150,000 Texoma, TX costs. Award Construction Contract to Protect significant Denison Dam, Lake OK Tulsa archeological site with riprap, preserves cultural heritage 200,000 Texoma, TX of the nation Denison Dam, Lake Award Construction Contract to Rehab intake gantry OK Tulsa 2,000,000 Texoma, TX crane to reduce the risk of failure. Denison Dam, Lake Award Construction Contract to Replace embankment OK Tulsa 1,000,000 Texoma, TX guardrail, provides for public safety Denison Dam, Lake Award Construction Contract to Undertake interim repairs OK Tulsa 3,000,000 Texoma, TX of Cumberland dike to Reduces the risk of dike failure. Award Construction Contract to Upgrade utilities various Denison Dam, Lake parks. Work will bring facilities to current health and OK Tulsa 500,000 Texoma, TX safety standards and meet American Disability Act requirements. Denison Dam, Lake Purchase stream gauging network equipment to reduce OK Tulsa 100,000 Texoma, TX public safety from flooding. Repairs at various locations on the project. Funds Denison Dam, Lake needed for contract mods and exercise options to existing OK Tulsa 1,062,000 Texoma, TX contracts as well as award new contract where bids are higher than expected. AE contract to conduct flood pool sedimentation survey. OK Tulsa Eufaula Lake, OK 200,000 Enhances reliability of water storage estimates. AE contract to create GIS platform for real estate OK Tulsa Eufaula Lake, OK acquisition and outgrant management. Reduces 250,000 encroachment and enforcement actions. AE contract to update forecast models, Water control OK Tulsa Eufaula Lake, OK manuals, stream gauging equipment, and operational 165,000 programs. Reduces risk to public. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award Construction Contract to Investigate and paint OK Tulsa Eufaula Lake, OK 900,000 bridge. Reduces future maintenance costs. Award Construction Contract to Protect significant OK Tulsa Eufaula Lake, OK archeological site with riprap to preserve the cultural 200,000 heritage of the nation. Award Construction Contract to Replace disconnecting OK Tulsa Eufaula Lake, OK 100,000 switches. Reduces risk of failure. Award Construction Contract to Replace tainter gate wire, OK Tulsa Eufaula Lake, OK 160,000 reduces future maintenance costs Award Construction Contract to Replace waterborne toilet at Damsite South Park. Work will bring facilities to current OK Tulsa Eufaula Lake, OK 165,000 health and safety standards and meet American Disability Act requirements. Award Construction Contract to Upgrade public use areas various locations. Work will bring facilities to current OK Tulsa Eufaula Lake, OK 5,000,000 health and safety standards and meet American Disability Act requirements. Fort Gibson Lake, AE contract to create real-time inundation mapping and OK Tulsa 162,000 OK economic damages program. Reduces risk to public. AE contract to update forecast models, Water control Fort Gibson Lake, OK Tulsa manuals, stream gauging equipment, and operational 165,000 OK programs. Reduces risk to public. Fort Gibson Lake, Award Contract to Protect significant archeological site OK Tulsa 150,000 OK #1 with riprap, preserves cultural heritage of the nation Award Construction Contract to Protect significant Fort Gibson Lake, OK Tulsa archeological site #2 with riprap, preserves cultural 100,000 OK heritage of the nation Fort Gibson Lake, Award Construction Contract to Remove trees from OK Tulsa 100,000 OK Wyandotte levee to reduce the risk of levee failure Fort Gibson Lake, Award Construction Contract to Repair tainter gates and OK Tulsa 15,000,000 OK chains to reduce the risk of failure Award Construction Contract to Replace corrugated Fort Gibson Lake, OK Tulsa metal pipe in Fort Gibson dike, to reduce the risk of levee 3,000,000 OK failure Award Construction Contract to Replace deteriorated Fort Gibson Lake, OK Tulsa waterlines and install new hydrants at Damsite PUA. 100,000 OK Reduces risk to public. Fort Gibson Lake, Award Construction Contract to Replace embankment OK Tulsa 129,000 OK guardrail to provide for public safety Fort Gibson Lake, Award Construction Contract to Replace sump pumps, OK Tulsa 300,000 OK piping, and valves. Reduces future maintenance costs.

Fort Gibson Lake, Award Contract to Protect significant archeological site #3 OK Tulsa 150,000 OK with riprap, preserves cultural heritage of the nation

AE contract to conduct flood pool sedimentation survey. OK Tulsa Fort Supply Lake, OK 100,000 Enhances reliability of water storage estimates. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) AE contract to create real-time inundation mapping and OK Tulsa Fort Supply Lake, OK 162,000 economic damages program. Reduces risk to public. Award Construction Contract to Replace boat ramps at OK Tulsa Fort Supply Lake, OK 120,000 Supply park. Reduces risk to public. Award Construction Contract to Replace embankment OK Tulsa Fort Supply Lake, OK 709,000 guardrail to improve public safety Great Salt Plains AE contract to conduct flood pool sedimentation survey. OK Tulsa 100,000 Lake, OK Enhances reliability of water storage estimates. Award Construction Contract to Replace embankment Great Salt Plains OK Tulsa guardrail and dam embankment riprap to improve public 160,000 Lake, OK safety and reduce the risk of failure. AE contract to create real-time inundation mapping and OK Tulsa Heyburn Lake, OK 162,000 economic damages program. Reduces risk to public. AE contract to update forecast models, Water control OK Tulsa Heyburn Lake, OK manuals, and operational programs. Reduces risk to 100,000 public. Award Construction Contract to Replace dam guardrail, OK Tulsa Heyburn Lake, OK 109,000 provides for public safety Award Construction Contract to Replace gate attendant booths in Heyburn and Sheppard Point parks to bring to OK Tulsa Heyburn Lake, OK 100,000 current standards and increase efficiency of park operations. AE contract to create real-time inundation mapping and OK Tulsa Hugo Lake, OK 162,000 economic damages program. Reduces risk to public. Award Construction Contract to Replace embankment OK Tulsa Hugo Lake, OK 621,000 guardrail, provides for public safety Award Construction Contract to Replace tainter gate wire, OK Tulsa Hugo Lake, OK 105,000 reduces future maintenance costs AE contract to conduct flood pool sedimentation survey. OK Tulsa Hulah Lake, OK 100,000 Enhances reliability of water storage estimates. Award Construction Contract to Award Construction OK Tulsa Hulah Lake, OK Contract to Replace embankment guardrail, provides for 319,000 public safety Award Construction Contract to Repair embankment OK Tulsa Hulah Lake, OK 240,000 riprap. Reduces risk of failure AE contract to conduct flood pool sedimentation survey. OK Tulsa Kaw Lake, OK 100,000 Enhances reliability of water storage estimates.

AE contract to create real-time inundation mapping and OK Tulsa Kaw Lake, OK 162,000 economic damages program. Reduces risk to public.

Award Construction Contract to Award option to existing OK Tulsa Kaw Lake, OK 1,153,000 contract for trainer gate repairs, reduces risk of failure American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award Construction Contract to Protect significant OK Tulsa Kaw Lake, OK archeological site with riprap, preserves cultural heritage 155,000 of the nation Award Construction Contract to Replace embankment OK Tulsa Kaw Lake, OK 553,000 guardrail, provides for public safety Award Construction Contract to Replace tainter gate wire, OK Tulsa Kaw Lake, OK 130,000 reduces future maintenance costs AE contract to conduct flood pool sedimentation survey. OK Tulsa Keystone Lake, OK 100,000 Enhances reliability of water storage estimates. AE contract to update forecast models, Water control OK Tulsa Keystone Lake, OK manuals, stream gauging equipment, and operational 200,000 programs. Reduces risk to public. Award Construction Contract to Replace courtesy docks OK Tulsa Keystone Lake, OK 100,000 various locations to enhance visitor safety. Award Construction Contract to Replace embankment OK Tulsa Keystone Lake, OK 282,000 guardrail, provides for public safety Award Construction Contract to Replace generator air OK Tulsa Keystone Lake, OK 350,000 coolers. Reduces future maintenance costs. Award Construction Contract to Replace ponding area OK Tulsa Keystone Lake, OK pump system at Cleveland levee, reduces risk of levee 650,000 failure Award Construction Contract to Replace tainter gate wire, OK Tulsa Keystone Lake, OK 270,000 reduces future maintenance costs Mcclellan-Kerr AE contract to conduct soil coring and geomorphologic Arkansas River OK Tulsa study. Supports preservation of Nations' significant 250,000 Navigation System, cultural resources. OK Mcclellan-Kerr Arkansas River AE contract to create real-time inundation mapping and OK Tulsa 162,000 Navigation System, economic damages program. Reduces risk to public. OK Mcclellan-Kerr Arkansas River Award Construction Contract to Install stainless steel OK Tulsa 2,500,000 Navigation System, piping. Reduces future maintenance costs. OK Mcclellan-Kerr Award Construction Contract to Overlay paving at Arkansas River OK Tulsa campsites and dump stations, upgrade electrical system 130,000 Navigation System, at Bluff Landing park. Reduces risk to park visitors. OK Mcclellan-Kerr Award Construction Contract to Paint tainter gate bridge Arkansas River OK Tulsa and operating equipment, reduces future maintenance 250,000 Navigation System, costs OK Mcclellan-Kerr Arkansas River Award Construction Contract to Rehab Chouteau L&D OK Tulsa 800,000 Navigation System, bridge. Reduces risk of failure. OK American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Mcclellan-Kerr Arkansas River Award Construction Contract to Repair spillway weirs and OK Tulsa 8,000,000 Navigation System, sill plates, reduces risk of failure OK Mcclellan-Kerr Award Construction Contract to Replace campsite paving Arkansas River OK Tulsa and electrical service at Afton Landing park. Reduces 125,000 Navigation System, risk to public. OK Mcclellan-Kerr Arkansas River Award Construction Contract to Replace guardrail, OK Tulsa 190,000 Navigation System, provides for public safety OK Mcclellan-Kerr Arkansas River Award Construction Contract to Replace tainter gate wire, OK Tulsa 300,000 Navigation System, reduces future maintenance costs OK AE contract to conduct flood pool sedimentation survey. OK Tulsa Oologah Lake, OK 100,000 Enhances reliability of water storage estimates. Award Construction Contract to Repair gantry crane. OK Tulsa Oologah Lake, OK 2,000,000 Reduces risk of failure and future maintenance costs. Award Construction Contract to Repair roads in various OK Tulsa Oologah Lake, OK 600,000 parks, to create safe public access to parks Award Construction Contract to Replace embankment OK Tulsa Oologah Lake, OK 242,000 guardrail, provides for public safety Award Construction Contract to Replace tainter gate wire, OK Tulsa Oologah Lake, OK 100,000 reduces future maintenance costs Close embankment road and demolish unsafe public use OK Tulsa Optima Lake, OK 225,000 areas AE contract to conduct flood pool sedimentation survey. OK Tulsa Pine Creek Lake, OK 100,000 Enhances reliability of water storage estimates. Award Construction Contract to Repair discharge conduit. OK Tulsa Pine Creek Lake, OK 200,000 Reduces risk of failure. Award Construction Contract to Repair service gates and OK Tulsa Pine Creek Lake, OK 1,200,000 liners, reduces risk of failure Robert S. Kerr Lock AE contract to conduct shoreline archeological survey. OK Tulsa and Dam and Supports preservation of Nations' significant cultural 150,000 Reservoir, OK resources. Robert S. Kerr Lock Award Construction Contract to Install automation OK Tulsa and Dam and equipment for centralized control. Increases efficiency of 200,000 Reservoir, OK system management. Award Construction Contract to Install waterborne shower/toilet at Short Mountain park, playgrounds at Robert S. Kerr Lock various parks, and gate attendant pad at Applegate park. OK Tulsa and Dam and 135,000 Work will bring facilities to current health and safety Reservoir, OK standards and meet American Disability Act requirements. Robert S. Kerr Lock Award Construction Contract to Rehab intake and draft OK Tulsa and Dam and 1,600,000 tube gates. Reduces risk of failure. Reservoir, OK American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Robert S. Kerr Lock Award Construction Contract to Repair erosion, reduces OK Tulsa and Dam and 700,000 future maintenance costs Reservoir, OK Robert S. Kerr Lock Award Construction Contract to Repair road to OK Tulsa and Dam and powerhouse to provide safer driving conditions for 100,000 Reservoir, OK employees Robert S. Kerr Lock Award Construction Contract to Replace dam guardrail, OK Tulsa and Dam and 141,000 provides for public safety Reservoir, OK Robert S. Kerr Lock Award Contract to Protect significant archeological site OK Tulsa and Dam and 100,000 with riprap #1 Reservoir, OK AE contract to conduct flood pool sedimentation survey. OK Tulsa Sardis Lake, OK 100,000 Enhances reliability of water storage estimates.

AE contract to create real-time inundation mapping and OK Tulsa Sardis Lake, OK 162,000 economic damages program. Reduces risk to public. AE contract to update forecast models, Water control OK Tulsa Sardis Lake, OK manuals, and operational programs. Reduces risk to 100,000 public. Award Construction Contract to Replace embankment OK Tulsa Sardis Lake, OK 974,000 guardrail, provides for public safety AE contract to investigate sloughing of outlet channel. OK Tulsa Skiatook Lake, OK 150,000 Reduces risk of failure. AE contract to conduct flood pool sedimentation survey. OK Tulsa Skiatook Lake, OK 100,000 Enhances reliability of water storage estimates. AE contract to create GIS platform for real estate OK Tulsa Skiatook Lake, OK acquisition and outgrant management. Reduces 100,000 encroachment and enforcement actions. AE contract to create real-time inundation mapping and OK Tulsa Skiatook Lake, OK 162,000 economic damages program. Reduces risk to public. AE contract to update forecast models, Water control OK Tulsa Skiatook Lake, OK manuals, and operational programs. Reduces risk to 100,000 public. Award Construction Contract to Repair dam OK Tulsa Skiatook Lake, OK 100,000 embankment, reduces risk of failure Award Construction Contract to Repair roads various OK Tulsa Skiatook Lake, OK 200,000 parks. Reduces risk to public. Award Construction Contract to Replace embankment OK Tulsa Skiatook Lake, OK 284,000 guardrail, provides for public safety Tenkiller Ferry Lake, AE contract to conduct flood pool sedimentation survey. OK Tulsa 100,000 OK Enhances reliability of water storage estimates. Award Construction Contract to Install CXT shower toilet Tenkiller Ferry Lake, at Strayhorn Park. Work will bring facilities to current OK Tulsa 125,000 OK health and safety standards and meet American Disability Act requirements. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award Construction Contract to Rehab Snake Creek Tenkiller Ferry Lake, North recreation area. Work will bring facilities to current OK Tulsa 425,000 OK health and safety standards and meet American Disability Act requirements. Award Construction Contract to Replace and repair sluice Tenkiller Ferry Lake, OK Tulsa gates, liners, and seals. Reduces future maintenance 2,500,000 OK costs. Award Construction Contract to Replace CMP and Tenkiller Ferry Lake, masonry vault toilets various locations. Work will bring OK Tulsa 150,000 OK facilities to current health and safety standards and meet American Disability Act requirements. Tenkiller Ferry Lake, Award Construction Contract to Replace embankment OK Tulsa 386,000 OK guardrail, provides for public safety Award Construction Contract to Replace shower toilet Tenkiller Ferry Lake, building at Cookson Bend Park. Work will bring facilities OK Tulsa 285,000 OK to current health and safety standards and meet American Disability Act requirements. Tenkiller Ferry Lake, Contract to replace flood damaged wood fencing and for OK Tulsa 1,050,000 OK road repairs. AE contract to conduct flood pool sedimentation survey. OK Tulsa Waurika Lake, OK 100,000 Enhances reliability of water storage estimates. Award Construction Contract to Replace embankment OK Tulsa Waurika Lake, OK 788,000 guardrail, provides for public safety Award Construction Contract to Dredge 530,000 cubic Webbers Falls Lock OK Tulsa yards for channel maintenance, returns channel to 1,560,000 and Dam, OK authorized depth Webbers Falls Lock Award Construction Contract to Rehab intake and draft OK Tulsa 4,000,000 and Dam, OK tube gantry cranes. Reduces future maintenance costs. Webbers Falls Lock Award Construction Contract to Repair roads various OK Tulsa 135,000 and Dam, OK parks. Reduces risk to public. Webbers Falls Lock Award Construction Contract to Replace dam guardrail, OK Tulsa 112,000 and Dam, OK provides for public safety Webbers Falls Lock Award Construction Contract to Replace generator circuit OK Tulsa 500,000 and Dam, OK breakers. Reduces future maintenance costs. Award Construction Contract to Replace main power Webbers Falls Lock OK Tulsa cables and electrical distribution equipment. Reduces 1,500,000 and Dam, OK future maintenance costs. Webbers Falls Lock Award Construction Contract to Replace tainter gate wire, OK Tulsa 200,000 and Dam, OK reduces future maintenance costs AE contract to conduct flood pool sedimentation survey. OK Tulsa Wister Lake, OK 100,000 Enhances reliability of water storage estimates. AE contract to create GIS platform for real estate OK Tulsa Wister Lake, OK acquisition and outgrant management. Reduces 100,000 encroachment and enforcement actions. AE contract to create real-time inundation mapping and OK Tulsa Wister Lake, OK economic damages program, update forecast models, 200,000 update operational programs. Reduces risk to public. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award Construction Contract to Conduct off-mound archeological site testing, update Wister National OK Tulsa Wister Lake, OK 300,000 Register district nomination. Supports preservation of Nations' significant cultural resources. Award Construction Contract to Construct new road OK Tulsa Wister Lake, OK 226,000 guardrails, provides for public safety Award Construction Contract to Protect significant OK Tulsa Wister Lake, OK archeological site with riprap, preserves cultural heritage 175,000 of the nation Award Construction Contract to Replace embankment OK Tulsa Wister Lake, OK 618,000 guardrail, provides for public safety Inspect and Clean Spillway Gate Trunnion Bearings, Conduct Spillway Structural Analysis, Conduct Spillway OR Portland Applegate Lake, OR 300,000 Strengthening Study, Upgrade Undersized Spillway so that the spillway meets current design criteria

Replace Deteriorated Spillway Gate Seals, Replace Wire OR Portland Applegate Lake, OR Ropes, Paint Spillway Gates & Replace Undersized Gear 475,000 Boxes, so that the spillway meets current standards.

