“Anandgram Paud” by M/S Vastushodh Realty at Gat No.. 263 (P), 273(P), 275, 276 (P), 283 at Paud, Taluka Mulshi, District – Pune
Total Page:16
File Type:pdf, Size:1020Kb
Form 1 & 1A for Proposed Project “AnandGram Paud” by M/S Vastushodh Realty at Gat No.. 263 (P), 273(P), 275, 276 (P), 283 At Paud, Taluka Mulshi, District – Pune APPENDIX II (See paragraph 6) FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity) 1.1. Will the existing land use get significantly altered from the project that is not consistent with the surroundings? (Proposed land use must conform to the approved Master Plan / Development Plan of the area. Change of land use if any and the statutory approval from the competent authority be submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans. The proposed land use is in conformity with the Development Plan (DP) of the area. REFER ANNEXURE I: AERIAL VIEW REFER ANNEXURE II: SITE LOCATION PLAN & DP PLAN REFER ANNEXURE III: CONTOUR LEVELS PLAN REFER ANNEXURE IV: MASTER LAYOUT PLAN REFER ANNEXURE VI: PARKING & TRAFFIC MANAGEMENT PLAN 1.2. List out all the major project requirements in terms of the land area, built up area, water consumption, power requirement, connectivity, community facilities, parking needs etc. Details are as follows: Total Plot Area: 42850.00 m2 Total Built up Area (FSI): 28790.63 m2 Total Built up Area (NON FSI): 13235.10 m2 Total Construction Area: 42025.73 m2 Form 1 & 1A for Proposed Project “AnandGram Paud” by M/S Vastushodh Realty at Gat No.. 263 (P), 273(P), 275, 276 (P), 283 At Paud, Taluka Mulshi, District – Pune Area Statement Item Area In Description No. m2 1. AREA OF PLOT 42,850.00 2. DEDUCTIONS FOR a) AREA UNDER 60.0 M . WIDE ROAD WIDENING 2,116.25 TOTAL 2,116.25 3. NET GROSS AREA OF PLOT (1-2) 40,733.75 4. DEDUCTIONS FOR a) Amenity space-15% 6,110.06 a) Open space -10% (NOT DEDUCTED ) 4,073.38 a) 12.00 M WIDE INTERNAL ROAD (NOT 4,358.34 DEDUCTED ) TOTAL (a + b + c ) 6,110.06 5. NET AREA OF PLOT (3-4 × 0.90 ) 31,161.32 6. ADDITION FSI PERM. ON NET PLOT AREA 37,393.58 7. PERMISSIBLE FLOOR AREA 37,393.58 8. PROPOSED FLOOR AREA 28,790.63 TENEMENT STATEMENT No. & Type of Flat Sr. Building Total Floors 1 1 2 Population No. Name Tenements RK BHK BHK 1 A P + 9 - - 71 71 355 2 B P + 9 - - 71 71 355 3 C P + 9 - - 71 71 355 4 H P + 9 133 - - 133 665 5 I P + 9 133 - - 133 665 6 J P + 9 - 71 - 71 355 7 K P + 9 - 71 - 71 355 8 L P + 9 - 71 - 71 355 Total 692 3460 Total Population Residential = 3460 Form 1 & 1A for Proposed Project “AnandGram Paud” by M/S Vastushodh Realty at Gat No.. 263 (P), 273(P), 275, 276 (P), 283 At Paud, Taluka Mulshi, District – Pune WATER CONSUMPTION : During Construction Phase: 35 m3/day. Source: Tanker/Bore well During Operation Phase : Water Source: Paud Grampanchayat. Total Water demand is -538.56 m3/day Domestic for residence is –311.40 m3 /day Flushing for residence is - 155.70 m 3/day Landscaping is - 71.46 m 3/day No. of Tenements –692 Nos. Population - For Residential – 3460 Nos. Water use Water Sewage Sr. Description Loss requirement generation Fresh Recycled No. Domestic for residential building (@ 90 311.40 280.26 311.40 - 1 1.14 LPCD) no. of. Persons 3460 Flushing for residential building (@ 45 155.70 140.13 - 155.70 2 5.57 LPCD) no. of. Persons 3460 Landscape 71.46 - - 71.46 3 irrigation TOTAL 538.56 6.71 420.39 311.4 227.16 4 STP Capacity 425m3/day (ANNEXURE VIII – WATER BALANCE STATEMENT) POWER REQUIREMENT: SOURCE – Maharashtra State Electricity Distribution Company Limited (MSEDCL) During Construction Phase: • Total Load 30KW, • Source- MSEDCL Form 1 & 1A for Proposed Project “AnandGram Paud” by M/S Vastushodh Realty at Gat No.. 263 (P), 273(P), 275, 276 (P), 283 At Paud, Taluka Mulshi, District – Pune During Operation Phase: • Total Connected Load – 1774.7 KW • Maximum Demand – 1252.4 KW • Transformer – 630 KVA - 2 No. • DG Set for residential – 200 KVA – 1 No. • Total Fuel Consumption- 45.9 Lit/Hr for 200 KVA (ANNEXURE XIII ELETRICAL CALCULATION, D.G. CHART & LOCATION) PARKING STATEMENT: Approximately 108 Nos . of four wheeler, 1218 Nos. of two wheelers & 1218 Nos. cycles are proposed in the residential complex. Internal circulation pattern will be so as to avoid any congestion within the complex. Parking space will be allotted within the campus. (REFER ANNEXURE VI – PARKING AND TRAFFIC MANAGEMENT PLAN) 1.3.What are the likely impacts of the proposed activity on the existing facilities adjacent to the proposed site? (Such as open spaces, community facilities, details of the existing land use and disturbance to the local ecology). Although