Republic of Lebanon Public Disclosure Authorized Policy Note on Irrigation Sector Sustainability

Total Page:16

File Type:pdf, Size:1020Kb

Republic of Lebanon Public Disclosure Authorized Policy Note on Irrigation Sector Sustainability Report No. 28766 - LE Republic Of Lebanon Public Disclosure Authorized Policy Note on Irrigation Sector Sustainability November 2003 The World Bank Public Disclosure Authorized Water, Environment, Social, and Rural Development Group Middle East and North Africa Region and Agriculture and Rural Development Department Public Disclosure Authorized Public Disclosure Authorized Contents Preface ........................................................................................................................................... vii Acronyms and Abbreviations ........................................................................................................ viii Executive Summary ........................................................................................................................ ix 1. Introduction............................................................................................................................. 1 2. Water Resources....................................................................................................................... 2 WATER DEMAND ............................................................................................................................6 For Irrigation Water................................................................................................................... 6 For Domestic and Industrial Use................................................................................................. 7 3. The Agriculture Sector........................................................................................................... 10 ROLE OF AGRICULTURE IN THE ECONOMY......................................................................................10 AGRICULTURE IN THE LAST FIVE-YEAR PLAN.................................................................................11 4. Main Features of Irrigated Agriculture .................................................................................. 13 WATER AND LAND USE .................................................................................................................13 EXISTING AND PROPOSED IRRIGATION SCHEMES.............................................................................15 CROPPING PATTERNS.....................................................................................................................17 5. Current State of Water Quality and Pollution Control........................................................... 19 RECOMMENDATIONS.....................................................................................................................22 6. Institutional Aspects ............................................................................................................... 25 WATER LAW AND WATER RIGHTS .................................................................................................25 ORGANIZATION OF THE WATER SECTOR.........................................................................................25 Historical Perspective .............................................................................................................. 25 The Current Situation............................................................................................................... 30 Weaknesses of the Present System ............................................................................................. 32 RECOMMENDATIONS.....................................................................................................................33 7. Operation and Maintenance, Tariffs, and Cost Recovery....................................................... 35 OPERATION AND MAINTENANCE....................................................................................................35 WATER TARIFFS AND COST RECOVERY ..........................................................................................36 RECOMMENDATIONS.....................................................................................................................38 8. Financial and Economic Aspects............................................................................................. 41 COMPETITIVENESS AND SUSTAINABILITY OF IRRIGATED AGRICULTURE...........................................42 AGRICULTURAL MARKETING.........................................................................................................44 RECOMMENDATIONS.....................................................................................................................44 AGRICULTURAL SERVICES: RESEARCH, EXTENSION AND CREDIT.....................................................44 Agricultural Research............................................................................................................... 