Federal Register/Vol. 71, No. 238/Tuesday, December 12, 2006/Notices

Total Page:16

File Type:pdf, Size:1020Kb

Federal Register/Vol. 71, No. 238/Tuesday, December 12, 2006/Notices Federal Register / Vol. 71, No. 238 / Tuesday, December 12, 2006 / Notices 74515 service called eSubscription that allows f. Location: On the San Joaquin River, 119,940 acre-feet at an elevation of you to keep track of all formal issuances near North Fork, California. The project about 3,330 feet above mean sea level; and submittals in specific dockets. This affects 2,036 cres of Federal land one power tunnel about 7.5 miles long, can reduce the amount of time you administered by the Sierra National to convey water from Mammoth Pool spend researching proceedings by Forest. Reservoir to Mammoth Pool automatically providing you with g. Filed Pursuant to: Federal Power Powerhouse; two small diversions on notification of these filings, document Act 16 U.S.C. 791(a)–825(r). Rock Creek and Ross Creek; and one 230 summaries and direct links to the h. Applicant Contact: Russ W. kV transmission line about 6.7 miles documents. To register for this service, Krieger, Vice President Power long that connects the Mammoth Pool go to http://www.ferc.gov/ Production, Southern California Edison Powerhouse to the non-project Big esubscribenow.htm. Company, 300 N. Lone Hill Ave., San Creek No. 3 Switchyard. Type of Public meetings or site visits will be Dimas, CA 91773. Phone: 909–394– Application: New—Major Modified posted on the Commission’s calendar 8667. License located at http://www.ferc.gov/ i. FERC Contact: Jim Fargo at (202) m. A copy of the application is EventCalendar/EventsList.aspx along 502–6095, or e-mail: available for review at the Commission with other related information. [email protected]. in the Public Reference Room or may be For assistance with the FERC Web site j. Deadline for filing motions to viewed on the Commission’s Web site at or with eSubscription, please contact intervene and protests, comments, and http://www.ferc.gov using the FERC Online Support at final recommendations, terms and ‘‘eLibrary’’ link. Enter the docket [email protected] or toll conditions, and prescriptions is 60 days number excluding the last three digits in free at 1–866–208–3676, or TTY, contact from the issuance date of this notice; the docket number field to access the (202) 502–8659. reply comments are due 105 days from document. For assistance, contact FERC Finally, OGT has established an the issuance date of this notice. Online Support at Internet Web site for this project at All documents (original and eight [email protected] or toll- http://www.eastendexpansion@ copies) should be filed with: Magalie R. free at 1–866–208–3676, or for TTY, ozarkgastransmission.com. The Web Salas, Secretary, Federal Energy (202) 502–8659. A copy is also available site includes a description of the Regulatory Commission, 888 First for inspection and reproduction at the project, a map of the proposed pipeline Street, NE., Washington, DC 20426. address in item h above. route, and answers to frequently asked The Commission’s Rules of Practice n. Anyone may submit comments, a questions. You can also request require all intervenors filing documents protest, or a motion to intervene in additional information or provide with the Commission to serve a copy of accordance with the requirements of comments directly to OGT thorough that document on each person on the Rules of Practice and Procedure, 18 CFR their Operations Communication Center official service list for the project. 385.210, .211, .214. In determining the at 1–888–593–8207. Further, if an intervenor files comments appropriate action to take, the or documents with the Commission Commission will consider all protests or Magalie R. Salas, relating to the merits of an issue that other comments filed, but only those Secretary. may affect the responsibilities of a who file a motion to intervene in [FR Doc. E6–21052 Filed 12–11–06; 8:45 am] particular resource agency, they must accordance with the Commission’s BILLING CODE 6717–01–P also serve a copy of the document on Rules may become a party to the that resource agency. proceeding. Any comments, protests, or Motions to intervene and protests, motions to intervene must be received DEPARTMENT OF ENERGY comments, recommendations, terms and on or before the specified comment date conditions, and prescriptions may be for the particular application. Federal Energy Regulatory filed electronically via the Internet in All filings must (1) bear in all capital Commission lieu of paper. The Commission strongly letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘COMMENTS’’, [Project No. 2085] encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the ‘‘REPLY COMMENTS’’, Southern California Edison Company; instructions on the Commission’s Web ‘‘RECOMMENDATIONS’’, ‘‘TERMS Notice of Application and Applicant- site http://www.ferc.gov under the ‘‘e- AND CONDITIONS’’, or Prepared EA Accepted for Filing, Filing’’ link. ‘‘PRESCRIPTIONS’’; (2) set forth in the Soliciting