1983-2015 Fish Toxics Monitoring Survey List
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
J. Matthew Bellisle, P.E. Senior Vice President
J. Matthew Bellisle, P.E. Senior Vice President RELEVANT EXPERIENCE Mr. Bellisle possesses more than 20 years of experience working on a variety of geotechnical, foundation, civil, and dam engineering projects. He has acted as principal-in-charge, project manager, and project engineer for assignments involving geotechnical design, site investigations, testing, instrumentation, and construction monitoring. His experience also includes over 500 Phase I inspections and Phase II design services for earthen and concrete dams. REGISTRATIONS AND Relevant project experience includes: CERTIFICATIONS His experience includes value engineering of alternate foundation systems, Professional Engineer – Massachusetts, ground improvement methodologies, and temporary construction support. Mr. Rhode Island, Bellisle has also developed environmental permit applications and presented at New Hampshire, New York public hearings in support of public and private projects. Dam Engineering PROFESSIONAL AFFILIATIONS Natural Resources Conservation Services (NRCS): Principal-in- American Society of Civil Charge/Project Manager for various stability analyses and reports to assess Engineers long-term performance of vegetated emergency spillways. Association of State Dam - Hop Brook Floodwater Retarding Dam – Emergency Spillway Safety Officials Evaluation - George H. Nichols Multipurpose Dam – Conceptual Design of an Armored Spillway EDUCATION - Lester G. Ross Floodwater Retarding Dam – Emergency Spillway University of Rhode Island: Evaluation M.S., Civil Engineering 2001 - Cold Harbor Floodwater Retarding Dam – Emergency Spillway B.S., Civil & Environmental Evaluation Engineering, 1992 - Delaney Complex Dams – Emergency Spillway Evaluation PUBLICATIONS AND Hobbs Pond Dam: Principal-in-Charge/Project Manager for the design PRESENTATIONS and development of construction documents of a new armored auxiliary spillway and new primary spillway to repair a filed embankment and Bellisle, J.M., Chopy, D, increase discharge capacity. -
Ffy 2019 Annual Listing of Obligated Projects Per 23 Cfr 450.334
FFY 2019 ANNUAL LISTING OF OBLIGATED PROJECTS PER 23 CFR 450.334 Agency ProjInfo_ID MassDOT _Project Description▼ Obligation FFY 2019 FFY 2019 Remaining Date Programmed Obligated Federal Advance Federal Fund Fund Construction Fund REGION : BERKSHIRE MassDOT 603255 PITTSFIELD- BRIDGE REPLACEMENT, P-10-049, LAKEWAY DRIVE OVER ONOTA 10-Jul-19 $2,919,968.00 $2,825,199.25 Highway LAKE MassDOT 606462 LENOX- RECONSTRUCTION & MINOR WIDENING ON WALKER STREET 15-Apr-19 $2,286,543.00 $2,037,608.80 Highway MassDOT 606890 ADAMS- NORTH ADAMS- ASHUWILLTICOOK RAIL TRAIL EXTENSION TO ROUTE 21-Aug-19 $800,000.00 $561,003.06 Highway 8A (HODGES CROSS ROAD) MassDOT 607760 PITTSFIELD- INTERSECTION & SIGNAL IMPROVEMENTS AT 9 LOCATIONS ALONG 11-Sep-19 $3,476,402.00 $3,473,966.52 Highway SR 8 & SR 9 MassDOT 608243 NEW MARLBOROUGH- BRIDGE REPLACEMENT, N-08-010, UMPACHENE FALLS 25-Apr-19 $1,281,618.00 $1,428,691.48 Highway OVER KONKAPOT RIVER MassDOT 608263 SHEFFIELD- BRIDGE REPLACEMENT, S-10-019, BERKSHIRE SCHOOL ROAD OVER 20-Feb-19 $2,783,446.00 $3,180,560.93 Highway SCHENOB BROOK MassDOT 608351 ADAMS- CHESHIRE- LANESBOROUGH- RESURFACING ON THE 25-Jun-19 $4,261,208.00 $4,222,366.48 Highway ASHUWILLTICOOK RAIL TRAIL, FROM THE PITTSFIELD T.L. TO THE ADAMS VISITOR CENTER MassDOT 608523 PITTSFIELD- BRIDGE REPLACEMENT, P-10-042, NEW ROAD OVER WEST 17-Jun-19 $2,243,952.00 $2,196,767.54 Highway BRANCH OF THE HOUSATONIC RIVER BERKSHIRE REGION TOTAL : $20,053,137.00 $19,926,164.06 Wednesday, November 6, 2019 Page 1 of 20 FFY 2019 ANNUAL LISTING OF OBLIGATED PROJECTS PER -
2014 Boat Inspection Program Final Report
