Pre-Feasibility Report

Total Page:16

File Type:pdf, Size:1020Kb

Pre-Feasibility Report PRE-FEASIBILITY REPORT For Proposed Project Addition MANUFACTURING OF AROMA CHEMICALS By M/S. Raigad Petroleum Ltd. Plot No.: L-35, Additional MIDC Mahad, Taluka: Mahad, Dist: Raigad, Maharashtra: 402309 Conducted & Prepared By GREEN CIRCLE, INC. Integrated HSEQR Consulting Engineers, Scientists & Trainers (MoEF Recognized Environment Laboratory) (An ISO: 9001, 14001, NABL/17025:2005, OHSAS: 18001 Certified Organization & GPCB approved Environment Auditor – Schedule II) Gujarat High Court Stay Order for QCI NABET No. C/SCA/10311/2012 dated 24.01.2013 Corp. Office & Environmental Research Laboratory: Green Empire (Anupushpam), Above Axis Bank, Nr. Yash Complex, Gotri Road, Vadodara-390 021 (Gujarat) India Tel: 0265-2371269. Mumbai office Flat No 6 ,Ground Floor,Shakuntala Niwas, M G Road,Borivali (E),Mumbai- 400066 Tel : 022-28943090 /60 www.greencircleinc.com E: [email protected] ALSO AT BENGALURU RUDRAPUR NEW DELHI HYDERABAD PUNE RAIPUR KOLKATA GOA OVERSEAS AUSTRALIA OMAN KUWAIT AFRICA VIETNAM Project: Manufacturing of Aroma Chemicals Developer: M/s. Raigad Petroleum Limited TABLE OF CONTENTS Sl. No. Particulars Page No. 1 Introduction 3 2 Market Analysis 5 3 BENEFITS OF PROJECT 5 4 PROJECT LOCATION 5 5 COST OF PROJECT 6 PROPOSED PRODUCT AND BY-PRODUCT DETAILS AND CAPACITY 6 6 RAW MATERIAL REQUIRED AND STORAGE 7 10 PROCESS DESCRIPTION 8 16 9 LAND REQUIREMENT DETAILS 16 UTILITY AND REQUIREMENTS 10 17 STACK DETAILS 11 22 HAZARDOUS WASTE GENERATION AND MANAGEMENT 12 23 13 Rain Water Harvesting 24 14 GREEN BELT DEVELOPMENT 25 15 CONCLUSION 25 LIST OF TABLES Table. Particulars Page No. No. 1 Environment setting of the proposed project 5 Estimated Proposed Cost 2 6 3 Proposed Product details 6 4 Proposed BY- Product Details 7 5 Raw Materials for Proposed Product 10 Pre-Feasibility Report 2 Project: Manufacturing of Aroma Chemicals Developer: M/s. Raigad Petroleum Limited Area Details for Existing & Proposed Project 6 16 7 18 8 Power Requirements 21 Fuel Requirements 9 21 10 Employment Details 22 11 Details of Stack 22 Hazardous Waste generation and disposal details 12 23 Non-Hazardous waste generation disposal details 13 24 14 Green Belt Details within Premises 25 List of FIGURES Fig. No. Particulars Page No. 1 Location Map of Project Site 2 Google image of propose site 4 3 4 Lay-out Plan of Proposed Project 28 5 Strom Water Drainage 29 Pre-Feasibility Report 3 Project: Manufacturing of Aroma Chemicals Developer: M/s. Raigad Petroleum Limited 1.0 INTRODUCTION 1.1 COMPANY PROFILE Raigad Petroleum was promoted by Mr Ashokkumar Goenka, Mr. Gopal Mittal & Mr. Lalit Goenka. The manufacturing facility was commissioned in August 2000 and commercial production commenced in 2000. Initially Raigad Petroleum was manufacturing Aroma Chemicals and as market scenario changed Raigad Petroleum switched over to Job work of Aroma Chemicals of M/s. Privi Organics Ltd. Ever since the beginning, Raigad Petroleum has been gradually increasing its manufacturing capacity and the range of products from Batch process to continuous process. Raigad Petroleum Limited manufacturing Methyl Pentenone, Distillation of Aroma chemicals etc as Raw Material of M/s. Privi Organics Ltd speciality chemicals chemistry. The plant is having capacity of 2520 tonnes per annum. The company now on growth as M/s. Privi Organics Ltd giving opportunity to develop in all ways. At the time of establishment of the existing unit in the year 2000, Environmental Clearance was not pre-requisite for manufacturing of 210 MT/M Aroma chemicals. Hence Consent to Operate (CTO) was obtained from Maharashtra Pollution Control Board for establishment & operation of the plant. 1.2 OUR VISION To increase production capacity. 