GOVERNMENT OF SHIPPING, ROAD TRANSPORT AND HIGHWAYS

UNSTARRED QUESTION NO:2692 ANSWERED ON:10.08.2005 PROJECT Reddy Shri Karunakara G.

Will the Minister of SHIPPING, ROAD TRANSPORT AND HIGHWAYS be pleased to state:

(a) the sectors of the Golden Quadrilateral project funded by the Union Government;

(b) the sectors financed by the International Monetary Institutions and the total fund made available by the International Monetary Institutions for this purpose;

(c) whether the targets in respect of the sectors which are financed by the International Monetary Institutions are proposed to be revised;

(d) if so, the details thereof; and

(e) the reaction of the International Monetary Institutions in this regard? Answer

THE MINISTER OF STATE IN THE MINISTRY OF SHIPPING, ROAD TRANSPORT AND HIGHWAYS(SHRI K. H. MUNIYAPPA)

(a) The sub-projects on Golden Quadrilateral (GQ) funded by the Government (out of cess allocation and market borrowings by NHAI) are as per the Statement at Annexure − I.

(b) The list of the sub-projects on GQ being executed with external assistance is enclosed as Annexure II. The details of loan executed with these institutions are as per Annexure − III.

(c) and (d) Yes Sir. The loan closure for Western Transport Corridor (four laning of Tumkur − Haveri Section of NH-4) is December, 2005 which is proposed to be extended as the work is likely to be completed by June, 2006. The completion target is proposed to be revised due to delay in land acquisition, utility shifting, poor management and cash flow problems of some of the Contractors.

5. ADB has desired to take appropriate action against defaulting contractors as per contract agreement.

ANNEXURE-I

ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 2692 FOR ANSWER ON 10TH AUGUST, 2005 ASKED BY SHRI G. KARUNAKARA REDDY REGARDING GOLDEN QUADRILATERAL PROJECT.

Projects under Golden Quadrilateral funded by the Union Government

Sl. No.

Name of the Project

Length

(km)

Source of Finance

State Concerned

1

Jaipur Bypass Zone-C

13.60

NHAI

Rajasthan

2

Jaipur Bypass, Phase-II, Zone-D (including payments to RSRDCC)

34.70

NHAI

Rajasthan 3

Kishangarh-Nasirabad [KU-I]

36.23

NHAI

Rajasthan

4

Nasirabad - Gulabpura (KU-II)

55.87

NHAI

Rajasthan

5

Gulabpura - Bhilwara Bypass (KU-III)

50.00

NHAI

Rajasthan

6

Bhilwara Bypass to Chittorgarh (KU-IV)

66.00

NHAI

Rajasthan

7

Kishangarh-Udaipur (Chittorgarh-Mangalwar) Pkg (KU-V)

48.00

NHAI

Rajasthan

8

Kishangarh-Udaipur (Mangalwar-Udaipur) Km 172- Km 113.825 Pkg (KU-VI)

58.18

NHAI

Rajasthan

9

4-lane access controlled Chittorgarh Bypass 29.5 Km. From Km 159 on NH-79 to Km 213 on NH-76 with length of 20 Km in Rajasthan

20.00

NHAI

Rajasthan

10

Udaipur-Ratanpur-Chiloda (Udaipur-Kesariaji) Km 278 - Km 340 of NH-8 UG-I

62.00

NHAI

Rajasthan

11

Udaipur-Ratanpur-Chiloda (Kesariaji-Ratanpur) Km 340 - Km 388.4 UG-II

48.40

NHAI

Rajasthan

12

Udaipur-Ratanpur-Chiloda (Ratanpur-Himatnagar) Km 388.4 - Km 443 UG-III

54.60

NHAI

Gujarat

13

Udaipur-Ratanpur-Chiloda (Himatnagar-Chiloda/Gandhinagar) Km 443 - Km 495 UG-IV

52.00

NHAI

Gujarat

14

Westerly Diversion (Pune bypass)

34.25

NHAI

Maharastra

15

Pune -Satara (Wathar-Satara) Km 760- Km 725 ( PS-1 )

35.00

NHAI

Maharastra

16

Pune -Satara (Sarole-Wathar) Km 760- Km 797 ( PS-2 )