2014 Lake George Aquatic Invasive Species Prevention Program A Trailered Boat Inspection Program Final Report Table of Contents Acknowledgements....................................................................................................................................... 2 Executive Summary....................................................................................................................................... 3 2014 Boat Inspection Program Summary ‐ By the Numbers ........................................................................ 4 Introduction .................................................................................................................................................. 5 Public Outreach and Involvement ................................................................................................................ 6 Program Description ..................................................................................................................................... 7 Inspection Process: ............................................................................................................................... 8 Data Collection:..................................................................................................................................... 9 Sample Collection: ................................................................................................................................ 9 Decontamination Equipment:............................................................................................................ -
Massachusetts Freshwater Beaches [2018]: Water Quality Data for Public and Semi-Public Beaches
Massachusetts Freshwater Beaches [2018]: Water quality data for public and semi-public beaches The table below summarizes testing and posting information for each freshwater beach in Massachusetts. Under the state regulations, freshwater beaches must test for either E. coli or Enterococci. Most beaches do not have to post after each exceedance, provided that (1) they take an immediate resample and (2) that resample does not exceed the standard. Thus, a beach may have an exceedance but no days posted. Conversely, a beach may have days posted, but no exceedances, if it was posted for a reason other than a bacterial exceedance (e.g. rainfall, a cyanobacterial harmful algae bloom, or another hazard such as limited visibility due to poor water clarity). Single Minimum Maximum Testing Days Community Beach Name Tests Indicator Sample Exceedance Exceedance Frequency Posted Exceedances (cfu/100mL) (cfu/100mL) Abington Island Grove Beach Weekly 12 E. coli 3 236 312 3 Acton NARA Beach Weekly 16 E. coli Agawam Robinson Pond Beach (DCR) Weekly 15 Enterococci Amesbury Camp Bauercrest Weekly 10 E. coli Amesbury Glen Devin Condominiums Weekly 11 E. coli 2 261 1553 14 Amesbury Lake Attitash - A.L.S.I.A. Weekly 11 E. coli Amesbury Lake Gardner Weekly 11 E. coli 1 261 261 7 Amesbury Tuxbury RV Resort Lagoon Weekly 11 E. coli Amherst Puffers Pond (North) Weekly 17 E. coli 4 240 1986.3 8 Amherst Puffers Pond (South) Weekly 18 E. coli 4 285.1 1986.3 8 Andover Camp Maude Eaton (1) Weekly 11 E. Coli Andover Camp Maude Eaton (2) Weekly 11 E. -
Horsley Witten Group Technical Analysis Upper Alewife Brook Basin
+RUVOH\:LWWHQ*URXS 6XVWDLQDEOH(QYLURQPHQWDO6ROXWLRQV 5RXWH$6DQGZLFK0$ 3KRQH)D[ZZZKRUVOH\ZLWWHQFRP 7HFKQLFDO$QDO\VLV 8SSHU$OHZLIH%URRN%DVLQ ,PSDFW6WXG\ )HEUXDU\ 3UHSDUHGIRU (OOHQ0DVV )ULHQGVRI$OHZLIH5HVHUYDWLRQ $OHZLIH%URRN3DUNZD\ %HOPRQW0$ 6SRQVRUHGE\ %HOPRQW/DQG7UXVW &DPEULGJH*UHHQ %HOPRQW&LWL]HQV)RUXP Upper Alewife Brook Watershed Technical Analysis Table of Contents Page 1.0 Purpose 1 2.0 The Study Area 1 3.0 Flooding and Stormwater 2 4.0 Habitat 6 5.0 Water Quality 8 6.0 Smart Growth and Low Impact Development 10 7.0 References 11 LIST OF TABLES Table 1 ± Hydrologic Analysis 3 Table 2 ± Scientific Studies on Wildlife Habitat at the Belmont Uplands 6 Table 3 ± Phosphorus Loading Analysis 9 LIST OF FIGURES Figure 1 ± Mystic River Watershed and Subbasins Figure 2 ± FEMA National Flood Hazard Layer Alewife Subbasin Figure 3 ± Recharge Rates Figure 4 ± Impervious Cover Alewife Subbasin Figure 5 ± Impervious Cover vs. Native Fish Species Figure 6 ± Phosphorus Loading Rates 8 Figure 7 ± Phosphorus Loading Analysis 9 Figure 8 ± Low Impact Development Stormwater BMPs Technical Analysis ± Upper Alewife Brook Watershed 1.0 Purpose This report was prepared to provide the towns of Arlington, Belmont and Cambridge a clear understanding of the hydrologic and ecological considerations associated with continued development of environmentally-sensitive lands associated with the upper Alewife Brook Watershed which includes Little River in Cambridge and several ponds and streams. A specific focus is provided on the proposed development project at the Belmont Uplands site which is characterized by Charles Katuska, PVVS, Chair conservation Commission in Sutton, as a silver maple forest monoculture. The report provides a technical summary of flooding, habitat, water quality, and climate change as they substantially affect the regional subject area. -
