Form 1 & 1A for Proposed Project “Anandgram Paud”
Total Page:16
File Type:pdf, Size:1020Kb
Form 1 & 1A for Proposed Project “AnandGram Paud” by M/S Vastushodh Realty at Gat No.. 263 (P), 273(P), 275, 276 (P), 283 At Paud, Taluka Mulshi, District – Pune APPENDIX I (See paragraph – 6) FORM – 1 (I) Basic Information S.No. Item Details 1 Name of the Project “AnandGram Paud” 2 S. No. in the Schedule 8(a) 2 Proposed capacity/area/length/tonnage Total Plot Area:42850.00 m Total Built up Area (FSI): 28790.63 m2 3 to be handled/ command area/ lease 2 area/ number of wells to be drilled Total Built up Area(NON FSI): 13235.10 m Total Construction Area: 42025.73 m2 4 New/Expansion/Modernization New Total Plot Area:42850.00 m2 Total Built up Area (FSI): 28790.63 m2 5 Existing Capacity/Area etc. Total Built up Area(NON FSI): 13235.10 m2 Total Construction Area: 42025.73 m2 6 Category of Project i.e. ‘A’ or ‘B’ Category ‘B’ Does it attract the general condition? If 7 No yes, please specify. Does it attract the specific condition? If 8 No yes, please specify. Location Plot/Survey/Khasra No. Gat No.. 263 (P), 273(P), 275, 276 (P), 283 Village Paud 9 Tehsil Mulshi District Pune State Maharashtra Nearest railway station/airport along Pune Railway Station – 21.00 Km 10 with distance in Kms. Pune Airport – 30.00 Km Nearest Town, city, District 11 Headquarters along with distance in Nearest City Pune – 21 Km Kms. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body 12 Paud Grampanchayat (Complete postal addresses with telephone nos. to be given) 13 Name of the applicant M/S Vastushodh Realty Form 1 & 1A for Proposed Project “AnandGram Paud” by M/S Vastushodh Realty at Gat No.. 263 (P), 273(P), 275, 276 (P), 283 At Paud, Taluka Mulshi, District – Pune 101, Lotus Plaza, Off Karve Road, Kothrud, 14 Registered Address District – Pune, Pincode - 411 038 Address for correspondence: 101, Lotus Plaza, Off Karve Road, Kothrud, District – Pune, Pincode - 411 038 Name Mr. Sachin Kulkarni Designation (Owner/Partner/CEO) Partner 101, Lotus Plaza, Off Karve Road, Kothrud, 15 Address District – Pune, Pincode - 411 038 Pin code 411 038. E- mail [email protected] Telephone No. +91 20 2546 3549, +91 9011051170. Fax No. - Details of Alternative Sites examined, if No 16 any. Location of these sites should be shown on a toposheet. 17 Interlinked Projects No Whether separate application of 18 Not Applicable interlinked project has been submitted? 19 If yes, date of submission Not Applicable 20 If no, reason Not Applicable Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. 21 No (a) The Forest (Conservation) Act, 1980? (b) The Wild life (Protection) Act 1972? (c) The C.R.Z. Notification, 1991? Whether there is any Government Order 22 No / Policy relevant/ relating to the site? 23 Forest Land involves (hectares) No Whether there is any litigation pending against the project and/ or land in which the project is proposal to be set up Name of the Court 24 No (a) Case No. (b) Orders / directions of the Court, if any and its relevance with the proposed project. II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (Topography, land use, etc.) Details thereof (with approximate quantities Sr. Information/Checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data Form 1 & 1A for Proposed Project “AnandGram Paud” by M/S Vastushodh Realty at Gat No.. 263 (P), 273(P), 275, 276 (P), 283 At Paud, Taluka Mulshi, District – Pune Details thereof (with approximate quantities Sr. Information/Checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data Basically land is Barren land. The proposed Permanent or temporary project site is designated for the intended change in land use, land cover purpose and the necessary change in the land or topography including 1.1 No use of the plot area measuring 42850.00 m2has increase in intensity of land already been affected by converting it for use (with respect to local residential use. land use plan) ANNEXURE II : SITE LOCATION PLAN Clearance of existing land, 1.2 No Not Applicable vegetation and buildings? 1.3 Creation of new land uses? No Not Applicable Pre-construction investigations 1.4 Yes Not Applicable e.g. bore houses, soil testing? 