Arc Flash Study/Implementation & Personal Protective Equipment (PPE). OSHA requirements for electrical OR Portland Blue River Lake, OR worker safety are being updated. This will allow us to 44,000 comply with the latest requirements. Additionally funds will be used to purchase personal protection

Purchase & install synthetic log boom. Log boom is needed to keep debris away from the spillway gates. If OR Portland Blue River Lake, OR operated without the boom, the debris could be washed 120,000 downstream and cause additional damage to property. The boom will be purchased from a Contractor Purchase Emergency Diesel generator. The existing diesel generator has reached the end of it's useful life. OR Portland Blue River Lake, OR 157,000 This is a critical component that ensures operation of the plant during flooding events. Rehab elevator. This work will include upgrading the drive and controls to modern equipment with current OR Portland Blue River Lake, OR 500,000 safety standards. This will be a design/build contract with an elevator equipment Contractor. Repair/Pave Dam Road - The parking area to the north of the dam and road across the dam are deteriorated. The OR Portland Blue River Lake, OR 300,000 saddle dam road will also be evaluated. This will repair that damage. This will be done using Contract forces. Replace Spillway Regulating Outlet Hydraulics, Valves & OR Portland Blue River Lake, OR Controls. This work will be performed by Contractor 250,000 forces. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Spillway Gate Structural Analysis. Required analysis of the gates is needed to ensure that the gates have not OR Portland Blue River Lake, OR 100,000 deteriorated and meet design requirements. This work will be performed by a Contract Engineering firm. Upgrade Security System & SCADA Communications. OR Portland Blue River Lake, OR This will upgrade the security system to provide better 280,000 level of security. Bonneville Lock And Alternate Energy development display at Bradford Island OR Portland 100,000 Dam, OR & WA Visitor Center P&S.

Bonneville Lock And Auditorium and Project Office Window and Gutter OR Portland 750,000 Dam, OR & WA Replacement. Bradford Island Sandblast Building Demolition and Site Restoration (design). Removal of this building will Bonneville Lock And OR Portland minimize exposure to a hazardous substance by 38,000 Dam, OR & WA procuring the services of several firms to accomplish its removal. Bonneville Lock And OR Portland Construct Strawberry Island Campgrounds P&S. 500,000 Dam, OR & WA

Bonneville Lock And Construct Washington Shore Fish Viewing Building Gable OR Portland 500,000 Dam, OR & WA Roof. Major Refurbishment of Fishway Diffuser Valve System (design). The comprehensive program will not only Bonneville Lock And OR Portland replace the valves but include a design bringing the 500,000 Dam, OR & WA valves above the water easing maintenance and providing a better life cycle project. Navlock Spare parts purchase. Operation of the navigation lock is critical for reliable river traffic. Spare Bonneville Lock And OR Portland parts such as motors, wedges, electrical components and 50,000 Dam, OR & WA mechanically operated gearing systems facilitate quick turnaround in the event of a part

Bonneville Lock And Navlock Upstream Crane Boom Full Analysis. Analysis OR Portland 110,000 Dam, OR & WA required to determine if a repair is required. Prepare contract documents for two new spillway hoists. Bonneville Lock And OR Portland New, taller hoists are required for operation of the 450,000 Dam, OR & WA spillway gates during fish passage season. Procure & Install Robins Island Playground Equipment. Bonneville Lock And OR Portland Bonneville Lock and Dam is showcase for fish habitat and 50,000 Dam, OR & WA Corps visitors to a hydropower project. Procure 2nd Project Boat. Work on the Behavior Guidance System requires a second safety boat; one Bonneville Lock And OR Portland safety boat for each side of the boat exclusion device. 75,000 Dam, OR & WA There are no other options once the Behavior Guidance System was installed. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Procure and Install 2nd Sewage Treatment Plant Transformer (eliminate oil filled transformers): Bonneville Lock And OR Portland Replacement of these transformers requires local 75,000 Dam, OR & WA procurement to meet transformer demand for power demands, safety and environmental reasons. Procure and install Bradford Island Service Building boat ramp and dock and procurement of a new safety boat to Bonneville Lock And OR Portland accommodate for the changing forebay conditions with 150,000 Dam, OR & WA the installation of the Behavioral Guidance System and the increasing need for rapid response Procure Boat House. Procurement of the boat house will enable local vendors to design, fabricate and construct Bonneville Lock And OR Portland this needed boat house increasing the life cycle of 50,000 Dam, OR & WA government property and improve safety to project personnel. Bonneville Lock And Recreation svcs for full season operation to maintain our OR Portland 450,000 Dam, OR & WA building, landscaping and janitorial services. Rehab domestic water systems. The transfer of water between state lines and the improvement to its domestic Bonneville Lock And OR Portland wells requires the completion of phase two for the 2,450,000 Dam, OR & WA installation and construction as detailed in the phase one design. Rehab Ft. Cascades Trail and Extension.The trail system has been neglected over the years due to funding cuts Bonneville Lock And OR Portland and requires rehabilitation bringing the trail system up to 500,000 Dam, OR & WA current standards. Also while under rehabilitation the trails should be extended Repair Navigation Lock Corner Armor prevent further Bonneville Lock And deterioration of guidewall. The fabrication and OR Portland 700,000 Dam, OR & WA replacement to protect the concrete from further damage will be done by local contractors. Replace Navigation Lock Control System P&S. This replacement will modernize the equipment, improve Bonneville Lock And OR Portland automated functionality and provides a simpler human to 50,000 Dam, OR & WA machine interface. This replacement, including the design and installation will be accomplished Replace Windows in Bradford Island Visitor Center. The window casings have over the years continued to Bonneville Lock And deteriorate, accelerating the damage to government OR Portland 150,000 Dam, OR & WA property, unsightly conditions and the presence of airborne mold resulting in a potentially unsafe environment Replace Wooden Fishway Bulkheads with hydraulic concrete steel structures (design). The replacement will Bonneville Lock And remove wooden members, replace with concrete OR Portland 50,000 Dam, OR & WA structures eliminating the requirement for periodic inspection, annual maintenance and allow workers safe access. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Spillway Gate Repair Pit Temporary Shoring and Clean- Bonneville Lock And OR Portland up. Temporary shoring and clean-up of the gate repair pit 1,050,000 Dam, OR & WA would allow continued maintenance of the spillway gates.

Clamshell Contract 8,000 CY. To remove shoaling from the entrance channel that is too large for a hopper dredge OR Portland Chetco River, OR 332,000 to remove. There is also a permanent US Coast Guard station at Chetco and it is a critical harbor of refuge. Columbia & Lwr Phase 1 Hydraulic Analysis & Major Maint Willamette R Blw OR Portland Recommendations Report. Conduct hydraulic analysis 400,000 Vancouver, WA & and report Portland, OR South Jetty Beneficial Use Study. This study is required to Columbia River At obtain environmental clearances for a near shore, open OR Portland The Mouth, OR & water dredged material beneficial use site. This site will 380,000 WA ensure that dredged material is kept within the littoral zone and sand is available Dredge channel entrance 120,000 CY. Additional dredging required to provide adequate depths for deep- OR Portland Coos Bay, OR draft vessels. There is a major US Coast Guard 430,000 command station at Coos Bay and it is a critical harbor of refuge. Dredge Charleston Clamshell CT 20,000 CY. To remove OR Portland Coos Bay, OR shoaling from the Charleston channel that is impossible 435,000 for a hopper dredge to remove. Dredge river miles 12-15. 600,000 CY. There are 3 deep- OR Portland Coos Bay, OR draft navigation terminals located in this reach of the 3,698,000 Coos Bay navigation project. North & South Jetties Evaluation Report. The work performed will be to collect current data on the condition OR Portland Coquille River, OR of the jetties both above water and below water to 130,000 determine maintenance needs and priorities for repair of the structures. Pile Dike Letter Report and Plans & Specs. The L-shaped pile dike groin has been in a state of failure for many OR Portland Coquille River, OR years and presents a hazard to navigation. A 250,000 determination has been made by Portland District coastal engineers that it would be better to rep Arc Flash Study/Implementation & PPE. OSHA requirements for electrical worker safety are being Cottage Grove Lake, OR Portland updated. This will allow us to comply with the latest 44,000 OR requirements. The study will identify electrical safety hazards and recommend appropriate safety hazard Recreation service contracts for full season operation. Current budget does not provide adequate funding to Cottage Grove Lake, OR Portland award contracts to provide services such as gate 187,000 OR attendant, security, sanitation for recreation areas. This funding will be used to award the con American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Repair Leaking Roof Recreation Changing House at Cottage Grove Lake, Wilson Ck. The roof has several leaks that have been OR Portland 25,000 OR patched over the years. This will include a tear-off and re- roof of the existing structure by Contract forces. Repair Roof/Flooring Project Office & Maintenance Shop. Cottage Grove Lake, The project office is an old house that needs some OR Portland 32,000 OR upgrades. The roof has leaks and the flooring is in poor condition. Repair/pave Recreation area roads. The road surfaces Cottage Grove Lake, throughout the park areas are deteriorated and have OR Portland 150,000 OR needed repair. This will be used to Contract for repaving design and installation. TMDL Temperature Modeling for CE-QUAL-W2. Computer modeling is needed to help in determining the Cottage Grove Lake, OR Portland water temperature requirements that assist in operation 125,000 OR of the dams and in meeting our requirements under the law. This work will be contracted to an engine Upgrade Security System & SCADA Communications. Cottage Grove Lake, OR Portland This will upgrade the security system to provide better 260,000 OR level of security. Arc Flash Study/Implementation & PPE. OSHA requirements for electrical worker safety are being OR Portland Cougar Lake, OR updated. This will allow us to comply with the latest 12,000 requirements. The study will identify electrical safety hazards and recommend appropriate safety hazard Purchase Emergency Diesel generator. The existing diesel generator has reached the end of it's useful life. OR Portland Cougar Lake, OR 150,000 This is a critical component that ensures operation of the plant during flooding events. Rehab Regulating Outlet Cylinders and Hydraulic System Hydraulic system has deteriorated with sticking valves OR Portland Cougar Lake, OR and sever stick-slip during operation. This could lead to 322,000 loss of control of the gates and the corresponding loss of the regulation of the out Spillway HSS Climbing Inspection & Structural Analysis CT on 2 spillway gates. Required inspection and analysis OR Portland Cougar Lake, OR 226,000 of the gates is needed to ensure that the gates have not deteriorated and meet design requirements.

Upgrade Security System & SCADA Communications. This will upgrade the security system to provide better OR Portland Cougar Lake, OR level of security. The SCADA system is used to 220,000 communicate with the remotely operated plants and additional capability is needed for redundancy Pipeline Maint DREDGING 15,000 CY. This 8-foot authorized project has a controlling depth of 5 feet. OR Portland Depoe Bay, OR 200,000 There is a permanent US Coast Guard station in Depoe Bay and it is a critical harbor of refuge. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Arc Flash Implementation & PPE. OSHA requirements OR Portland Detroit Lake, OR for electrical worker safety are being updated. This will 8,000 allow us to comply with the latest requirements. Purchase Emergency Diesel generator. The existing diesel generator has reached the end of it's useful life. OR Portland Detroit Lake, OR 150,000 This is a critical component that ensures operation of the plant during flooding events. Spillway Structural Analysis CT Detroit. Required OR Portland Detroit Lake, OR analysis of the gates is needed to ensure that the gates 99,000 have not deteriorated and meet design requirements. Arc Flash Study/Implementation & PPE. OSHA requirements for electrical worker safety are being OR Portland Dorena Lake, OR updated. This will allow us to comply with the latest 44,000 requirements. The study will identify electrical safety hazards and recommend appropriate safety hazard Pave Recreation area roads. Dorena is a high use recreation area. The campground and day use areas OR Portland Dorena Lake, OR 274,000 need pavement repair to ensure safe access and lessen maintenance. Purchase & Install New Synthetic Log Booms. The existing log boom is in very poor condition. A contract will OR Portland Dorena Lake, OR be awarded to purchase new synthetic boom that is better 120,000 able to keep debris and people away from the dam. Debris could be washed downstream OR Portland Dorena Lake, OR Recreation svcs contracts for full season operation. 137,000 Repair regulating outlet gates. Regulating outlet slide OR Portland Dorena Lake, OR gates have been damaged by use over the years and 193,000 need welding repairs completed on them. Roof repair - restrooms at Schwarz Park. The roof has several leaks that have been patched over the years. OR Portland Dorena Lake, OR 50,000 This will include a tear-off and re-roof of the existing structure by Contract forces. TMDL Temperature Modeling for CE-QUAL-W2. Computer modeling is needed to help in determining the OR Portland Dorena Lake, OR water temperature requirements that assist in operation 125,000 of the dams and in meeting our requirements under the law. Upgrade Security System & SCADA Communications. This will upgrade the security system to provide better OR Portland Dorena Lake, OR level of security. The SCADA system is used to 267,000 communicate with the remotely operated plants and additional capability is needed for redundancy Arc Flash Study/Implementation & PPE. OSHA requirements for electrical worker safety are being OR Portland Fall Creek Lake, OR updated. This will allow us to comply with the latest 44,000 requirements. The study will identify electrical safety hazards and recommend appropriate safety hazard American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Develop forest management plan. Wildlife plant and OR Portland Fall Creek Lake, OR invertebrate assessment and develop prescriptions that 20,000 will improve forest habitat for wildlife. Fish facility deferred maintenance. Many of the pumps OR Portland Fall Creek Lake, OR and valves and safety equipment used at this plant is in 100,000 poor condition or failed. This will restore the equipment. Invasive Weed Control-Oregon Dept Agriculture Weed Coop. Working with Oregon Dept of agriculture and OR Portland Fall Creek Lake, OR Watershed council to eradicate false broam and other 10,000 weeds in the watershed. This is a task order on an existing cooperative agreement. Purchase New Fish Transport Truck. The fish transport truck is over 30 years old and is dangerous to drive and OR Portland Fall Creek Lake, OR 90,000 operate. This will provide funding to purchase a new truck. Recreation svcs contracts for full season operation. Current budget does not provide adequate funding to OR Portland Fall Creek Lake, OR 20,000 award contracts to provide services such as gate attendant, security, sanitation for recreation areas. Rehab spillway trunnion bearing. The bearings that support the spillway gate had a non-functioning OR Portland Fall Creek Lake, OR lubrication system that limited grease getting to the 600,000 bearing surfaces. It is anticipated that the bearing surface is damaged due to this lack of lubrication Spillway Gate Climbing Inspections & Structural Analysis. Required inspection and analysis of the gates is needed OR Portland Fall Creek Lake, OR 280,000 to ensure that the gates have not deteriorated and meet design requirements. TMDL Temperature Modeling for CE-QUAL-W2. Computer modeling is needed to help in determining the OR Portland Fall Creek Lake, OR water temperature requirements that assist in operation 125,000 of the dams and in meeting our requirements under the law. Upgrade Security System & SCADA Communications. This will upgrade the security system to provide better OR Portland Fall Creek Lake, OR level of security. The SCADA system is used to 267,000 communicate with the remotely operated plants and additional capability is needed for redundancy Arc Flash Study/Implementation & PPE. OSHA requirements for electrical worker safety are being OR Portland Fern Ridge Lake, OR updated. This will allow us to comply with the latest 44,000 requirements. The study will identify electrical safety hazards and recommend appropriate safety hazard Perform backlog maintenance & operation of Recreation OR Portland Fern Ridge Lake, OR 86,000 sites for full season. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Remove Vegetation Long Tom. The Long Tom river has many areas that require advanced maintenance that is OR Portland Fern Ridge Lake, OR above the routine maintenance performed annually. 500,000 Many areas need to have vegetation removed or native vegetation restored. Spillway HSS Climbing Inspect & Structural Analysis CT on 6 gates. Required inspection and analysis of the OR Portland Fern Ridge Lake, OR 440,000 gates is needed to ensure that the gates have not deteriorated and meet design requirements. Threaten Endangered Species Plant Technician & Prairie Habitat Restoration. Competitive hire to assist in prairie restoration in conjunction with in-house forces. OR Portland Fern Ridge Lake, OR 55,000 AmeriCorps hire to assist in prairie restoration in conjunction with in-house forces. This is to implement the Biological Opinion for terrestrial plants. TMDL Temperature Modeling for CE-QUAL-W2. Computer modeling is needed to help in determining the OR Portland Fern Ridge Lake, OR water temperature requirements that assist in operation 125,000 of the dams and in meeting our requirements under the law. Upgrade Security System & SCADA Communications. This will upgrade the security system to provide better OR Portland Fern Ridge Lake, OR level of security. The SCADA system is used to 267,000 communicate with the remotely operated plants and additional capability is needed for redundancy Arc Flash Study/Implementation & PPE. OSHA requirements for electrical worker safety are being Green Peter - Foster OR Portland updated. This will allow us to comply with the latest 40,000 Lakes, OR requirements. The study will identify electrical safety hazards and recommend appropriate safety hazard Automate spillway gate controls. This funding will be Green Peter - Foster used to update and modernize the controls that operate OR Portland 126,000 Lakes, OR the spillway gates at Foster Dam. The existing equipment is old and parts are not available to repair. Purchase Emergency Diesel generator. The existing Green Peter - Foster diesel generator has reached the end of it's useful life. OR Portland 150,000 Lakes, OR This is a critical component that ensures operation of the plant during flooding events. Recreation management plan for Green Peter. A Green Peter - Foster OR Portland partnership to develop a comprehensive plan for 30,000 Lakes, OR recreation on the reservoir. Recreation svcs contracts for full season operation. Green Peter - Foster Current budget does not provide adequate funding to OR Portland 55,000 Lakes, OR award contracts to provide services such as gate attendant, security, sanitation for recreation areas. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Rehab Spillway Gear Boxes - Green Peter. The gearboxes that operate the spillway gates have Green Peter - Foster OR Portland deteriorated over the years due to sever weather and 222,000 Lakes, OR moisture entering the lubricating oil. This Contract will be to evaluate and repair damage to the gearboxes. Repair Spillway Gates 2, 3, & 4. Structural defects were found during inspections. Deformed members need to be Green Peter - Foster OR Portland replaced and the bearing that the gates operate upon 2,500,000 Lakes, OR need to be updated to lower friction during operation. This work will restore the gates Replace Diesel Day Tank - Foster. The existing diesel tank that supplies fuel for the emergency generator is an Green Peter - Foster OR Portland environmental risk and does not have adequate 75,000 Lakes, OR protective equipment to ensure that fuel does not leak into the waterway. This project will rep Arc Flash Study/Implementation & Personal Protective Equipment (PPE). OSHA requirements for electrical OR Portland Hills Creek Lake, OR worker safety are being updated. This will allow us to 36,000 comply with the latest requirements. The study will identify electrical safety hazards and rec Purchase Emergency Diesel generator. The existing diesel generator has reached the end of it's useful life. OR Portland Hills Creek Lake, OR 150,000 This is a critical component that ensures operation of the plant during flooding events. Rehab Spillway Gear Boxes. The gearboxes that operate the spillway gates have deteriorated over the years due to OR Portland Hills Creek Lake, OR sever weather and moisture entering the lubricating oil. 237,000 This Contract will be to evaluate and repair damage to the gearboxes. Replace spillway gate wire ropes. The wire ropes that OR Portland Hills Creek Lake, OR operate the spillway gates have deteriorated and need to 432,000 be replaced. Construct New Lepage Campground (RV campground) Waterborne Restroom and Showerhouse. Existing John Day Lock And OR Portland restroom facility is a vault toilet. This line item will 300,000 Dam, OR & WA upgrade the restroom facility to a waterborne facility with sewer capabilities. Construct Phillipi Park Boat Dock Gangways (2). Phillipi Park is accessible by boat only. The success of the park John Day Lock And OR Portland depends on safe operations of the park. The existing 50,000 Dam, OR & WA gangways are in poor condition and must be replaced in order to meet safety standards Hatchery Roof Repair. The roof on the office building at Bonneville Hatchery leaks. Garbage cans are placed John Day Lock And OR Portland throughout the facility to prevent water from harming the 9,000 Dam, OR & WA floors and office equipment. Designs are complete for repair of the roof. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Lepage Day Use Restroom and Showerhouse Rehab. John Day Lock And This restroom facility is in poor condition. This line item OR Portland 100,000 Dam, OR & WA will provide for rehabilitation of the facility to include the American with Disabilities Act requirements. NavLock DS gate rehab. The spillway gates at John Day Dam are not designed to meet all required load cases. John Day Lock And Recent spillway gate failures around the Corps have OR Portland 16,000,000 Dam, OR & WA illustrated the need to strengthen spillway gates at most facilities.