New Marlborough Open Space 2004
New Marlborough Open Space and Recreation Plan March, 2004 2 Table of Contents Section One: Plan Summary 5 Section Two: Statement of Purpose 7 Planning Process and Public Participation 7 Section Three: Community Se�ing 9 Section Four: Environmental Inventory and Analysis 15 A. Geology, Soils, and Topography 15 B. Landscape Character 18 C. Water Resources 18 D. Vegetation 21 E. Fisheries and Wildlife 26 F. Scenic Resources and Unique Environments 27 G. Environmental Challenges 29 Section Five: Inventory of Lands of Conservation 31 and Recreation Interest 31 A. Private Parcels With Permanent Protection 32 B. Private Parcels With Temporary Protection 35 C. Public and Nonprofit Protected Parcels 35 Section Six: Community Goals 39 A. Description of Process 39 B. Statement of Open Space and Recreation Goals 39 Section Seven: Analysis of Needs 41 A. Summary of Resource Protection Needs 41 B. Summary of Community’s Needs 43 C. Management Needs 44 Section Eight: Goals and Objectives 47 Section Nine: Five-Year Action Plan 49 Section Ten: Public Comments 59 Section Eleven: References 61 Appendix 64 3 4 Section One: Plan Summary Section One: Plan Summary Preserving rural character and protecting natural resources are the primary goals for the 2004 New Marlborough Open Space and Recreation Plan (OSRP). Situated in the most southern part of Berkshire County, New Marlborough is off the beaten path, roughly twenty miles from the nearest exit of the Massachuse�s Turnpike. The residents take pride in their sense of place and wish to maintain it. Recent decades of broad economic and demographic changes in New England are affecting the small, rural community of New Marlborough. -
Use of Thematic Mapper Imagery to Assess Water Quality, Trophic State, and Macrophyte Distributions in Massachusetts Lakes
U.S. Department of the Interior U.S. Geological Survey Use of Thematic Mapper Imagery to Assess Water Quality, Trophic State, and Macrophyte Distributions in Massachusetts Lakes By MARCUS C. WALDRON, PETER A. STEEVES, and JOHN T. FINN (Department of Forestry and Wildlife Management, University of Massachusetts, Amherst) Water-Resources Investigations Report 01-4016 Prepared in cooperation with the Massachusetts Department of Environmental Management Northborough, Massachusetts 2001 U.S. DEPARTMENT OF THE INTERIOR GALE A. NORTON, Secretary U.S. GEOLOGICAL SURVEY Charles G. Groat, Director The use of trade or product names in this report is for identification purposes only and does not constitute endorsement by the U.S. Government. For additional information write to: Copies of this report can be purchased from: Chief, Massachusetts-Rhode Island District U.S. Geological Survey U.S. Geological Survey Branch of Information Services Water Resources Division Box 25286 10 Bearfoot Road Denver, CO 80225-0286 Northborough, MA 01532 or visit our web site at http://ma.water.usgs.gov CONTENTS Abstract ................................................................................................................................................................................. 1 Introduction ........................................................................................................................................................................... 2 Study Methods...................................................................................................................................................................... -
Douglas Reconnaissance Report
