Annexure-PFR

Total Page:16

File Type:pdf, Size:1020Kb

Annexure-PFR CONTENTS CHAPTER 1 ..................................................................................................................................... 1 PROJECT SUMMARY ................................................................................................................... 1 CHAPTER 2 ..................................................................................................................................... 2 INTRODUCTION .......................................................................................................................... 2 (I) IDENTIFICATION OF PROJECT AND PROJECT PROPONENT ............................... 2 CHAPTER 3 ..................................................................................................................................... 3 PROJECT DESCRIPTION ............................................................................................................. 3 (I) TYPE OF PROJECT INCLUDING INTERLINKED AND INTERDEPENDENT PROJECTS IF .................................................................................................................................. 3 (II) LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION, AND PROJECT BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATES .......... 4 (III) MINING ............................................................................................................................... 8 (IV) SOURCE OF WATER/ ENERGY AND POWER REQUIREMENT ............................... 8 (V) QUANTITY OF WASTES TO BE GENERATED AT SITE AND SCHEMES ADOPTED FOR MANAGEMENT / DISPOSAL. ....................................................................... 9 (VI) SCHEMATIC REPRESENTATION OF THE FEASIBILITY DRAWING FOR EIA PURPOSE ...................................................................................................................................... 10 CHAPTER 4 ................................................................................................................................... 11 SITE ANALYSIS ........................................................................................................................... 11 (I) CONNECTIVITY .............................................................................................................. 11 (II) LAND USE PATTERN...................................................................................................... 11 (III) TOPOGRAPHY ................................................................................................................. 12 (IV) EXISTING LAND USE PATTERN ................................ ERROR! BOOKMARK NOT DEFINED. (V) EXISTING INFRASTRUCTURE ..................................................................................... 12 (VI) SOIL CLASSIFICATION ................................................................................................. 12 (VII) CLIMATIC DATA FROM SECONDARY SOURCES ............................................... 12 (VIII) SOCIAL INFRASTRUCTURE AVAILABLE.............................................................. 14 CHAPTER 1 PROJECT SUMMARY Promoter Shri T. Udayasingh Location Kharse.No : 155 Village: Periyanagalur, Kallankurichi, Ameenabad & Khairulabad Taluk: Ariyalur District : Ariyalur State: Tamil Nadu. Geographical Lat : 11o 07’5”N to 11o 10’56”N Location Long : 79o 6’26”E to 79o 07’43”N Mean Sea Level 80 meter (MSL) Extent 194.16.5 Hectares Production 1.34 MTPA Source of water Water Tankers and Existing Borewell Nearest Town Ariyalur (4.42 Km from the project site) Populated areas Ariyalur (4.42 Km from the project site) 1 | P a g e CHAPTER 2 INTRODUCTION (i) Identification of project and project proponent This is a proposed expansion mining over an extent of 194.16.5 Hectares located in Kharse No 155, Periyanagalur, Kallankurichi, Ameenabad & Khairulabad Village, Ariyalur Taluk, Ariyalur District. Tamil Nadu Cements Corporation Limited (TANCEM), a wholly owned Government of Tamil Nadu undertaking, started business from 1st April 1976. TANCEM has a multi plants, multi locations and multi products company with an annual turnover of around Rs. 250 Crore. The company has its main objective in production of cement and cement based products and primarily caters to the needs of Government departments. TANCEM have two cement units, one at Alangulam and another at Ariyalur. Limestone being the main raw material, the company acquired and reserved enough limestone bearing lands in and around Alangulam and Ariyalur. Ariyalur unit is having four mining leases. Three out of the four mine leases have expired. The proposed ML area bearing the G.O. MS. 456, Dated: 16-05-1985. It spreads in an area of 194.16.5 Hec, in the villages namely Periyanagalur, Kallankurichi, Ameenabad & Khairulabad. The ML area comprises of both Own Patta Lands (149.665 Ha) and Government Lands (44.5 Ha). It is proposed to raise 1.34 MTPA of Limestone during the Plan Period (5 years) from this Lease of G.O.MS. 456. The Mine Lease area is scattered as pieces and forming compact and contiguity along with the adjoining Mining Leases of G.O.MS. 344 & 469. The scheme of mining along with Progressive Mine Closure Plan has been approved by the IBM vide Letter No. TN/ALR/LST/MS-1268 MDS Dated: 11/11/2015. There is no forest land within and around the ML area. Mining operations will be carried out by open cast mining method by working the deposit by systematic formation of benches as per Metalliferous Mines Regulation 1961. The project proponent has to therefore obtain environment clearance as per EIA notification 14 Sept, 2006 and subsequent amendments. 