1.3 OUR MISSION To be the best by giving only the best! At any given moment, we are self-assured and prepared to provide quality products by adopting safe and healthy practices in procuring, preparing and presenting our products. Pre-Feasibility Report 4 Project: Manufacturing of Aroma Chemicals Developer: M/s. Raigad Petroleum Limited 1.4 Organization Structure Pre-Feasibility Report 5 Project: Manufacturing of Aroma Chemicals Developer: M/s. Raigad Petroleum Limited 2.0 MARKET ANALYSIS We are doing 100% Job work of M/s. Privi Organics Ltd. 3.0 BENEFITS OF PROJECT The Project will create direct & indirect employment opportunities within the surrounding region. The Unit will use good faith efforts to employ local people from the nearby villages depending upon the availability of skilled & un-skilled man- power surrounding the project site. In operation phase, the proposed project would require significant workforce of non-technical and technical persons. Migration of highly education and skilled experience will result in increase of literacy in the surrounding villages. The revenue generated will also promote CSR activities. 4.0 PROJECT LOCATION The Plant is located at plot no. L-35, Additional MIDC Mahad, Taluka- Mahad, Dist. Raigad, State-Maharashtra. The Total Plot area of the site is 12180.0 sq m. The environmental setting around the site is given in Table-1 and the Google image of project site is shown as Figure 1. Table 1: Environment setting of the proposed project Sl. Particulars Details No. 1 Latitude 18° 06.147’N 2 Longitude 73°29.369’E 3 Elevation above MSL 60.0 m above Mean Sea Level 4 Present land use at the location Existing Plant 6 Nearest Village Birwadi (3.0 km) 7 Nearest Town/City Town: Mahad (9.0 km) 8 Nearest Railway Station Veer Railway Station (19 km) 9 Nearest Hospital M.M.A Hospital M.I.D.C (3.0 km) 10 Nearest Highway NH 17 (4.0 km) 11 Nearest Airport Mumbai Airport (190.0 km) 12 Nearest Water Body Kal River (1.0 km) Ecologically sensitive zones within No Eco sensitive Zone present within 10 13 10-km distance km of radius. Raigad Fort (16 km), Chavdar Tale (8 14 Historical/ Archaeological places km) Pre-Feasibility Report 6 Project: Manufacturing of Aroma Chemicals Developer: M/s. Raigad Petroleum Ltd. Sl. Particulars Details No. 15 National Parks/Wild Life Sanctuary NA List of Major Industries (within 10 16 Sandoz, Privi, Sudarshan, Vinati, km) 17 Seismic Zone Zone – III Figure 1: Google map of project site 5.0 COST OF PROJECT Estimated Cost of proposed as on date is approx 5337.1 Lakhs. The detailed project cost proposed is as given in Table 2. Table 2: Estimated Project Cost Sr. No. Description Amount in Lacs 1 Land & Building 0 2 Building (Factory + Office + Warehouse) 278.5 3 Plant & Machinery 2731.8 Piping + Electrical + Instrumentations + Painting 4 2326.8 + Erection & Commissioning 5 Other Assets 0.0 TOTAL 5337.1 Pre-Feasibility Report 7 Project: Manufacturing of Aroma Chemicals Developer: M/s. Raigad Petroleum Ltd. 6.0 PROPOSED PRODUCT AND BY-PRODUCT DETAILS AND CAPACITY At present the production capacities of M/s Raigad Petroleum Limited is 210.0 MT/Month and propose to addition manufacturing capacity by 913.5 MT/Month. The detail products capacity is given in Table-3. Table 3: Proposed Product details No Product Category Existing Proposed Qty MT/Month 01 Benzyl Salicylate Aroma chemical 0 300 300 02 CAMEK Aroma chemical 0 7 7 03 Geranyl Nitrile Aroma chemical 0 5 5 04 Prionyl Aroma chemical 0 30 30 05 Aldehyde C 11 Aroma chemical 0 25 25 MPO By Sulphuric 100 06 acid OR Intermediate 125 225 MPO By Resin 0 07 DNEI Aroma chemical 0 1.5 1.5 Geranyl Acetate/Neryl 08 Aroma chemical 0 200 200 acetate/Linalyl acetate Geranyl Alcohol/Neryl 09 Aroma chemical 0 200 200 alcohol/Linalyl alcohol 10 Phenyl ethyl alcohol Aroma chemical 0 Phenyl Ethyl Methyl 11 Aroma chemical 0 Either OR all Ether Either OR all total total not to Alpha-Pinene not to exceed 20 12 Aroma chemical 0 exceed 20 epoxide MT/M MT/M Alpha-Campholenic 13 Aroma chemical 0 aldehyde Alpha-Terpinyl 14 Aroma chemical 10 0 10 Acetate Distillation of 15 Aroma chemical 100 0 100 Aromatic chemicals Pre-Feasibility Report 8 Project: Manufacturing of Aroma Chemicals Developer: M/s. Raigad Petroleum Ltd. 16 CST Storage Intermediate 0 600 600 Total 210 913.5 1123.5 Note: CST storage has no manufacturing process involve it’s only for store. Table 4: Proposed BY- Product Details Poposed Sl. Products By-Products Quarntity Utilization No. (MT/M) Reuse or Sale to PCB registered 1. TEA recovered 168.67 party Recover TEA or Sale to PCB 2. TEA.HCL solution 853.21 registered party 3. Column Tops 29.75 Sale to PCB registered party Benzyl Column Bottom 4. 