Tvl. SJ Natural Minerals, Door No. 1259, Solai Colony, Sivakasi Taluk
Total Page:16
File Type:pdf, Size:1020Kb
From: To: Tvl. S.J. Natural Minerals, The Member Secretary, Door No. 1259, Solai Colony, State Level Environment Impact Sivakasi Taluk, Assessment Authority (SEIAA), Virudhunagar District, 3rd Floor, Panagal Maligai, Tamil Nadu – 626 189 No.1 Jeenis Road, Saidapet, Mobile No:94431-36073, 94421-36928 Chennai – 15, Tamilnadu Sir, Sub: Proposal seeking Environmental Clearance for Category B2 Project- Multi-Colour Granite quarry from over an Extent of 7.56.5Ha in S.F.No. 113/1A, 113/2A, 113/2B, 113/3A, 113/3B, 113/4B, 113/5B, 121/1A and 121/2A at Karisalpatti Village of Sattur Taluk, Virudhunagar District - Proposal with Form – 1 and Pre-feasibility report along with approved Mining Plan– Send regarding. Ref: 1.The Mining Plan was approved by the Director of Geology and Mining, Chennai Vide Rc. No: 9368/MM2/2017 Dated: 09.07.2018. A Demand Draft of Induslnd Bank, bearing No. 372719 Dated: 11.07.2018 for an amount of Rs.1,00,000/- (Rupees one lakh only) towards processing charge for the above proposal is enclosed herewith for further action. I request that Environmental Clearance for the above newly proposed Multi-Colour Granite quarry at Karisalpatti Village of Sattur Taluk, Virudhunagar District may please be issued as early as possible please. We are submitting the following documents for obtaining Environmental Clearance from your office. 1. Demand Draft for Rs:1,00,000/- 2. Check list 3. Applicant Declaration letter 4. Form-1 5. Approved Mining Plan 6. Pre-Feasibility Report 7. Baseline studies 8. CD(Above said documents in PDF format) As all the reports and documents are submitted and soft copies of reports, plans etc are send to SEIAA-chennai by Email. I request you to grant EC as early as possible. Yours Faithfully, For Tvl. S.J. Natural Minerals (T. Palanivel Murugan) Partner Place: Virudhunagar Dated: 12.07.2018 INDEX FILE PAGE S. No DESCRIPTION NOS 1. Environmental Clearance Format 5-9 2. Declaration Letter 11 3. Demand Draft 13 4. Form-1 15-55 Approved Mining Plan along with 5. 57- 181 Approval Letter 6. Pre-Feasibility Report 183-247 7. VAO signed for Quarry site 231 8. Baselines Studies 249-275 9. Affidavit Document 277-279 10. Quarry detail from 500m 281 11. Habitation detail from 300m 283 12. Copy of Explosive License 285-287 Consolidated Above Document In 289 13. PDF Format (DVD) To consider the proposal for the grant of Environmental Clearance for Multi-Colour Granite Quarrying in at 7.56.5Ha in S.F.No: 113/1A, 113/2A, 113/2B, 113/3A, 113/3B, 113/4B, 113/5B, 121/1A and 121/2A of Karisalpatti Village in Sattur Taluk, Virudhunagar District by Tvl. S.J. Natural Minerals The salient features of the proposal are as follows: S.No: Details of the proposal : Data furnished Page No: Name of the owner/Firm Tvl. S.J. Natural Minerals, 19,81,195 Door No. 1259, Solai Colony, Sivakasi Taluk, 1. : Virudhunagar District, Tamil Nadu – 626 189 Mobile No: +91 94431-36073, 94421-36928 Type of quarrying It is a Multi-Colour Granite Quarry Project in 57,77,83,13 2. (Savudu/Rough stone/ : Karisalpatti Village. 5, Sand/Granite) S.F.No of the quarry site with S.F.No: 113/1A, 113/2A, 113/2B, 113/3A, 113/3B, 17,85,195 3. area break up : 113/4B, 113/5B, 121/1A and 121/2A 4. Village in which situated : Karisalpatti Village 17,85,195 5. Taluk in which situated : Sattur Taluk 17,85,195 6. District in which situated : Virudhunagar District 17,85,195 7. Extent of quarry (in ha) 7.56.5Ha 17,85,195 Period of quarrying proposed Mining license applied for period of twenty years only. 57,77,85,13 8. : Mining plan period for the first five years. 5 Production (Quantity in m3) The proposed quantity of reserves (30%) is about 17,103,217 9. : 37125m3 of Multi-Colour Granite during this period of five years. Latitude and Longitude of all 09°16’25.14’’N to 09°16’35.64’’N 17,157,187 10. corners of the quarry site : 77°52’47.87’’ E to 77°52’58.68’’ E 11. Topo sheet No : 58 G/15 17,157,187 Precise area communication : The precise area communication has been granted as per 135 approved by the District Govt. letter No. 5358/MMB.2/2018-1, dated: Collector with date 14.05.2018, the recommended total extent of the area is 7.88.0 hectares, in the above circumstances after leaving 12. the Cart Track, the remaining area is about 7.56.5 hectares only. Hence, this mining plan has been prepared accordingly for the balance area of 7.56.5 hectares instead of 7.88.0 hectares Mining plan