1180. Pavement Design
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Roadway Gravel in Maine
Updated Feb2018 Maine Department of Transportation Community Services Division 16 State House Station Augusta, Maine 04333-0016 (207) 624-3270 or 1-800-498-9133 -ROADWAY-------- GRAVEL----- IN---- ---------------------MAINE (continued) Page 2 I PAVEDROADS I material may be a good "gravel" and compact Maine DOT "Gravel" Specifications well. If it is verysandy or composed predomi- nantly of one size of particle, this can present It is common practice in Maine municipalities compacting · problems because it acts fairly to specifythat roads be built with a thin crushed "dead" and may not support construction traffic gravel base course on top of a thicker subbase well. course. The practice of specifyingan upper "base So, if your "gravel"is not veryworkable or is course" and a lower "subbase course" is fine, subject to heavyrutting during construction, then but a town may be spending more than is neces- it is recommendedto specifya thin layer (3" to 4") sary for this type of design. The MaineD0T has of crushed base gravel( MaineDOT Standard not used this design for decades because of the Spec 703.06(a) - Type A) to go on top of the higher quality and more expensive crushed subbase gravel. This base gravel should be material for the upper base course. MaineDOT specified as an option to be used, if routinely requires "aggregate subbase" gravel necessary, and not as a standard requirement which meets MaineDOT Standard Specifica- tion 703.06(c) - Type D for the entire thickness. GravelDepth Pavement goes directly on the surface of this The final compacted thickness of "gravel" compacted sub base course in most cases. -
Inspector's Handbook: Subbase Construction
INSPECTOR'S HANDBOOK SUBBASE CONSTRUCTION IOWA STATE HIGHWAY COMMISSION AMES, IOWA 1969 r 17:_:H53 s~sl4 1969 \------ -- "- SUBBASE CONSTRUCTION Walter Schneider Jerry Rodibaugh INTRODUCTION This handbook is an inspector's aid. It was written by two inspectors to bring together a 11 of the most of ten-needed information involved in their work. Much care has been taken to detai I each phase of construction, with particular attention to the r.equire ments and limitations of specifications. All applicable specification interpretations in Instructions to Resident Engineers have been included. The beginning inspector should look to the hand book as a reference for standards of good practice. The Standard.Specifications and Special Provisions should not, however, be overlooked as the basic sources of information on requirements and restrictions concerning workmanship and materials. I . CONTENTS SUBBASE CONSTRUCTION Page 1 Definition 1 Types 1 Figure 1 - Typical Section 1 INSPECTION 1 Plans, Proposals, and Specifications · 1 Preconstruction Detai Is 2 I l. STAKING 2 Purpose 2 Techniques 2 -- SUBGRADE CORRECTION 3 Application 3 Profile and Cross-Section Requirements 4 Figure 2 - Flexible Base Construction 5 INSPECTING DIFFERENT TYPES OF ROLLERS USED IN SUBBASE CONSTRUCTION 5 Tamping Rollers . s· Self-Propelled, Steel-Tired Rollers 5 Self-Propelled and Pull-Type Pneumatic Tire Roi lers 6 Figure 3 - Pneumatic-Tired Roller 6 SPREAD RA TES AND PLAN QUANTITIES 6 Spread Chart 6 Fig.ure 4 - Typical Spr~ad chart 7 Figure 5 - scale Ti ck 8 et -- Granular -
Base Course and Paving Page 02740-1
02740 Base Course and Paving Page 02740-1 02740 – BASE COURSE AND PAVING (Last revised 6/22/10) SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Part 1 – General Geotextile (Petromat) Part 2 – Products Lime Treated Soil Part 3 – Execution Milling Asphalt - Pavement Profiling Aggregate Base Course Pavement Markings Base Course, Construction Paving Operations Bituminous Concrete Asphalt Pavement Repair Bituminous Pavement, Construction Seal Coat Cement Treated Stabilization Surface Casting Adjustments Herbicide – Bikeway Subgrade Tack Coat PART 1 – GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions apply to this specification. B. Section 02200 – EARTHWORK C. Section 02275 – TRENCHING, BACKFILLING, AND COMPACTION OF UTILITIES D. Section 02400 – CURB & GUTTER, DRIVEWAYS AND SIDEWALKS E. Section 02920 – SEEDING, SODDING, & GROUNDCOVER F. Bicycle lanes and paths shall be designed and constructed in accordance with the latest version of the NCDOT NC Bicycle Facilities Planning and Design Guidelines, latest revision, NCDOT Office of Bicycle and Pedestrian Transportation. 