Columbia Active Transportation Action Agenda

Off‐Road Pathway Connections Priorities V.16 ‐ 08/31/2012

Preliminary Map Primary Recommendation Type Priority Location # Location Description Route Classification Length (miles) Construction Cost Notes Number Operator Estimate**

Pathway from to Patuxent Branch Trail Along existing Route 29 Sewer Alignment from Lake (south of Allview Drivew), along existing sewer alignment. Major Pathway Connection 1 70 2, 3, 5 Kittamaqundi to existing Patuxent Branch Trail and minor 10 foot wide pathway Primary 2.73 CA $ 1,440,000 Provides a north‐south connection from Columbia Town Center connections to south of .

Connection from Stevens Forest Road to existing pathway at Pathway Connection 2 75 3 10 foot wide pathway Primary 0.06 CA $ 32,000 Stevens Forest Elementary School

Provide pathway connection from Wilde Lake High School to intersection of Little Patuxent Parkway and Harpers Farm Road. An alternative alignment (#85) extends from intersection of Pathway Connection 3 84 2 From Harpers Farm Road to Wilde Lake High School 10 foot wide pathway Secondary 0.38 HCPSS $ 200,000 Little Patuxent Parkway and Harpers Farm Road through office complex to the fields adjacent to Wilde Lake High School. Existing sidewalks are to be widened to 10‐ft width (0.14 mi).

10 foot wide pathway from existing McGaw Road ‐ From existing county pathway behind Dobbin pathway to along east side of McGaw Pathway connection behind Dobbin Center to commercial area Pathway Connection 4 37 3, 5 Primary / Secondary 0.50 HC $ 265,000 Center to Snowden River Parkway Road. Includes possible (inc. future Wegmans) bridge/boardwalk

Connection between townhomes from Faulkner Ridge Circle Pathway Connection 5 86 2 10 foot wide pathway Primary 0.17 CA $ 90,000 (west) to Faulkner Ridge Circle (east)

10 foot wide pathway between existing Pathway Connection 6 88 2 Adjacent to Harper's Choice Middle School Secondary 0.05 HCPSS $ 26,000 pathways

Connection from Rivendell Lane to Harper's Choice Village Pathway Connection 7 89 2 10 foot wide pathway Secondary 0.19 CA $ 100,000 Existing dirt path/desire line Center

Pathway Connection/ Improved pathway between Park and Kilimanjaro 8203 10 foot wide pathway Primary 0.10 HCPSS $ 53,000 Improvement Road along east side of Oakland Mills High School

Along utility easement ‐ from Dobbin Road to Stonecutter Pathway Connection 9 24 3 10 foot wide pathway Secondary 0.98 CA $ 514,000 Road

Parallel to Guilford Road, between Hammond HS and Kings Pathway Connection 10 50 4 10 foot wide pathway Primary 0.31 CA $ 165,000 Possible educational pathway in stream valley Contrivance Village Center

Connection behind Columbia Palace ‐ from existing pathway at Pathway Connection/ Sidepath 11 13 3 Red Branch Road to the intersection of Centre Park Drive and 10 foot wide pathway Primary 0.23 CA $ 121,000 Connection Old Annapolis Road

Connection from Daylong Lane to existing pathway wast of 10 foot wide pathway along south side Pathway Connection 12 103 2 Primary 0.11 CA $ 58,000 Connection to River Hill Village Center Wild Orange Gate of stormwater pond

Improved existing pathway west of Long Reach Village Center Pathway Connection 13 22 3 10 foot wide pathway Secondary 0.10 CA $ 52,000 to Lambskin Lane

1 of 8 Columbia Active Transportation Action Agenda

Preliminary Map Primary Recommendation Type Priority Location # Location Description Route Classification Length (miles) Construction Cost Notes Number Operator Estimate**

From existing pathway off Second Time Lane to intersection of Pathway Connection 14 55 4 10 foot wide pathway Secondary 0.08 CA $ 40,000 Sweet Hours Way

Connection from existing pathway at the south end of Pathway Connection 15 97 4 10 foot wide pathway Secondary 0.15 CA $ 79,000 Connection to school Quarterstaff Road to