Purchase Frontend Skid Loader & Backhoe. This John Day Lock And purchase will allow us to perform work in all areas OR Portland 175,000 Dam, OR & WA associated with project operations to include: parks, natural resource areas, project administration areas, etc.

Purchase Parts to Rebuild fishwater south turbine pumps. John Day Lock And These turbines provide attraction water for endangered OR Portland 363,000 Dam, OR & WA fish. These turbines have been in service for almost forty years and are in need of refurbishment.

Purchase Work/Safety Boats. This line item will allow for the purchase of two boats that are absolutely needed in John Day Lock And OR Portland the operations of the John Day Lock and Dam Project. 160,000 Dam, OR & WA Existing boats are unable to be operated by project staff due to their size and existing condition Repair/Pave roads at Recreation sites. Existing recreation roads are in poor condition as rated in John Day Lock And OR Portland RecBest. These roads are becoming unsafe for the 1,700,000 Dam, OR & WA public to use. This line item will allow for the proper and safe maintenance of Corps managed public roads Spillway Trunnion Bearing Lube System. Existing lubing John Day Lock And is performed manually. This lube system would provide OR Portland 120,000 Dam, OR & WA automatic trunion bearing lubing and reduce maintenance costs significantly. Spring Creek NFH Flat bed truck with boom. The flatbed truck and boom are needed to move equipment among John Day Lock And OR Portland ponds and to effetely crowd fish into the spawning 80,000 Dam, OR & WA building. The existing flatbed truck and boom are old, unreliable, and require frequent annual main

Spring Creek NFH Water Alarm System upgrades. Funds to install a new alarm system that would include John Day Lock And OR Portland more reliable alarm switches, continuous dissolved 21,000 Dam, OR & WA oxygen readings, flow rates, and ammonia levels, including additional water flow alarm points in the inlet American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Staffing Increase (term positions) 2 Aden's Park Rangers & 3 Park Maintenance staff for full season operations. John Day Lock And OR Portland Current staffing levels are at 50% of program needs. 250,000 Dam, OR & WA These positions would allow the Corps to interface with the public Vacuum Truck and Motorized Surface Containment Removal Purchase. Required for safe operations of John Day Lock And OR Portland project road ways. This purchase will ensure the safety 140,000 Dam, OR & WA of project personnel and park visitors. there are no existing snow plow equipment for the John D Vehicle Wash Facility Purchase. This purchase will allow us to meet environmental regulations concerning proper John Day Lock And OR Portland containment and disposal of wastes associated with the 30,000 Dam, OR & WA washing of project vehicles. This also will help maintenance personnel better service

Arc Flash PPE (clothing rental and training) - Lookout Point. OSHA requirements for electrical worker safety Lookout Point Lake, OR Portland are being updated. This will allow us to comply with the 10,000 OR latest requirements. Funds will be used to purchase personal protective equipment for employees Dock Replacement at Meridian Park. The existing boat Lookout Point Lake, OR Portland dock is deteriorate and unsafe. A new dock will be 25,000 OR purchased under contract. Recreation svcs contracts for full season operation. Lookout Point Lake, Current budget does not provide adequate funding to OR Portland 60,000 OR award contracts to provide services such as gate attendant, security, sanitation for recreation areas. Rehab Spillway Gear Boxes. The gearboxes that operate the spillway gates have deteriorated over the years due to Lookout Point Lake, OR Portland sever weather and moisture entering the lubricating oil. 333,000 OR This Contract will be to evaluate and repair damage to the gearboxes. Spillway Structural Analysis CT on 12 gates. Required Lookout Point Lake, OR Portland analysis of the gates is needed to ensure that the gates 151,000 OR have not deteriorated and meet design requirements. Willamette Hatchery Dexter Ponds Pipeline repair LOP. The water supply line from Dexter reservoir to the Lookout Point Lake, hatchery has severely deteriorated. Holding Pond OR Portland 32,000 OR Improvement. The holding pond needs to be repaired to improve environmental conditions for ESA listed species to reduce mortality. Willamette Hatchery- New Backhoe and New Flatbed Lookout Point Lake, Truck and tank. This equipment will replace existing OR Portland 159,000 OR equipment that is in poor condition and needs to be replaced. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Perform O&M Backlog Maintenance & Operation of Recreation site for full season: Repair 30 miles of Hiking OR Portland Lost Creek Lake, OR Trails, Fully Fund Grounds Maintenance & Janitorial 208,000 Contracts, Replace Deteriorated Irrigation Systems, Install Takelma Boat Ramp Retaining Wall Perform O&M Backlog of Recreation Sites for Full Season: Replace Deteriorated Trail Bridge & Install Hand OR Portland Lost Creek Lake, OR Rails on 30 trail bridges, Replace rotting deck on visitor 282,000 center observation deck , Replace Playground that does not meet safety standards,etc Replace Failing river sedge Park Sewage Leachfield so OR Portland Lost Creek Lake, OR 100,000 that restroom sewage treatment meets or DEQ standards Derrick Cranes repairs. Fund the contractor performance McNary Lock And of crane structural and control repairs and upgrades OR Walla Walla 1,300,000 Dam, OR & WA necessary to permit two cranes to perform assigned mission support. Miscellaneous Areas Park Amenities Upgrades. Procure new park amenities to include picnic tables, barbeque McNary Lock And OR Walla Walla grills, trash can holders, fire pits, etc. and use temporary 400,000 Dam, OR & WA labor to install at parks to improve park condition and promote visitation and usage. Scan and Store Real Estate Documents for GIS database development (Jnt Exp). Fund consultant scanning of McNary Lock And OR Walla Walla historical and current real estate documents and 50,000 Dam, OR & WA drawings so they can be protected from deterioration and the information incorporated into new drawings

Spillway Gates Rehabilitation (Jnt exp). Fund contractor McNary Lock And OR Walla Walla maintenance, repair and painting of spillway gates to 2,300,000 Dam, OR & WA ensure continued operation and prolong life. Breakwater Major Maintenance Report to determine minimum effective repairs for this fishing community. Breakwater Engineering Evaluation and Analysis Report and P&S for repairs to the Existing Structure. The work OR Portland Port Orford, OR performed will be to collect current data on the condition 120,000 of the breakwater both above water and below water, determine maintenance needs and priorities for repair of the structure, and develop contract plans and specifications for repairs. Breakwater Major Maintenance Report to determine minimum effective repairs for this fishing community. North & South Jetties Evaluation Report. The work Rogue River At Gold OR Portland performed will be to collect data on the condition of the 120,000 Beach, OR jetties both above water and below water to determine maintenance needs and priorities for repair of the structures. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Dredge Turning Basin 100,000 CY. This authorized turning basin has not been maintained in 15-plus years. OR Portland Siuslaw River, OR The permanent US Coast Guard station and the Port of 1,462,000 Siuslaw have requested this turning basin to facilitate Coast Guard rescue operations Major maintenance report North and South Jetties; significant damage has occurred due to deferred OR Portland Siuslaw River, OR maintenance of this infrastructure. Analysis required to 350,000 determine extent of repairs needed and minimum repair requirements Ocean Disposal Site Evaluation. The existing ocean disposal site is covered under Section 103 authority, OR Portland Siuslaw River, OR which will expire at the end of 2009. This evaluation is 145,000 required for continued use of the ocean disposal site for dredged material. Dredge Garibaldi boat basin 40,000 CY. This is a 12- foot authorized project which currently has a controlling Tillamook Bay & Bar, OR Portland depth of 4 feet. There is a large commercial fishing fleet 697,000 OR located at Garibaldi, and a permanent US Coast Guard station. North Jetty repair. Purchase & place Jetty stone. North Jetty head failing with degrading into the core material. If not repaired, expect significant lose of jetty length. This Tillamook Bay & Bar, will create more hazardous entrance conditions for OR Portland 12,600,000 OR commercial and rec users. If not repaired, significant loss of jetty length is expected, creating more hazardous entrance conditions for commercial and recreational users. Dredge Winchester Bay boat basin 15,000 CY. This navigation channel has historically been maintained every OR Portland Umpqua River, OR 659,000 year. It is home to a large commercial and recreational fishing fleet, and a permanent US Coast Guard station. Complete HSS Inspections and Repair Deficiencies. The lock miter gates are one of the most critical elements of Willamette River At OR Portland lock operation and lock integrity. A hydraulic steel 1,800,000 Willamette Falls, OR structures evaluation of the lock gates is required for continued reliable and safe opera Revetment repair contract at most critical sites. Many of Willamette River the Corps bank protection projects are in poor condition. OR Portland 250,000 Bank Protection, OR This would employ contractors to perform needed maintenance. Dredge Port of Toledo 55,000 CY. This is a 10-foot authorized project with a controlling depth of 3 feet. OR Portland Yaquina River, OR Commercial and recreational use. This project has not 640,000 been dredged in a number of years due to lack of Federal funds. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Allegheny river Correct Valve Interlock Problems. Correct safety issue that could result in filling and emptying valves PA Pittsburgh Allegheny River, PA 100,000 being opened at the same time resulting in dangerous river flow conditions thru the lock chamber. Allegheny river Replace Water Control Equipment. Award PA Pittsburgh Allegheny River, PA contract to replace water level gage equipment used to 240,000 predict flooding reducing risk to the public. CW Bill Young Lock Rehabilitate and Replace PA Pittsburgh Allegheny River, PA Downstream Gates & Repair Machinery. Complete work 650,000 and reduce risk of miter gate failure Dredging. Award and complete contract to maintain authorized 9 foot navigation pool. Failure to fund will PA Pittsburgh Allegheny River, PA 400,000 hinder or stop navigation, increasing costs. No dredging has been performed on the Allegheny for many years. Lock 5 dam scour repairs. Award and complete contract PA Pittsburgh Allegheny River, PA to repair fixed crest navigation dam, reduces risk of 2,000,000 failure. Lock 5 Maintenance Building Structural Repairs. Award and complete contract to make structural repairs to PA Pittsburgh Allegheny River, PA 300,000 prevent total collapse of building and reduce risk to public and employees. Lock 6 & Lock 7 Purchase & Install Elec. Hydraulic PA Pittsburgh Allegheny River, PA Pumps. Award contract to purchase new equipment to 120,000 eliminate use of unreliable 80 year old equipment. Lock 6 Dam Scour Repairs. Award and complete contract PA Pittsburgh Allegheny River, PA to repair fixed crest navigation dam, reduces risk of 2,500,000 failure. Lock 6 Replace Emergency Generator. Award contract to PA Pittsburgh Allegheny River, PA 60,000 replace inoperable generator. Lock 7 Replace Emergency Generator & New Electrical Unit Heaters. Award and complete contract to replace PA Pittsburgh Allegheny River, PA inoperable generator and unsafe oil fired heaters 144,000 reducing risk of complete shut down of the facility and unsafe operating conditions for the employee Replace Emergency Generator. Current equip is obsolete PA Pittsburgh Allegheny River, PA and undersized. Increase energy efficiency and reduce 100,000 unscheduled lock closures. Re-roof landwall building and garage at Lock and Dam 4 PA Pittsburgh Allegheny River, PA & Lock and Dam 5. Award and complete contract reduce 225,000 risk of total loss of building use. Award a contract to rehab the flood control gate for water PA Philadelphia Beltzville Lake, PA regulation and protection of downstream communities. 523,000 on this 4200 ft long dam and reservoir project

