FIRE RATED ACCESS PANEL CEILING INSTALLATION INSTRUCTION EXTRA SPRING PROVIDED for CEILING INSTALLATION on SIZES 16" X 16" OR LARGER

Total Page:16

File Type:pdf, Size:1020Kb

FIRE RATED ACCESS PANEL CEILING INSTALLATION INSTRUCTION EXTRA SPRING PROVIDED for CEILING INSTALLATION on SIZES 16 ACCESS DOORS FIRE RATED ACCESS PANEL CEILING INSTALLATION INSTRUCTION EXTRA SPRING PROVIDED FOR CEILING INSTALLATION ON SIZES 16" x 16" OR LARGER. BOTH SPRINGS MUST BE ATTACHED FROM 12 GAGE the SPRING BASE TO THE FRAMING OR FLOOR ABOVE IN SUCH WIRE TIE MANNER TO ENSURE THE PANEL IS SELF-CLOSING. STEEL STUD WOOD INSIDE LATCH RELEASE 1-1/4" DRYWALL STUD BENT INWARDS LATCH RELEASE SCREWS SO PANEL REMAINS (THROUGH IN THE "UP" POSITION HOLES TWO LAYERS SPRING PROVIDED) OF TYPE X BASE DRYWALL 2-1/2" 1" 1" ONE HOUR RATED CONSTRUCTION THREE HOUR RATED CONSTRUCTION THREE HOUR CEILING NON-COMBUSTIBLE SYSTEM OR ONE HOUR WOOD FRAME SYSTEM AT ALL FOUR SIDES OF DOOR 1. With metal studding, install a framed opening at Important: specified location of panel. Opening dimensions a. Panel sizes 16" x 16" and larger are supplied with an should be 1-5/8" larger than door size of panel; extra spring. It is the responsibility of the installer to i.e., for a 16" x 16" panel, opening should be attach these springs from the spring base on back of 17-5/8" x 17-5/8" before being lined with panel to framing of floor above to insure that door is drywall. self-closing. 2. The interior of opening should be lined with b. Before installing panel, bend "lock release" bracket 5/8" type "X" gypsumboard, using screws spaced inward causing panel to stay in the "up" position. 18" o.c. maximum to the 1-5/8" track. Minimum c. In order to insure that panel is self-closing, it must of two screws per side. (Wrapping of joist not be released from at least 60 degrees from the required in one hour ceiling application.) horizontal. 3. Remove automatic door closer (spring). 4. Place panel in position in opening and mark Note: location of attaching screws on studding, using All fire rated access panels are self-closing. holes in latch and hinge sides of panel frame as marking guides. 5. Remove panel and drill 5/32" holes through ***************** studding at points marked for attachment holes. Alternate installation for 1 hour ceiling with wood frame. 6. Place panel in position (leaving masonry anchor Ceiling to have two layers of 5/8" gypsum wallboard straps flat against panel frame) and attach with leaving a 1" airspace around the door/frame assembly. #10 drywall screws. No lining of wood joist required. 7. Panel can be supported with 12 gage wire ties or plumbers tape attached from framing screws to wood studs of flooring above. 8. Check panel for freedom of movement. If binding occurs, shim as necessary to prevent racking of frame. 9. Re-attach automatic door closer (spring), and secure to sub-framing above to ensure door is self-closing. Member of U.S. Green Recyclable Building Council FRC INSTALLATION Revised: 3/24/09 Product ELMDOR/STONEMAN • P.O. BOX 3527 • CITY OF INDUSTRY, CA 91744-0527 U.S.A. • TEL: (800) 591-9181 • (626) 968-8699 • FAX: (626) 333-4109 A Division of Acorn Engineering Company www.elmdorstoneman.com • E-mail: [email protected].
