CPY Document
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
J. Matthew Bellisle, P.E. Senior Vice President
J. Matthew Bellisle, P.E. Senior Vice President RELEVANT EXPERIENCE Mr. Bellisle possesses more than 20 years of experience working on a variety of geotechnical, foundation, civil, and dam engineering projects. He has acted as principal-in-charge, project manager, and project engineer for assignments involving geotechnical design, site investigations, testing, instrumentation, and construction monitoring. His experience also includes over 500 Phase I inspections and Phase II design services for earthen and concrete dams. REGISTRATIONS AND Relevant project experience includes: CERTIFICATIONS His experience includes value engineering of alternate foundation systems, Professional Engineer – Massachusetts, ground improvement methodologies, and temporary construction support. Mr. Rhode Island, Bellisle has also developed environmental permit applications and presented at New Hampshire, New York public hearings in support of public and private projects. Dam Engineering PROFESSIONAL AFFILIATIONS Natural Resources Conservation Services (NRCS): Principal-in- American Society of Civil Charge/Project Manager for various stability analyses and reports to assess Engineers long-term performance of vegetated emergency spillways. Association of State Dam - Hop Brook Floodwater Retarding Dam – Emergency Spillway Safety Officials Evaluation - George H. Nichols Multipurpose Dam – Conceptual Design of an Armored Spillway EDUCATION - Lester G. Ross Floodwater Retarding Dam – Emergency Spillway University of Rhode Island: Evaluation M.S., Civil Engineering 2001 - Cold Harbor Floodwater Retarding Dam – Emergency Spillway B.S., Civil & Environmental Evaluation Engineering, 1992 - Delaney Complex Dams – Emergency Spillway Evaluation PUBLICATIONS AND Hobbs Pond Dam: Principal-in-Charge/Project Manager for the design PRESENTATIONS and development of construction documents of a new armored auxiliary spillway and new primary spillway to repair a filed embankment and Bellisle, J.M., Chopy, D, increase discharge capacity. -
Bulletin of the Massachusetts Archaeological Society, Vol. 62, No. 2 Massachusetts Archaeological Society
Bridgewater State University Virtual Commons - Bridgewater State University Bulletin of the Massachusetts Archaeological Journals and Campus Publications Society Fall 2001 Bulletin of the Massachusetts Archaeological Society, Vol. 62, No. 2 Massachusetts Archaeological Society Follow this and additional works at: http://vc.bridgew.edu/bmas Part of the Archaeological Anthropology Commons Copyright © 2001 Massachusetts Archaeological Society This item is available as part of Virtual Commons, the open-access institutional repository of Bridgewater State University, Bridgewater, Massachusetts. BULLETIN OF THE MASSACHUSElTS ARCHAEOLOGICAL SOCIETY VOLUME 62(2) FALL 2001 CONTENTS: In Memoriam: Great Moose (Russell Herbert Gardner) . Mark Choquet 34 A Tribute to Russell H. Gardner (Great Moose) . Kathryn Fairbanks 39 Reminiscences of Russell H. Gardner (Great Moose) Bernard A. Otto 41 The Many-Storied Danson Stone of Middleborough, Massachusetts Russell H. Gardner (Great Moose) 44 Discovery and Rediscovery of a Remnant 17th Century Narragansett Burial Ground' in Warwick, Rhode Island Alan Leveillee 46 On the Shore of a Pleistocene Lake: the Wamsutta Site (I9-NF-70) Jim Chandler 52 The Blue Heron Site, Marshfield, Massachusetts (l9-PL-847) . John MacIntyre 63 A Fertility Symbol from Cuttyhunk Island, Massachusetts . Ethel Twichell 68 Contributors 33 Editor's Note 33 THE MASSACHUSETTS ARCHAEOLOGICAL SOCIETY, Inc. P.O.Box 700, Middleborough, Massachusetts 02346 MASSACHUSETTS ARCHAEOLOGICAL SOCIETY Officers: Ronald Dalton, 100 Brookhaven Dr., Attleboro, MA 02703 President Donald Gammons, 7 Virginia Dr., Lakeville, MA 02347 Vice President Wilford H. Couts Jr., 127 Washburn Street, Northborough, MA 01532 Clerk Edwin C. Ballard, 26 Heritage Rd., Rehoboth, MA 02769 .. Treasurer Eugene Winter, 54 Trull Ln., Lowell, MA 01852 Museum Coordinator Shirley Blancke, 579 Annursnac Hill Rd., Concord, MA 01742 Bulletin Editor Curtiss Hoffman, 58 Hilldale Rd., Ashland, MA 01721 .................. -