1.2 SUMMARY This section includes all equipment, labor, material, and services required for complete installation of aggregate base courses and bituminous concrete pavement structures and specialties for municipal street and greenway systems. 1.3 DEFINITIONS A. General For the purposes of this specification, the following definitions refer to roadway and street systems that come under the authority of the Town of Clayton, North Carolina as specified within this section and other sections of this manual. The Town of Clayton, NC - Manual of Specifications, Standards and Design July 2010 02740 Base Course and Paving Page 02740-2 1) Aggregate Base Course: A layer of graded aggregate materials (ABC unless otherwise specified by the Town Engineer) of a specified thickness placed between the subgrade and the paving course. -
Section 02232 Aggregate Base Course Part 1 General 1.01
TENDER DOCUMENTS DIVISION 02 Specifications Siteworks SECTION 02232 AGGREGATE BASE COURSE PART 1 GENERAL 1.01 SECTIONS INCLUDES A. Provision, spreading and compaction of materials of aggregate base course for roads in accordance with the specifications and in conformity with grade, lines and thickness shown on the drawings, including setting out of controls and furnishing of all plant, machinery, tools, equipment, guides, templates and labor. 1.02 RELATED SECTIONS A. Section 01330 Submittal Procedures. B. Section 01400 Quality Requirements. C. Section 02210 Compaction and Testing of Earthwork. D. Section 02230 Granular Sub-base. E. Section 02513 Pavements – Asphaltic Concrete. 1.03 REFERENCES A. General Specifications for Roads and Bridge construction, Ministry of Communications, in Kingdom of Saudi Arabia. B. Ministry of Communications circular No. 2403 dated 24.05.1407 H, with other applicable circulars and addenda to General Specifications. C. American Society for Testing and Materials – ASTM. 1. ASTM C 131 Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine. 2. ASTM C 136 Sieve Analysis of Fine and Coarse Aggregate. 3. ASTM D 1196 Standard Method for Non-Repetitive Static Plate Load Tests of Soil and Flexible Pavement Components, for Use in Evaluation and Design of Airport, and Highway Pavements. 4. ASTM D 4318 Test Method for Liquid Limit, Plastic Limit and Plasticity Index of Soils. 5. ASTM D 1883 Test Method for CBR (California Bearing Ratio) of Laboratory – Compacted Soils. TENDER DOCUMENTS DIVISION 02 Specifications Siteworks 1.04 SUBMITTALS A. Comply with Section 01300. B. Propose Job Mix Formula (JMF) with pertinent test data and results at least 30 days before producing aggregate base mixtures. -
Table of Contents 05-299 (7-08) PUBLICATION
Table of Contents 05-299 (7-08) PUBLICATION: TRANSMITTAL LETTER Publication 242 May 2015 Edition � pennsylvania DATE: DEPARTMENT OF TRANSPORTATION December 1, 2019 SUBJECT: Publication 242 Pavement Policy Manual, May 2015 Edition, Change No. 5 INFORMATION AND SPECIAL INSTRUCTIONS: Publication 242 (Pavement Policy Manual), Change No. 5 is to be issued with this letter. The enclosed May 2015 Edition, Change No. 4 represents Updates made to Chapters 2 to 6, 8 to 14, and Appendices C, D, G, I, and J. May 2015 Edition, Change No. 5 is effective immediately. These new policies should be adopted on all new and existing projects as soon as practical without affecting any letting schedules. This release incorporated approved changes through the Clearance Transmittal process. CANCEL AND DESTROY THE FOLLOWING: ADDITIONAL COPIES ARE AVAILABLE FROM: Publication 242 (May 2015 Edition) 0 PennDOT SALES STORE Table of Contents (717) 787-6746 phone Chapter 2 (717) 787-8779 fax Chpater 3 ra-penndotsa lesstore.state. pa. us Chapter 4 Chapter 5 � PennDOT website - www.dot.state.pa.us Chapter 6 Click on Forms, Publications & Maps Chapter 8 Chapter 9 D DGS warehouse (PennDOT employees ONLY) Chapter 10 Chapter 11 Chapter 12 APPROVED FOR ISSUANCE BY: Chapter 13 Chapter 14 LESLIE S. RICHARDS Appendix C Secretary of Transportation Appendix D Appendix G Appendix H Appendix I Appendix J SOL 495-19-08 (September 19, 2019) u , P.E. irector, Bureau of Project Delivery, NOTE: Publication 242 is only available y Administration electronically via the PennDOT website. 05-299 (7-08) PUBLICATION: TRANSMITTAL LETTER Publication 242 May 2015 Edition pennsylvania DATE: DEPARTMENT OF TRANSPORTATION February 28, 2018 SUBJECT: Publication 242 Pavement Policy Manual, May 2015 Edition, Change No. -