Motions To Intervene and k. This application has been accepted heading the name of the applicant and Protests, and Soliciting Comments, for filing. the project number of the application to and Final Recommendations, Terms l. Description of project: the Project is which the filing responds; (3) furnish and Conditions, and Prescriptions located in the central Sierra Nevada, the name, address, and telephone within the San Joaquin River watershed, number of the person protesting or December 5, 2006. about 50 miles northeast of the City of intervening; and (4) otherwise comply Take notice that the following Fresno. The Project is operated as a with the requirements of 18 CFR hydroelectric application and applicant- reservoir-storage type plant with an 385.2001 through 385.2005. All prepared environmental assessment has installed operating capacity of 190.0 comments, recommendations, terms and been filed with the Commission and is MW and a dependable operating conditions or prescriptions must set available for public inspection. capacity of 187.0 MW. Water for the forth their evidentiary basis and a. Type of Application: New—Major Project is taken from the San Joaquin otherwise comply with the requirements License. River, Ross Creek, and Rock Creek and of 18 CFR 4.34(b). Agencies may obtain b. Project No.: 2085–014. conveyed to the Mammoth Pool copies of the application directly from c. Date Filed: November 29, 2005. Powerhouse through the Mammoth Pool the applicant. A copy of any protest or d. Applicant: Southern California Tunnel. motion to intervene must be served Edison Company. The Project facilities include: the upon each representative of the e. Name of Project: Mammoth Pool Mammoth Pool Dam forming Mammoth applicant specified in the particular Hydroelectric Power Project. Pool Reservoir, with a capacity of about application. A copy of all other filings VerDate Aug<31>2005 18:00 Dec 11, 2006 Jkt 211001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\12DEN1.SGM 12DEN1 jlentini on PROD1PC65 with NOTICES 74516 Federal Register / Vol. 71, No. 238 / Tuesday, December 12, 2006 / Notices in reference to this application must be You may also register online at o. Procedural schedule: The accompanied by proof of service on all http://www.ferc.gov/docs-filing/ application will be processed according persons listed in the service list esubscription.asp to be notified via e- to the following Hydro Licensing prepared by the Commission in this mail of new filings and issuances Schedule. Revisions to the schedule will proceeding, in accordance with 18 CFR related to this or other pending projects. be made if the Commission determines 4.34(b) and 385.2010. For assistance, contact FERC Online it necessary to do so: Support. Milestone Tentative date Notice of the availability of the draft EIS ............................................................................................................................ June 2007. Notice of the availability of the final EIS ............................................................................................................................. November 2007. Magalie R. Salas, policy that agencies that cooperate in foot-long by 79-foot-wide Carmen Secretary. the preparation of the environmental powerhouse, (7) two Francis turbines [FR Doc. E6–21070 Filed 12–11–06; 8:45 am] document cannot also intervene. See, 94 each with a generating capacity of 52.25 BILLING CODE 6717–01–P FERC ¶ 61,076 (2001). megawatts (MW) for a total capacity of k. Pursuant to Section 4.32(b)(7) of 18 104.50 MW, (8) a 19-mile, 115-kilovolt CFR of the Commission’s regulations, if (kV) transmission line that connects the DEPARTMENT OF ENERGY any resource agency, Indian Tribe, or Carmen powerhouse to the Bonneville person believes that an additional Power Administration’s Cougar-Eugene Federal Energy Regulatory scientific study should be conducted in transmission line, and (9) appurtenant Commission order to form an adequate factual basis facilities. for a complete analysis of the The Trail Bridge development Notice of Application Tendered for application on its merit, the resource Filing With the Commission, Soliciting includes: (1) A 100-foot-high, 700-foot- agency, Indian Tribe, or person must file long, and 24-foot-wide earthen Trail Additional Study Requests, and a request for a study with the Establishing Procedural Schedule for Bridge dam section with a gated Ogee Commission not later than 60 days from spillway, (2) a 1,000-foot-long and 20- Relicensing and a Deadline for the date of filing of the application, and Submission of Final Amendments foot-wide emergency spillway section, serve a copy of the request on the (3) a 300-foot-long by 12-foot-diameter December 5, 2006. applicant. concrete penstock at the intake that l. Deadline for filing additional study Take notice that the following narrows to a diameter of 7 feet, (4) a 66- requests and requests for cooperating hydroelectric application has been filed foot-long by 61-foot-wide Trail Bridge agency status: January 23, 2007.