Connection from existing pathways south of Sandchain Road Pathway Connection 16 72 3 10 foot wide pathway Primary 0.05 CA $ 25,000 to Overheart Lane

Along utility easement ‐ north of Wilde lake and east of West Pathway Connection 17 142 2 10 foot wide pathway Primary 0.33 CA $ 173,000 Connection along existing BG&E right‐of‐way Running Brook Road

Connection between single family homes along Iron Pen Place Pathway Connection 18 87 2 10 foot wide pathway/sidepath Secondary 0.33 CA $ 174,000 from Elliots Oak Road to Hesperus Drive

From the intersection of Basket Ring Road and Stevens Forest Pathway Connection 19 18 3 10 foot wide pathway Secondary 0.27 CA $ 142,000 Road, north to existing pathways

Stream valley path ‐ from Applied Physics Laboratory at Includes crossings of Old Columbia Road, and under Rt 29 Pathway Connection 20 59 4 10 foot wide pathway Primary 0.83 HC $ 438,000 Montpelier Road to existing pathways off of First League within stream valley

Connection along stream valley ‐ between Summer Hollow Pathway Connection 21 16 3 10 foot wide pathway Primary 0.22 HC $ 114,000 Connection along stream valley Lane and Phelps Luck Road

10 foot wide pathway across Utility Line Crossing ‐ East end of Tamar Drive to Dobbin Pathway Connection 22 36 3 floodplain/wetland to Tamar Dr Primary 0.17 CA $ 91,000 Recommendation in 2006 County Pedestrian Plan #136 Center Way (bridge/boardwalk)

Connection behind townhomes on Setting Sun Way to single Pathway Connection 23 56 4 10 foot wide pathway Secondary 0.08 CA $ 40,000 family homes along Kindler Road

10 foot wide pathway extending Crossing over/under Route 29 with midblock crossing of Pathway Connection 24 9 3 From Columbia Road to Meadowbrook Athletic Complex trails Primary 0.36 CA $ 190,000 over/under Route 29 Meadowbrook Ln.

Pathway Connection/ Sidepath Waterloo Road ‐ Columbia Gateway Drive to Old Montgomery 10 foot wide sidepath on east side of Recommendation in 2006 County Pedestrian Plan #130 25 41 3, 5 Primary 1.11 HC $ 583,000 Connection Road Waterloo Road (sidewalk improvements to Columbia Gateway)

From west of Robert Fulton Drive to existing rail corridor to 10 foot wide pathway, Rail to Trail/ Rail Pathway Connection 26 45 5 Primary 1.49 HC $ 783,000 Berger Drive with Trail

Widen existing pathway ‐ from northeast of Lake Elkhorn to Pathway Improvement 27 74 5 10 foot wide pathway Primary 0.40 CA $ 162,000 Oakland Mills Road

Pathway connection from Columbia Road to Existing pathway Connection would need to cross under/over Route 29 within Pathway Connection 28 76 3 10 foot wide pathway Primary 0.89 CA $ 469,000 at Lightning View Road. stream valley

On‐going Feasibility Study to determine potential crossing of Lake Kittamaqundi. Cost estimate includes pathway extension Pathway Connection 29 125 3 Pedestrian Bridge connection across Lake Kittamaqundi 10 foot wide pathway/bridge Primary 0.17 CA $ 91,000 and improvements to approach to bridge crossing on the east side of lake.

Pathway Connection 30 51 5 Utility Easement ‐ from Skyrock Court to Rain Flower Way 10 foot wide pathway Secondary 0.09 CA $ 50,000

2 of 8 Columbia Active Transportation Action Agenda

Preliminary Map Primary Recommendation Type Priority Location # Location Description Route Classification Length (miles) Construction Cost Notes Number Operator Estimate**

Pathway Connection 31 115 3 From Orchard Green to Old Annapolis Road 10 foot wide pathway Secondary 0.06 CA $ 32,000

From the Meadowbrook Athletic Complex trails to the Oakland Connections to pass through Dower Drive and Wethered Drive Pathway Connection 32 10 1 Business Center at Mellenbrook Rd, and existing pathways 10 foot wide pathway Secondary 1.24 CA $ 655,000 and connect to existing paths and sidewalk connections. adjacent to the Slave Quarters. Includes intersection improvements at Dower Drive.