Gravel Road Basics for Local Officials 2
Main Class Takeaways* 1. Protect your investments 2. Get water away 3. Build on a firm foundation 4. Use quality materials 5. Compact well 6. Build for traffic loads and volumes 7. Pave only when above items are done! 8. Keep good records *Adapted from “The Basics of a Good Road” — Vermont Local Roads 1984 Core Factors of a Good Road 1. Drainage 2. Shape 3. Material Quality 4. Material Thickness for Local Officials Gravel Road Basics Glossary ADT and AADT: Average daily traffic and annual Gradation: The distribution of large and small sized average daily traffic. aggregate in a sample of gravel. Aggregate: A mixture of gravel, sand, and fine-sized High Shoulder (Secondary Ditch): The rock particles (also referred to as “gravel”). condition of gravel cast off from unpaved roads forming Angularity: The shape of an individual aggregate into berms that prevent water from leaving a road’s particle. A more angular aggregate has more fractured and traveled way. jagged faces and less-rounded faces. Parabolic Crown: A road crown that has become Backslope: The surface leading from the base of a rounded in shape. ditch away from a road. Permeability: The degree to which a surface or Base: The layer beneath a road surface; usually large- material allows water to flow through it. sized aggregate and drainable. Saturated Zone: The ground layers that remain Capillary Action: The ability of liquid to flow intermittently or permanently saturated by sub-surface through other materials, in spite of counteractive forces water. like gravity. Slope: The percent or ratio of vertical change to Clear Zone: An unobstructed, traversable roadside horizontal change between two points on a straight line. -
Typical Bituminous Pavement Construction
Verge or footway 150 Finished road surface 125 Finished road surface 125 250x125 Polymer modified kerb friction course (PMFC) 50 Wearing course (Optional) 150 Base course . n 20/20 concrete backing i Road-base 150 m (See Note 3) Sub-base 150 Subgrade 20/20 concrete foundation 1:3 cement mortar PAVEMENT CROSS-SECTION Layers Material Thickness Polymer modified Bituminous friction course 30 Applications refer to RD/GN/011 and RD/GN/032 (non-structural layer) (Optional) Wearing course 40 Total thickness to be designed to RD/GN/042 and (i) min. 350 for Expressway, Trunk Road, and Base course Bituminous 65 Primary Distributor, or (ii) min. 280 for all other roads except low-volume roads Road base max. 395 (iii) min. 205 for low-volume roads Sub-base Granular Designed to RD/GN/042 THICKNESS OF PAVEMENT LAYERS Overlap (see Note 2) Cut back distance Prepared joint (See Note 1 ) D Notes: JOINTS IN BITUMINOUS MATERIALS LAYERS 1. Minimum cut back distance = 2 x D or 100 whichever is greater. 2. Minimum overlap between adjoining layers: 150 for joints longitudinal to carriageway. Original 500 for joints transverse to carriageway. C Include PMFC layer Jan 17 Signed 3. Where the crossfall of road surface is towards the kerb the Table for thickness revised to tally sub-base should be carried through to the edge of the B - Nov 13 with RD/GN/042 embankment or to the filter drain. Table for thickness revised July 11 4. Refer to the general specification for the nominal sizes of materials. A - 5. Kerb units shall be laid on 1 : 3 cement mortar not less than Former Drg. -
Base Courses