Recommended publications
  • Terr–14 Mule Deer
    TERR–14 MULE DEER 1.0 EXECUTIVE SUMMARY In 2001 and 2002, the literature review, a camera feasibility study, the Mammoth Pool migration study (observation study, boat survey, and remote camera study), and a hunter access study were completed. A map of known mule deer summer and winter ranges, migration corridors, and holding areas was created based on the literature review. The camera feasibility study was conducted in the fall of 2001 to test the remote camera system for the spring 2002 remote camera study. The cameras were successful at capturing photographs of 82 animals, including photographs of six deer, during this testing period. The Mammoth Pool migration study consisted of an observation study, boat survey, and remote camera study. The study focused on documenting key migration routes across the reservoir and relative use, identifying potential migration barriers, and documenting any deer mortality in the reservoir. The observation study consisted of two observers positioned with binoculars at two observation points on Mammoth Pool at dusk and dawn in order to observe migrating deer. There were no observations of deer using the dam road. Two observations of deer were made out of a total of 51 observation periods. One observation consisted of a single deer that swam from the Windy Point Boat Launch area to the Mammoth Pool Boat Launch area. The other observation was of one group of five adult deer approaching the reservoir near the observation point by the Mammoth Pool Boat Launch, but turning back up the hill. There was no sign of difficulty in the deer swimming or exiting the reservoir and no obvious disturbance to the deer that turned back.
    [Show full text]
  • ZACHARY B. SHARP, Phd Research Engineer, Utah State University 435‐797‐3167 / [email protected]
    ZACHARY B. SHARP, PhD Research Engineer, Utah State University 435‐797‐3167 / [email protected] EDUCATION PhD Civil and Environmental Engineering, Utah State University, 2016 Major: Fluid Mechanics and Hydraulics. Dissertation: Applications of Computational Fluid Dynamics in Flow Metering and Meter Design. MS Civil and Environmental Engineering, Utah State University, 2009 Major: Fluid Mechanics and Hydraulics. Thesis: Energy Losses in Cross Junctions BS Civil and Environmental Engineering, Utah State University, 2008 Major: Civil and Environmental Engineering. WORK SUMMARY 2009 ‐ Present: Research Engineer, Utah Water Research Laboratory, Civil and Environmental Engineering, Utah State University, Logan, Utah 2009 ‐ Present: Independent Engineering Consultant 2007 ‐ 2009: Research Assistant/Graduate Student, Utah State University/Utah Water Research Laboratory 2004 - 2007: Engineering Lab technician, Utah State University/Utah Water Research Laboratory 1998 ‐ 2004: Construction Worker, Various companies and responsibilities in residential and commercial construction EXPERIENCE Extensive experience performing hydraulic structure physical model studies on dams and spillways, pumping pits, power plant intakes, erosion control issues, pipelines, channels, spillway basins, gated structures, control structures, outlet and energy dissipation structures, fish screens, bypasses, sewer and storm water systems. A sample list of model studies is shown below. Hydraulic Structures (Partial Listing) 2016, Physical Model Study of the Tekai Dam and Stair Step Spillway for to evaluate gate operation Snowy Mountain Engineering Consultants (SMEC). 2016, Physical Model Study of the Brainerd Dam to evaluate gate operation for Barr Engineering. 2015, Physical Model Study of the 2nd Street Pump Station in Fargo North Dakota conducted for the Cascade Pump company. 2015, Physical Model Study of the John Hart Generating Station intake structure and operating gate conducted for SCN-Lavalin.