DRAFT Northeast Regional Mercury Total Maximum Daily Load
DRAFT Northeast Regional Mercury Total Maximum Daily Load Connecticut Department of Environmental Protection Maine Department of Environmental Protection Massachusetts Department of Environmental Protection New Hampshire Department of Environmental Services New York State Department of Environmental Conservation Rhode Island Department of Environmental Management Vermont Department of Environmental Conservation New England Interstate Water Pollution Control Commission April 2007 DRAFT Contents Contents .......................................................................................................................................................ii Tables ..........................................................................................................................................................iv Figures.........................................................................................................................................................iv Acknowledgements .....................................................................................................................................v Executive Summary ...................................................................................................................................vi Abbreviations ...........................................................................................................................................xiii Definition of Terms..................................................................................................................................xvi -
2014 Boat Inspection Program Final Report
2014 Lake George Aquatic Invasive Species Prevention Program A Trailered Boat Inspection Program Final Report Table of Contents Acknowledgements....................................................................................................................................... 2 Executive Summary....................................................................................................................................... 3 2014 Boat Inspection Program Summary ‐ By the Numbers ........................................................................ 4 Introduction .................................................................................................................................................. 5 Public Outreach and Involvement ................................................................................................................ 6 Program Description ..................................................................................................................................... 7 Inspection Process: ............................................................................................................................... 8 Data Collection:..................................................................................................................................... 9 Sample Collection: ................................................................................................................................ 9 Decontamination Equipment:............................................................................................................ -
Taunton, MA Waterbody Assessment, 305(B)/303(D)
MA62-10_2008 MA62-22_2008 MA62-32_2008 Matfield River (5) Satucket River (2) Coweeset Brook (3) 106 West 28 123 MA62-13_2008 Bridgewater Town River (3) Mansfield Easton MA62106_2008 MA62-12_2008 MA62-13_2008 Hockomock River Little Cedar Swamp (3) Town River (3) Town River (3) MA62203_2008 Town Black Brook River Fuller Hammond Ward Pond (3) MA62-35_2008 TownTown RiverRiver Pond Hockomock River (3) MA62134_2008 MA62158_2008 MA62-11_2008 Norton Reservoir (5) Reservoir (3) Town River (3) MA62-27_2008 South Brook 138 South Brook Canoe River (2) MA62-31_2008 Mulberry Meadow Brook (3) Carver Canoe River Pond MA62033_2008 Norton MA62213_2008 Carver Pond (4c) Reservoir Winnecunnet Pond (4c) MA62131_2008 Norton Lake Nippenicket (4c) (TMDL) 140 Bridgewater Winnecunnet MA62-28_2008 Lake 18 Pond Nippenicket MA62-40_2008 Snake River (3) 495 Rumford River Rumford River Rumford River (2) Watson