Recommended publications
  • NW Wall & Ceiling Agreement 2019
    AGREEMENT between The Pacific Northwest Regional Council of Carpenters and Northwest Wall & Ceiling Contractors Association Effective June 1, 2019 - May 31, 2023 opeiu8aflcio Table of Contents Article Description Page 1 Preamble and Purpose . 1 2 Work Description . .1 3 Recognition . 5 4 Subcontractor Clause . 6 5 Effective Date and Duration . 7 6 Savings Clause . 7 7 Fringe Benefits . 8 7 .01 Health & Security . 8 7 .02 Retirement . 8 7 .02 .1 Elective Contributions . .. 9 7 .03 Apprenticeship and Training . 10 7 .04 Vacation Fund . 11 7 .05 Trust Merger . 11 8 Liability of Employers Under Funds . .. 11 9 Settlement of Disputes and Grievances . .. 14 10 Hiring . 16 10 .04 Continuing Education . 18 10 .05 Apprenticeship . 19 11 Hours of Work, Shifts & Holidays . 20 11 .01 Single Shift Operation . 20 11 .02 Multiple Shift Operation . 21 11 .03 Holidays . 23 11 .04 Rest Breaks . 23 11 .05 Meal Provisions . .. 23 Table of Contents (continued) Article Description Page 11 .06 Start Time . 23 11 .07 Overtime . 24 12 Work Rules . 24 12 .05 Shop Stewards . 26 12 .06 Tool Storage . 28 13 Safety Measures . 29 14 Travel Conditions . 30 14 .01 Zone Pay Differential . 30 14 .01 .2 General Travel Conditions . 30 14 .01 .3 Carpenters’ Zone Pay . 31 15 Committees . 33 16 Miscellaneous . 33 17 Substance Abuse Policy . 35 18 Light Duty Return to Work . 36 19 Residential Provisions . 36 20 Sick Leave Waiver . 37 Schedule A Western Washington Wages and Benefits . 38 Eastern Washington Wages & Benefits . 39 A .3 Union Dues Check-Off Assignments . 40 Handling of Hazardous Waste Materials .
    [Show full text]
  • Corporate Office Employee Analysis: Transformation from Closed Office Layout to Open Floor Plan Environment
    University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Theses from the Architecture Program Architecture Program Winter 12-1-2011 CORPORATE OFFICE EMPLOYEE ANALYSIS: TRANSFORMATION FROM CLOSED OFFICE LAYOUT TO OPEN FLOOR PLAN ENVIRONMENT Stephanie J. Fanger University of Nebraska-Lincoln, [email protected] Follow this and additional works at: https://digitalcommons.unl.edu/archthesis Part of the Interior Architecture Commons, and the Other Architecture Commons Fanger, Stephanie J., "CORPORATE OFFICE EMPLOYEE ANALYSIS: TRANSFORMATION FROM CLOSED OFFICE LAYOUT TO OPEN FLOOR PLAN ENVIRONMENT" (2011). Theses from the Architecture Program. 123. https://digitalcommons.unl.edu/archthesis/123 This Article is brought to you for free and open access by the Architecture Program at DigitalCommons@University of Nebraska - Lincoln. It has been accepted for inclusion in Theses from the Architecture Program by an authorized administrator of DigitalCommons@University of Nebraska - Lincoln. CORPORATE OFFICE EMPLOYEE ANALYSIS: TRANSFORMATION FROM CLOSED OFFICE LAYOUT TO OPEN FLOOR PLAN ENVIRONMENT by Stephanie Julia Fanger A THESIS Presented to the Faculty of The Graduate College at the University of Nebraska In Partial Fulfillment of Requirements For the Degree of Master of Science Major: Architecture Under the Supervision of Professor Betsy S. Gabb Lincoln, Nebraska December, 2011 CORPORATE OFFICE EMPLOYEE ANALYSIS: TRANSFORMATION FROM CLOSED OFFICE LAYOUT TO OPEN FLOOR PLAN ENVIRONMENT Stephanie J. Fanger, M.S. University of Nebraska, 2011 Advisor: Betsy Gabb The office workplace within the United States has undergone monumental changes in the past century. The Environmental Protection Agency (EPA) has cited that Americans spend an average of 90 percent of their time indoors. As human beings can often spend a majority of the hours in the day at their workplace, more so than their home, it is important to understand the effects of the built environment on the American office employee.