44 Extension................................................................................................................................. 45 AGRICULTURAL TRADE AND TRADE AGREEMENTS.........................................................................45 iii 9. The Public Investment Program in Irrigated Agriculture ....................................................... 47 MOEW INVESTMENT PROGRAM ....................................................................................................47 LRA INVESTMENT PROGRAM.........................................................................................................48 RECOMMENDATIONS.....................................................................................................................52 10. Strategic Choices Facing Irrigated Agriculture .................................................................. 53 TECHNICAL ASPECTS.....................................................................................................................53 FINANCIAL AND ECONOMIC ASPECTS.............................................................................................54 INSTITUTIONAL ASPECTS...............................................................................................................55 ENVIRONMENTAL ASPECTS............................................................................................................56 AREAS OF POSSIBLE BANK SUPPORT ..............................................................................................57 Appendix 1 Overview of Irrigation Schemes in Lebanon............................................................... 59 Appendix 2 Water Resources and Use in Lebanon......................................................................... 64 Appendix 3 Pollution and Treatment of Water Sources in Lebanon.............................................. 67 Appendix 4 His torical Review of Water Laws in Lebanon............................................................. 69 Appendix 5 Operation & Maintenance of Irrigation Systems ........................................................ 71 References...................................................................................................................................... 75 Tables TABLE 2.1 CATCHMENT AREAS OF THE MAJOR RIVERS OF LEBANON ......................................3 TABLE 2.2 EXISTING SCHEMED AND SMALL SCALE IRRIGATION AREAS (HA)............................6 TABLE 2.3 PROPOSED IRRIGATION EFFICIENCIES ...................................................................7 TABLE 2.4 PROJECTED WATER DEMAND FOR IRRIGATION BY MOHAFAZA ...............................8 TABLE 2.5 TOTAL ANNUAL WATER DEMAND AND AVAILABLE SUPPLY....................................9 TABLE 3.1 GROSS VALUE OF AGRICULTURAL PRODUCTION.................................................11 TABLE 4.1 ESTIMATES OF WATER RESOURCES UTILIZATION .................................................13 TABLE 4.2 LAND RESOURCES AND LAND USE (1,000 HA) IN LEBANON, 1998.........................13 TABLE 4.3 FARM LAND IN FOUR SELECTED DISTRICTS AND ENTIRE LEBANON, 1998 ..............14 TABLE 4.4 PRESENT LAND USE...........................................................................................15 TABLE 4.5 IRRIGATED AREAS.............................................................................................15 TABLE 4.6 PROPOSED AND ONGOING IRRIGATION SCHEMES .................................................16 TABLE 4.7 CROPPING PATTERN IN THE MOHAFAZATS..........................................................17 TABLE 5.1 CHLORIDE AND SODIUM CONCENTRATIONS IN 31 WELLS ACROSS THE COUNTRY...21 TABLE 6.1 REGIONAL WATER AUTHORITIES ........................................................................27 TABLE 6.2 LOCAL WATER COMMITTEES FORMED BETWEEN 1984 AND 1990 ..........................29 TABLE 6.3 RECENTLY CREATED WATER AUTHORITIES .........................................................31 TABLE 6.4 WATER AUTHORITIES GENERAL CHARACTERISTICS............................................34 TABLE 8.1 IMPORTS AND EXPORTS OF AGRICULTURAL PRODUCTS (LL BILLION), 1999-2001 .45 TABLE 10.1 MOEW’S INVESTMENT PROGRAM , 2003-2030 ..................................................48 TABLE 10.2 LRA’S INVESTMENT PROGRAM , 2003-2020 ......................................................49 TABLE 10.3 SUMMARY OF LEBANON’S CURRENT IRRIGATION INVESTMENT PROGRAM , 2002-2030....................................................................................51 TABLE A1.1 EXISTING SCHEMED IRRIGATION......................................................................59 TABLE A1.2 PROPOSED AND/OR ONGOING IRRIGATION SCHEMES .........................................62
Recommended publications
  • Syria Refugee Response ±