29.00

NHAI

Maharastra

17

Pune -Satara (Katraj-Sarole) Km 797- Km 825.5 ( PS-3 )

28.50

NHAI

Maharastra

18

Pune -Satara (Katraj Bypass), Katra realignment ( PS-4 )

9.00

NHAI

Maharastra

19

Sira Bypass

5.80

NHAI

Karnataka

20

Tumkur Bypass

13.00

NHAI

Karnataka

21

Belgaum Bypass

18.00

NHAI

Karnataka

22

Dharwad-Belgaum (KT) NH 4 Pkg-III

62.00

NHAI

Karnataka

23

Hubli-Haveri

64.00

NHAI

Karnataka

24

Hosur-

45.40

NHAI

Tamil Nadu

25

Chennai-Ranipet-kishanagiri (Krishnagiri-) Package III (KR-1)

49.00

NHAI

Tamil Nadu 26

Chennai-Ranipet-kishanagiri (Vaniyambadi-) Km 49 - Km 100 Package III (KR-2)

51.00

NHAI

Tamil Nadu

27

Chennai-Ranipet-kishanagiri (PalliKonda -Ranipat Road) Km 100- Km 145 Package III (KR-3)

45.00

NHAI

Tamil Nadu

28

Chennai-Ranipet-kishanagiri(Poonamlee-) Km 70.2 - Km 13.8 Package I (RC-1)

56.40

NHAI

Tamil Nadu

29

Chennai-Ranipet-kishanagiri (Valelapet-Kanchipuram) Km 70.2 - Km 106.2 Package II (RC-2)

36.20

NHAI

Tamil Nadu

30

Dhankuni-kolaghat WB-I

54.40

NHAI

West Bengal

31

Kolaghat-Kharagpur NH 6 WB-II

60.45

NHAI

West Bengal

32

Dhankuni-kharagpur WB-III (Bridges) Km 17.6 - Km 136

NA

NHAI

West Bengal

33

Laxmannath-Kharagpur WB-IV

65.86

NHAI

West Bengal

34

Bridges Balasore-Kharagpur OR-WB-I

NA

NHAI

Orissa

35

Bhubaneswar-khurda OR-I

26.30

NHAI

Orissa

36

Chandikhol-Bhadrak OR-II

75.50

NHAI

Orissa

37

Bhadrak-Balasore OR-III

62.64

NHAI

Orissa

38

Balasore-Laxmannath OR-IV

53.41

NHAI

Orissa

39

Chandikhol-Balasore (Bridges) OR-V

NA

NHAI

Orissa

40

Sunakhala-Khurda OR-VI Km 233-284

52.06

NHAI

Orissa

41

Ganjam - Sunakhala OR-VII Km 284-338

55.71

NHAI

Orissa

42

Ichapuram - Ganjam OR-VIII Km 338-388

50.80

NHAI

Orissa

43

Champavati-Srikakulam (Kms 49-Kms 97) AP-I

48.00

NHAI

Andhra Pradesh

44

Srikakulam-Palasa (Kms 97-Kms171) AP-II

74.00

NHAI

Andhra Pradesh

45

Visakhapatnam-Champavati River Km.2.8-49 NH 5 (AP-III)

46.20

NHAI

Andhra Pradesh

46

Ichapuram-Visakhapatnam Package IA (Korlam-Palasa) Km 171 -Km 200, AP-IVA

29.00

NHAI

Andhra Pradesh

47

Ichapuram-Visakhapatnam Package IB (Ichapuram-Korlam) Km 233-Km 200 AP-IVB

33.00

NHAI

Andhra Pradesh

48

Visakhapatnam-Champavati (Bridges section Km.49-97) AP-V

NA

NHAI

Andhra Pradesh

49

Ichapuram-Champavati (Bridges Section Km 98-233) AP-VI

NA

NHAI

Andhra Pradesh

50

Rajahmundry - Eluru AP-17 (Gowthami - Rajahmundry) (Km 200-165)

