Festive Packages 2011
Total Page:16
File Type:pdf, Size:1020Kb
OUTDOOR PROPOSAL FESTIVE PACKAGES 2011 24 June 2011 BERAYA WITH BIG TREE • Catch the 2011 Balik Kampung exodus early !! • Be the first few to grab limited packages targeting at the highly mobile Malaysians this coming festive season. • We celebrate this festive season by delivering your brand message across the country and into the heart of the city with the best value outdoor advertising packages. • Come celebrate and generate brand BIGNESS with over 56 million travellers on the expressways. CAMPAIGN CALENDER HARI RAYA ADILFITRI 30 – 31 Aug 2011 DEEPAVALI 26 Oct 2011 CHRISTMAS 25 Dec 2011 NEW YEAR 1 Jan 2012 2012 CHINESE NEW YEAR 23 - 24 Jan 2012 FREEWAY PACKAGE FW-11-F7 Freeway Coverage . Northern – 7 sites Value-Add Package . Central – 4 site KJLine + APLine . Southern – 9 sites No. of Duration Rental 6% GST Production Lighting Total Media Size Sites (mths) (RM) (RM) (RM) (RM) (RM) COMMENCEMENT: 1 AUG 2011 TO 14 FEBRUARY 2012 North-South Expressway 20 Various 6.5 mths 237,250 14,235 80,640 4,875 337,000 Value Add: LRT 5ft x 3ft; 5ft x 8 6.5 mths 49,075 2,495 6,950 n/a 58,970 Lightboxes 10ft TOTAL 286,325 17,180 87,590 4,875 395,970 2011 FESTIVE RATE (FW-11-F7) 208,000 12,480 59,520 n/a 280,000 TOTAL SAVINGS RM115,970 FREEWAY PACKAGE FW-11-F7 State Site No Location Add Size Available Package NORTH PS0672 KM400.30 (nb) Tg Malim Interchange 7x120x1 Immediate FW-11-F7 NORTH NSH037 KM382.00 (sb) Dr Slim River – Behrang 10x40 01/07/2011 FW-11-F7 NORTH SB026 KM254.30 (sb-offside) Dr K.Kangsar – Jelapang 10x40 Immediate FW-11-F7 NORTH NSH041 KM215.60 (nb) Dr Chg Jering – Taiping 10x40 21/07/2011 FW-11-F7 NORTH PS0680 KM155.90 (nb) Jawi I/C - Bkt Tambun I/C 10x40 15/08/11 FW-11-F7 NORTH NSH039 KM148.10 (nb) Dr Bkt Tambun – Juru 10x40 15/07/11 FW-11-F7 NORTH JKR0230 KM88.75 (sb) Dr Gurun – Sg Petani 7x120x1 Immediate FW-11-F7 CENTRAL PS0720 (L) KM17.20 (nb) Damansara Toll Plaza 10x40 Immediate FW-11-F7 CENTRAL SH0007 KM9.30 Dr Plaza Toll Kapar – Plaza Toll Pelabuhan Klang 10x40 Immediate FW-11-F7 CENTRAL PL0009 KM4.60 (wb-offside) L’raya Prolintas dr Ampang ke KL 10x40 11/07/11 FW-11-F7 CENTRAL PL0028 Per Jln Sultan Ismail/susur ke AKLEH 10x40 Immediate FW-11-F7 SOUTH SEL176 KL-Seremban Highway /Kajang / North Bound, Selangor 10x40 Immediate FW-11-F7 SOUTH NSH017 KM286.20 KL-Seremban Highway towards JB 20x40 Immediate FW-11-F7 SOUTH NEW KM197.20 (nb-o) Dr Ayer Keroh - Spg Ampat 10x40 01/07/2011 FW-11-F7 SOUTH NSH058 KM197.20 (sb) Dr Spg Ampat – Ayer Keroh 10x40 15/07/11 FW-11-F7 SOUTH NSH055 KM112.50 (sb) Dr Pagoh - Yong Peng 10x40 15/07/2011 FW-11-F7 SOUTH PS0291 KM70.10 (sb) Machap – Spg Renggam 10x40 15/07/11 FW-11-F7 SOUTH NSH051 KM51.20 (nb) Sedenak-Spg Renggam 10x40 15/07/11 FW-11-F7 SOUTH PS0616 KM40.25 (sb) Sedenak I/C – Kulai I/C 10x40 15/07/11 FW-11-F7 SOUTH PS0172 KM25.80 (nb) Dr Senai – Kulai 