    [Show full text]
  • Plumbing Identification and Damage Assessment Guide
    Plumbing Identification and Damage Assessment Guide *Please note that not all systems will be represented exactly by these diagrams and photos. As a vendor, it is required that you familiar yourself with all types of existing systems to assure you and your company maintains vital and accurate information. Water System Identification To properly inspect the plumbing system, determine if the property has city water or well water. The below photos will assist you in determining what kind of water system the property has. Well Water Components City Water Components Plumbing Component Identification Plumbing components are items within the property that either provide or store water into the home or drain water from the home. The items that supply water to the home are kitchen and bathroom sinks, toilets, bathtubs, showers, interior and exterior faucets, hot water heater, water meter, and shutoff valves. Items that drain water from the home are drainage pipes and drainage traps. Exterior Water Meter Interior Water Meter Exterior Water Faucet Interior Water Faucet Plumbing Component Identification Continued… Water Meter Shut Off Valve Toilet Shut Off Valve Kitchen Faucet Bathroom Faucet Shower and Bathtub Toilet Plumbing Component Identification Continued… Plumbing Lines Plumbing Lines P- Trap P- Trap Refrigerator Ice Maker Line Basement Floor Drainage Plumbing Component Identification Continued… Conventional Water Heater Main Devices to Document: • Hot and Cold Water Supply Lines • Temp an d Pressure Relief Valve • Drain Va lve • Thermos tat • Gas Line Entry Point Tankless Water Heater Main Devices to Document: • Incoming Cold Water Line • Outgoing Hot Water Line Plumbing Assessment Determine the Type of Plumbing in the Property.
    [Show full text]
  • Elmdor Access Door Brochure
    PRODUCT SHOWN ES SERIES EASY INSTALL ACCESS DOOR EASY INSTALL ES SERIES ACCESS DOORS ® ELMDOR/STONEMAN Manufacturing Co. Our product line includes the widest was founded on the principle of design variety of standard access doors of and production of the finest quality sheet any manufacturer. metal fabrication. Elmdor’s continued dedication to Six decades of experience and innovative cost-effective quality, development of engineering have enabled us to become new products for the building industry, a well established high volume, low cost and customer service, firmly establishes producer of access doors. us as the leader in its field. With a nationwide distribution network, Elmdor® is a division of plus strategically located warehouses, Acorn Engineering Company.® we are dedicated to effectively satisfying our customers’ requirements. ACCESS WHERE YOU NEED IT RECESSED DRYWALL ALUMINUM ACCESS DOORS SERIES ADW SLAMMER ACCESS DOORS SERIES SLA SHUR-LOK ACCESS DOORS SERIES SLK CATEGORIES NON-RATED 06-21 DRYWALL (ADW, DW, DWB, GD) PLASTER (AP, ML, PW) TILE (AT, CFR) EXTERIOR (ATWT, ED, EDI ) FIRE RATED 22-25 WALL (FR) CEILING (FRC) LIGHTWEIGHT ALUMINUM ACCESS DOOR SERIES AI FIRE RATED CEILING ACCESS DOORS SERIES FRC SLAMMER ACCESS DOORS EASY INSTALL ACCESS DOORS SERIES ES SECURITY 26-31 SLAMMER (SLA) SHUR-LOCK (SLK) MEDIUM SECURITY (SMD) SPECIALTY 32-47 LIGHTWEIGHT (AI) DUCT (ODD, DT, GDT) EASY INSTALL (ES) GYPSUM (GFG) HIDDEN FLANGE (HF) SURF (SF) VALVE (S009, S010, SVB, VB) WEATHER STRIP REMOVABLE (WSR) PAGES 06 - 21 PAGES 06 - 21 DRYWALL ADW NON-RATED ACCESS DOORS ARE USED IN A VARIETY OF NON-RESIDENTIAL SETTINGS. A WIDE-VARIETY OF AVAILABLE MODELS ENSURE COMPATIBILITY WITH NEARLY ANY APPLICATION.