34.95

NHAI

Andhra Pradesh

51

Rajahmundry - Eluru AP-18 (Eluru - Gowthami) (Km 80-165) AP-18

81.08

NHAI

Andhra Pradesh

52

Eluru - Rajahmundry (Bridges - II) AP-19

NA

NHAI

Andhra Pradesh

53

Eluru - Rajahmundry (Bridges - I) AP-20

NA

NHAI

Andhra Pradesh

54

Kavali-Nellore (AP-11)

43.80

NHAI

Andhra Pradesh

55

Kavali-Ongole (AP-12)

72.00

NHAI

Andhra Pradesh

56

Ongole-Chilakaluripet (AP-13)

66.00

NHAI

Andhra Pradesh

57

Chennai - Tada (TN-1)

41.80

NHAI

Tamil Nadu

58

Near Eluru (Rajahmundry - Vijayawada) (Km 75-80)

5.00

NHAI

Andhra Pradesh

59

Etawah Bypass NH2

13.60

NHAI

Uttar Pradesh ANNEXURE-II

ANNEXURE REFERRED TO IN REPLY TO PART (b) OF LOK SABHA UNSTARRED QUESTION NO. 2692 FOR ANSWER ON 10TH AUGUST, 2005 ASKED BY SHRI G. KARUNAKARA REDDY REGARDING GOLDEN QUADRILATERAL PROJECT.

Projects under Golden Quadrilateral funded by International Monetary Institutions

Sl. No.

Name of the Project

Length

(km)

Source of Finance

State Concerned

1

Surat-Manor Package - I

79.60

EAP [ADB-IV]

Gujarat

2

Surat-Manor Package - II

38.60

EAP [ADB-IV]

Gujarat

3

Surat-Manor Package - III

57.40

EAP [ADB-IV]

Maharastra

4

Gurgaon Kotputli (ADB Pkg-I)

126.00

EAP [ADB-III]

Common

5

Tumkur-Haveri (Tumkar-Sira) Pkg-I

41.40

EAP [ADB-V]

Karnataka

6

Tumkur-Haveri (Sira-Chitradurga) Pkg-II

66.70

EAP [ADB-V]

Karnataka

7

Tumkur-Haveri (Chitradurga section) Pkg-III

18.00

EAP [ADB-V]

Karnataka

8

Tumkur-Haveri ( Chitradurga-Davengere) Pkg-IV

77.00

EAP [ADB-V]

Karnataka

9

Tumkur-Haveri (Davengere-Haveri) Pkg-V

56.00

EAP [ADB-V]

Karnataka

10

Jagatpur-Chandikhol (IDP-100)

33.00

EAP [JBIC]

Orissa

11

Chilkaluripet-Vijayawada Package I

25.00

EAP [JBIC]

Andhra Pradesh

12

Chilkaluripet - Vijayawada (Package - II, including Guntur Bypass of (Km.0-15.20)

32.00

EAP [JBIC]

Andhra Pradesh

13

Chilkaluripet - Vijayawada (Package - III, including Krishna Bridge Approach of (Km 0-10.8)

23.78

EAP [JBIC]

Andhra Pradesh

14

Chilkaluripet-Vijayawada Package IV (Krishna Bridge)

2.88

EAP [JBIC]

Andhra Pradesh

15

Vijayawada - Eluru (ADB, Pkg-V) (Km 3.4 to 75)

71.60

EAP [ADB-III]

Andhra Pradesh

16

Sikandra-Bhaunti (TNHP -1)Package II-A

62.00

EAP [WB-III]

Uttar Pradesh

17

Fatehpur-Khaga (TNHP -2) Package II-C (UP) Km 38-115-NH2

77.00

EAP [WB-III]

Uttar Pradesh

18

Khaga-kokhraj (TNHP -3) Package III-A (UP)

43.00

EAP [WB-III]

Uttar Pradesh

19

Handia-Varanasi (TNHP -4)Package III-C (UP) WB

72.00

EAP [WB-III]

Uttar Pradesh

20

Mohania-Sasaram (TNHP -5) Package IV-B (Bihar) (WB)

45.00

EAP [WB-III]

Bihar

21

Dehri-on-sone-Aurangabad (TNHP -6) Package IV-D (WB)

40.00

EAP [WB-III]

Bihar 22

Aurangabad-Barwa-Adda (TNHP-7) Package (V-A) [Aurangabad-Barachati]

