‘hmamï´> amÁ` nmocrg J¥h{Z‘m©U d H$ë`mU ‘hm‘§S>i ‘¶m©{XV, ‘w§~B© (‘hmamï´> emgZmMm CnH«$‘) 3838 dmdm dm{f©H$dm{f©H$ AhdmbAhdmb {XZm§H$ 31 ‘mM© 2012 amoOr g‘mßV hmoUmè¶m dfm©Mm.

nmobrg AYrjH$ H$m¶©b¶, na^Ur

MAHARASHTRA STATE POLICE HOUSING & WELFARE CORPORATION LTD., (A Government of Undertaking) 3838thth AnnualAnnual ReportReport For the Year Ending 31st March 2012. MSPH & WC LTD., MUMBAI VISION To strive to provide state-of-art, cost-effective, user & eco-friendly campuses - buildings / accommodation to the guardians of law and protectors of society - the police personnel and to comfort them and cause the betterment in personal and public life to discharge the duties and responsibilities without stress and strain.

MSPH & WC LTD., MUMBAI MISSION To design and construct state-of-art buildings and campuses according to specifications and provide adequate infrastructural services, to fulfill requirement(s) of user department(s)-Police, Home Guards, Civil Defence and Jails of Maharashtra. To ensure the quality, workmanship and timely completion of projects by introducing the innovative ideas, latest techniques and technology in design and construction to the optimal satisfaction of the user department by keeping the pace of advancement in mind. To evolve dedicated and committed, continually improving competence and skill to meet the changing needs of construction industry/activity by ensuring complete transparency with a right to access to the information to the public. AZwH«$‘{UH$m Contents g§MmbH$ ‘§S>i Board of Directors 05 gyMZm Notice 06

àH$ën Projects 09 - 78

Ahdmb Reports 79 - 85

Vmio~§X Balance Sheet 86 - 105 ^maVmMo {Z¶§ÌH$ d ‘hmboImnarjH$ ¶m§Mo A{^àm¶ Comments of the Comptoller and

Auditor General of India 106 From the Desk of the Managing Director

feel very much delighted and overwhelmed while presenting the I 38th Annual Report together with Auditors’ Report for the financial year ending 31st March 2012.

I would like to urge you to refer to the Vision and Mission of this Corporation. It’s each and every word is indicating expressively and lucidly the utmost desire and determined commitment of this Corporation towards its objective. Through the year, we ensured sincere efforts to realize the same, by completing: 1112; police quarters, 45; administrative buildings, 1; barrack, 1; mess building & 5; hostels at various places across the State.

Since its incorporation, the MSPH & WC Ltd. has made available twenty nine thousand and thirty one houses. As an integral part of programme of capacity building and empowerment of the State Police Force one hundred and seventy four buildings for office use, twenty one barracks, eighty five class rooms, twenty eight mess buildings and thirty nine hostels for training schools and institutes have also been constructed and handed over for utilization. This is how MSPH & WC Ltd. has played its complementary but vital role in maximizing welfare of policemen & officers.

Thus, the Corporation has made excellent progress in execution of its planned strategies for exceeding the satisfaction level of police housing. This commendable performance and operational excellence is again endorsed in the financial year 2011-2012. These noteworthy milestones are accomplished primarily due to unfailing commitment and passion of MSPH & WC Ltd. family for taking this Corporation to a relentlessly upward career trajectory.

Before I wrap up, I would like to express my gratitude to all the Board members for their valuable guidance and great support. I would also like to thank everyone of our team MSPH & WC Ltd. for their contribution which has enabled us to create immensely impressive and praiseworthy projects throughout the State.

Shri Praveen Dixit, IPS Director General of Police, Vice Chairman & Managing Director, Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai

4 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 LIST OF BOARD OF DIRECTORS AS ON 31/03/2012 Dr. Amitabh Rajan lr. A{‘Vm^ amOZ Addl. Chief Secretary A{V. ‘w»` g{Md, Home Department, Govt. of Maharashtra, J¥h {d^mJ, ‘hmamîQ´> emgZ, Mantralaya, Mumbai & Chairperson, ‘§Ìmb`, ‘w§~B© d M.S.P.H. & W. C. Ltd., Mumbai Aܶj, ‘.am.nmo.J¥. d H$.‘., ‘w§~B© Shri. Praveen Dixit lr. àdrU Xr{jV Vice Chairman & Managing Director, Cnmܶj d ì¶dñWmnH$s¶ g§MmbH$, M.S.P.H. & W. C. Ltd., Mumbai ‘.am.nmo.J¥. d H$.‘., ‘w§~B©.

Shri. K. Subramanyam lr. Ho$. gw~«‘ݶ‘ Director General of Police, M.S., Mumbai, nmobrg ‘hmg§MmbH$, ‘hmamîQ´> amÁ`, ‘w§~B©. & Director, M.S.P.H. & W.C.Ltd., Mumbai d g§MmbH$, ‘.am.nmo.J¥. d H$.‘., ‘w§~B©.

Shri. K. K. Pathak (Addl. Charge) lr. Ho$. Ho$. nmR>H$ (A{V[aº$ H$m¶©^ma) Principal Secretary (SPL), àYmZ g{Md ({deof), Home Department, J¥h {d^mJ, Govt. of Maharshtra, Mantralaya, Mumbai, ‘hmamîQ´> emgZ, ‘§Ìmb`, ‘w§~B©. & Director, M.S.P.H. & W.C.Ltd., Mumbai d g§MmbH$, ‘.am.nmo.J¥. d H$.‘., ‘w§~B©.

Shri. Arup Patnaik lr. Aê$n nQ>Zm¶H$ Commissioner of Police, Brihanmumbai, nmobrg Am`wŠV ~¥hÝ‘w§~B©. & Director, M.S.P.H. & W.C.Ltd., Mumbai d g§MmbH$, ‘.am.nmo.J¥. d H$.‘., ‘w§~B©.

Shri. Manukumar Srivastava lr. ‘ZwHw$‘ma lrdmñVd Principal Secretary, Urban Development g{Md, ZJa {dH$mg {d^mJ, Department, Govt. of Maharshtra, ‘hmamîQ´> emgZ, Mantralaya, Mumbai ‘§Ìmb`, ‘w§~B©. & Director, M.S.P.H. & W.C.Ltd., Mumbai d g§MmbH$, ‘.am.nmo.J¥. d H$.‘., ‘w§~B©.

Shri. Gautam Chatterjee lr. Jm¡V‘ MQ>Ou Secretary, Housing Department, Govt. of àYmZ g{Md, J¥h{Z‘m©U {d^mJ, Maharshtra, Mantralaya, Mumbai ‘hmamîQ´> emgZ, ‘§Ìmb`, ‘w§~B©. & Director, M.S.P.H. & W.C.Ltd., Mumbai d g§MmbH$, ‘.am.nmo.J¥. d H$.‘., ‘w§~B©.

Shri. S. K. Mukherjee lr. Eg. Ho$. ‘wIOu Secretary, Public Works Department, g{Md, gmd©O{ZH$ ~m§YH$m‘ {d^mJ, Govt. of Maharshtra, ‘hmamîQ´> emgZ, Mantralaya, Mumbai & Director, ‘§Ìmb`, ‘w§~B©. M.S.P.H. & W.C.Ltd., Mumbai. d g§MmbH$, ‘.am.nmo.J¥. d H$.‘., ‘w§~B©.

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 5 MAHARASHTRA STATE POLICE HOUSING & WELFARE CORPORATION LTD., MUMBAI. (A Government of Maharashtra Undertaking) Plot No. 89-89A, Sir Pochkhanwala Road, Worli, Mumbai-400 030.

NOTICE

Notice is hereby given that the 38th Annual General Meeting of the Shareholders of Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai will be held Thursday, 20th September 2012 at 5.00 P.M at the Meeting Room, Home Department, 30th Floor, World Trade Centre – 1, Cuffe Parade, Mumbai 400 005 to transact the following business: ORDINARY BUSINESS (i) To receive, consider and adopt the Audited Balance Sheet as at 31st March, 2012 and the Profit & Loss Account for the period ended on that date together with the Reports of Directors and Auditors thereon. (ii) To fix the remuneration of Statutory Auditors appointed by the Comptroller & Auditors General of India, pursuant to section 224 (8) (aa) of the Companies Act 1956, for auditing the accounts of the financial year 2011-12 by passing following resolution as an ordinary resolution: "RESOLVED THAT pursuant to section 224(8) (aa) of the Companies Act 1956, the Managing Director be and is hereby authorized to fix the remuneration of Statutory Auditors for auditing the Accounts of the financial year 2011-12 in consultation with the Statutory Auditors." Yours Faithfully,

Sd/- (Ravindra Baghel) Company Secretary Note: A member entitled to attend and vote at the meeting is entitled to appoint a proxy need not be a member of the Corporation. 1. Dr. Amitabh Rajan, Chairman, M.S.P.H. & W.C. Ltd, Mumbai. 2. Shri Praveen Dixit, Managing Director, M.S.P.H. & W.C. Ltd, Mumbai. 3. Shri Sanjeev Dayal, Director General of Police, Maharashtra State, Mumbai. 4. Shri P. H. Wagde, Joint Secretary, Home Department, Mantralaya, Mumbai, Representative of Governor of Maharashtra.

6 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 MAHARASHTRA STATE POLICE HOUSING & WELFARE CORPORATION LTD., MUMBAI. (A Government of Maharashtra Undertaking) Plot No. 89-89A, Sir Pochkhanwala Road, Worli, Mumbai-400 030.

NOTICE

Notice is hereby given that an Extra Ordinary General Meeting of the shareholders of Maharashtra State Police Housing & Welfare Corporation Limited will be held on Monday, 14th January, 2013 at12.30 p.m. at Meeting Room, Home Department, 30th floor, World Trade Centre – 1, Cuffe Parade, Mumbai 400 005 to transact the following business as: ORDINARY BUSINESS: To consider and if thought fit, to pass with or without modification, the following resolution as an Ordinary Resolution. ITEM NO. 1 To note, adopt & approve the Comments of the Comptroller and Auditor General of India on audited annual accounts for financial years 2010-11 & 2011-12. “RESOLVED THAT the comments (i.e. Nil Comments) of the Comptroller and Auditor General of India on the audited annual accounts of Maharashtra State Police Housing & Welfare Corporation Ltd. for the financial years 2010-11 & 2011-12 are hereby noted, adopted & approved. RESOLVED FURTHER THAT Shri Ravindra Baghel, Company Secretary is hereby authorised to sign and dispatch the Notice to the shareholders of the company and to do all such acts, deeds and things as may be necessary to convene the Extra Ordinary General Meeting." By order of the Board For Maharashtra State Police Housing & Welfare Corporation Ltd.

Registered Office: Sd/- Plot No. 89-89A (Ravindra Baghel) Sir Pochkhanwala Road Company Secretary Near Police Officers’ Mess, Worli, Mumbai 400030. Dated: 09/01/2013 To, 1. Dr. Amitabh Rajan, Chairman, M.S.P.H. & W.C. Ltd, Mumbai. 2. Shri Praveen Dixit, Managing Director, M.S.P.H. & W.C. Ltd, Mumbai. 3. Shri Sanjeev Dayal, Director General of Police, Maharashtra State, Mumbai. 4. Shri S. R. Chavan, Joint Secretary, Home Department, Mantralaya, Mumbai, Representative of Governor of Maharashtra

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 7 NOTES: a) A member entitled to attend and vote at the meeting is entitled to appoint one or more proxies to attend and vote instead of himself. A proxy need not be a member of the company. Proxies in order to be valid shall be deposited with the company at least forty eight hours before the commencement of the meeting. b) Members/proxies should bring the attendance slip duly filled in for attending the Meeting. c) The explanatory statement pursuant to Section 173(2) of the Companies Act,1956, is annexed herewith. ANNEXURE TO THE NOTICE EXPLANATORY STATEMENT AS REQUIRED BY SECTION 173(2) OF THE COMPANIES ACT, 1956 The following Explanatory Statement, as required by section 173(2) of the Companies Act, 1956 sets out the material facts relating to business under Item No. 1 mentioned in the accompanying Notice. ITEM NO. 1 The Corporation conducted the Annual General Meetings for financial year 2010-11 & 2011-12 on 23/01/2012 & 20/09/2012 respectively and the audited annual accounts were adopted with Director’s Report and Statutory Auditor’s Report. As per the prevailing practice the Corporation has been submitting the annual accounts to the Comptroller and Auditor General of India after conducting the annual general meeting. However as per the provisions of section 619(5) of the Companies Act, 1956, “any such comments upon, or supplement to, the audit report shall be placed before the annual general meeting of the company at the same time and in the same manner as the audit report.” During the Supplementary Audit for the financial year 2011-12 conducted by the Accountant General (Audit) – III, Maharashtra, Mumbai, the auditors reported that the annual accounts for the financial years 2010-11 & 2011-12 were adopted in the annual general meeting dated 23/01/2012 & 20/09/2012 respectively, though the audit certificates on the audited annual accounts were yet to be issued by Comptroller and Auditor General of India. The Corporation has received NIL COMMENTS from Comptroller and Auditor General of India on the audited annual accounts for the financial year 2010-11 & 2011-12. The Corporation had given an undertaking that an Extra Ordinary General Meeting of the shareholders will be conducted to place the comments of the Comptroller and Auditor General of India on the audited annual accounts for the financial years 2010-11 & 2011-12. Your Directors recommend the resolution as set out in Item No. 1 of the convening Notice for your approval. No Director is in any way concerned or interested in the aforesaid Resolution By order of the Board For Maharashtra State Police Housing & Welfare Corporation Ltd. Registered Office: Sd/- Plot No. 89-89A (Ravindra Baghel) Sir Pochkhanwala Road Company Secretary Near Police Officers’ Mess, Worli, Mumbai 400030. Dated: 09/01/2013

8 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 COMPLETED WORKS IN 2011 - 12

1) Aurangabad, 309 quarters for India Reserve Battalion at Village Satara 2) Nandurbar, 168 quarters for Superintendent of Police, Nandurbar at Nandurbar 3) Solapur, 71 quarters for Superintendent of Police at Akkalkot Dist. Solapur 4) Yeotmal , 45 quarters for Superintendent of Police, at Darati Dist. Yeotmal 5) Nagpur, Unconventional Operational Training Centre (UOTC) & 108 quarters at Surabaradi 6) Navi Mumbai, Administrative Buildings for Commissioner of Police at Kalamboli 7) Nagpur, Barrack Building for CP, Nagpur 8) Nandurbar, Administrative Buildings for Superintendent of Police, Nandurbar at Nandurbar 9) Mumbai, Traffic office & Hostel Building for CP, Mumbai at Byculla 10) Mumbai, Hostel Building No. 2 for Police Training School at Marol 11) Solapur, Administrative Building for Commissioner of Police, Solapur 12) Parbhani, Administrative Building for SP, Parbhani 13) Raigad, Administrative Building for SP, Raigad at Alibag 14) Nanded, Administrative Building for IGP Nanded at Nanded 15) Beed, Administrative Building for Additional Superintendent of Police, Ambejogai Dist. Beed

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 9 g‘mXoeH$, ^maV amIrd ~Q>mcr`Z, Am¡a§Jm~mX `m§MoH$[aVm ‘m¡Oo gmVmam `oWo 309 {ZdmgñWmZo

hmamï´> amÁ` nmocrg J¥h{Z‘m©U d gd© B‘maVrMo EHy$U ~m§YH$m‘ joÌ’$i H§$nZr, CëhmgZJa `m§Zm H$amaZm‘m H«$. ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ 19570.51 Mm¡. ‘r. Amho. gXa àH$ënm‘Ü`o gr-04+2009-10, {X.21/08/2009 ‘§S>imÀ`m {X. 24/03/2009 amoOr nmUr nwadR>m, C§M OcHw§$^, B‘maVrdarc AÝd`o `2835.27 cmI aH$‘oÀ`m {Z{dXm g§nÝZ Pmcoë`m 180 ì`m ~¡R>H$s‘Ü`o nmÊ`mÀ`m Q>mŠ`m, A§VJ©V añVo, A§VJ©V ‘wë`mg gXa àH$ënmMo H$m‘ XoÊ`mV Amco g‘mXoeH$, ^maV amIrd ~Q>mcr`Z, / ~mh` {dÚwVrH$aU, añË`mdarc {dÚwV hmoVo. Am¡a§Jm~mX `m§MoH$[aVm ‘m¡Oo gmVmam `oWo Im§~, g§ajU q^V, O‘rZ amoIyZ YaUmar, gXa àH$ënmgmR>r ^maV gaH$ma d 309 {ZdmgñWmZo ~m§YH$m‘ H$aUogmR>r VmaoMo Hw§$nZ, Oc:{ZñgmaU `moOZm, O‘rZ ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY `3473.21 cmI IMm©g gwYm[aV gnmQ>rH$aU d gwemo{^H$aU, d¥jmamonU, H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda àemgH$s` ‘mÝ`Vm àXmZ H$aÊ`mV Amcocr O‘rZrV nmUr ‘wa{dUo, Am{U A§VJ©V JQ>mao `3489.52 cmI IM© Pmcocm Amho. Amho. BË`mXr nm`m^wV ~m~tMm g‘mdoe Ho$cm Amho. àH$ënmMo H$m‘ {X.07/09/2011 gXa àH$ënm‘Ü`o Q>mB©n-2 Mr 288 àH$ënmgmR>r ‘o. g§O` Xw‘Zo, Zm{eH$ amoOr nyU© H$aÊ`mV Amcoo AgwZ {X. {ZdmgñWmZo, Q>mB©n-3 Mr 8 {ZdmgñWmZo, `m§Zr dmñVw{demaX Am{U àH$ën ì`dñWmnZ 01/10/2011 amoOr Cn^omJVm {d^mJmg Q>mB©n-4 Mr 12 {ZdmgñWmZo, Q>mB©n-5 Mo 1 g„mJma åhUyZ H$m‘ nm{hcoco Amho. gXa hñVm§VarV H$aÊ`mV Amcm Amho. {ZdmgñWmZm§Mo ~m§YH$m‘ {X.21/8/2009 àH$ënmMo A§Xm{OV ‘wë` `3028.20 cmI amoOr gwé H$aÊ`mV Amco. àH$ënmVrc hmoVo. Va H§$ÌmQ>Xma ‘o. B©Jc H$ÝñQ´>ŠeZ

10 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Aurangabad, 309 quarters for India Reserve Battalion at Village Satara

he revised administrative approval Tank on each building, Internal Roads, The funds are provided by both Tamounting to `3473.21 lakhs has Internal/ External electrification, Street Government of India and Government of been accorded for 309 quarters for India light, Compound Wall & Chain link Maharashtra. The expenditure incurred Reserve Battalion at Village Satara, Wire Fencing, Sewerage scheme, Land on this project is `3489.52 lakhs. The District Aurangabad by the Board of scaping, Tree plantation, Rain water project is completed on 07/09/2011 Directors of Maharashtra State Police Harvesting, Storm water drain etc. and handed over to user Department on Housing & Welfare Corporation Ltd., M/s. Sanjay Dhumane, Nashik 01/10/2011. th Mumbai in its 180 meeting held on has worked as an Architect as well as 24/03/2009. Project Management Consultant for The project consists of Type-II – 288 this project. The estimated cost of this qtrs., Type-III – 8 qtrs., Type-IV – 12 project is `3028.20 lakhs. The work qtrs. & Type-V – 1 qtr. and work has been of this project has been awarded to the started on 21/8/2009. The total built up Contractor M/s. Eagle Construction Co., area of this project is 19570.51 sq. mt. Ulhasnagar at tender cost amounting to The project includes all infrastructural `2835.27 lakhs vide contract agreement amenities viz Water supply, Elevated no. C-4/2009-10, dated 21/08/2009. Storage Reservoir, Overhead Water

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 11 Z§Xwa~ma, nmocrg AYrjH$ Z§Xwa~ma ‘w»`mc`mMo {R>H$mUr 168 {ZdmgñWmZo hmamï´> amÁ` nmocrg J¥h{Z‘m©U d Amho. gXa àH$ënm‘Ü`o nmUr nwadR>m, nmQ>H$a H$ÝñQ´>ŠeZ àm. {c., Zm{eH$ `m§Zm ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ C§M ObH§w$^, ^yOb Q>mH$s, B‘maVrdarc H$amaZm‘m H«$. gr-22/2009-10, {X. ‘§S>imÀ`m {X. 24/03/2010 amoOr nmÊ`mÀ`m Q>mŠ`m, A§VJ©V añVo, A§VJ©V 25/02/2010 AÝd`o `628.18 cmI g§nÝZ Pmcoë`m 184 ì`m ~¡R>H$s‘Ü`o / ~mh` {dÚwVrH$aU, añË`mdarc {dÚwV aH$‘oÀ`m {Z{dXm ‘wë`mg gXa àH$ënmMo Z§Xwa~ma, nmocrg AYrjH$ Z§Xwa~ma Im§~, g§ajU q^V, gm§S>nmUr `moOZm (Eg². H$m‘ XoÊ`mV Amco hmoVo. ‘w»`mc`mMo {R>H$mUr 168 {ZdmgñWmZo Am¶.~r.E\ .) Oc:{ZñgmaU `moOZm, gXa àH$ënmgmR>r ^maV gaH$ma Am{U ~m§YH$m‘ H$aUogmR>r `1286.77 cmI O‘rZ gwemo{^H$aU, d¥jmamonU, O‘rZrV ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY IMm©g gw-gwYm[aV àemgH$s` ‘mÝ`Vm nmUr ‘wa{dUo Am{U A§VJ©V JQ>mao BË`mXr H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda àXmZ H$aÊ`mV Amcocr Amho. nm`m^wV ~m~tMm g‘mdoe Ho$cm Amho. `1265.64 cmI IM© Pmcocm Amho. gXa àH$ënm‘Ü`o Q>mB©n-2 Mr àH$ënmgmR>r ‘o. qcH$m°c H$ÝñQ´>ŠeZ, àH$ënmMo H$m‘ {X. 30/01/2012 168 {ZdmgñWmZm§Mo ~m§YH$m‘ {X. Ywio `m§Zr dmñVw{demaX Am{U àH$ën amoOr nyU© H$aÊ`mV Amcoo AgwZ {X. 25/02/2010 amoOr gwé H$aÊ`mV ì`dñWmnZ gëbmJma åhUyZ H$m‘ nm{hcoco 30/01/2012 amoOr Cn^omJVm {d^mJmg Amco. àH$ënmVrc gd© B‘maVrMo EHy$U Amho. gXa àH$ënmMo A§Xm{OV ‘wë` hñVm§VarV H$aÊ`mV Amcm Amho. ~m§YH$m‘ joÌ’$i 8554.56 Mm¡. ‘r. `604.01 cmI hmoVo. H§$ÌmQ>Xma ‘o. ndma

12 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Nandurbar, 168 quarters for Superintendent of Police, Nandurbar at Nandurbar

he revised administrative approval Internal/ External electrification, street The funds are provided by both Tamounting to `1286.77 lakhs has light, Compound Wall SIBF system, Government of India and Government of been accorded for 168 quarters for Sewerage scheme, Land scaping, Tree Maharashtra. The expenditure incurred Superintendent of Police, Nandurbar at plantation, Rain water Harvesting, storm on this project is `1265.64 lakhs. The Nandurbar by the Board of Directors water drain etc. project completed on 30/01/2012 and of Maharashtra State Police Housing & M/s. Linkall Construction, Dhule has handed over to user Department on Welfare Corporation Ltd., Mumbai in its worked as an Architect as well as Project 30/01/2012. th 184 meeting held on 24/03/2010. Management Consultant for this project. The project consists of Type-II – The estimated cost of this project is 168 qtrs and work has been started on `604.01 lakhs. The work of this project 25/02/2010. The total built up area of this has been awarded to the Contractor project was 8554.56 sq. mt. The project M/s. Pawar Patkar Construction Pvt. includes all infrastructural amenities Ltd., Nashik at tender cost amounting to viz water supply, Overhead Water `628.18 lakhs vide contract agreement Tank on each building, Internal Roads, no. C-22/2009-10, dated 25/02/2010.

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 13 gmocmnya, nmocrg AYrjH$ `m§MoH$[aVm AŠH$cH$moQ> `oWo 71 {ZdmgñWmZo hmamï´> amÁ` nmocrg J¥h{Z‘m©U d gXa àH$ënm‘Ü`o nmUr nwadR>m, C§M H§$ÌmQ>Xma ‘o. àH$me H$ÝñQ´>modoc, Zm{eH$ ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ OcHw§$^, ^y{‘JV OcHw§$^, B‘maVrdarc `m§Zm H$amaZm‘m H«$. gr-12/2009-10, ‘§S>imÀ`m {X. 17/08/2009 amoOr nmÊ`mÀ`m Q>mŠ`m, A§VJ©V añVo, A§VJ©V {X. 31/08/2009AÝd`o `1199.00 g§nÝZ Pmcoë`m 182 ì`m ~¡R>H$s‘Ü`o / ~mh` {dÚwVrH$aU, añË`mdarc {dÚwV cmI aH$‘oÀ`m {Z{dXm ‘wë`mg gXa gmocmnya, nmocrg AYrjH$ `m§MoH$[aVm Im§~, {dÚwV O{ZÌ, g§ajU q^V, àH$ënmMo H$m‘ XoÊ`mV Amco hmoVo. AŠH$cH$moQ> `oWo 71 {ZdmgñWmZo Oc:{ZñgmaU `moOZm, IoimMo ‘¡XmZ, gXa àH$ënmgmR>r ^maV gaH$ma ~m§YH$m‘ H$aUogmR>r `1504.77 cmI O‘rZ gwemo{^H$aU, d¥jmamonU, O‘rZrV Am{U ‘hmamï´> emgZ `m§À`mH$Sy>Z IMm©g gwYm[aV àemgH$s` ‘mÝ`Vm àXmZ nmUr ‘wa{dUo, Am{U nmÊ`mMm {ZMam {ZYr CncãY H$éZ XoÊ`mV Amcocm H$aÊ`mV Amcocr Amho. H$aÊ`mgmR>r A§VJ©V JQ>mao BË`mXr nm`m^wV AgyZ àH$ënmda `1223.65 cmI gXa àH$ënm‘Ü`o Q>mB©n-2 Mr 68 ~m~tMm g‘mdoe Ho$cm Amho. IM© Pmcocm Amho. àH$ënmMo H$m‘ {X. {ZdmgñWmZo, Q>mB©n-3 Mr 2 {ZdmgñWmZo, àH$ënmgmR>r ‘o. gå`H$, nwUo `m§Zr 20/07/2011 amoOr nyU© H$aÊ`mV Amcoo Q>mB©n-4 Mo 1 {ZdmgñWmZm§Mo ~m§YH$m‘ dmñVw{demaX Am{U ‘o. AVwc R>m|~ao, AgwZ {X.22/11/2011 amoOr Cn^omJVm {X. 31/08/2009 amoOr gwé H$aÊ`mV cmVya `m§Zr àH$ën ì`dñWmnZ g„mJma {d^mJmg hñVm§VarV H$aÊ`mV Amcm Amho. Amco. àH$ënmVrc gd© B‘maVrMo EHy$U åhUyZ H$m‘ nm{hcoco Amho. gXa àH$ënmMo ~m§YH$m‘ joÌ’$i 4940.06 Mm¡. ‘r. Amho. A§Xm{OV ‘wë` `1203.60 cmI hmoVo.

