Pre-Feasibility Report Vadavucode Ordinary
Total Page:16
File Type:pdf, Size:1020Kb
PRE-FEASIBILITY REPORT OF VADAVUCODE ORDINARY EARTH MINING PROJECT Village : Vadavucode Taluk : Kunnathunad District : Ernakulam State : Kerala Capacity : 15000 Metric tons Lease : 0.2145 hectares Category of : B2 Project Cost : Rs. 10 lakhs Project Proponent SRI. PAULOSEKUTTY KEERIKKATTEL HOUSE VADAVUCODE, PUTHENCRUZ ERNAKULAM- 682310 PREPARED BY P.K.BHARATHAN RQP /BNG/212/1005/A 1 Contents 1.0 Executive Summary ........................................................................................................... 5 2.0 Introduction of the Project / Background Information ....................................................... 5 2.1 Identification of Project and Project Proponent ............................................................ 5 2.2 Brief Information about the Project ................................................................................ 6 2.3 Need for the Project and Its Importance to the Country or Region............................... 6 2.4 Demands-Supply Gap .................................................................................................... 6 2.5 Imports vs. Indigenous Production ................................................................................ 6 2.6 Export Possibility ............................................................................................................ 7 2.7 Domestic/ Export Markets .............................................................................................. 7 2.8 Employment Generation ................................................................................................ 7 3.0 Project Description ............................................................................................................. 7 3.1 Type of project including interlinked and interdependent project, if any....................... 7 3.2 Location (Map showing general location, specific location and project boundary & project site layout) with co-ordinates ................................................................................... 7 3.3 Details of alternate sites considered and basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted ................. 9 3.4 Size or magnitude of operation ................................................................................... 10 3.5 Project description with process details ...................................................................... 10 3.6 Raw material required along with estimated quantity, likely source, marketing area of final products, mode of transport of raw materials and finished products ........................ 10 3.7 Resource optimization/ recycling and reuse envisaged in the project, if any ............. 10 2 3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their management....................................................................................................................... 11 3.10 Schematic representation of the feasibility drawing which give information of EIA purpose ............................................................................................................................... 11 4.0 Site Analysis ..................................................................................................................... 12 4.1 Connectivity .................................................................................................................. 12 4.2 Land Form, Land use and Land Ownership ................................................................ 12 Details of the lease area are given below:......................................................................... 12 4.3 Topography (along with map) ...................................................................................... 13 4.4 Existing land use pattern (agriculture, non- agriculture, forest, water bodies (including area under CRZ), shortest distance from the periphery of project to periphery of forest, national park, wild life sanctuary, eco sensitive area, water bodies (distance from the HFL of the river), CRZ. ............................................................................................................... 13 4.5 Existing Infrastructure .................................................................................................. 14 4.6 Soil Classification ......................................................................................................... 14 4.7 Climatic data from secondary sources ........................................................................ 15 4.8 Social Infrastructure available ...................................................................................... 15 5.0 Planning Brief ................................................................................................................... 15 5.1 Planning Concept (types of industries, facilities, transportation, etc.) Town and Country Planning/ Development authority classification ................................................... 16 5.2 Population projection ................................................................................................... 16 5.3 Land use planning (break up along with green belt etc.) ............................................ 17 5.4 Assessment of Infrastructure Demand (physical & Social) ......................................... 17 5.5 Amenities/ Facilities ..................................................................................................... 17 3 6.0 Proposed Infrastructure .................................................................................................... 17 6.1 Industrial Area (Processing Area) ................................................................................ 18 6.2 Residential Area (Non Processing Area) ..................................................................... 18 6.3 Green Belt .................................................................................................................... 18 6.4 Social Infrastructure ..................................................................................................... 18 6.5 Connectivity (Traffic and Transportation Road/ Rail/ Metro/ Water ways etc.) .......... 18 6.6 Drinking Water Management (Source & supply of water) ........................................... 18 6.7 Sewerage System ........................................................................................................ 19 6.8 Industrial Waste Management ..................................................................................... 19 6.9 Solid Waste Management ............................................................................................ 19 7.0 Rehabilitation and Resettlement (R&R) Plan................................................................... 19 7.1 Policy to be adopted (Central/ State) in respect of the project affected persons including home oustees, land oustees and landless laborers .......................................... 20 8.0 Project Schedule & Cost Estimates ................................................................................. 20 8.1 Likely date of start of construction and likely date of completion (Time Schedule for the project) .......................................................................................................................... 20 8.2 Estimated project cost along with analysis in terms of economic viability of the project ............................................................................................................................................ 20 9.0 Analysis of Proposal (Final Recommendations) ............... Error! Bookmark not defined. 9.1 Financial and social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area ..................... Error! Bookmark not defined. 4 1.0 Executive Summary The present proposal is for mining ordinary earth from 0.2145 hectares in Sy. No. 445/9-2 of Vadavucode village, Kunnathnad taluk, Ernakulam district. The subject land is Private Patta Land and does not belong to government or reserved for any other public purposes. The subject area is away from public properties and there is no objection of the public or any litigation is pending on the land. The project proponent proposes to excavate the ordinary earth available in the area on the strength of a quarrying permit granted by the Geologist, Department of Mining and Geology, Ernakulam. Excavated ordinary earth will be utilized for the jobe of laying12” OD pipeline of Kochi Salem LPG pipeline project of M/s. KSPPL. As per office memorandum No.J-13012/12/2013-1A-II (I) dated 24 th December, 2013 of the Ministry of Environment and Forests all minor mineral mining projects with mining lease area less than 25 hectares, except for river sand mining projects, will be appraised as Category ‘B2’ projects. Total area of the mining project is 0.2145 hectares. As per statutory obligation this project needs Environmental Clearance from DEIAA, Ernakulam. Accordingly submitting Form-1M, Pre-Feasibility Report to the District Level Environment Impact Assessment Authority, Ernakulam for issuing environmental clearance. 2.0 Introduction of the Project / Background Information 2.1 Identification of Project and Project Proponent The present proposal is for mining ordinary earth from 0.2145 hectares in Sy. No. 445/9-2 of Vadavucode village, Kunnathnad taluk, Ernakulam district. The project site is located at Vadavucode.