Federal Register/Vol. 71, No. 238/Tuesday, December 12, 2006/Notices
Total Page:16
File Type:pdf, Size:1020Kb
Federal Register / Vol. 71, No. 238 / Tuesday, December 12, 2006 / Notices 74515 service called eSubscription that allows f. Location: On the San Joaquin River, 119,940 acre-feet at an elevation of you to keep track of all formal issuances near North Fork, California. The project about 3,330 feet above mean sea level; and submittals in specific dockets. This affects 2,036 cres of Federal land one power tunnel about 7.5 miles long, can reduce the amount of time you administered by the Sierra National to convey water from Mammoth Pool spend researching proceedings by Forest. Reservoir to Mammoth Pool automatically providing you with g. Filed Pursuant to: Federal Power Powerhouse; two small diversions on notification of these filings, document Act 16 U.S.C. 791(a)–825(r). Rock Creek and Ross Creek; and one 230 summaries and direct links to the h. Applicant Contact: Russ W. kV transmission line about 6.7 miles documents. To register for this service, Krieger, Vice President Power long that connects the Mammoth Pool go to http://www.ferc.gov/ Production, Southern California Edison Powerhouse to the non-project Big esubscribenow.htm. Company, 300 N. Lone Hill Ave., San Creek No. 3 Switchyard. Type of Public meetings or site visits will be Dimas, CA 91773. Phone: 909–394– Application: New—Major Modified posted on the Commission’s calendar 8667. License located at http://www.ferc.gov/ i. FERC Contact: Jim Fargo at (202) m. A copy of the application is EventCalendar/EventsList.aspx along 502–6095, or e-mail: available for review at the Commission with other related information. [email protected]. in the Public Reference Room or may be For assistance with the FERC Web site j. Deadline for filing motions to viewed on the Commission’s Web site at or with eSubscription, please contact intervene and protests, comments, and http://www.ferc.gov using the FERC Online Support at final recommendations, terms and ‘‘eLibrary’’ link. Enter the docket [email protected] or toll conditions, and prescriptions is 60 days number excluding the last three digits in free at 1–866–208–3676, or TTY, contact from the issuance date of this notice; the docket number field to access the (202) 502–8659. reply comments are due 105 days from document. For assistance, contact FERC Finally, OGT has established an the issuance date of this notice. Online Support at Internet Web site for this project at All documents (original and eight [email protected] or toll- http://www.eastendexpansion@ copies) should be filed with: Magalie R. free at 1–866–208–3676, or for TTY, ozarkgastransmission.com. The Web Salas, Secretary, Federal Energy (202) 502–8659. A copy is also available site includes a description of the Regulatory Commission, 888 First for inspection and reproduction at the project, a map of the proposed pipeline Street, NE., Washington, DC 20426. address in item h above. route, and answers to frequently asked The Commission’s Rules of Practice n. Anyone may submit comments, a questions. You can also request require all intervenors filing documents protest, or a motion to intervene in additional information or provide with the Commission to serve a copy of accordance with the requirements of comments directly to OGT thorough that document on each person on the Rules of Practice and Procedure, 18 CFR their Operations Communication Center official service list for the project. 385.210, .211, .214. In determining the at 1–888–593–8207. Further, if an intervenor files comments appropriate action to take, the or documents with the Commission Commission will consider all protests or Magalie R. Salas, relating to the merits of an issue that other comments filed, but only those Secretary. may affect the responsibilities of a who file a motion to intervene in [FR Doc. E6–21052 Filed 12–11–06; 8:45 am] particular resource agency, they must accordance with the Commission’s BILLING CODE 6717–01–P also serve a copy of the document on Rules may become a party to the that resource agency. proceeding. Any comments, protests, or Motions to intervene and protests, motions to intervene must be received DEPARTMENT OF ENERGY comments, recommendations, terms and on or before the specified comment date conditions, and prescriptions may be for the particular application. Federal Energy Regulatory filed electronically via the Internet in All filings must (1) bear in all capital Commission lieu of paper. The Commission strongly letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘COMMENTS’’, [Project No. 2085] encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the ‘‘REPLY COMMENTS’’, Southern California Edison Company; instructions on the Commission’s Web ‘‘RECOMMENDATIONS’’, ‘‘TERMS Notice of Application and Applicant- site http://www.ferc.gov under the ‘‘e- AND CONDITIONS’’, or Prepared EA Accepted for Filing, Filing’’ link. ‘‘PRESCRIPTIONS’’; (2) set forth in the Soliciting Motions To Intervene and k. This