32.83 Sale to PCB registered party Salicylate mass Recovered Reuse or Sale to PCB registered 5 2.92 Methanol party Reuse or Sale to PCB registered 6 Recovered Hexane 7.33 party Sodium Hydroxide Reuse or Sale to PCB registered 7 80 solution party Separate MEK & Methanol from Recovered MEK & 8 54.50 mixture & Reuse or Sale to PCB Methanol Mixture registered party Potassium acetate 9. CAMEK 15.8 Sale to PCB registered party solution 10. Column tops 1.7 Sale to PCB registered party Column bottom 11 1.2 Sale to PCB registered party mass Sodium Sulphate or Separate MEK & Methanol from Ammonium 12.06 mixture & Reuse or Sale to PCB 12 sulphate Solution registered party Geranyl Nitrile Aq.Acetic acid 9.69 Sale to PCB registered party solution (25-30%) 13 Column tops 0.2 Sale to PCB registered party Pre-Feasibility Report 9 Project: Manufacturing of Aroma Chemicals Developer: M/s. Raigad Petroleum Ltd. Column bottom 14 0.3 Sale to PCB registered party mass 15 White oil 1.35 Sale to PCB registered party Aqueous AlCl3 soln 16 450.48 Sale to PCB registered party (30-38%) Aqueous TEA.HCl Separate TEA & Reuse or Sale to 506.49 (29 to 33%) PCB registered party Reuse or Sale to PCB registered 18 TEA Recovered 119.17 party 19 Recovered EDC 469.54 Reuse or Sale to PCB registered 20 Tops & Bottom Mass 58.40 Sale to PCB registered Methanol Reuse or Sale to PCB registered 21 116.95 recovered party Aquoeus solution 22 (Sodium salt with 407.63 Sale to PCB registered Methanol) Prionyl DMF & Acids solution of 23 Ammonium 390.00 Sale to PCB registered chloride & Sulphimide solution Charcoal Reuse or Sale to PCB registered 24 0.80 recovered party Separate Methanol from mixture & Aq.
Recommended publications
  • Pharmaceutical Sciences
    IAJPS 2018 (Suppl.), 05 (01), S52-S55 Valmik R. Jondhale and Sanjiv K.Sadgir ISSN 2349-7750 CODEN [USA]: IAJPS ISSN: 2349-7750 INDO AMERICAN JOURNAL OF PHARMACEUTICAL SCIENCES Available online at: http://www.iajps.com Research Article USE OF ALGAE AS A BIOINDICATOR TO STUDY WATER QUALITY OF RIVER SAVITRI, DIST- RAIGAD, MAHARASHTRA (INDIA) Valmik R. Jondhale and Sanjiv K.Sadgir Department of Chemistry, GES Arts Commerce and Science College Shreewardhan, Raigad - 402110) (M.S., India), [email protected] Abstract: The samples of algae were collected from pre-defined fix 5 sampling point. The samples were collected monthly from selected sampling stations of river Savitri from August 2016 to June 2017. In present study, the water quality of river Savitri, Algal Species Pollution Index were employed.The total score of each station was greater than 20 indicating the confirmed high organic pollution. Considering all the water parameters and pollution index it was clearly shown that the sampling stations II and III were highly polluted than station I. The results of the present study revealed that the surface water quality was affected from Industrial effluents and domestic water of the river. Thus, algal communities were used as bioindicator of organic pollution of river Savitri. Keyword: Algae, Bio indicator, Savitri river, , pollution index, *Corresponding Author: Valmik R. Jondhale, QR code Department of Chemistry, GES Arts Commerce and Science College Shreewardhan, Raigad -402110) (M.S., India), E-Mail: [email protected] Please cite this article in press as Valmik R. Jondhale and Sanjiv K.Sadgir, Use of Algae as A Bioindicator to Study Water Quality of River Savitri, Dist- Raigad, Maharashtra (India) , Indo Am.