    [Show full text]
  • Upper San Joaquin River Basin Storage Investigation Draft
    Chapter 11 Geology and Soils This chapter describes the affected environment for geology and soils, as well as potential environmental consequences and associated mitigation measures, as they pertain to implementing the alternatives. This chapter presents information on the primary study area (area of project features, the Temperance Flat Reservoir Area, and Millerton Lake below RM 274). It also discusses the extended study area (San Joaquin River from Friant Dam to the Merced River, the San Joaquin River from the Merced River to the Delta, the Delta, and the CVP and SWP water service areas). Affected Environment This section describes the affected environment related to geology, geologic hazards, erosion and sedimentation, geomorphology, mineral resources, soils, and salts. Where appropriate, geology and soils characteristics are described in a regional context, including geologic provinces, physiographic regions, or other large-scale areas, with some area-specific geologic maps and descriptions of specific soil associations. Geology This section describes the geology of the primary and extended study areas. Primary Study Area A description of the surficial geologic units encountered in the primary study area is presented in Table 11-1. Geologic maps of the primary study area and the area of project features are presented in Figure 11-1 and Figure 11-2, respectively. Draft – August 2014 – 11-1 Upper San Joaquin River Basin Storage Investigation Environmental Impact Statement Table 11-1. Description of Surficial Geologic Units of the Primary Study Area Geologic Map of Millerton Lake Quadrangle, West-Central Sierra Nevada, California1 Formation Surficial Deposits General Features Abbreviation Plutonic rocks characterized by undeformed blocky hornblende prisms as long as 1 cm and by biotite books as Tonalite of Blue Canyon much as 5 mm across.
    [Show full text]
  • USGS Topographic Maps of California
    USGS Topographic Maps of California: 7.5' (1:24,000) Planimetric Planimetric Map Name Reference Regular Replace Ref Replace Reg County Orthophotoquad DRG Digital Stock No Paper Overlay Aberdeen 1985, 1994 1985 (3), 1994 (3) Fresno, Inyo 1994 TCA3252 Academy 1947, 1964 (pp), 1964, 1947, 1964 (3) 1964 1964 c.1, 2, 3 Fresno 1964 TCA0002 1978 Ackerson Mountain 1990, 1992 1992 (2) Mariposa, Tuolumne 1992 TCA3473 Acolita 1953, 1992, 1998 1953 (3), 1992 (2) Imperial 1992 TCA0004 Acorn Hollow 1985 Tehama 1985 TCA3327 Acton 1959, 1974 (pp), 1974 1959 (3), 1974 (2), 1994 1974 1994 c.2 Los Angeles 1994 TCA0006 (2), 1994, 1995 (2) Adelaida 1948 (pp), 1948, 1978 1948 (3), 1978 1948, 1978 1948 (pp) c.1 San Luis Obispo 1978 TCA0009 (pp), 1978 Adelanto 1956, 1968 (pp), 1968, 1956 (3), 1968 (3), 1980 1968, 1980 San Bernardino 1993 TCA0010 1980 (pp), 1980 (2), (2) 1993 Adin 1990 Lassen, Modoc 1990 TCA3474 Adin Pass 1990, 1993 1993 (2) Modoc 1993 TCA3475 Adobe Mountain 1955, 1968 (pp), 1968 1955 (3), 1968 (2), 1992 1968 Los Angeles, San 1968 TCA0012 Bernardino Aetna Springs 1958 (pp), 1958, 1981 1958 (3), 1981 (2) 1958, 1981 1981 (pp) c.1 Lake, Napa 1992 TCA0013 (pp), 1981, 1992, 1998 Agua Caliente Springs 1959 (pp), 1959, 1997 1959 (2) 1959 San Diego 1959 TCA0014 Agua Dulce 1960 (pp), 1960, 1974, 1960 (3), 1974 (3), 1994 1960 Los Angeles 1994 TCA0015 1988, 1994, 1995 (3) Aguanga 1954, 1971 (pp), 1971, 1954 (2), 1971 (3), 1982 1971 1954 c.2 Riverside, San Diego 1988 TCA0016 1982, 1988, 1997 (3), 1988 Ah Pah Ridge 1983, 1997 1983 Del Norte, Humboldt 1983
