Proposed Construction of 3360 Residential Tenements Under Pradan Mandri Awas Yojana - Hfa Scheme Form 1
Total Page:16
File Type:pdf, Size:1020Kb
PROPOSED CONSTRUCTION OF 3360 RESIDENTIAL TENEMENTS UNDER PRADAN MANDRI AWAS YOJANA - HFA SCHEME FORM 1 FORM - 1 I. Basic Information S. No Item Details 1 Name of the project/s Proposed construction of 3360 residential tenements at Edyanchavadi Village, Ponneri Taluk, Tiruvallur District by Tamil Nadu Slum Clearance Board 2 S. No. in the schedule 8 (a) 3 Proposed capacity / area / length / Proposed Built-up area is 1,18,622.49 tonnage to be handled/command Sq.m area / lease area / number of wells Building wise area details are given in to be drilled the Conceptual Plan 4 New/Expansion/Modernization New 5 Existing Capacity/ Area etc. Nil 6 Category of Project i.e. ‘A’ or ‘B’ Category ‘B’ 7 Dose it attract the general No condition? If yes, please specify. 8 Dose it attract the specific condition? No If yes, please specify. 9 Location Plot/survey/ Khasra. No 317/1pt, 2, 3E, 3F, 3G, 3H, 3I, 3K, 3A1A1, 3A2, 3A1B, 3A3, 3A1A2, 3A4, 318, 319/2, 3, 4, 5, 6, 7, 8, 10A, 10B, 320/1B, 1C, 1D, 1Apt, 2C, 2A2, 5B, 5C, 5D, 5E, 5, 5A2, 3, 4, 6A1, 6B, 7A, 7B, 7C, 8A, 8B, 8C, 8D, 9A, 9B, 356/8A, 8Bpt, 357/1, 2, 3, 4, 5, 10, 11. Village Edyanchavadi Tehsil Ponneri District Tiruvallur State Tamil Nadu 10 Nearest railway station/airport along Wimco Nagar Railway Station - 4.36 with distance in Km. km (SE) Chennai International Airport - 25 km (SSW) 11 Nearest town, city, district Manali New Town - 1 km (S) headquarters along with distance in Km. 12 Village panchayats, Zilla parished, Corporation of Chennai municipal corporation, local body Address: 1131, EVR Periyar Salai, (complete postal address with Park Town, Ripon Building, telephone nos. to be given) Chennai - 600 003 Telephone No: 044 25619555 13 Name of the applicant Tamilnadu Slum Clearance Board 1 AUGUST 2018 PROPOSED CONSTRUCTION OF 3360 RESIDENTIAL TENEMENTS UNDER PRADAN MANDRI AWAS YOJANA - HFA SCHEME FORM 1 14 Registered address No. 5, Kamarajar Salai, Chennai, 600 005. 15 Address for correspondence Name Mr. V. Kaliannan Designation (Owner/Partner/CEO) Executive Engineer Address Division I, Tamil Nadu Slum Clearance Board, HLL Nagar, Tondiarpet, Chennai Pin Code 600 081 E-Mail [email protected] Telephone No Fax No --- 16 Details of Alternative Sites No alternative sites examined Examined, if any, location of these sites should be shown on a topo sheet. 17 Interlinked Projects Nil 18 Whether separate application of Not Applicable interlinked project has been submitted? 19 If yes, date of submission Not Applicable 20 If no, reason Not Applicable 21 Whether the proposal involves No approval/ Clearance under the following acts: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22 Whether there is any government No order/ Police relevant/ relating to the site? 23 Forest land involved (hectares) Nil 24 Whether there is any litigation Nil pending against the land/ or land in which the Project is proposed to be set up? (a) Name of the Court (b) Case No. (c) Order/ directions of the Court, if any and its relevance with the proposed project 2 AUGUST 2018 PROPOSED CONSTRUCTION OF 3360 RESIDENTIAL TENEMENTS UNDER PRADAN MANDRI AWAS YOJANA - HFA SCHEME FORM 1 (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No. Information / Checklist Yes / Details thereof with approximate confirmation No quantities / rates, wherever possible) with source of information data 1.1 Permanent or temporary Yes There will not be any change in the change in land use, land cover land use, land cover or topography or topography including as the site is categorized as Primary increase intensity of land use Residential Land Use as per the (with respect to local land use Chennai Metropolitan Development plan) Authority is given in Annexure - I 1.2 Clearance of existing land, No Since the existing land is vacant, no vegetation and Buildings? major clearance activities will take place. Only minor clearance activities will be carried out to remove the shrubs and weeds. 1.3 Creation of new land uses? No No creation of new land use as the site is vacant land & only tenements will be constructed. 1.4 Pre-construction investigations Yes Soil Testing has been done to find e.g. Bore Houses, Soil testing? the suitability of soil for providing adequate foundations for the proposed structures and the copy of the report is given in Annexure - V. 1.5 Construction works? Yes Construction of 15 blocks of 3360 Tenements and other buildings such as Convenient shop, ICDS, Ration shop, Milk Booth and Community Hall will be done systematically with economy of materials. 