    [Show full text]
  • Jurisdiction Raigad Alibag.Pdf
    CNTVTINNT JURISDICTION 'r ,r, .,r,:. ,,1, r r' .i T,. AIJBAGAIJBAG,. .rr.r,, ,:i .. L , ,., ...:i, . ,t .. , : L Court of Dirict and 1. Trial and Disposal of Session's cases and all Sessions Judge, Raigad-'special Cases arises in the area of Police Station Alibag Alibag, Mandawa Sagari, Revdanda, Poynad,, Pen, Wadkhal, Dadar Sagari, Nagothane, Murud 2. Appeals and Revision Petitions of rDecisions,/Orders passed by Adhoc-District, 'Magistrate, Raigad-Alibag, Chief Judicial, Magistrate, Raigad-Alibag, Judicial Magistrate of Sub-Division Alibag Pen and Murud. 3. Revision Petitions against Decisions,/Orders under Cr.P.C. Passed by Sub-Divisional Magistrate,/Additional District Magistrate of Sub- Division Alibag, Pen and Murud. Bail Application matters in the area of Police ,Station'4. Alibag, Mandawa Sagari, Revdanda, Poynad, Pen, Wadkhal, Dadar Sagari, Nagothane, Murud. 5. Application filled under section 408 Cr.P.C. 2 Court of District Judge- 1. Uearing & Disposal of all cases tr"rrsferred' 1 and Additional from District Coun. Session Judge, Raigad- Alibag 2. Trial & Disposal of cases relating to. M.O.C.C.A., E.C. Act., M.P.I.D. and case filed by C.B.I. under anti-corruption and N.D.P.S. arises iin the area of Police Station Alibag,r gryg6, Mandawa :Sagari, Revdanda, Poynad, Pen, Wadkhal, DadarDadar: . .:"l1t'Nagothane'*ulo:'Sagari, Nagothane, Murud. 3 Court of^^. District Judge- 1. Hearing A Oisposal oi all cases transferred 2 and Assistant Session from District Court. Judge, Raigad-Alibag 4 Coun of Adhoc District l. Hearing & Disposal of all cases transferred, Judge-1 and Assistant,from District Court.
    [Show full text]
  • Police Station Wise Magistrate Raigad Alibag.Pdf
    Police station wise Magisfiate 1. Alibag Police Station 2. Poynad Police Station 3. Revdanda Police Station Court of Chief Judicial Magistrate, Raigad 4. Mandawa Sagari Police Station 11 - Alibag 5. State Excise Depaftment Alibag & Flying Squad Police Station 6. Local Crime Branch 1. Alibag Police Station t2 Civil Judge, J. D. & J.M.F.C., Alibag 2. Poynad Police Station 3. Revdanda Police Station -tJ 2nd Jt. Civil Judge, J. D. & J.M.F.C., Alibag 4. Mandawa Sagari Police Station 3'd Jt. Civil Judge, J. D. & J.M.F.C., Alibag t4 5. State Excise Departrnent Alibag & Flying Squad Police Station l5 4sJt. Civil Judge, J. D. & J.M.F.C., Alibag 6. Local Crime Branch 1. Panvel Ciry Police Station t6 Jt. Civil Judge, Junior Divisioq Panvel 2. Panvel Town Police Station 1. Khandeshwar Police Stadon t7 2"d Civil Judge, J. D. & J.M.F.C., Panvel 2. NRI Sagari Police Station 1. Khargar Police Station 18 3'd Civil Judge, J. D. & J.M.F.C., Panvel 2. Navasheva Police Station 1. Kalamboli Police Station r9 4d Civil Judge, J. D. & J.M.F.C., Panvel 2. Kamothe Police Station 3. Taloia Police Station 1. Rasayani Police Station 2. State Excise Panvel City 3. State Excise Khalapur 4. State Excise Kadat 20 5d Civil Judge, J. D. & J.M.F.C., Panvel 5. State Excise Uran 6. State Excise Flying Squad No-2, Panvel 7. State Excise Flying Squad Thane 8. State Excise Flying Squad Mumbai L. Pen Police Station 2. Wadkhal Police Station 27 Civil Judge, J.