    [Show full text]
  • Madera Integrated Regional Water Management Plan 2019 Prop 1
    MADERA INTEGRATED REGIONAL WATER MANAGEMENT PLAN PROPOSITION 1 UPDATE MAY 2019 MADERA IRWMP PROPOSITION 1 UPDATED MADERA IRWMP PROPOSITION 1 UPDATE Prepared for: Madera Regional Water Management Group. P. O. Box 1061 Coarsegold, CA 93614 Contact Person: Jeannie Habben Consultant: 2816 Park Avenue Merced, CA 95348 Contact: Garth Pecchenino, P.E. Phone: (661) 616-2600(209) 723-2066 May 2019 © Copyright by Quad Knopf, Inc. Unauthorized use prohibited. Project #180028 TABLE OF CONTENTS Executive Summary ................................................................................................................. 1-1 1.1 - Strategies .................................................................................................................................................... 1-2 Introduction ............................................................................................................................... 2-1 2.1 - Mission Statement .................................................................................................................................. 2-1 2.2 - Governance ................................................................................................................................................ 2-2 2.3 - Goals ............................................................................................................................................................. 2-2 2.4 - Accomplishments ...................................................................................................................................
    [Show full text]
  • Forest Service Research Natural Areas
    28. Fern Canyon 28. Fern Canyon (Meier 1979) Location This established RNA is on the San Dimas Experimental Forest, within the Angeles National Forest. It is approximately 6 miles (10 km) N. of the city of Claremont. It occupies portions of seven sects. in T1N, R8W SBBM (34°12'N., 117°43'W.), USGS Mt. Baldy quad (fig. 58). Ecological subsection – San Gabriel Mountains (M261Bd). Target Elements Chamise Chaparral (Adenostoma fasciculatum) and Canyon Live Oak (Quercus chrysolepis) Distinctive Features Well-Monitored Site: The RNA is located within an experimental forest. There is a good record of the impact and extent of fires in the area dating back to 1914 (six major fires have occurred). This record extends to the relative Figure 58—Fern Canyon RNA volume of pre- and post-fire stream flow in the three subdrainages within the RNA. Stream flow has changed appreciably among the three drainages since a major fire in 1938. Low-Elevation Ponderosa Pine: Brown’s Flat, a shallow 80-acre (32-ha) bowl created by an ancient land slump, contains the lowest elevation stand of Pinus ponderosa in S. California (about 3900 ft, 1189 m). This relictual stand of 81 individuals is well-isolated from other ponderosa pine stands in the San Gabriel Mountains and strongly affected by air pollution. There is almost no recent reproduction. Chaparral: This extensive vegetation formation occurs as chamise (Adenostoma fasciculatum) and Ceanothus-dominated types. It was extensively burned in 1975 and, thus, is vigorous (fig. 59). Oak Woodlands: The area covered by this vegetation is extensive and varied.