20x60 Immediate FW-11-F7 REGIONAL PACKAGE FW-11-F8 Main Towns Coverage . Northern – 6 sites . Central – 8 sites . Southern – 4 sites . East – 2 sites Other Towns Coverage . Northern – 3 sites . Central – 1 site . Southern – 4 sites . East – 2 sites Value-Add Package KJLine + APLine No. of Duration Rental 6% GST Production Lighting Total Media Size Sites (mths) (RM) (RM) (RM) (RM) (RM) COMMENCEMENT: 1 AUG 2011 TO 14 FEBRUARY 2012 Market Centres 20 10ft x 40ft 6.5mths 325,000 19,500 29,250 96,000 574,248 Other Towns 10 10ft x 40ft 6.5 mths 98,583 5,915 n/a Value Add: LRT Lightboxes 8 5ft x 3ft; 5ft x 10ft 6.5 mths 49,075 2,495 6,950 n/a 58,970 2011 FESTIVE RATE (FW-11-F8) 285,000 17,100 75,900 FOC 378,000 TOTAL SAVINGS RM255,217 REGIONAL PACKAGE FW-11-F8 State Site No Location Add Size Available Package CENTRAL KL-037 (L) Jln Ipoh / Opposite Public Bank, KL 10x40 Immediate FW-11-F8 CENTRAL UP0134 Jln Segambut / Jln Segambut Utara berhpr Kilang Goh Ban Huat 10x40 Immediate FW-11-F8 CENTRAL UP0129 Jln Taman Ibu Kota / Jln Langkawi, Setapak, KL 10x40 01/05/2011 FW-11-F8 CENTRAL UP0127 Jln Kg Pandan / Desa Pandan 10x40 01/07/2011 FW-11-F8 CENTRAL UP0007 (L) Jln 21/1 berhpr Stesen Caltex, PJ 10x40 11/07/2011 FW-11-F8 CENTRAL UP0109 LDP / MRR2 berhp Desa Parkcity, PJ 10x40 Immediate FW-11-F8 CENTRAL BGT-162 (L) Per Jln Kedah / Jln Meru / Jln Pekan, Klang 10x40 Immediate FW-11-F8 CENTRAL UP0044 Per Jln Subang / Psn Kerjaya, Shah Alam 10x40 Immediate FW-11-F8 CENTRAL UP0580 Per Jln Galaksi/Jln Sg Buloh, Shah Alam 10x40 16/06/2011 FW-11-F8 NORTH UP0241 (L) Perspg Jln Jelutong Lebuhraya Gelugor 10x40 Immediate FW-11-F8 NORTH UP0251 (L) Di Jln Gambiar berhpr taman permainan, Penang 10x40 Immediate FW-11-F8 NORTH PRK068 (L) Jln Yang Kalsom, Ipoh 10x40 Immediate FW-11-F8 NORTH *UP0160 (L) Per Jln Gopeng / Jln Kampar, Ipoh 10x40 01/07/2011 FW-11-F8 NORTH UP0179 Di Jln Utama Batu Gajah – Ipoh, Batu Gajah 10x40 Immediate FW-11-F8 NORTH UP0191 Per Jln Titi Serong / Jln Ipoh, Parit Buntar 10x40 Immediate FW-11-F8 NORTH UP0217 Jalan masjid berhpr TNB and Kompleks Cayman Citypoint, SP 10x40 01/08/2011 FW-11-F8 NORTH BT0030 Dr Jln Sultanah /Jln Gangsa di Spg Empat / Pusat Bdr Alor Setar 10x40 01/08/2011 FW-11-F8 NORTH UP0221 Jln Kelang Lama / Spg ke Tmn Penaga Indah, Kulim 10x40 01/08/2011 FW-11-F8 SOUTH NSH018 Pasir Gudang Highway, Johor Bahru 10x40 01/08/2011 FW-11-F8 SOUTH JHR081 Tebrau H’way / Opp Kg Setanggi after Shell, Johor Bahru 10x40 Immediate FW-11-F8 SOUTH JHR075 (L) Jln Datin Halimah/Jln Kasawari JB 10x40 Immediate FW-11-F8 SOUTH UP0291 (L) Jalan Yong Peng – Batu Pahat berhpr Hotel, Yong Peng 10x40 Immediate FW-11-F8 SOUTH UP0295 Jln Mersing/Jalan Manis berhpr Sungai Kluang, Kluang 10x40 Immediate FW-11-F8 SOUTH UP0313 Jln Batu Anam ke Jalan Tampin, Gemas 10x40 Immedaite FW-11-F8 SOUTH UP0301 (L) Jln Tuanku Munawir Spg Jln Utam Singh, Seremban 10x40 Immediate FW-11-F8 