    [Show full text]
  • Responsible for Plague in Bombay Province, Though They Have Been
    Bull. Org. mond. Sante Bull. World Hlth Org.J 1951, 4, 75-109 SPREAD OF PLAGUE IN THE SOUTHERN AND CENTRAL DIVISIONS OF BOMBAY PROVINCE AND PLAGUE ENDEMIC CENTRES IN THE INDO-PAKISTAN SUBCONTINENT a M. SHARIF, D.Sc., Ph.D., F.N.I. Formerly Assistant Director in Charge of Department of Entomology, Haffkine Institute, Bombay b Manuscript received in September 1949 The findings of the Plague Recrudescence Inquiry in Sholapur and Adjoining Districts, conducted by Sharif & Narasimham11 12 in the districts of Sholapur and Dharwar during 1940 to 1943, do not support the idea that wild rodents help to carry plague infection from one place to another as in " temperate climes ".4 Wild rodents cannot be considered responsible for plague in Bombay Province, though they have been shown to be so in Transbaikalia, Mongolia, South-Eastern Russia, South Africa, and the western parts of the USA.17 In Bombay Province, the domestic rat perpetuates the plague infection. In some suitable places the infection among domestic rats goes on throughout the year. The infection is not apparent during the hot and dry season, its intensity being diminished because of the ill effect of prevailing climatic conditions on the wanderings of adult rat-fleas ; it pursues the course of a slow subterranean enzootic from burrow to burrow. The conclusion of the off-season is characterized by the advent of the rainy season, which exerts its influence in two ways first, it causes the rats from outside shelters to herd into burrows indoors and remain there perforce, which results in a considerable increase in the rat population within houses; secondly, it brings down the temperature and increases the humidity to such an extent as to result in a striking rise in the flea population and to allow rat-fleas to come out of burrows to attack human beings.
    [Show full text]
  • Company List for the Year 2017 18 Website
    Manufacturing Companies List for the Year 2017-18 Validity From Sr. No. Firm/Company Name Lic. No From Date Exp Manufacturing Premises Date Address 1 CANPEX CHEMICALS PVT LTD LCIM3 01-01-16 31-12-17 SURVEY NO.155, At post:- AMBHORA, Taluka:- ASHTI, Dist:- BID, Pincode:-412208 2 GHARDA CHEMICALS LIMITED LCIM5 01-01-17 31-12-18 B-27/29, PHASE 1, MIDC, DOMBIVLI EAST, At post:- DOMBIVLI EAST, Taluka:- KALYAN, Dist:- THANE, Pincode:-421203 3 PEST CONTROL (INDIA) PVT. LTD. LCIM7 01-01-16 31-12-17 PLOT NOS 38/39, TALOJA MIDC INDUSTRIAL ESTATE, At post:- NAVADE, Taluka:- PANVEL, Dist:- RAIGARH, Pincode:-410208 4 SUJANIL CHEMO INDUSTRIES LCIM8 01-01-16 31-12-17 GAT NO.382, MANKARWADI ROAD, At post:- URAVADE, Taluka:- MULSHI, Dist:- PUNE, Pincode:-412115 5 NATIONAL PESTICIDES AND CHEMICAL LCIM10 01-01-16 31-12-17 C-8 MIDC INDUSTRIAL AREA AMRAVATI, At post:- AMRAVATI, Taluka:- AMRAVATI, Dist:- AMRAVATI, Pincode:- 444607 6 JAY BIOTECH LCIM0012 01-01-15 31-12-16 GAT NO. 357/1, PATETHAN, TAL. DAUND, DIST. PUNE, At post:- PATETHAN, Taluka:- DAUND, Dist:- PUNE, Pincode:-412207 7 GHARDA CHEMICALS LIMITED LCIM0013 01-01-17 31-12-18 D-1/2, LOTE PARSHURAM MIDC, At post:- LOTE, Taluka:- KHED, Dist:- RATNAGIRI, Pincode:-415722 8 RELAXO DOMESWEAR LCIM0015 01-01-16 31-12-17 GAT NO 217, At post:- JAULAKEDINDORI, Taluka:- DINDORI, Dist:- NASHIK, Pincode:- 422206 9 INDIAN AGRO CHEM INDUSTRIES PVT LCIM0016 01-01-15 31-12-16 PLOTNO/B13/MIDC/KULGAON/BADL LTD APUR, At post:- BADLAPUR, Taluka:- ULHASNAGAR, Dist:- THANE, Pincode:-421503 10 SUNSHINE FINE CHEMSOL INDIA (PVT) LCIM0020 01-01-17 31-12-18 GAT NO.138, SINGAPUR, GURHOLI LTD ROAD, At post:- SINGAPUR, Taluka:- PURANDHAR, Dist:- PUNE, Pincode:- 412204 11 SULPHUR MILLS LIMITED LCIM0024 01-01-15 31-12-16 PLOT NO.