2 | P a g e CHAPTER 3 PROJECT DESCRIPTION (i) Need for the project TANCEM, a Public Sector Undertaking is having two cement units one at Ariyalur and other one at Alangulam. Ariyalur unit is having four mining leases. Out of the four leases, three leases have expired. TANCEM is in the process of renewing the three expired Mining Leases to meet the Limestone requirement, exclusively for its captive usage. The proposed ML area bearing the G.O.MS. 456, Dated: 16-05-1985, is one among those three Mine Leases. India is the second largest producing country of cement in the world after China. There were 171 large cement plants having an installed capacity of 290.48 million tonnes in 2010-11. India has huge resources of limestone distributed over different parts of the country. As per the Report of the Working Group, Planning Commission of India, the total limestone requirement during 12th Plan (2012-2017) with growth scenario of cement @ 10%, 11% and 12% for the respective GDP growth of 8%, 9% and 10% is projected at 3,163 million tonnes, 3,253 million tonnes and 3,385 million tonnes, respectively. The Indian cement industry is weakly oligopolistic in nature on a national level with top 11 to 12 firms among more than 100 firms capturing 70% of the cement market. The Cement Industry produces a variety of cement to suit a host of applications matching the world's best in quality. In 2010-11, the total consumption of limestone & other calcareous minerals/ materials, as reported by different industries was 213.12 million tonnes. Cement was the major consuming industry accounting for 94% consumption, followed by iron and steel (4%) and chemical (1%). The remaining consumption was reported by sugar, paper, fertilizer, glass, metallurgy, foundry, etc. As a part of Corporate Social Responsibility (CSR), the Cement Industry employs around one lakh people and takes care of the social needs not only of the employees but also adopts several villages around the factories providing 3 | P a g e drinking water, electricity, medical and educational facilities. imports: imports of limestone increased to 5.04 million tonnes in 2010-11 from 3.90 million tonnes in the previous year. limestone was imported mainly from uae (47%) and Oman (38%). exports: exports of limestone decreased to 1.04 million tonnes in 2010-11 from 2.41 million tonnes in the previous year. limestone in bulk was exported mainly to neighboring countries, viz, Bangladesh (94%) Bhutan and Nepal besides other countries. (Source: Indian minerals year book - 2011). (ii) Type of Project including interlinked and interdependent projects if Any The project is mining project. Mining operation is being carried out by fully mechanized opencast method, utilizing HEM. In conjunction with drilling deep hole blasting shall be carried out to create fragmented material. Rock breaker will be used for further blasting. The bench height will be used for blasting. The blasted material will be loaded into 20 tonnes trippers with 1.2 M3 bucket capacity loader/excavator. Based upon the production assumed (1.34 MTPA) the life of the mine would be 28 years. (iii) Location (map showing general location, specific location, and project boundary & project site layout) with coordinates Topo Map of the project site is given in the Fig 2.1 Location coordinates are detailed below: o o Lat : 11 07’5”N to 11 10’56”N o o Long : 79 6’26”E to 79 07’43”N 4 | P a g e Tamilnadu State Map showing Tiruchirappalli District and The Project Site 5 | P a g e Topo Map of the Project site (10 km Radius) 6 | P a g e Satellite Image of the Project Site 7 | P a g e (iv) Mining The proposed ML area (G.O.MS. 456) spreads in an area of 194.16.5 Ha, as scattered isolated pits and forming compact and contiguity with the adjoining ML area of G.O.MS. 344 & 469. The entire ML area is falls under non forest land, which include Govt. owned lands & Patta lands owned by the Corporation. The mining will
Recommended publications
  • District Survey Report for Limekankar Ariyalur District Tamilnadu State
    DISTRICT SURVEY REPORT FOR LIMEKANKAR ARIYALUR DISTRICT TAMILNADU STATE (Prepared as per Gazette Notification S.O.3611 (E) dated 25.07.2018 of Ministry of Environment, Forest and Climate Change) 1 Chapter Content Page No. 1. Introduction 3 2. Overview of Mining Activity in the District 3 3. General Profile of the District 3-7 4. Geology of Ariyalur District 7-11 5. Drainage of Irrigation pattern 12 6. Land Utilisation Pattern in the District: Forest, Agricultural, 12-13 Horticultural, Mining etc., 7. Surface Water and Ground Water scenario of the District 13-19 8. Climate and Rainfall of the District 19 9. Details of Mining Leases in the District 20 10. Details of Royalty or Revenue received in last three years 20 11. Details of Production of Minor Mineral in last three years 20 12. Mineral Map of the District 21 13. List of Letter of Intent (LOI) Holder in the District along with 22-23 its validity 14. Total Mineral Reserve available in the district 24-25 15. Quality/Grade of Mineral available in the district 26 16. Use of Mineral 26 17. Demand and supply of the Mineral in the last three years 26 18. Mining Leases marked on the map of the district 26 19. Details of the area of where there is a cluster of the mining 27 leases 20. Details of Eco-sensitive area 27-28 21. Impact on the environment due to Mining activity 28-30 22. Remedial measures to mitigate the impact of mining on the 30-32 environment 23. Reclamation of the mined out area 32 24.