14 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Solapur, 71 quarters for Superintendent of Police at Akkalkot

he revised administrative approval External electrification, street light, The funds are provided by both Tamounting to `1504.77 lakhs DG Set, Compound Wall & Chain link Government of India and Government of has been accorded for 71 quarters for Wire Fencing, Sewerage scheme, Play Maharashtra. The expenditure incurred Superintendent of Police, Akkalkot at ground, Land scaping, Tree plantation, on this project is `1223.65 lakhs. The Solapur by the Board of Directors of Rain water Harvesting, storm water project is completed on 20/07/2011 Maharashtra State Police Housing & drain etc. and handed over to user Department on Welfare Corporation Ltd., Mumbai in its M/s. Samyak, Pune has worked as an 22/11/2011. nd 182 meeting held on 17/08/2009. Architect and M/s. Atul Thombare, Latur The project consists of Type-II – 68 as a Project Management Consultant for qtrs., Type-III – 2 qtrs. & Type-IV – 1 qtr this project. The estimated cost of this and work has been started on 31/8/2009. project is `1203.60 lakhs. The work The total built up area of this project is of this project has been awarded to the 4940.06 sq. mt. The project includes all Contractor M/s. Prakash Constrowell, infrastructural amenities viz Elevated Nashik at tender cost amounting to Storage Reservoir, Ground Storage `1199.00 lakhs vide contract agreement Reservoir, Overhead Water Tank on no. C-12/2009-10, dated 31/08/2009. each building, Internal Roads, Internal/

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 15 `dV‘mi, nmocrg AYrjH$, `dV‘mi `m§MoH$arVm XamQ>r `oWo 45 {ZdmgñWmZo hmamï´> amÁ` nmocrg J¥h{Z‘m©U d àH$ënm‘Ü`o nmUr nwadR>m, C§M OcHw§$^, àm. {c., Zm{eH$ `m§Zm H$amaZm‘m H«$. ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ ^y{‘JV OcHw§$^, B‘maVrdarc nmÊ`mÀ`m gr-03/2009-10, {X. 05/06/2009 ‘§S>imÀ`m {X. 24/03/2009 amoOr Q>mŠ`m, A§VJ©V añVo, A§VJ©V / ~mh` AÝd`o `751.00 cmI {Z{dXm ‘wë`mg g§nÝZ Pmcoë`m 180 ì`m ~¡R>H$s‘Ü`o {dÚwVrH$aU, añË`mdarc {dÚwV Im§~, gXa àH$ënmMo H$m‘ XoÊ`mV Amco hmoVo. `dV‘mi, nmocrg AYrjH$, `dV‘mi g§ajU q^V, Oc:{ZñgmaU `moOZm, O‘rZ gXa àH$ënmgmR>r ^maV gaH$ma `m§MoH$arVm XamQ>r `oWo 45 {ZdmgñWmZoo gwemo{^H$aU, d¥jmamonU Am{U A§VJ©V JQ>mao Am{U ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr ~m§YH$m‘ H$aUogmR>r `942.50 cmI BË`mXr nm`m^wV ~m~tMm g‘mdoe Ho$cm CncãY H$éZ XoÊ`mV Amcocm AgyZ IMm©g gwYm[aV àemgH$s` ‘mÝ`Vm àXmZ Amho. àH$ënmda `830.03 cmI IM© Pmcocm H$aÊ`mV Amcocr Amho. àH$ënmgmR>r ‘o. {H«$`o{Q>ìh ’$moa‘, Amho. àH$ënmMo H$m‘ {X. 30/04/2011 gXa àH$ënm‘Ü`o Q>mB©n-2 Mr 44 d A‘amdVr `m§Zr dmñVw{demaX Am{U ‘o. amoOr nyU© H$aÊ`mV Amcoo AgwZ {X. Q>mB©n-3 Mr 1 {ZdmgñWmZm§Mo ~m§YH$m‘ {X. ‘oam°J, AH$mocm `m§Zr àH$ën ì`dñWmnZ 18/07/2011 amoOr Cn^omJVm {d^mJmg 05/06/2009 amoOr gwé H$aÊ`mV Amco. g„mJma åhUyZ H$m‘ nm{hcoco Amho. gXa hñVm§VarV H$aÊ`mV Amcm Amho. àH$ënmVrc gd© B‘maVrMo EHy$U ~m§YH$m‘ àH$ënmMo A§Xm{OV ‘wë` `724.64 cmI joÌ’$i 4158.00 Mm¡. ‘r. Amho. gXa hmoVo. H§$ÌmQ>Xma ‘o. àH$me H$m°ÝQ´>modoc

16 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 45 quarters for Superintendent of Police, Yavatmal at Darati

he revised administrative approval Overhead Water Tank on each building, The funds are provided by both Tamounting to `942.50 lakhs has Internal Roads, Internal/ External Government of India and Government been accorded for 45 quarters for electrification, street light, Compound of Maharashtra. The expenditure Superintendent of Police, Yavatmal wall, Sewerage scheme, Land scaping, incurred on this project is `830.03 lakhs. at Darati by the Board of Directors of Tree plantation, & storm water drain etc. The project completed on 30/04/2011 Maharashtra State Police Housing & M/s. Creative Forum, Amravati and handed over to user Department on Welfare Corporation Ltd., Mumbai in has worked as an Architect and M/s. 18/07/2011. th its 180 meeting held on 24/03/2009. Merog, Akola as a Project Management The project consists of Type-II – 44 Consultant for this project. The & Type-III – 01 quarters and work has estimated cost of this project is `724.64 been started on 5.06.2009. The total lakhs. The work of this project has been built up area of this project is 4158.00 awarded to the Contractor M/s. Prakash sq. mt. This project also includes all Constrowell Pvt. Ltd., Nashik at tender infrastructural amenities viz water cost amounting to `751.00 lakhs vide supply scheme, Elevated Storage contract agreement no. C-03/2009-10, Reservoir, Ground Storage Reservoir, dated 05/06/2009.

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 17 ZmJnya, gwam~S>u ¶oWo Anma§nm[aH$ A{^`mZ à{ejU Ho§$Ð d 108 {ZdmgñWmZo hmamï´> amÁ` nmocrg J¥h{Z‘m©U d Amho. àH$ënmMo AmaoIZ ‘o. Agmo{gEQ>oS> gXa àH$ënmMo A§Xm{OV ‘wë` ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ Am{H©$Q>oŠQ>, ZmJnya d àH$ën ì`dñWmnZmMo `3335.03 cmI hmoVo. H§$ÌmQ>Xma ‘o. ‘§S>imÀ`m {X. 24/03/2009 amoOr H$m‘ ‘hm‘§S>imÀ¶m A{^¶§Ë¶mZr `m§Zr B©Jc H$ÝñQ´>ŠeZ H§$nZr, CëhmgZJa `m§Zm g§nÝZ Pmcoë`m 180 ì`m ~¡R>H$s‘Ü`o Ho$coco AgyZ gXa àH$ënmMo EHy$U ~m§YH$m‘ H$amaZm‘m H«$. gr-1/2009-10, {X. ZmJnya, Anma§nm[aH$ A{^`mZ à{ejU joÌ’$i 19311.47 Mm¡. ‘r. Amho. gXa 21/05/2009 AÝd`o `3222.31 cmI Ho$§Ð, ZmJnya B‘maV d 108 {ZdmgñWmZo àH$ënm‘Ü`o nmUr nwadR>m `moOZm, C§M aH$‘oÀ`m {Z{dXm ‘wë`mg gXa àH$ënmMo ~m§YH$m‘mgmR>r `4044.00 cmI IMm©g OcHw§$^, ^y{‘JV ObHw§$^, B‘maVrdarc H$m‘ XoÊ`mV Amco hmoVo. gwYm[aV àemgH$s` ‘mÝ`Vm àXmZ H$aÊ`mV nmÊ`mÀ`m Q>mŠ`m, A§VJ©V añVo, A§VJ©V / gXa àH$ënmgmR>r ^maV gaH$ma Am{U Amcocr Amho. ~mh` {dÚwVrH$aU, añË`mdarc {dÚwV Im§~, ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY gXa àH$ënm‘Ü`o 1 àemgH$s` B‘maV {dÚwV O{ZÌ, g§ajU q^V, VmaoMo Hw§$nZ, H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda d à{ejU Ho$§Ð H$m°ÝñQ>o~c hmoñQ>oc (4+1), gm§S>nmUr `moOZm, Oc:{ZñgmaU `moOZm, `4326.68 cmI IM© Pmcocm Amho. ‘og S>m`qZJ (200 ì`ŠVr), à{ejUmWu H$dm`Vr ‘¡XmZ, IoimMo ‘¡XmZ, O‘rZ `m àH$ënmMo H$m‘ {X. 20/09/2011 dgVrJ¥h (4+1), ‘°JPrZ, Am‘© ñQ>moa, gwemo^rH$aU, d¥jmamonU, O‘rZrV nmUr amoOr nyU© H$aÊ`mV Amcoo AgwZ {X. em°qnJ, J°aoO, Q>m°`coQ>, hm°pñnQ>c Am{U ‘wa{dUo Am{U A§VJ©V JQ>mao BË`mXr nm`m^wV 16/12/2011 amoOr Cn^omJVm {d^mJmg Q>mB©n-2 Mr 108 {ZdmgñWmZo ~m§YH$m‘ {X. ~m~tMm g‘mdoe Ho$cm Amho. hñVm§VarV H$aÊ`mV Amcm Amho. 21/05/2009 amoOr gwé H$aÊ`mV Amcoco

18 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Nagpur, Unconventional Operational Training Centre (UOTC) & 108 quarters at Surabaradi

he revised administrative approval Nagpur has been appointed as an Eagle Construction, Ulhasnagar at tender Tamounting to `4044.00 lakhs has Architect and PHC Engineers has been cost amounting to `3222.31 lakhs vide been accorded for Unconventional appointed as PMC for this project. This contract agreement no. C-1/2009-10, Operational Training Centre (UOTC) project also includes all infrastructural dated 21/05/2009. at Nagpur by the Board of Directors of amenities viz Water supply scheme, The funds are provided by both Maharashtra State Police Housing & Elevated Storage Reservoir, Ground Government of India and Government of Welfare Corporation Ltd., Mumbai in its Storage Reservoir, Overhead Water Maharashtra. The expenditure incurred th 180 meeting held on 24/03/2009. Tank on each building, Internal Roads, on this project is `4326.68 lakhs. The The project consists of administrative Internal/ External electrification, Street project is completed on 20/09/2011 and building and training centre, constable light, DG set, Compound Wall & Chain handed over to user Department on hostel (4+1), Mess & Dinning 200 link Wire Fencing, waste water treatment 16/12/2011. person, Trainee’s hostel (4+1), Magazine, scheme, Sewerage scheme, Parade Arm’s Store, Convenient shopping, ground, Play ground, Land scaping, Garages (M.T. section), Experimental Tree plantation, Rain water harvesting & workshop, Toilet, Gymnasium, Hospital, storm water drain etc. Residential Buildings, Type II – 108 The estimated cost of this project is quarters and the work has been started on `3335.03 lakhs. The work of this project 21/05/2009. M/s. Associated Architect, has been awarded to the Contractor M/s.

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 19 Zdr ‘w§~B©, nmocrg Am`wŠV, Zdr ‘w§~B© ‘w»`mc`mÀ`m H$i§~mocr `oWo àemgH$s` B‘maVr hmamï´> amÁ` nmocrg J¥h{Z‘m©U d {ZdmgñWmZo ~m§YH$m‘ {X. 31/08/2009 gXa àH$ënmMo A§Xm{OV ‘wë` ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ amoOr gwé H$aÊ`mV Amcoco Amho. àH$ënmMo `2424.14 cmI hmoVo. H§$ÌmQ>Xma ‘o. ‘§S>imÀ`m {X. 17/08/2009 amoOr AmaoIZ d àH$ën ì`dñWmnZmMo H$m‘ ‘o. àH$me H$m°ÝñQ´>modoc àm. {c., Zm{eH$ `m§Zm g§nÝZ Pmcoë`m 182 ì`m ~¡R>H$s‘Ü`o Mm¡Jwco nmQ>rc H$ÝgëA§Q> àm. {c., gm§Jcr H$amaZm‘m H«$. gr-11/2009-10, {X. Zdr ‘w§~B©, nmocrg Am`wŠV, Zdr ‘w§~B© `m§Zr Ho$coco AgyZ gXa àH$ënmMo EHy$U 31/08/2009 AÝd`o `2461.00 cmI ‘w»`mc`mÀ`m H$i§~mocr `oWo àemgH$s` ~m§YH$m‘ joÌ’$i 14912.05 Mm¡. ‘r. Amho. aH$‘oÀ`m {Z{dXm ‘wë`mg gXa àH$ënmMo B‘maVr ~m§YH$m‘mgmR>r `3014.72 cmI gXa àH$ënm‘Ü`o nmUr nwadR>m, C§Mmdarc H$m‘ XoÊ`mV Amco hmoVo. IMm©g gwYm[aV àemgH$s` ‘mÝ`Vm àXmZ OcHw§$^, ^y{‘JV ObH§w$^, B‘maVrdarc gXa àH$ënmgmR>r ^maV gaH$ma Am{U H$aÊ`mV Amcocr Amho. nmÊ`mMr Q>mH$s, A§VJ©V añVo, A§VJ©V / ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY gXa àH$ënm‘Ü`o Cn nmocrg Am`wŠV ~mh` {dÚwVrH$aU, añË`mdarc {dÚwV H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda `m§Mo H$m`m©c`, amIrd nmocrg {ZarjH$ Im§~, O{ZÌ, g§ajU q^V, VmaoMo Hw§$nZ, `3087.45 cmI IM© Pmcocm Amho. H$m`m©c`, ‘moQ>a n[adhZ H$m`©emim Oc:{ZñgmaU `moOZm, H$dm`Vr ‘¡XmZ, àH$ënmMo H$m‘ {X. 08/02/2012 ‘wcm‘yctMo dgVrJ¥h d ^moOZmc`, O‘rZ gwemo{^H$aU, d¥jmamonU, AmJ amoOr nyU© H$aÊ`mV Amcoo AgwZ {X. ~hþCXXo²{e` g^mJ¥h, àmW{‘H$ Amamo½` Ho$§Ð, à{V~§YH$ `moOZm Am{U A§VJ©V JQ>mao BË`mXr 14/02/2012 amoOr Cn^omJVm {d^mJmg {dlm‘J¥h, ì`m`m‘emim, Cn nmocrg Am`wŠV nm`m^wV ~m~tMm g‘mdoe Ho$cm Amho. hñVm§VarV H$aÊ`mV Amcm Amho. d ghmæ`H$ nmocrg Am`wŠV `m§MogmR>r 12

20 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Navi Mumbai, Administrative Buildings for Commissioner of Police at Kalamboli

he revised administrative been appointed as an Architect and at tender cost amounting to `2461.00 Tapproval amounting to `3014.72 PMC for this project. The total built up lakhs vide contract agreement no. lakhs has been accorded for Navi area of this project is 14912.05 sq. mt. C-11/2009-10, dated 31/08/2009. Mumbai, Administrative Buildings for This project includes all infrastructural The funds are provided by both Commissioner of Police at Kalamboli by amenities viz Water supply, Elevated Government of India and Government of the Board of Directors of Maharashtra Storage Reservoir, Ground Storage Maharashtra. The expenditure incurred State Police Housing & Welfare Reservoir, Overhead Water Tank on on this project is `3087.45 lakhs. The nd Corporation Ltd., Mumbai in its 182 each building, Internal Roads, Internal/ project completed on 08/02/2012 and meeting held on 17/08/2009. External electrification, Street light, handed over to user Department on The project consists of DCP office, Compound Wall & Chain link Wire 14/02/2012. RPI Office, MT Workshop & Garage, Fencing, Sewerage scheme, Parade Departmental Store, Multipurpose Hall, ground, Land scaping, Tree plantation, Primary Health Centre, Boy’s & Girl’s Fire fighting equipments & storm water Hostel. Mess building, Gymnasium drain etc. (Police Club House), 12 quarters for The estimated cost of this project is DCP & ACP and the work has been `2424.14 lakhs. The work of this project started on 31/08/2009. M/s. Chaugule has been awarded to the Contractor M/s. Patil consultant Pvt. Ltd., Sangli has Prakash Constrowell Pvt. Ltd., Nashik

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 21 ZmJnwa, nmocrg Am`wŠV, ZmJnwa `m§MoH$[aVm ~°aoŠg B‘maV hmamï´> amÁ` nmocrg J¥h{Z‘m©U d EHy$U ~m§YH$m‘ joÌ’$i 2377.62 Mm¡. ‘r. ‘wë`mg gXa àH$ënmMo H$m‘ XoÊ`mV Amco ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ Amho. gXa àH$ënm‘Ü`o nmUr nwadR>m, hmoVo. ‘§S>imÀ`m {X. 06/08/2008 amoOr g§nÝZ ^y{‘JV ObH§w$^, B‘maVrdarc nmÊ`mMr gXa àH$ënmgmR>r ^maV gaH$ma Pmcoë`m 178 ì`m ~¡R>H$s‘Ü`o ZmJnwa, Q>mH$s, A§VJ©V añVo, A§VJ©V / ~mh` Am{U ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr nmocrg Am`wŠV, ZmJnwa `m§MoH$[aVm ~°aoŠg {dÚwVrH$aU, añË`mdarc {dÚwV Im§~, CncãY H$éZ XoÊ`mV Amcocm AgyZ B‘maV ~m§YH$m‘mgmR>r `1726.03 cmI Oc:{ZñgmaU `moOZm, O‘rZ gwemo^rH$aU, àH$ënmda `339.85 cmI IM© Pmcocm IMm©g gwYm[aV àemgH$s` ‘mÝ`Vm àXmZ d¥jmamonU BË`mXr nm`m^wV ~m~tMm g‘mdoe Amho. àH$ënmMo H$m‘ {X. 06/05/2011 H$aÊ`mV Amcocr Amho. Ho$cm Amho. amoOr nyU© H$aÊ`mV Amcoo AgwZ {X. gXa àH$ënm‘Ü`o 1 ~°aoŠg B‘maV gXa àH$ënmMo A§Xm{OV ‘wë` 02/06/2011 amoOr Cn^omJVm {d^mJmg ~m§YH$m‘ {X. 21/04/2010 amoOr gwé `243.61 cmI hmoVo. H§$ÌmQ>Xma ‘o. hñVm§VarV H$aÊ`mV Amcm Amho. H$aÊ`mV Amcoco Amho. àH$ënmMo AmaoIZ d {à{Wnmc qgJ, ZmJnwa `m§Zm H$amaZm‘m H«$. àH$ën ì`dñWmnZmMo H$m‘ ‘o. namJ XmVo, gr-01/2010.11, {X. 21/04/2010 ZmJnwa `m§Zr Ho$coco AgyZ gXa àH$ënmMo AÝd`o `225.55 cmI aH$‘oÀ`m {Z{dXm

22 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Nagpur, Barrack Building for CP, Nagpur

he revised administrative approval amenities viz Water supply, Ground Government of India and Government Tamounting to `1726.03 lakhs has Storage Reservoir, Overhead Water of Maharashtra. The expenditure been accorded for Barrack Building for Tank on building, Internal Roads, incurred on this project is `339.85 lakhs. CP, Nagpur at Nagpur by the Board of Internal/ External electrification, Street The project completed on 06/05/2011 Directors of Maharashtra State Police light, Sewerage scheme, Land scaping, and handed over to user Department on Housing & Welfare Corporation Ltd., Tree plantation, etc. 02/06/2011. th Mumbai in its 178 meeting held on The estimated cost of this project is 06/08/2008. `243.61 lakhs. The work of this project The project consists of 1 Barrack has been awarded to the Contractor building and the work has been started M/s. Prithipal Sing, Nagpur at tender on 21/04/2010. M/s. Parag Date, Nagpur cost amounting to `225.55 lakhs vide has been appointed as an Architect and contract agreement no. C-01/2010-11, PMC for this project. The total built up dated 21/04/2010. area of this project is 2377.62 sq. mt. The funds are provided by both This project includes all infrastructural

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 23 Z§Xwa~ma, nmocrg AYrjH$, Z§Xwa~ma ‘w»`mc` àemgH$s` B‘maVr hmamï´> amÁ` nmocrg J¥h{Z‘m©U d H$ë`mU em¡Mmc`o BË`mXr B‘maVtMo ~m§YH$m‘ {X. nm`m^wV ~m~tMm g‘mdoe Ho$cm Amho. ‘‘hm‘§S>imÀ`m g§MmcH$ ‘§S>imÀ`m {X. 31/08/2009 amoOr gwé H$aÊ`mV gXa àH$ënmMo A§Xm{OV ‘wë` 14/11/2007 amoOr g§nÝZ Pmcoë`m Amcoco Amho. àH$ënmMo AmaoIZ ‘o. aMZm `1399.28 cmI hmoVo. H§$ÌmQ>Xma ‘o. ndma 174 ì`m ~¡R>H$s‘Ü`o Z§Xwa~ma, nmocrg {díd, Ywio d àH$ën ì`dñWmnZmMo H$m‘ nmQ>H$a H$ÝñQ´>ŠeZ àm. {c., Zm{eH$ `m§Zm AYrjH$, Z§Xwa~ma ‘w»`mc` àemgH$s` ‘o. qcH$m°c H$ÝñQ´>ŠeZ, Ywio `m§Zr Ho$coco H$amaZm‘m H«$. gr-5/2009-10, {X. B‘maV ~m§YH$m‘mgmR>r `1586.52 cmI AgyZ gXa àH$ënmMo EHy$U ~m§YH$m‘ 31/08/2009 AÝd`o `1297.00 cmI IMm©g àemgH$s` ‘mÝ`Vm àXmZ H$aÊ`mV joÌ’$i 11014.73 Mm¡. ‘r. Amho. gXa aH$‘oÀ`m {Z{dXm ‘wë`mg gXa àH$ënmMo Amcocr Amho. àH$ënm‘Ü`o nmUr nwadR>m, B‘maVrdarc H$m‘ XoÊ`mV Amco hmoVo. gXa àH$ënm‘Ü`o amIrd nmocrg {ZarjH$ nmÊ`mÀ`m Q>mŠ`m, A§VJ©V añVo, A§VJ©V gXa àH$ënmgmR>r ^maV gaH$ma Am{U H$m`m©c`, ‘moQ>a n[adhZ H$m`©emim, / ~mh` {dÚwVrH$aU, añË`mdarc {dÚwV ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY ‘wcm‘yctMo dgVrJ¥h d ^moOZmc`, àmW{‘H$ Im§~, {dÚwV O{ZÌ, g§ajU q^V, VmaoMo H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda Amamo½` Ho$§Ð, {dlm‘J¥h, ì`m`m‘emim, Hw§$nZ, gm§S>nmUr `moOZm, Oc:{ZñgmaU `1557.80 cmI IM© Pmcocm Amho. àmW{‘H$ emim, nmocrg Cn{ZarjH$ `moOZm, IoimMo ‘¡XmZ, O‘rZ gwemo{^H$aU, àH$ënmMo H$m‘ {X. 30/01/2012 amoOr {dlm‘J¥h, ~hþCXX²oer` g^mJ¥h, à{e{jV d¥jmamonU, O‘rZrV nmUr ‘wa{dUo, AmJ nyU© H$aÊ`mV `odyZ àH$ën nmocrg {d^mJmg Hw$Í`m§H$[aVm B‘maV, ì¶mnmar g§Hw$b d à{V~§YH$ `moOZm Am{U A§VJ©V JQ>mao BË`mXr hñVm§V[aV H$aÊ`mV Amcm.