1.6 Demolition works? No No demolition works will be carried out as the land is vacant 1.7 Temporary sites used for Yes Inside the proposed site, a small construction works or housing area will be utilized temporarily for of construction workers? construction of sheds for the migrated workers and materials. But most of the workers will be deployed from local area only. 1.8 Above ground buildings, Yes Excavation works will be carried out structures or earthworks for foundation of the structures. including linear structures, cut Later on, the site will be leveled. and fill or excavations Thus the cut and fill process will be required. 3 AUGUST 2018 PROPOSED CONSTRUCTION OF 3360 RESIDENTIAL TENEMENTS UNDER PRADAN MANDRI AWAS YOJANA - HFA SCHEME FORM 1 1.9 Underground works mining or No No underground works will be tunneling? required as the proposed project is the construction of tenements. 1.10 Reclamation works? No Not envisaged. 1.11 Dredging? No Not envisaged. 1.12 Off shore structures? No Not envisaged. 1.13 Production and manufacturing No Not applicable as the project is processes? construction of tenements. 1.14 Facilities for storage of goods Yes Temporary sheds will be constructed or materials? for the storage of cement and other materials during construction phase. 1.15 Facilities for treatment or Yes Sewage will be treated in the disposal of solid waste or liquid proposed STP of 2.2 MLD and the effluents? treated sewage will be reused for green belt development and excess will be disposed to nearby underground CMWSSB Sewer line. Bio degradable wastes will be treated in Organic Waste Converter and non- bio degradable wastes will be disposed to Authorized Recyclers. 1.16 Facilities for long term housing No No operational phase workers of operational workers? involved in this project. 1.17 New road, rail or sea traffic No The existing road network is during Construction or sufficient for connectivity of the site operation? with other parts of the city. 1.18 New road, rail, air, waterborne No There will be no change to the or other transport existing transport infrastructure. infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No As construction works will be within transport routes or a specified area, there is no need for infrastructure leading to closure or diversion of existing changes in Traffic movements? transport routes. 1.20 New or diverted transmission No No new or diversion transmission lines or pipelines? lines & pipelines are required for this project. 1.21 Impoundment, damming, No There will not be any alteration in culverting, realignment or the hydrology of the watercourses or other changes to the aquifers due to the proposed project. hydrology of watercourses or aquifers? 1.22 Stream crossings? No There is no stream crossing in the project site. 1.23 Abstraction or transfers of Yes Water requirement will be sourced water form ground or surface from CMWSSB. waters? 4 AUGUST 2018 PROPOSED CONSTRUCTION OF 3360 RESIDENTIAL TENEMENTS UNDER PRADAN MANDRI AWAS YOJANA - HFA SCHEME FORM 1 1.24 Changes in water bodies or No There is no change in the water land surface affecting drainage bodies or land surface which affects or runoff? the drainage or runoff. 1.25 Transport of personnel or Yes Transportation of personnel & materials for construction, construction materials during operation or decommissioning? construction phase will be through existing roads only. 1.26 Long-term dismantling or No As part of this project, no long-term decommissioning or dismantling or decommissioning or restoration works? restoration works would be involved. 1.27 Ongoing activity during No There will not be any decommissioning which could decommissioning works. have an impact on the environment? 1.28 Influx of people to an area Yes During construction period few either temporarily or workers will be stationed temporarily permanently? and others will be deployed locally. 1.29 Introduction of alien species? No No introduction of alien species 1.30 Loss of native species or No No loss at the site is plain and there genetic diversity? is no significant species. 1.31 Any other actions? No Only eco-friendly activities like tree plantation will be undertaken. 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply). Details there of (with Information/checklist Yes / approximate quantities/rates, S. No. confirmation No wherever possible) with source of information data 2.1 Land especially undeveloped or Yes The proposed project will be agricultural land (ha) developed in area of 78,615.20 Sq.m. The copy of the land ownership documents is enclosed as Annexure II 2.2 Water (expected source & Yes Total water Requirement - 2,314 KLD competing users) Unit: KLD Source: CMWSSB and the acknowledgement copy of the request letter submitted to same is enclosed as Annexure - III.