From Huntington Pool to existing pathways at Kings 10 foot wide pathway through Kings Pathway Connection 33 52 5 Primary 0.15 HC $ 80,000 Contrivance Park Contrivance Park

Existing pathway located east of Oakland Mills Road to 10 foot wide pathway with possible Pathway Connection 34 38 3, 5 Secondary 0.12 CA $ 61,000 Community Gardens bridge/boardwalk to cross stream

From existing Kings Contrivance Park trail, south to Pathway Connection 35 53 5 10 foot wide pathway Secondary 0.09 HC $ 47,000 Vollmerhausen Road and Early Spring Way

From end of Moonride Lane off of Sweet Grass Ridge to Pathway Connection 36 54 5 10 foot wide pathway Secondary 0.05 CA $ 26,000 existing pathway

Improve existing single track dirt path ‐ from existing pathway Pathway Connection 37 62 4 at the end of Sandalfoot Way to existing pathway at the end of 10 foot wide pathway Secondary 0.36 CA $ 187,000 Yellow Bonnet Place

Pathway Connection 38 92 2 From Bright Passage to Clary's Forest Pool 10 foot wide pathway Secondary 0.12 CA $ 63,000

Connection from existing pathway west of Little Patuxent Pathway Connection 39 120 2 10 foot wide pathway Secondary 0.08 CA $ 43,000 Parkway to the south end of Green Meadow Drive

Primary Operator Legend Improvement Prioritization Criteria CA: Columbia Association 1. Pathway Hierarchy HC: Howard County ‐ Primary HCPSS: Howard County Public School System ‐ Secondary OT: Other/Private Land Owners ‐ Tertiary/ Sidewalk 2. Pathway Connection Proximity to Commercial Centers ‐ Within 1/4 Mile **Estimated costs are based on average construction costs for 10‐ft asphalt pathways and ancillary structures (ie. retaining walls and bridges), and does not include cost of feasibility studies or pathway design. ‐ Within 1/2 Mile 3. Pathway Connection Proximity to Schools ‐ Within 1/4 Mile ‐ Within 1/2 Mile 4 ‐other considerations ‐ connectivity to close major gaps

3 of 8 Columbia Active Transportation Action Agenda

Roadway Corridor Connections Priorities V.16 ‐ 08/31/2012

Map Primary Recommendation Type Priority Location # Location Description Route Classification Length (miles) Comments Number Operator

10 foot wide sidepath on the south side of Little Part of requirement of Downtown Columbia Plan (Hospital to Blandair Park Trail) Major Sidepath Connection/ Little Patuxent Parkway ‐ from Cedar Lane to South Entrance 1822 Patuxent Parkway and the east side of South Primary 1.84 OT to be completed by Howard Hughes Corporation. Identified in Baltimore Sidewalk Widening Road Entrance Road Metropolitian Council Plan It 2035 long‐range plan.

Current County capital improvement project to widen SRP. Recommendations in 2006 County Pedestrian Plan #132, #133 (sidewalk improvements on south side Snowden River Parkway ‐ Broken Land Parkway to Waterloo 10 foot wide sidepath on north side of Snowden of Snowden River Parkway), #130 (sidewalk improvements on Columbia Major Sidepath Connection 2 40 3, 5 Primary 3.94 HC Road River Parkway Gateway). Ramp crossings/bridge accommodations required at Robert Fulton, as well as slope considerations within alignment. Identified in Baltimore Metropolitian Council Plan It 2035 long‐range plan.

Recommended in 2006 County Pedestrian Plan; identified as a County Capital project for Feasibility Study; some segments may be feasible for sidewalk and Major Sidepath Connection 3 134 2 Cedar Lane ‐ from Little Patuxent Parkway to Guildford Road 10 foot wide sidepath on west side of Cedar Lane Primary 2.61 HC pathway widening. Identified in Baltimore Metropolitian Council Plan It 2035 long‐ range plan.