    [Show full text]
  • Location, Location, Location by Pam Horack Page 15
    Nancy Drew: Location, Location, Location by Pam Horack Page 15 Nancy’s World (to me) In real estate, the mantra is “Location, Location, Location”. As in a story, the right setting can be an effective plot device and can be used to evoke specific feelings. The Nancy Drew books often used a location to create the backdrop for the mysterious and adventurous. As a child, I was able to use my grandparents’ home as a true reference for many of the Nancy Drew settings, thus bringing the stories to life and turning me into Nancy Drew Green’s Folly, located in Halifax County, Virginia, was home to my maternal grandparents. As my mother was raised there, our family visited frequently. The estate has served many functions through the years: county courthouse, a racetrack, a farm, and currently an 18-hole golf course, which was originally developed by my grandfather, John G. Patterson, Jr. As a child with a vivid imagination, my senses were aroused by mysterious features of the old home. This was the world of my childhood and it made a natural location for many of my adventures with Nancy Drew. As many of the Nancy Drew stories involved large old estates, my mind easily substituted the real world for the fictitious. There seemed to be too many coincidences and similarities for it to be otherwise. I found my imagination using Green’s Folly as the backdrop for the following stories: 1. The Hidden Staircase 2. The Mystery at Lilac Inn 3. The Sign of the Twisted Candles 4.
    [Show full text]
  • Converting Attics, Basements and Garages to Living Space
    Converting Attics, Basements and Garages to Living Space 9 Livable space or accessory dwelling unit This publication provides information for homeowners who want to increase livable space in their single family homes by converting an attic, basement or garage or legalize existing space that was converted without permits. It is important to know that most existing basements, attics and garages were built to be used for storage rather than living space; therefore, each conversion project is unique. The conditions of your site and dwelling will determine the scope and feasibility of the project. This brochure includes alternative standards for existing conditions as approved by the Building Official and available in the Habitable Space Standards for Existing Elements Code Guide located at www.portlandoregon.gov/BDS/article/68635. Requirements for Accessory Dwelling Units (ADUs) are different from simply converting a space to additional living space. For information on adding ADUs or in-law quarters to your home, go to www.portlandoregon.gov/bds/36676. Converting basements and garages to habitable space may be prohibited if your home is located within the floodplain. Please contact Site Development at 503-823-6892 for additional information. tlandoregon.gov/bds Permit requirements OPMENT SERVICES Building permit Is required to convert attics, basements or garages to living space .por Electrical, Mechanical and May also be required, depending on the scope of the work www Plumbing permits Permit Fees Building permit fees are calculated based on the value of the project. Fees for electrical, mechanical and plumbing permits are based on the specific work being done. Fees are printed on the applications.
    [Show full text]
  • SOHO Design in the Near Future
    Rochester Institute of Technology RIT Scholar Works Theses 12-2005 SOHO design in the near future SooJung Lee Follow this and additional works at: https://scholarworks.rit.edu/theses Recommended Citation Lee, SooJung, "SOHO design in the near future" (2005). Thesis. Rochester Institute of Technology. Accessed from This Thesis is brought to you for free and open access by RIT Scholar Works. It has been accepted for inclusion in Theses by an authorized administrator of RIT Scholar Works. For more information, please contact [email protected]. Rochester Institute of Technology A thesis Submitted to the Faculty of The College of Imaging Arts and Sciences In Candidacy for the Degree of Master of Fine Arts SOHO Design in the near future By SooJung Lee Dec. 2005 Approvals Chief Advisor: David Morgan David Morgan Date Associate Advisor: Nancy Chwiecko Nancy Chwiecko Date S z/ -tJ.b Associate Advisor: Stan Rickel Stan Rickel School Chairperson: Patti Lachance Patti Lachance Date 3 -..,2,2' Ob I, SooJung Lee, hereby grant permission to the Wallace Memorial Library of RIT to reproduce my thesis in whole or in part. Any reproduction will not be for commercial use or profit. Signature SooJung Lee Date __3....:....V_6-'-/_o_6 ____ _ Special thanks to Prof. David Morgan, Prof. Stan Rickel and Prof. Nancy Chwiecko - my amazing professors who always trust and encourage me sincerity but sometimes make me confused or surprised for leading me into better way for three years. Prof. Chan hong Min and Prof. Kwanbae Kim - who introduced me about the attractive
    [Show full text]
  • Above Ceiling Inspections