24 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Nandurbar, Administrative Buildings for Superintendent of Police, Nandurbar

he administrative approval on 31/08/2009. M/s. Rachana Vishwa has been awarded to the Contractor M/s. Tamounting to `1586.52 lakhs has been appointed as an Architect and Pawar Patkar Construction Pvt. Ltd. has been accorded for Administrative M/s. Linkall Constructions has been at tender cost amounting to `1297.00 Buildings for Superintendent of Police, appointed as PMC for this project. lakhs vide contract agreement no. Nandurbar at Nandurbar by the Board The total built up area of this project is C-5/2009-10, dated 31/08/2009. of Directors of Maharashtra State Police 11014.73 sq. mt. This project includes The funds are provided by both Housing & Welfare Corporation Ltd., all infrastructural amenities viz Water Government of India and Government of th Mumbai in its 174 meeting held on supply, Overhead Water Tank on each Maharashtra. The expenditure incurred 14/11/2007. building, Internal Roads, Internal/ on this project was `1557.80 lakhs. The The project consists of RPI Office, External electrification, Street light, project completed on 31/01/2012 and MT Workshop & Garage, Boy’s & Girl’s Compound Wall & Chain link fencing, handed over to user Department. Hostel, Mess building, Primary Health Sewerage scheme, Play ground, Land Centre, VIP Guest House, Gymnasium, scaping, Tree plantation, Rain water KG & Primary School, (Police Club harvesting, Fire fighting equipments & House), PSI rest house, Multipurpose storm water drain etc. Hall, Kennel, Departmental Store, Toilet The estimated cost of this project is block etc. The work has been started `1399.28 lakhs. The work of this project

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 25 ‘w§~B©, nmocrg Am`wŠV, ‘w§~B© `m§MoH$[aVm ^m`Iim `oWo dmhVwH$ H$m`m©c` d dgVrJ¥h B‘maVr hmamï´> amÁ` nmocrg J¥h{Z‘m©U d gXa àH$ënmMo EHy$U ~m§YH$m‘ joÌ’$i gXa àH$ënmMo H$m‘ XoÊ`mV Amco hmoVo. ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ 5485.67 Mm¡. ‘r. Amho. gXa àH$ënm‘Ü`o gXa àH$ënmgmR>r ^maV gaH$ma Am{U ‘§S>imÀ`m {X. 17/08/2009 amoOr ^y{‘JV ObH§w$^, B‘maVrdarc nmÊ`mMr ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY g§nÝZ Pmcoë`m 182 ì`m ~¡R>H$s‘Ü`o ‘w§~B©, Q>mH$s, A§VJ©V / ~mh` {dÚwVrH$aU, H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda nmocrg Am`wŠV, ‘w§~B© `m§MoH$[aVm ^m`Iim añË`mdarc {dÚwwV Im§~, g§ajU q^V, `1092.57 cmI IM© Pmcocm Amho. `m `oWo dmhVwH$ H$m`m©c` d dgVrJ¥h B‘maVr VmaoMo Hw§$nU, Oc:{ZñgmaU `moOZm, O‘rZ àH$ënmMo H$m‘ {X. 30/10/2011 amoOr nyU© ~m§YH$m‘mgmR>r `1128.07 cmI IMm©g gwemo{^H$aU, d¥jmamonU, AmJ à{V~§YH$ H$aÊ`mV Amcoo AgwZ {X.15/12/2011 gwYm[aV àemgH$s` ‘mÝ`Vm àXmZ H$aÊ`mV `moOZm Am{U A§VJ©V JQ>mao BË`mXr nm`m^wV amoOr Cn^om³Vm {d^mJmg hñVm§VarV Amcocr Amho. ~m~tMm g‘mdoe Ho$cm Amho. H$aÊ`mV Amcm Amho. gXa àH$ënm‘Ü`o 2 B‘maVr ~m§YH$m‘ gXa àH$ënmMo A§Xm{OV ‘wë` `941.44 {X. 31/08/2009 amoOr gwé H$aÊ`mV cmI hmoVo. H§$ÌmQ>Xma ‘o. B©Jc H$ÝñQ´>ŠeZ, Amcoco Amho. àH$ënmMo AmaoIZ ‘o. O`§V CëhmgZJa `m§Zm H$amaZm‘m H«$. gr-9, {Q>nUrg, ‘w§~B© d àH$ën ì`dñWmnZmMo H$m‘ 2009-10, {X. 31/08/2009 AÝd`o ‘hm‘§S>imÀ¶m A{^`§Ë¶mZr Ho$coco AgyZ `916.79 cmI aH$‘oÀ`m {Z{dXm ‘wë`mg

26 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Mumbai, Traffic office & Hostel Building for CP, Mumbai at Byculla

he revised administrative approval includes all infrastructural amenities viz The funds are provided by both Tamounting to `1128.07 lakhs has Ground Storage Reservoir, Overhead Government of India and Government of been accorded for Mumbai, Traffic office Water tank on each building, Internal/ Maharashtra. The expenditure incurred & Hostel Building for CP, Mumbai at External electrification, Street light, on this project is `1092.57 lakhs. The Byculla by the Board of Directors of Compound Wall & Chain link fencing, project completed on 30/10/2011 and Maharashtra State Police Housing & Sewerage scheme, Land scaping, Tree handed over to user Department on Welfare Corporation Ltd., Mumbai in its plantation, Fire Fighting Equipments, 15/12/2011. 182nd meeting held on 17/08/2009. storm water drain etc. The project consists of 2 The estimated cost of this project is administrative building and the work has `941.44 lakhs. The work of this project been started on 31/08/2009. M/s. Jayant has been awarded to the Contractor M/s. Tipnis, Mumbai has been appointed Eagle Construction, Ulhasnagar at tender as an Architect and PHC Engineer has cost amounting to `916.79 lakhs vide been appointed as PMC for this project. contract agreement no. C-9, 2009-10, The total built up area of this project dated 31/08/2009. is 5485.67 sq. mt. This project also

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 27 ‘w§~B©, nmocrg à{ejU Ho$§Ð, ‘amoi `m§MoH$[aVm dgVrJ¥h Z§.2 B‘maV hmamï´> amÁ` nmocrg J¥h{Z‘m©U d EHy$U ~m§YH$m‘ joÌ’$i 6502.11 Mm¡. ‘r. gXa àH$ënmMo H$m‘ XoÊ`mV Amco hmoVo. ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ Amho. gXa àH$ënm‘Ü`o ^y{‘JV ObH§w$^, gXa àH$ënmgmR>r ^maV gaH$ma Am{U ‘§S>imÀ`m {X. 29/06/2009 amoOr g§nÝZ B‘maVrdarc nmÊ`mMr Q>mH$s, A§VJ©V añVo, ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY Pmcoë`m 181 ì`m ~¡R>H$s‘Ü`o ‘w§~B©, nmocrg A§VJ©V / ~mh` {dÚwVrH$aU, añË`mdarc H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda à{ejU Ho$§Ð, ‘amoi `m§MoH$[aVm dgVrJ¥h {dÚwV Im§~, g§ajU q^V, VmaoMo Hw§$nZ, `991.13 cmI IM© Pmcocm Amho. `m Z§.2 B‘maV ~m§YH$m‘mgmR>r `929.48 Oc:{ZñgmaU `moOZm, O‘rZ gwemo{^H$aU, àH$ënmMo H$m‘ {X. 15/04/2011 cmI IMm©g gwYm[aV àemgH$s` ‘mÝ`Vm d¥jmamonU, AmJ à{V~§YH$ `moOZm Am{U amoOr nyU© H$aÊ`mV Amcoo AgwZ {X. àXmZ H$aÊ`mV Amcocr Amho. A§VJ©V JQ>mao BË`mXr nm`m^wV ~m~tMm 10/05/2011 amoOr Cn^om³Vm {d^mJmg gXa àH$ënm‘Ü`o 1 dgVrJ¥h B‘maV g‘mdoe Ho$cm Amho. hñVm§VarV H$aÊ`mV Amcm Amho. ~m§YH$m‘ {X. 31/08/2009 amoOr gwê$ gXa àH$ënmMo A§Xm{OV ‘wë` `792.22 H$aÊ`mV Amcoco Amho. àH$ënmMo AmaoIZ cmI hmoVo. H§$ÌmQ>Xma ‘o. B©Jc H$ÝñQ´>ŠeZ, ‘o. gnZm R>mZmdmcm, ‘w§~B© d àH$ën CëhmgZJa `m§Zm H$amaZm‘m H«$. gr-10, ì`dñWmnZmMo H$m‘ ‘o. dràm H$ÝgëQ>§Q>, 2009-10, {X. 31/08/2009 AÝd`o ‘w§~B© `m§Zr Ho$coco AgyZ gXa àH$ënmMo `754.68 cmI aH$‘oÀ`m {Z{dXm ‘wë`mg

28 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Mumbai, Hostel Building No. 2 for Police Training School, Marol

he revised administrative approval includes all infrastructural amenities viz The funds are provided by both Tamounting to `929.48 lakhs has Ground Storage Reservoir, Overhead Government of India and Government been accorded for Mumbai, Hostel Water Tank on building, Internal road, of Maharashtra. The expenditure Building No. 2 for Police Training Internal/ External electrification, incurred on this project is `991.13 lakhs. School, Marol by the Board of Directors Street light, Compound Wall & Chain The project completed on 15/04/2011 of Maharashtra State Police Housing & link fencing, Sewerage scheme, Land and handed over to user Department on Welfare Corporation Ltd., Mumbai in scaping, Tree plantation, Fire fighting 10/05/2011. its 181st meeting held on 29/06/2009. equipments, storm water drain etc. The project consists of 1 Hostel The estimated cost of this project is building and the work has been started `792.22 lakhs. The work of this project on 31/08/2009. M/s. Sapana Thanawala, has been awarded to the Contractor Mumbai has been appointed as an M/s. Eagle Construction, Ulhasnagar Architect and M/s. Vipra Consultant, at tender cost amounting to `754.68 Mumbai has been appointed as PMC for lakhs vide contract agreement no. C-10, this project. The total built up area of this 2009-10, dated 31/08/2009. project is 6502.11 sq. mt. This project

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 29 gmocmnya, nmocrg Am`wŠV, gmocmnya H$m`m©c` àemgH$s` B‘maV hmamï´> amÁ` nmocrg J¥h{Z‘m©U d Ho$coco AgyZ gXa àH$ënmMo EHy$U ~m§YH$m‘ `m§Zm H$amaZm‘m H«$. gr-16/2009-10, ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ joÌ’$i 4574.25 Mm¡. ‘r. Amho. gXa {X. 01/12/2009 AÝd`o `665.55 ‘§S>imÀ`m {X. 17/08/2009 amoOr àH$ënm‘Ü`o nmUr nwadR>m, ^y{‘JV ObHw§$^, cmI aH$‘oÀ`m {Z{dXm ‘wë`mg gXa g§nÝZ Pmcoë`m 182 ì`m ~¡R>H$s‘Ü`o B‘maVrdarc nmÊ`mMr Q>mH$s, A§VJ©V añVo, àH$ënmMo H$m‘ XoÊ`mV Amco hmoVo. gmocmnya, nmocrg Am`wŠV, gmocmnya A§VJ©V / ~mh` {dÚwVrH$aU, añË`mdarc gXa àH$ënmgmR>r ^maV gaH$ma H$m`m©c` àemgH$s` B‘maV ~m§YH$m‘mgmR>r {dÚwwV Im§~, {dÚwwV O{ZÌ, g§ajU q^V, Am{U ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr `834.26 cmI IMm©g gwYm[aV àemgH$s` gm§S>nmUr ¶moOZm, Oc:{ZñgmaU `moOZm, CncãY H$éZ XoÊ`mV Amcocm AgyZ ‘mÝ`Vm àXmZ H$aÊ`mV Amcocr Amho. O‘rZ gwemo^rH$aU, d¥jmamonU, O‘rZrV àH$ënmda `770.37 cmI IM© Pmcocm gXa àH$ënm‘Ü`o 1 àemgH$s` B‘maV nmUr ‘wa{dUoo Am{U A§VJ©V JQ>mao BË`mXr Amho. àH$ënmMo H$m‘ {X. 09/02/2012 ~m§YH$m‘ {X. 01/12/2009 amoOr gwé nm`m^wV ~m~tMm g‘mdoe Ho$cm Amho. amoOr nyU© H$aÊ`mV Amcoo AgwZ Cn^omJVm H$aÊ`mV Amcoco Amho. àH$ënmMo AmaoIZ gXa àH$ënmMo A§Xm{OV ‘wë` {d^mJmg hñVm§VarV H$aÊ`mV Amcm Amho. d àH$ën ì`dñWmnZmMo H$m‘ ‘o. Mm¡Jwco `711.61 cmI hmoVo. H§$ÌmQ>Xma ‘o. nmQ>rc H$ÝgëQ>§Q> àm. {c./, gm§Jcr `m§Zr ñH$m`cmH©$ BÝ’«$m àmoOoŠQ> àm. {c., nwUo

30 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Administrative Building for Commissioner of Police, Solapur

The revised administrative approval of this project is 4574.25 sq. mt. This at tender cost amounting to `665.55 amounting to `834.26 lakhs has been project also includes all infrastructural lakhs vide contract agreement no. accorded for Administrative Building amenities viz Water supply, Ground C-16/2009-10, dated 01/12/2009. for Commissioner of Police, Solapur Storage Reservoir, Overhead Water The funds are provided by both at Solapur by the Board of Directors of Tank on building, Internal road, Internal/ Government of India and Government of Maharashtra State Police Housing & External electrification, Street light, DG Maharashtra. The expenditure incurred Welfare Corporation Ltd., Mumbai in its set, Compound wall, Sewerage scheme, on this project `770.37 lakhs. The nd 182 meeting held on 17/08/2009. SIBF system, Land scaping, Tree project completed on 09/02/2012 and The project consists of 1 Administrative plantation, Rain water Harvesting, storm handed over to user Department. Building and the work has been started water drain etc. on 01/12/2009. M/s. Chaugule Patil The estimated cost of this project is Consultant Pvt. Ltd., Sangli has been `711.61 lakhs. The work of this project appointed as an Architect as well as PMC has been awarded to the Contractor M/s. for this project. The total built up area Skylark Infra Project Pvt. Ltd., Pune

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 31 na^Ur, nmocrg AYrjH$, na^Ur `m§MoH$[aVm àemgH$s` B‘maV

hmamï´> amÁ` nmocrg J¥h{Z‘m©U d EHy$U ~m§YH$m‘ joÌ’$i 4140.48 Mm¡. AÝd`o `515.31 cmI aH$‘oÀ`m {Z{dXm ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ ‘r. Amho. gXa àH$ënm‘Ü`o nmUr nwadR>m, ‘wë`mg gXa àH$ënmMo H$m‘ XoÊ`mV Amco ‘§S>imÀ`m {X. 17/08/2009 amoOr g§nÝZ ^y{‘JV ObH§w$^, B‘maVrdarc nmÊ`mMr hmoVo. Pmcoë`m 182 ì`m ~¡R>H$s‘Ü`o na^Ur, Q>mH$s, A§VJ©V añVo, A§VJ©V / ~mh` gXa àH$ënmgmR>r ^maV gaH$ma Am{U nmocrg AYrjH$, na^Ur `m§MoH$[aVm {dÚwVrH$aU, añË`mdarc {dÚwV Im§~, ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY àemgH$s` B‘maV ~m§YH$m‘mgmR>r `646.71 {dÚwV O{ZÌ, g§ajU q^V, Oc:{ZñgmaU H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda cmI IMm©g gwYm[aV àemgH$s` ‘mÝ`Vm `moOZm, O‘rZ gwemo^rH$aU, d¥jmamonU `572.41 cmI IM© Pmcocm Amho. `m àXmZ H$aÊ`mV Amcocr Amho. Am{U A§VJ©V JQ>mao BË`mXr nm`m^wV ~m~tMm àH$ënmMo H$m‘ {X. 15/11/2011 gXa àH$ënm‘Ü`o 1 B‘maV ~m§YH$m‘ g‘mdoe Ho$cm Amho. amoOr nyU© H$aÊ`mV Amcoo AgwZ {X. {X. 01/12/2009 amoOr gwé H$aÊ`mV gXa àH$ënmMo A§Xm{OV ‘wë` `579.49 29/11/2011 amoOr Cn^omJVm {d^mJmg Amcoco Amho. àH$ënmMo AmaoIZ d àH$ën cmI hmoVo. H§$ÌmQ>Xma ‘o. àH$me H$m°ÝñQ´>modoc, hñVm§VarV H$aÊ`mV Amcm Amho. ì`dñWmnZmMo H$m‘ ‘o. ndZ B§{O{ZAg©, ZmerH$ `m§Zm H$amaZm‘m H«$. gr- cmVwa `m§Zr Ho$coco AgyZ gXa àH$ënmMo 15/2009-10, {X. 01/12/2009

32 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Parbhani, Administrative Building for SP, Parbhani

he revised administrative approval also includes all infrastructural amenities The funds are provided by both Tamounting to `646.71 lakhs has been viz Water supply, Ground Storage Government of India and Government of accorded for Parbhani, Administrative Reservoir, Overhead Water Tank on Maharashtra. The expenditure incurred Building for SP, Parbhani by the Board each building, Internal Roads, Internal/ on this project is `572.41 lakhs. The of Directors of Maharashtra State Police External electrification, Street light, DG project completed on 15/11/2011 and Housing & Welfare Corporation Ltd., set, Compound Wall, Sewerage scheme, handed over to user Department on Mumbai in its 182nd meeting held on Land scaping, Tree plantation, storm 29/11/2011. 17/08/2009. water drain etc. The project consists of 1 The estimated cost of this project is administrative building and the work has `579.49 lakhs. The work of this project been started on 01/12/2009. M/s. Pawan has been awarded to the Contractor M/s. Engineers, Latur has been appointed Prakash Constrowell, Nashik at tender as an Architect as well as PMC for this cost amounting to `515.31 lakhs vide project. The total built up area of this contract agreement no. C-15/2009-10, project is 4140.48 sq. mt. This project dated 01/12/2009.

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 33 am`JS>, nmocrg AYrjH$, am`JS> `m§MoH$[aVm Acr~mJ `oWo àemgH$s` B‘maV

hmamï´> amÁ` nmocrg J¥h{Z‘m©U d H$ë`mU Ho$coco AgyZ gXa àH$ënmMo EHy$U ~m§YH$m‘ AÝd`o `417.75 cmI aH$‘oÀ`m {Z{dXm ‘‘hm‘§S>imÀ`m g§MmcH$ ‘§S>imÀ`m {X. joÌ’$i 2729.33 Mm¡. ‘r. Amho. gXa ‘wë`mg gXa àH$ënmMo H$m‘ XoÊ`mV Amco 06/08/2008 amoOr g§nÝZ Pmcoë`m 178 àH$ënm‘Ü`o nmUr nwadR>m, ^y{‘JV ObH§w$^, hmoVo. ì`m ~¡R>H$s‘Ü`o am`JS>, nmocrg AYrjH$, B‘maVrdarc nmÊ`mMr Q>mH$s, A§VJ©V añVo, gXa àH$ënmgmR>r ^maV gaH$ma Am{U am`JS> `m§MoH$[aVm Acr~mJ `oWo àemgH$s` A§VJ©V / ~mh` {dÚwVrH$aU, añË`mdarc ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY B‘maV ~m§YH$m‘mgmR>r `506.88 cmI {dÚwV Im§~, VmaoMo Hw§$nZ, Oc:{ZñgmaU H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda IMm©g àemgH$s` ‘mÝ`Vm àXmZ H$aÊ`mV `moOZm, O‘rZ gwemo{^H$aU, d¥jmamonU, `499.20 cmI IM© Pmcocm Amho. Amcocr Amho. AmJ à{V~§YH$ `moOZm Am{U A§VJ©V JQ>mao àH$ënmMo H$m‘ {X. 10/02/2012 gXa àH$ënm‘Ü`o EH$ B‘maV (Vi+1 BË`mXr nm`m^wV ~m~tMm g‘mdoe Ho$cm Amho. amoOr nyU© H$aÊ`mV Amcoo AgwZ {X. ‘Ocm) ~m§YH$m‘ {X. 29/04/2010 gXa àH$ënmMo A§Xm{OV ‘wë` `393.30 21/02/2012 amoOr Cn^omJVm {d^mJmg amoOr gwé H$aÊ`mV Amcoco Amho. àH$ënmMo cmI hmoVo. H§$ÌmQ>Xma ‘o. qMVm‘Ur àmoOoŠQ>g hñVm§VarV H$aÊ`mV Amcm Amho. AmaoIZ d àH$ën ì`dñWmnZmMo H$m‘ ‘o. àm. {b., A{c~mJ `m§Zm H$amaZm‘m H«$. gr. ~r. Oomer, amohm, {Oëhm am¶JS> `m§Zr gr-02/2010-11, {X. 29/04/2010

34 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Raigad, Administrative Building for SP, Raigad at Alibag

he administrative approval project also includes all infrastructural C-02/2010-11, dated 29/04/2010. Tamounting to `506.88 lakhs has amenities viz Water supply, Ground The funds are provided by both been accorded for Raigad, Administrative Storage Reservoir, Overhead Water Government of India and Government of Building for SP, Raigad at Alibag by the Tank on each building, Internal Roads, Maharashtra. The expenditure incurred Board of Directors of Maharashtra State Internal/ External electrification, Street on this project is `499.20 lakhs. The Police Housing & Welfare Corporation light, DG set, Chain link fencing, project completed on 10/02/2012 and th Ltd., Mumbai in its 178 meeting held Sewerage scheme, Land scaping, Tree handed over to user Department on on 06/08/2008. plantation, Fire fighting equipments, 21/02/2012. The project consists of one storm water drain etc. administrative building (G+1) and the The estimated cost of this project is work has been started on 29/04/2010. `393.20 lakhs. The work of this project M/s. C.B. Joshi, Roha, Dist. Raigad has has been awarded to the Contractor M/s. been appointed as an Architect and PMC Chintamani Projects Pvt. Ltd., Alibag for this project. The total built up area at tender cost amounting to `417.75 of this project is 2729.33 sq. mt. This lakhs vide contract agreement no.

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 35 Zm§XoS>, {deof nmocrg ‘hm{ZarjH$, Zm§XoS> `m§MoH$[aVm àemgH$s` B‘maV hmamï´> amÁ` nmocrg J¥h{Z‘m©U d àH$ënmMo EHy$U ~m§YH$m‘ joÌ’$i 1985.08 ‘wë`mg gXa àH$ënmMo H$m‘ XoÊ`mV Amco ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ Mm¡. ‘r. Amho. gXa àH$ënm‘Ü`o nmUr hmoVo. ‘§S>imÀ`m {X. 06/06/2012 amoOr g§nÝZ nwadR>m, ^y{‘JV OcHw§$^, B‘maVrdarc gXa àH$ënmgmR>r ^maV gaH$ma Am{U Pmcoë`m 195 ì`m ~¡R>H$s‘Ü`o Zm§XoS>, {deof nmÊ`mÀ`m Q>mH$s, A§VJ©V añVo, A§VJ©V / ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY nmocrg ‘hm{ZarjH$, Zm§XoS> `m§MoH$[aVm ~mh` {dÚwVrH$aU, añË`mdarc {dÚwV Im§~, H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda àemgH$s` B‘maV ~m§YH$m‘mgmR>r `515.66 {dÚwV O{ZÌ, g§ajU q^V, Oc:{ZñgmaU `514.13 cmI IM© Pmcocm Amho. `m cmI IMm©g gw-gwYm[aV àemgH$s` `moOZm, O‘rZ gwemo{^H$aU, d¥jmamonU, àH$ënmMo H$m‘ {X. 15/11/2011 ‘mÝ`Vm àXmZ H$aÊ`mV Amcocr Amho. AmJ à{V~§YH$ `moOZm Am{U A§VJ©V JQ>mao amoOr nyU© H$aÊ`mV Amcoo AgwZ {X. gXa àH$ënm‘Ü`o 1 B‘maV ~m§YH$m‘ BË`mXr nm`m^wV ~m~tMm g‘mdoe Ho$cm Amho. 12/12/2011 amoOr Cn^omJVm {d^mJmg {X. 01/12/2009 amoOr gwé H$aÊ`mV gXa àH$ënmMo A§Xm{OV ‘wë` `342.90 hñVm§VarV H$aÊ`mV Amcm Amho. Amcoco Amho. àH$ënmMo AmaoIZ ‘o. ZmS>H$Uu cmI hmoVo. Va H§$ÌmQ>Xma ‘o. gÝ‘mZ ‘hmOZ Agmo{gEQ>g², Am¡a§Jm~mX d àH$ën H$ÝñQ´>ŠeZ, Zm§XoS> `m§Zm H$amaZm‘m H«$. ì`dñWmnZmMo H$m‘ ‘o. AVwc R>m|~ao gr-17/2009-10, {X. 01/12/2009 Agmo{gEQ>g², cmVya `m§Zr Ho$coco AgyZ gXa AÝd`o `333.00 cmI aH$‘oÀ`m {Z{dXm

36 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Nanded, Administrative Building for IGP Nanded.

he Re-revised administrative up area of this project is 1985.08 sq. mt. contract agreement no. C-17/2009-10, Tapproval amounting to `515.66 The project includes all infrastructural dated 01/12/2009. lakhs has been accorded for amenities viz water supply scheme, ESR, The funds provided by both Administrative Building for IGP Nanded GSR, Overhead Water Tank, Internal Government of India and Government of at Nanded by the Board of Directors of Roads, Internal/ External electrification, Maharashtra. The expenditure incurred Maharashtra State Police Housing & street light, DG set, Compound Wall on this project was `514.13 lakhs. The Welfare Corporation Ltd., Mumbai in & Chain link Wire fencing, Sewerage project completed on 15/11/2011 and th its 195 meeting held on 06/06/2012. scheme, Pared ground, Play ground, handed over to user Department on The project consists of 1 Land scaping, Tree plantation, Fire 12/12/2011. administrative building and the work Fighting Equipments & storm water has been started on 01/12/2009. M/s. drain line etc. Nadkarni Mahajan & Associates, The estimated cost of this project is Aurangabad has been appointed as an `342.90 lakhs. The work of this project Architect and M/s. Atul Thombare & has been awarded to the Contractor M/s. Associates, Latur has been appointed Sanman Construction, Nanded at tender as PMC for this project. The total built cost amounting to `333.00 lakhs vide

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 37 ~rS> A{VarŠV nmocrg AYrjH$ `m§MoH$[aVm A§~oOmoJmB© ¶oWo àemgH$s` B‘maV hmamï´> amÁ` nmocrg J¥h{Z‘m©U d cmVya `m§Zr Ho$coco AgyZ gXa àH$ënmMo H$amaZm‘m H«$. gr-20/2009-10, {X. ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ EHy$U ~m§YH$m‘ joÌ’$i 2816.66 Mm¡. 01/12/2009 AÝd`o `403.33 cmI ‘§S>imÀ`m {X. 17/08/2009 amoOr ‘r. Amho. gXa àH$ënm‘Ü`o nmUr nwadR>m, aH$‘oÀ`m {Z{dXm ‘wë`mg gXa àH$ënmMo g§nÝZ Pmcoë`m 182 ì`m ~¡R>H$s‘Ü`o ^y{‘JV ObH§w$^, B‘maVrdarc nmÊ`mÀ`m H$m‘ XoÊ`mV Amco hmoVo. A§~oOmoJmB©, A{VarŠV nmocrg AYrjH$, Q>mH$s, A§VJ©V añVo, A§VJ©V / ~mh` gXa àH$ënmgmR>r ^maV gaH$ma A§~oOmoJmB© `m§MoH$[aVm àemgH$s` B‘maV {dÚwVrH$aU, añË`mdarc {dÚwwV Im§~, Am{U ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr ~m§YH$m‘mgmR>r `506.18 cmI IMm©g {dÚwwV O{ZÌ, g§ajU q^V, Oc:{ZñgmaU CncãY H$éZ XoÊ`mV Amcocm AgyZ gwYm[aV àemgH$s` ‘mÝ`Vm àXmZ H$aÊ`mV `moOZm, O‘rZ gwemo^rH$aU, d¥jmamonU, àH$ënmda `439.77 cmI IM© Pmcocm Amcocr Amho. Am{U A§VJ©V JQ>mao BË`mXr nm`m^wV Amho. àH$ënmMo H$m‘ {X. 15/11/2011 gXa àH$ënm‘Ü`o 1 B‘maV ~m§YH$m‘ ~m~tMm g‘mdoe Ho$cm Amho. amoOr nyU© H$aÊ`mV Amcoo AgwZ {X. {X. 01/12/2009 amoOr gwé H$aÊ`mV gXa àH$ënmMo A§Xm{OV ‘wë` 14/12/2011 amoOr Cn^omJVm {d^mJmg Amcoco Amho. àH$ënmMo AmaoIZ d àH$ën `455.65 cmI hmoVo. H§$ÌmQ>Xma hñVm§VarV H$aÊ`mV Amcm Amho. ì`dñWmnZmMo H$m‘ ‘o. ndZ B§{O{Z`g©, ‘o. gmaS>m H$ÝñQ´>ŠeZ, ~rS> `m§Zm

38 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Beed, Administrative Building for Additional Superintendent of Police at Ambejogai

he revised administrative approval project is 2816.66 sq.mt. The project dated 01/12/2009. Tamounting to `506.18 lakhs has includes all infrastructural amenities The funds are provided by both been accorded for Administrative viz Water supply, Ground Storage Government of India and Government of Building for Additional Superintendent Reservoir, Overhead Water Tank on Maharashtra. The expenditure incurred of Police, Ambejogai by the Board of each building, Internal Roads, Internal/ on this project was `439.77 lakhs. The Directors of Maharashtra State Police External electrification, Street light, DG project completed on 15/11/2011 and Housing & Welfare Corporation Ltd., set, Compound Wall, Sewerage scheme, handed over to user Department on nd Mumbai in its 182 meeting held on Land scaping, Tree plantation, Rain 04/12/2011. 17/08/2009. water harvesting, storm water drain etc. The project consists of 1 The estimated cost of this project is administrative building and the work has `455.65 lakhs. The work of this project been started on 01/12/2009. M/s. Pawan has been awarded to the Contractor M/s. Engineers, Latur has been appointed as Sarada Construction, Beed at tender an Architect and also as PMC for this cost amounting to `403.33 lakhs vide project. The total built up area of this contract agreement no. C-20/2009-10,

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 39 Mumbai, Traffic office & Hostel Building for CP, Mumbai at Byculla