Broken Land Parkway ‐ from Cradlerock Way to Hickory Ridge 10 foot wide sidepath in center median of Broken Major Sidepath Connection 4 122 2, 3 Road in median, and from Hickory Ridge Road to Little Primary 1.76 HC Land Parkway Patuxent Parkway on eastside

10 foot wide sidepath on west side of Freetown Sidewalk Widening 5 136 2 Freetown Road ‐ from Cedar Lane to Harriet Tubman Lane Secondary 0.99 HC Road

Waterloo Road ‐‐ From Brothers Partnership Court to Old 10 foot wide sidepath on east side of Waterloo Sidepath Connection 6 25 3 Secondary 0.47 HC Montgomery Rd Road

Twin Rivers Road ‐ from Governor Warfield Parkway to Green 10 foot wide sidepath on east side of Twin Rivers Sidepath Connection 7 124 2 Primary 0.11 HC Mountain Circle (south) Road

10 foot wide sidepath on east side of Harpers Farm Sidepath Connection 8 138 2 Harpers Farm Road ‐ from Clarksville Pike to Calico Court Primary 1.07 HC Road

Adjacent to tennis courts and north of Wilde Lake Middle Sidewalk Widening 9 143 2 10 foot wide pathway Secondary 0.06 CA School

Phelps Luck Road ‐ Old Annapolis Road to Graywing Court on 10 foot wide sidepath on west side of Phelps Luck Sidewalk Widening 10 14 3 westside, and from Graywing Ct. to existing pathway (midway Primary 0.20 HC Road between Enberend Terrace and Halflight Garth) on eastside.

Along Vollmerhausen Road widen existing sidewalks between 10 foot wide sidepath on south side of Sidewalk Widening 11 111 5 existing trail head parking south of Spring Water Path to Primary 0.32 HC Provide wayfinding; widen existing sidewalk Vollmerhausen Road pathway entrance at Patuxent Valley Middle School

4 of 8 Columbia Active Transportation Action Agenda

Map Primary Recommendation Type Priority Location # Location Description Route Classification Length (miles) Comments Number Operator

Widen existing sidewalk to 10 foot wide sidepath Sidewalk Widening 12 140 2 Harpers Farm Road ‐ at Beaverkill Road Primary 0.04 HC on south side of Harpers Farm Road

Old Montgomery Road ‐ existing pathway at Waterloo 10 foot wide sidepath on north side of Old Sidepath Connection 13 27 3 Secondary 0.56 HC Elementary to Brightfield Road Montgomery Road

Widen existing sidewalk to 10 foot wide sidepath Sidewalk Widening 14 28 3 Old Dobbin Road ‐ from Dobbin Road to Tamar Drive Secondary 0.58 HC Recommendation in 2006 County Pedestrian Plan #146 on east side of Old Dobbin Road

Sidewalk Widening/ Sidepath Seneca Drive ‐ from Martin Road to Atholton Elementary 10 foot wide sidepath/ sidewalk widening on south 15 96 4 Secondary 0.71 HC Extends over Rt 29 Connection School side of Seneca Drive

Snowden River Parkway ‐ from Waterloo Road south along Recommended in 2006 County Pedestrian Plan #132 (sidewalk improvements on Sidepath Connection 16 107 3 10 foot wide pathway Secondary 0.06 HC Snowden River Parkway to existing County sidepath south side of Snowden River Parkway)

Old Annapolis Road ‐ from Mellenbrook Road to Phelps Luck 10 foot wide sidepath on south side of Old Sidepath Connection 17 121 1, 3 Secondary 1.05 HC Existing Utility Easement Drive Annapolis Road

Kilimanjaro Road ‐ from high school entrance driveway to Widen existing sidewalk to 10 foot wide sidepath Sidewalk Widening 18 19 3 Primary 0.03 HC existing pathway on north side of Kilimanjaro Road

Widen existing sidewalk along Guilford road to 10 Sidepath Connection/ Pathway Guilford Road/Gerwig Lane/Open Space Area ‐ Hammond Hill 19 49 4, 5 foot sidepath on south side and Gerwig Road/ 10 Primary 1.89 HC Connection/ Sidewalk Widening HS to rail line foot wide pathway in open space area