    November 2018 Office of Education and Data Management Fall 2018 Career Development Seminar November 2018 Above Ceiling Inspections Presented by Joseph J. Summers, MCP, CBO, Senior Project Inspector, 4LEAF 2018 CT State Building Code books are available 2 OEDM- Fall 2018 Career Development 1 November 2018 Online Governmental Consensus Vote (OGCV) Cdpaccess.com Opens approximately Nov. 15-30 Your vote does count 3 Reference Code: 2018 CT State Building Code 2015 IBC 2015 IMC 2015 IPC 2017 NEC 4 OEDM- Fall 2018 Career Development 2 November 2018 Objectives: • Identify key building elements that require inspections above the ceiling. • Review codes and other standards that should be referenced during above ceiling inspection process. • Discuss inspection related issues. 5 What are we doing? • Reinspection of all the rough-ins and the grid lay-out of the ceiling • Check for approved inspections from plumbing, mechanical, electrical, fuel gas, sprinkler, framing and fire marshal if required 6 OEDM- Fall 2018 Career Development 3 November 2018 Is this a Required Inspection? • 110.3.8 Other inspections. In addition to the inspections specified in Sections 110.3.1 through 110.3.7, the building official is authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of this code and other laws that are enforced by the department of building safety. 7 Access for Inspection • 110.5 Inspection requests. • It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. • It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code.
    [Show full text]
  • Office Space Standards and Guidelines Government of the Northwest Territories
    VERSION 1.4, DECEMBER 2012 Public Works and Services Government of the Northwest Territories Office Space Standards and Guidelines Government of the Northwest Territories 2012 GNWT OFFICE SPACE STANDARDS AND GUIDELINES VERSION 1.4, DECEMBER 2012 2012 GNWT OFFICE SPACE STANDARDS AND GUIDELINES VERSION 1.4, DECEMBER 2012 Project Team and Committee Member GNWT Office Space Standards and Guidelines Public Works and Services (PWS), Asset Management Division Pat Slighte Facility Programmer, Asset Mgmt. Yellowknife Consultant Marji Tanner Facility Planner Consultant to PWS Edmonton 2012 GNWT OFFICE SPACE STANDARDS AND GUIDELINES PAGE I VERSION 1.4, DECEMBER 2012 2012 GNWT OFFICE SPACE STANDARDS AND GUIDELINES PAGE II VERSION 1.4, DECEMBER 2012 Table of Contents 1. Executive Summary 1 Purpose 1 The Changing Workplace 2 What is New? 2 2. Introduction 4 Background and Purpose 4 Office Space Standards 6 3. Authorities 9 Authority 9 Compliance 9 Non-Compliance 9 Responsibilities 10 4. Office Space Standards 11 Overview 11 Workstation Allocations 11 Support Spaces 15 5. Planning Principles and Guidelines 20 Macro Planning 20 Support Spaces 22 Planning Template – Micro Allotment Calculations 23 Calculating Total Net Assignable or Useable Area 25 APPENDICES A. Workstation Configurations 28 B. Office Support Space Configurations 36 C. Example Work Planning Templates 45 D. Acronyms and Definitions 51 E. Form: Request for Accommodation Project 55 F. Form: Request for Non-Compliance Accommodation 59 2012 GNWT OFFICE SPACE STANDARDS AND GUIDELINES PAGE III
    [Show full text]
  • The Evolution of the Ceiling in Architecture
    The situation changed only with the invention of the The evolution of the ceiling Roman concrete, when people started using it for the in architecture construction of the vaults. In architecture, this is the type of ceiling or covering space, limited by walls, beams or 1 2 Hanna Tkachuk , Oksana Bilinska pillars – the structure that is formed by slopingsurfaces 1.Department of Architectural Environment Design, (rectilinear or curvilinear). Lviv Polytechnic National University, UKRAINE, Lviv, S. Bandery Street 12, E-mail: [email protected] 2. Department of Design and Architecture Basics, Lviv Polytechnic National University, UKRAINE, Lviv, S. Bandery Street 12, E-mail: [email protected] Abstract – The evolution of the ceiling, vault, as an important element of forming the interior space of architectural buildings is highlighted. The form, structure, materials and aesthetic factors in Fig.3. Gery II Temple in the building history of mankind are analyzed. The changes in the Fig.4. Temple of Bel [16] Paestum [16] formation of the ceiling, the principles of the application of polychrome are described. The topic of artistic aesthetics ceilings (e.g. vaults ) was discussed in detail. Examples of modern types of ceilings, such as geo-grating, ceilings made of red shoe laces, modern interpretation of the vault – stretch ceilings, etc., which today are extremely important for interior design of buildings, are given. Keywords – ceiling, vaults of the building, art aesthetics, interior design. Fig.6. Treasury of Atreus, Fig.5. Treasury of Atreus, Mycenaea, Greece, interior Mycenaea, Greece [16] I. Introduction [16] From the beginning of their existence, the primitive men Vaults allow to cover large areas without any columns tried to protect himself from adverse weather conditions, in between and are used primarily in the round, polygonal other dangers, creating a comfortable environment, or elliptical rooms.