40 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 WORK IN PROGRESS IN 2011 - 12

1) Thane, 260 quarters for Commissioner of Police, Thane at Thane 2) Solapur, 197 quarters for SRPF Gr. X, Solapur at Solapur 3) Navi Mumbai, 171 quarters for SRPF Gr. XI, Navi Mumbai at Balegaon 4) Mumbai, 64 quarters for Commissioner of Police, Mumbai at Ghatkopar 5) Aurangabad, 56 quarters for Commissioner of Police, Aurangabad 6) Sindhudurg, 40 quarters for Superintendent of Police, Sindhudurg at Oras 7) Raigad, 36 quarters for Superintendent of Police, Raigad at Alibag 8) Mumbai, 24 quarters for Senior Police officer at Malbar Hill, Mumbai 9) Mumbai, Administrative, Hostel Building & 96 quarters for Force One, Mumbai at Goregaon 10) Mumbai, Administrative Building for Commissioner of Police, Mumbai at Crawford Market 11) Amravati, Administrative Building for Commissioner of Police, Amravati 12) Thane Administrative Building for Superintendent of Police, Thane (Rural) at Thane 13) Osmanabad, Barracks Building for 400 Policemen at Tuljapur

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 41 R>mUo, nmocrg Am`wŠV, R>mUo `m§MoH$[aVm R>mUo `oWo 260 {ZdmgñWmZo ~m§YH$m‘ H$aUo hmamï´> amÁ` nmocrg J¥h{Z‘m©U d ObH§w$^, B‘maVrdarc nmÊ`mÀ`m Q>mŠ`m, nm{hcoco Amho. àH$ënmMo A§Xm{OV ‘wë` ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ A§VJ©V añVo, A§VJ©V / ~mh` {dÚwVrH$aU, `3712.87 cmI hmoVo. H§$ÌmQ>Xma ‘o. ‘§S>imÀ`m {X. 14/11/2007 amoOr añË`mdarc {dÚwV Im§~, {dÚwV O{ZÌ, AO`{Xn Ý`w Q>mCZ So>ìhcng© àm. {c. `m§Zm g§nÝZ Pmcoë`m 174 ì`m ~¡R>H$s‘Ü`o R>mUo, g§ajU q^V, Oc:{ZñgmaU `moOZm, O‘rZ H$amaZm‘m H«$. gr-13/2009-10, {X. nmocrg Am`wŠV, R>mUo `m§MoH$[aVm R>mUo `oWo gwemo{^H$aU, d¥jmamonU, O‘rZrV nmUr 31/08/2009 AÝd`o `3574.74 cmI 260 {ZdmgñWmZo ~m§YH$m‘ H$aUogmR>r ‘wa{dUo, AmJ à{V~§YH$ `moOZm, gm¡a CO} aH$‘oÀ`m {Z{dXm ‘wë`mg gXa àH$ënmMo `5657.58 cmI IMm©g àemgH$s` nmgyZ Ja‘ nmUr H$aʶmMr `moOZm Am{U H$m‘ XoÊ`mV Amco hmoVo. ‘mÝ`Vm àXmZ H$aÊ`mV Amcocr Amho. A§VJ©V JQ>mao BË`mXr nm`m^wV ~m~tMm gXa àH$ënmgmR>r ^maV gaH$ma Am{U gXa àH$ënm‘Ü`o Q>mB©n-2 Mr 208 g‘mdoe Ho$cm Amho. ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY {ZdmgñWmZo d Q>mB©n-3 Mr 52 {ZdmgñWmZo àH$ënmgmR>r ‘o. A{M©Zmodm {S>PmB©Z, H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda A§V^w©V AmhoV. àH$ënmVrc gd© B‘maVrMo R>mUo `m§Zr dmñVw{demaX Am{U ‘o. Q>m|Jgo `4719.47 cmI IM© Pmcocm Amho. EHy$U ~m§YH$m‘ joÌ’$i 19024.97 Mm¡. Am{U nmQ>rc B§{O{ZAg©, A‘amdVr `m§Zr àH$ënmMo H$m‘ OmZodmar 2013 amoOr nyU© ‘r. Amho. àH$ënm‘Ü`o nmUr nwadR>m, ^y{‘JV àH$ën ì`dñWmnZ g„mJma åhUyZ H$m‘ hmoUma Amho.

42 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Thane, 260 quarters for Commissioner of Police, Thane at Thane

he administrative approval Internal/ External electrification, `3574.74 lakhs vide contract agreement Tamounting to `5657.58 lakhs has Street light, DG sets, Compound Wall, no. C-13/2009-10, dated 31/08/2009. been accorded for Construction of 260 Sewerage scheme, Land scaping, Tree The funds are provided by both quarters for Commissioner of Police, plantation, Rain water Harvesting, Fire Government of India and Government of Thane at Thane by the Board of Directors Fighting Equipments, storm water drain Maharashtra. The expenditure incurred of Maharashtra State Police Housing & & solar water heater system etc. on this project is `4719.47 lakhs. This Welfare Corporation Ltd., Mumbai in its M/s. Archinova Design, Thane has project will be completed on or before th 174 meeting held on 14/11/2007. worked as an Architect and M/s. Tongse January 2013. The project consists of Type-II – 208 & Patil Engineers, Amravati as a Project quarters & Type-II – 52 quarters. The total Management Consultant for this project. built up area of this project is 19024.97 The estimated cost of this project is sq. mt. Project includes all infrastructural `3712.87 lakhs. The work of this project amenities viz Water supply, Ground has been awarded to the Contractor Storage Reservoir, Overhead Water M/s. Ajaydeep New Town Developers Tank on each building, Internal Roads, Pvt. Ltd. at tender cost amounting to

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 43 gmocmnwa, amÁ` amIrd nmocrg ~c JQ> H«$. 10 `m§MoH$[aVm gmocmnwa `oWo 197 {ZdmgñWmZo ~m§YH$m‘ H$aUo hmamï´> amÁ` nmocrg J¥h{Z‘m©U d joÌ’$i 15025.11 Mm¡. ‘r. Amho. gXa `2235.52 cmI hmoVo. H§$ÌmQ>Xma ‘o. ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ àH$ënm‘Ü`o nmUr nwadR>m `moOZm, C§Mmdarc ecmH$m BÝ’«$m-Q>oH$ àm.{c., nwUo `m§Zm ‘§S>imÀ`m {X. 12/06/2002 amoOr OcHw§$^, ^y{‘JV ObH§w$^, B‘maVrdarc H$amaZm‘m H«$. gr-2/2009-10, {X. g§nÝZ Pmcoë`m 130 ì`m ~¡R>H$s‘Ü`o amÁ` nmÊ`mÀ`m Q>mŠ`m, A§VJ©V añVo, A§VJ©V 26/05/2009 AÝd`o `2072.80 cmI am{Id nmocrg ~c JQ> H«$. 10 `m§MoH$[aVm / ~mh` {dÚwVrH$aU, añË`mdarc {dÚwwV aH$‘oÀ`m {Z{dXm ‘wë`mg gXa àH$ënmMo gmocmnwa `oWo 197 {ZdmgñWmZo ~m§YH$m‘ Im§~, VmaoMo Hw§$nU, Oc:{ZñgmaU `moOZm, H$m‘ XoÊ`mV Amco hmoVo. H$aUogmR>r `3028.27 cmI IMm©g O‘rZ gwemo^rH$aU, d¥jmamonU Am{U gXa àH$ënmgmR>r ^maV gaH$ma d àemgH$s` ‘mÝ`Vm àXmZ H$aÊ`mV Amcocr O‘rZrV nmUr ‘wa{dUo BË`mXr nm`m^wV ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY Amho. ~m~tMm g‘mdoe Ho$cm Amho. H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda gXa àH$ënm‘Ü`o Q>mB©n-2 Mr 178 àH$ënmgmR>r ‘o. Eg. Or. gwio, nwUo `2429.46 cmI IM© Pmcocm Amho. {ZdmgñWmZo, Q>mB©n-3 Mr 14 {ZdmgñWmZo, `m§Zr dmñVw{demaX Am{U ‘o. Mm¡Jwco àH$ënmMo H$m‘ ‘o 2012 ‘Ü`o nyU© hmoUma Q>mB©n-4 Mr 4 {ZdmgñWmZo Am{U nmQ>rc H$ÝgëQ>§Q> àm. {c., gm§Jcr Amho. Q>mB©n-6 Mo 1 {ZdmgñWmZ A§V^w©V AmhoV. àH$ën ì`dñWmnZ g„mJma åhUyZ H$m‘ àH$ënmVrc gd© B‘maVrMo EHy$U ~m§YH$m‘ nm{hcoco Amho. àH$ënmMo A§Xm{OV ‘wë`

44 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Solapur, 197 quarters for SRPF Gr. X, Solapur at Solapur

he administrative approval Internal/ External electrification, Street Maharashtra. The expenditure incurred Tamounting to `3028.27 lakhs has light, Wire Fencing, Sewerage scheme, on this project is ` 2429.46 lakhs. The been accorded for Construction of 197 Land scaping & tree plantation & Rain project will be completed on or before quarters for SRPF Gr. X, Solapur at water Harvesting etc. May 2012. Solapur by the Board of Directors of M/s. S. G. Sule, Pune has worked Maharashtra State Police Housing & as an Architect and M/s Chaugule Patil Welfare Corporation Ltd., Mumbai in its consultant Pvt. Ltd, Sangli as a Project th 130 meeting held on 12.06.2002. Management Consultant for this project. The project consists of Type-II – 178 The estimated cost of this project is qtrs., Type-III – 14 qtrs., Type-IV – 4 `2235.52 lakhs. The work of this project qtrs. & Type-VI – 1 qtr. The total built has been awarded to the Contractor M/s. up area of this project is 15025.11 sq. Shalaka Infra-Tech Pvt. Ltd. at tender mt. Project includes all infrastructural cost amounting to `2072.80 lakhs vide amenities viz Water supply scheme, contract agreement no. C-2/2009-10, Elevated Storage Reservoir, Ground dated 26/05/2009. Storage Reservoir, Overhead Water The funds are provided by both Tank on each building, Internal Roads, Government of India and Government of

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 45 Zdr ‘w§~B©, amÁ` ampId nmocrg ~c JQ> H«$. 11 `m§MoH$[aVm ~mioJmd `oWo 171 {ZdmgñWmZo ~m§YH$m‘ H$aUo hmamï´> amÁ` nmocrg J¥h{Z‘m©U d EHy$U ~m§YH$m‘ joÌ’$i 19520 Mm¡. ‘r. àm. {c., Zm{eH$ `m§Zm H$amaZm‘m H«$. ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ Amho. gXa àH$ënm‘Ü`o nmUr nwadR>m, gr-06/2009-10, {X. 31/08/2009 ‘§S>imÀ`m {X. 17/08/2009 amoOr O{‘ZrImcrc nmÊ`mMr Q>mH$s, A§VJ©V añVo, AÝd`o `3003.54 cmI aH$‘oÀ`m {Z{dXm g§nÝZ Pmcoë`m 182 ì`m ~¡R>H$s‘Ü`o Zdr A§VJ©V / ~mh` {dÚwVrH$aU, añË`mdarc ‘wë`mg gXa àH$ënmMo H$m‘ XoÊ`mV Amco ‘w§~B©, amÁ` am{Id nmocrg ~c JQ> H«$. 11 {dÚwV Im§~, g§ajU q^V, gm§S>nmUr hmoVo. `m§MoH$[aVm ~mioJmd `oWo 171 {ZdmgñWmZo `moOZm, Oc:{ZñgmaU `moOZm, ‘wcm§À`m gXa àH$ënmgmR>r ^maV gaH$ma d ~m§YH$m‘ H$aUogmR>r `3579.34 cmI IoimÀ`m CnH$aUmgh IoimMo ‘¡XmZ, O‘rZ ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY IMm©g gwYm[aV àemgH$s` ‘mÝ`Vm àXmZ gwemo{^H$aU, d¥jmamonU Am{U A§VJ©V JQ>mao H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda H$aÊ`mV Amcocr Amho. BË`mXr nm`m^wV ~m~tMm g‘mdoe Ho$cm Amho. `3304.90 cmI IM© Pmcocm Amho. gXa àH$ënm‘Ü`o Q>mB©n-2 Mr 147 àH$ënmgmR>r ‘o. dmñVw `moOZm, Zdr àH$ënmVrc 2 ~°Mca ~°aoŠg d ^moOZmc` {ZdmgñWmZo, Q>mB©n-3 Mr 15 {ZdmgñWmZo, ‘w§~B© `m§Zr dmñVw{demaX Am{U ‘o. Q>m|Jgo B‘maV nwU© H$éZ hñVm§VaU H$aÊ`mV Amco Q>mB©n-4 Mr 8 {ZdmgñWmZo, {deof Am{U nmQ>rc B§{O{ZAg©, A‘amdVr àH$ën AgwZ g§nwU© àH$ënmMo H$m‘ ‘mM© 2013 Q>mB©n-6 Mo 1 {ZdmgñWmZ d ~°Mca ì`dñWmnZ g„mJma åhUyZ H$m‘ nm{hcoco n`ªV nwU© hmoUma Amho. ~°aoŠg XmoZ B‘maVr, ^moOZmc` BË`mXr Amho. àH$ënmMo A§Xm{OV ‘wë` `2885.24 A§V^w©V AmhoV. àH$ënmVrc gd© B‘maVrMo cmI hmoVo. H§$ÌmQ>Xma ‘o. àH$me H$m°ÝñQ´>modoc

46 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Navi Mumbai, 171 quarters for SRPF Gr. XI, Navi Mumbai at Balegaon

he revised administrative approval scaping, Tree plantation, & storm water building is completed & handed over to Tamounting to ` 3579.34 lakhs has drain etc. user and all project will be completed on been accorded for Construction of 171 M/s. Vastu Yojna, Navi Mumbai or before March 2013. quarters for SRPF Gr. XI, Navi Mumbai has worked as an Architect and M/s. at Balegaon by the Board of Directors Tongse & Patil, Amravati as a Project of Maharashtra State Police Housing & Management Consultant for this project. Welfare Corporation Ltd., Mumbai in its The estimated cost of this project is nd 182 meeting held on 17/08/2009. `2885.24 lakhs. The work of this project The project consists of Type-II – 147 has been awarded to the Contractor M/s. qtrs., Type-III – 15 qtrs., Type-IV – 8 Prakash Constrowell Pvt. Ltd., Nashik qtrs. & Type-VI – 1 qtr & Bachelor at tender cost amounting to `3003.54 Barracks, Mess building. The total lakhs vide contract agreement no. built up area of this project is 19520 sq. C-06/2009-10, dated 31/08/2009. mt. Project includes all infrastructural The funds are provided by both amenities viz Water supply, Internal Government of India and Government of Roads, Internal/ External electrification, Maharashtra. The expenditure incurred Street light, Compound Wall, Sewerage on this project is ` 3304.90 lakhs. In this scheme, Children play equipment, Land project 2 Bachelor of barrack, 1 Mess

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 47 ‘w§~B©, nmocrg Am`wŠV, ‘w§~B© `m§MoH$[aVm KmQ>H$mona `oWo 64 {ZdmgñWmZo ~m§YH$m‘ H$aUo

hmamï´> amÁ` nmocrg J¥h{Z‘m©U d 5179.84 Mm¡. ‘r. Amho. gXa àH$ënm‘Ü`o àH$ënmMo A§Xm{OV ‘wë` `715.63 cmI ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ O{‘ZrImcrc nmÊ`mMr Q>mH$s, B‘maVrdarc hmoVo. H§$ÌmQ>Xma ‘o. ~r. Or. {eH}$, nwUo `m§Zm ‘§S>imÀ`m {X. 16/01/2008 amoOr nmÊ`mÀ`m Q>mŠ`m, A§VJ©V añVo, A§VJ©V / H$amaZm‘m H«$. gr-05, 2011-12, {X. g§nÝZ Pmcoë`m 176 ì`m ~¡R>H$s‘Ü`o ~mh` {dÚwVrH$aU, g§ajU q^V d JoQ>, 02/02/2012 AÝd`o `715.63 cmI ‘w§~B©, nmocrg Am`wŠV, ‘w§~B© `m§MoH$[aVm Oc:{ZñgmaU `moOZm, O‘rZ gwemo{^H$aU, aH$‘oÀ`m {Z{dXm ‘wë`mg gXa àH$ënmMo KmQ>H$mona `oWo 64 {ZdmgñWmZo ~m§YH$m‘ d¥jmamonU, O‘rZrV nmUr ‘wa{dUo Am{U H$m‘ XoÊ`mV Amco hmoVo. H$aUogmR>r `5896.77 cmI IMm©g nmÊ`mMm {ZMam H$aÊ`mgmR>r A§VJ©V JQ>mao gXa àH$ënmgmR>r ^maV gaH$ma Am{U gwYm[aV àemgH$s` ‘mÝ`Vm àXmZ H$aÊ`mV BË`mXr nm`m^wV ~m~tMm g‘mdoe Ho$cm ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY Amcocr Amho. Amho. H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda gXa àH$ënm‘Ü`o Q>mB©n-2 Mr 64 àH$ënmgmR>r dmñVw{demaX Am{U àH$ën `689.81 cmI IM© Pmcocm Amho. {ZdmgñWmZo A§V^w©V AmhoV. àH$ënmVrc ì`dñWmnZ g„mJma åhUyZ ‘o. ~r. Or. àH$ënmMo H$m‘ Am°JñQ> 2013 amoOr nyU© gd© B‘maVrMo EHy$U ~m§YH$m‘ joÌ’$i {eH}$, nwUo `mZr H$m‘ nm{hcoco Amho. hmoUma Amho.

48 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Mumbai, 64 quarters for Commissioner of Police, Mumbai at Ghatkopar

he revised administrative approval Internal Roads, Internal/ External dated 02/02/2012. Tamounting to `5896.77 lakhs has electrification, Compound Wall & Gate, The funds are provided by both been accorded for Construction of 64 Sewerage scheme, Land scaping, Tree Government of India and Government of quarters for Commissioner of Police, plantation, Rain water Harvesting & Maharashtra. The expenditure incurred Mumbai at Ghatkopar by the Board of storm water drain etc. on this project is `689.81 lakhs. This Directors of Maharashtra State Police M/s. B.G. Shirke, Pune has worked project will be completed on or before Housing & Welfare Corporation Ltd., as an Architect as well as Project August 2013. th Mumbai in its 176 meeting held on Management Consultant for this project. 16/01/2008. The estimated cost of this project is The project consists of Type-II – 64 `715.63 lakhs. The work of this project quarters. The total built up area of has been awarded to the Contractor M/s. this project is 5179.84 sq. mt. Project B.G. Shirke Pvt. Ltd., Pune at tender includes all infrastructural amenities viz cost amounting to `715.63 lakhs vide Overhead Water Tank on each building, contract agreement no. C-05, 2011-12,

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 49 Am¡a§Jm~mX, nmocrg Am`wŠV, Am¡a§Jm~mX `m§MoH$[aVm 56 {ZdmgñWmZo ~m§YH$m‘ H$aUo

hmamï´> amÁ` nmocrg J¥h{Z‘m©U d 5767.52 Mm¡. ‘r. Amho. àH$ënm‘Ü`o nmUr ‘wë` `955.02 cmI hmoVo. H§$ÌmQ>Xma ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ nwadR>m, ^y{‘JV ObH§w$^, B‘maVrdarc ‘o. aí‘r H$ÝñQ´>ŠeZ H§$nZr, ‘w§~B© `m§Zm ‘§S>imÀ`m {X. 16/11/2011 amoOr nmÊ`mÀ`m Q>mŠ`m, A§VJ©V añVo, A§VJ©V / H$amaZm‘m H«$. gr- 04/2011-12, {X. g§nÝZ Pmcoë`m 192 ì`m ~¡R>H$s‘Ü`o ~mh` {dÚwVrH$aU, Oc:{ZñgmaU `moOZm, 30/12/2011 AÝd`o `806.97 cmI Am¡a§Jm~mX, nmocrg Am`wŠV, Am¡a§Jm~mX O‘rZrV nmUr ‘wa{dUo, AmJ à{V~§YH$ aH$‘oÀ`m {Z{dXm ‘wë`mg gXa àH$ënmMo `m§MoH$[aVm 56 {ZdmgñWmZo ~m§YH$m‘ `moOZm Am{U nmÊ`mMm {ZMam H$aÊ`mgmR>r H$m‘ XoÊ`mV Amco hmoVo. H$aUogmR>r `1078.54 cmI IMm©g A§VJ©V JQ>mao BË`mXr nm`m^wV ~m~tMm gXa àH$ënmgmR>r ^maV gaH$ma Am{U gwYm[aV àemgH$s` ‘mÝ`Vm àXmZ H$aÊ`mV g‘mdoe Ho$cm Amho. ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY Amcocr Amho. àH$ënmgmR>r ‘o. {S>Pm`Za {nnc, Zm{eH$ H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda gXa àH$ënm‘Ü`o Q>mB©n-2 Mr 56 `m§Zr dmñVw{demaX Am{U ‘o. ‘oam°J, AH$mocm `71.52 cmI IM© Pmmcocm Amho. {ZdmgñWmZo A§V^w©V AmhoV. àH$ënmVrc `m§Zr àH$ën ì`dñWmnZ g„mJma åhUyZ àH$ënmMo H$m‘ OyZ 2013 amoOr nyU© hmoUma gd© B‘maVrMo EHy$U ~m§YH$m‘ joÌ’$i H$m‘ nm{hcoco Amho. àH$ënmMo A§Xm{OV Amho.

50 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Aurangabad, 56 quarters for Commissioner of Police, Aurangabad

he revised administrative approval Reservoir, Overhead Water Tank on `806.97 lakhs vide contract agreement Tamounting to `1078.54 lakhs has each building, Internal Roads, Internal/ no. C- 04/2011-12, dated 30/12/2011. been accorded for Construction of 56 External electrification, Sewerage The funds are provided by both quarters for Commissioner of Police, scheme, Rain water Harvesting, Fire Government of India and Government of Aurangabad at Aurangabad by the Board Fighting Equipments, storm water drain Maharashtra. The expenditure incurred of Directors of Maharashtra State Police etc. on this project is `71.52 lakhs. This Housing & Welfare Corporation Ltd., M/s. Designer People, Nashik project will be completed on or before nd Mumbai in its 192 meeting held on has worked as an Architect and M/s. June 2013. 16/11/2011. Merog, Akola as a Project Management The project consists of Type-II – 56 Consultant for this project. The estimated quarters. The total built up area of this cost of this project is `955.02 lakhs. The project is 5767.52 sq. mt. This project work of this project has been awarded to also includes all infrastructural amenities the Contractor M/s. Rasmi Construction viz Water supply, Ground Storage Co., Mumbai at tender cost amounting to

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 51 qgYwXwJ©, nmocrg AYrjH$, qgYwXwJ© `m§MoH$[aVm Amoag `oWo 40 {ZdmgñWmZo ~m§YH$m‘ H$aUo hmamï´> amÁ` nmocrg J¥h{Z‘m©U d AmhoV. àH$ënmVrc gd© B‘maVrMo EHy$U ‘o. Eg. E’$. Mm¡Jwco, gm§Jcr `m§Zm ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ ~m§YH$m‘ joÌ’$i 3583.21 Mm¡. ‘r. Amho. H$amaZm‘m H«$. gr-14/2009-10, {X. ‘§S>imÀ`m {X. 24/03/2009 amoOr gXa àH$ënm‘Ü`o nmUr nwadR>m, ^y{‘JV 31/08/2009 AÝd`o `519.10 cmI g§nÝZ Pmcoë`m 180 ì`m ~¡R>H$s‘Ü`o ObH§w$^, B‘maVrdarc nmÊ`mÀ`m Q>mŠ`m, aH$‘oÀ`m {Z{dXm ‘wë`mg gXa àH$ënmMo qgYwXwJ©, nmocrg AYrjH$, qgYwXwJ© A§VJ©V añVo, A§VJ©V / ~mh` {dÚwVrH$aU, H$m‘ XoÊ`mV Amco hmoVo. `m§MoH$[aVm Amoag `oWo 40 {ZdmgñWmZo añË`mdarc {dÚwwV Im§~, Oc:{ZñgmaU gXa àH$ënmgmR>r ^maV gaH$ma Am{U ~m§YH$m‘ H$aUogmR>r `657.15 cmI `moOZm Am{U A§VJ©V JQ>mao BË`mXr nm`m^wV ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY IMm©g àemgH$s` ‘mÝ`Vm àXmZ H$aÊ`mV ~m~tMm g‘mdoe Ho$cm Amho. H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda Amcocr Amho. àH$ënmgmR>r ‘o. Mm¡Jwco nmQ>rc H$ÝgëQ>§Q> `693.09 cmI IM© Pmcocm Amho. gXa àH$ënm‘Ü`o Q>mB©n-2 Mr 24 àm. {c., gm§Jcr `m§Zr dmñVw{demaX àH$ënmMo H$m‘ OyZ 2012 amoOr nyU© hmoUma {ZdmgñWmZo, Q>mB©n-3 Mr 12 {ZdmgñWmZo Am{U àH$ën ì`dñWmnZ g„mJma åhUyZ Amho. d Q>mB©n-4 Mr 4 {ZdmgñWmZo Am{U H$m‘ nm{hcoco Amho. àH$ënmMo A§Xm{OV ^moOZmc`, à{ejU emim B‘maV A§V^w©V ‘wë` `512.93 cmI hmoVo. H§$ÌmQ>Xma

52 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Sindhudurg, 40 quarters for Superintendent of Police, Sindhudurg at Oras

he administrative approval supply, Ground Storage Reservoir, The funds are provided by both Tamounting to `657.15 lakhs has Overhead Water Tank on each building, Government of India and Government of been accorded for Construction of 40 Internal Roads, Internal/ External Maharashtra. The expenditure incurred quarters for Superintendent of Police, electrification, Street light, Sewerage on this project is `693.09 lakhs. This Sindhudurg at Oras by the Board of scheme, & storm water drain etc. project will be completed on or before Directors of Maharashtra State Police M/s. Chaugule Patil consultant Pvt. June 2012. Housing & Welfare Corporation Ltd., Ltd, Sangli has worked as an Architect as th Mumbai in its 180 meeting held on well as Project Management Consultant 24/03/2009. for this project. The estimated cost of The project consists of Type-II – 24 this project is `512.93 lakhs. The work qtrs., Type-III – 12 qtrs. & Type-IV – 4 of this project has been awarded to the qtrs & Mess Building, Recruit School. Contractor M/s. S. F. Chougule, Sangli The total built up area of this project at tender cost amounting to `519.37 is 3583.21 sq. mt. Project includes lakhs vide contract agreement no. all infrastructural amenities viz Water C-14/2009-10, dated 31/08/2009.