    S Y R I A R E F U G E E R E S P O N S E LEBANON Beirut and Mount Lebanon Governorates Distribution of the Registered Syrian Refugees at the Cadastral Level As of 30 November 2015 Fghal Distribution of the Registered Syrian Kfar Kidde Berbara Jbayl Chmout 24 Maad Refugees by Province 26 Bekhaaz Aain Kfaa Mayfouq Bejje 12 Mounsef Gharzouz 22 Qottara Jbayl BEIRUT 7 2 Kharbet Jbayl 16 Tartij Chikhane GhalbounChamate 23 9 Rihanet Jbayl 16 Total No. of Household Registered Hsarat Haqel Lehfed 8,760 12 Hasrayel Aabaydat Beit Habbaq 22 Jeoddayel Jbayl 69 Hbaline 33 Jaj 47 Kfoun Saqiet El-Khayt Ghofrine 31 kafr Total No. of Individuals Registered 28,706 20 11 Behdaydat 6 Habil Saqi Richmaya Aarab El-Lahib Kfar Mashoun 19 Aamchit 31 Birket Hjoula Hema Er-Rehban 978 Bintaael Michmich Jbayl Edde Jbayl 33 63 7 Hema Mar Maroun AannayaLaqlouq MOUNT LEBANON Bichtlida Hboub Ehmej 19 8 Jbayl 57 Hjoula 69 Total No. of Household Registered 1,737 Bmehrayn Brayj Jbayl 74,356 Ras Osta Jbeil Aaqoura 10 Kfar Baal Mazraat El-Maaden Mazraat Es Siyad Qartaboun Jlisse 53 44 Blat Jbeil 144 9 25 Sebrine Aalmat Ech-Chamliye Total No. of Individuals Registered 548 Tourzaiya Mghayre Jbeil 283,552 Mastita 24 Bchille Jbayl Jouret El-Qattine 8 Tadmor 6 211 47 Ferhet Aalmat Ej-Jnoubiye Yanouh Jbayl Zibdine Jbayl Bayzoun 5 Hsoun Souanet Jbayl Qartaba Mar Sarkis 17 40 4 2 3 Boulhos Hdeine Halate Aalita 266 Fatre Frat 940 1 Aain Jrain Aain El-GhouaybeSeraaiita Majdel El-Aqoura Adonis Jbayl Mchane Bizhel 7 Janne 8 Ghabat Aarasta 112 42 4 19 Qorqraiya 11 Kharayeb Nahr Ibrahim
    [Show full text]
  • The Herpetofauna of Lebanon: New Data on Distribution by Souad Hraoui-Bloquet, Riyad A
    The herpetofauna of Lebanon: new data on distribution by Souad Hraoui-Bloquet, Riyad A. Sadek, Roberto Sindaco, and Alberto Venchi Abstract. This paper reports more tIia11 400 original data on the Lebanese herpetotiuna (covering 5 mphibians and 44 reptiles), deriving liom museum collecllons and recent lield observations. The most interesting data concern: (a) C:vity1ohoi7 ornicto~~holi.~,a species known only from Mt. Hermon, reported for the first time from Mt. Lehanon Range; (b) Lrrcerto,/i.atr.,i, previously con- rldered endemic to the Mount Lebanon Range. also recorded from Antilebanon; (c) the occur- rence of Moci~~r~iperiiIehetii7rr is contir~nedw~th certainty kom two localities in the north. New records are glben Ibr many specles known in Lebanon only on the basis of very few and often old repolts. Kurzfassung. In diescr Arbeit werden iiber 400 un\~eroffcntlicliteDaten zu 5 Amphibien- und 44 Reptilien-Arten des Libanon mitgeteilt, die auf Museumssamn~lungzn und elgenen Feldbeobachtungen basieren. Die Daten umfassen, unter anderem, folgende interessante Feststellungcn: (a) Ci~i.fopotiioiicri~ictopiiolis, eine Art, die bisher nur vom Mt. Hennon bekannt ist. wurde erstmals in1 Gebiet des Mt. Lcbanon gefunden; (h) L~rcevtafi~~~rsr. die bisher als mdemlscll liir das Gcbiet des Mt. Lehanon angesehen \wrde, wurde nun auch im .Antilibanon festgestellt; (c) das sichcre Vorkommen \on Clrrci.oi,iptwr lehe/ii~tr\\id an z\\ci Stellen im &orden Jes Landes bestiitigt. Filr viele Altcn, die 311s dem Libanon nur aufgrund sehr weniger und hautig alter Zitate bekannt sind, \+erden neue Nachweiae ,nelneldet. Key words. Lc\ant, Middle East, roogeography, faun~stics,Amph~bia.
    [Show full text]
  • Part 2 (Bcharre)
    The Study on the Integrated Tourism Development Plan in the Republic of Lebanon Final Report Vol. 3 Feasibility Study Report (1) Fauna and Flora During the construction phase, fauna and flora will be not negatively impacted because of the tourism facilities will be constructed avoiding the inhabiting areas of important fauna and flora. (2) Air Pollution, Noise During the construction and operating phases air quality and noise will not be negatively impacted because that the construction will be not so large scale and the increase of tourist vehicles is not so much comparing present amount. (3) Water Quality, Solid Waste During the construction and operating phases water quality and solid waste will not be negatively impacted because that the construction will be not so large scale and the increase of tourist excreta is not so much comparing present amount. (4) Other Items During the construction and operating phases all of other items will not be negatively impacted. Part 2 (Bcharre) 2.1 EXISTING CONDITIONS Exhibits 9 and 10 present sensitive eco-system and land cover for Bcharre Qaza. ANNEX-15 The Study on the Integrated Tourism Development Plan in the Republic of Lebanon Final Report Vol. 3 Feasibility Study Report tem Map s Figure 9 Sensitive Ecosy Qnat Bcharre Qaza ANNEX-16 The Study on the Integrated Tourism Development Plan in the Republic of Lebanon Final Report Vol. 3 Feasibility Study Report Figure 10 Land Cover Map ANNEX-17 The Study on the Integrated Tourism Development Plan in the Republic of Lebanon Final Report Vol. 3 Feasibility Study Report 2.1.1 TOPOGRAPHY The study area could be divided into two main topographic units.