Award a contract to replace small boat, Motor, trailer and PA Philadelphia Beltzville Lake, PA two slope mowers used to maintain project grounds and 65,000 facilities on this 4200 ft long dam and reservoir project American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award a contract to repair the flood control and water quality gates for water regulation and protection of PA Philadelphia Blue Marsh Lake, PA 306,000 downstream communities on this 1700 ft long dam and reservoir project Award a contract to replace the hydraulic seals on the service gates for water regulation and protection of PA Philadelphia Blue Marsh Lake, PA 63,000 downstream communities on this 1700 ft long dam and reservoir project Award contract for concrete repairs to stilling basin PA Philadelphia Blue Marsh Lake, PA 325,000 feature. Award and complete contract to provide enhanced Conemaugh River PA Pittsburgh cleaning, grounds keeping and maintenance services for 43,000 Lake, PA recreation areas. Conemaugh River Hire 1 temporary Summer Park Ranger for water and PA Pittsburgh 17,000 Lake, PA public safety patrols. Hire One Seasonal 10-Month Park Ranger to develop Conemaugh River partnerships/programming in reducing public water- PA Pittsburgh 50,000 Lake, PA related fatalities. Ranger will support Conemaugh and Loyalhanna Lakes. Replace Log/Trash Boom. Award and complete contract to replace the floating boom upstream of the dam, Conemaugh River PA Pittsburgh prevents logs and debris from lodging under and 150,000 Lake, PA damaging flood control gates and reduces the risk of uncontrolled water flow thru the dam. Reroof Dam Site Recreation Area Restroom and Upgrade Conemaugh River PA Pittsburgh Pavilion Electric Service, award and complete contract, 50,000 Lake, PA reduces future maintenance costs. Services for increased shoreline management, Conemaugh River threatened/endangered species surveillance, cultural PA Pittsburgh 25,000 Lake, PA resource protection/preservation, invasive species eradication, and protection of natural resources. E&D for repair of vertical cracks in right downstream spillway wall. This repair will assure the project will Cowanesque Lake, PA Baltimore continue to be operated to meet the flood risk 100,000 PA management mission Cowenesque and Tioga river basins. Pave Knoll Camping Loop to include stripping and leveling of camping pads and roadways and Tompkins Cowanesque Lake, PA Baltimore Boat Launch to include stripping to widen parking and 130,000 PA take care of deteriorating asphalt along the launching lanes and approach. This will make the area safe Reclamation mowing to meet the requirements of the Cowanesque Mitigation Plan, control of invasive species Cowanesque Lake, PA Baltimore & move mitigation properties from "degraded" to 30,000 PA "improved" under the Environmental Stewardship mission of the project. Award and complete contract to provide enhanced Crooked Creek Lake, PA Pittsburgh cleaning, grounds keeping and maintenance services for 78,000 PA recreation areas. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Control Tower Repairs (Heating System, Grating, Covers, Crooked Creek Lake, PA Pittsburgh Concrete). Award and complete contract and improve 100,000 PA conditions and safety for employees. Hire 2 temporary Summer Park Rangers for water and Crooked Creek Lake, PA Pittsburgh public safety patrols. Will reduce public water related 33,000 PA fatalities and accidents. Hire One Seasonal 10-Month Park Ranger to develop Crooked Creek Lake, partnerships/programming in reducing public water- PA Pittsburgh 50,000 PA related fatalities. Ranger will support Crooked Creek and Mahoning Lakes. Services for increased shoreline management, Crooked Creek Lake, threatened/endangered species surveillance, cultural PA Pittsburgh 15,000 PA resource protection/preservation, invasive species eradication, and protection of natural resources. Perform Preventive Maintenance on relief well system. There are 34 relief wells located along the downstream Curwensville Lake, PA Baltimore toe of Curwensville Dam whose function is to relieve 235,000 PA hydrostatic pressures within dam, assuring the project will continue to operate in a safe ma Reconstruct Seepage Collection System The reconstruction of the seepage collection system at Curwensville Lake, PA Baltimore Curwensville Dam will facilitate inspection by geotechnical 170,000 PA engineers to assure the project continues to operate in a safe manner. Award a contract to dredge the Duck Island range of the Delaware River, project. (150,000 CY). Approximately 7,000 vessels PA Philadelphia Philadelphia, PA To 1,555,000 transit this deep draft navigation Trenton, NJ project. Award a contract to dredge the Upper reach (750,000 Delaware River, CY). Approximately 7,000 vessels transit this deep draft PA Philadelphia Philadelphia, PA To navigation project carry close to 8.5 million tons of various 4,136,000 Trenton, NJ commodities such as steel, petroleum, chemicals and coal. Several major chemical com Award and complete contract to provide enhanced East Branch Clarion PA Pittsburgh cleaning, grounds keeping and maintenance services for 69,000 River Lake, PA recreation areas. Hire 1 temporary Summer Park Ranger for water and East Branch Clarion PA Pittsburgh public safety patrols. Will reduce public water related 17,000 River Lake, PA fatalities and accidents. Hire One Seasonal 10-Month Park Ranger to develop East Branch Clarion partnerships/programming in reducing public water- PA Pittsburgh 50,000 River Lake, PA related fatalities. Ranger will support East Branch, Kinzua, Woodcock/Union City Lakes. Replace Boat Launch Dock System. Award and complete East Branch Clarion PA Pittsburgh contract, reduce risk to boating public and improve water 60,000 River Lake, PA safety. Services for increased shoreline management, East Branch Clarion threatened/endangered species surveillance, cultural PA Pittsburgh 2,000 River Lake, PA resource protection/preservation, invasive species eradication, and protection of natural resources. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Remove debris from stilling basin which has been Foster Joseph PA Baltimore impeding releases through the outlet works. This will 55,000 Sayers Dam, PA allow the project to continue to operate as designed. Replace mower which is utilized to maintain the dam Foster Joseph PA Baltimore embankment and Howard levee. This will result in 41,000 Sayers Dam, PA reduced annual maintenance costs. Award a contract to repair miscellaneous concrete spalling and cracks and maintenance repairs throughout Francis E Walter PA Philadelphia the facility (i.e., paint bridge handrail, replace damaged 358,000 Dam, PA intake tower door, etc.,). on this 3000 ft long dam and reservoir project Award a contract to upgrade the access road to the Francis E Walter PA Philadelphia Steam Gaging station which has severely eroded on this 259,000 Dam, PA 3000 ft long dam and reservoir project Award a contract to upgrade the access road to the Francis E Walter stilling basin, which has severely eroded and has become PA Philadelphia 259,000 Dam, PA extremely steep, on this 3000 ft long dam and reservoir project Seal Concrete Joints in Intake Tower which controls the Francis E Walter PA Philadelphia lake levels of this 3000 ft long dam and reservoir project 342,000 Dam, PA basin. Upgrade Electric Service to Intake Tower which controls Francis E Walter PA Philadelphia the lake levels of this 3000 ft long dam and reservoir 46,000 Dam, PA project General Edgar Award a contract to repair miscellaneous concrete PA Philadelphia Jadwin Dam and spalling and cracks on Outlet Structure and surrounding 320,000 Reservoir, PA facility on this 1200 ft long dam and reservoir project General Edgar Replace Failed Concrete Spalling and Cracks on Ogee PA Philadelphia Jadwin Dam and 423,000 Weir feature of this 1200 ft long dam and reservoir project Reservoir, PA Kinzua Dam and Award and complete contract to provide enhanced PA Pittsburgh Allegheny Reservoir, cleaning, grounds keeping and maintenance services for 105,000 PA recreation areas. Kinzua Dam and Dam Service Road Security Gate Improvements. Award PA Pittsburgh Allegheny Reservoir, and complete contract to improve security at this critical 50,000 PA structure. Kinzua Dam and Hire 1 temporary Summer Park Ranger for water and PA Pittsburgh Allegheny Reservoir, public safety patrols. Will reduce public water related 17,000 PA fatalities and accidents. Replace Maintenance Building Roof and Gutters. Award Kinzua Dam and and complete contract to replace roof and prevent total PA Pittsburgh Allegheny Reservoir, 75,000 loss of use of building and equipment and reduce future PA maintenance costs. Kinzua Dam and Replace Waterline to Bent Run Restroom. Facilities are PA Pittsburgh Allegheny Reservoir, not useable due to waterline condition these repairs will 78,000 PA make facility available for public use. Services for increased shoreline management, Kinzua Dam and threatened/endangered species surveillance, cultural PA Pittsburgh Allegheny Reservoir, 6,000 resource protection/preservation, invasive species PA eradication, and protection of natural resources. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award and complete contract to provide enhanced PA Pittsburgh Loyalhanna Lake, PA cleaning, grounds keeping and maintenance services for 46,000 recreation areas. Hire 1 temporary Summer Park Ranger for water and PA Pittsburgh Loyalhanna Lake, PA public safety patrols. Will reduce public water related 17,000 fatalities and accidents. Services for increased shoreline management, threatened/endangered species surveillance, cultural PA Pittsburgh Loyalhanna Lake, PA 60,000 resource protection/preservation, invasive species eradication, and protection of natural resources. Award and complete contract to provide enhanced Mahoning Creek PA Pittsburgh cleaning, grounds keeping and maintenance services for 23,000 Lake, PA recreation areas. As part of overall maintenance at Mahoning Creek Lake, Mahoning Creek replace unsafe Playground Equipment. Award and PA Pittsburgh 30,000 Lake, PA complete contract and reduce injury risk to children and users. Dam Concrete Repairs Awardable Options. Award and Mahoning Creek PA Pittsburgh complete contract for critical concrete repairs, improves 2,700,000 Lake, PA dam reliability and reduces future maintenance costs. Hire 1 temporary Summer Park Ranger for water and Mahoning Creek PA Pittsburgh public safety patrols. Will reduce public water related 17,000 Lake, PA fatalities and accidents. Replace Access Road Chain Link Guard Rail. Award and Mahoning Creek PA Pittsburgh complete contract and improve road safety for traveling 100,000 Lake, PA public and employees. Replace Furnace and Re-Roof Resource Manager's Mahoning Creek Office. Award and complete contract to replace roof and PA Pittsburgh 150,000 Lake, PA furnace and prevent total loss of use of building and equipment and reduce future maintenance costs. Services for increased shoreline management, Mahoning Creek threatened/endangered species surveillance, cultural PA Pittsburgh 32,000 Lake, PA resource protection/preservation, invasive species eradication, and protection of natural resources. Dredging. Award and complete contract for critical minimum dredging to maintain authorized 9 foot Monongahela River, PA Pittsburgh navigation pool. Failure to fund will hinder or stop 1,000,000 PA navigation, increasing costs. Grounding of commercial vessels is expected potentially causing property Hildebrand Monitor Dam Pier Alignment and Settlement. Monongahela River, Award and complete contract to monitor movement and PA Pittsburgh 50,000 PA stability of the structure and reduce the risk of complete failure. Lock 4 & Opekiska Trunnion Anchorage Testing. Award Monongahela River, PA Pittsburgh and complete contract to test anchors which secure the 100,000 PA gates to the dam and reduce the risk of complete failure. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Monongahela river Correct Valve Interlock Problems. Monongahela River, Correct safety issue that could result in filling and PA Pittsburgh 100,000 PA emptying valves being opened at the same time resulting in dangerous river flow conditions thru the lock chamber. Monongahela river Replace Water Control Equipment. Monongahela River, PA Pittsburgh Award contract to replace water level gage equipment 250,000 PA used to predict flooding reducing risk to the public. Point Marion Replace Observation Deck Coating. Award Monongahela River, and complete contract to replace roof and prevent total PA Pittsburgh 212,000 PA loss of use of building and equipment and reduce future maintenance costs. Purchase Workboat for Braddock Lock and Dam. Award Monongahela River, PA Pittsburgh contract to purchase equipment, replace antiquated 460,000 PA equipment and improve employee and public safety. Re-roof Operations Buildings and Garage at Braddock, Pt. Marion and Hildebrand Locks. Award and complete Monongahela River, PA Pittsburgh contract to replace roofs and prevent total loss of use of 330,000 PA buildings and equipment and reduce future maintenance costs. Security Upgrades at Morgantown, Hildebrand and Opekiska Locks. Award and complete contract for Monongahela River, PA Pittsburgh upgrades, these locks are not manned 24/7 and are 100,000 PA located in remote areas. This will reduce the risk of vandalism and stolen equipment. Upgrade Remote Operation of 6 Navigation Dams. Award Monongahela River, PA Pittsburgh and complete contract to improve operations, reduces 317,000 PA risk to employees. Hannibal and Dashields Replace Work Boats. Award Ohio River Locks and PA Pittsburgh contract to purchase equipment, replace antiquated 899,000 Dams, PA, OH & WV equipment and improve employee and public safety. Montgomery Investigate Upstream Out draft Problem. Ohio River Locks and Award and complete contract to investigate river flow PA Pittsburgh 850,000 Dams, PA, OH & WV conditions upstream of Montgomery to reduce risk to commercial and recreation boaters. Ohio river Replace Water Control Equipment. Award Ohio River Locks and PA Pittsburgh contract to replace water level gage equipment used to 230,000 Dams, PA, OH & WV predict flooding reducing risk to the public. Pike Island Fabricate DS Miter Gates. Award and Ohio River Locks and complete contract for new miter gates, reduce the risk of PA Pittsburgh 5,315,000 Dams, PA, OH & WV miter gate failure and loss of navigation thru the primary lock chamber. Pike Island Replace Emergency Standby Generator. Ohio River Locks and Award and complete contract to replace unreliable PA Pittsburgh 546,000 Dams, PA, OH & WV equipment and reduce risk of loss of navigation during commercial power outage. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Reroof shelters, pier buildings and garages at Hannibal, Pike Island, New Cumberland & Montgomery. Award and Ohio River Locks and PA Pittsburgh complete contract to replace roofs and prevent total loss 450,000 Dams, PA, OH & WV of use of buildings and equipment and reduce future maintenance costs. Award a contract to repair miscellaneous concrete spalling and cracks on Outlet Structure and surrounding PA Philadelphia Prompton Lake, PA facility features of this 1200 ft long dam and reservoir 290,000 project which has prevented over $12 million in flood damages in the Lackawaxen river basin.

Conduct aerial infrared surveys to determine deer densities which support deer harvest allocations. Conduct PA Baltimore Raystown Lake, PA 100,000 forage vegetation study to evaluate the success of the deer harvest program in achieving quality habitat.

Conduct Endangered Species Bat Surveys at 45 PA Baltimore Raystown Lake, PA 100,000 locations as part of the EA process for timber harvesting.

Funding would be utilized for service contracts and hiring PA Baltimore Raystown Lake, PA of seasonal employees to assure the customary 359,000 recreational experience to 100% of the visiting public.

Funds will be used to paint and repair the tainter gates at the project. Recent inspections have shown deterioration PA Baltimore Raystown Lake, PA of the gates, including rusting and pitting, and performing 1,000,000 these repairs will prevent continued deterioration and assure the gates will operate Provide critical forage development including food Plots, PA Baltimore Raystown Lake, PA plantings and nutrients to increase habitat quality and 115,000 sustainability. Repair secondary roads and drainage systems to provide PA Baltimore Raystown Lake, PA safe access for timber harvesting, access for wildlife 150,000 management equipment and access for fire fighting. Replace approximately 11,000 linear feet of failing main water piping in the projects potable water distribution PA Baltimore Raystown Lake, PA system. This will include the replacement of all valves, 200,000 trench adapters, Valve boxes and the addition of water meters at camp ground entrance Replace deteriorated steel doors, door frames and door hardware in 17 different facility buildings, each door shall PA Baltimore Raystown Lake, PA 125,000 be brought up to current federal, state and local fire safety standards and American Disability Act standards. Shoreline erosion repair to protect developed lakeshore recreation facilities. Shoreline has been eroding from PA Baltimore Raystown Lake, PA wave action, resulting in increased sedimentation in the 150,000 lake and, if it continues, possible safety issues to the visiting public. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) To provide services for inventory and mapping in the PA Baltimore Raystown Lake, PA 230,000 development of a Cultural Resources Mgmt. Plan. Treatment of invasive species and Hemlock Woolly Adelgid treatments to improve native vegetation recovery. PA Baltimore Raystown Lake, PA 200,000 This will protect the forested land within the project from these invasive species. Universal access rehabilitation on recreation facilities to include restrooms, campsites, parking spaces and curb PA Baltimore Raystown Lake, PA 400,000 cuts and power assist access doors. This will bring these facilities in compliance with American Disability Act. Upgrade approximately 90 campsites in Seven Points Camping areas from 30 amp electrical services to 50 PA Baltimore Raystown Lake, PA amp electrical services. This upgrade will include the 250,000 replacement of 13,000 linear feet of the existing direct burial aluminum wire with stranded copper wire Water treatment plant, which services the Seven Points Recreation Area will be upgraded to increase its capacity. PA Baltimore Raystown Lake, PA Since the existing plant was constructed, the recreation 800,000 facilities have been expanded and upgraded to include more water-borne comfort state Award and complete contract to provide enhanced Shenango River PA Pittsburgh cleaning, grounds keeping and maintenance services for 389,000 Lake, PA recreation areas. Shenango River Hire 1 temporary Summer Park Ranger to collect PA Pittsburgh 49,000 Lake, PA campground fees. Hire 3 temporary Summer Park Rangers for water and Shenango River PA Pittsburgh public safety patrols. Will reduce public water related 50,000 Lake, PA fatalities and accidents. Hire One Seasonal 10-Month Park Ranger to develop Shenango River PA Pittsburgh partnerships/programming in reducing public water- 50,000 Lake, PA related fatalities. Service Gate Position Indicators and Outflow Warning Shenango River System. Award and complete contract for upgrades, PA Pittsburgh 500,000 Lake, PA improve reliability of flood gate operations and reduce risk to public fishing downstream of the dam. Services for increased shoreline management, Shenango River threatened/endangered species surveillance, cultural PA Pittsburgh 20,000 Lake, PA resource protection/preservation, invasive species eradication, and protection of natural resources. Concrete existing parking lot, pave new boat ramp access road, and stripe parking spaces, access lanes Tioga - Hammond PA Baltimore and turn around areas and pave newly repaired and 675,000 Lakes, PA upgraded campsites in Beech and Birch Camping Loops of the Ives Run Recreation Area. Funding would be utilized for service contracts and hiring Tioga - Hammond PA Baltimore of seasonal employees to assure the customary 150,000 Lakes, PA recreational experience to 100% of the visiting public. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Re-Caulk joints and repaint station numbers in the Corey Tioga - Hammond Creek Conduit. This is an integral feature of the PA Baltimore 186,000 Lakes, PA Mansfield Protective Works, and these repairs will assure future capability of the project during high water events. Remove sediment from Mansfield Protective Levee Tioga - Hammond System, to assure the project continues to meet the flood PA Baltimore 100,000 Lakes, PA risk management mission, as designed and required under Operations and Maintenance Manual. Award and complete contract to provide enhanced PA Pittsburgh Tionesta Lake, PA cleaning, grounds keeping and maintenance services for 322,000 recreation areas. Control Tower Replace Damaged Exterior Insulation and PA Pittsburgh Tionesta Lake, PA Coating. Award and complete contract to protect building 100,000 from additional water damage. Hire 3 temporary Summer Park Rangers for water and PA Pittsburgh Tionesta Lake, PA public safety patrols. Will reduce public water related 50,000 fatalities and accidents. Hire One Seasonal 10-Month Park Ranger to develop PA Pittsburgh Tionesta Lake, PA partnerships/programming in reducing public water- 50,000 related fatalities. Services for increased shoreline management, threatened/endangered species surveillance, cultural PA Pittsburgh Tionesta Lake, PA 15,000 resource protection/preservation, invasive species eradication, and protection of natural resources. Award and complete contract to provide enhanced PA Pittsburgh Union City Lake, PA cleaning, grounds keeping and maintenance services for 7,000 recreation areas. Services for increased shoreline management, threatened/endangered species surveillance, cultural PA Pittsburgh Union City Lake, PA 5,000 resource protection/preservation, invasive species eradication, and protection of natural resources. Award and complete contract to provide enhanced Woodcock Creek PA Pittsburgh cleaning, grounds keeping and maintenance services for 74,000 Lake, PA recreation areas. Hire 1 temporary Summer Park Ranger for water and Woodcock Creek PA Pittsburgh public safety patrols. Will reduce public water related 17,000 Lake, PA fatalities and accidents. Services for increased shoreline management, Woodcock Creek threatened/endangered species surveillance, cultural PA Pittsburgh 15,000 Lake, PA resource protection/preservation, invasive species eradication, and protection of natural resources. York Indian Rock Remove trees from the York levee to become compliant PA Baltimore 76,000 Dam, PA with the new Army Corps of Engineer levee safety criteria. Replace roof and fencing within the maintenance York Indian Rock PA Baltimore compound which has deteriorated, and will result in lower 25,000 Dam, PA annual operation and maintenance costs. Sediment removal from within the York local flood York Indian Rock PA Baltimore protection project which will permit the project to continue 75,000 Dam, PA to operate within the design parameters. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award and complete contract to provide enhanced Youghiogheny River PA Pittsburgh cleaning, grounds keeping and maintenance services for 357,000 Lake, PA and Md recreation areas. Hire 3 temporary Summer Park Rangers for water and Youghiogheny River PA Pittsburgh public safety patrols. Will reduce public water related 50,000 Lake, PA and Md fatalities and accidents. Hire One Seasonal 10-Month Park Ranger to develop Youghiogheny River PA Pittsburgh partnerships/programming in reducing public water- 50,000 Lake, PA and Md related fatalities. Services for increased shoreline management, Youghiogheny River threatened/endangered species surveillance, cultural PA Pittsburgh 45,000 Lake, PA and Md resource protection/preservation, invasive species eradication, and protection of natural resources. Funding for Arecibo Harbor will allow the required site management plan for the ocean disposal site to be PR Jacksonville Arecibo Harbor, PR 100,000 initiated which is critical to planning for future maintenance of the harbor. Fox Point Barrier - Issue contract to complete required repairs to pump RI New England Narrangansett Bay, number 5 and building repairs needed to return project to 4,000,000 RI operational status. Issue contract to complete deficiency repairs – extensive vegetation removal along dikes and adjacent to floodwall; RI New England Woonsocket, RI 3,700,000 replace gate cables and painting of Woonsocket falls dam; MSC and administration priority. Dredge Little river to Port Royal (1,025,000 CY) and minimal dike maintenance at selected disposal areas. Atlantic Intracoastal SC Charleston Dredging will return channel to authorized depth of 12 ft. 4,000,000 Waterway, SC in critical areas so vessels can traverse the entire length of the waterway rather than be Dredge lower harbor channels (1,300,000 CY) to full project depth. Dredging will return channel to authorized Charleston Harbor, SC Charleston depth of 45 ft to support the movement of vessels in and 6,000,000 SC out of the container port . This will be accomplished with contract work. Cooper River, Bank stabilization. Lack of bank stabilization is resulting in SC Charleston Charleston Harbor, eroded areas encroaching and jeopardizing access road 1,200,000 SC and effecting structural integrity of bridge abutments.