SOUTH TRC-025 PD-Seremban Highway, PD 10x40 Immediate FW-11-F8 EAST UP0320 (L) Per Jln Mahkota/Jln Merdeka, Kuantan 10x40 01/07/2011 FW-11-F8 EAST TRC037 Perspg Persiaran Sultan Abu Bakar / Indera Mahkota 2 10x40 Immediate FW-11-F8 EAST UP0330 (L) Jln Besar KL-Kuantan berhpr masjid, Maran 10x40 Immediate FW-11-F8 EAST CGT-054 Jln Besar dr Temerloh ke Kuantan, Temerloh 10x40 Immediate FW-11-F8 1MALAYSIA – BEST OOH INTEGRATION • Kuching International Airport (KIA) is Sarawak's main gateway with total passenger movement 3.5 million (2009) • Kota Kinabalu International Airport (KKIA) is Sabah and Borneo's main gateway with total passenger movement 5.2 million • KKIA is the second busiest airport in Malaysia after KLIA, followed by KIA. 1MALAYSIA – BEST OOH INTEGRATION KIA DIGITAL SCREENS SPECTACULARS COVERAGE • Northern – PS0435 & PB0044 KKIA DIGITAL SCREENS • Central – SEL323C • Southern – BT0527 No. of Duration Rental 5% GST Production Lighting Total Media Size Sites (mths) (RM) (RM) (RM) (RM) (RM) COMMENCEMENT: 1 AUG 2011 TO 31 JANUARY 2012 Alor Setar, Penang, KLIA and JB 4 Various 6mths 395,000 23,700 91,300 37,000 547,000 Causeway KKIA + KIA 16 63” 6mths 120,000 7,200 4,000 n/a 131,200 Digital Screens – Carousel Belt TOTAL 515,000 30,900 95,300 37,000 678,200 1MALAYSIA – BEST OOH INTEGRATION PKG 269,500 16,170 68,330 31,000 385,000 TOTAL SAVINGS RM293,200 1MALAYSIA – BEST OOH INTEGRATION State Site No Location Add Size Light Available NORTH PS0435 KM49.90 (nb) Alor Setar Selatan I/C 20x80x3 Yes 15/08/2011 NORTH PB0044 KM137.55 (sb) Dr Seberang Jaya ke Penang Bridge 30x20x1 No Immediate CENTRAL SEL323C KM A5.80 (sb) menuju ke KLIA Terminal 20x80x2 Yes 01/07/2011 SOUTH BT0413 JB Causeway towards JB city 50x30x1 Yes Immediate EAST KIA Digital screens at carousel belt 63” Immediate EAST KKIA Digital screens at carousel belt 63” Immediate 1MALAYSIA – BEST OOH INTEGRATION 1MALAYSIA – BEST OOH INTEGRATION 1MALAYSIA – BEST OOH INTEGRATION 1MALAYSIA – BEST OOH INTEGRATION NOTES TO ADVERTISER: - • “Jom Balik Kampung 2011” is valid for incharge date not later than 1 August 2011. • Availability of sites are based on first come first serve basis and subject to confirmation at the time of booking. • Big Tree reserves the right to offer alternative media as value-add in the event of non-approval from the authorities or non-availability of media at time of booking. • Package rate is not applicable for renewal/extension. Renewal will be based on new rate. • Production cost is based on inkjetprint and does not include special effects/protrusions. Additional cost shall apply for such design. Inkjetprint materials can last for period of 8-10 months. Payment Terms • Rental & Lighting – Two (2) equal payments in advance. • Production – 1st 50% prior to commencement of production, balance payable upon installation. • Big Tree reserves the right to vary terms and conditions. .