Cradlerock Way ‐‐ existing pathway entrance east of Frietchie Sidepath Connection 20 73 3 10 foot sidepath on north side of Cradlerock Way Primary 0.03 HC Row to Young Heart Lane

10 foot wide sidepath on west side of Columbia Sidepath Connection 21 77 1, 3 Columbia Road ‐ Little Patuxent Parkway to Clarksville Pike Primary 1.34 HC Road

Sweet Hours Way ‐ existing pathway across from Weather 10 foot wide sidepath on south side of Sweet Hours Sidewalk Widening 22 135 4 Primary 0.06 HC Worn Way to pathway entrance east of Weather Worn Way Way

Harpers Farm Road ‐ between pathway connection north of Widen existing sidewalk to 10 foot wide sidepath Sidewalk Widening 23 139 2 Primary 0.05 HC Twin Rivers Road on east side of Harpers Farm Road

Sidewalk Widening 24 23 3 Tamar Drive ‐ Cloudleap Court to Old Dobbin Road 10 foot wide sidepath on south side of Tamar Drive Secondary 0.18 HC Widen existing sidewalk

Widen existing sidewalk to 10 foot wide sidepath Sidewalk Widening/ Pathway Eden Brook Drive/Shaker Drive ‐ From Kindler Drive to South Shaker Bridge sidewalks to be widened; Recommended in 2006 County 25 57 4 on west side of Eden Brook Drive/Shaker Drive, and Primary 1.64 HC Connection Carolina Ave Pedestrian Plan crossing of Middle along former

Owen Brown Village Center ‐ connect existing north and south Pedestrian connections through Owen Brown Sidepath Connection 26 69 5 Primary 0.07 CA pathways Village Center to existing pathways

Little Patuxent Parkway/ Governor Warfield Parkway ‐ from 10 foot wide sidepath on west side of Little Identified within Downtown Columbia Plan; widen existing sidewalk south of Sidepath Connection 27 79 2, 3 Secondary 1.17 HC Columbia Road to Little Patuxent Parkway Patuxent Parkway/Governor Warfield Parkway Vantage Point Road intersection

5 of 8 Columbia Active Transportation Action Agenda

Map Primary Recommendation Type Priority Location # Location Description Route Classification Length (miles) Comments Number Operator

Cedar Lane ‐ from Little Patuxent Parkway to existing pathway Recommended in 2006 County Pedestrian Plan #233 (proposed sidewalk Sidewalk Widening 28 90 2 10 foot wide sidepath on east side of Cedar Lane Primary 0.13 HC entrance south of Swansfield Pool connections); widen existing sidewalk in sections

10 foot wide sidepath on Columbia Mall Loop Recommended connection within proposed street network as part of the Sidepath Connection 29 80 2 Sidepaths within Downtown Columbia Plan Area Primary 0.78 OT Driveway Downtown Columbia Plan Redevelopment Area

Little Patuxent Parkway ‐ from South Entrance Road to 10 foot wide sidepath on east side of Little Recommendation identified in Downtown Columbia Plan, and County capital Sidepath Connection 30 109 2 Primary 0.95 CA Columbia Road Patuxent Parkway improvement project # 236

Columbia Road ‐ Sidepath from Clarksville Pike to pathway Sidepath Connection/ Sidewalk entrance of Swim Club (westside), and widen 10 foot wide sidepath on west and eastside of 31 3 1 Primary 1.32 HC Widening existing sidewalk from Community Center Pool Drive to Columbia Road pathway connection East of Kingscup Rd (eastside)

Old Montgomery Road ‐ from existing pathway at Jeffers Pool 10 foot wide sidepath on north side of Old Sidepath Connection 32 21 3 Primary 0.04 CA to Tamar Drive Montgomery Road

10 foot wide sidepath on north side of Dobbin Dobbin Road ‐ from Oakland Mills Road to Snowden River Sidepath Connection 33 29 3, 5 Road from Oakland Mills Road to Rt. 175, and on Primary / Secondary 1.77 HC Recommendation in 2006 County Pedestrian Plan #146 Parkway both sides east of Rt. 175