DOUGLAS RECONNAISSANCE REPORT BLACKSTONE VALLEY / QUINEBAUG-SHETUCKET LANDSCAPE INVENTORY MASSACHUSETTS HERITAGE LANDSCAPE INVENTORY PROGRAM Massachusetts Department of Conservation and Recreation John H. Chafee Blackstone River Valley National Heritage Corridor Quinebaug and Shetucket Rivers Valley National Heritage Corridor PROJECT TEAM Massachusetts Department of Conservation and Recreation Jessica Rowcroft, Preservation Planner Division of Planning and Engineering John H. Chafee Blackstone River Valley National Heritage Corridor Commission Joanna Doherty, Community Planner Project Consultants Elizabeth Vizza, Elizabeth Vizza Consulting Electa Kane Tritsch, Oakfield Research Daniel Wells, Hyla Ecological Services Inc. Local Project Coordinator Sue Perkins, Chair, Open Space Committee Local Heritage Landscape Participants Sean Aldrich Linda Brown Shirley Cooney Dawn Fontaine Fred Fontaine Carol Gogtolinski Becky Kalagher David Kmetz Leon Mosczynski Shirley Mosczynski Sue Perkins Stephen Sheldon Julia Taddei Merritt Tetrault Cary VandenAkker Stephen Zisk June 2007 Cover Photographs: South Douglas Cemetery Stone Arch Bridge, Wallum Lake Road Hunt’s Pond Spillway CONTENTS Introduction ........................................................................................................................1 Part I: Douglas’s Heritage Landscapes Douglas’s Landscape Through Time..........................................................................2 Community-Wide Heritage Landscape Issues ...........................................................3 -
MDPH Beaches Annual Report 2008
Marine and Freshwater Beach Testing in Massachusetts Annual Report: 2008 Season Massachusetts Department of Public Health Bureau of Environmental Health Environmental Toxicology Program http://www.mass.gov/dph/topics/beaches.htm July 2009 PART ONE: THE MDPH/BEH BEACHES PROJECT 3 I. Overview ......................................................................................................5 II. Background ..................................................................................................6 A. Beach Water Quality & Health: the need for testing......................................................... 6 B. Establishment of the MDPH/BEHP Beaches Project ....................................................... 6 III. Beach Water Quality Monitoring...................................................................8 A. Sample collection..............................................................................................................8 B. Sample analysis................................................................................................................9 1. The MDPH contract laboratory program ...................................................................... 9 2. The use of indicators .................................................................................................... 9 3. Enterococci................................................................................................................... 10 4. E. coli........................................................................................................................... -
Watertown, MA Waterbody Assessment, 305(B)/303(D), and Total Maximum Daily Load (TMDL) Status
Spy Lexington Pond Winns Brook MA71040_2008 Arlington Spy Pond (5) MA71-09_2008 2 Little Winn Brook (5) Pond MA71-04_2008 Alewife Brook (5) Alewife Brook Jerrys MA72-28_2008 Clay Pit Pond Pond Beaver Brook (5) (TMDL) Belmont BeaverBeaver BrookBrook MA71011_2008 Clematis Brook Clay Pit Pond (5) 3 60 MA71005_2008 Blacks Nook (5) Waltham Cambridge Lilly Fresh Pond Pond Cambridge Reservoir 20 16 Watertown MA72-32_2008 MA72-07_2008 Unnamed tributary (4a) (TMDL) Charles River (5) (TMDL) MA72-30_2008 Unnamed Tributary (5) (TMDL) MA72-36_2008 Cheese Cake Brook Cheese Cake Brook Charles River (5) (TMDL) Charles River 16 90 20 MA72-29_2008 Cheese Cake Brook (5) (TMDL) Boston Newton MA72017_2008 Chandler Pond (5) Chandler Pond Notes: MA72011_2008 1) Adapted from Final Massachusetts Year 2008 Integrated List of Waters; Bulloughs Pond (5) available at http://www.mass.gov/dep/water/resources/08list2.pdf Bulloughs 2) Waterbodies shown without an identified category are assigned30 as Category 3 by definition. Pond 3) For additional information on TMDLs and to view reports, see: http://www.mass.gov/dep/water/resources/tmdls.htmMA72023_2008 Chestnut Hill 4) ForChestnut Massachusetts Hill ReservoirSurface Water (3) QualityReservoir Standards, and waterbody classesBrookline and uses, see: http://www.mass.gov/dep/service/regulations/314cmr04.pdf 0 0.5 Waterbody Assessment and TMDL Status Miles Map produced by EPA Region I GIS Center Map Tracker ID 6678, February 25, 2010 Watertown, MA Data Sources: TeleAtlas, Census Bureau, USGS, MassDEP Waterbody Label Assessment of Waterbody Segment Category 4a: TMDL is completed and approved for Waterbodies one or more pollutants State ID, Category 2: Attaining some uses; other uses Waterbody Name (Category) not assessed Impairment not caused by a pollutant. -