    [Show full text]
  • Interest-01-01-2000.Xlsx
    KRCL-2A & 6B Series Bonds - Interest for the period 01/07/1999 to 31/12/1999 due on 01/01/2000 Statement of Unclaimed/Unpaid amount due to Bondholders as on 10/10/2020 Sl. No. Investor First Investor Middle Investor Last Father/H Father/H Father/Husb Address Country State District PIN Folio Number DP id- Investment Amount Date of PAN Date of Aadhar Nominee Joint Remarks Is the Name Name Name usband usband and Last Client id- Type Transferr event ( Birth Number Name Holder investme First Middle Name Account ed Date of Name nt Name Name Number declaratio (Amount/ n of Shares dividend/ under any redempti litigation on date of preferenc e 1 DINESH RAGHUNATH HEGDE HEGDE C/O KRCL, BELAPUR INDIA MAHARASHTRA 400614 KRC000002 Amount for 52.5 01-JAN-shares/da NO BHAVAN, PLOT NO.6, unclaimed 2000 SECTOR 11, CBD and unpaid BELAPUR, NAVI dividend MUMBAI, 400614 2 BHARTI BALAKRISHNA PRABHU PRABHU C/O KRCL, BELAPUR INDIA MAHARASHTRA 400614 KRC000005 Amount for 52.5 01-JAN- NO BHAVAN, PLOT NO.6, unclaimed 2000 SECTOR 11, CBD and unpaid BELAPUR, NAVI dividend MUMBAI, 400614 3 SUDHAKAR K SHETTY SHETTY INNA TANDOLIGE INDIA KARNATAKA Dakshina KRC000006 Amount for 52.5 01-JAN- NO HADI,POST Kannada unclaimed 2000 INNA,KARKALA TALUK and unpaid DK, dividend 4 M MANAJUNATHA HOLLA HOLLA C/O KRCL, BELAPUR INDIA MAHARASHTRA 400614 KRC000008 Amount for 52.5 01-JAN- NO BHAVAN, PLOT NO.6, unclaimed 2000 SECTOR 11, CBD and unpaid BELAPUR, NAVI dividend MUMBAI, 400614 5 HEMANT G KARMALI KARMALI C/O KRCL, BELAPUR INDIA MAHARASHTRA 400614 KRC000009 Amount for 52.5 01-JAN-
    [Show full text]
  • Geographical Analysis of Population Characteristics in Mahad City
    Scholarly Research Journal for Interdisciplinary Studies, Online ISSN 2278-8808, SJIF 2018 = 6.371, www.srjis.com PEER REVIEWED JOURNAL, JAN-FEB, 2019, VOL- 6/49 GEOGRAPHICAL ANALYSIS OF POPULATION CHARACTERISTICS IN MAHAD CITY Priyadarshani B. More Dr. Babasaheb Ambedkar ASC College, Mahad- Raigad -402 301 [email protected] Abstract Development plays very vital role in changing population of a city. Population characteristics shows relationship between geographical condition and economic development as well as changes in population. This paper aims to provide information about how population characteristics changes with economic development with the Mahad city as a case study. The results of the statistical analyses also point toward the existence of a unidirectional causality from economic development to changes in population characteristics in the Mahad city. Key Words: Development, population characteristics. c Scholarly Research Journal's is licensed Based on a work at www.srjis.com Introduction The Mahad city developed after the establishment of M.I.D.C. in 1990. Due to this economic development there are changes occurred in population characteristics of Mahad city. This paper focuses changes in population characteristics after industrial development in Mahad city. For this study secondary data has been. Study Area The Mahad is a city and Municipal Council located in Mahad taluka of Raigad district in Maharashtra. Mahad city has 2149 households and town is divided into 17 wards. Mahad is one of the most important cities of Western Maharashtra, India. Mahad is situated 180 km from Mumbai and 120 km from Pune. The city has become the centre of attraction because of its beautiful surroundings and pleasant climate.