60.00

EAP [WB-III]

Bihar

23

Aurangabad-Barwa-Adda (TNHP-8) [Gorhar-Barwa Adda] (V-C) Km 320 - Km 398.75

78.75

EAP [WB-III]

Jharkhand

24

Agra-Shikohabad (GTRIP-1) Package I-A (Km 199.66 - Km 250.50)

50.84

EAP [WB-IV]

Uttar Pradesh

25

Shikohabad-Etawah (GTRIP-2) Package I-B (Km 250.50-Km 307.50)

57.00

EAP [WB-IV]

Uttar Pradesh

26

Etawah-Rajpur (GTRIP-3) Package I-C (Km 321.1 - Km 393)

72.83

EAP [WB-IV]

Uttar Pradesh

27

Bhaunti - Fatehpur (GTRIP-4) Package II-B

51.50

EAP [WB-IV]

Uttar Pradesh

28

Allahabad Bypass Project (Pkg ABP-I) Construction of bridge across river Ganga from Km 163.280 to Km 164.30 (Ganga Bridge)

1.02

EAP [WB-ABP]

Uttar Pradesh

29

Allahabad Bypass Project (Pkg ABP-II) on NH-2 from Km 158 to Km 198 in the state of UP

39.00

EAP [WB-ABP]

Uttar Pradesh

30

Allahabad Bypass Project (Pkg ABP-III) on NH-2 from Km 198 to Km 242.708 in the state of UP

44.70

EAP [WB-ABP]

Uttar Pradesh

31

Varanasi-Mohania (GTRIP-5) Package IV-A (WB)

76.00

EAP [WB-IV]

Common

32

Sasaram-Dehri-on-sone (GTRIP-6) Package IV-C (WB)

30.00

EAP [WB-IV]

Bihar

33

Aurangabad-Barwa-Adda (GTRIP-7) (V-B) [Barachati-Gorhar]

80.00

EAP [WB-IV]

Common

34

Raniganj-Panagarh (ADB Pkg-II)

42.00

EAP [ADB-III]

West Bengal

35

Barwa Adda-Barakar (ADB Pkg-III)

42.70

EAP [ADB-III]

Jharkhand

ANNEXURE-III

ANNEXURE REFERRED TO IN REPLY TO PART (b) OF LOK SABHA UNSTARRED QUESTION NO. 2692 FOR ANSWER ON 10TH AUGUST, 2005 ASKED BY SHRI G. KARUNAKARA REDDY REGARDING GOLDEN QUADRILATERAL PROJECT.

DETAILS OF LOANS TAKEN FROM MULTILATERAL AGENCIES

PARTICULARS

AMOUNT

LOAN STATUS AS ON 30.06.2005

WORLD BANK (WB)

NHDP Phase-I

Third National Highways Project

US $ 516 million

On going

Grand Trunk Road Improvement Project (GTRIP)

US $ 589 million

On going

Allahabad Bypass

US $ 240 million

On going

NHDP Phase-II

Lucknow-Muzaffarpur

US $ 620 million

Loan Agreement yet to be signed

Sub Total World Bank

US $ 1965 million

ASIAN DEVELOPMENT BANK (ADB)

NHDP Phase-I

NH Projects (ADB-III)

US $ 245 million

Loan closed

Surat-Manor (ADB-IV)

US $ 180 million

On going

Western Transport Corridor (ADB-V)

US $ 240 million

On going

NHDP Phase-II

East-West Corridor (ADB-VI)

US $ 320 million

On going

Sector-I (Chittorgarh-Kanpur)

US $ 400 million

On going

Sector-II (Jhansi-Lakhnadan)

US $ 400 million

Loan Agreement yet to be signed

Sub total ADB

US $ 1785 million

JAPAN BANK FOR INTERNATIONAL COOPERATION (JBIC)

NHDP Phase-I

Naini Bridge

Yen 10037 million

Loan closed

Chilkaluripet-Vijayawada

Yen 11360 million

Loan closed

Jagatpur-Chandikhol

Yen 5836 million

Loan closed

Gaziabad-Hapur

Yen 4827 million

Loan closed

Sub Total JBIC

Yen 32060 million