    [Show full text]
  • Ii Pullambadi Canal
    DEPARTMENT OF ECONOMICS St. JOSEPH’S COLLEGE (Autonomous) (Affiliated to Bharathidasan University, Tiruchirappalli) TIRUCHIRAPPALLI – 620 002. Dr. G. GNANASEKARAN M.A., M.B.A., M.Phil., Ph.D., Head & Research Advisor. CERTIFICATE This is to certify that the thesis entitled “AN ECONOMIC ANALYSIS OF WATER USE EFFICIENCY OF FARMERS IN PULLAMBADI CANAL OF TIRUCHIRAPPALLI AND ARIYALUR DISTRICTS, TAMIL NADU” submitted by Mr. G. IRUTHAYARAJ (Reg. No. 011148 / Ph.D.2 / Economics / F.T. / July 2007) is a bonafide record of research work done by him under my guidance as a full time scholar in the Department of Economics, St. Joseph’s College (Autonomous), Tiruchirappalli and that the thesis has not previously formed the basis for the award to the candidate of any degree or any other similar title. The thesis is the outcome of personal research work done by the candidate under my overall supervision. (G. GNANASEKARAN) Station: Tiruchirappalli Date : DECLARATION I hereby declare that the work embodied in this thesis has been originally carried out by me under the guidance and supervision of Dr. G. GNANASEKARAN , Head and Research Advisor, Department of Economics, St. Joseph’s College (Autonomous), Tiruchirappalli - 620 002. This work has not been submitted either in full or in part for any other degree or diploma at any university. (G. IRUTHAYARAJ) Research Scholar Place: Tiruchirappalli Date : ACKNOWLEDGEMENT I wish to place on record the valuable help rendered by various people to complete this dissertation work. I would like to express my profound sense of gratitude to my research adviser and Best Teacher Awardees Dr. G. Gnanasekaran M.A., M.B.A., M.Phil., Ph.D., Head and Associate Professor of Economics, for his stimulating guidance by spending his valuable time with me in sharpening my thinking and analysis, valuable suggestions and continuous encouragement throughout the study.
    [Show full text]
  • S.NO Name of District Name of Block Name of Village Population Name
    STATE LEVEL BANKERS' COMMITTEE, TAMIL NADU CONVENOR: INDIAN OVERSEAS BANK PROVIDING BANKING SERVICES IN VILLAGE HAVING POPULATION OF OVER 2000 DISTRICTWISE ALLOCATION OF VILLAGES -01.11.2011 Name of S.NO Name of Block Name of Village Population Name of the Bank Name of Branch District 1 Ariyalur Andiamadam Anikudichan (South) 2730 Indian Bank Andimadam 2 Ariyalur Andiamadam Athukurichi 5540 Bank of India Alagapuram 3 Ariyalur Andiamadam Ayyur 3619 State Bank of India Edayakurichi 4 Ariyalur Andiamadam Kodukkur 3023 State Bank of India Edayakurichi 5 Ariyalur Andiamadam Koovathur (North) 2491 Indian Bank Andimadam 6 Ariyalur Andiamadam Koovathur (South) 3909 Indian Bank Andimadam 7 Ariyalur Andiamadam Marudur 5520 Canara Bank Elaiyur 8 Ariyalur Andiamadam Melur 2318 Canara Bank Elaiyur 9 Ariyalur Andiamadam Olaiyur 2717 Bank of India Alagapuram 10 Ariyalur Andiamadam Periakrishnapuram 5053 State Bank of India Varadarajanpet 11 Ariyalur Andiamadam Silumbur 2660 State Bank of India Edayakurichi 12 Ariyalur Andiamadam Siluvaicheri 2277 Bank of India Alagapuram 13 Ariyalur Andiamadam Thirukalappur 4785 State Bank of India Varadarajanpet 14 Ariyalur Andiamadam Variyankaval 4125 Canara Bank Elaiyur 15 Ariyalur Andiamadam Vilandai (North) 2012 Indian Bank Andimadam 16 Ariyalur Andiamadam Vilandai (South) 9663 Indian Bank Andimadam 17 Ariyalur Ariyalur Andipattakadu 3083 State Bank of India Reddipalayam 18 Ariyalur Ariyalur Arungal 2868 State Bank of India Ariyalur 19 Ariyalur Ariyalur Edayathankudi 2008 State Bank of India Ariyalur 20 Ariyalur