    [Show full text]
  • Raigad District
    1 Revision – 3 May - 2016 2 Forward I have great pleasure to present this revised version of District Off Site Emergency Plan for Raigad District. The District Off Site Emergency Plan outlining the measures to be taken in the event of chemical emergency or Industrial disaster in the entire district prepared on the basis of past experiences. The plan is prepared with a view to help the District Administration to focus quickly on the essentials and crucial aspects of both preparedness and response. There is no life without change and same is applicable for anything including planning and its related documents. With this in mind the District Off Site Emergency Plan is going under 3rd revision after it was made in March -1998. This revision is focused on the aspects like – Updating the list of the industrial establishments falling under MAH category and this includes few additions. Updating the contact details of the responsible Govt. authorities and MARG members who will either directly or indirectly involved in execution of this plan. When I have gone through this document and found that it was made meticulously and special care is taken to ensure that the information incorporated in it is current. I am sure this plan will help in effective handling of industries related emergencies. Smt. Sheetal Teli - Ugale ,(I.A.S.) District Collector & Chairman - District Crisis Group, Raigad June 2016. 3 4 “We ourselves feel that, We are doing just a drop in ocean. But the ocean would be less, Because of that missing drop.” – Mother Terressa. About this plan This is the 3rd revision, June - 2016, of the District Off Site Emergency Plan for Raigad District which was prepared in March 1998 and was subsequently revised in June 2011 & January 2012 by Directorate of Industrial Safety and Health, Raigad, which will be useful to fire fighting crew, Police and emergency service providers.
    [Show full text]
  • A Case Study on Missing Aircrafts and Damage of Bridges Due to Flood
    International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June-2017 www.irjet.net p-ISSN: 2395-0072 Disaster Risk Reduction: A Case Study on Missing Aircrafts and Damage of Bridges due to Flood Priya Menon K1, Deepa V2, Kala L3 1,2M Tech Student, Dept. of ECE, NSS College of Engineering, Palakkad, Kerala, India 3Associate Professor, HOD, Dept. of ECE, NSS College of Engineering, Palakkad, Kerala, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - The purpose of this study is twofold: to create dangerous condition that leads to injury / death to people, awareness about the recent aviation tragedies in Indian Air loss of a system or damage to the environment. This can be Force including the causes of accidents and the problem of due to natural hazards (geophysical events, severe weather identification of missing aircrafts and to create a knowledge events like heavy rain, snow, etc.) and technical hazards base on Bridge damages due to flood in different parts of the (deficiencies regarding aircraft and aircraft components, region with diverse climatic and socioeconomic conditions in systems and related equipments) [3]. Failure of an aircraft order to understand existing flood risk management structural component can have ruinous consequences, with mechanisms, including policies and institutional mechanisms, resultant loss of life and the aircraft. The investigation of and increase
    [Show full text]
  • Homegaurd Qualify Male 2019 RUNNIN REG.ID CHEST TECH RUNNING SHOTPUT SHOTPU TOTAL REMAR UNIT / POLICE SR NO
    Homegaurd Qualify Male 2019 RUNNIN REG.ID CHEST TECH RUNNING SHOTPUT SHOTPU TOTAL REMAR UNIT / POLICE SR NO. FULL NAME EDUCATION AGE HIGHT G NO. MARKS TIME DIST T MARKS MARKS K ZONE STATION MARKS 1 10645 137 BHAVESH SHARAD BHOIR 12th Pass 21 170 2 5.3 18 9.05 10 30 Qualify Pen Vadkhal Pst 2 10648 139 ANIKET RAMCHANDRA PATIL 12th Pass 20 171 0 5.1 20 8.4 9 29 Qualify Pen Vadkhal Pst 3 10574 6 SATYAM NARESH PATIL 12th Pass 21 174 2 5.3 18 7.35 8 28 Qualify Pen Vadkhal Pst 4 10918 412 GANESH LAHU SHID 12th Pass 26 170 0 5.1 20 7.55 8 28 Qualify Roha Nagothne Pst 5 10151 124 MAHADIK SAGAR NARAYAN 12th Pass 25 177 0 5.3 18 7.9 9 27 Qualify Murud Murud Pst 6 10547 35 MANOJ MOHAN MHATRE 12th Pass 21 168 2 5.5 16 7.6 8 26 Qualify Alibag Alibag Pst 7 10251 177 SURAJ JANARDAN PATIL 12th Pass 30 168 0 5.5 16 8.74 10 26 Qualify Pen Dadar sagri