Mercury Pollution in Massachusetts' Waters
Photo: Supe87, Under license from Shutterstock.com from Supe87, Under license Photo: ToXIC WATERWAYS Mercury Pollution in Massachusetts’ Waters Lauren Randall Environment Massachusetts Research & Policy Center December 2011 Executive Summary Coal-fired power plants are the single larg- Human Services advises that all chil- est source of mercury pollution in the Unit- dren under twelve, pregnant women, ed States. Emissions from these plants even- women who may become pregnant, tually make their way into Massachusetts’ and nursing mothers not consume any waterways, contaminating fish and wildlife. fish from Massachusetts’ waterways. Many of Massachusetts’ waterways are un- der advisory because of mercury contami- Mercury pollution threatens public nation. Eating contaminated fish is the main health source of human exposure to mercury. • Eating contaminated fish is the main Mercury pollution poses enormous public source of human exposure to mercury. health threats. Mercury exposure during • Mercury is a potent neurotoxicant. In critical periods of brain development can the first two years of a child’s life, mer- contribute to irreversible deficits in verbal cury exposure can lead to irreversible skills, damage to attention and motor con- deficits in attention and motor control, trol, and reduced IQ. damage to verbal skills, and reduced IQ. • While adults are at lower risk of neu- In 2011, the U.S. Environmental Protection rological impairment than children, Agency (EPA) developed and proposed the evidence shows that a low-level dose first national standards limiting mercury and of mercury from fish consumption in other toxic air pollution from existing coal- adults can lead to defects similar to and oil-fired power plants. -
Clay Pit Pond Deforestation Damages Wetland
Belmont Citizens Forum Clay Pit Pond Deforestation Damages Wetland By Judy Singler In September 2020, several Belmont residents removed more than 80 trees and shrubs from the south side of Clay Pit Pond. In an unauthorized action taken ostensibly to “enhance” the view of the pond, individuals visited the site on at least three occasions that month, cutting down 50-foot-tall trees, shrubs, vines, and other vegetation. The remaining trees at the edge of the pond were pruned of side branches to a height of 20 feet and more. Town officials eventually ordered a halt to the illegal tree cutting after calls from several concerned citizens. Environmental Laws Exist to Protect our Wetlands Cutting vegetation within 100 feet of a protected body of water is subject to state wetlands laws and requires a permit from the town’s Conservation Commission (ConCom). In this case, no permit was requested or granted. In October, when the ConCom became aware of this activity, members began discussing options for the town. The contractor origi- SINGLER JUDY nally hired for management of Bare ground, erosion, and cut stumps after illegal tree invasive species around the pond had removal at Clay Pit Pond. been unable to perform the work due to the Covid-19 crisis. He will inspect the pond due to large areas without soil-stabi- the site to assess current needs. lizing vegetation near the shoreline. Because many tree and shrub stumps remained near the pond, creating a hazard The Conservation Commission’s Role to visitors, the Department of Public Works This activity at Clay Pit Pond reveals the need arranged for a contractor to remove the larger for greater understanding in the community stumps in December, even as citizens raised of our wetland areas and the regulations that concerns about possible erosion and siltation at protect them.