Cooper River, Intake gate repairs. Without repairs our ability to unwater SC Charleston Charleston Harbor, the powerhouse unit would hamper any maintenance 200,000 SC actions and increase the cost of maintenance. Cooper River, Powerhouse roof replacement. Replacement will protect SC Charleston Charleston Harbor, sensitive electrical equipment, and improve energy 260,000 SC efficiency and climate control. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Replacement of excitation system. An upgrade to a Cooper River, modern solid state excitation system is needed because SC Charleston Charleston Harbor, current system in the powerhouse is over 20 years old 1,250,000 SC and replacement parts and technical support are becoming unavailable. An upgrade to a modern so Interpretive Services - Design, construction and , Lake SD Omaha purchase interpretive panels, displays, signs, trails, mini- 100,000 Sharpe, SD boats and other interpretation materials Big Bend Dam, Lake Acquisition of LIDAR data - Topographic mapping will be SD Omaha 100,000 Sharpe, SD obtained for areas surrounding the dam Big Bend Powerplant Exciter Alignment - to ensure Big Bend Dam, Lake operational system for transmitting electrical power to the SD Omaha 96,000 Sharpe, SD customer thus Hydroelectric plant is able to continue to produce electrical power. Boundary Survey - Surveys, Monumentation, boundary Big Bend Dam, Lake SD Omaha marking, fencing and other requirements will be 100,000 Sharpe, SD completed Big Bend Dam, Lake Campground Lighting - Upgrade and install appropriate SD Omaha 145,000 Sharpe, SD campground lighting at the Left Tailrace Campground Big Bend Dam, Lake Connect Lower Brule Waterline to Project Lands - SD Omaha 153,000 Sharpe, SD Ensures potable water to employees and public. Crestroad Lighting - Replaces defective lighting system to Big Bend Dam, Lake ensure lighting for security of Dam and associated SD Omaha 175,000 Sharpe, SD structures thus ensuring the safety of the dam and downstream residents. Cultural Site Protection - Little Elk DeGray - Protect a Big Bend Dam, Lake SD Omaha National Register eligible site from erosion and other 250,000 Sharpe, SD adverse impacts Cultural Site Protection - North Iron Nation - Protect a Big Bend Dam, Lake SD Omaha National Register eligible site from erosion and other 250,000 Sharpe, SD adverse impacts Cultural Site Protection - Bowman East/West - Protect a Big Bend Dam, Lake SD Omaha National Register eligible site from erosion and other 500,000 Sharpe, SD adverse impacts FY09 Replace Backhoe - Replaces key dam safety Big Bend Dam, Lake SD Omaha piece of equipment that requires high level of 98,000 Sharpe, SD maintenance to remain serviceable. Level I and II Natural Resources Inventories - Complete Big Bend Dam, Lake report(s) to determine plant, animal, soil and land use SD Omaha 400,000 Sharpe, SD composition and types. Implement recommendations when feasible. Prairie Restoration Project - Complete project(s) that Big Bend Dam, Lake SD Omaha promote understanding of and protect native 50,000 Sharpe, SD grasses/prairie Replace Powerplant Annunciation System - to ensure Big Bend Dam, Lake SD Omaha Hydroelectric plant is able to continue to produce 150,000 Sharpe, SD electrical power. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Sandblast and Paint Spillway Stoplogs - to ensure Big Bend Dam, Lake emergency stoplogs remain operational so repairs on SD Omaha 300,000 Sharpe, SD generators can be performed in Hydroelectric plant so it is able to continue to produce electrical power. Construct Emergency Access Road at Cold Brook Dam - SD Omaha Cold Brook Lake, SD Will allow access to dam during dam safety emergencies 127,000 to increase safety of dam and residents below. Level I and II Natural Resources Inventories - Complete report(s) to determine plant, animal, soil and land use SD Omaha Cold Brook Lake, SD 50,000 composition and types. Implement recommendations when feasible. Cottonwood Springs Hydrographic Surveys - Determines available capacity to SD Omaha 58,000 Lake, SD store flood waters to protect downstream residents. Install Piezometers - Install new instruments in the Cottonwood Springs SD Omaha embankment of the dam to ensure that the safety of the 60,000 Lake, SD dam is maintained. Level I and II Natural Resources Inventories - Complete Cottonwood Springs report(s) to determine plant, animal, soil and land use SD Omaha 50,000 Lake, SD composition and types. Implement recommendations when feasible. Purchase and Install New Seismic Instruments to monitor the area for the magnitude of earthquake activity at the dam to allow assessment of potential impacts to the dam Cottonwood Springs SD Omaha and foundation. - Done by Engineering firm to ensure 25,000 Lake, SD dam safety instruments are installed and operating satisfactory thus increasing the safety of the dam and downstream residents.

Cottonwood Springs Rebuild defective subpavement and install new asphalt SD Omaha 600,000 Lake, SD pavement to ensure the safety of the public is maintained Cottonwood Springs Tree Thinning of Project Lands - Remove undesirable SD Omaha 70,000 Lake, SD tree species , Install Emergency Blackstart Station Service Generator - SD Omaha , to ensure operational system for restarting Hydroelectric 180,000 SD plant so it is able to continue to produce electrical power. Fort Randall Dam, Interpretive Services - Design, construction and SD Omaha Lake Francis Case, purchase interpretive panels, displays, signs, trails, mini- 100,000 SD boats and other interpretation materials Fort Randall Dam, Acquisition of LIDAR data - Topographic mapping will be SD Omaha Lake Francis Case, 100,000 obtained for areas surrounding the dam SD Clean Deicing Nozzles at Intake and Spillway - Prevents Fort Randall Dam, freezing of water against structures that would cause SD Omaha Lake Francis Case, damage to Spillway and Intake structure for cold-weather 160,000 SD operability, thus ensuring safety of the dam and downstream residents. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Fort Randall Dam, Dam Safety-Clean and rehab Radial Drains of the SD Omaha Lake Francis Case, Penstock Tunnels - to ensure operability of pressure 100,000 SD relief system to avoid dam safety problems Dam Safety-Inspect and Evaluate Retaining Wall Toe Fort Randall Dam, Drain - Done by Engineering firm a camera inspection SD Omaha Lake Francis Case, company to ensure drains are operating correctly to 20,000 SD maintain the safety of the dam and downstream residents. Install and Automate Intake Gate Hoist Control - to Fort Randall Dam, ensure water intake gates remain operational in SD Omaha Lake Francis Case, 173,000 Hydroelectric plant so it is able to continue to produce SD electrical power. Level I and II Natural Resources Inventories - Complete Fort Randall Dam, report(s) to determine plant, animal, soil and land use SD Omaha Lake Francis Case, 400,000 composition and types. Implement recommendations SD when feasible. Fort Randall Dam, Prairie Restoration Project - Complete project(s) that SD Omaha Lake Francis Case, promote understanding of and protect native 50,000 SD grasses/prairie Prepare and Paint Corroded Penstocks - repairs to Fort Randall Dam, ensure water penstocks remain operational and extend SD Omaha Lake Francis Case, 413,000 service life. Thus, the Hydroelectric plant is able to SD continue to produce electrical power. Fort Randall Dam, Purchase Frames for Intake Vents to ensure water SD Omaha Lake Francis Case, intake remains operational in Hydroelectric plant so it is 60,000 SD able to continue to produce electrical power. Purchase New Protective Relays - to ensure operational Fort Randall Dam, system for transmitting electrical power to the customer SD Omaha Lake Francis Case, 320,000 thus Hydroelectric plant is able to continue to produce SD electrical power. Repair Surge Tank Trusses & Add Walk Way - to ensure Fort Randall Dam, structural safety of roof trusses, and safety of personnel SD Omaha Lake Francis Case, 350,000 working on the surge tanks for the Hydroelectric plant so SD it is able to continue to produce electrical power. Fort Randall Dam, Replace Failing Powerhouse Heat Pumps - to ensure SD Omaha Lake Francis Case, Hydroelectric plant is able to continue to produce 500,000 SD electrical power. Replace Failing Station Service & Depressing Air Fort Randall Dam, Compressors - to ensure compressors that supply air to SD Omaha Lake Francis Case, 250,000 the generators remain operational in Hydroelectric plant SD so it is able to continue to produce electrical power. Fort Randall Dam, Replace Spillway Gate Brake Thrusters - to maintain SD Omaha Lake Francis Case, gate operability for potential water releases in a dam 210,000 SD safety emergency Switchyard Transformer High Press Relief - to ensure Fort Randall Dam, operational system for transmitting electrical power to the SD Omaha Lake Francis Case, 170,000 customer thus Hydroelectric plant is able to continue to SD produce electrical power. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) , Acquisition of LIDAR data - Topographic mapping will be SD Omaha Lewis And Clark 100,000 obtained for areas surrounding the dam Lake, NE & SD Gavins Point Dam, Boundary Survey - Surveys, Monumentation, boundary SD Omaha Lewis And Clark marking, fencing and other requirements will be 500,000 Lake, NE & SD completed Gavins Point Dam, Downstream Access Road Slope Repair - Ensures steep SD Omaha Lewis And Clark 65,000 slope is stabilized, for public safety. Lake, NE & SD Gavins Point Dam, Environmental Compliance Corrective Actions - Complete SD Omaha Lewis And Clark 50,000 identified corrective actions and required training Lake, NE & SD Gavins Point Dam, Interpretive Services - Design, construction and purchase SD Omaha Lewis And Clark interpretive panels, displays, signs, trails, mini-boats and 200,000 Lake, NE & SD other interpretation materials Level I and II Natural Resources Inventories - Complete Gavins Point Dam, report(s) to determine plant, animal, soil and land use SD Omaha Lewis And Clark 410,000 composition and types. Implement recommendations Lake, NE & SD when feasible. Modernize generator and transformer protective relaying - Gavins Point Dam, to ensure operational system for transmitting electrical SD Omaha Lewis And Clark 300,000 power to the customer thus Hydroelectric plant is able to Lake, NE & SD continue to produce electrical power. Modify Four Relief Well Channel Flumes - Modifies dam Gavins Point Dam, safety instruments so they operate satisfactory thus SD Omaha Lewis And Clark 40,000 increasing the safety of the dam and downstream Lake, NE & SD residents. Gavins Point Dam, Prairie Restoration Project - Complete project(s) that SD Omaha Lewis And Clark promote understanding of and protect native 50,000 Lake, NE & SD grasses/prairie Gavins Point Dam, Rehab / Powerplant Pl Bridge Crane - to ensure crane SD Omaha Lewis And Clark for generators remains operational in Hydroelectric plant 400,000 Lake, NE & SD so it is able to continue to produce electrical power. Gavins Point Dam, Rehab Powerplant Elevator - Repairs to ensure elevator SD Omaha Lewis And Clark 300,000 remains operational in Hydroelectric plant. Lake, NE & SD Gavins Point Dam, Rehab Roads in Training Dike Recreation Area - Rebuild SD Omaha Lewis And Clark defective subpavement and install new asphalt pavement 406,000 Lake, NE & SD to ensure the safety of the public is maintained

Gavins Point Dam, Rehabilitate Intake Gates - Extends operability and SD Omaha Lewis And Clark service life of gates, and continued safety and reliability 1,500,000 Lake, NE & SD for water releases through the Hydroelectric plant. Re-Inventory - Cedar, Knox Counties, NE - Complete Gavins Point Dam, fieldwork and report documenting CR sites on Corps SD Omaha Lewis And Clark 180,000 lands in Cedar and Knox Counties, SD. Required by the Lake, NE & SD National Historic Preservation Act American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Re-Inventory-Yankton, Bon Home Counties (Non-Title Gavins Point Dam, VI) - Complete fieldwork and report documenting CR sites SD Omaha Lewis And Clark 105,000 on Corps lands in Yankton and Bon Homme Counties, Lake, NE & SD SD. Required by the National Historic Preservation Act Relief Well Rehabilitation and Maintenance - Gavins Point Dam, Engineering/Drilling firm will be used to ensure dam SD Omaha Lewis And Clark safety instruments are operating satisfactory thus 80,000 Lake, NE & SD maintaining the safety of the dam and downstream residents. Gavins Point Dam, Replace Fire Detection Systems to ensure fires are SD Omaha Lewis And Clark detected in Hydroelectric plant for safety, and to continue 130,000 Lake, NE & SD to produce electrical power. Gavins Point Dam, Settle Real Estate claim - Complete Niobrara Reach SD Omaha Lewis And Clark Engineering Study and other requirements to facilitate 390,000 Lake, NE & SD claim settlement Cultural Stabilization - Morreau river - Protect a National , Lake SD Omaha Register eligible site from erosion and other adverse 550,000 Oahe, SD & ND impacts Oahe Dam, Lake Cultural Stabilization - Protect a National Register eligible SD Omaha 500,000 Oahe, SD & ND site from erosion and other adverse impacts Boundary Survey - Surveys, Monumentation, boundary Oahe Dam, Lake SD Omaha marking, fencing and other requirements will be 500,000 Oahe, SD & ND completed Dam Safety - right Abutment Drain - Install drain to Oahe Dam, Lake ensure dam safety drains relieve pressure in the dam are SD Omaha 80,000 Oahe, SD & ND operating satisfactory thus increasing the safety of the dam and downstream residents. Emergency Spillway - Downstream - Remove siltation so Oahe Dam, Lake Spillway has enough capacity to pass flood water during SD Omaha 1,700,000 Oahe, SD & ND dam safety emergency thus increasing the safety of the dam and downstream residents.