    [Show full text]
  • Hydropower Technical Appendix
    Hydropower Hydropower Technical Appendix UPPER SAN JOAQUIN RIVER BASIN STORAGE INVESTIGATION Initial Alternatives Information Report Hydropower Technical Appendix TABLE OF CONTENTS Chapter Page CHAPTER 1. INTRODUCTION.................................................................................. 1-1 STUDY AREA.........................................................................................................................1-2 SURFACE WATER STORAGE MEASURES CONSIDERED IN THE IAIR ...........................1-3 ORGANIZATION OF THIS TECHNICAL APPENDIX.............................................................1-3 CHAPTER 2. EXISTING AND FUTURE WITHOUT-PROJECT CONDITIONS......... 2-1 HYDROPOWER BACKGROUND ..........................................................................................2-1 HISTORICAL PERSPECTIVE................................................................................................2-1 EXISTING HYDROPOWER FACILITIES IN THE UPPER SAN JOAQUIN RIVER BASIN....2-5 Friant Dam and Millerton Lake ............................................................................................2-9 Friant Power Project............................................................................................................2-9 PG&E Kerckhoff Hydroelectric Project ..............................................................................2-10 Kerckhoff No. 2 Powerhouse .........................................................................................2-10 Kerckhoff Dam and Lake................................................................................................2-11
    [Show full text]
  • Supplemental Response to FERC's
    KLAMATH RIVER RENEWAL CORPORATION March 22, 2018 DELIVERY VIA ELECTRONIC FILING David E. Capka, P .E. Office of Energy Projects Director, Division of Dam Safety and Inspections (D2SI) Federal Energy Regulatory Commission 888 First Street, N.E., Routing Code: PJ-13 Washington, D.C. 20426 RE: FERC No. P-14803, NATDAM-OR00559, CA00323, CA00234, CA00325; Response to October 5, 2017 Directive to Convene an Independent Board of Consultants Dear Director Capka: The Klamath River Renewal Corporation ("KRRC") responds to the Federal Energy Regulatory Commission's ("Commission") October 5, 2017 directive ("Directive") to convene an Independent Board of Consultants ("BOC") to review and assess aspects of the proposed dam removal process for the Lower Klamath Project (FERC No. P-14803). Resumes for each proposed BOC member are provided as attachments for your review and approval. This response also addresses the March 15, 2018 "Order Amending License and Deferring Consideration of Transfer Application," and specifically, Item no. 4 in the Appendix, "Additional Information Required for License Transfer Application." This response to the Directive is solely and exclusively attributable to KRRC. PacifiCorp will coordinate with KRRC and BOC to allow the BOC's work to be performed and completed consistent with the Directive. Except as may otherwise be expressly provided by PacifiCorp, all responses, statements of fact, views, opinions, interpretations, and other communications as may be provided in response to this Directive are solely and exclusively attributable to the KRRC, are based on facts and information that are known to the KRRC, and are not attributable to PacifiCorp or any other party. The Directive requires that the BOC be fully independent and consist of at least three members with the following experience: • Civil engineering (with specialized experience in dam construction and removal of both concrete and embankment dams) • Civil engineering (with specialized experience in hydrology, hydraulics, and stream diversion) • Geotechnical engineering 423 Washington St.
    [Show full text]
  • Appendix a Big Creek Alp Hydroelectric Projects Settlement Agreement Proposed New License Conditions
    Big Creek ALP Settlement Agreement FERC Project Nos. 2085, 2175, 67 and 120 APPENDIX A BIG CREEK ALP HYDROELECTRIC PROJECTS SETTLEMENT AGREEMENT PROPOSED NEW LICENSE CONDITIONS Copyright 2007 by Southern California Edison Company February 2007 Big Creek ALP Settlement Agreement FERC Project Nos. 2085, 2175, 67 and 120 Appendix A: BCALP Hydroelectric Projects Settlement Agreement Proposed New License Conditions TABLE OF CONTENTS Page 1.0 INSTREAM FLOW, TEMPERATURE, FLOW, GEOMORPHOLOGY AND RIPARIAN RESOURCES...........................................................................1 1.1 Instream Flows ................................................................................1 1.1.1 Streamflow Requirements.....................................................1 1.1.1.1 Rock Creek ...........................................................1 1.1.1.2 Ross Creek ...........................................................2 1.1.1.3 San Joaquin River (Dam 6 to Redinger) ...............2 1.1.1.4 San Joaquin River (Mammoth Pool Dam to Dam 6) ..................................................................2 1.1.1.5 Stevenson Creek ..................................................3 1.1.1.6 Balsam Creek (Diversion to Big Creek).................3 1.1.1.7 Balsam Creek (Forebay to Diversion) ...................3 1.1.1.8 Big Creek (Dam 4 to Dam 5).................................3 1.1.1.9 Big Creek (Dam 5 to San Joaquin River) ..............3 1.1.1.10 Big Creek (Huntington Lake to Dam 4) .................4 1.1.1.11 Ely Creek ..............................................................4