    [Show full text]
  • Time Published: 08:00 PM Report #295 Thursday, January 07, 2021
    Thursday, January 07, 2021 Report #295 Time Published: 08:00 PM New in the report: Amendment and clarification issued by the Presidency of the Council of Ministers No. 10 / MAM on 1/7/2012 of what was stated in the Presidency of the Council of Ministers Decision No. 3 / PMP issued .on 1/5/2021 related to the complete closure For daily information on all the details of the beds distribution availability for Covid-19 patients among all governorates and according to hospitals, kindly check the dashboard link: Computer:https:/bit.ly/DRM-HospitalsOccupancy-PCPhone:https:/bit.ly/DRM-HospitalsOccupancy-Mobile Beirut 522 Baabda 609 Maten 727 Chouf 141 Kesrwen 186 Aley 205 Ain Mraisseh 10 Chiyah 13 Borj Hammoud 18 Damour 1 Jounieh Sarba 12 El Aamroussiyeh 2 Aub 1 Jnah 39 Nabaa 1 Naameh 3 Jounieh Kaslik 6 Hay Sellom 18 Ras Beyrouth 7 Ouzaai 4 Sinn Fil 26 Haret Naameh 1 Zouk Mkayel 14 El Qoubbeh 1 Manara 6 Bir Hassan 14 Horch Tabet 5 Jall El Bahr 1 Nahr El Kalb 1 Khaldeh 8 Qreitem 6 Ghbayreh 12 Jdaidet Matn 29 Mechref 1 Haret El Mir 1 El Oumara 23 Raoucheh 22 Ain Roummane 28 Baouchriyeh 8 Chhim 4 Jounieh Ghadir 11 Deir Qoubel 2 Hamra 37 Furn Chebbak 14 Daoura 9 Mazboud 1 Zouk Mosbeh 11 Aaramoun 28 Ain Tineh 7 Haret Hreik 114 Raouda 19 Daraiya 5 Adonis 7 Baaouerta 1 Msaitbeh 13 Laylakeh 5 Sad Baouchriye 9 Ketermaya 1 Haret Sakhr 5 Bchamoun 21 Mar Elias 22 Borj Brajneh 42 Sabtiyeh 13 Aanout 5 Sahel Aalma 12 Ain Aanoub 4 Unesco 6 Mreijeh 18 Mar Roukoz 2 Sibline 1 Kfar Yassine 2 Blaybel 3 Tallet Khayat 9 Tahuitat Ghadir 7 Dekouaneh 60 Bourjein 1 Tabarja
    [Show full text]
  • Inter-Agency Q&A on Humanitarian Assistance and Services in Lebanon (Inqal)
    INQAL- INTER AGENCY Q&A ON HUMANITARIAN ASSISTANCE AND SERVICES IN LEBANON INTER-AGENCY Q&A ON HUMANITARIAN ASSISTANCE AND SERVICES IN LEBANON (INQAL) Disclaimers: The INQAL is to be utilized mainly as a mass information guide to address questions from persons of concern to humanitarian agencies in Lebanon The INQAL is to be used by all humanitarian workers in Lebanon The INQAL is also to be used for all available humanitarian hotlines in Lebanon The INQAL is a public document currently available in the Inter-Agency Information Sharing web portal page for Lebanon: http://data.unhcr.org/syrianrefugees/documents.php?page=1&view=grid&Country%5B%5D=122&Searc h=%23INQAL%23 The INQAL should not be handed out to refugees If you and your organisation wish to publish the INQAL on any website, please notify the UNHCR Information Management and Mass Communication Units in Lebanon: [email protected] and [email protected] Updated in April 2015 INQAL- INTER AGENCY Q&A ON HUMANITARIAN ASSISTANCE AND SERVICES IN LEBANON INTER-AGENCY Q&A ON HUMANITARIAN ASSISTANCE AND SERVICES IN LEBANON (INQAL) EDUCATION ................................................................................................................................................................ 3 FOOD ........................................................................................................................................................................ 35 FOOD AND ELIGIBILITY ............................................................................................................................................
