PROJECT FACT SHEET I-270 Northwest Side Widening Project Details Fast Facts • Widens both directions of Interstate 270 from three to four lanes between Start: April 2017 Trabue Road and U.S. 33 on the Northwest Side of Franklin County • Rehabilitates 10 bridges Complete: September 2018 • Upgrades all highway safety features including guardrail, cable rail, drainage, lighting and signing Cost: $66.5 million • Constructs two noise walls • The interstate will be widened within the existing median Location: I-270 between Dublin • Traffic on this stretch of I-270 between Hilliard and Dublin is expected to and Hilliard on the Northwest Side increase by 30,000 vehicles a day in the next 20 years of Franklin County • At least two lanes will be maintained during construction • There will be coordination between this project and the I-270/US 33 Contact: ODOT Public Information interCHANGE project in Dublin, which will be complete this year Office at 740-833-8268 Benefits: • Reduce congestion • Enhance Capacity Stay in the Loop Sign up to recieve project updates: Send your email address to [email protected]. Visit OHGO.com or download the app: View traffic cameras and get the latest information, including planned lanes closures related to construction and unplanned impacts like accidents. Follow ODOT Columbus on social media Slow down or move over for roadside workers. It’s the law. The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by ODOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 11, 2015, and executed by FHWA and ODOT..