Sawmill Brook SnowsBrook 104 SnowsBrook Pond MA62007_2008 MA62-56_2008 MA62-36_2008 Barrowsville Pond (3) Three Mile River (5) MA62166_2008 MA62088_2008 Sawmill Brook (3) Barrowsville MA62084_2008 MA62205_2008 Lake Sabbatia (5) Hewitt Pond (3) Gushee PondMA62-49_2008 Pond Gushee Pond (4c) Watson Pond (5) Otis Pratt Brook Wading River (5) Meadow Sabbatia Lake Kings Brook Pond Prospect Hill MA62101_2008 Pond Pond MA62228_2008 Mill Kings Pond (3) 24 MA62113_2008 River Johnson Bassett Brook Whittenton Impoundment (4c) Pond Meadow Brook Pond (3) MA62149_2008 Birch Brook Prospect Hill Pond (3) MA62097_2008 Middleborough MA62-56_2008 Three Mile River (5) MA62136_2008 -
Section 16 - ABP Progress & Expenditures Report, Run Date: 12/15/2015 10:08:00 AM Page 1 of 13 ESTIMATED COSTEXPENDITURES ESTIMATED SCHEDULE
ABP Progress and Expenditures Report Pursuant to 2008 Transportation Bond Act Chapter 233 §16 Data is current through 11/15/2015 This progress and expenditure report contains project expenditures incurred as of August 4, 2008 through the report date. This report may not reflect total project cost if the project incurred expenditures prior to August 4, 2008. Column Header Footnotes: 1 PRELIMINARY ESTIMATE - The preliminary estimate is not a performance measure for on-budget project delivery. It is the estimated construction cost value that was included in the November 30, 2008 report to the Legislature pursuant to §19 of Chapter 233 of the Acts of 2008; used for early budgeting purposes only. This “baseline” estimate was established at the inception of the program before many projects were scoped. This estimate included allowances for incidentals for construction such as police details, adjustment for inflation, and reasonable contingencies to account for growth approved by MassHighway/DCR. The Preliminary Estimate did NOT include costs associated with design, right-of-way, force accounts, project oversight, or other program related costs. * Indicates project is one of several that had an incorrect “Preliminary Estimate” and/or scheduled completion, as part of the Chapter 233 §19 Legislative requirement, to provide the estimates and schedules, as part of the 3 year plan of ABP. This Project had actual bid amounts and encumbered amounts, at the time of the filing of the Dec‐08 Legislative Report, but was not properly accounted for in the recording of the Dec‐08 Legislative Report. The Nov/Dec‐08 Conceptual Plan Chapter 233 §19 "Construct Cost" and/or "Completion" in this report reflect the corrected values as approved by the ABP Oversight Council at the March 8, 2010 Quarterly Meeting. -
Massachusetts Freshwater Beaches [2018]: Water Quality Data for Public and Semi-Public Beaches
Massachusetts Freshwater Beaches [2018]: Water quality data for public and semi-public beaches The table below summarizes testing and posting information for each freshwater beach in Massachusetts. Under the state regulations, freshwater beaches must test for either E. coli or Enterococci. Most beaches do not have to post after each exceedance, provided that (1) they take an immediate resample and (2) that resample does not exceed the standard. Thus, a beach may have an exceedance but no days posted. Conversely, a beach may have days posted, but no exceedances, if it was posted for a reason other than a bacterial exceedance (e.g. rainfall, a cyanobacterial harmful algae bloom, or another hazard such as limited visibility due to poor water clarity). Single Minimum Maximum Testing Days Community Beach Name Tests Indicator Sample Exceedance Exceedance Frequency Posted Exceedances (cfu/100mL) (cfu/100mL) Abington Island Grove Beach Weekly 12 E. coli 3 236 312 3 Acton NARA Beach Weekly 16 E. coli Agawam Robinson Pond Beach (DCR) Weekly 15 Enterococci Amesbury Camp Bauercrest Weekly 10 E. coli Amesbury Glen Devin Condominiums Weekly 11 E. coli 2 261 1553 14 Amesbury Lake Attitash - A.L.S.I.A. Weekly 11 E. coli Amesbury Lake Gardner Weekly 11 E. coli 1 261 261 7 Amesbury Tuxbury RV Resort Lagoon Weekly 11 E. coli Amherst Puffers Pond (North) Weekly 17 E. coli 4 240 1986.3 8 Amherst Puffers Pond (South) Weekly 18 E. coli 4 285.1 1986.3 8 Andover Camp Maude Eaton (1) Weekly 11 E. Coli Andover Camp Maude Eaton (2) Weekly 11 E. -