application has been accepted heading the name of the applicant and Protests, and Soliciting Comments, for filing. the project number of the application to and Final Recommendations, Terms l. Description of project: the Project is which the filing responds; (3) furnish and Conditions, and Prescriptions located in the central Sierra Nevada, the name, address, and telephone within the San Joaquin River watershed, number of the person protesting or December 5, 2006. about 50 miles northeast of the City of intervening; and (4) otherwise comply Take notice that the following Fresno. The Project is operated as a with the requirements of 18 CFR hydroelectric application and applicant- reservoir-storage type plant with an 385.2001 through 385.2005. All prepared environmental assessment has installed operating capacity of 190.0 comments, recommendations, terms and been filed with the Commission and is MW and a dependable operating conditions or prescriptions must set available for public inspection. capacity of 187.0 MW. Water for the forth their evidentiary basis and a. Type of Application: New—Major Project is taken from the San Joaquin otherwise comply with the requirements License. River, Ross Creek, and Rock Creek and of 18 CFR 4.34(b). Agencies may obtain b. Project No.: 2085–014. conveyed to the Mammoth Pool copies of the application directly from c. Date Filed: November 29, 2005. Powerhouse through the Mammoth Pool the applicant. A copy of any protest or d. Applicant: Southern California Tunnel. motion to intervene must be served Edison Company. The Project facilities include: the upon each representative of the e. Name of Project: Mammoth Pool Mammoth Pool Dam forming Mammoth applicant specified in the particular Hydroelectric Power Project. Pool Reservoir, with a capacity of about application. A copy of all other filings VerDate Aug<31>2005 18:00 Dec 11, 2006 Jkt 211001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\12DEN1.SGM 12DEN1 jlentini on PROD1PC65 with NOTICES 74516 Federal Register / Vol. 71, No. 238 / Tuesday, December 12, 2006 / Notices in reference to this application must be You may also register online at o. Procedural schedule: The accompanied by proof of service on all http://www.ferc.gov/docs-filing/ application will be processed according persons listed in the service list esubscription.asp to be notified via e- to the following Hydro Licensing prepared by the Commission in this mail of new filings and issuances Schedule. Revisions to the schedule will proceeding, in accordance with 18 CFR related to this or other pending projects. be made if the Commission determines 4.34(b) and 385.2010. For assistance, contact FERC Online it necessary to do so: Support. Milestone Tentative date Notice of the availability of the draft EIS ............................................................................................................................ June 2007. Notice of the availability of the final EIS ............................................................................................................................. November 2007. Magalie R. Salas, policy that agencies that cooperate in foot-long by 79-foot-wide Carmen Secretary. the preparation of the environmental powerhouse, (7) two Francis turbines [FR Doc. E6–21070 Filed 12–11–06; 8:45 am] document cannot also intervene. See, 94 each with a generating capacity of 52.25 BILLING CODE 6717–01–P FERC ¶ 61,076 (2001). megawatts (MW) for a total capacity of k. Pursuant to Section 4.32(b)(7) of 18 104.50 MW, (8) a 19-mile, 115-kilovolt CFR of the Commission’s regulations, if (kV) transmission line that connects the DEPARTMENT OF ENERGY any resource agency, Indian Tribe, or Carmen powerhouse to the Bonneville person believes that an additional Power Administration’s Cougar-Eugene Federal Energy Regulatory scientific study should be conducted in transmission line, and (9) appurtenant Commission order to form an adequate factual basis facilities. for a complete analysis of the The Trail Bridge development Notice of Application Tendered for application on its merit, the resource Filing With the Commission, Soliciting includes: (1) A 100-foot-high, 700-foot- agency, Indian Tribe, or person must file long, and 24-foot-wide earthen Trail Additional Study Requests, and a request for a study with the Establishing Procedural Schedule for Bridge dam section with a gated Ogee Commission not later than 60 days from spillway, (2) a 1,000-foot-long and 20- Relicensing and a Deadline for the date of filing of the application, and Submission of Final Amendments foot-wide emergency spillway section, serve a copy of the request on the (3) a 300-foot-long by 12-foot-diameter December 5, 2006. applicant. concrete penstock at the intake that l. Deadline for filing additional study Take notice that the following narrows to a diameter of 7 feet, (4) a 66- requests and requests for cooperating hydroelectric application has been filed foot-long by 61-foot-wide Trail Bridge agency status: January 23, 2007.