Oahe Dam, Lake Environmental Compliance Corrective Actions - Complete SD Omaha 50,000 Oahe, SD & ND identified corrective actions and required training Level I and II Natural Resources Inventories - Complete Oahe Dam, Lake report(s) to determine plant, animal, soil and land use SD Omaha 400,000 Oahe, SD & ND composition and types. Implement recommendations when feasible. Oahe - Instrument testing, maintenance and repair - Oahe Dam, Lake Done by Engineering/Drilling firm to ensure dam safety SD Omaha 100,000 Oahe, SD & ND instruments are operating satisfactory thus maintaining the safety of the dam and downstream residents. Oahe Dam, Lake Replace 2 Tractors - Tractors are 20+ years old and SD Omaha 140,000 Oahe, SD & ND require increasing maintenance Re-Survey of Multiple Counties - Complete fieldwork and Oahe Dam, Lake report documenting CR sites on Corps lands in Multiple SD Omaha 500,000 Oahe, SD & ND Counties surrounding , SD. Required by the National Historic Preservation Act American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Oahe Dam, Lake Spot Paint Gantry Cranes - Rehabilitates cranes used for SD Omaha 100,000 Oahe, SD & ND maintenance operations on generators. Center Hill is a multipurpose project located near Lancaster, TN. This project provides hydropower, flood TN Nashville Center Hill Lake, TN control and recreation. Economic stimulus funds will be 5,720,000 utilized for multiple contracts to reduce backlog of infrastructure maintenance. Cheatham Lock and Dam is a multipurpose project located near Ashland City, TN. This project provides Cheatham Lock and TN Nashville navigation, hydropower and recreation. Economic 4,700,000 Dam, TN stimulus funds will be utilized for multiple contracts to reduce backlog of infrastructure maintenance. Designing an emergency closure for upper miter gate sill; updating finite element analysis; replacing old service Chickamauga Lock, TN Nashville pumps and piping; purchasing long lead items and forged 1,440,000 Tennessee River, TN material for downstream landwall gate anchorage and post tensioning of upper guard wall Funds will be utilized for multiple contracts to reduce backlog of infrastructure maintenance. Work will be a Cordell Hull Dam and TN Nashville combination of supply and construction type contracts to 5,530,000 Reservoir, TN replace failing components in the lock, dam and power plant. Funds will be utilized for multiple contracts to reduce backlog of infrastructure maintenance. Work will be a Dale Hollow Lake, TN Nashville combination of supply and construction type contracts to 3,900,000 TN replace failing components in the dam and power plant. This will reduce future maintenance Funds will be utilized for multiple contracts to reduce backlog of infrastructure maintenance. Work will be a J Percy Priest Dam TN Nashville combination of supply and construction type contracts to 5,000,000 and Reservoir, TN replace failing components in the dam and power plant. This will reduce future maintenance Northwest Contract dredge the harbor channel at northwest Tennessee Regional tennessee harbor, to to maintain the authorized depth TN Memphis 1,000,000 Harbor, Lake County, and harbor limits to ensure year round access to barge TN transportation. Funds will be utilized for multiple contracts to reduce backlog of infrastructure maintenance. Work will be a Old Hickory Lock and TN Nashville combination of supply and construction type contracts to 2,700,000 Dam, TN replace failing components in the lock, dam and power plant. This will reduce future maintenance

Funds will be utilized for multiple contracts to accomplish backlog of infrastructure maintenance, reducing TN Nashville Tennessee River, TN unscheduled lock outages and maintaining safe 20,297,000 navigation channels. Work items such as protective coatings of metals will also reduce future maintenance American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Contract dredge the harbor channel, approximately 296,000 cu yds to restore/maintain the authorized depth Wolf River Harbor, TN Memphis (9 feet) and harbor limits to ensure year round access to 653,000 TN a coast guard facility and barge transportation. Loss of project depth would have significant impacts Award Construction Contract to Repair Park Roads and TX Fort Worth Aquilla Lake, TX Replace Restrooms to Insure Health and Safety of the 320,000 Public Arkansas - Red River Award Construction Contract to Construct boundary fence Basins Chloride TX Tulsa to reduce improper entry by unauthorized people and 400,000 Control - Area Viii, cattle. TX Arkansas - Red River Basins Chloride Award Construction Contract to Install fiber optics for TX Tulsa 1,950,000 Control - Area Viii, Area VIII control system to reduce the risk of failure. TX Arkansas - Red River Award Construction Contract to Install fiberglass surge Basins Chloride TX Tulsa tanks, PVC membrane, rock in outlet ditch, and repair 200,000 Control - Area Viii, roads to reduce future maintenance costs. TX Arkansas - Red River Basins Chloride Award Construction Contract to Rehab Truscott project TX Tulsa 775,000 Control - Area Viii, office to reduce future maintenance cost. TX Arkansas - Red River Award Construction Contract to Repair overlook and Basins Chloride TX Tulsa maintenance buildings to reduce future maintenance 100,000 Control - Area Viii, costs TX Arkansas - Red River Basins Chloride Award Construction Contract to Repair pump equipment TX Tulsa 378,000 Control - Area Viii, to reduce the risk of failure. TX Arkansas - Red River Basins Chloride Award Construction Contract to Replace embankment TX Tulsa 780,000 Control - Area Viii, guardrail to provide public safety TX Arkansas - Red River Basins Chloride Award Construction Contract to Replace project heavy TX Tulsa 720,000 Control - Area Viii, equipment to reduce future maintenance costs TX Award Construction Contract to Complete Repair of Critical Embankment Slides and Flatten Slope to Prevent TX Fort Worth Bardwell Lake, TX Future Slides. Repair Flood Gates, Guides and Liners, 4,007,000 Paint Service Bridge. FY 09 Funds Were Insufficient to Repair All Slides. Award Construction Contract to Upgrade TX Fort Worth Bardwell Lake, TX Electrical/Mechanical Flood Control Gate Controllers 134,000 Insuring Reliability to Protect Life American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award Construction Contract to Complete Cultural TX Fort Worth Belton Lake, TX Resources Inventory to Protect Valuable Cultural 480,000 Resources Award Construction Contract to Modernize Parks by Realigning and Paving Roads, Upgrading Utility Systems, TX Fort Worth Belton Lake, TX Realigning Campsites, Constructing Screen Shelters, and 1,131,000 Upgrading Restrooms to Insure Health and Safety of Public. Award Construction Contract to Repair and Replace Damaged rip rap on Upstream Embankment and Replace TX Fort Worth Belton Lake, TX 5,000,000 Malfunctioning Flood Gate Seals to Insure Structural Integrity and Operability to Protect the Public.

Award Construction Contract to Resurvey, Re-establish TX Fort Worth Belton Lake, TX and Mark Government Boundary Lines to Prevent 325,000 Encroachment of Government Natural Resources

Award Construction Contract to Modernize Camping/Day- use Facilities in Cranes Mill Park by Realigning and TX Fort Worth Canyon Lake, TX Paving Roads, Upgrading Utility Systems, Realigning 3,120,000 Campsites, Constructing Screen Shelters, and Upgrading Restrooms to Insure Health and Safety of Public Award Construction Contract to Repair Unreliable Gate Operating Equipment Inside Flood Control Structure and TX Fort Worth Canyon Lake, TX 450,000 Repaint Outlet Works Service Bridge Insuring Protection to Downstream Public Award Construction Contract to Award remaining Option Corpus Christi Ship to ongoing contract to remove remaining mooring TX Galveston 3,371,000 Channel, TX structures. Reduces risk to public, environment, and commercial/recreational navigation. Award Construction Contract to increase capacity of Corpus Christi Ship TX Galveston dredged material placement area to reduce future 2,000,000 Channel, TX maintenance costs. Award Construction Contract to Modernize Parks by Ferrells Bridge Dam, Realigning and Paving Roads, Upgrading Utility Systems, TX Fort Worth Lake O' The Pines, Realigning Campsites, Constructing Screen Shelters, and 3,449,000 TX Upgrading Restrooms to Insure Health and Safety of Public. Award Construction Contract to Replace Damaged Ferrells Bridge Dam, Guardrail on Dam, Pave and Stripe Road on Top of Dam, TX Fort Worth Lake O' The Pines, Repair and Pave Service Road, and Replace the 2,263,000 TX Inadequate Project Boat Storage Building Which Will Improve Health and Safety of the Public Award Construction Contract to Replace or Repair Ferrells Bridge Dam, Embankment Piezometers, Expand Seepage Collector TX Fort Worth Lake O' The Pines, System, and Extend riprap Erosion Protection Along Bank 1,170,000 TX of the Discharge Channel Providing improved Protection to Public American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award Architect-Engineer contract to complete Dredged Galveston Harbor Material Management Plan for Galveston Ship Channel. TX Galveston 500,000 and Channel, TX Provides a more efficient, least costly, environmentally acceptable disposal plan Award Construction Contract to dredge Inner Harbor to Galveston Harbor authorized 40 ft project depth and width. Returns TX Galveston 3,646,000 and Channel, TX channel to authorized depth and reduces future maintenance costs. Award Construction Contract to Repair Benching and Granger Dam and TX Fort Worth Severe Erosion on Upstream Embankment Insuring 5,000,000 Lake, TX Structural Integrity and Public Safety Award Contract to Plug 55 Abandoned Wells, Herbicide Granger Dam and Treatment of Invasive Species, Clearing and Fence TX Fort Worth 930,000 Lake, TX Boundary Lines, And Pave Roads to Protect Natural Resources. Award Construction Contract to Resurvey, Re-establish and Mark Government Boundary Lines, Fence Boundary TX Fort Worth Grapevine Lake, TX 755,000 Line, and Perform Habitat Restoration to Protect Natural Resources and Prevent Encroachments Award construction contract to rehabilitate dredged Gulf Intracoastal material placement area levees on the reach of the TX Galveston 30,000,000 Waterway, TX GIWW from High Island to Brazos river. Reduces future maintenance costs. Award Construction Contract to repair of mooring buoys Gulf Intracoastal TX Galveston at all 14 mooring basins. Improves navigation safety for 5,000,000 Waterway, TX commercial navigation. Award construction contract to fence government Hords Creek Lake, TX Fort Worth boundary line and enhance protection of Natural 374,000 TX Resource wetland areas Award construction contract to resurface road on dam Hords Creek Lake, TX Fort Worth allowing reliable access to outlet works and protection to 209,000 TX downstream area to reduce future maintenance costs. Award AE contract to complete feasibility study for Houston Ship assumption of maintenance on Jacintoport Channel and TX Galveston 600,000 Channel, TX expanded portion of Bayport Channel to reduce future maintenance costs. Award construction contract to rehabilitate Spilman, Lost Houston Ship TX Galveston Lake, and Peggy Lake Placement Areas. Reduces future 36,100,000 Channel, TX maintenance costs. Comprehensive Evaluation of Project Datums. Backlog Inspection of Infrastructure Maintenance - This effort is needed to meet TX Albuquerque Completed Works, requirements of Executive Order that calls for the 680,000 TX standardization of the use of the most current vertical datum (North America Vertical Datum 88). American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award Construction Contract to Repair and Pave Road Jim Chapman Lake, on Top of Dam, Repair and Resurface Stilling Basin TX Fort Worth 1,223,000 TX Road, and Pave Parking Lots Insuring Dam Structural Integrity and Protection to Downstream Areas Award Construction Contract to Repair Ditches on Downstream Side of Dam, Install New Piezometers, Jim Chapman Lake, TX Fort Worth Repair Embankment Erosion, and Place riprap to Prevent 1,242,000 TX Future Erosion Thus Insuring Structural Integrity of Dam and Protection to Downstream Areas Award Construction Contract to Complete Repair of Critical Embankment Slides and Flatten Slopes to TX Fort Worth Joe Pool Lake, TX Prevent Future Slides Insuring Protection of Downstream 2,000,000 Public. FY 09 Funds Were Insufficient to Repair All Slides. Award construction contract to complete trail around lake TX Fort Worth Joe Pool Lake, TX and replace buoys in marked boat channel to Insure 141,000 public safety Award Construction Contract to Repair Erosion at Lavonia Park, Replace Malfunctioning Sewage Plant With TX Fort Worth Lavon Lake, TX Aeration Type System, and Clear, Survey and Fence Fee 1,750,000 Boundary Line to Insure Health and Safety and Protect Natural Resources Award construction contract for new East Jetty and Mouth Of The channel realignment to reduce dredging frequency, TX Galveston 21,000,000 Colorado River, TX reduce channel maintenance costs, and improve navigation safety. Award Construction Contract to Replace Deteriorated Navarro Mills Lake, riprap, Replace Electrical Service to Structure, Repair TX Fort Worth 7,500,000 TX Discharge Channel and Security Fence to Insuring Reliable Operation to Protect Downstream Public Award Construction Contract for Construction to North San Gabriel Modernize Parks by Realigning and Paving Roads, TX Fort Worth Dam and Lake Upgrading Utility Systems, Realigning Campsites, 1,675,000 Georgetown, TX Constructing Screen Shelters, and Upgrading Restrooms to Insure Health and Safety of Public. North San Gabriel Award Construction Contract to Repair and Paint Service TX Fort Worth Dam and Lake Bridge and Install Emergency Generator Insuring Gate 550,000 Georgetown, TX Operability to Protect Downstream Public Award Construction Contract to Complete Repair of Malfunctioning Tainter Gate Hoists and Operating TX Fort Worth Proctor Lake, TX 3,000,000 Equipment Thus Reducing risk of Gate Failures and Increasing Protection to Downstream Public. Award Construction Contract to Modernize Parks by Realigning and Paving Roads, Upgrading Utility Systems, TX Fort Worth Proctor Lake, TX Realigning Campsites, Constructing Screen Shelters, 1,952,000 Entrance Complex, and Upgrading Restrooms to Insure Health and Safety of Public. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award Construction Contract to Repair Embankment Slide Adjacent to Outlet Structure, Benched riprap on the TX Fort Worth Proctor Lake, TX Dam’s Abutment, and Repair Discharge Channel to 2,918,000 Insure Structural Integrity and Protection to Downstream Public Award Construction Contract to Replace Electrical Distribution System at Project Office, OSHA Required TX Fort Worth Proctor Lake, TX Permanent Fall Protection System on Tainter Gates, 1,200,000 Install Piezometers Insuring Structural Integrity and Protection to Public. Award Construction Contract to Replace Outlet Works Ray Roberts Lake, Butterfly Gates And Replace Damaged Piezometers TX Fort Worth 300,000 TX Reducing risk of Gate Failures and Increasing Protection to Downstream Public Award Construction Contract to Survey and Replace Ray Roberts Lake, Government Boundary Line Monuments and Fence TX Fort Worth 500,000 TX Government Property Line to Prevent Encroachments and Protect Valuable Natural Resources Sabine - Neches Award construction contract to rehabilitate Placement TX Galveston 18,700,000 Waterway, TX Areas (PA) 8 and 11. Reduces future maintenance costs. Contract to supplement on-going work to remove shoaling in the Sabine-Neches Waterway; repair Sabine Sabine - Neches TX Galveston Jetties where cover stone has been dislodged and/or 9,000,000 Waterway, TX shifted into channel posing threat to navigation; repair dredge placement area 8 at Port Arthur Canal Award Construction Contract to Complete Rehab of Non- functioning Powerhouse Bridge Crane and Replace Sam Rayburn Dam TX Fort Worth Malfunctioning Controls. Unable to use for Major 3,400,000 and Reservoir, TX Maintenance of Generating Units. Reduces future maintenance costs. Award Construction Contract to Protect Valuable Natural and Cultural Resources by Conducting Timber Inventory Sam Rayburn Dam TX Fort Worth on 6,000 Acres of Forest Management Lands, Repair of 772,000 and Reservoir, TX 15 Miles of Natural Resources Access Road, Clear and Mark 106 Miles of Natural Resource Boundaries Award Construction Contract to Repair and Pave Roads Sam Rayburn Dam TX Fort Worth in Fee Parks and Ralph McAlister Boat Ramp Thus 900,000 and Reservoir, TX Insuring Health and Safety of Public Users Award Construction Contract to Replace Air Compressors Sam Rayburn Dam TX Fort Worth for Station and Draft Tube Depression Air Insuring 170,000 and Reservoir, TX Reliable Gate Operation and Protection to Public Award Construction Contract to Replace Malfunctioning Sam Rayburn Dam TX Fort Worth Dewatering and Sump Pumps to reduce future 680,000 and Reservoir, TX maintenance costs American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award Construction Contract to Correct Parks Sanitary and Disposal System Deficiencies to Improve Health and TX Fort Worth Somerville Lake, TX Safety of Public. TCEQ Has Informed COE They Will 800,000 Issue a Notification of Deficiency and Begin Imposing Significant Fines if Not Remediated Expedited Award Construction Contract to Modernize Parks by Realigning and Paving Roads, Upgrading Utility Systems, TX Fort Worth Somerville Lake, TX Realigning Campsites, Constructing Screen Shelters, and 9,380,000 Upgrading Restrooms to Insure Health and Safety of Public. Award Construction Contract to Repair and Repaint Service Bridge, Remove Unnecessary Embankment Security Lights, Replace Pumps & Electrical Wiring & TX Fort Worth Somerville Lake, TX 1,095,000 Control Boxes in Relief Well Building Remodel Project Office, And Pave Road on Dam Insuring Structural Integrity Award Construction Contract to Dewater, Inspect and Stillhouse Hollow TX Fort Worth Repair Stilling Basin Thus Insuring Structural Integrity, 200,000 Dam, TX Operability, and Protection to Downstream Areas Award Construction Contract to Purchase and Install Stillhouse Hollow Emergency Back-up Generator to Insure Continuity of TX Fort Worth 100,000 Dam, TX Project Operations During Flood Emergency and Protecting Downstream Areas Award Construction Contract to Survey and Replace Stillhouse Hollow Government Boundary Line Monuments and Fence TX Fort Worth 300,000 Dam, TX Government Property Line to Prevent Encroachments and Protect Valuable Natural Resources Award Construction Contract to Rehabilitate levees for Texas City Ship TX Galveston Placement Area 5 and 6. Reduces future maintenance 3,600,000 Channel, TX costs. Award Construction Contract to Pave Roads and Town Bluff Dam, B A TX Fort Worth Camping Pads in Magnolia ridge Park to Insure Health 200,000 Steinhagen Lake, TX and Safety of Public Award Construction Contract to Purchase and Install Town Bluff Dam, B A Reclose Switch in the R D Willis Hydropower Switchyard TX Fort Worth 65,000 Steinhagen Lake, TX to Provide Reliable Power to Customers and reduce future maintenance costs. Award Construction Contract to Replace Restrooms at Town Bluff Dam, B A TX Fort Worth Magnolia ridge & Bluff View Parks to Improve Health and 400,000 Steinhagen Lake, TX Safety of Public Award Construction Contract to Complete Repair Damaged Tainter Gates & Bridge Superstructure to TX Fort Worth Whitney Lake, TX 18,000,000 Insure Structural Integrity, Operability and Protection to Downstream Areas. Identified Dam Safety Concern. Award Construction Contract to Complete Resurvey, Re- establish and Mark Government Boundary Lines to TX Fort Worth Whitney Lake, TX 1,001,000 Prevent Encroachment of Government Natural Resources American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award Construction Contract to Complete Resurvey, Re- Wright Patman Dam establish and Mark Government Boundary Lines to TX Fort Worth 200,000 and Lake, TX Prevent Encroachment of Government Natural Resources Award Construction Contract to Dewater, Inspect and Repair Stilling Basin; Repave Headquarters and Storage Wright Patman Dam TX Fort Worth Area Yard; Repair Embankment Downstream Drainage 2,633,000 and Lake, TX Ditches; and Repair Guardrail to Insure Structural Integrity of Dam and Provide Protection to Public

Award Construction Contract to Modernize Parks by Realigning and Paving Roads, Upgrading Utility Systems, Wright Patman Dam TX Fort Worth Realigning Campsites, Constructing Screen Shelters, 902,000 and Lake, TX Upgrading Restrooms and Constructing Controlled Entrance Complex to Insure Health and Safety of Public