    [Show full text]
  • Smart Attic Ladders 2017/2018
    SMART ATTIC LADDERS 2017/2018 www.fakrousa.com, www.fakro.ca 1 MODELS & APPLICATIONS OF FAKRO ATTIC LADDERS – GENERAL INFORMATION Folding attic ladders enable safe and easy access to non-inhabited spaces without the need for installing costly and space consuming staircases. FAKRO folding attic ladders satisfy all technical and safety requirements while maximizing ease of use and comfort. FAKRO offers many attic ladder models to cover all individual customers’ needs around the world. We deliver some of these models to North America for almost immediate delivery to our customers. These attic ladders were designed to satisfy your needs and protect your comfort with a long-term warranty program. Our installation system enables the ladder to be easily installed by one or two people and provides easy ladder toe space and height adjustment. All minimum ceiling heights are recommended by the manufacturer. The customer agrees to indemnify the manufacturer and FAKRO, and hold them harmless from any liabilities that may arise from any further adjustments that the customer may make/alter beyond the recommended minimum ceiling height. WOODEN FOLDING ATTIC LADDERS METAL FOLDING ATTIC LADDERS METAL SCISSOR ATTIC LADDERS LWN LWP LWT LWF OWM LMS LML LST LSF URER URER URER URER URER CT C CT C CT C CT C CT C A E A E A E A E A E F RM R F RM R F RM R F RM R F RM R FO AN T FO AN T FO AN T FO AN T FO AN T U N C I U N C I U N C I U N C I U N C I N O TO E F N O TO E F N O TO E F N O TO E F N O TO E F C C C C C I I I I I A E A E A E A E A E S S S S S M M M M M
    [Show full text]
  • Level 2 8: Secret Passage Lies Directly Below 7: False Temple Neat
    Level 2 Inside the pool are 2 Mummy Fragments (HD 2; AC 8: Secret Passage 7; MV 30’; Int 0; #atk 1; claw 1d4; Special – mindless, Lies directly below 7: False Temple mummy rot, strangle, undead; morale 12; XP 29) Neat stonework, with gaps caused by water that will jump out to attack anyone who comes near Smells strongly of mildew, slime, wet stone the pit. A fragment that hits tightens its grip around Puddles of water on floor the target’s throat, automatically dealing 1d6 Widens to become 9: Statue Hall. damage per round. A missed attack against a 30'x10'x6' high strangler has a 50% chance to strike the victim instead. Anyone struck will also contract weakened 9: Statue Hall mummy rot: They are immune to magical healing for A long, wide corridor 24 hours. Smells of mildew, wet stone. Small trickle of water going east Lessons: there are hidden monsters. Some monsters Six huge statues of heavily armed and armored also carry diseases. It is very hard to hit a monster beast-men loom over the hall. One of the statues clinging to your friend's throat. (wolf-man) is slightly out of alignment: It can be moved to reveal 10: Secret Guardroom. If the party dredges or searches the pool they will End of hall is in darkness find Light from the surface can't penetrate this far down; • a mummified head that resembles a fish or lizard. from this point, the PCs must rely on other light Has a 10% chance every hour to animate for 1d4 sources.
    [Show full text]