    [Show full text]
  • Zgharta Caza
    Roads and Employment Project Environmental and Social Management Plan Zgharta Caza Final Associated Consulting Engineers 1|P a g e Roads and Employment Project Environmental and Social Management Plan Zgharta Caza TABLE OF CONTENTS Table of Contents ...................................................................................................................2 List of Tables ..........................................................................................................................6 List of Figures .........................................................................................................................7 List of Acronyms ....................................................................................................................8 Executive Summary – Non-Technical Summary .........................................................................9 19 ................................................................................................... ملخص تنفيذي - موجز غير تقني 1. Introduction ................................................................................................................. 28 1.1 Project Background ............................................................................................... 28 1.2 Project Rationale ................................................................................................... 28 1.3 Report Objectives .................................................................................................. 29 1.4 Methodology .......................................................................................................
    [Show full text]
  • Cretaceous Transition in Mount Lebanon
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by I-Revues Carnets Geol. 16 (8) Some steps toward a new story for the Jurassic - Cretaceous transition in Mount Lebanon Bruno GRANIER 1 Christopher TOLAND 2 Raymond GÈZE 3 Dany AZAR 3, 4 Sibelle MAKSOUD 3 Abstract: The stratigraphic framework of the Upper Jurassic and Lower Cretaceous strata of Lebanon that dates back to DUBERTRET's publications required either consolidation or full revision. The preliminary results of our investigations in the Mount Lebanon region are presented here. We provide new micro- paleontological and sedimentological information on the Salima Oolitic Limestones, which is probably an unconformity-bounded unit (possibly Early Valanginian in age), and the "Grès du Liban" (Barremian in age). Our revised bio- and holostratigraphic interpretations and the new age assignations lead us to em- phasize the importance of the two hiatuses in the sedimentary record below and above the Salima, i.e., at the transition from the Jurassic to the Cretaceous. Key Words: Tithonian; Valanginian; Barremian; hiatus; unconformity; Salima Oolitic Limestones; "Grès du Liban"; amber; Balkhania. Citation: GRANIER B., TOLAND C., GÈZE R., AZAR D. & MAKSOUD S. (2016).- Some steps toward a new story for the Jurassic - Cretaceous transition in Mount Lebanon.- Carnets Geol., Madrid, vol. 16, no. 8, p. 247- 269. Résumé : Avancées dans une réécriture de l'histoire de la transition du Jurassique au Crétacé dans le Mont Liban.- Le canevas stratigraphique du Jurassique supérieur et du Crétacé inférieur du Liban date des publications anciennes de DUBERTRET et aurait donc besoin d'être soit toiletté et consolidé, soit révisé de fond en comble.
    [Show full text]
  • Groundwater Model of the Nahr Ibrahim Valley, Lebanon
    Groundwater Model of the Nahr Ibrahim Valley, Lebanon by Aimee Fitzpatrick B.S., Civil and Environmental Engineering (2000) Worcester Polytechnic Institute Submitted to the Department of Civil and Environmental Engineering in Partial Fulfillment of the Requirements for the Degree of Master of Engineering in Civil and Environmental Engineering at the Massachusetts Institute of Technology June 2001 © 2001 Aimee Fitzpatrick All rights reserved The author hereby grants to M.I.T. permission to reproduce and to distribute publicly paper and electronic copies of this thesis document in whole and in part. Signature of Author Deaigment of Civil and Environmental Engineering May 11, 2001 Certified by dharles F. Harvey Assistant Professor of Civil and Environmental Engineering Thesis Supervisor Accepted by Oral Buyukozturk Chairman, Departmental Committee on Graduate Studies MASSACHUSETTS INSTITUTE OF TECHNOLOGY BARKER JUN 0 4 2001 LIBRARIES 2 Groundwater Model of the Nahr Ibrahim Valley, Lebanon by Aimee Fitzpatrick Submitted to the Department of Civil and Environmental Engineering on May 11, 2001 in Partial Fulfillment of the Requirements for the Degree of Master of Engineering in Civil and Environmental Engineering ABSTRACT The Nahr Ibrahim is one of Lebanon's most pristine rivers. The Lebanese Ministry of Environment wishes to maintain the natural grandeur of the region, even during the massive renewal that is occurring as a result of the end of their civil war. In order to understand the interconnectivity between the river and the groundwater a groundwater-surface water interaction study was completed. This study utilized a groundwater flow model and a mass balance analysis to determine where the river is losing and gaining.