approved by the The Mining Plan was Approved by the Director of 57 13. Assistant Director of the District : Geology and Mining, Chennai vide Letter. No: with date 9368/MM2/2017 Dated: 09.07.2018 Water Requirement: Purpose Quantity Source 33,221 KLD 1. Drinking & Domestic Drinking & Domestic 0.2KLD Approved Water vendors purpose (in KLD) purpose 14. ; 2. Dust suppression & Dust suppression 0.4KLD From Existing bore hole on Green Belt (in KLD) nearby quarry area Afforestation 0.4KLD From Existing bore hole on nearby quarry area Depth of quarrying The applicant proposed Multi-Colour Granite up to a 103 15. : depth of 13m during this plan period. Project cost (including EMP The total project cost including EMP cost (A+B+C) is 123,125,24 16. cost) : about Rs. 3,43,75,000/- (Rupees Three crores forty 3 three lakhs and seventy five thousand only) EMP cost The total EMP cost is about Rs. 2, 75,000/- (Rupees 123,125,24 17. : Two lakhs seventy five thousand only) 3 INDEX FILE PAGE S. No DESCRIPTION NOS 1. Environmental Clearance Format 5-9 2. Declaration Letter 11 3. Demand Draft 13 4. Form-1 15-55 Approved Mining Plan along with 5. 57- 181 Approval Letter 6. Pre-Feasibility Report 183-247 7. VAO signed for Quarry site 231 8. Baselines Studies 249-275 9. Affidavit Document 277-279 10. Quarry detail from 500m 281 11. Habitation detail from 300m 283 12. Copy of Explosive License 285-287 Consolidated Above Document In 289 13. PDF Format (DVD) Checklist for Mining of Minor Mineral >5 Ha and <25 Ha for B2 Category mines & Cluster of Mines within 25 Ha fallen within 500m radius S.No. Details of the proposal : Data furnished Page No. 1. Name of the owner/Firm : Tvl. S.J. Natural Minerals, 19,81,195 Correspondence Address with Pin Door No. 1259, Solai Colony, Sivakasi Taluk, 2. Code : Virudhunagar District, Tamil Nadu – 626 189 3. Email Address : [email protected] 19,195 4. Mobile Number : +91 94431-36073, 94421-36928 19,195 Type of quarrying It is a Multi - Colour Granite quarry Project in Karisalpatti 57,77,83, 5. : (Earth/ Rough stone/Sand/Granite) Village. 135, S.F. No of the Quarry site S.F.No: 113/1A, 113/2A, 113/2B, 113/3A, 113/3B, 113/4B, 17,85,195 6. : 113/5B, 121/1A and 121/2A Village in which situated, Town Village Panchayat : Karisalpatti 17,85,195 7. Panchayat/ Panchayat Union in : Panchayat Union : Sattur which the village is situated 8. Taluk in which situated : Sattur Taluk 17,85,195 9. District in which situated : Virudhunagar District 17,85,195 10. Extent of quarry (in Ha) : 7.56.5Ha 17,85,195 New or existing quarry It is New proposal Multi - Colour Quarry Project in 57,77,83, 11. : Karisalpatti Village. 135, If in case of existing Rough Stone/ It is New proposal Multi - Colour Quarry Project in 57,77,83, Blue Metal/ Granite Quarry, the Karisalpatti Village. 135, length, width and depth to which 12. : quarrying has already been done (below the ground level/ above the ground level) If quarrying had been done below : It is New proposal Multi - Colour Quarry Project in 57,77,83, 13. the ground level/above the Ground Karisalpatti Village. 135, level, the height of quarrying Name of the owner who had earlier It is New proposal Multi - Colour Quarry Project in 57,77,83, 14. undertaken the quarrying & a copy : Karisalpatti Village. 135, of mining lease issued with date Proof of land ownership. It is a Patta land, registered in the name of company vide 85,141 If owned patta copy. patta No. 925 and 943. 15. If not own patta land agreement/ : lease copy entered with the owner (to be enclosed) Period of quarrying Mining license applied for period of twenty years only. 57,77,85, 16. : Mining plan period for the first five years. 135 Production (quantity in m3): 17,97,99, The proposed quantity of reserves (30%) is about 37125m3 (or) 6188 Lorry Loads of Multi-Colour 103,217 Granite during this period of five years. The applicant proposed up to a depth of 13m during this period. Recoverable Granite Side Total Waste Topsoil 17. Description ROM Reserves @ Waste @ Burden (GW + SB in m3 (m3) 30% (m3) 70% (m3) (m3) in m3 Geological resources 648725 194621 454104 2111305 236574 2565409 Mineable Reserves 499675 149903 349772 283320 114021 633092 Five years of mining 123750 37125 86625 14950 68598 101575 plan period Method of Mining The quarrying operation will be carried out by Open cast 23,101,21 18. : semi mechanized mining method with 5.0m vertical bench 3 with a bench width of 5.0m is being proposed. Top soil/ Overburden in case of The thickness of topsoil is about 3.0m.