New Jharkhand a Progressive Journey Since 2014 Giridih Parliamentary Constituency PREFACE
Total Page:16
File Type:pdf, Size:1020Kb
Shri Narendra Modi Hon’ble Prime Minister NEW RAILWAYS New Jharkhand A progressive journey since 2014 Giridih Parliamentary Constituency PREFACE Indian Railways is the lifeline of the Nation and a catalyst for India’s progress and economic development. South Eastern Railway (SER) plays a significant role in the socio-economic development of the state of Jharkhand. 36% of SER’s jurisdiction covers Jharkhand. With a view to improve railway infrastructure and extend the railway network in Jharkhand, the Ranchi Railway Division was formed in the year 2003. The Government of Jharkhand always extends necessary support and co-operation to this railway towards development of Jharkhand and improvement of train services. Railways have achieved many visible milestones in Jharkhand in the last 5 years in different fields viz. construction of new lines, doubling, introduction of new trains, extension of service, increase in frequency of trains etc. On the freight side, loading of South Eastern Railway has reached the mile stone of 154.87 Million Tonnes, where the lead role has been taken by the state. The changing face of transport sector in Jharkhand and the expectations of its people are being fulfilled with top most priority. Some of the recent achievements of railways and ongoing projects parliamentary constituency-wise in the state of Jharkhand have been highlighted in this Pamphlet. It may be noted that the budgets allocated to various projects are not apportioned constituency- wise but reflect the cost of the project. *Jharkhand Railway Network Map Not To Scale INPUTS BY RAILWAY IN GIRIDIH CONSTITUENCY GIRIDIH PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENTS : Giridih,Baghmara, Tundi, Dumri, Gomia & Berno B. WORKS COMPLETED IN LAST FIVE YEARS: B.1 Infrastructural Developments: u Extension of pit from 10 to 16 coach length at NSCB Gomoh at a cost of Rs.2.20 crores u Provision of 50,000 gallons RCC over head tank deep tube weel for platform, station water supply at Gomoh on replacement of account at a cost of Rs. 0.55 crores u Provision of dedicated water tank with deep tube well for carriage watering at Gomoh at a cost of Rs.1.06 crores u Electrification of Dughda siding at Chandrapura at a cost of Rs.10.86 crores u Gomoh : Provision of washable appron on Up Main Line at Gomoh Station at a cost of Rs.1.38 crores u Provision of washable appron for platform No.2 at Gomoh at a cost of Rs.1.85 u Additional new Foot Over Bridge from north side circulating area to platform No.1 and 2 at NSCB Gomoh at a cost of Rs.2.02 crores u Raising of platform No.1,2 & 3 as high level at Chandrapura at a cost of Rs.1.05 crores u Doubling from Chandrapura to Rajabera of N.S.C.B. Gomoh Barkakana Section at a cost of Rs. 64.44 crore. u New line Nawadih to Kawar 53Km. commissioned on 08.08.15 of Koderma to Giridih new line project at cost of Rs. 200 crore. B. 2 Passenger Amenities u Provision of CCTV cameras for surveillance and monitoring for loading and unloading in the sidings of KKC Main and KKC Link between Mohuda-Khanoodih stations in Bhojudih Gomoh Section at a cost of Rs.0.019 crores u Provision of 2nd at 9 numbers of stations and 13 numbers of level crossing gates at a costs of Rs.0.07 crores u Provision of full electrification of Up shunting neck towards Khanoodih end of Mohuda station at a cost of Rs.0.04 crores u Extension of platform at Mohuda station at a cost of Rs.0.45 crores u Raising of platform at Mohuda station at a cost of Rs.0.30 crores u Platform surface provided at Mohuda station at a cost of Rs.0.15 crores u Tocken less block working system between Sudamdih-Bhowra-Mahalboni-Jamadoba Bhaga- Layabad-TSBD-Malkhera-Jamuniatand-Chandrapura stations at a cost of Rs.3.16 crores C. OTHERS: u 15661/15662 Ranchi-Kamakhya Weekly Express, 18620/18619 Dumka-Ranchi Intercity Express, 18621/18622 Pataliputra Express, 15021/15022 Shalimar-Gorakhpur Express, 13404/13403 Bananchal Express, 58013/58014 Howrah-Bokaro Steel City Passenger, 13301/13302 Swarnarekha Express, 68071/68072 Adra-Khanoodih and Bhaga - Adra MEMU, 08627 Howrah- Ranchi Tri-weekly Express, 18605/18606 Ranchi-Jaynagar Express, 13425/13426 Malda Town- Sural Express and some other trains are running through Giridih D. ON GOING WORKS: u Anara-Purulia, Purulia-Chandil and Bhaga-Mohuda complete track renewal secondary 7.433 through rail renewal secondary -6.791 track kilometer at a cost of Rs.16.22 crores u Renewal of switch expansion joint 60 KG 100 Nos. at a cost of Rs.4.80 crores u Through sleeper renewal primary - 27.879 track kilometer at a cost of Rs.26.18 crores u Development of high level passenger amenities at Bhojudih station and provision of Foot Over Bridge at Anara station at a cost of Rs.5.79 crores u Replacement of existing Old Foot Over Bridge at Chandil, Mohuda and some other stations at a total cost of Rs.8.22 crores u Provision of Foot Over Bridge at Sanka and Khanoodih, Booking Office-cum-Waiting Hall, Circulating Area at Khanoodih and some other places at a total cost of Rs.19.31 crores. u Extension of platforms at 30 different stations at a cost of Rs.4.75 crores u Provision of facilities for Divyang at various stations at a cost of Rs.0.35 crores u Doubling from Jarangdih to Danea of CIC Section at cost of Rs. 331.96 crore. u Doubling from Danea to Ranchi Road in CIC Section at cost of Rs. 323.88 crores. SOME IMPORTANT PHOTOS.