Contract to replace or refurbish bridge surface, structure, Atlantic Intracoastal VA Norfolk mechanical systems, tender house upgrades, and traffic 1,685,000 Waterway - Acc, VA detours during construction of the North Landing Bridge, Virginia. Cost includes design work. Award contract to include but not limited to replacing, or Atlantic Intracoastal refurbish traffic control gates, lights, conduit, controls, and VA Norfolk 375,000 Waterway - Acc, VA cables, and traffic detours during construction to the North Landing Bridge, Virginia. Award contract to include but not limited to replacing, OR Atlantic Intracoastal refurbishing bridge grid and structures, and provide traffic VA Norfolk 875,000 Waterway - Acc, VA detours during construction to the North Landing Bridge, Virginia. Costs include design work. Award contract modification to include but not limited to replacing structural steel and concrete, repairs to the Atlantic Intracoastal VA Norfolk tenders houses, replace or refurbish traffic control gates, 500,000 Waterway - Dsc, VA lights, conduit, and cables, painting, and traffic detours during construction Award contract to Dredge the channel and restore the 7’ maintenance depth, including earthwork activities to VA Norfolk Broad Creek, VA 670,000 prepare the upland disposal site for dredged material and actual dredging and material placement at the site. Dredge the navigation channel and harbor to restore the Chincoteague Bay VA Norfolk authorized 5-ft depth of this critical harbor of refuge used 328,000 Channel, VA by the area commercial fishing industry. Gathright Dam and Paving and repairing the stilling basin road on this 1100 ft VA Norfolk 285,000 Lake Moomaw, VA long dam and reservoir project Dredge the navigation channel and restore the authorized 6’ maintenance depth to improve safety and restore VA Norfolk Greenvale Creek, VA 450,000 channel and public access point for struggling businesses. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Dredge critical shoals in channel and harbor to restore 12- ft depth. Barges and large commercial fishing vessels VA Norfolk Hampton Creek, VA 868,000 having difficulty navigating congested project, impairing safety. Project also used as Harbor of Refuge. Award contract to support increased patrols and removal Hampton Rds, of floating debris within the Norfolk Harbor and tributaries Norfolk & NEwport VA Norfolk to preclude debris collisions with hulls and critical 123,000 News Hbr, VA (Drift appendages and possible sinking of military, commercial Removal) and pleasure vessels. Dredge the channel to restore the 10-ft. project depth; work will include preparing the upland dredged material VA Norfolk Hoskins Creek, VA site. The channel transports grain from twelve counties 1,093,000 spanning both Virginia and Maryland. USCG uses project as a safe harbor during storm event Maintenance dredge Tribell, Goose Hill, Dancing Point and Richmond Deepwater Terminal-Hopewell Channels. James River VA Norfolk Channel used by ships bound for Hopewell and 3,000,000 Channel, VA Richmond Deepwater Terminal. Serves bulk and container vessel traffic. John W Flannagan Maintain healthy natural and cultural resources and VA Huntington Dam and Reservoir, 3,000 minimize adverse environmental impacts. VA John W Flannagan Maintain recreational facilities and provide additional VA Huntington Dam and Reservoir, water safety ranger staffing to reduce the risk of failure 289,000 VA and risk to the public John W Flannagan Upgrade/pave access road to reduce future maintenance VA Huntington Dam and Reservoir, 300,000 costs VA Perform full maintenance dredging within the most VA Norfolk Lynnhaven Inlet, VA 517,000 critically shoaled areas of the channel. A contract to repair storm damage to the Craney Island VA Norfolk Norfolk Harbor, VA 260,000 project office including roofing, siding, and HVAC. A contract to replace spillway #3 at Craney Island. Craney Island Dredged Material Mgmt. Area, part of the Norfolk VA Norfolk Norfolk Harbor, VA 2,280,000 Harbor project, is a 2,500 acre facility serving the Hampton Roads region. A contract to replace the Craney Island Rehandling Basin bulkhead. Craney Island Dredged Material Mgmt. Area, VA Norfolk Norfolk Harbor, VA 2,010,000 part of the Norfolk Harbor project, is a 2,500 acre facility serving the Hampton Roads region. Award a Contract to accomplish an environmental compliance initiative at Craney Island. Craney Island VA Norfolk Norfolk Harbor, VA Dredged Material Mgmt. Area, part of the Norfolk Harbor 901,000 project, is a 2,500 acre facility serving the Hampton Roads region. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Award a contract to construct Breakwaters on the west shoreline of the Craney Island disposal facility to prevent VA Norfolk Norfolk Harbor, VA continued erosion and improve water quality. Craney 2,030,000 Island Dredged Material Mgmt. Area, part of the Norfolk Harbor project, is 2,500 acres Award a contract to install safety rails and repair the Fort VA Norfolk Norfolk Harbor, VA 210,000 Norfolk seawall. Contract to repair a 50-year old security fence at Craney VA Norfolk Norfolk Harbor, VA 63,000 Island, a 2,500 acre facility. Raise dikes at Craney Island to provide capacity for additional dredged material inflows required during the VA Norfolk Norfolk Harbor, VA 3,000,000 coming months to contain for existing maintenance needs. Sediment testing for Environment Protection Agency VA Norfolk Norfolk Harbor, VA 1,100,000 compliance at Dam Neck Ocean Dredged Material Site. Maintain recreational facilities and provide additional North Fork Of Pound VA Huntington water safety ranger staffing to reduce the risk of failure 54,000 River Lake, VA and risk to the public Dredge the channel and restore the 6’ maintenance depth serving Town of Smithfield and used as a harbor of VA Norfolk Pagan River, VA 900,000 refuge and base of operations for Smithfield Police for search and rescue. Construct sewer line to connect philpott park to Henry county system. Contract will connect administrative, VA Wilmington Philpott Lake, VA public recreation facilities and powerhouse to municipal 1,200,000 sewer, eliminating the need for maint. Of 50 year plus septic systems. Develop plans & specifications using archeological and engineering services contract to repair the 50 ton VA Wilmington Philpott Lake, VA overhead bridge crane in powerhouse supporting a 200,000 14,000 kilowatts powerhouse and preventing failure of the dam. Develop plans & specifications using architectural and engineering services contract to replace critical VA Wilmington Philpott Lake, VA 150,000 equipment the powerhouse headgate machinery and controls supporting a 14,000 kilowatts powerhouse. Hire additional temp ranger employees and term employees--.this activity will provide additional visitor VA Wilmington Philpott Lake, VA 150,000 assistance during the peak recreation season, which will improve public safety and security. Prepare plans & specifications using archeological and engineering services contract for the rewind of electric VA Wilmington Philpott Lake, VA 300,000 generators and replace the hydraulic turbines to increase capacity at the already 14,000 kilowatts powerhouse. Repair rec facilities at horseshoe point and salt house branch parks - this activity will repair deteriorated public VA Wilmington Philpott Lake, VA park facilities and correct non-compliance with modern 750,000 design standards and the Americans with Disabilities Act, increasing visitor satisfaction. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Repair-bridge crane has failed once and reached end of life for critical lifts. Contract to rebuild crane controls, VA Wilmington Philpott Lake, VA 1,000,000 Motors, cables supporting a 14,000 kilowatts powerhouse. Award a contract to maintenance dredge critical shoals within the channel to a depth of 6 ft. Work will restore Creek, VA Norfolk safe navigation. Queens Creek provides navigation and 447,000 Mathews County, VA safe harbor for commercial fishing and tour boats. The Coast Guard frequently sends patrols Winter Harbor, Award a contract to dredge the channel to restore project VA Norfolk 1,190,000 Mathews County, VA depth. Work will restore safe navigation. Contract to construct a dump station on the north side VT New England Ball Mountain, VT campground for visitors. Average of over 200,000 visitor 275,000 hours each year. North Hartland Lake, Issue A/E contract to complete bridge and periodic VT New England 112,000 VT inspections to reduce risk of structure failure. North Hartland Lake, VT New England Issue contract to install guardrails along top of dam. 170,000 VT Issue small contracts and/or purchase orders to replace North Hartland Lake, VT New England equipment and complete essential miscellaneous repair 71,000 VT work necessary to maintain project integrity.

Issue small contracts and/or purchase orders to replace North Springfield VT New England equipment and complete essential miscellaneous repair 103,000 Lake, VT work necessary to maintain project integrity. Issue small contracts and/or purchase orders to replace equipment and complete essential miscellaneous repair VT New England Townshend Lake, VT 100,000 work necessary to maintain project integrity including seismic reevaluation. Union Village Dam, Issue A/E contract to complete mandated bridge and VT New England 107,000 VT periodic inspections. Issue small contracts and/or purchase orders to replace Union Village Dam, VT New England equipment and complete essential miscellaneous repair 66,000 VT work necessary to maintain project integrity. Chief Joseph Dam, WA Seattle Add additional security Fencing and Security cameras 200,000 WA Chief Joseph Dam, Contract for new accessible exhibits to meet American WA Seattle 250,000 WA Disability Act requirements Chief Joseph Dam, WA Seattle Contract to pave/stripe Brandt's Landing 350,000 WA Additional O&M dredging requirements due to increased Columbia & Lwr shoaling after deepening and ESA issues. In order to Willamette R Blw WA Portland provide the newly deepened channel for deep-draft ship 4,745,000 Vancouver, WA & traffic, this funding is required to remove the expected Portland, OR increase in material from the Federal project American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Columbia River Dredge river miles 110 - 125. 20,000 CY. Additional Between Vancouver, WA Portland dredging need in the Federal navigation channel from 174,000 WA and The Dalles, Vancouver to The Dalles. OR Fund additional dredging to provide for safer navigation across the ocean bar. It would provide for the removal of WA Seattle Grays Harbor, WA 970,000 approximately 150,000 cubic yard to provide additional depths. Debris Management Activities this coming season will Howard Hanson WA Seattle increase substantially due to the January 2009 flood 154,000 Dam, WA event and the additional debris deposited in the lake. Fish Habitat Debris Separation and Improvement. Used Howard Hanson WA Seattle to enhance the fish habitat in the lake per the biological 20,000 Dam, WA opinion. Howard Hanson WA Seattle Improve project culverts 25,000 Dam, WA Rehabilitation of Project Office. Additional facilities Howard Hanson needed to provide much needed work space for project WA Seattle 250,000 Dam, WA support personnel. Soundproofing office space to inhibit noise from emergency generator. Howard Hanson Relocate earthquake sensors based on dam safety WA Seattle 70,000 Dam, WA requirement. Sediment Management Plan implementation. Define Howard Hanson tasks and methods for efficiently managing the incoming WA Seattle 100,000 Dam, WA upstream sediment that impacts the operation of the dam. Stilling Basin Investigation and Repairs. Funding is Howard Hanson WA Seattle needed to investigate the existing condition of the stilling 100,000 Dam, WA basin. To award multiple contracts to implement dam safety measures on the right abutment for the operation of the Howard Hanson Howard Hanson Dam. Perform public communication, WA Seattle 7,000,000 Dam, WA implement Interim risk Reduction Measures, and initiate dam safety studies.

Tower Cracking Investigation and Repairs. Develop a Howard Hanson WA Seattle plan to mitigate for the cracks and determine structural 200,000 Dam, WA vulnerabilities. Howard Hanson Water Control Manual updates and revisions needed due WA Seattle 300,000 Dam, WA to changes in project operations. Charbonneau and Fishhook Campgrounds Electrical Ice Harbor Lock And Systems Upgrades. Fund the contracted upgrade WA Walla Walla 1,390,000 Dam, WA existing deficient electrical systems for campground/RV sites to current National Electric Code requirements. Charbonneau Potable Water System Upgrade. Fund Ice Harbor Lock And contract construction of new reverse osmosis water WA Walla Walla 1,400,000 Dam, WA treatment system at Charbonneau Park to ensure water quality meets state drinking water standards. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Fund the contracted rehabilitation/repair and improvement of existing roads and parking areas for Ice Harbor Lock And WA Walla Walla access to recreation and public use areas through new 908,000 Dam, WA chip seal, pothole repair and paving where needed as determined by inspection. Scan and Store Real Estate Documents for GIS database development (Jnt Exp). Fund consultant scanning of Ice Harbor Lock And WA Walla Walla historical and current real estate documents and 6,000 Dam, WA drawings so they can be protected from deterioration and the information incorporated into new drawings Assorted Actions for water quality improvement for fish Lake Washington WA Seattle passage to comply with biological opinion and provide for 175,000 Ship Canal, WA more natural water quality conditions. Lake Washington Conduct a Dam Safety Analysis of spillway capacity WA Seattle 100,000 Ship Canal, WA under conditions of probable maximum flood Construct model of fish movement through project for fish Lake Washington WA Seattle passage improvements enabling compliance with 100,000 Ship Canal, WA biological opinion. Lake Washington Mechanical rehab of the stony gate valves. These are WA Seattle 200,000 Ship Canal, WA the critical valves used to fill and empty the lock chamber

Purchase commercial street cleaner to more efficiently Lake Washington WA Seattle clean public areas for visitor safety. The amount of 150,000 Ship Canal, WA paved area makes it unfeasible to clean manually.

Repair existing walkways that are trip hazards for visitors. Lake Washington WA Seattle Repair uneven concrete walkways for visitor safety. 250,000 Ship Canal, WA Needed to meet American Disability Act compliance. Repair spalling concrete on sides of lock chambers. Spalling is the minor failure of the concrete lock sidewalls Lake Washington WA Seattle that occurs due to age. A safety issue due to the 350,000 Ship Canal, WA locations of spalling could fall on boats and or presents a hazard for boaters and employees Replace 100-year-old electric boiler that supplies heat to Lake Washington WA Seattle Admin Bldg with a more efficient smaller unit. Necessary 150,000 Ship Canal, WA Asbestos remediation included in this project.

Replace the existing 30 yr old, worn out Lorrain Rough Lake Washington WA Seattle Terrain Crane with a new crane that provides additional 350,000 Ship Canal, WA needed lifting capabilities and enhances safety. Lake Washington To improve conditions for fish, add small rock to WA Seattle 250,000 Ship Canal, WA interstices of boulders that line the ship canal. Bascule Bridge Repairs. Fund repairs to the Bascule Little Goose Lock WA Walla Walla Bridge at the Navigation lock that were programmed to 100,000 And Dam, WA occur this year as part of the Downstream Gate work American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Miscellaneous Areas Park Amenities Upgrades. Procure new park amenities to include picnic tables, barbeque Little Goose Lock WA Walla Walla grills, trash can holders, fire pits, etc. and use temporary 50,000 And Dam, WA labor to install at parks to improve park condition and promote visitation and usage. Repair/Paving of Dam Crest Road. Fund the contracted Little Goose Lock rehabilitation/repair and improvement of existing roads WA Walla Walla 250,000 And Dam, WA across dam crest through new chip seal, pothole repair and paving where needed as determined by inspection. Repair/Paving of Roads. Fund the contracted rehabilitation/repair and improvement of existing roads to Little Goose Lock WA Walla Walla recreation and public use areas through new chip seal, 800,000 And Dam, WA pothole repair and paving where needed as determined by inspection. Scan and Store Real Estate Documents for GIS database development (Jnt Exp). Fund consultant scanning of Little Goose Lock WA Walla Walla historical and current real estate documents and 2,000 And Dam, WA drawings so they can be protected from deterioration and the information incorporated into new drawings Visitor Center Heating Ventilation Air Conditioning (HVAC) Replacement. Fund the contracted survey and Little Goose Lock WA Walla Walla repair/replacement all or portions of existing HVAC 200,000 And Dam, WA system to ensure system performs in accordance with building and design requirements. Group Picnic Shelters at Miscellaneous Locations. Lower Granite Lock WA Walla Walla Through contracting with private sector, procure and 103,000 And Dam, WA install group picnic shelters at various locations. Northshore Storage building. Fund contracted procurement and installation of prefabricated open bay Lower Granite Lock WA Walla Walla storage building for hydropower and other materials and 900,000 And Dam, WA equipment to protect them from the environment and prolong their life. Repair/Paving of Roads. Fund the contracted rehabilitation/repair and improvement of existing roads to Lower Granite Lock WA Walla Walla recreation and public use areas through new chip seal, 1,600,000 And Dam, WA pothole repair and paving where needed as determined by inspection. Scan and Store Real Estate Documents for GIS database development (Jnt Exp). Fund consultant scanning of Lower Granite Lock WA Walla Walla historical and current real estate documents and 1,000 And Dam, WA drawings so they can be protected from deterioration and the information incorporated into new drawings Swallows Park Restroom upgrades. Fund contracted Lower Granite Lock replacement of existing deteriorated restrooms that also WA Walla Walla 300,000 And Dam, WA do not meet Americans With Disabilities Act code requirements with modern prefabricated units. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Visitor Center Heating Ventilation Air Conditioning (HVAC) Replacement. Fund contracted survey and Lower Granite Lock WA Walla Walla repair/replacement all or portions of existing HVAC 200,000 And Dam, WA system to ensure system performs in accordance with building and design requirements. Miscellaneous Areas Park Amenities Upgrades. Procure new park amenities to include picnic tables, barbeque Lower Monumental WA Walla Walla grills, trash can holders, fire pits, etc. and use temporary 50,000 Lock & Dam, WA labor to install at parks to improve park condition and promote visitation and usage. Critical navigation lock gate structural problems with high Lower Monumental WA Walla Walla probability of failure. Replacement includes design, 14,000,000 Lock And Dam, WA fabrication and construction. Scan and Store Real Estate Documents for GIS database development (Jnt Exp). Fund consultant scanning of Lower Monumental WA Walla Walla historical and current real estate documents and 2,000 Lock And Dam, WA drawings so they can be protected from deterioration and the information incorporated into new drawings Repair/Paving of Roads. Fund the contracted rehabilitation/repair and improvement of existing roads to WA Walla Walla Mill Creek Lake, WA recreation and public use areas through new chip seal, 90,000 pothole repair and paving where needed as determined by inspection. Contract for the design steel liner of the 9-foot flood Mud Mountain Dam, control primary outlet tunnel. This liner is showing much WA Seattle 200,000 WA increased cavitations and wear since the Nov 2008 and Jan 2009 flood events. Mud Mountain Dam, WA Seattle Fish Chute Repairs 25,000 WA Fish Hauling The fish hauling is anticipated to increase Mud Mountain Dam, WA Seattle due to a doubling of Pink salmon spawning. (Needs are 90,000 WA additional vehicle and personnel.) Mud Mountain Dam, WA Seattle Improve access to gaging station. 20,000 WA Light Plant. This self powered outdoor lighting system is Mud Mountain Dam, needed to provide an emergency backup for power WA Seattle 13,000 WA outages when personnel are working to manage and remove debris. Mud Mountain Dam, Purchase video equipment to monitor lake conservation WA Seattle 15,000 WA pool elevations and the debris basin. Purchase video equipment to monitor road conditions on Mud Mountain Dam, WA Seattle roads prone to slides and wash-outs along Cascade 15,000 WA Creek. Mud Mountain Dam, WA Seattle Repair the concrete apron 960 Deck 500,000 WA Staff Gage on Tower to enable remote reading of Mud Mountain Dam, WA Seattle reservoir water elevations. This is a backup for the 10,000 WA electronic gaging system which can be prone to failure. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Project Condition Replace failing heave pitch and roll compensator on 31 WA Seattle 200,000 Surveys, WA boat. Project Condition WA Seattle Replace failing radios and base station for survey crews 44,000 Surveys, WA Project Condition WA Seattle Replace outdated GPS units for survey crew 200,000 Surveys, WA Puget Sound And Purchase 24 ft landing craft boat to assist Puget with WA Seattle Tributary Waters, debris removal and back up when Puget MV is not 175,000 WA available, i.e.. Dry dock, maintenance breakdown. Puget Sound And Purchase Jet work boat to better support all project WA Seattle Tributary Waters, 50,000 specific support and transport tasks. WA Puget Sound And Purchase new log bronc, a specialized boat used to WA Seattle Tributary Waters, safely manage large logs and wood debris, to enhance 75,000 WA our ability to manage debris. Puget Sound And Replace survey boat to enhance ability to do survey WA Seattle Tributary Waters, 100,000 tasks. WA Puget Sound And WA Seattle Tributary Waters, Shipyard work on debris storage barge 60,000 WA The repowering of the Vessel Puget will replace aging, Puget Sound And inefficient engines with computer-controlled Tier 2 WA Seattle Tributary Waters, engines which will markedly reduce diesel exhaust 250,000 WA particulates and undesirable emissions to meet existing and up-coming Regional emission requirement