DIVISION 3 BASE COURSES 3.01 AGGREGATE BASE COURSE 3.01.01 Description This work shall consist of an aggregate base course constructed on an existing aggregate surface, on a prepared subbase, or on a prepared subgrade. 3.01.02 Materials The materials shall meet the requirements of Surfacing Aggregates 22A, as specified in Division 8.02 of the current edition of the Michigan Department of Transportation's Standard Specifications for Highway Construction. All aggregate base courses shall be crushed limestone. 3.01.03 Maximum Unit Weight Maximum unit weight, when used as a measure of compaction or density of cohesive materials, including aggregate bases and aggregate surfaces, having a loss by washing greater than 10 percent, shall be understood to mean the maximum unit weight per cubic foot as determined by AASHO T99, Method C, modified to include all materials passing the one-inch sieve. It may be further modified to allow one molded sample in conjunction with typical moisture-density curves developed by the MDOT. For aggregate bases and aggregate surfaces having a loss by washing of 10 percent or less, the maximum unit weight will be determined, at the moisture content between 4 and 8 percent, which will give the maximum unit weight, by the Standard Method of Test for Compaction and Density of Soils (Granular as described in Appendix D of the Soils Manual). 3.01.06 Preparation of New Subgrade These requirements apply to new locations or sections of the existing road that are changed in alignment or grade or both, or altered by subgrade undercutting or excavation of unsuitable material. -
High Performance Racetracks Good for a Racetrack, Good for a Highway?
High Performance Racetracks Good for a Racetrack, Good for a Highway? 38th Annual Rocky Mountain Asphalt Conference and Equipment Show Brian D. Prowell, Ph.D., P.E. Advanced Materials Services Collective Experience • Road Courses • Ovals – Daytona International* Miami-Homestead* – Portland International Richmond International* Raceway Martinsville Speedway* – Lime Rock Park Talladega Superspeedway* – Palm Beach International Darlington Raceway – Circuit Gilles Villeneuve Daytona International • Repair Speedway – Watkins Glen* – Phoenix International – Chicagoland ADVANCED *While working for NCAT MATERIALS – Summit Point SERVICES, LLC Design Concerns • Racetracks are about entertainment. What might be a small problem on a highway would be a disaster if it delayed a race • Smoothness • Durability – Resistance to raveling – Resistance to shoving – Resistance to cracking • Uniformity (texture etc.) ADVANCED MATERIALS SERVICES, LLC Brian Prowell 12/4/08 Removed NASCAR, added last bullet, edited surface friction sub bullet Fan Excitement • A performance specification for a racetrack would provide for “fan excitement or driver entertainment” • Side-by-side racing, a function of: – Geometry – Surface friction (including rubber laydown) • The racing surface should not dictate the outcome of the race ADVANCED MATERIALS SERVICES, LLC Brian Prowell 12/4/08 Good to add a race car picture to this slide Thoughts About Forces on a Racetrack Pavement • Not concerned about rutting like on a highway, port, or possibly an airport taxiway • Main concern is raveling • Lateral forces are greater on a road course or flat oval with less banking, like Indianapolis, than on a steeply banked oval, like Talladega • Down draft on cars produces suction under cars which can pull out loose chunks of pavement or manholes covers. -
Abu Dhabi Dot Pavement Design Manual
Department of Municipal Affairs and Transport PO Box 20 Abu Dhabi, United Arab Emirates © Copyright 2016, by the Department of Municipal Affairs and Transport. All Rights Reserved. This manual, or parts thereof, may not be reproduced in any form without written permission of the publisher PAVEMENT DESIGN MANUAL TABLE OF CONTENTS List of Figures ............................................................................................................................. vii List of Tables ................................................................................................................................ ix Glossary ....................................................................................................................................... xi abbreviations and acronyms ..................................................................................................... xvi 1 Introduction ............................................................................................................................ 