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 53 am`JS>, nmocrg AYrjH$ `m§MoH$[aVm Acr~mJ `oWo 36 {ZdmgñWmZo ~m§YH$m‘ H$aUo hmamï´> amÁ` nmocrg J¥h{Z‘m©U d àH$ënm‘Ü`o nmUr nwadR>m, ^y{‘JV ‘o. Ho$. Ho$. WmoamV, g§J‘Zoa `m§Zm ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ ObH§w$^, B‘maVrdarc nmÊ`mÀ`m Q>mŠ`m, H$amaZm‘m H«$. gr-03/2011-12, {X. ‘§S>imÀ`m {X. 06/08/2008 amoOr g§nÝZ A§VJ©V añVo, A§VJ©V / ~mh` {dÚwVrH$aU, 25/08/2011 AÝd`o `609.30 cmI Pmcoë`m 178 ì`m ~¡R>H$s‘Ü`o am`JS>, añË`mdarc {dÚwV Im§~, Oc:{ZñgmaU aH$‘oÀ`m {Z{dXm ‘wë`mg gXa àH$ënmMo nmocrg AYrjH$ `m§MoH$[aVm Acr~mJ `moOZm Am{U A§VJ©V JQ>mao BË`mXr nm`m^wV H$m‘ XoÊ`mV Amco hmoVo. `oWo 36 {ZdmgñWmZoo ~m§YH$m‘ H$aUogmR>r ~m~tMm g‘mdoe Ho$cm Amho. gXa àH$ënmgmR>r ^maV gaH$ma Am{U `4054.06 cmI IMm©g àemgH$s` àH$ënmgmR>r ‘o. gr. EZ. E. A{H©$Q>oŠQ>, ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY ‘mÝ`Vm àXmZ H$aÊ`mV Amcocr Amho. ‘w§~B© `m§Zr dmñVw{demaX Am{U ‘o. gr. H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda gXa àH$ënm‘Ü`o Q>mB©n-2 Mr 36 ~r. Omoer, amohm, {Oëhm am¶JS> `m§Zr `728.76 cmI IM© Pmcocm Amho. {ZdmgñWmZo B‘maVr A§V^w©V AmhoV. àH$ën ì`dñWmnZ g„mJma åhUyZ àH$ënmMo H$m‘ OmZodmar 2013 amoOr nyU© àH$ënmVrc gd© B‘maVrMo EHy$U ~m§YH$m‘ H$m‘ nm{hcoco Amho. àH$ënmMo A§Xm{OV hmoUma Amho. joÌ’$i 3138.24 Mm¡. ‘r. Amho. gXa ‘wë` `580.91 cmI hmoVo. H§$ÌmQ>Xma

54 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Raigad, 36 quarters for Superintendent of Police, Raigad at Alibag

he administrative approval Tank, Internal Roads, Internal/ External The funds are provided by both Tamounting to `4054.06 lakhs has electrification, Street light, Sewerage Government of India and Government of been accorded for Construction of 36 scheme & storm water drain etc. Maharashtra. The expenditure incurred quarters for Superintendent of Police, M/s. C. N. A. Architect, Mumbai has on this project is `728.76 lakhs. This Raigad at Alibag by the Board of worked as an Architect and M/s. C. B. project will be completed on or before Directors of Maharashtra State Police Joshi, Roha, Dist. Raigad as a Project January 2013. Housing & Welfare Corporation Ltd., Management Consultant for this project. th Mumbai in its 178 meeting held on The estimated cost of this project is 06/08/2008. `580.91 lakhs. The work of this project The project consists of Type-II – 36 has been awarded to the Contractor quarters. The total built up area of this M/s. K. K. Thorat, Sangamner at tender project is 3138.24 sq. mt. This project cost amounting to `609.30 lakhs vide also includes all infrastructural amenities contract agreement no. C-03/2011-12, viz Water supply, GSR, Overhead Water dated 25/08/2011.

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 55 ‘w§~B©, d[að> nmocrg A{YH$mar `m§MoH$[aVm ‘c~ma {hc, ‘w§~B© `oWo 24 {ZdmgñWmZo ~m§YH$m‘ H$aUo hmamï´> amÁ` nmocrg J¥h{Z‘m©U d g§ajU q^V d JoQ>, Oc:{ZñgmaU `moOZm, gXa àH$ënmMo H$m‘ XoÊ`mV Amco hmoVo. ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ O‘rZ gwemo{^H$aU, d¥jmamonU, O‘rZrV VXZ§Va àH$ënmMr ì`már dmT>ë`mZo ‘§S>imÀ`m {X. 12/09/2011 amoOr nmUr ‘wa{dUo, AmJ à{V~§YH$ `moOZm Am{U H§$ÌmQ>mVrc H$c‘mÀ`m Am{YZ amhþZ g§nÝZ Pmcoë`m 191 ì`m ~¡R>H$s‘Ü`o nmÊ`mMm {ZMam H$aÊ`mgmR>r A§VJ©V JQ>mao 8599.03 joÌ’$imMo H$m‘ `1636.63 ‘w§~B©, d[að> nmocrg A{YH$mar `m§MoH$[aVm BË`mXr nm`m^wV ~m~tMm g‘mdoe Ho$cm cmI ‘wë`mg ‘o. B©Jc H$ÝñQ´>ŠeZ, ‘c~ma {hc, ‘w§~B© `oWo 24 {ZdmgñWmZo Amho. CëhmgZJa `m§Zm àH$ënmMo ‘wi H$m‘mgh ~m§YH$m‘ H$aUogmR>r `2017.15 cmI àH$ënmgmR>r ‘o. gr. EZ. E. Am{H©$Q>oŠQ>, A{VarŠV H$m‘ XoÊ`mV Amco. IMm©g gwYm[aV àemgH$s` ‘mÝ`Vm àXmZ ‘w§~B© `mZr dmñVw{demaX Am{U ‘o. gXa àH$ënmgmR>r ^maV gaH$ma Am{U H$aÊ`mV Amcocr Amho. A{^`§Vm, nmoJ¥‘ `mZr àH$ën ì`dñWmnZ ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY gXa àH$ënm‘Ü`o Q>mB©n-6 Mr 24 g„mJma åhUyZ H$m‘ nm{hcoco Amho. gXa H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda {ZdmgñWmZo A§V^w©V AmhoV. àH$ënmVrc àH$ënmMo A§Xm{OV ‘wë` `866.28 cmI `1908.75 cmI IM© Pmcocm Amho. B‘maVrMo EHy$U ~m§YH$m‘ joÌ’$i hmoVo. H§$ÌmQ>Xma ‘o. B©Jc H$ÝñQ´>ŠeZ, àH$ënmMo H$m‘ ‘mM© 2013 amoOr nyU© 3962.90 Mm¡. ‘r. Amho. gXa àH$ënm‘Ü`o CëhmgZJa `m§Zm H$amaZm‘m H«$. gr-7, hmoUma Amho. ^y{‘JV ObH§w$^, B‘maVrdarc nmÊ`mÀ`m 2009-10, {X. 31/08/2009 AÝd`o Q>mŠ`m, A§VJ©V / ~mh` {dÚwVrH$aU, `895.67 cmI aH$‘oÀ`m {Z{dXm ‘wë`mg

56 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Mumbai, 24 quarters for Senior Police officer at Malbar Hill, Mumbai

he revised administrative approval scaping, Tree plantation, Rain water per condition of contract to an amount Tamounting to `2017.15 lakhs has Harvesting, Fire Fighting Equipments, 1636.63 Lakhs. been accorded for Construction of 24 storm water drain etc. The funds are provided by both quarters for Senior Police officer at M/s. CNA Architect, Mumbai has Government of India and Government of Malbar Hill, Mumbai by the Board of worked as an Architect and M/s PHC Maharashtra. The expenditure incurred Directors of Maharashtra State Police Engineer has worked as a Project on this project is `1908.75 lakhs. This Housing & Welfare Corporation Ltd., Management Consultant for this project. project will be completed on or before st Mumbai in its 191 meeting held on The estimated cost of this project is March 2013. 12/09/2011. `866.28 lakhs. The work of this project The project consists of Type-VI – 24 has been awarded to the Contractor M/s. quarters. The total built up area of Eagle Construction, Ulhasnagar at tender this project is 3962.90 sq. mt. Project cost amounting to `895.67 lakhs vide includes all infrastructural amenities viz contract agreement no. C-7, 2009-10, Ground Storage Reservoir, Overhead dated 31/08/2009. As per increase Water Tank on each building, Internal/ in scope of work the work alloted to External electrification, Compound M/s. Eagle Construction, Ulhasnagar Wall & Gate, Sewerage scheme, Land of increased built up area 8599.03 as

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 57 ‘w§~B©, ’$mog© dZ H$arVm JmoaoJmd `oWo àemgH$s` B‘maVr d 96 {ZdmgñWmZo ~m§YH$m‘m~m~V hmamï´> amÁ` nmocrg J¥h{Z‘m©U d AmaoIZ ‘o. Mm¡Jwco nmQ>rc H$ÝgëQ>§Q> àm. {c., gXa àH$ënmMo A§Xm{OV ‘wë` ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ gm§Jcr d àH$ën ì`dñWmnZmMo H$m‘ ‘o. `4538.98 cmI hmoVo. H§$ÌmQ>Xma ‘o. ‘§S>imÀ`m {X. 05/08/2011 amoOr eem§H$ ‘oh§Xio Am{U Agmo{gEQ>g, ‘w§~B© `m§Zr H$moZmH©$ BÝà’$mñQ´>ŠMa {c., CëhmgZJa g§nÝZ Pmcoë`m 190 ì`m ~¡R>H$s‘Ü`o ‘w§~B©, Ho$coco AgyZ gXa àH$ënmMo EHy$U ~m§YH$m‘ `m§Zm H$amaZm‘m H«$. gr-2, 2011-12, {X. ’$mog© dZ H$arVm JmoaoJmd `oWo àemgH$s` joÌ’$i 19870.60 Mm¡. ‘r. Amho. gXa 25/08/2011 AÝd`o `4479.43 cmI B‘maVr d 96 {ZdmgñWmZo ~m§YH$m‘mgmR>r àH$ënm‘Ü`o ^y{‘JV ObH§w$^, B‘maVrdarc aH$‘oÀ`m {Z{dXm ‘wë`mg gXa àH$ënmMo `6485.00 cmI IMm©g gwYm[aV nmÊ`mÀ`m Q>mŠ`m, A§VJ©V añVo, A§VJ©V / H$m‘ XoÊ`mV Amco hmoVo. àemgH$s` ‘mÝ`Vm àXmZ H$aÊ`mV Amcocr ~mh` {dÚwVrH$aU, añË`mdarc {dÚwV Im§~, gXa àH$ënmgmR>r ^maV gaH$ma Am{U Amho. {dÚwV O{ZÌ, g§ajU q^V, VmaoMo Hw§$nU, ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY gXa àH$ënm‘Ü`o 1 dgVrJ¥h, 1 gm§S>nmUr `moOZm, Oc:{ZñgmaU `moOZm, H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda àemgH$s` B‘maV, Q>mB©n-2 Mr 68 O‘rZ gwemo{^H$aU, d¥jmamonU, O‘rZrV `12116.89 cmI IM© Pmcocm Amho. {ZdmgñWmZo Am{U Q>mB©n-3 Mr 28 nmUr ‘wa{dUo, AmJ à{V~§YH$ `moOZm Am{U àH$ënmMo H$m‘ {S>g|~a 2013 amoOr nyU© {ZdmgñWmZo ~m§YH$m‘ {X. 25/08/2011 nmÊ`mMm {ZMam H$aÊ`mgmR>r A§VJ©V JQ>mao hmoUma Amho. amoOr gwé H$aÊ`mV Amcoco Amho. àH$ënmMo BË`mXr nm`m^wV ~m~tMm g‘mdoe Ho$cm Amho.

58 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Mumbai, Administrative, Hostel Building & 96 quarters for Force One, Mumbai at Goregaon

he revised administrative approval Architect and M/s. Shashank Mehandale The estimated cost of this project is Tamounting to `6485.00 lakhs & Associates has been appointed as PMC `4538.98 lakhs. The work of this project has been accorded for Construction for this project. The total built up area of has been awarded to the Contractor M/s. of Administrative, Hostel Building & this project is 19870.60 sq. mt. Project Konark Infrastructure Ltd., Ulhasnagar 96 quarters for Force One, Mumbai at includes all infrastructural amenities viz at tender cost amounting to `4479.43 Goregaon by the Board of Directors of Ground Storage Reservoir, Overhead lakhs vide contract agreement no. C-02, Maharashtra State Police Housing & Water Tank on each building, Internal 2011-12, dated 25/08/2011. Welfare Corporation Ltd., Mumbai in its Roads, Internal/ External electrification, The funds are provided by both th 190 meeting held on 05/08/2011. Street light, DG sets, Compound Wall & Government of India and Government of The project consists of administrative Chain link wire fencing, SIBF system, Maharashtra. The expenditure incurred building, Hostel building, Type II – 68 Sewerage scheme, Land scaping, Tree on this project is `2116.89 lakhs. This quarters & Type III – 28 quarters and the plantation, Rain water Harvesting, Fire project will be completed on or before work has been started on 25/08/2011. fighting Equipments & storm water December 2013. M/s. Chaugule Patil Consultant Pvt. drain etc. Ltd., Sangli has been appointed as an

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 59 ‘w§~B©, nmocrg Am`wŠV, ‘w§~B© `m§MoH$arVm H«$m°’$S>© ‘mH}$Q> `oWo àemgH$s` B‘maV ~m§YH$m‘m~m~V hmamï´> amÁ` nmocrg J¥h{Z‘m©U d H$m°ÝQ´>°ŠQ>a, ‘w§~B© `m§Zr Ho$coco AgyZ Am{U Mm¡Yar (B§{S>`m) {c., ‘w§~B© `m§Zm ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ gXa àH$ënmMo EHy$U ~m§YH$m‘ joÌ’$i H$amaZm‘m H«$. gr-01, 2011-12, {X. ‘§S>imÀ`m {X. 05/08/2011 amoOr 9668.15 Mm¡. ‘r. Amho. gXa àH$ënm‘Ü`o 25/08/2011 AÝd`o `3200.00 cmI g§nÝZ Pmcoë`m 190 ì`m ~¡R>H$s‘Ü`o ^y{‘JV ObH§w$^, B‘maVrda nmÊ`mMr aH$‘oÀ`m {Z{dXm ‘wë`mg gXa àH$ënmMo ‘w§~B©, nmocrg Am`wŠV, ‘w§~B© `m§MoH$arVm Q>mH$s, A§VJ©V / ~mh` {dÚwVrH$aU, H$m‘ XoÊ`mV Amco hmoVo. H«$m°’$S>© ‘mH}$Q> `oWo àemgH$s` B‘maV añË`mdarc {dÚwV Im§~, {dÚwV O{ZÌ, gXa àH$ënmgmR>r ^maV gaH$ma Am{U ~m§YH$m‘mgmR>r `4709.52 cmI IMm©g Oc:{ZñgmaU `moOZm, O‘rZ gwemo{^H$aU, ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY gwYm[aV àemgH$s` ‘mÝ`Vm àXmZ H$aÊ`mV d¥jmamonU, O‘rZrV nmUr ‘wa{dUo, AmJ H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda Amcocr Amho. à{V~§YH$ `moOZm Am{U nmÊ`mMm {ZMam `974.62 cmI IM© Pmcocm Amho. gXa àH$ënm‘Ü`o 1 àemgH$s` B‘maV H$aÊ`mgmR>r A§VJ©V JQ>mao BË`mXr nm`m^wV àH$ënmMo H$m‘ {S>g|~a 2013 n`ªV nyU© ~m§YH$m‘ {X. 25/08/2011 amoOr gwé ~m~tMm g‘mdoe Ho$cm Amho. hmoUma Amho. H$aÊ`mV Amcoco Amho. àH$ënmMo AmaoIZ gXa àH$ënmMo A§Xm{OV ‘wë` d àH$ën ì`dñWmnZmMo H$m‘ ‘o. hm’$sO `3010.76 cmI hmoVo. H§$ÌmQ>Xma ‘o. Mm¡Yar

60 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Mumbai, Administrative Building for Commissioner of Police, Mumbai at Crawford Market

he revised administrative approval appointed as an Architect as well as Choudhury & Choudhury (India) Ltd., Tamounting to `4709.52 lakhs PMC for this project. The total built Mumbai at tender cost amounting to has been accorded for Construction up area of this project is 9668.15 sq. `3200.00 lakhs vide contract agreement of Administrative Building for mt. Project includes all infrastructural no. C-01, 2011-12, dated 25/08/2011. Commissioner of Police, Mumbai amenities viz Ground Storage Reservoir, The funds are provided by both at Crawford Market by the Board of Overhead Water Tank on building, Government of India and Government of Directors of Maharashtra State Police Internal/ External electrification, DG Maharashtra. The expenditure incurred Housing & Welfare Corporation Ltd., set, Sewerage scheme, Land scaping, on this project is `974.62 lakhs. This th Mumbai in its 190 meeting held on Tree plantation, Rain water Harvesting, project will be completed on or before 05/08/2011. Fire Fighting Equipments, storm water December 2013. The project consists of 1 drain etc. Administrative Building and the work The estimated cost of this project is has been started on 25/08/2011. M/s. `3010.76 lakhs. The work of this project Hafeez Contractor, Mumbai has been has been awarded to the Contractor M/s.

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 61 A‘amdVr, nmocrg Am`wŠV, A‘amdVr H$m`m©c` àemgH$s` B‘maV ~m§YH$m‘m~m~V hmamï´> amÁ` nmocrg J¥h{Z‘m©U d Am{U nmQ>rc B§{O{ZAg©, A‘amdVr ndma nmQ>H$a àm. {c. `m§Zm H$amaZm‘m H«$. ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ `m§Zr Ho$coco AgyZ gXa àH$ënmMo EHy$U gr-18/2009-10, {X. 01/12/2009 ‘§S>imÀ`m {X. 17/08/2009 amoOr ~m§YH$m‘ joÌ’$i 4740.00 Mm¡. ‘r. Amho. AÝd`o `591.87 cmI aH$‘oÀ`m {Z{dXm g§nÝZ Pmcoë`m 182 ì`m ~¡R>H$s‘Ü`o gXa àH$ënm‘Ü`o nmUr nwadR>m, ^y{‘JV ‘wë`mg gXa àH$ënmMo H$m‘ XoÊ`mV Amco A‘amdVr, nmocrg Am`wŠV, A‘amdVr ObH§w$^, B‘maVrda nmÊ`mMr Q>mH$s, hmoVo. H$m`m©c` àemgH$s` B‘maV ~m§YH$m‘mgmR>r A§VJ©V añVo, A§VJ©V / ~mh` {dÚwVrH$aU, gXa àH$ënmgmR>r ^maV gaH$ma Am{U `3099.84 cmI IMm©g gwYm[aV añË`mdarc {dÚwwV Im§~, {dÚwV O{ZÌ, ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY àemgH$s` ‘mÝ`Vm àXmZ H$aÊ`mV Amcocr g§ajU q^V, Oc:{ZñgmaU `moOZm, H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda Amho. O‘rZ gwemo^rH$aU, d¥jmamonU, O‘rZrV `825.02 cmI IM© Pmcocm Amho. gXa àH$ënm‘Ü`o 1 àemgH$s` B‘maV nmUr ‘wa{dUo Am{U A§VJ©V JQ>mao BË`mXr àH$ënmMo H$m‘ ‘o 2012, n¶ªV nyU© hmoUma ~m§YH$m‘ {X. 01/12/2009 amoOr gwé nm`m^wV ~m~tMm g‘mdoe Ho$cm Amho. Amho. H$aÊ`mV Amcoco Amho. àH$ënmMo AmaoIZ gXa àH$ënmMo A§Xm{OV ‘wë` d àH$ën ì`dñWmnZmMo H$m‘ ‘o. Q>m|Jgo `627.52 cmI hmoVo. H§$ÌmQ>Xma ‘o.

62 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Amravati, Administrative Building for Commissioner of Police, Amravati

he revised administrative approval up area of this project is 4740.00 sq. contract agreement no. C-18/2009-10, Tamounting to `3099.84 lakhs mt. Project includes all infrastructural dated 01/12/2009. has been accorded for Construction amenities viz Water supply, Ground The funds are provided by both of Administrative Building for Storage Reservoir, Overhead Water Tank Government of India and Government of Commissioner of Police, Amravati at on building, Internal Roads, Internal/ Maharashtra. The expenditure incurred Amravati by the Board of Directors of External electrification, Street light, DG on this project is `825.02 lakhs. This Maharashtra State Police Housing & set, Compound Wall, Sewerage scheme, project will be completed on or before Welfare Corporation Ltd., Mumbai in its Land scaping, Tree plantation, Rain May 2012. 182nd meeting held on 17/08/2009. water harvesting & storm water drain The project consists of 1 etc. Administrative Building and the work The estimated cost of this project is has been started on 01/12/2009. M/s. `627.52 lakhs. The work of this project Tongse & Patil Engineers, Amravati has has been awarded to the Contractor been appointed as an Architect as well M/s. Pawar Patakar Pvt. Ltd. at tender as PMC for this project. The total built cost amounting to `591.87 lakhs vide

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 63 R>mUo, nmocrg AYrjH$, R>mUo (J«m) `m§MoH$[aVm àemgH$s` B‘maV ~m§YH$m‘m~m~V

hmamï´> amÁ` nmocrg J¥h{Z‘m©U d nmQ>rc B§{O{ZAg©, A‘amdVr `m§Zr Ho$coco `878.75 cmI hmoVo. H§$ÌmQ>Xma ‘o. ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ AgyZ gXa àH$ënmMo EHy$U ~m§YH$m‘ àH$me H$m°ÝñQ´>modoc àm. {c., Zm{eH$ `m§Zm ‘§S>imÀ`m {X. 14/11/2007 amoOr g§nÝZ joÌ’$i 6086.16 Mm¡. ‘r. Amho. gXa H$amaZm‘m H«$. gr-21/2009-10, {X. Pmcoë`m 174 ì`m ~¡R>H$s‘Ü`o R>mUo, nmocrg àH$ën nmUr nwadR>m, ^y{‘JV ObH§w$^, 01/12/2009 AÝd`o `896.40 cmI AYrjH$, R>mUo (J«m) `m§MoH$[aVm àemgH$s` B‘maVrda nmÊ`mMr Q>mH$s, A§VJ©V añVo, aH$‘oÀ`m {Z{dXm ‘wë`mg gXa àH$ënmMo B‘maV ~m§YH$m‘mgmR>r `1586.52 cmI A§VJ©V / ~mh` {dÚwVrH$aU, añË`mdarc H$m‘ XoÊ`mV Amco hmoVo. IMm©g àemgH$s` ‘mÝ`Vm àXmZ H$aÊ`mV {dÚwwV Im§~, {dÚwwV O{ZÌ, {dÚwV gXa àH$ënmgmR>r ^maV gaH$ma Am{U Amcocr Amho. g~ñQ>oeZ, g§ajU q^V, Oc:{ZñgmaU ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY gXa àH$ënm‘Ü`o 1 B‘maV (Vi‘Ocm `moOZm, O‘rZ gwemo{^H$aU, d¥jmamonU, H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda + 4) ~m§YH$m‘ {X. 01/12/2009 amoOr O‘rZrV nmUr ‘wa{dUo, AmJ à{V~§YH$ `1044.28 cmI IM© Pmcocm Amho. `m gwé H$aÊ`mV Amcoco Amho. àH$ënmMo `moOZm Am{U A§VJ©V JQ>mao BË`mXr nm`m^wV àH$ënmMo H$m‘ ‘o 2012 n`ªV nyU© hmoUma AmaoIZ ‘o. A{M©Zmodm {S>PmB©Z, R>mUo d ~m~tMm g‘mdoe Ho$cm Amho. Amho. àH$ën ì`dñWmnZmMo H$m‘ ‘o. Q>m|Jgo Am{U gXa àH$ënmMo A§Xm{OV ‘wë`

64 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Administrative Building for Superintendent of Police, Thane (Rural) at Thane.

he administrative approval PMC for this project. The total built at tender cost amounting to `896.40 Tamounting to `1586.52 lakhs up area of this project is 6086.16 sq. lakhs vide contract agreement no. has been accorded for Construction mt. Project includes all infrastructural C-21/2009-10, dated 01/12/2009. of Administrative Building for amenities viz Water supply, Ground The funds are provided by both Superintendent of Police, Thane (Rural) Storage Reservoir, Overhead Water Tank Government of India and Government of at Thane by the Board of Directors of on building, Internal Roads, Internal/ Maharashtra. The expenditure incurred Maharashtra State Police Housing & External electrification, Street light, DG on this project is `1044.28 lakhs. This Welfare Corporation Ltd., Mumbai in its sets & electric sub station, Compound project will be completed on or before th 174 meeting held on 14/11/2007. Wall, Sewerage scheme, Land May 2012. The project consists of 1 scaping, Tree plantation, Fire Fighting administrative building (parking + 4) and Equipments, storm water drain etc. the work has been started on 01/12/2009. The estimated cost of this project is M/s. Archinova Design, Thane has been `878.75 lakhs. The work of this project appointed as an Architect and M/s. has been awarded to the Contractor M/s. Tongse & Patil Engineers, Amravati as Prakash Constrowell Pvt. Ltd., Nashik

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 65 Cñ‘mZm~mX, 400 nmocrg H$‘©Mmè`mH$[aVm VwiOmnwa `oWo ~°aoŠg B‘maV ~m§YH$m‘m~m~V hmamï´> amÁ` nmocrg J¥h{Z‘m©U d Ho$coco AgyZ gXa àH$ënmMo EHy$U H$amaZm‘m H«$. gr-19/2009-10, {X. ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ ~m§YH$m‘ joÌ’$i 4300.00 Mm¡. ‘r. 01/12/2009 AÝd`o `517.50 cmI ‘§S>imÀ`m {X. 06/08/2008 amoOr Amho. gXa àH$ënm‘Ü`o nmUr nwadR>m, aH$‘oÀ`m {Z{dXm ‘wë`mg gXa àH$ënmMo g§nÝZ Pmcoë`m 178 ì`m ~¡R>H$s‘Ü`o ^y{‘JV ObH§w$^, B‘maVrda nmÊ`mMr H$m‘ XoÊ`mV Amco hmoVo. Cñ‘mZm~mX, 400 nmocrg H$‘©Mmè`mH$[aVm Q>mH$s, A§VJ©V añVo, A§VJ©V / ~mh` gXa àH$ënmgmR>r ^maV gaH$ma Am{U VwiOmnwa `oWo ~°aoŠg B‘maV ~m§YH$m‘mgmR>r {dÚwVrH$aU, g§ajU q^V, Oc:{ZñgmaU ‘hmamï´> emgZ `m§À`mH$Sy>Z {ZYr CncãY `703.68 cmI IMm©g àemgH$s` ‘mÝ`Vm `moOZm, O‘rZ gwemo^rH$aU, d¥jmamonU, H$éZ XoÊ`mV Amcocm AgyZ àH$ënmda àXmZ H$aÊ`mV Amcocr Amho. O‘rZrV nmUr ‘wa{dUo Am{U A§VJ©V JQ>mao `584.19 cmI IM© Pmcocm Amho. gXa àH$ënm‘Ü`o 1 ~°aoŠg B‘maV BË`mXr nm`m^wV ~m~tMm g‘mdoe Ho$cm àH$ënmMo H$m‘ ‘o 2012 n`ªV nyU© hmoUma ~m§YH$m‘ {X. 01/12/2009 amoOr gwé Amho. Amho. H$aÊ`mV Amcoco Amho. àH$ënmMo AmaoIZ gXa àH$ënmMo A§Xm{OV ‘wë` d àH$ën ì`dñWmnZmMo H$m‘ ‘o. Mm¡Jwco `502.76 cmI hmoVo. H§$ÌmQ>Xma ‘o. nmQ>rc H$ÝgëQ>§Q> àm. {c., gm§Jcr `m§Zr ZdH$m°Z BZ’«$mñQ´>³Ma, cmVwa `m§Zm