This increment is to provide for management of flood control activities at Section 7 and other non-Corps Scheduling Reservoir WA Seattle projects where the Corps has flood control responsibilities 170,000 Operations, WA under the legal mandates of the Federal Power Act or by Congressional authorized FDR.

The Dalles Lock And Pave Roads at Recreation sites - Roadway infrastructure WA Portland 1,000,000 Dam, WA & OR is degrading to poor condition.

The Dalles Lock And Purchase New Backhoe & Street Maintenance WA Portland 131,000 Dam, WA & OR Equipment

The Dalles Lock And WA Portland Purchase Park Ranger Patrol Boat - 80,000 Dam, WA & OR Service Building Roof Replacement - This building The Dalles Lock And WA Portland houses the administrative staff, materials warehouse and 500,000 Dam, WA & OR resource maintenance staff. The Dalles Lock And Spillway Gate Wire Rope Replacement & Install - Spillway WA Portland 420,000 Dam, WA & OR gates 10, 11, and 13 require new wire ropes and drums. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Expand Parking Lot - This parking lot is currently full Eau Galle River during all peak periods and overflow parking must be WI St. Paul 125,000 Lake, WI directed by a ranger on duty. Expand existing lot to meet user needs. Replace Roof & Siding on HQ Building - The roof and siding on the project office are 30 years old and have Eau Galle River WI St. Paul been deteriorating to the point that they have developed 90,000 Lake, WI leaks which are causing damage to interior walls and fixtures. Sandblast and Paint Morning Glory and Gate Operators - The FY05 periodic inspection and previous periodic Eau Galle River WI St. Paul inspections require sandblasting and painting of the 138,000 Lake, WI intake morning glory trash rack structure, low flow mechanical gate operators, and WT steel supp

Sandblast and Paint Steel Conduit Line - Install Vinyl Eau Galle River Transitions- FY 05 periodic inspection recommendation WI St. Paul 436,000 Lake, WI requires that the corroded concrete conduit steel tunnel liner plates be sandblasted and painted. Seal Coat Highland Ridge Campground Road - The Eau Galle River WI St. Paul bituminous pavement has dried and cracked and is in 65,000 Lake, WI need of repair. Upgrade Electrical Service in Campground - The existing Eau Galle River WI St. Paul electrical service to the campground was installed in the 65,000 Lake, WI early 1980's and is in need of upgrading.

By contract, complete automation of dam gates; reduces time and effort needed to make gate changes; improves WI Detroit Fox River, WI service to stakeholders that rely on pool elevation 1,000,000 responses; also by contract perform miscellaneous dam safety repairs and upgrades Issue Contract to Repair failed trunion pins at 4 dams; repairs will provide critical infrastructure repairs to remove WI Detroit Fox River, WI 5,000,000 risk of failure and associated risk to life and property due to trunion pin failure. Kewaunee Harbor, WI Detroit Perform condition surveys and issue contract for dredging 1,430,000 WI Manitowoc Harbor, WI Detroit Perform condition surveys and issue contract for dredging 508,000 WI Issue a contract to construct a permanent repair to the Sturgeon Bay Harbor south revetment Section N; Contract will repair these WI Detroit and Lake Michigan 7,500,000 important components of the harbor's navigation Ship Canal, WI infrastructure. Sturgeon Bay Harbor WI Detroit and Lake Michigan Perform condition surveys and issue contract for dredging 1,357,000 Ship Canal, WI American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) As part of overall maintenance at Beech Fork Lake, Beech Fork Lake, purchase playground equipment to meet safety standards WV Huntington 82,000 WV and provide American Disability Act accessibility for one of the three Day Use Areas at the project. Beech Fork Lake, Maintain healthy natural and cultural resources and WV Huntington 2,000 WV minimize adverse environmental impacts. Maintain recreational facilities and provide additional Beech Fork Lake, WV Huntington water safety ranger staffing to reduce the risk of failure 239,000 WV and risk to the public Beech Fork Lake, Rehabilitate operations building ceiling to reduce the risk WV Huntington 1,200,000 WV to the public Maintain healthy natural and cultural resources and WV Huntington Bluestone Lake, WV 67,000 minimize adverse environmental impacts. Maintain recreational facilities and provide additional WV Huntington Bluestone Lake, WV water safety ranger staffing to reduce the risk of failure 40,000 and risk to the public Purchase and install playground equipment to meet WV Huntington Bluestone Lake, WV safety standards and provide American Disability Act 120,000 accessibility. Rehabilitate Foundation Drains to reduce the risk of WV Huntington Bluestone Lake, WV 800,000 failure As part of overall maintenance at Burnsville Lake, replace WV Huntington Burnsville Lake, WV playgrounds to meet playground safety standards and 515,000 provide American Disability Act accessibility. Maintain healthy natural and cultural resources and WV Huntington Burnsville Lake, WV 178,000 minimize adverse environmental impacts. Maintain recreational facilities and provide additional WV Huntington Burnsville Lake, WV water safety ranger staffing to reduce the risk of failure 281,000 and risk to the public Rehabilitate campground to include upgrade of electrical service from 30 amps to 50 amps at Bulltown and riffle WV Huntington Burnsville Lake, WV 800,000 Run Campgrounds to meet National Recreation Area standards and to reduce future maintenance costs. As part of overall maintenance at East Lynn Lake, replace playground equipment to meet playground safety WV Huntington East Lynn Lake, WV 160,000 standards and provide American Disability Act accessibility Maintain healthy natural and cultural resources and WV Huntington East Lynn Lake, WV 228,000 minimize adverse environmental impacts. Maintain recreational facilities and provide additional WV Huntington East Lynn Lake, WV water safety ranger staffing to reduce the risk of failure 438,000 and risk to the public WV Huntington East Lynn Lake, WV Pave access roads to reduce future maintenance costs 600,000 Dredge navigational channel to return the channel to WV Huntington Elk River Harbor, WV 400,000 authorized depth American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Kanawha River Dredge navigational channel to return the channel to WV Huntington Locks and Dams, 340,000 authorized depth WV Kanawha River Fabricate culvert intake screens at London L&D (Lock & WV Huntington Locks and Dams, Dam) to increase reliability and reduce future 600,000 WV maintenance costs. Kanawha River London, Marmet, Winfield: Develop Historic Properties WV Huntington Locks and Dams, 70,000 Management Plans to meet legal requirements WV Kanawha River Maintain healthy natural and cultural resources and WV Huntington Locks and Dams, 7,000 minimize adverse environmental impacts. WV Kanawha River Maintain recreational facilities and provide additional WV Huntington Locks and Dams, water safety ranger staffing to reduce the risk of failure 98,000 WV and risk to the public Kanawha River Perform comprehensive evaluation of project datum's at WV Huntington Locks and Dams, all Kanawha river L&D projects to reduce the risk of 75,000 WV failure and risk to the public Kanawha River Remove lead paint at Winfield L&D at former operations WV Huntington Locks and Dams, 500,000 building to reduce environmental impact WV Kanawha River Temporary hires for efficient, effective, safe & reliable WV Huntington Locks and Dams, operation of all Kanawha river projects to reduce future 175,000 WV maintenance costs Kanawha River Winfield: Geotechnical investigation of left abutment WV Huntington Locks and Dams, seepage and misalignment; determine risk & recommend 300,000 WV fix Ohio River Locks and Belleville, Racine, RC Byrd & Greenup: Develop Historic WV Huntington 80,000 Dams, WV, KY & OH Properties Management Plans to meet legal requirements

Ohio River Locks and Complete plans and specifications for miter gate storage WV Huntington 400,000 Dams, WV, KY & OH pier at R. C. Byrd L&D Develop Traffic Forecasts, Transportation Rate Data and Ohio River Locks and WV Huntington Reliability Assessments for Ohio river system - Inland 300,000 Dams, WV, KY & OH Waterways Transportation Economics Ohio River Locks and Fabricate culvert intake screens at Belleville L&D to WV Huntington 600,000 Dams, WV, KY & OH increase reliability and reduce future maintenance costs

Ohio River Locks and Fabricate culvert intake screens at Racine L&D to WV Huntington 200,000 Dams, WV, KY & OH increase reliability and reduce future maintenance costs

Ohio River Locks and Fabricate culvert intake screens at Willow Island L&D to WV Huntington 600,000 Dams, WV, KY & OH increase reliability and reduce future maintenance costs

Ohio River Locks and Maintain healthy natural and cultural resources and WV Huntington 14,000 Dams, WV, KY & OH minimize adverse environmental impacts. Maintain recreational facilities and provide additional Ohio River Locks and WV Huntington water safety ranger staffing to reduce the risk of failure 150,000 Dams, WV, KY & OH and risk to the public American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Perform comprehensive evaluation of project datum's at Ohio River Locks and WV Huntington all Ohio river L&D projects to reduce the risk of failure 175,000 Dams, WV, KY & OH and risk to the public Ohio River Locks and Repair grating on the miter gates at R. C. Byrd L&D to WV Huntington 100,000 Dams, WV, KY & OH increase safety of project personnel Replace emergency gate trash screens at Greenup L&D Ohio River Locks and WV Huntington to increase reliability and reduce future maintenance 400,000 Dams, WV, KY & OH costs Ohio River Locks and Replace emergency gate trash screens at Meldahl L&D to WV Huntington 400,000 Dams, WV, KY & OH increase reliability and reduce future maintenance costs Temporary hires for efficient, effective, safe & reliable Ohio River Locks and WV Huntington operation of all Ohio river projects to reduce future 350,000 Dams, WV, KY & OH maintenance costs As part of overall maintenance at R D Bailey Lake, purchase and install playground equipment to meet WV Huntington R D Bailey Lake, WV 130,000 playground safety standards and provide American Disability Act accessibility at Big Branch Day Use Area. Maintain healthy natural and cultural resources and WV Huntington R D Bailey Lake, WV 81,000 minimize adverse environmental impacts. Maintain recreational facilities and provide additional WV Huntington R D Bailey Lake, WV water safety ranger staffing to reduce the risk of failure 188,000 and risk to the public Rehabilitate campground to include upgrade of electrical WV Huntington R D Bailey Lake, WV service to meet National Recreation Area standards and 600,000 to reduce future maintenance costs.. Update Master plan to support Environmental Stewardship objectives and American Disability Actpt WV Huntington R D Bailey Lake, WV 350,000 ongoing development & land use pressures from mineral extraction. Award and complete contract to provide enhanced Stonewall Jackson WV Pittsburgh cleaning, grounds keeping and maintenance services for 63,000 Lake, WV recreation areas. Hire 1 temporary Summer Park Ranger for water and Stonewall Jackson WV Pittsburgh public safety patrols. Will reduce public water related 17,000 Lake, WV fatalities and accidents. Hire One Seasonal 10-Month Park Ranger to develop Stonewall Jackson partnerships/programming in reducing public water- WV Pittsburgh 50,000 Lake, WV related fatalities. Ranger will support Stonewall Jackson and Tygart Lakes. Services for increased shoreline management, Stonewall Jackson threatened/endangered species surveillance, cultural WV Pittsburgh 10,000 Lake, WV resource protection/preservation, invasive species eradication, and protection of natural resources. Hire One Seasonal 12-Month Park Ranger to provide Summersville Lake, WV Huntington additional water safety staffing to reduce the risk of failure 100,000 WV and risk to the public Summersville Lake, Maintain healthy natural and cultural resources and WV Huntington 101,000 WV minimize adverse environmental impacts. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Operation & Maintenance Planned Primary Corps Project Name Work Description - as Approv Aug 09 Allocation State District ($) Maintain recreational facilities and provide additional Summersville Lake, WV Huntington water safety ranger staffing to reduce the risk of failure 232,000 WV and risk to the public Summersville Lake, Replace restroom facilities at Battle Run Recreation WV Huntington 800,000 WV Areas to increase access to the public As part of overall maintenance at Sutton Lake, purchase and install playground equipment to meet playground WV Huntington Sutton Lake, WV 250,000 safety standards and provide American Disability Act accessibility at Gerald R. Freeman Campground. Initiate Dam Safety evaluation to ensure that the dam WV Huntington Sutton Lake, WV meets current design criteria in accordance with the 430,000 National dam safety program Maintain healthy natural and cultural resources and WV Huntington Sutton Lake, WV 79,000 minimize adverse environmental impacts. Maintain recreational facilities and provide additional WV Huntington Sutton Lake, WV water safety ranger staffing to reduce the risk of failure 1,032,000 and risk to the public Rehabilitate foundation drains to reduce the risk of dam WV Huntington Sutton Lake, WV 750,000 failure Award and complete contract to provide enhanced WV Pittsburgh Tygart Lake, WV cleaning, grounds keeping and maintenance services for 60,000 recreation areas. American Recovery and Reinvestment Act of 2009 Army Corps of Engineers - Civil Works Formerly Utilized Sites Remedial Action Program (FUSRAP) Primary Planned Corps District Project Name Work Description - as of 5 January 10 State Allocation ($)

MA New England Shpack Landfill Fully fund and complete a remedial contract option 5,997,847

St. Louis Airport Site Vicinity MO St. Louis Remediate 5 Vicinity Properties. 2,000,000 Properties, St. Louis, MO Complete remediation at Stepan: Area 10 - Burial NJ New York FMSS, Maywood, NJ 16,474,971 Pit #1 NJ New York FMSS, Maywood, NJ Complete remediation at Stepan: Areas 13,15,&18 10,920,277 Complete remediation at Myron Property 205 NJ New York FMSS, Maywood, NJ 639,481 Maywood Ave NJ New York FMSS, Maywood, NJ Complete remediation at Sears Area 5 2,346,936 Complete remediation at Stepan: Area 9 - Burial Pit NJ New York FMSS, Maywood, NJ 8,237,141 #2 NJ New York FMSS, Maywood, NJ Complete remediation at Scanel Property 13,303,965 Complete remediation at NYS&W (Lodi): Rail Road NJ New York FMSS, Maywood, NJ 2,363,288 Property NJ New York Wayne Complete Inaccessible Soil Removal 1,000,000 Fully fund contract to establish Permanent and NY Buffalo N.F.S.S., Lewiston, NY Administrative Record Files and digital project 250,000 records database. Fully fund contracts for 1) Design & install NY Buffalo N.F.S.S., Lewiston, NY Department of Defense compliant security systems 9,200,000 and structures and 2) Demolish Building -401. NY New York Sylcor Plant, Hicksville, NY Complete Remedial Investigation 4,500,000 Fully fund contract and complete supplemental NY Buffalo Tonawanda Landfill field investigation based on input received on the 902,000 "No Action" Proposed Plan. Fully fund contract to complete Remedial Design OH Buffalo Luckey, OH Field Characterization to improve confidence in 1,118,000 volumes and costs. The Corps will complete contractor mobilization, site preparation, and begin excavation of OH Buffalo Painesville approximately 5,000 in-situ cubic yards of 15,246,094 radiologically contaminated soils for off-site disposal at a properly permitted facility. PA Pittsburgh Shallow Land Disposal Area Complete remediation at 2 trenches. 5,000,000