Robert Fulton Drive ‐ from Columbia Gateway Drive to Solar 10 foot wide sidepath on south side of Robert County capital improvement project, recommendation in 2006 County Pedestrian Sidewalk Widening 34 44 5 Primary 0.70 HC Walk Fulton Drive Plan #139 (entire length of Robert Fulton Drive with sidewalk improvements)

Stanford Blvd ‐ Dobbin Road to existing pathway on the 10 foot wide sidepath on south and west sides of Sidepath Connection 35 34 3 Secondary 0.22 HC south/west side of Stanford Blvd Stanford Blvd

Alexander Bell Drive ‐ From Columbia Gateway Drive to west 10 foot wide sidepath on south side of Alexander Sidepath Connection 36 43 5 Secondary 0.53 HC end of Alexander Bell Drive Bell Drive

10 foot wide sidepath on south side of Kindler Road Sidewalk Widening 37 58 4 Kindler Road ‐ from west end of First League to Little Bird Path Primary 0.20 HC Widen existing sidewalk and First League

Cradlerock Way ‐ from Broken Land Parkway to pathway 10 foot wide sidepath on north side of Cradlerock Sidepath Connection 38 71 3 Primary 0.12 HC entrance west of Overheart Lane Way

Great Star Drive ‐ Summer Sunrise Drive to existing pathway at 10 foot sidepath on east side of Great Star Drive Sidepath Connection 39 99 2 Primary 0.08 CA Connection to River Hill Pool the west end of Gentle Light Lane and north side of WB 32 Great Star Dr Ramp

Donleigh Drive ‐ from existing pathway entrance west of 10 foot wide sidepath on south side of Donleigh Sidepath Connection 40 112 4 Primary 0.05 CA Intersection improvements needed at Shaker Drive and Donleigh Dr Wesleigh Drive to Shaker Drive Drive

Old Annapolis Road ‐ from southern path entrance east of 10 foot sidepath on south side of Old Annapolis Sidepath Connection 41 118 1 Secondary 0.05 HC Woodland Road to Columbia Road Road

Great Star Drive ‐ widen existing sidewalks along bridge over 10 foot wide sidepath on east and westside of Sidewalk Widening 42 131 2 Primary 0.29 HC Route 32 Route 29 bridge

6 of 8 Columbia Active Transportation Action Agenda

Map Primary Recommendation Type Priority Location # Location Description Route Classification Length (miles) Comments Number Operator

Red Branch Road ‐ from Old Annapolis Road to existing 10 foot wide sidepath on the south side of Red Sidepath Connection 43 144 3 Secondary 0.27 HC pathway Branch Road

Shaker Drive ‐ from Cape Ann Drive to existing path entrance Modify existing terminus of Columbia Association pathway to extend to Sidepath Connection 44 65 4 10 foot wide sidepath on south side of Shaker Drive Secondary 0.07 HC west of Goodin Circle intersection

Sidepath Connection/ Sidewalk Broken Land Parkway ‐ from Snowden River Parkway to 10 foot wide sidepath on east and west sides of Connection to park and rides. Recommendation in 2006 County Pedestrian Plan # 45 66 5 Primary 0.79 HC Widening Guilford Road Broken Land Parkway 142; widen existing sidewalk in segments

Broken Land Parkway ‐ from existing pathway south of Lake 10 foot wide sidepath on east side of Broken Land Sidepath Connection 46 67 5 Primary 0.47 HC Existing County capital improvement project Elkhorn to Snowden River Parkway on both sides of roadway Parkway

Little Patuxent Parkway ‐ from Hickory Ridge Road to Peartree 10 foot wide sidepath on south side of Little Sidewalk Widening 47 91 2 Primary 0.23 HC Widen existing sidewalk/ pathway Way Patuxent Parkway

Columbia Road ‐ Widen existing sidewalk from Rams Horn Sidewalk Widening 48 108 1 10 foot sidepath on south side of Columbia Road Primary 0.04 HC Row to pathway south of intersection

Clarksville Pike ‐ from path entrance east of Wood Road to 10 foot wide sidepath on north side of Clarksville Sidepath Connection 49 5 1 Secondary 0.13 HC Columbia Road Pike