Quaboag & Quacumquasit Ponds
Managing Cranberry Bogs on White Island Pond Mark D. Mattson PhD Massachusetts Dept. of Environmental Protection Plymouth Massachusetts 1621 Thanksgiving Turkey, Cranberries and White Island Pond Pumping began in 1960 (repeated floods, 10 feet water) Photo : Jack Rabin $ 100 million crop 200 80 70 150 60 50 100 40 30 (lb/Acre) 50 20 ? 10 Rate P Recommended Cranberry Yield (Barrel/Acre) Cranberry Yield 0 0 1960 1970 1980 Year 1990 2000 2010 White Island Pond Ezekiel Pond Enforce CWA? Combine TMDL+ 319 Alternative Sample EPA 319 Grant(s) to • Violation of WQS 2000 University to do 2001- Study on Cranberry 2005 P fertilizer rates, Sample 2007 discharge of P • TMDL MOA Draft 2008 More 319 grants BMPs, Final 2010 Growers fund first alum • Enforcement 2013 with homeowners 319 grant to help fund 2014 final alum treatment 319 Grant results: Cranberry Yield vs P fertilizer DeMoranville (Acta Hort, 2014): Table 1 Sites show average of 24% increased yield with lower P (<10 kg/ha) rate. 9.9 kg P/ha/yr Flow-thru bog Howe and Teal, 1995 Net Export TP vs TP Discharge Concentration (319 Grant data: DeMoranville and Howes, 2005) 5 4 3 kg/ha/yr 2 1 Organic1 Organic2 0 Organic3 0 0.1 0.2 0.3 0.4 0.5 0.6 Organic4 -1 Mineral5 Mineral6 Regression Net TP Netexport TP -2 TP Concentration in Discharge mg/L TP in Bog Discharge (mg/l) 680 78 68 12 260 51 34 91 81 6 Total Phosphorus concentrations (ug/L) in the area. TMDL from TP 57 ug/l to 19 ug/l 3.4 kg/ha 0.5 kg/ha 3.4 kg/ha 0.5 kg/ha Total Phosphorus (ug/L) 100 120 20 40 60 80 0 1977 Whittaker (1980) 2000 2007 -
Geology of the Taunton "Quadrangle, Bristol and Plymouth Counties Massachusetts
Geology of the Taunton "Quadrangle, Bristol and Plymouth Counties Massachusetts By JOSEPH H. HARTSHORN GEOLOGY OF SELECTED QUADRANGLES IN MASSACHUSETTS v -GEOLOGICAL SURVEY BULLETIN 1163-D Prepared in cooperation with the Commonwealth of Massachusetts ' Department of Public ff^orks ,UNITED STATES GOVERNMENT PRINTING OFFICE, WASHINGTON : 1967 UNITED STATES DEPARTMENT OF THE INTERIOR STEWART L. UDALL, Secretary GEOLOGICAL SURVEY William T. Pecora, Director For sale by the Superintendent of Documents, U. S. Government Printing Office Washington, D.C. 20402 CONTENTS ' Page Abstract__ ____-_____-_---___________----__---_----___-------_--- Dl Introduction._ ___-___----____________---_----_------_-------______ 1 Acknowledgments. __.._________,.______-_-_-___-___--______-___ 2 General setting.._.---_____________-_-___'__________-.__________ 2 Pre-Pleistocene geology and history._________________________________ 2 Stratigraphy._______________________----_--------_---_-.______ 3 Structure._______-----____________---------_-----_----____.___ 6 Geologic history._-_-_--__________----_-----_-----_--_-________ 7 Pleistocene geology____-_-_____-_______--__------___-__---_-_______ 8 Glacial erosion._______________________________________________ 8 Glacial deposits.__-_-_.-_______-___---------_---_-_------_.____ 9 Till..---------------------------------------------------- 9 Field and laboratory data..____________________________ 11 * Ground moraine.-.-----------^-------------------- 12 Flowtill. _-______-.-.---------.--------.....-...-_ 19 Textural data.____________________________________ -
Taunton Watershed Wildlife Habitat/Ecological Resources Geosyntec Consultants
Bridgewater State University Virtual Commons - Bridgewater State University Maps Taunton River Watershed Project 2006 Taunton Watershed Wildlife Habitat/Ecological Resources GeoSyntec Consultants Recommended Citation GeoSyntec Consultants (2006). Taunton Watershed Wildlife Habitat/Ecological Resources. Taunton River Watershed Project Maps. Item 1. Available at: http://vc.bridgew.edu/taunton_riv_maps/1 This item is available as part of Virtual Commons, the open-access institutional repository of Bridgewater State University, Bridgewater, Massachusetts. #*#* #*#* #* #* #* #*#* #* #* #* #* BOSTON #* #* #*#* #* QUINCY #* #* QUINCY #*#* #* DEDHAM #* #*#*#* #* #* #* #* #* #* DOVER #* #* #* #* #* #* MILTON COHASSET #*#* SHERBORN #* #* #* #* #* WESTWOOD #* #* #* #* #* #* #* #* #* #* #* HINGHAM #* #* #* #* #* #* #* #* #* #* #* #* #*#*#*#*#*#*#* #* #* BRAINTREE #*#*#* #* #* SCITUATE HOLLISTON #* #* #* #*#* #* WEYMOUTH #* #* NORWOOD #* MEDFIELD #* #* #* RANDOLPH #* #* #* CANTON #* #* #* #* #* MILLIS #*#* #* #* #* #*#* #* #* #* #* #* #* NORWELL #* #* #* #*#* #* #* #* #*#* #* #* #* #* #* #*#* #* MEDWAY #*#*#*#* #* #* #* #* #* HOLBROOK #* WALPOLE #* #* #* #* #* #* #*#* #*#* #* #* #* #* #* #*#* #* #* #*#* #* Cushing Pond ROCKLAND #* Spring Street Pond MARSHFIELD AVON #* #* #* #* #* HANOVER #*#*#*#* Shumatucacant River Pon #* #* #* Cleveland Pond #* #* STOUGHTON ABINGTON #* #* #* #* N#*ORFOLK Brockton Reservoir #* Island Grove Pond #* #* #*#* #* SHARON Waldo Lake #* Dry Pond Plain Street Pond #* #* Upper Porter Pond Wolomolopoag Pond Lower Porter Pond -
Bird Observer
Bird Observer VOLUME 39, NUMBER 2 APRIL 2011 HOT BIRDS On November 20 the Hampshire Bird Club was waiting at Quabbin headquarters for the rest of the group to arrive when Larry Therrien spotted a flock of 19 swans in the distance— Tundra Swans! Ian Davies took this photograph (left). Since 2003 Cave Swallows have been a specialty of November, showing up in coastal locations in increasing numbers over the years. This year there was a flurry of reports along the New England coast. On Thanksgiving Day, Margo Goetschkes took this photograph (right) of one of the birds at Salisbury. On November 30, Vern Laux got a call from a contractor reporting a “funny bird” at the Nantucket dump. Vern hustled over and was rewarded with great views of this Fork-tailed Flycatcher (left). Imagine: you’re photographing a Rough- legged Hawk in flight, and all of a sudden it is being mobbed—by a Northern Lapwing (right)! That’s what happened to Jim Hully on December 2 on Plum Island. This is only the second state record for this species, the first being in Chilmark in December of 1996. On April 9, Keelin Miller found an interesting gull at Kalmus Beach in Hyannis. As photographs were circulated, opinions shifted toward a Yellow-legged Gull (left). Check out Jeremiah Trimble’s photo from April 13. CONTENTS BIRDING THE LAKEVILLE PONDS OF PLYMOUTH COUNTY, MASSACHUSETTS Jim Sweeney 73 THE FINAL YEAR OF THE BREEDING BIRD ATLAS: GOING OVER THE TOP John Galluzzo 83 37 YEARS OF NIGHTHAWKING Tom Gagnon 86 LEIF J ROBINSON: MAY 21, 1939 – FEBRUARY 28, 2011 Soheil Zendeh 93 FIELD NOTES Double-crested Cormorant Has Trouble Eating a Walking Catfish William E. -
Foundry Pond Diagnostic Feasibility Study
I I I GALE I I I FOUNDRY POND DIAGNOSTIC/FEASIBILITY STUDY I FINAL REPORT I JANUARY 1992 I I Prepared For: The Town of Hingham -' And The Massachusetts Division of Hater Pollution Control I Clean Lakes Program In Association With I M.G.L. Ch. 628 I Massachusetts Clean Lakes Program I Prepared By: GALE ASSOCIATES, INC. I Eight School Street Weymouth, MA 02189 and I K-V ASSOCIATES, INC. 281 Main Street I Falmouth, MA 02540 I I B°ston • St. Augustine • Baltimore I I I FOUNDRY POND I DIAGNOSTIC/FEASIBILITY STUDY I FINAL REPORT TABLE OF CONTENTS I SECTION ' PAGE • List of Figures iii List of Tables v " Executive Summary , vii • 1.0 INTRODUCTION 1 1 -1 Background 1 • 1.2 Scope of Work and Study Objectives 5 2 . 0 DIAGNOSTIC EVALUATION 7 I 2.1 Recreational Use and Public Access 7 I 2.2 Watershed Description . 10 2. 3 Watershed Land Uses 17 • 2.4 Watershed Geology 24 2 . 5 Basin Morphometry 31 | 2.6 Hydrologic Budget 34 M 2.7 Phosphorus and Nitrogen Budgets 39 • 2.8 Limnological Data 43 • 2.9 Tributary Water Quality 67 2 .10 Macrophyton. 74 | 2.11 Fisheries 78 2.12 Inventory of On-Site Wastewater Disposal 82 1 Practices i 2.13 Lake Sediment Characteristics 82 I I I I TABLE OF CONTENTS (CONT.) I SECTION PAGE • 3.0 FEASIBILITY ASSESSMENT 90 3 .1 Watershed Management 96 I 3.2 In-lake Restoration. , , 112 3 .3 Implementation of Recommendations 130 B 3.4 Public Meeting 139 I 4 . 0 REFERENCES 140 5.0 APPENDICES • A Land Use Descriptions B Limits of Detection I C Road Salt and Groundwater Protection D Job Estimate I E Public Comments I F Environmental Notification Form I I I I I I 11 1 1 LIST OF FIGURES 1 FIGURE TITLE PAGE 1 Locus Map 2 2 Assessor * s Map 3 1 3 Public Access to Foundry Pond 8 4 Area of Critical Environmental Concern 11 5 Surface Watershed 13 6 Watershed Subdrainage Basins 14 7 Open Space Land in Hingham 16 1• 8 Watershed Land Use Map 18 9 USGS Map .....