66 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Osmanabad, Barracks Building for 400 Policemen at Tuljapur

he administrative approval up area of this project is 4300.00 sq. contract agreement no. C-19/2009-10, Tamounting to `703.68 lakhs has mt. Project includes all infrastructural dated 01/12/2009. been accorded for Construction of amenities viz Water supply, Ground The funds are provided by both Osmanabad, Barracks Building for 400 Storage Reservoir, Overhead Water Government of India and Government of Policemen at Tuljapur by the Board of Tank on building, Internal Roads, Maharashtra. The expenditure incurred Directors of Maharashtra State Police Internal/ External electrification, on this project is `584.19 lakhs. This Housing & Welfare Corporation Ltd., Street light, Compound, Sewerage project will be completed on or before th Mumbai in its 178 meeting held on scheme, Land scaping, Tree plantation, May 2012. 06/08/2008. Rain water harvesting & storm water The project consists of 1 Barrack drain etc. building and the work has been started The estimated cost of this project is on 01/12/2009. M/s. Caugule Patil `502.76 lakhs. The work of this project consultant Pvt. Ltd., Sangli has been has been awarded to the Contractor M/s. appointed as an Architect as well as Nawakon Infrastructure, Latur at tender PMC for this project. The total built cost amounting to `517.50 lakhs vide

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 67 Administrative Building for Superintendent of Police, Thane (Rural) at Thane

68 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 PLANNING PROJECTS IN 2011 - 12

1) Nashik, Administrative Building for C. P. Nashik at Nashik 2) Nagpur, Hostel Building No. 3 for Police Training School, Nagpur at Nagpur 3) Sangli, 51 quarters for Superintendent of Police, Sangli at Vita 4) Mess Building (extension) for Academy, Nashik at Nashik

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 69 Zm{eH$, nmocrg Am`wŠV, Zm{eH$ `m§MoH$[aVm Zm{eH$ `oWo àemgH$s` B‘maV ~m§YH$m‘m~m~V hmamï´> amÁ` nmocrg J¥h{Z‘m©U d hmVr KoÊ`mV `oUma Amho. àH$ënmMo d¥jmamonU, O‘rZrV nmUr ‘wa{dUo, AmJ ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ AmaoIZ ‘o. nJma Agmo{gEQ>g, Zm{eH$ à{V~§YH$ `moOZm Am{U A§VJ©V JQ>mao ‘§S>imÀ`m {X. 22/06/2011 amoOr d ì`dñWmnZmMo H$m‘ ‘o. {gìhrc Q>oH$, BË`mXr nm`m^wV ~m~tMm g‘mdoe Ho$cm g§nÝZ Pmcoë`m 189 ì`m ~¡R>H$s‘Ü`o Zm{eH$ ho H$aUma AgyZ gXa àH$ënmMo Amho. Zm{eH$, nmocrg Am`wŠV, Zm{eH$ EHy$U ~m§YH$m‘ joÌ’$i 4482.00 Mm¡. gXa àH$ënmMo A§Xm{OV ‘wë` `m§MoH$[aVm Zm{eH$ `oWo àemgH$s` B‘maV ‘r. Amho. gXa àH$ënm‘Ü`o nmUr nwadR>m, `787.09 cmI hmoVo. gXa àH$ënmgmR>r ~m§YH$m‘m§gmR>r `965.26 cmI IMm©g ^y{‘JV ObH§w$^, B‘maVrda nmÊ`mMr ^maV gaH$ma d ‘hmamï´> emgZ `m§À`mH$Sy>Z àemgH$s` ‘mÝ`Vm àXmZ H$aÊ`mV Amcocr Q>mH$s, A§VJ©V añVo, A§VJ©V / ~mh` {ZYr CncãY H$éZ XoÊ`mV Amcocm Amho. Amho. {dÚwVrH$aU, añË`mdarc {dÚwV Im§~, àH$ën gßQ>|~a 2012 ‘Ü`o gwé H$aÊ`mV gXa àH$ënm‘Ü`o 1 àemgH$s` B‘maV {dÚwV O{ZÌ, g§ajU q^V, VmaoMo Hw§$nZ, `oB©c. (Vi + 3 ‘Oco) AgyZ Ë`mMo ~m§YH$m‘ Oc:{ZñgmaU `moOZm, O‘rZ gwemo{^H$aU,

70 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Administrative Building for C. P. Nashik at Nashik

he administrative approval Nashik has been appointed as an Rain water harvesting, Fire fighting Tamounting to `965.26 lakhs Architect and M/s. Civil Tech, Nashik equipments, & storm water drain etc. has been accorded for Aurangabad, has been appointed as a PMC for this The estimated cost of this project is Construction of Administrative Building project. The total built up area of this `787.09 lakhs. The funds are provided for C. P. Nashik at Nashik by the Board project is 5767.52 sq. mt. This project by both Government of India and of Directors of Maharashtra State Police also includes all infrastructural amenities Government of Maharashtra. Project Housing & Welfare Corporation Ltd., viz Water supply scheme, Ground will be started in September 2012. Mumbai in its 189th meeting held on water storage reservior, Over head 22/06/2011. Water Tank, Internal Roads, Internal/ The project consisting of 1 External electrification, Street light, administrative Building (G+3) will be DG set, Compound Wall, Sewerage taken in hand. M/s. Pagar Associates, scheme, Land scaping, Tree plantation,

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 71 ZmJnwa, nmocrg à{ejU H«|$Ð, ZmJnwa `m§MoH$[aVm dgVrJ¥h B‘maV Z§.3 ~m§YH$m‘m~m~V hmamï´> amÁ` nmocrg J¥h{Z‘m©U d ZmJnwa d ì`dñWmnZmMo H$m‘ ‘o. {S>PmB©Z gXa àH$ënmMo A§Xm{OV ‘wë` ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ H$moa, ZmJnwa ho H$aV AgyZ gXa àH$ënmMo `673.89 cmI hmoVo. gXa àH$ënmgmR>r ‘§S>imÀ`m {X. 22/06/2011 amoOr g§nÝZ EHy$U ~m§YH$m‘ joÌ’$i 4708.77 Mm¡. ‘r. ^maV gaH$ma d ‘hmamï´> emgZ `m§À`mH$Sy>Z Pmcoë`m 189 ì`m ~¡R>H$s‘Ü`o ZmJnwa, Amho. Ë`mMà‘mUo gXa àH$ën nmUr nwadR>m, {ZYr CncãY H$éZ XoÊ`mV Amcocm Amho. nmocrg à{ejU H«|$Ð, ZmJnwa `m§MoH$[aVm O{‘ZrImcrc nmÊ`mMr Q>mH$s, B‘maVrdarc àH$ën Zmoìh|~a 2012 ‘Ü`o gwé H$aÊ`mV dgVrJ¥h B‘maV H«$.3 ~m§YH$m‘m§gmR>r nmÊ`mÀ`m Q>mŠ`m, A§VJ©V añVo, A§VJ©V / `oB©c. `1199.62 cmI IMm©g àemgH$s` ~mh` {dÚwVrH$aU, añË`mdarc {dÚwV Im§~, ‘mÝ`Vm àXmZ H$aÊ`mV Amcocr Amho. Oc:{ZñgmaU `moOZm, O‘rZ gwemo^rH$aU, gXa àH$ënm‘Ü`o 1 dgVrJ¥h B‘maV d¥jmamonU, O‘rZrV nmUr ‘wa{dUo Am{U AgyZ Ë`mMo ~m§YH$m‘ hmVr KoÊ`mV `oUma A§VJ©V JQ>mao BË`mXr nm`m^wV gw{dYm Amho. àH$ënmMo AmaoIZ H$m‘ ‘o. YdS>, XoÊ`mMo {Z`mo{OV Amho.

72 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Hostel Building No. 3 for Police Training School, Nagpur at Nagpur

he administrative approval Nagpur has been appointed as a PMC India and Government of Maharashtra. Tamounting to `1199.62 lakhs for this project. The total built up area Project will be started in November has been accorded for Construction of this project is 4708.77 sq. mt. This 2012 of Hostel Building No. 3 for Police project also includes all infrastructural Training School, Nagpur at Nagpur by amenities viz Water supply, overhead the Board of Directors of Maharashtra water tank, Internal roads, Internal/ State Police Housing & Welfare external electrification, Street light, Corporation Ltd., Mumbai in its 189th Sewerage scheme, Land scaping, Tree meeting held on 22/06/2011. plantation, Rain water harvesting, storm The project consisting of 1 Hostel water drain line etc. Building will be taken in hand. M/s. The estimated cost of this project is Dhawad, Nagpur has been appointed `673.89 lakhs. For this project the funds as an Architect and M/s. Design Core, are provided by both Government of

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 73 gm§Jcr, nmocrg AYrjH$ `m§MoH$[aVm drQ>m `oWo 51 {ZdmgñWmZo ~m§YH$m‘ H$aUo hmamï´> amÁ` nmocrg J¥h{Z‘m©U d Am{U Q>mB©n-4 Mr 1 {ZdmgñWmZo A§V^w©V ‘wa{dUo Am{U nmÊ`mMm {ZMam H$aÊ`mgmR>r ‘H$ë`mU ‘hm‘§S>imÀ`m g§MmcH$ AmhoV. àH$ënmMo AmaoIZ ‘o. Q>ocogrg, A§VJ©V JQ>mao BË`mXr nm`m^wV ~m~tMm ‘§S>imÀ`m {X. 16/11/2011 amoOr nwUo ¶m§Mo Amho. àH$ënmVrc gd© B‘maVrMo g‘mdoe Ho$cm Amho. g§nÝZ Pmcoë`m 192 ì`m ~¡R>H$s‘Ü`o EHy$U ~m§YH$m‘ joÌ’$i 4127.78 Mm¡. gXa àH$ënmMo A§Xm{OV ‘wë` `595.95 gm§Jcr, nmocrg AYrjH$ `m§MoH$[aVm drQ>m ‘r. Amho. gXa àH$ënm‘Ü`o nmUr nwadR>m, cmI hmoVo. gXa àH$ënmgmR>r ^maV `oWo 51 {ZdmgñWmZo ~m§YH$m‘ H$aUogmR>r ^y{‘JV ObH§w$^, B‘maVrdarc nmÊ`mÀ`m gaH$ma Am{U ‘hmamï´> emgZ `m§À`mH$Sy>Z `827.97 cmI IMm©g gwYm[aV àemgH$s` Q>mŠ`m, A§VJ©V añVo, A§VJ©V / ~mh` {ZYr CncãY H$éZ XoÊ`mV Amcocm Amho. ‘mÝ`Vm àXmZ H$aÊ`mV Amcocr Amho. {dÚwVrH$aU, añË`mdarc {dÚwwV Im§~, àH$ën E{àb 2012 ‘ܶo gwê$ H$aÊ`mV gXa àH$ënm‘Ü`o Q>mB©n-2 Mr 48 g§ajU q^V, Oc:{ZñgmaU `moOZm, O‘rZ `oUma Amho. {ZdmgñWmZo, Q>mB©n-3 Mr 2 {ZdmgñWmZo gwemo^rH$aU, d¥jmamonU, O‘rZrV nmUr

74 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Sangli, 51 quarters for Superintendent of Police, Sangli at Vita

he revised administrative approval appointed as an Architect. The total built The estimated cost of this project is Tamounting to `827.97 lakhs has up area of this project is 4127.78 sq. mt. `595.95 lakhs. The funds are provided been accorded for Construction of 51 The project includes all infrastructural by both Government of India and quarters for Superintendent of Police, amenities viz Water supply scheme, Government of Maharashtra. Project Sangli at Vita by the Board of Directors Ground Storage Reservoir, Overhead will be completed in June 2013. of Maharashtra State Police Housing & Water Tank on each building, Internal Welfare Corporation Ltd., Mumbai in its Roads, Internal/ External electrification, 192nd meeting held on 16/11/2011. street light, Compound Wall, Sewerage The project consists of Type-II – 48 scheme, Land scaping, Tree plantation, qtrs., Type-III – 2 qtrs. & Type-IV – 1 Rain water Harvesting, storm water qtrs. M/s. Telesis, Pune has been drain etc.

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 75 Zm{eH$, ‘hmamï´> nmocrg AH$mX‘r, Zm{eH$ `m§MoH$[aVm Zm{eH$ `oWo ^moOZmc` B‘maV ({dñVmarV) ~m§YH$m‘m~m~V

ì`dñWmnH$s` g§MmcH$, ‘hmamï´> nmÜ`o, Zm{eH$ d ì`dñWmnZmMo H$m‘ ‘o. gXa àH$ënmMo A§Xm{OV ‘wë` ‘m. amÁ` nmocrg J¥h{Z‘m©U d H$ë`mU MìhmU nmQ>rc Agmo{gEQ>g, Zm{eH$ `112.29 cmI hmoVo. gXa àH$ënmgmR>r ‘hm‘§S>i ‘w§~B© `m§Zr {X. 01/02/2012 ho H$aUma AgyZ gXa àH$ënmMo EHy$U ^maV gaH$ma d ‘hmamï´> emgZ `m§À`mH$Sy>Z Zm{eH$, ‘hmamï´> nmocrg AH$mX‘r, Zm{eH$ ~m§YH$m‘ joÌ’$i 676.14 Mm¡. ‘r. Amho. {ZYr CncãY H$éZ XoÊ`mV Amcocm `m§MoH$[aVm Zm{eH$ `oWo ^moOZmc` B‘maV Ë`mMà‘mUo gXa àH$ënm‘ܶo nmUr nwadR>m Amho. àH$ën Am°ŠQ>m|~a 2012 ‘Ü`o gwé ({dñVmarV) ~m§YH$m‘m§gmR>r `142.53 ¶moOZm, A§VJ©V añVo, A§VJ©V / ~mh` H$aÊ`mV `oB©c. cmI aH$‘og àemgH$s` ‘mÝ`Vm àXmZ {dÚwVrH$aU, Oc:{ZñgmaU `moOZm, O‘rZ H$aÊ`mV Amcocr Amho. gwemo{^H$aU, d¥jmamonU, A§VJ©V JQ>mao gXa àH$ënm‘Ü`o 1 ^moOZmc` B‘maV BË`mXr nm`m^wV gw{dYm XoÊ`mMo {Z`mo{OV AgyZ Ë`mMo ~m§YH$m‘ hmVr KoÊ`mV `oUma Amho. Amho. àH$ënmMo AmaoIZ H$m‘ ‘o. gw{à`m

76 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Mess Building (extension) for Maharashtra Police Academy, Nashik at Nashik

he Managing Director of and M/s. Chavhan Patil Associates, India and Government of Maharashtra. TMaharashtra State Police Housing Nashik has been appointed as a PMC for Project will be started in October 2012. & Welfare Corporation Ltd., Mumbai this project. The total built up area of has given the administrative approval this project is 676.14 sq. mt. This project for Construction of Mess Building also includes all infrastructural amenities (extension) for Maharashtra Police viz Water supply scheme, Internal Academy, Nashik at Nashik amount to Roads, Internal/ External electrification, `142.53 lakhs on 01/02/2012. Sewerage scheme, Land scaping, Tree The project consisting of 1 Ground plantation & storm water drain etc. floor Mess Building (extension) will The estimated cost of this project is be taken in hand. M/s. Supria Padhye, `112.29 lakhs. For this project the funds Nashik has been appointed as an Architect are provided by both Government of

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 77 Hostel Building No. 3 for Police Training School, Nagpur at Nagpur

78 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 REPORTS

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 79 DIRECTOR’S REPORT TO THE SHAREHOLDERS

Dear Shareholders, Rules, 1988 for conservation of Energy, Technology Absorption and Foreign Exchange earnings and Your Directors have pleasure in presenting the outgo are not applicable to the company having Annual Report on the business and operations of the regard to the nature of business of the company. company and Audited Statement of Accounts of the Company for the year ended 31st March, 2012. DIRECTOR RESPONSIBILITY STATEMENT FINANCIAL RESULTS Pursuant to section 217(2AA) of the Companies Act, 1956 the Directors confirm that: The Income and Expenditure of the company during the Financial Year 2011-12 shows reserve In presentation of the annual accounts, the and surplus amounting to `1,90,22,008.36/- applicable standards had been followed along with proper explanation relation to material departures; The Directors had selected such accounting GENERAL REVIEW policies and applied them consistently and made The company’s performance was satisfactory judgments and estimates that are reasonable and during the year. The company has successfully prudent so as to give a true and fair view of the state completed nine projects and reached the completion of affairs of your company at the end of the financial stage of many projects during the year. Your year; Directors are hopeful that the company shall be able The Directors had taken proper and sufficient to achieve its target of projects in the year to come. care for the maintenance of adequate accounting The future of the company seems to be bright. records in accordance with the provisions of this Act for safeguarding the assets of your company DIVIDEND and for preventing and detection fraud and other irregularities; Directors have not recommended dividend during the year, in order to conserve the resources and build The Directors had prepared the annual accounts the net worth of the company. on a going concern basis.

PARTICULARS OF EMPLOYEES AUDITORS None of the employee of the company received M/s. I. C. Jain & Co. Chartered Accountant, remuneration in excess of the limit specified u/s 217 are appointed statutory Auditor of the company. (2A) of the Companies Act, 1956. The said appointment is made by Comptroller and Auditor General of India vide letter no. CA/V/ COY/MAHARASHTRA/MHPOLI (I) 1532, dt. DISCLOSURE OF PARTICULARS WITH 24/01/2012. RESPECT OF CONSERVATION OF ENERGY The details as required by Companies (Disclosure of particulars in Report of Board of Directors)

80 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 COMPLETED PROJECTS DURING THE YEAR The following projects have been completed during the Financial year (2011-12):- Sr.No. Name of the Project 1 Aurangabad, 309 Police Qtrs. at Satara 2 Beed, New Admn. Bldg. for Addl. S.P. Ambejogai 3 Mumbai, Hostel Bldg. No. 2 for PTS at Marol. 4 Mumbai, Traffic Adm. Bldg. at Byculla 5 Nagpur, Admn. Bldg. for U.O.T.C. & 108 Qtrs. 6 Nagpur, Barracks for 288 Policemen 7 Nanded, Admn. Bldg. for Special I.G.P. at Nanded 8 Nandurbar, 168 Qtrs. for S.P. Nandurbar. 9 Nandurbar, Admn. Bldg. at H.Q. for S.P. 10 Navi Mumbai, Admn. Bldg. at H.Q. for C.P. 11 Parbhani, New Admn. Bldg. for S.P. Parbhani. 12 Raigad, Admn. Bldg. for S.P. Raigad. 13 Solapur, 71 Qtrs. at Akkalkot 14 Solapur, Admn. Bldg. for C.P. Solapur. 15 Yeotmal, 45 Qtrs. at Darati

APPRECIATION We wish to place on record our deep and sincere appreciation for the contribution made by the Executives, Officers, Staff to the performance of the Company. For and on behalf of the Board of Directors

Sd/- Sd/- (Dr. Amitabh Rajan) (Praveen Dixit) Chairman Managing Director

Sd/- (Vineet Agarwal) Director

Place : Mumbai Date : 15/09/2012

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 81 AUDITORS’ REPORT

To, The Members of MAHARASHTRA STATE POLICE HOUSING AND WELFARE CORPORATION LIMITED, MUMBAI.

We have audited the annexed Balance sheet of MAHARASHTRA STATE POLICE HOUSING AND WELFARE CORPORATION LIMITED, as at 31/03/2012 and the Income and Expenditure Account for the year ended on that date annexed thereto. These financial statements are the responsibility of the company's management. Our responsibility is to express an opinion on these financial statements based on our audit. We conducted our audit in accordance with Auditing standards generally accepted in India. Those Standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating overall financial statement presentation. We believe that our audit provides a reasonable basis for our opinion. 1. This report includes a statement on the matters specified in paragraph 4 of the Companies (Auditor’s Report) Order, 2003, issued by the department of company affairs, in terms of section 227 (4A) of the companies Act, 1956.

2. Further to our comments in the annexure referred to in paragraph 1 above, we State that:- (a) We have obtained all the information and explanations, which to the best of our knowledge and belief were necessary for the purpose of our audit; (b) In our opinion books of accounts as required by the law have been kept by the company so far as it appears from the examination of such books; (c) The Balance Sheet and the Income and Expenditure Account dealt with by this report, are in agreement with the said books of accounts; (d) In Our opinion the Balance Sheet and the Income and Expenditure Account comply with the accounting standards referred to in Sub Section 3(c) of Section 211 of the Companies Act, 1956; (e) On the basis of written representation received from the directors as of 31/03/2012 and taken on record by the board of directors, We report that none of the directors is disqualified as of31/03/2012 from being appointed as a director in terms of clause (g) of sub section (1) of Section 274 of the Companies Act, 1956; (f) In Our opinion and to the best of Our information and according to the explanations given to us, read with Accounting Policies and notes on Accounting mentioned in schedule O, the said accounts give the information required by the Companies Act, 1956, in the manner so required give a true and fair view Subject to :

82 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Note no. O-09 Regarding non-provision of doubtful recovery of fixed deposits with Dadar Janta Sahakari Bank. Note no. O-12(A) Regarding doubtful recovery from the following projects: • 168 Qtrs S.P Nandurbar, Dhule; contract awarded to M/s Sainath Enterprises. • 186 Qtrs at S.P Ratnagiri; contract awarded to M/s Sainath Enterprises. • 442 Qtrs at Wanawadi, Pune; contract awarded to M/s ECP Housing (INDIA) Pvt. Ltd. Note no. P-13(B) Regarding non-provision from the following projects: • 550 Qtrs at Nagpur; contract awarded to M/s National Contractors & Engineers. (i) In the case of the Balance Sheet, of the State of Affairs of the company as at 31/03/2012 and; (ii) In the case of the Income and Expenditure Account, of the deficit of the company for the year ended on that date. Note no. P-14 3 % Centage charges : The Corporation has created a centage fund as per Board Resolution No. 1078 for the first time by charging 3% on the project cost and after expenses are adjusted. Note no. P-15 TDS Recoverable from Income Tax. Note no. P-16 Short provision written of expenses.

Place: Mumbai For: I.C. Jain & Co. Date: 15/09/2012 (Chartered Accountants) FRNo. 103912W

Sd/- (C.A. I.C. Jain). (Proprietor) M.No.036803

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 83 ANNEXURE TO THE AUDITORS’ REPORT

1. In respect of its Fixed Assets: (a) The company has not maintained proper records showing full particulars including quantitative details and situation of fixed assets. (b) Fixed assets have been physically verified by the management at reasonable intervals; No material discrepancies were noticed on such verification. (c) No substantial part of fixed assets have been disposed off during the year, and it has not affected the going concern. 2. In respect of its inventories: The company does not have any inventory. Accordingly, clause 4(ii) of the order is not applicable to the company. 3. In respect of Loans granted and taken to / from parties covered in the register maintained u/s 301 of the Companies Act, 1956. As informed, during the year, the company has neither granted nor taken any loan, secured or unsecured, to/ from company, firms and other parties listed in the register maintained under section 301 of the companies act, 1956. Accordingly, clause 4(iii) of the order is not applicable to the company. 4. In respect of Internal Control In our opinion and according to the information and explanations given to us there are adequate internal control system commensurate with the size of the company and the nature of its business, for the purchase of inventory and fixed assets and for the sale of goods and services. During the course of audit, We have not observed continuing failure to correct major weaknesses in internal control system. 5. In respect of Contracts or Arrangements need to be entered into a register maintained u/s 301 of the Companies Act, 1956 According to the information and explanations provided by the management, we are of the opinion that there are no contracts or arrangements, the particulars of which need to be entered into the register required to be maintained under section 301 of Companies Act, 1956. 6. In respect of Deposits from Public The company has not accepted any deposits from the public during the year. Accordingly, clause 4(vi) of the order is not applicable to the company. 7. In respect of Internal Audit System In our opinion the company has an adequate internal audit system which is commensurate with the size and nature of its business. 8. In respect of Maintenance of Cost Records The company is not required to maintain cost records pursuant to the Rules made by the Central Government for the maintenance of cost records under Section 209 (1) (d) of the Act. 9. In respect of Statutory Dues Undisputed statutory dues including provident fund, investor education and protection fund, employees state insurance, income tax, sales tax, wealth tax, service tax, customs duty, excise duty, cess have been regularly deposited with the appropriate authorities though the delays in deposit have not been serious. 10. In respect of Accumulated Losses and Cash Losses The company does not have any accumulated losses at the end of the financial year and has not incurred cash losses in the financial year and in the immediately preceding financial year.

84 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 11. In respect of dues to Financial Institution / Banks / Debentures Based on our audit procedures and as per the information and explanations given by the management, we are of the opinion that the company has not defaulted in repayment of dues to a financial institution, although there is delay in payment of installments in certain cases. 12. In respect of Loans and Advances granted on the basis of security The company has not granted loans and advances on the basis of security by way of pledge of shares, debentures and other securities. 13. In respect of Provisions applicable to Chit Fund In our opinion and according to information and explanations given to us the company is not chit fund or a nidhi or mutual benefit fund/society. Accordingly, the provisions of clause 4(xiii) of the Order are not applicable to the company. 14. In respect of Dealing or trading in shares, securities, debentures and other investment In our opinion, the company is not dealing in or trading in shares, securities, debentures and other investments. Accordingly, the provisions of clause 4(xiv) of the companies (Auditor`s Report) Order, 2003 (as amended) are not applicable to the company. 15. In respect of Guarantee given for Loans taken by others According to the information and explanations given to us, the company has not given any guarantee for loans taken by others from bank or financial institutions. 16. In respect of Application of Term Loans Based on information and explanations given to us by the management, term loans were applied for the purpose for which the loans were obtained. 17. In respect of Fund used According to the information and explanations given to us and overall examination of the balance sheet of the company, we report that no funds raised on short-term basis have been used for long-term investment by the company. 18. In respect of Preferential Allotment of Shares The company has not made any preferential allotment of shares to parties and companies covered in the register maintained u/s 301 of the Act, during the year. 19. In respect of Securities created for Debentures The company has not issued any debentures during the year. 20. In respect of end use of money raised by Public issues The company has not raised any money from the public during the year. 21. In respect of Fraud According to the information and explanation given to us, no fraud on or by the company has been noticed or reported during the financial year.

Place : Mumbai For: I. C. Jain & Co. Date : 15/09/2012 (Chartered Accountants)

Sd/- I. C. Jain & Co.