42025.73 m2 (FSI – 28790.63 m2 + Non - FSI –13235.10m2 ) 1.5 Construction works? Yes will be total built up area. ANNEXURE IV: MASTER LAYOUT 1.6 Demolition works? No Not Applicable Temporary sites used for During construction total 60 Nos. of workers 1.7 construction works or housing Yes will be on site. of construction workers? Total 42025.73 m2 ( FSI – 28790.63 m2 + Non - FSI –13235.10m2 ) will be built up area for Above ground buildings, residential purpose. structures or Earth works 1.8 Yes Excavated material during construction will be including linear structures, cut used for landscape & backfilling; therefore there and fill or excavations will not be any solid waste problem from the generation of construction- excavated earth. Underground works including 1.9 No Not Applicable mining or tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable Production and manufacturing 1.13 No Not Applicable processes? Facilities for storage of goods Temporary shed will be constructed for the 1.14 Yes or materials? storage of the construction material Facilities for treatment or Solid Waste Management 1.15 disposal of solid waste or Yes During Construction Phase – liquid effluents? Excavated material will be used for backfilling Form 1 & 1A for Proposed Project “AnandGram Paud” by M/S Vastushodh Realty at Gat No.. 263 (P), 273(P), 275, 276 (P), 283 At Paud, Taluka Mulshi, District – Pune Details thereof (with approximate quantities Sr. Information/Checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data and landscape. During Operation Phase – Total population of the Residential scheme is 3460 Nos. 1) Quantity of the solid waste- 1591.65 kg/day 2) Quantity of the wet waste – 986.1 kg/day 3) Quantity of the dry waste – 605.55 kg/day Biodegradable and non biodegradable waste will be segregated. Dry waste will be sold out. Wet waste will be treated by ‘Organic Waste Composter’ for composting. WATER MANAGEMENT - During Construction Phase : Source of water – Tanker/Bore Well Total Water requirement – 35 m3/day During Operation Phase : Water Source: Paud Grampanchayat Water Demand :Dry Season Total Water demand is -538.56 m3/day Domestic for residence is –311.40 m3/day Flushing for residence is - 155.70 m 3/day Landscaping is - 71.46 m 3/day (ANNEXURE VIII – WATER BALANCE STATEMENT) Facilities for long term housing 1.16 No Not Applicable of operational workers? New road, rail or sea traffic 1.17 during construction or No Not Applicable operation? New road, rail, air waterborne or other transport infrastructure 1.18 including new or altered routes No Not Applicable and stations, ports, airports etc? Closure or diversion of existing transport routes or 1.19 No Not Applicable infrastructure leading to changes in traffic movements? New or diverted transmission 1.20 No Not Applicable lines or pipelines? Form 1 & 1A for Proposed Project “AnandGram Paud” by M/S Vastushodh Realty at Gat No.. 263 (P), 273(P), 275, 276 (P), 283 At Paud, Taluka Mulshi, District – Pune Details thereof (with approximate quantities Sr. Information/Checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data Impoundment, damming, culverting, realignment or 1.21 No Not Applicable other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not Applicable Abstraction or transfers of 1.23 water from ground or surface No Not Applicable waters? Changes in water bodies or the 1.24 land surface affecting drainage No Not Applicable or run-off? Transport of personnel or 1.25 materials for construction, No Not Applicable operation or decommissioning? Long-term dismantling or 1.26 decommissioning or No Not Applicable restoration works? Ongoing activity during decommissioning which could 1.27 No Not Applicable have an impact on the environment? INFLUX DURING CONSTRUCTION : During construction approximately 60 nos . Influx of people to an area in workers. 1.28 either temporarily or Yes INFLUX DURING OPERATION : permanently? During operation influx of approximately 3460 Nos . of persons are going to reside in the Residential complex 3460 Nos . 1.29 Introduction of alien species? No Not Applicable Loss of native species or 1.30 No Not Applicable genetic diversity? 1.31 Any other actions? No Not Applicable 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate quantities Sr. Information/checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data Form 1 & 1A for Proposed Project “AnandGram Paud” by M/S Vastushodh Realty at Gat No.. 263 (P), 273(P), 275, 276 (P), 283 At Paud, Taluka Mulshi, District – Pune Details thereof (with approximate quantities Sr. Information/checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data Undeveloped land of about 4073.38 m2 Land especially undeveloped or The proposed development has been planned in 2.1 Yes agricultural land (ha) such a way that it does not damage the existing contours as