    [Show full text]
  • Mammoth Pool Reservoir Closure Dean A
    Logo Department Name Agency Organization Organization Address Information United States Forest Sierra National Forest 1600 Tollhouse Road Department of Service Clovis, CA 93611 Agriculture 559-297-0706 TDD: 559-322-0425 FAX: 559-294-4809 File Code: 2670 Date: April 30, 2021 Route To: File Subject: Forest Order No. 05-15-51-21-06 – Mammoth Pool Reservoir Closure From: Dean A Gould, Forest Supervisor This document explains my rationale and the regulatory basis for implementing an Order prohibiting entry into the Mammoth Pool Reservoir within the Sierra National Forest. The purpose of Forest Order No. 05-15-51-21-06 is to protect natural resources by limiting human activity within the Mammoth Pool Reservoir to accommodate the annual deer migration crossing. This Order will be effective from May 1, 2021, through June 15, 2021. In 1960, the Mammoth Pool Dam was completed, forming the Mammoth Pool Reservoir. The Reservoir now exists upon a historical deer migration corridor. California Department of Fish and Wildlife (CDFW) records indicate that deer swim across Mammoth Pool Reservoir at several locations during migration. During a recent telemetry study (Kroeker 2018), migration of telemetered deer in this population usually occurred from April 1 through May 31. Weather related factors, however, such as plant phenology and impassable snow, effect the timing of migration in any given year (Bertram 1984), and migrations for individual animals could begin in late March or end in July, depending on such factors. In years past, Mammoth Pool Reservoir access was closed to recreational fishing during the time frame of May 1 through June 15 [Title 14, CCR Section 7.50(b)(109)], supporting annual deer migration across the Reservoir.
    [Show full text]
  • 1969 04 0003.Pdf
    INTERNATIONAL SOCIETY FOR SOIL MECHANICS AND GEOTECHNICAL ENGINEERING This paper was downloaded from the Online Library of the International Society for Soil Mechanics and Geotechnical Engineering (ISSMGE). The library is available here: https://www.issmge.org/publications/online-library This is an open-access database that archives thousands of papers published under the Auspices of the ISSMGE and maintained by the Innovation and Development Committee of ISSMGE. STATE OF-THE-ART REPO RT ETAT ACTUEL DES CO N AISSAN CES EARTH AN D ROCKFILL DAM S BARRAGES EN TERRE ET EN EN ROCHbM EN T by Stanley D. W ilson, Consulting Engineer Seattle, W ashington, U .S.A. and R. Squier Portland, O regon, U .S.A. INTRODUCTION This paper is a report on the state-of-the- A dam, whether it be for power production, art of the design and construction of earth flood control, pumped storage, irrigation, and rockfill dams. As such, it is intended recreation, lowstream augmentation, or multi­ to reflect current design and construction purpose, contains many elementa. This report practise throughout the world, but the is concerned primarily with the embankment writers are well aware that neither they nor itaelf and not with such elementa a8 power- anyone else could possibly accomplish this houaes, apillways, diversion features and solely on the basis of personal experience outlet works except insofar as they interact and knowledge. A detailed review of the with and thereby affect the embankment per­ published literature plus extensive conver­ formance. Abutments and foundation treatment sations and correspondence with colleagues are considered essential elements of the em­ provides tha basis for most of this report, bankment although grouting per ae ia not cov­ but inevitably there are errors of omission, ered in detail.
    [Show full text]
  • Draft Wild and Scenic River Evaluation for the Inyo, Sequoia and Sierra National Forests
    Forest Service Pacific Southwest Region December 2015 Draft Wild and Scenic River Evaluation for Public Feedback on Revision of the Inyo, Sequoia and Sierra National Forests Land Management Plans In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident. Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English. To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by: (1) mail: U.S.
    [Show full text]