    [Show full text]
  • Baalbek Hermel Zahleh Jbayl Aakar Koura Metn Batroun West Bekaa Zgharta Kesrouane Rachaiya Miniyeh-Danniyeh Bcharreh Baabda Aale
    305 307308 Borhaniya - Rehwaniyeh Borj el Aarab HakourMazraatKarm el Aasfourel Ghatas Sbagha Shaqdouf Aakkar 309 El Aayoun Fadeliyeh Hamediyeh Zouq el Hosniye Jebrayel old Tekrit New Tekrit 332ZouqDeir El DalloumMqachrine Ilat Ain Yaaqoub Aakkar El Aatqa Er Rouaime Moh El Aabdé Dahr Aayas El Qantara Tikrit Beit Daoud El Aabde 326 Zouq el Hbalsa Ein Elsafa - Akum Mseitbeh 302 306310 Zouk Haddara Bezbina Wadi Hanna Saqraja - Ein Eltannur 303 Mar Touma Bqerzla Boustane Aartoussi 317 347 Western Zeita Al-Qusayr Nahr El Bared El318 Mahammara Rahbe Sawadiya Kalidiyeh Bhannine 316 El Khirbe El Houaich Memnaa 336 Bebnine Ouadi Ej jamous Majdala Tashea Qloud ElEl Baqie Mbar kiye Mrah Ech Chaab A a k a r Hmaire Haouchariye 34°30'0"N 338 Qanafez 337 Hariqa Abu Juri BEKKA INFORMALEr Rihaniye TENTEDBaddouaa El Hmaira SETTLEMENTS Bajaa Saissouq Jouar El Hachich En Nabi Kzaiber Mrah esh Shmis Mazraat Et Talle Qarqaf Berkayel Masriyeh Hamam El Minié Er Raouda Chane Mrah El Dalil Qasr El Minie El Kroum El Qraiyat Beit es Semmaqa Mrah Ez Zakbe Diyabiyeh Dinbou El Qorne Fnaydek Mrah el Arab Al Quasir 341 Beit el Haouch Berqayel Khraibe Fnaideq Fissane 339 Beit Ayoub El Minieh - Plot 256 Bzal Mishmish Hosh Morshed Samaan 340 Aayoun El Ghezlane Mrah El Ain Salhat El Ma 343 Beit Younes En Nabi Khaled Shayahat Ech Cheikh Maarouf Habchit Kouakh El Minieh - Plots: 1797 1796 1798 1799 Jdeidet El Qaitaa Khirbit Ej Jord En Nabi Youchaa Souaisse 342 Sfainet el Qaitaa Jawz Karm El Akhras Haouch Es Saiyad AaliHosh Elsayed Ali Deir Aamar Hrar Aalaiqa Mrah Qamar ed Dine
    [Show full text]
  • Lebanon Fire Risk Bulletin
    Lebanon Fire Risk Bulletin Refer to cadast table condition. Please note that the indicated temperature is at 2 CIVILDEDEFENCE meters height from the ground. General description of potential fire risk situation Symbol Level of Meaning and actions risk Very Very low fire risk. Controlled burning operations can be hardly executed due to high fuel moisture content. Normally VL low wildfires self-extinguish. Low Low fire risk. Controlled burning operations can be executed with a reasonable degree of safety. L Medium Medium-low fire risk. Controlled burning operations can be executed in safety conditions. All the fires need to be ML low extinguished. Medium Medium fire risk. Controlled burning operations would be avoided. All the fires need to be very well extinguished. M Medium Controlled burning is not recommended. Open flame will start fires. Cured grasslands and forest litter will burn readily. Spread is moderate in forests and fast in exposed areas. Patrolling and monitoring is suggested. Fight fires M high with direct attack and all available resources. Ignition can occur easily with fast spread in grass, shrubs and forests. Fires will be very hot with crowning and short High to medium spotting. Direct attack on the head may not be possible requiring indirect methods on flanks. Patrolling H and monitoring the territory is highly suggested. Ignition can occur also from sparks. Fires will be extremely hot with fast rate of spread. Control may not be possible Extreme during day due to long range spotting and crowning. Suppression forces should limit efforts to limiting lateral spread. E Damage potential total. Patrolling and monitoring the territory is highly suggested.