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 85 BALANCE SHEET 2011 - 12

86 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 BALANCE SHEET AS AT 31st MARCH , 2012 PARTICULARS NOTE NO. AS AT 31.03.2012 (`) AS AT 31.03.2011 (`) I. EQUITY AND LIABILITIES (1) Shareholder's Funds: (a) Share capital "1" 7,95,91,000.00 7,95,91,000.00 (b) Reserves & surplus "2" 1,90,22,008.36 - (c) Money Received Against share Warrant - - (2) Share Application money pending allotment - - (3) Non- Current Liabilities (a) Long Term Borrowings - - (b) Defferd Tax Liabilities (Net) - - (c) Other Long term Liabilities "3" 4,33,25,14,179.21 2,73,57,65,080.16 (d) Long Term provisions - - (4) Current Liabilities (a) Short Term Borrowings - - (b) Trade Payable "4" 3,03,37,301.46 4,83,38,013.46 (c) Other Current Liabilities "5" 1,76,69,322.00 2,46,17,325.00 (d) Short Term Provisions "6" 7,17,08,582.00 7,79,52,358.00 TOTAL 4,55,08,42,393.03 2,96,62,63,776.62

II. ASSETS Non-Current Assets (1) (a) Fixed Assets (i) Tangiable Assets "7" 12,96,98,604.58 13,04,35,988.75 (ii) Intangiable Assets - - (iii) Capital Work - in - progress "8" 1,86,49,58,336.92 2,08,98,48,789.85 (iv) Intangiable Assets Under development - - (b) Non- Current Investments "9" - 1,000.00 (c) Defferd Tax Assets (net) - - (d) Long Term loans & Advances "10" 1,56,210.00 1,31,210.00 (e) Other Non- Current Assets - - (2) Current Assets (a) Current Investment - - (b) Inventories - - (c) Trade Receivables - - (d) Cash & Cash Equivalents "11" 1,84,54,03,825.90 66,17,84,687.15 (e) Short Term Loans & Advances "12" 61,36,76,163.00 38,497.00 (f) Other Current Assets "13" 9,69,49,252.63 8,40,23,603.87 TOTAL 4,55,08,42,393.03 2,96,62,63,776.62

As per our Report attached of even Date For: I.C. Jain & Co. For: Maharashtra State Police Housing Chartered Accountants & Welfare Corporation Ltd. FRN No.: 103912 W Sd/- Sd/- Sd/- (Dr. Amitabh Rajan) (Praveen Dixit) Proprietor Chairman Managing Director (CA I.C. Jain) M. No. 036803 Sd/- (Vineet Agarwal) Place: Mumbai Director Date: 15/09/2012

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 87 STATEMENT OF PROFIT AND LOSS ACCOUNT FOR THE YEAR ENDED 31ST MARCH 2012

PARTICULARS NOTE NO. AS AT 31.03.2012 (`) AS AT 31.03.2011 (`) I. Revenue From Operations Income "14" 5,55,90,201.00 - II. Other Income "15" 22,54,102.78 14,17,817.82

III. TOTAL REVENUE (I + II) 5,78,44,303.78 14,17,817.82

IV. Expenses: Employees Benefit Cost "16" 2,76,61,374.00 2,35,27,929.50 Other Expenses: Administrative Expenses "17" 87,36,799.00 75,28,964.00 Financial Expenses "18" 64.00 710.00 Depreciation 24,24,058.42 23,83,804.25

V. TOTAL OF EXPENSES 3,88,22,295.42 3,34,41,407.75

Net Profit/ (loss) Before Tax 1,90,22,008.36 (3,20,23,589.93) Less: Allocated To Projects - 3,20,23,589.93 Less: Transfer to Centage Reserve Fund 1,90,22,008.36 - Net Profit/ (loss) Before Tax

Less: Provision For Tax - - Current tax - - Fringe Benefit Tax - -

Profit/loss for the Year

Basic & Diluted Earning Per Share - -

As per our Report attached of even Date For: I.C. Jain & Co. For: Maharashtra State Police Housing Chartered Accountants & Welfare Corporation Ltd. FRN No.: 103912 W Sd/- Sd/- Sd/- (Dr. Amitabh Rajan) (Praveen Dixit) Proprietor Chairman Managing Director (CA I.C. Jain) M. No. 036803 Sd/- (Vineet Agarwal) Place: Mumbai Director Date: 15/09/2012

88 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 NOTES TO ACCOUNTS OF BALANCE SHEETS AS AT 31ST MARCH, 2012

As at As at PARTICULARS NOTE NO. 31.03.2012 (`) 31.03.2011 (`) SHARE CAPITAL "1" Authorised 100,000 Equity Shares of `1,000/- each 10,00,00,000.00 10,00,00,000.00 Issued , Subscribed and Paid up 79,591(P.Y.79,591) Equity Shares of `1,000/- each 7,95,91,000.00 7,95,91,000.00 Fully Paid up Issued to Government of Maharashtra (of the above 78,274) shares issued for consideration other than Cash) TOTAL 7,95,91,000.00 7,95,91,000.00

RESERVES & SURPLUS "2" Centage Reserve Fund 1,90,22,008.36 - TOTAL 1,90,22,008.36 - (a) Reconciliation of the number of shares: Particular As on 31.03.2012 (`) As on 31.03.2011 (`) No. of Shares Amount In (`) No. of Shares Amount In (`) Opening Balance 79,591 7,95,91,000.00 79,591 7,95,91,000.00 Changes during the Year - - - - Closing Balance 79,591 7,95,91,000.00 79,591 7,95,91,000.00

(b) Details of Equity Shares held by each shareholders holding more than 5% Particular As on 31.03.2012 (`) As on 31.03.2011 (`) No. of Shares Amount In (`) No. of Shares Amount In (`) Govt. of Maharashtra 79,581 7,95,81,000.00 79,581 7,95,81,000.00

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 89 NOTES TO ACCOUNTS FORMING PART OF BALANCE SHEET AS AT 31ST MARCH 2012 As at 31.03.2012 As at 31.03.2011 Particulars Note No. Rupees Rupees (3) NON CURRENT LIABILITIES

(c) Other Long term Liabilities "3" Security Deposit From PMC 21,34,675.00 7,67,209.00 Security Deposit From Architect 6,84,732.00 1,42,534.00 Security Deposit From Contractors 10,08,96,927.25 10,80,83,922.25 State Government of Maharashtra 7,82,73,008.08 7,82,73,008.07 Grants 41,87,13,606.00 - PWD Grant Payable 14,00,02,586.00 14,00,02,586.00 Grant Payable towards project at planning Stage 1,50,25,106.00 4,00,00,000.00 G.R NO. SUP0611/C.R.348/POL-7 3,75,00,000.00 - G.R. NO. CRP-0411/C.R. 179/POL-7 18,75,28,000.00 - G.R. NO. CRP-1011/C.R. 535/POL-7 60,00,000.00 - G.R. NO. CRP-0411/C.R. 182/POL-7 4,57,40,000.00 - G.R. NO. CRP-0411/C.R. 181/POL-7 1,68,40,000.00 - G.R. NO. CRP-0411/C.R. 180/POL-7 12,81,65,000.00 - G.R. NO. PLF/0110/1961/CR741/POL4 2,00,00,000.00 - G.R. NO. PLF/0110/1961/CR741/POL4 5,13,00,000.00 - G.R. NO. TEX-0309/CR-985/POL-5A 12,06,00,000.00 - Grant Payable Towards Amaravati SP 82(205) 3,08,99,258.50 - Grant Payable Towards Babhalgaon PTS Hostel Bldg. 12,54,79,454.53 - Grant Payable Towards Costal Security Scheme A/c No. 43,70,045.00 - Grant Payable Towards C.P. Ghatkopar 2,40,23,052.00 - Grant payable Towards CP Mumbai Kolekalyan Vakola 1,64,63,194.37 - Grant payable Towards DG Equipments A/c No. 4 21,88,58,105.00 - Grants Payable Towards DG Naxal A/c No. 5 1,72,45,033.00 - Grant payable Towards Ghatkopar Gulistan Comp. (261) 4,22,44,156.00 - Grant payable Towards Goregaon Compound Wall Force 5,56,50,000.00 - Grants Payable Towards Hingoli S.P. 164 67,63,135.41 - Grant Payable Towards Kolhapur SP 2,11,99,517.00 - Grants Payable Towards Marol Hostel Bldg 1,82,673.78 - Grant Payable Towards Nagpur M.T Workshop 50 64,05,893.98 - Grant Payable Towards Nandura (S.P. Buldhana) 5,91,95,953.60 - Grant Payable Towards Oros. Sindhudurg 1,12,01,716.47 - Grant Payable Towards Pune Wanwadi 442 16,57,81,674.43 - Grant Payable Towards to Buldhana S.P. 63 1,48,12,651.51 - Grant Payable Towards Sangali Tasgaon 11,86,84,064.31 - Grant Payable Towards SID Speed Boat A/c No. 6 13,81,95,523.00 - Grant Payable Towards Solapur CP 2,00,000.00 - Grant Payable Towards Washim 172 1,24,89,804.92 - Grant Payable Towards CP Mumbai Vakola 324 8,44,91,952.04 - Grants received toward Work in Progress 1,01,20,40,488.03 1,52,03,25,099.84 Grant Payable Towards Costal Security Scheme 24,61,41,161.00 27,09,99,542.00 Misc Grant payable - 4,06,86,924.00 Grant From Govt. of Mah (CIDCO) - 6,53,73,000.00 Grant Payable Towards SID 1,719.00 1,719.00 Planning Stage - - Grant Payable Towards CCTNS Project 12,45,47,827.00 6,89,34,051.00 Grant Payable towards life & Bomb Security Scheme 38,25,66,000.00 38,25,66,000.00 Grant Payable towards Land 7,42,000.00 21,42,000.00 Grant Payable towards Home Guard 2,21,82,485.00 1,74,15,485.00 Grant payable towards State Security Guard 52,000.00 52,000.00 TOTAL 4,33,25,14,179.21 2,73,57,65,080.16

90 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 NOTES TO ACCOUNTS FORMING PART OF BALANCE SHEET AS AT 31ST MARCH 2012 As at 31.03.2012 As at 31.03.2011 Particulars Note No. Rupees Rupees (4) Current Liabilities (b) Trade Payable "4" Sundry Creditors for Works (Payable to PWD) 3,03,37,301.46 4,83,38,013.46 TOTAL 3,03,37,301.46 4,83,38,013.46

(c) Other Current Liabilities "5" other liabilities (refer Grouping) 1,76,69,322.00 1,76,69,322.00 TOTAL 1,76,69,322.00 1,76,69,322.00

(d) Short Term provision "6" Provision for WIP 6,43,45,836.00 7,36,89,959.00 Recovery: Government 11,267.00 48,09,229.00 Recovery: Non Government 200.00 200.00 Provision for Expenses 5,43,402.00 5,94,151.00 Remuneration to MD Payable 1,36,800.00 - Salary Payable 14,50,507.00 15,44,423.00 Provision for Gratuity 37,33,226.00 27,22,729.00 Provision for Leave Encashment 14,87,344.00 15,39,670.00 TOTAL 7,17,08,582.00 8,49,00,361.00

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 91 4,261.00 As at 8,00,549.00 6,01,868.00 3,18,297.00 1,21,203.00 11,99,886.00 11,99,886.00 20,56,286.00 31/03/2011 2,46,27,123.00 10,07,06,517.00 13,04,35,990.00 13,14,34,798.00 Net Block 2,557.00 As at 5,25,345.00 5,71,775.00 1,16,151.00 16,84,098.00 13,90,399.00 12,88,495.58 31/03/2012 2,33,95,767.00 10,07,24,017.00 12,96,98,604.58 13,04,35,989.75 - Upto 2,29,725.00 2,66,050.00 2,68,210.00 20,39,102.00 57,08,998.00 20,08,985.00 24,82,739.42 31/03/2012 1,00,68,050.00 2,30,71,859.42 2,06,47,801.25 ------year 6,03,082.00 Recouped/ During the Adjustment Depreciation - 1,704.00 year 30,093.00 18,441.00 3,36,904.00 3,72,188.00 1,95,847.00 2,37,525.42 During the 12,31,356.00 24,24,058.42 23,83,804.25 - Upto 2,64,346.00 1,99,632.00 2,49,769.00 01-04-2011 17,02,198.00 53,36,810.00 18,13,138.00 22,45,214.00 88,36,694.00 2,06,47,801.00 1,88,67,079.00 As at 2,68,607.00 8,01,500.00 3,84,361.00 25,64,447.00 73,93,096.00 33,99,384.00 37,71,235.00 31/03/2012 3,34,63,817.00 10,07,24,017.00 15,27,70,464.00 15,10,83,791.00 ------Year Deduction During the 6,31,541.00 DEPRECIATION ON FIXED ASSETS FOR THE F.Y 2011-2012 THE F.Y ASSETS FOR ON FIXED DEPRECIATION DEPRECIATION ON FIXED ASSETS FOR THE F.Y 2011-2012 THE F.Y ASSETS FOR ON FIXED DEPRECIATION - - - - Year 61,700.00 17,500.00 13,389.00 Purchase 3,86,360.00 During the 12,07,726.00 16,86,675.00 14,13,454.00 Gross Block Gross As at 2,68,607.00 8,01,500.00 3,70,972.00 25,63,511.00 25,63,511.00 25,02,747.00 73,93,096.00 30,13,024.00 01-04-2011 3,34,63,817.00 10,07,06,517.00 15,10,83,791.00 15,03,01,878.00 Description Computers (40%) Digital Duplicate Machine(40%) Land Office Quarters (5%) Furniture & Fixtures (18.1%) O ffice E quipments (13.91%) Vehicles (25.89%) Air Conditioners (13.91%) CURRENT CURRENT TOTAL YEAR Worli Welfare Welfare Worli Complex (5%) PERVIOUS PERVIOUS TOTAL YEAR 5 6 1 2 3 4 7 8 9 S r . N o . Note to Account "7" Note to

92 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 3,32,963.69 1,17,508.85 9,65,172.88 value 11,84,792.63 11,84,792.63 11,33,984.74 11,33,984.74 12,36,069.82 50,35,953.32 1,11,85,345.54 1,11,85,345.54 2,11,27,800.87 2,11,27,800.87 9,09,69,116.23 9,09,69,116.23 8,44,84,514.01 4,30,13,286.96 4,00,28,503.95 7,48,71,783.75 7,01,61,335.49 4,83,78,145.83 2,60,06,381.58 5,36,23,034.32 27,92,11,923.96 27,92,11,923.96 11,22,97,352.07 11,22,97,352.07 21,38,46,115.03 21,38,46,115.03 21,21,45,453.98 36,44,30,236.57 10,91,71,560.86 New Closing 1,86,49,58,336.92 ------Loss to Project Apportioned 3,32,963.69 1,17,508.85 9,65,172.88 11,84,792.63 11,84,792.63 11,33,984.74 11,33,984.74 12,36,069.82 50,35,953.32 Balance 1,11,85,345.54 1,11,85,345.54 2,11,27,800.87 2,11,27,800.87 9,09,69,116.23 9,09,69,116.23 8,44,84,514.01 4,30,13,286.96 4,00,28,503.95 7,48,71,783.75 7,01,61,335.49 4,83,78,145.83 2,60,06,381.58 5,36,23,034.32 New Closing 27,92,11,923.96 27,92,11,923.96 11,22,97,352.07 11,22,97,352.07 21,38,46,115.03 21,38,46,115.03 21,21,45,453.98 36,44,30,236.57 10,91,71,560.86 1,86,49,58,336.92 31/03/2012 at 9,565.24 27,103.31 96,442.37 78,565.27 92,306.59 9,10,489.46 1,00,616.34 4,09,927.65 as 57,11,147.36 57,11,147.36

68,77,057.08 35,01,290.54 32,58,328.58 17,19,807.40 91,41,027.90 60,94,578.83 74,04,905.05 39,37,991.17 88,86,587.85 21,16,924.89 43,64,926.19 1,74,07,118.41 1,74,07,118.41 1,72,68,684.24 2,27,27,908.90 2,96,64,697.34 Apportioned 15,18,07,997.97 Interest on FD on Interest 3,60,067.00 1,27,074.09 12,81,235.00 13,36,686.16 54,45,880.97 10,43,738.15 12,26,291.33 Balance Closing 1,20,95,835.00 9,13,61,571.09 4,65,14,577.50 4,32,86,832.53 2,28,47,608.27 8,09,66,362.58 9,83,74,021.28 5,23,16,137.00 7,58,72,482.85 2,81,23,306.47 5,79,87,960.51 11,80,58,148.71 11,80,58,148.71 22,94,14,138.22 30,19,39,832.86 39,40,94,933.91 12,14,38,379.97 23,12,53,233.44 2,01,67,66,334.89 B alance S heet of Year 3,60,067.00 7,34,938.00 1,05,280.00 4,02,775.00 12,81,235.00 36,13,573.00 10,00,000.00 95,57,400.00 Addition (42,77,797.00) 1,20,95,835.00 7,91,15,590.00 1,57,85,121.00 2,44,66,582.00 8,32,77,958.00 2,18,32,253.00 2,87,98,908.00 3,33,04,389.00 5,23,16,137.00 1,10,60,128.00 2,21,83,470.00 3,31,78,467.00 During the 11,32,08,968.00 11,32,08,968.00 82,78,32,531.00 14,46,12,827.00 13,98,18,427.00 ------21,794.09 43,738.15 6,01,748.16 8,23,516.33 ched u le - 8 S W or k in P ro g ress d u rin 2011-12 10,15,355.27 97,23,677.97 Balance Opening 1,22,45,981.09 3,07,29,456.50 1,88,20,250.53 9,26,39,471.97 4,76,61,973.58 9,47,60,448.28 6,48,12,354.85 9,58,74,678.71 1,85,65,906.47 2,48,09,493.51 9,14,34,806.44 14,61,36,180.22 15,73,27,005.86 28,08,85,965.91 1,18,89,33,803.89 C apital S chedule forming part TOTAL Name of Project Sangali,51 Qrts for S.P at Vita at Sangali,51 Qrts for S.P Mumbai Admn Bldg for C.P. at Crowford Market Admn Bldg for C.P. Mumbai Thane Admn. Bldg for S.P. (r) at Thane (r) at Admn. Bldg for S.P. Thane at Usmanbad Barrack for 400 police man S.P. Tuljapur Aurangabad at For C.P. Aurangabad 56 Qr. Raigad Admn.Bldg. for S.P. at Alibaug at Admn.Bldg. for S.P. Raigad at Santacruz (w) Wireless For Mumbai 140 Qr. X at Soregaon For SRPF Gr. Solapur 197 Qr. Thane at For C.P. Thane 262 Qr. Raigad 36 QRts S.P. at Alibag at Raigad 36 QRts S.P. Nagpur U.O.T.C Admn. Bldg. for Sp. IGP Nanded Nandurbar Nandurbar H.Q. for S.P. Mumbai 24 Qr. for senior police officer at Malbar Mumbai 24 Qr. Hill Mumbai Compund wall for Force One at Goregaon Mumbai Hostel No. 2 for 210 trainee PTS Marol Yavatmal 45 Qr. For SP at Darati For SP 45 Qr. Yavatmal for PTS Nanveej Trainee Pune Hostel for 210 For Force Admn Bldg.,Hostel and 96 Qr. Mumbai One at Goregaon For SP Gadchiroli 244(168+76) Qr. WORK IN PROGRESS Akkalkot at Solapur 71 Qtrs. For SP Beed, Admn. Bldg. for Addl. SP at Ambejogai at Addl. SP Admn. Bldg. for Beed, Admn. Bldg. for C.P. Amravati for SRPF XI at Balegaon (phase Thane, 171 Qr. -II) 5 6 7 8 1 2 3 4 11 26 25 22 23 24 17 18 19 21 16 13 14 15 10 12 Sr. Sr. No

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 93 NOTES FORMING PART OF BALANCE SHEET AS AT 31/03/2012 COMPLETED WORKS DURING THE YEAR 2011-2012

Sr. Opening Balance Addition During Closing Value as Name of the project No. as on 01-04-2011 the year on 31-03-2012 1 Ahmednagar 101 Qtrs. at Sangamner 33,15,946.44 (5,81,328.00) 27,34,618.44 2 Akola Hostel for 210 Trainees PTS Akola 7,69,569.69 - 7,69,569.69 3 Amravati 82 Qtrs. For SP at Amravati 31,70,691.50 (31,70,691.50) - 4 Amravati S.P. (CID) Admn. Bldg. 96,066.24 - 96,066.24 5 Amravati SRPF Gr. IX Admn. Bldg. 21,50,158.33 - 21,50,158.33 6 Buldhana 63 Qtrs. For SP Buldhana 22,08,835.49 3,12,651.51 25,21,487.00 7 Chandrapur 220 Qtrs. - 36,68,360.00 36,68,360.00 8 Mumbai Hostel for 1496 constables at Kola Kalyan Vakola 21,10,650.63 (21,10,650.66) - 9 Dhule 300 Trainees at PTS Mess 6,47,735.48 (47,175.00) 6,00,560.48 10 Dhule srpf Gr, XI Admn. Bldg. 12,75,756.99 (7,15,00,000.00) (7,02,24,243.01) 11 Gadchiroli 168 Qtrs. 39,52,785.14 21,79,482.00 61,32,267.14 12 Gadchiroli 192 Qtrs. 20,00,977.72 (2,25,365.00) 17,75,612.72 13 Mumbai Ghatkopar Gulistan Compound 232 Qtrs. Ph-I 30,75,706.12 79,53,218.00 1,10,28,924.12 14 Gondia 235 Qtrs. At Gondia 41,810.84 4,94,148.00 5,35,958.84 15 Hingoli 164 Qtrs. For SP Hingoli. 9,36,209.59 (9,36,209.59) - 16 Hingoli SRPF Gr. XII 29,89,031.68 - 29,89,031.68 17 Mumbai Tungave PPP Project (Closed) 1,85,79,099.31 48,77,062.35 2,34,56,161.66 18 Aurangabad IRB HQ Bldg. at Aurangabad 16,46,640.15 (17,62,42,571.00) (17,45,95,930.85) 19 Jalna 3 Addl. Classroom at PTS Jalna 9,66,245.71 61,718.00 10,27,963.71 20 Jalna II 210 Trainees Hostel Bldg. 46,471.87 58,08,728.14 58,55,200.01 21 Pune Khandala Nanveej 74,78,005.64 1,52,343.00 76,30,348.64 22 Pune Khandala PTS 3 Classroom Mess 99,54,095.45 28,07,327.00 1,27,61,422.45 23 Latur Hostel for 210 Trainees for PTS Babhalgaon. 25,96,147.47 (25,96,147.47) - 24 Mumbai, Hostel Bldg. 210 Trainees at Marol PTS 6,74,207.22 98,457.78 7,72,665.00 25 Mumbai Addl. Classroom & Mess 300 Trainees at Marol. 6,12,176.31 (1,21,413.00) 4,90,763.31 26 Mumbai Traffic Training Institute & Hostel Bldg. at Byculla 5,26,81,597.85 6,52,95,531.00 11,79,77,128.85 27 Nagpur 38 Toilets & 38 Bathrooms for 300 Trainees 8,51,222.65 - 8,51,222.65 28 Nagpur CID Bldg. 2,32,123.27 2,46,795.00 4,78,918.27 29 Nagpur 550 Qtrs. 0.01 1,08,33,083.78 1,08,33,083.79 30 Nagpur Hostel Bldg. for 210 Trainess 13,51,887.64 (1,67,14,382.00) (1,53,62,494.36) 31 Nanded Admn. Bldg. for SP Nanded 1,18,58,866.39 (1,18,58,866.39) - 32 Buldhana Admn. Bldg. for SP at Nandura 5,23,794.40 (5,23,794.40) - 33 Pune 3 Classroom Hall etc. for Nanveej PTS 13,58,342.11 16,49,311.00 30,07,653.11 34 Nashik 210 Trainees Hostel at MPA Nashik 29,32,373.73 15,228.00 29,47,601.73 Nashik 250 Hostel Bldg. for PSI & 3 Addl. Classroom at 35 9,67,091.67 50,352.00 10,17,443.67 MPA Nashik. 36 Nashik 8 Resi. Qtrs. (Type - II) at MPA Nashik. 3,85,142.21 2,26,394.00 6,11,536.21 37 Nashik SP (Rural) 1,20,321.12 (1,04,12,720.00) (1,02,92,398.88) 38 Pune Bldg. CID 41,06,561.22 (14,45,335.00) 26,61,226.22 39 Pune SPU Trainees Centre 21,92,901.65 (8,40,91,502.00) (8,18,98,600.35) 40 Pune 442 Qtrs. At Wanwadi. 17,10,879.68 1,95,94,910.43 2,13,05,790.11 41 Ratnagiri 168 Qtrs. 47,30,129.74 (2,27,05,936.00) (1,79,75,806.26) 42 Sangli PTS Tasgaon at Turchi 1,16,16,268.00 (98,87,407.65) 17,28,860.35 43 Solapur SP Rural 13,41,291.66 35,43,749.00 48,85,040.66 44 Solapur WPTS 3,47,54,479.25 (4,41,602.00) 3,43,12,877.25 45 Thane Admn. Bldg. for SRPF Gr. XI at Balegaon 74,33,058.81 9,42,210.00 83,75,268.81

94 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 COMPLETED WORKS DURING THE YEAR 2011-2012 Sr. Opening Balance Addition During Closing Value as Name of the project No. as on 01-04-2011 the year on 31-03-2012 46 Mumbai Vakola 88,60,859.65 1,57,89,433.04 2,46,50,292.69 47 Jalgaon Varangaon 50 Qtrs. (Closed) 7,78,147.32 - 7,78,147.32 48 Washim 172 Qtrs. At Washim 30,10,195.08 (30,10,195.08) - 49 Yeotmal Pusad 143 Qtrs. 11,39,566.34 (1,62,08,474.00) (1,50,68,907.66) 50 Yeotmal 45 Qtrs. At Darati 13,893.70 - 13,893.70 51 Aurangabad 309 Qtrs. At IRB Aurangabad - 24,84,63,686.69 24,84,63,686.89 52 Nagpur 288 Barracks - 3,17,41,027.01 3,17,41,027.01 53 Nanded Special IGP Bldg. - 1,25,88,949.39 1,25,88,949.39 54 Nandurbar 168 Qtrs. At Nandurbar. - 10,10,51,900.46 10,10,51,900.46 55 Navi Mumbai Admn. Bldg. for CP Navi Mumbai - 25,82,67,019.91 25,82,67,019.91 56 Parbhani Admn. Bldg. for SP - 4,79,89,885.32 4,79,89,885.32 57 Solapur Admn. Bldg. for CP - 6,81,14,715.75 6,81,14,715.75 59 Thane 700 (Closed) 99,46,544.57 - 99,46,544.57 60 Nagpur UOTC Admn. Bldg. - 6,62,000.00 6,62,000.00 61 Mumbai 172 Worli. 17,88,327.91 - 17,88,327.91 62 Gadchiroli 120 Qtrs. At Aheri. - (9,00,000.00) (9,00,000.00) 63 Thane Ambernath ULC 6 - 88,87,430.00 88,87,430.00 64 Dhule 437 Qtrs. At Dhule 24,616.92 (2,11,00,000.00) (2,10,75,383.38) 66 Buldhana Khamgaon & Shegaon (Closed) - 2,54,550.32 2,54,550.32 67 Mumbai 2228 at Marol - 2,52,63,878.86 2,52,63,878.86 68 Nagpur SRPF 400 (Closed) - 55,35,788.49 55,35,788.49 69 Nashik 340 Qtrs. At Adgaon. - 9,91,153.00 9,91,153.00 70 Navi Mumbai (Closed) - 9,30,048.78 9,30,048.78 71 Parbhani 350 Qtrs. 1,43,662.85 - 1,43,662.85 72 Buldhana Shegaon 401 (Closed) - 42,504.67 42,504.67 73 Solapur 197 Qtrs. For SRPF Gr. X at Soregaon - (55,87,814.01) (55,87,814.01) 74 Raigad Uran 124 Qtrs. At Uran - (67,00,000.00) (67,00,000.00) 75 Wardha 182 Qtrs. - (4,00,000.00) (4,00,000.00) 76 Mumbai ACB Bldg. at Worli - 2,01,57,052.00 2,01,57,052.00 77 Mumbai Infrastructurea Work 1 - 5,89,840.00 5,89,840.00 TOTAL COMPLETED WORKS (A) 23,81,49,168.41 50,86,12,343.93 74,67,61,512.27