10 foot wide sidepath on south side of Clarksville Sidepath Connection 50 6 1 Clarksville Pike ‐ between Davidge Drive and Columbia Road Secondary 0.39 HC Pike

Sidepath Connection 51 11 3 Rumsey Road ‐ existing pathway to Red Branch Road 10 foot wide sidepath on west side of Rumsey Road Secondary 0.25 HC

Dried Earth Blvd/April Brook Circle ‐ From Snowden River 10 foot wide sidepath on north side of Dried Earth Sidewalk Widening 52 110 3 Parkway to west side pathway entrance south of Three Apple Secondary 0.32 HC Blvd to south side of April Brook Circle Downs Widen existing sidewalk to 10 foot sidepath on east Mellenbrook Road/Creekbed Court ‐ From existing pathway on Sidewalk Widening 53 133 1 side of Creekbed Court and south side of Secondary 0.22 HC Creekbed Court to Edgar Road Mellenbrook Road

10 foot wide sidepath on west side of Oakland Mills Sidewalk Widening 54 39 5 Oakland Mills Road ‐ Pathway tunnel to Dasher Court Primary 0.08 HC Widen existing sidewalk with existing minibus right‐of‐way Road

Watch Chain Way ‐ from existing west side pathway entrance 10 foot wide sidepath on east side of Watch Chain Sidewalk Widening 55 126 2 north of Middlewater Court to existing east side pathway Primary 0.07 HC Way entrance

Murray Hill Road ‐ from Vollmerhausen Road to Huntington Widen existing sidewalk to 10 foot wide sidepath Sidewalk Widening 56 141 5 Primary 0.05 HC Pool on east side of Murray Hill Road

Sidepath Connection 57 145 2, 4 Grace Drive ‐ from Quiet Night Ride to Cedar Lane 10 foot wide sidepath on north side of Grace Drive Primary 0.85 HC

Sidewalk Widening 58 146 5 Oakland Mills Road ‐ from existing pathway to Dobbin Road 10 foot widening of sidewalk Primary 0.03 HC

Sidewalk Widening/ Sidepath Sanner Road ‐ from Applied Physics Laboratory entrance to 59 147 4 10 foot widening of sidewalk Primary 0.54 HC Connection Cedar Lane

Sidepath Connection/ Sidewalk Widen existing sidewalk to 10 foot wide sidepath 60 7 1 Clarksville Pike ‐ between Ten Mills Road and existing pathway Secondary 0.09 CA Widening on south side of Columbia Road

7 of 8 Columbia Active Transportation Action Agenda

Map Primary Recommendation Type Priority Location # Location Description Route Classification Length (miles) Comments Number Operator

Martin Road ‐ sidepath connection from existing pathway to Sidepath Connection/ Realigned 10 foot wide sidepath on east side of Martin Road/ 61 81 2 Hickory Ridge Road/ realign pathway to connect to the Secondary 0.05 CA Path Connection 10 foot wide realigned pathway intersection of Hickory Ridge Road and Broken Land Parkway

Realignment of existing pathway east of Velvet Path to Sidewalk Widening 62 98 2 10 foot wide pathway Secondary 0.07 HC Alternative realignment of path to line up at Summer Sunrise crossing crossing of Summer Sunrise Drive

Oakland Mills Road ‐ from Gracious End Court to Snowden 10 foot wide sidepath on east side of Oakland Mills Sidepath Connection 63 130 5 Secondary 0.07 HC River Parkway Road

Oak Hall Lane ‐ from Oakland Mills Road to end of Oak Hall 10 foot wide sidepath on south side of Oak Hall Sidepath Connection 64 148 5 Secondary 0.22 HC Lane Lane

Primary Operator Legend Improvement Prioritization Criteria CA: Columbia Association 1. Pathway Hierarchy HC: Howard County ‐ Primary OT: Other/Private Land Owners ‐ Secondary ‐ Tertiary/ Sidewalk 2. Pathway Connection Proximity to Commercial Centers ‐ Within 1/4 Mile ‐ Within 1/2 Mile 3. Pathway Connection Proximity to Schools ‐ Within 1/4 Mile ‐ Within 1/2 Mile 4 ‐other considerations ‐ connectivity to close major gaps

8 of 8