    [Show full text]
  • Lebanon National Operations Room Daily Report on COVID-19
    Lebanon National Operations Room Daily Report on COVID-19 Wednesday, December 16, 2020 Report #273 Time Published: 08:00 PM New in the report: Recommendations issued by the meeting of the Committee for Follow-up of Preventive Measures and Measures to Confront the Coronavirus on 12/16/2020 Occupancy rate of COVID-19 Beds and Availability For daily information on all the details of the beds distribution availablity for Covid-19 patients among all governorates and according to hospitals, kindly check the dashboard link: Computer :https:/bit.ly/DRM-HospitalsOccupancy-PCPhone:https:/bit.ly/DRM-HospitalsOccupancy-Mobile All reports and related decisions can be found at: http://drm.pcm.gov.lb Or social media @DRM_Lebanon Distribution of Cases by Villages Beirut 160 Baabda 263 Maten 264 Chouf 111 Kesrwen 112 Aley 121 AIN MRAISSEH 6 CHIYAH 9 BORJ HAMMOUD 13 DAMOUR 1 JOUNIEH SARBA 6 AMROUSIYE 2 AUB 1 JNAH 2 SINN FIL 9 SAADIYAT 2 JOUNIEH KASLIK 5 HAY ES SELLOM 9 RAS BEYROUTH 5 OUZAAI 2 JDAIDET MATN 12 CHHIM 12 ZOUK MKAYEL 14 KHALDEH 2 MANARA 2 BIR HASSAN 1 BAOUCHRIYEH 12 KETERMAYA 4 NAHR EL KALB 1 CHOUIFAT OMARA 15 QREITEM 3 MADINE RIYADIYE 1 DAOURA 7 AANOUT 2 JOUNIEH GHADIR 4 DEIR QOUBEL 2 RAOUCHEH 5 GHBAYREH 9 RAOUDA 8 SIBLINE 1 ZOUK MOSBEH 16 AARAMOUN 17 HAMRA 8 AIN ROUMANE 11 SAD BAOUCHRIYE 1 BOURJEIN 4 ADONIS 3 BAAOUERTA 1 AIN TINEH 2 FURN CHEBBAK 3 SABTIYEH 7 BARJA 14 HARET SAKHR 8 BCHAMOUN 10 MSAITBEH 6 HARET HREIK 54 DEKOUANEH 13 BAASSIR 6 SAHEL AALMA 4 AIN AANOUB 1 OUATA MSAITBEH 1 LAYLAKEH 5 ANTELIAS 16 JIYEH 3 ADMA W DAFNEH 2 BLAYBEL
    [Show full text]
  • Lebanese Republic Ba'albeck Water and Wastewater
    Public Disclosure Authorized LEBANESE REPUBLIC Public Disclosure Authorized BA'ALBECK WATER AND WASTEWATER PROJECT ENVIRONMENTAL ASSESSMENT Public Disclosure Authorized Public Disclosure Authorized January 15, 2002 LEBANESE REPUBLIC Ba'albeck Water and Wastewater Project Environmental Assessment 1. INTRODUCTION 1.1 Background As part of the National Emergency Reconstruction Program (NERP), the design and construction of a water supply and distribution network for Ba'albeck was implemented under the ERRP that was funded through a World Bank loan. The water supply network was designed to meet the demands up to the year 2015 and to cover all villages falling between Ba'albeck and El Nabi Chit. The present population of the villages benefiting from the water network is approximately 250,000 inhabitants. Under the ERRP, the construction of the water supply and distribution network was implemented and covered all components (boreholes, transmission lines, reservoirs, chlorination station, distribution pipelines) except the house connections. Also, the operation and maintenance of the system was not included in the construction contract. Similarly to the water supply and distribution network, considerable efforts have been made to improve the wastewater system in Ba'albeck and the surrounding villages. Under the ERRP, around 20 km of wastewater pipelines were laid in the city of Ba'albeck, mainly in replacement of damaged or very old existing pipelines. Later on, the Council of Development and Reconstruction (CDR) initiated a new contract that included: (1) the construction of a wastewater treatment plant with a capacity of 12,500 cum/day to serve Ba'albeck and the surrounding villages up to the year 2008, (2) the provision of approximately 7.4 km of trunk lines, and (3) the operation and maintenance of the wastewater treatment plant for one year.
    [Show full text]