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 95 As at 31.03.2012 As at 31.03.20121 Particulars Note No. Rupees Rupees Non- Current Assets

(b) Non Current Investment "9" (At Cost -unquoted other than Trade , unless otherwise Stated) 10 Equity Shares of Rs 100/- Fully Paid up of Dadar - 1,000.00 Janata Sahakari Bank Ltd. Pune TOTAL - 1,000.00

(d) Long term loans & Advances "10" Recoverable of Work Tax From Nice 45,367.00 45,367.00 Deposits with Government Authorities 1,09,843.00 84,843.00 Deposits with Other (Hathway Internet) 1,000.00 1,000.00 TOTAL 1,56,210.00 1,31,210.00

(2) Current Assets (d) Cash & cash Equivalents "11" Cash in Hand 41.44 17,984.68 Balance with Scheduled Banks In Saving Account 68,99,29,669.46 6,92,92,587.47 In Fixed Deposit Account 1,15,06,74,115.00 58,76,74,115.00 Balance with Non Scheduled Banks In Fixed Deposit Account (Dadar Janata Sahakari Bank) 48,00,000.00 48,00,000.00 TOTAL 1,84,54,03,825.90 66,17,84,687.15

(e) Short Term loans & Advances "12" Amount Receivable From GOM (FY 11-12 Grants) 61,36,73,000.00 - Advances Recoverable in cash or in kind or value - to be Received (Festival & HBA Advance) 3,163.00 38,497.00 TOTAL 61,36,76,163.00 38,497.00

(f) Other Current Assets "13" Interest Receivable on Fixed Deposits (Refer Grouping) 3,10,60,067.76 1,97,50,995.00 Advance Income Tax (Refer grouping) 6,58,89,184.87 6,42,72,608.87 TOTAL 9,69,49,252.63 8,40,23,603.87

96 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 NOTES TO ACCOUNTS FORMING PART OF INCOME STATEMENT FOR THE YEAR ENDED AS AT 31ST MARCH 2012

As at 31.03.2012 As at 31.03.2011 Particulars Note No. Rupees Rupees REVENUE FROM OPERATIONS "14"

Interest on Bank Deposits (Gross) [TDS Deducted Rs 18,754,869.38] 15,18,07,997.97 6,53,69,721.19 Less : Transfer to Projects 15,18,07,997.97 6,53,69,721.19 - Centage 3% on Project Expenses 3,98,39,000.00 - Tender Fees 19,19,000.00 - Excess Provision Reversed 1,38,32,201.00 - TOTAL 5,55,90,201.00 -

Other Income "15" Miscellaneous Income 4,46,002.78 13,57,302.82 Interest on Income Tax Refund (08-09) 18,08,100.00 - Reimbursement by Govt. towards bonds Interest (107.00 cr) - 60,515.00 Less : Interests Paid - - TOTAL 22,54,102.78 14,17,817.82

PERSONNEL COST "16" Salary , Bonus and other Allowances 2,33,73,342.00 2,24,05,703.00 Arrears in salary Transfer to GPF A/c 3,08,972.00 - Admin Charges on EPF Contribution 65,025.00 - House Rent (Govt.) 30,80,960.00 - DLI Charges on EPF Contribution 8,307.00 - Employer's Contribution to Provident and other Fund 8,24,768.00 6,09,122.00 Employee Welfare - 5,13,104.50 TOTAL 2,76,61,374.00 2,35,27,929.50

ADMINISTRATION EXPENSES "17" Advertisement 12,29,636.00 1,37,048.00 Auditors Remunerations Audit Fees 7,09,525.00 4,19,140.00 Other Matters (Tax Audit Fees) Service Tax Books & Periodicals 11,424.00 46,216.00 Commercial Exploitation-Feasibility - 42,135.00 Computer Expenses 4,83,226.00 3,01,674.00 Electricity Charges 6,06,068.00 5,15,413.00 Travelling Expenses and Conveyances MD 1,21,466.00 61,430.00 Travelling Expenses and Conveyances Staff 3,15,962.00 5,02,342.00 Garden Maintenance 2,58,117.00 30,490.00 Honorarium 1,500.00 6,500.00 Insurances 5,000.00 3,170.00 Legal and Professional Fees 5,11,077.00 13,04,163.00 Rates and Taxes 9,18,634.00 9,94,411.00 Office expenses 7,08,466.00 9,68,804.00

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 97 (GROUPINGS) NOTES TO ACCOUNTS FORMING PART OF BALANCE SHEET AS AT 31ST MARCH 2012

As at 31.03.2012 As at 31.03.2011 Particulars Note No. Rupees Rupees Petrol,Oil etc 5,25,516.00 4,34,398.00 Postage and Telegram 40,381.00 32,607.00 Printing and stationery 9,68,362.00 5,95,031.00 Repairs & maintenances Office Quarters 2,80,985.00 3,20,824.00 Vehicles 3,81,371.00 4,38,045.00 Telephone and Telex Expenses 3,07,069.00 2,97,784.00 Short Provision Written Off 3,15,498.00 - Training & development 10,200.00 58,934.00 Water Charges 27,316.00 18,405.00 TOTAL 87,36,799.00 75,28,964.00

FINANCIAL EXPENSES "18" Bond Issue expenses - - Bank Charges and Commission 64.00 710.00 Claims & penalties - - TOTAL 64.00 710.00

98 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 (GROUPINGS) NOTES TO ACCOUNTS FORMING PART OF BALANCE SHEET AS AT 31ST MARCH 2012

As at 31.03.2012 As at 31.03.2011 Particulars Note No. Rupees Rupees CASH & CASH EQUIVALENT

Balance in Saving / Current Account Syndicate Bank S.B A/c No. 3911 95.06 95.06 Axis Bank 1,25,883.00 8,96,591.00 Corporation Bank S.B. A/c No. 10006 10,43,46,070.99 6,51,43,214.49 CID Corporation Bank A/c 13,99,40,087.68 30,19,845.93 Corporation Bank S.B. A/c No. 0111002 46,75,245.00 - Corporation Bank S.B. A/c No. 0111003 90,84,581.80 - Corporation Bank S.B. A/c No. 0111004 36,99,66,397.30 - Corporation Bank S.B. A/c No. 0111005 1,85,91,707.78 - Corporation Bank S.B. A/c No. 0111006 2,86,03,300.86 - Corporation Bank S.B. A/c No. 0111007 1,764.00 - Corporation Bank S.B. A/c No. 0111008 55,092.00 - Corporation Bank S.B. A/c No. 17225 1,45,39,443.99 2,32,840.99 SUB TOTAL 68,99,29,669.46 6,92,92,587.47

Balance in Fixed Deposit Account FD Andhra Bank - 10,00,00,000.00 FD Allahabad Bank (Worli Branch) 51,00,00,000.00 - FD Indian Overseas Bank 5,00,00,000.00 - FD Corporation Bank 43,90,00,000.00 - FD Central Bank - 10,00,000.00 FD Union Bank 15,00,00,000.00 25,00,00,000.00 FD Oriental Bank - 22,00,00,000.00 FD Punjab & Sindh Bank (Worli Branch) - 1,50,00,000.00 FD Corporation Bank (Keti Const.) 3,29,523.00 3,29,523.00 FD P&S Bank (210 Train. PTS Akola & Jalna) 5,52,645.00 5,52,645.00 FD P&S Bank (Hingoli-500 Prakash Constrowell) 7,91,947.00 7,91,947.00 SUB TOTAL 1,15,06,74,115.00 58,76,74,115.00

Interest Accured on Fixed Deposits Interest Accured on FD Allahabad Bank 59,06,348.00 - Interest Accured on FD Indian Overseas Bank 11,12,178.00 - Interest Accured on FD Andhra Bank - 31,12,329.00 Interest Accured on FD P&S , Worli Br. - 4,69,379.00 Interest Accured on FD Oriental Bank - 62,09,372.00 Interest Accured on FD Union Bank 33,43,747.00 59,30,135.00 Interest Accured on FD Punjab National Bank - - Interest Accured on FD Corporation Bank 1,66,68,014.76 - Interest Accured on FD with Dena Bank - - Interest Accured on FD DJS Bank 40,29,780.00 40,29,780.00 SUB TOTAL 3,10,60,067.76 1,97,50,995.00

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 99 (GROUPINGS) NOTES TO ACCOUNTS FORMING PART OF BALANCE SHEET AS AT 31ST MARCH 2012

As at 31.03.2012 As at 31.03.2011 Particulars Note No. Rupees Rupees Advances Receivable in Cash or Kind Prepaid expenses 7,715.00 7,715.00 Flood Advances (1,344.00) - HBA (PHC) (1,937.00) - Petty Loan (30,421.00) - Salary Advance 8,000.00 - Advances to Staff (Festival Adv) 21,150.00 30,782.00 SUB TOTAL 3,163.00 38,497.00

Deposits with Government Bodies Deposits For LPG 950.00 950.00 Deposits For BEST U/T 150.00 150.00 Deposits For Housing Board 1,090.00 1,090.00 Deposits For MTNL 24,103.00 24,103.00 Deposits For Mobile Security 3,500.00 3,500.00 VAT Deposit 25,000.00 - Deposits For CIDCO 45,050.00 45,050.00 Nagpur Municipal Corporation (CID) 10,000.00 10,000.00 TOTAL 1,09,843.00 84,843.00

Other Liabilities Bank Guarantee 1,76,69,322.00 1,76,69,322.00 TOTAL 1,76,69,322.00 1,76,69,322.00

Miscellaneous Income Sundry Balance written back/ written off 28,337.00 Other Receipts 37,803.78 1,64,459.00 Interest on Saving Bank A/c 4,08,199.00 11,34,466.71 Profit on Sale of Asset 30,040.11 TOTAL 4,46,002.78 13,57,302.82

Advance Income Tax TDS ON FDR (10-11) 21,01,618.00 52,43,301.38 TDS ON FDR (07-08) 2,17,33,580.00 2,17,33,580.00 TDS ON FDR (08-09) 42,06,202.00 1,92,02,812.00 TDS ON INTEREST FY 06-07 1,02,61,800.00 1,02,61,800.00 TDS ON INTEREST ON FD 2011-12 1,87,54,869.38 - TDS (FDR 09-10) 88,31,115.49 78,31,115.49 TOTAL 6,58,89,184.87 6,42,72,608.87

100 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 MAHARASHTRA STATE POLICE HOUSING AND WELFARE CORPORATION LIMITED Schedule “O” Notes Forming Part of Accounts for the Year Ended 31st March, 2012 A. Nature of Business : To undertake construction of buildings for the housing of employees of Government of Maharashtra in the Police and Jail Department. B. Significant Accounting Policies :- 1) Method of accounting :- The accounts are maintained on accrual basis except in the case of interest of loans and advances given to the employees on receipt basis. Interest is recovered after repayment of principal amount. 2) Fixed assets:- Fixed assets are stated at cost of acquisition less accumulated depreciation as per rate specified in schedule XIV of companies act,1956 on Written Down Value method. 3) Works expenditure:- a) Work in progress : Expenditure on work in progress is accounted on the basis of the progress reports received from project management consultant by the company up to the date of finalization of accounts. The interest on Fixed Deposit is apportioned in proportion of balance at the end of the year, of the work in progress of each project during the year and thus capitalized. b) Completed works : Completed works means where the possession of the works is handed over to the user department. Generally this handling over takes place when the work is fully completed. In few cases, the company also incurs some expenditure on projects, which have been handed over earlier. Such expenses are debited to respective work completed projects. Once the project is completed, the cost of the project is adjusted against the grant received from the government (central or state) and balance if any is shown as receivable from the government (central or state). 4) Retirement benefits:- Liability on account of Gratuity is provided for as per actuarial valuation. Liability for leave encashment is provided on actuarial basis in terms of the company. 5) Grants:- The grants received from Home Department, Government of Maharashtra for modernization of Police is accounted on accrual basis. The grants received are shown under “current liabilities”. The grants received from Home Department, Government of Maharashtra for modernization, on behalf of PWD Department are credited to grant account and on payment to PWD Department, the same is debited to Grants Account. 6) Taxes on income:- No provision for tax is made as income is not taxable as explained. 7) Borrowing cost:- Borrowing costs which are directly attributable to the acquisition of fixed assets, which can be put to use, are capitalized as part of such fixed assets. Other borrowing costs are charged to income and expenditure account. 8) Provisions and contingent liabilities:- The company creates a provision when there is a present obligation as a result of a past event that probably requires an outflow of resources and a reliable estimate can be made of the amount of the obligation. A disclosure for contingent liability is made when there is a possible obligation or a present obligation that may, but probably will not, require an outflow of resources. When there is a possible obligation or a present obligation in respect of which the likelihood of outflow of resources is remote, no provision or disclosure is made.

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 101 9) MSPHWC had made a Short Term Deposit for 91 days with Dadar Janata Sahakari Bank in November 1992. The principal amount of `50 lakhs (`2 lakhs recovered up to 31.03.2002 and balance amount outstanding is `48 lakhs) and interest up to 15.12.1997 (the date on which liquidator is appointed) of `4,029,780 /- is still due from them. In the C.A.G’s Audit Report dated 20.06.1994 at para No.5, adverse comments are mentioned regarding the investment made by the company in November 1992 in Dadar Janata Sahakari Bank. After the bankruptcy of Bank of Karad And Metropolitan Co-Operative Bank, the government had issued guidelines in June 1992 about the investment of surplus funds with government companies / Institutions operating in public sector. As per the guidelines, surplus funds should be invested in Nationalized Bank. The company tried to justify the above investment with explanation that at the time of investment the financial condition of Dadar Janata Sahakari Bank was sound and the rate of interest offered by Dadar Janata Sahakari Bank was very attractive i.e., 18.20% p.a. In August, 1995 the bank has executed a mortgage deed (first English mortgage) of premises of its Ghatkopar branch (ground floor, 1137 square feet and underground basement 565 square feet) in favour of MSPHWC, in support of its undertaking to repay the amount due to MSPHWC. The valuation of the premises of Ghatkopar branch in 1995 was more than Rs 1 Crore. In April, 1996 an administrator was appointed by the government in order to improve the financial position of the Bank. As per power ensued by first English mortgage, the company has taken possession of the mortgage premises on 21.01.1997 after giving due notices to the administrator according to Transfer of Property Act, but the administrator of the bank has filed suit No. 345/97 in the high court with the following prayer in brief:- a) To return mortgaged property to Dadar Janata Sahakari Bank. b) To appoint court receiver and possession be given to Dadar Janata Sahakari Bank as an agent of the court receiver. c) Defendant’s (P.H.C) be restrained from disposing off mortgaged property by alienating, encumbering and parting with possession. The Hon’ble court rejected the request to appoint Dadar Janata Sahakari Bank as receiver but at the same time restrained the company from disposing the mortgaged property. The state government has appointed a liquidator on 15.12.1997 on the Dadar Janata Sahakari Bank. The Liquidator filed a new suit no. 3569/98 on 29TH August, 1998. Both the cases are pending in the high court. We have been informed that the hearing of the case is completed. No provision is made for interest on fixed deposit placed with Dadar Janata Sahakari Bank. The issue was again discussed in the public undertaking committee (PUC) on 14.01.1997. in P.U.C’s report passed on 22.02.1997 by Legislative assembly at para 15.1 the details regarding investment of `50 Lakhs in Dadar Janata Sahakari Bank are explained and at para 15.5 P.U.C has expressed it opinion and recommendation. In its opinion and recommendation at para 15.4 the P.U.C has directed that the company should invest it surplus fund only in Nationalized Bank and Government should exercise it control by observing companies financial matter. P.U.C has also recommended that the departmental enquiry should be initiated in order to take action against the officer responsible for the investment. In order to comply with recommendation of P.U.C to get explanation of the concerned officer, the necessary documents have been submitted to appropriate authority under whom the responsible officer are presently working (those officer were on deputation to the company). No provision is made for interest on fixed deposit placed with Dadar Janata Sahakari Bank. To expedite the recovery and to settle the dispute the matter is continuously being persuaded at various levels.

102 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 10) Balances included in Advance recoverable, Sundry Creditors for works, deposits with Government bodies and Security Deposits received from contractors are subjected to confirmation and reconciliation. 11) The Grants and/or funds received from the central and/or state government are project wise. But as per our checking it is found that, when the utilization exceeds the grant received for a particular project the corporation used the grant of some other project and the record has been maintained for the inter project transfer of grants. 12) 12-A) Doubtful recovery from the following projects – • MSPHWC had awarded the work of 168 quarters S.P Nandurbar to M/s Sainath Enterprises on dated 26/08/2004 on the bidding amount quoted by the contractor. Initially the duration of the contract was 18 months (including Monsoon Season). MSPHWC states that since Sainath has failed to complete the said project in all corners within a reasonable time period hence the project was handed over to the new contractor by re-tendering. The previous cost of the project was `8,32,35,869/-. M/s Sainath have carried out the work of `4,58,46,317/- as such, the balance cost of work was `3,73,89,552/- which was re-tendered and the work was issued to M/s Pawar Patkar Construction at the cost of `6,28,18,000/-. Thus, under re-tender, an aggregate sum of `2,54,28,448/- was incurred as an additional cost. MSPHWC states that the work was re-tendered at the risk and cost of M/s Sainath Enterprises as has been agreed under the contract. MSPHWC states that M/s Sainath Enterprises are also liable to pay the additional cost of Architect, PMC, advertisement expenses and allied expenses aggregating to `1,45,12,006/-. Therefore, M/s Sainath Enterprises are liable to pay total amount of `3,99,40,454/- and after adjusting the recoveries already made an aggregate sum of `3,61,64,815/- is due and recoverable from them till date. The civil court by order No. i.e. special civil suit No. 28/2011 Exh. No 77 dated 05/05/2012 has passed a decree order in favour of Corporation amounting to `36164815/-. Further necessary action has been initiated by the Management. • MSPHWC had awarded the work of 186 quarters S.P Ratnagiri to M/s Sainath Enterprises on dated 26/08/2004 on the bidding amount quoted by the contractor. Initially the duration of the contract was 18 months (including Monsoon Season). MSPHWC states that since Sainath has failed to complete the said project in all corners within a reasonable time period hence the project was handed over to the new contractor by re-tendering. The contract was then handed over to M/s Eagle Constructions. The amount to be recovered from M/s Sainath Enterprises is arrived after taking into consideration the amount to be recovered due to re-tendering amounting `3,80,15,084/- together with various other additional amounts to be recovered for payment to architect, PMC, advertisement expenses, printing of tender documents and drawing, escalation and liquidated damages totaling `65,24,085/-. In all the recovery excluding interest is to the extent of `4,45,39,169/- and after adjustment of the amount already recovered to the tune of `48,91,563/- on account of forfeiture of bank guarantee, security deposit, final bill, price escalation etc, the net amount to be recovered is to the tune of `3,96,47,606/-. The said amount is due and payable to MSPHWC as provided in the contract agreement, but M/s Sainath Enterprises has failed to make the payment from them till date. The civil court by order No. i.e. special civil suit No. 66/2011 Exh. No. 61 dated 22/02/2012 has passed decree order in favour of Corporation amounting to `39647606/-. Further necessary action has been initiated by the Management. • MSPHWC had awarded the work of 442 quarters wanawadi to M/s ECP Housing (INDIA) Pvt. Ltd. on dated 02.04.2004 on the bidding amount quoted by the contractor. Initially the

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 103 duration of the contract was 24 months (including Monsoon Season). MSPHWC states that there was delay in excavation work also due to the lethargic attitude of M/s ECP Housing (INDIA) Pvt. Ltd. and so, the project was handed over to the new contractor by re-tendering. The contract was then handed over to M/s Shalaka Engineers. The amount to be recovered from M/s ECP Housing (INDIA) Pvt Ltd is arrived after taking into consideration the amount to be recovered due to re-tendering amounting to `10,67,09,908/- together with various additional amounts to be recovered for payment to architect, PMC, advertisement expenses, printing of tender documents and drawing, escalation and liquidated damages totaling `2,78,22,249/-. In all the recovery excluding interest is to the extent of `13,45,32,157/- and after adjustment of the amount already recovered to the tune of `1,08,56,302/- on account of forfeiture of bank guarantee, security deposit, final bill, price escalation etc, the net amount to be recovered is to the tune of `12,36,75,855/-. The said amount is due and payable to MSPHWC as provided in the contract agreement, but M/s ECP Housing (INDIA) Pvt. Ltd. has failed to make the payment. 12-B) Non provision of court case filed by the M/s National Contractors & Engineers • MSPHWC had awarded the work of 550 Quarters Nagpur to M/s National Contractors & Engineers on dated 28.03.2003 on the bidding amount quoted by the contractor. Initially the duration of the contract was 18 months (including Monsoon Season). MSPHWC states that since M/s National Contractors & Engineers failed to complete the said project in all corners within a reasonable time period, the project was handed over to the new contractor by re-tendering. The contract was then handed over to M/s Keti Constructions. M/s National Contractors & Engineers has filed a suit against MSPHWC claiming `3,62,12,941/- as the balance amount to be recovered from MSPHWC which the corporation denies. Instead MSPHWC has counter claimed `9,13,91,523/- to be recovered from M/s National Contractors & Engineers as MSPHWC has suffered liquidated damages and also has incurred loss due to re-tendering and non-completion of work. The said amount is due and payable to MSPHWC as provided in the contract agreement, but M/s National Contractors & Engineers has failed to make the payment. 13) The company does not have:- a) Any imports during the year. b) Any non-residential shareholders. c) Any expenditure in foreign currency. d) Any earnings in foreign currency. 14) The Corporation has created a centage fund as per Board Resolution No. 1078 for the first time by charging 3% on the Project cost and after expanses are adjusted, the balance is transferred to Reserve and Surplus account. 15) TDS Receivable are shown as under. YEAR AMOUNT TDS for 2006-07 1,02,61,800/- TDS for 2007-08 2,17,33,580/- TDS for 2008-09 42,06,202/-

104 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 Remarks a. If no refund is due for Financial Year 2006-07, 2007-08 & 2008-09 then why it is shown as receivable, as refund is received for Financial Year 2009-10 & 2010-11 is received after 31/03/2012. b. Whether proper claim was made before income tax authorities for particular year or not. c. If not receivable then it is to be written off & to reconciled. 16) Short provision written off Expenses:- a. Professional tax `18698/- If it is paid then whether it was not received in Previous Year or not accounted properly in Previous Year. b. TDS paid on contract `912342/- If it is TDS paid of Previous Year then whether it was not deducted from contract or if deducted & not properly accounted. c. Income Accrued Interest of `615542/- Cr. Balance. The Cr. Balance in interest accrued has been shown as income. It pertains to Previous Year. 17) As the company follows the system of capitalization of excess of expenses over income, there is no profit/loss for the year and up to the year. The provisions of AS-22 on “Accounting for taxes on Income” issued by the Institute of Chartered Accountants of India are not applicable. 18) The previous year’s figures are regrouped/ rearranged wherever considered necessary to make them comparable with those of the current year. 19) All figures are rounded off to the nearest rupee. As per our Report attached of even date

As per our Report attached of even Date For: I.C. Jain & Co. For: Maharashtra State Police Housing Chartered Accountants & Welfare Corporation Ltd. FRN No.: 103912 W Sd/- Sd/- Sd/- (Dr. Amitabh Rajan) (Praveen Dixit) Proprietor Chairman Managing Director (CA I.C. Jain) M. No. 036803 Sd/- (Vineet Agarwal) Place: Mumbai Director Date: 15/09/2012

Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12 105 COMMENTS OF THE COMPTROLLER AND AUDITOR GENERAL OF INDIA UNDER SECTION 619(4) OF THE COMPANIES ACT, 1956, ON THE ACCOUNTS OF MAHARASHTRA STATE POLICE HOUSING AND WELFARE CORPORATION LIMITED, MUMBAl FOR THE YEAR ENDED 31ST MARCH 2012

The preparation of financial statements of 'Maharashtra State Police Housing And Welfare Corporation Limited,' Mumbai for the year ended 31st March 2012 in accordance with the financial reporting framework prescribed under the Companies Act, 1956 is the responsibility of the management of the company. The Statutory Auditors appointed by the Comptroller and Auditor General of India under Section 619(2) of the Companies Act, 1956 are responsible for expressing opinion on these financial statements under Section 227 of the Companies Act, 1956 based on independent audit in accordance with the Auditing and Assurance Standards prescribed by their professional body, the Institute of Chartered Accountants of India. This is stated to have been done by them vide their Audit Reports dated 15th September 2012. I, on behalf of the Comptroller and Auditor General of India, have conducted a supplementary audit under Section 619(3)(b)of the Companies Act, 1956 of the financial statements of 'Maharashtra State Police Housing And Welfare Corporation Limited,' Mumbai for the year ended 31st March 2012. This supplementary audit has been carried out independently without access to the working papers of the Statutory Auditors and is limited primarily to inquiries of the Statutory Auditors and Company personnel and a selective examination of some of the accounting records. On the basis of my audit nothing significant has come to my knowledge which would give rise to any comment upon or supplement to Statutory Auditors' report under Section 619(4) of the Companies Act, 1956.

Place : Mumbai Date : 01/01/2013 For and on behalf of The Comptroller and Auditor General of India

Sd/- Accountant General (Audit) - III

106 Maharashtra State Police Housing & Welfare Corporation Ltd., Mumbai I ANNUAL REPORT 2011-12

Nandurbar, 168 quarters for Superintendent of Police, Nandurbar at Nandurbar

‘hmamï´> amÁ` nmocrg J¥h{Z‘m©U d MAHARASHTRA STATE POLICE HOUSING & H$ë`mU ‘hm‘§S>i ‘¶m©{XV, ‘w§~B© WELFARE CORPORATION LTD., MUMBAI (‘hmamï´> emgZmMm CnH«$‘) (A Government of Maharashtra Undertaking) 89/89 E, ga nmoMImZdmbm amoS>, ‘w§~B© - 400 030. Sir Pochkhanwala Road, Worli, Mumbai - 400 030. XÿaÜdZr H«$.: 24984748/24918388-89 Ph.: 24984748/24918388-89 Email:[email protected];[email protected] Email:[email protected];[email protected] Website:www.msphc.org Website:www.msphc.org