Pst 8 10460 281 ABHIJIT CHANDRAKANT BAVKAR 10th Pass 24 169 2 6.1 14 9.2 10 26 Qualify Roha Nagothne Pst 9 10521 330 MAHADEV SAKHARAM DAWLE 12th Pass 31 173 0 5.5 16 9.05 10 26 Qualify Mangoan Mangoan Pst 10 10695 36 MARUTI SOMA PARDHI 12th Pass 22 168 0 5.5 16 8 9 25 Qualify Roha Nagothne Pst 11 10779 52 PARESAH NARESH BHEKARE 12th Pass 22 174 0 5.3 18 6.9 7 25 Qualify Alibag Alibag Pst 12 10607 134 KAMALAKAR MAHADU HIRAWA Graduate 22 175 0 5.5 16 8 9 25 Qualify Pen Khopoli Pst 13 10315 277 SANKESH PARSHURAM PATIL 12th Pass 22 163 2 5.5 16 6.9 7 25 Qualify Murud Murud Pst 14 10140 317 PAVAN GANESH GAVASKAR 12th Pass 20 176 0 5.3 18 7.03 7 25 Qualify Alibag Alibag Pst 15 10484 112 PRANAY PRAVIN PARAB 12th Pass
    [Show full text]
  • Mma Cetp Mahad Mma Cetp, Mahad
    MMA CETP MAHAD MMA CETP, MAHAD Seven Billion Dreams. One Planet. Consume with Care Contents • Historical Background of CETP • Effluent characteristics & Challenges of MIDC, MAHAD • Improving Effluent Treatment & Management • Journey towards Sustainability Historical Background…. MMA CETP Mahad Purpose of Existence The Mahad Industrial Area came into existence in the later part of eighties to overcome the water pollution related problems of the area. Tremendous water pollution in surrounding of industrial area and Savitri River & creek Thought process developed in early nineties to develop a CETP However, actual development activity started only in 1998-99. The treatability studies were conducted in the year 2000 by M/s. Paramount Ltd., Baroda. The DPR was prepared in Nov. 2000 & technical appraisal done by IIT, Mumbai in 2001. Primary treatment commissioned in 2003. Although the project execution was delayed due to financial difficulties, The project was completed and was fully operational only in June 2005. Industry membership status Large Scale Industries 16 Large Scale Medium Scale Industries 16 Closed & Industries, 12% Temporary Small Scale Industries 40 Closed Industries, 26% Medium Scale Total 72 Industries, 12% Green 28 Green Small Scale Industries, 21% Closed/Temp. Closed 35 Industries, 30% TOTAL 135 Category wise distribution of Industries Industries Small Medium Large Total Chemicals 66 15 9 90 Pharmaceutical 1 1 3 5 Dyes & Dye Intermediate 2 2 0 4 Textile 2 0 2 4 Pigment 0 0 1 1 Paper 0 0 1 1 Packing 1 0 0 1 Engineering 3 2 0 5 Others 23 1 0 24 Total 98 21 16 135 • Historical Background of CETP • Effluent characteristics & Challenges of MIDC, MAHAD • Improving Effluent Treatment & Management • Journey towards Sustainability Nature of Waste water – MAHAD MIDC Flow cu.
    [Show full text]
  • View Full Paper
    International Journal of Scientific and Research Publications, Volume 2, Issue 11, November 2012 1 ISSN 2250-3153 Assessment of Awareness about HIV/AIDS and Operationalization of Interventions in Rural Population of Raigad District, India Sachin Solat*, GD Velhal**, Hemant Mahajan***, Amrita Rao****, Bhuwan Sharma***** *Assistant Professor, PDVVPF‟s Medical College, Ahmednagar, MUHS Nashik, India ** Additional Professor, TN Medical College, Mumbai, MUHS Nashik, India *** Assistant Professor, RCSM GMC Kolhapur, MUHS Nashik, India ****Assistant Professor, TN Medical College, Mumbai, MUHS Nashik, India *****Junior Resident, TN Medical College, Mumbai, MUHS Nashik, India Abstract- We are living in an 'international' society, and HIV has disappointing that the global numbers of people infected with become the first truly 'international' epidemic, easily crossing HIV continue to increase, despite the fact that effective oceans and borders. It is disappointing that the global numbers of prevention strategies already exist. Number of people living with people infected with HIV continue to increase, despite the fact HIV in 2008 was 33.4 million. Of these 33.4 million 2.7 million that effective prevention strategies already exist. The present were newly infected patients in 2008 and AIDS related deaths study was carried out to assess the awareness of rural population were 2 million.(1) about HIV/AIDS in Raigad district and operationalization of The Government of India estimates that in 2007, about 2.31 appropriate interventions to empower the community leaders million Indians were living with HIV (1.8 – 2.9 million) with an with appropriate leadership skills, to control the spread of HIV adult prevalence of 0.34 percent.(2) Demographically the second infection.
    [Show full text]