1 1.1 Overview ........................................................................................................................... 1 1.2 Purpose and scope ........................................................................................................... 1 1.3 Application of this manual ................................................................................................. 2 1.4 Content and format .......................................................................................................... -
Heavy-Duty Haul Road Application Bulletin Featured Project Haul Road
HEAVY-DUTY HAUL ROAD APPLICATION BULLETIN FEATURED PROJECT HAUL ROAD Haul Road Applications Like These – and Hundreds More HAUL ROAD IN AMAZON RIVER BASIN The Solution: A 20-foot wide, 93-mile long gravel haul RAINFOREST, REPUBLIC OF ECUADOR road using Tensar® Geogrid was successfully built and Application: A haul-and-access corridor for personnel remains fully operational today. The road’s subbase and heavy equipment, as well as a platform for the features a 12-inch layer of dredged river sand over a silt/ construction and maintenance of an oil pipeline, was clay subgrade, separated and stabilized by Tensar Geogrid. built in 1993 to support the exploration, recovery and A non-woven geotextile confines the subbase along the transport of a key export commodity. road’s shoulders. The base course features a 10-inch layer of unbound processed aggregate separated from the Heavily vegetated; the Amazon River The Challenge: subbase by an additional layer of Tensar Geogrid. Basin Rainforest is one of the most environmentally sensitive areas in the world. With an annual rainfall The application of geosynthetics maximized the use averaging 200 inches, it is also one of the wettest. of native materials, minimized material thicknesses Native soils are perpetually weak and saturated, and and reduced borrow and haul requirements. The Republic the availability and quality of native aggregates are of Ecuador now advocates geosynthetic stabilization extremely limited. In addition, the exploration site procedures along the country’s rainforest roadways. was located within an area protected for indigenous The performance of the products used on this haul peoples. -
61 1 Introduction
View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by DSpace at VSB Technical University of Ostrava Transactions of the VŠB – Technical University of Ostrava Civil Engineering Series, Vol. 16, No. 1, 2016 paper #9 Przemysław ROKITOWSKI1, Marcin GRYGIEREK2 INFLUENCE OF HIGH WATER CONTENTS ON PAVEMENT LAYERS STIFFNESS CAUSED BY FLOODING Abstract Moisture inside the construction of road pavements is the problem for road engineers all around the world. This issue is mentioned in many European or the US papers and studies, but still it needs to be developed. From the road engineers’ point of view, very important for solving above problems are the studies on the influence of water and moisture inside the construction of road pavement during deflection measurements using Falling Weight Deflectometer (FWD). The paper raises this issue by showing a short review of Polish and foreign literature and presenting the first step of research work at the test site on Voivodeship Road 933 in Poland. Keywords Falling Weight Deflectometer (FWD), non-destructive testing, water, moisture, deflection, pavement, road construction. 1 INTRODUCTION One of the main objectives at the design stage as well as at the execution stage is not lead up to the occurrence of excess water in a pavement structure. Frequently the movement of water into pavement construction is observed. Presence of excessive moisture in pavements is primarily due to melting of ice lenses during spring thaw, capillary actions and infiltration through pavement surface, shoulders and various kinds of existing damages. Following numerously investigations on the behaviour of pavement structure it is proved that excess water accelerates the deterioration of the structure causing i.e.