it is a construction activity, its impact on air quality, water quality, noise and soil will not be notable. As a matter of fact this activity will have positive impact, on socio- economic culture of people residing in the vicinity of the proposed area. There will not be any disturbance to the local ecology as the selected site for the construction is a barren land. The project site and the surrounding area are not developed. The plantations, which would be grown in the residential area, will be helpful in increasing green cover of the area. This would also increase avifauna in the area. 1.4.Will there be any significant land disturbance resulting in erosion, subsidence & instability? (Details of soil type, slope analysis, vulnerability to subsidence, seismicity, etc may be given). Generally, soil types found in Pune district are black, copper, red, & paddy soil. Soil blends of variable properties are modified by sand, gravel, lime salts, & other ingredients. (REFER ANNEXURE III - CONTOUR PLAN) 1.5.Will the proposal involve alteration of natural drainage systems? (Give details on a contour map showing the natural drainage near the proposed project site) Not Applicable (REFER ANNEXURE III - CONTOUR PLAN) 1.6. What are the quantities of earthwork involved in the construction activity cutting, filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill materials from outside the site etc.)? Form 1 & 1A for Proposed Project “AnandGram Paud” by M/S Vastushodh Realty at Gat No.. 263 (P), 273(P), 275, 276 (P), 283 At Paud, Taluka Mulshi, District – Pune The debris will not be generated at the project site as the excavated material will be utilized on site for filling. 1.7. Give details regarding water supply, waste handling etc. during the construction period. Total water requirement during construction phase will be approximately 35m3/day for domestic use for the workers working/dwelling on the site. The construction water requirement will be in addition to this. The source will be Tankers. The non biodegradable solid waste will be segregated and will send to kabadi. The wet waste will be treated by “Organic Waste Convertor ”. A septic tank and soak pit will be constructed for temporary shelters of construction workers. The construction debris and cut and fill waste will be recycled for road construction 1.8. Will the low-lying areas & wetlands get altered? (Provide details of how low lying and Wetland are getting modified from the proposed activity) Not Applicable 1.9. Whether construction debris & waste during construction cause health hazard? (Give quantities of various types of wastes generated during construction including the construction labor and the means of disposal) Construction debris and waste during construction will not cause health hazard. The natural depression on site will be lined and converted into water bodies which would add to passive cooling and will act as Rainwater Harvesting devices. Construction debris generated will be used for development of landscape. 2. WATER ENVIRONMENT 2.1. Give the total quantity of water requirement for the proposed project with the breakup of requirements for various uses. How will the water requirement be met? State the sources & quantities and furnish a water balance statement. During Construction Phase: 35 m3/day. Source: Tanker/Bore well During Operation Phase : Water Source: Paud Grampanchayat Water Demand: Dry Season Total Water demand is -538.56 m3/day Domestic for residence is –311.40 m3/day Flushing for residence is - 155.70 m 3/day Landscaping is - 71.46 m 3/day STP Capacity 425 m3/day (ANNEXURE VIII – WATER BALANCE STATEMENT) Form 1 & 1A for Proposed Project “AnandGram Paud” by M/S Vastushodh Realty at Gat No.. 263 (P), 273(P), 275, 276 (P), 283 At Paud, Taluka Mulshi, District – Pune 2.2 What is the capacity (dependable flow or yield) of the proposed Source of water? The source of water during operation is Paud Grampanchayat. 2.3. What is the quality of water required, in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality) The water will be available from Paud Grampanchayat which will accomplish the water requirement for this residential complex. 2.4. How much of the water requirement can be met from the recycling of treated wastewater? (Give the details of quantities, sources and usage) About 155.70 m3/day of water will be recycled for flushing at residential building & landscaping. 2.5. Will there be diversion of water from other users? (Please assess the impacts of the project on other existing uses and quantities of consumption) Not Applicable 2.6.