    [Show full text]
  • Ariyalur District
    CENSUS OF INDIA 2011 TOTAL POPULATION AND POPULATION OF SCHEDULED CASTES AND SCHEDULED TRIBES FOR VILLAGE PANCHAYATS AND PANCHAYAT UNIONS ARIYALUR DISTRICT DIRECTORATE OF CENSUS OPERATIONS TAMILNADU ABSTRACT ARIYALUR DISTRICT No. of Total Total Sl. No. Panchayat Union Total Male Total SC SC Male SC Female Total ST ST Male ST Female Village Population Female 1 Ariyalur 37 1,10,558 55,660 54,898 28,210 14,361 13,849 960 468 492 2 Thirumanur 36 1,16,349 57,007 59,342 23,979 11,678 12,301 249 126 123 3 Jayamkondam 35 1,17,515 58,360 59,155 32,388 16,099 16,289 2,906 1,441 1,465 4 Andimadam 30 1,10,115 54,791 55,324 21,811 10,837 10,974 2,339 1,172 1,167 5 T. Palur 33 1,06,142 52,799 53,343 24,772 12,435 12,337 2,148 1,045 1,103 6 Sendurai 30 1,10,421 54,636 55,785 32,610 16,447 16,163 1,344 645 699 Grand Total 201 6,71,100 3,33,253 3,37,847 1,63,770 81,857 81,913 9,946 4,897 5,049 ARIYALUR PANCHAYAT UNION Sl. Name of Population Scheduled Castes Scheduled Tribes No. Panchayat Total Males Females Total Males Females Total Males Females 1 2 3 4 5 6 7 8 9 10 11 1 Alanduraiyarkattalai 2,106 1,090 1,016 427 220 207 - - - 2 Andipattakkadu 1,963 1,017 946 372 205 167 - - - 3 Arungal 3,581 1,767 1,814 827 415 412 259 120 139 4 Edayathankudi 2,191 1,135 1,056 109 52 57 81 43 38 5 Eruthukaranpatti 4,801 2,419 2,382 531 266 265 246 127 119 6 Govindapuram 1,468 759 709 363 190 173 - - - 7 Hasthinapuram 1,854 931 923 428 215 213 - - - 8 Iluppaiyur 4,142 2,158 1,984 1,985 1,043 942 - - - 9 Kadugur 5,662 2,890 2,772 855 437 418 1 1 - 10 Kallankurichi 1,869
    [Show full text]
  • Tamil Nadu Public Service Commission Bulletin
    © [Regd. No. TN/CCN-466/2012-14. GOVERNMENT OF TAMIL NADU [R. Dis. No. 196/2009 2018 [Price: Rs. 145.60 Paise. TAMIL NADU PUBLIC SERVICE COMMISSION BULLETIN No. 7] CHENNAI, FRIDAY, MARCH 16, 2018 Panguni 2, Hevilambi, Thiruvalluvar Aandu-2049 CONTENTS DEPARTMENTAL TESTS—RESULTS, DECEMBER 2017 NAME OF THE TESTS AND CODE NUMBERS Pages Pages The Tamil Nadu Government office Manual Departmental Test for Junior Assistants In Test (Without Books & With Books) the office of the Administrator - General (Test Code No. 172) 552-624 and official Trustee- Second Paper (Without Books) (Test Code No. 062) 705-706 the Account Test for Executive officers (Without Books& With Books) (Test Code No. 152) 625-693 Local Fund Audit Department Test - Commercial Book - Keeping (Without Books) Survey Departmental Test - Field Surveyor’s (Test Code No. 064) 706-712 Test - Paper -Ii (Without Books) (Test Code No. 032) 694-698 Fisheries Departmental Test - Ii Part - C - Fisheries Technology (Without Books) Fisheries Departmental Test - Ii Part - B - (Test Code No. 067) 712 Inland Fisheries (Without Books) (Test Code No. 060) 698 Forest Department Test - forest Law and forest Revenue (Without Books) Fisheries Departmental Test - Ii Part - (Test Code No. 073) 713-716 A - Marine Fisheries (Without Books) (Test Code No. 054) 699 Departmental Test for Audit Superintendents of Highways Department - Third Paper Departmental Test for Audit Superintendents (Constitution of India) (Without Books) of Highways Department - First Paper (Test Code No. 030) 717 (Precis and Draft) (Without Books) (Test Code No. 020) 699 The Account Test for Public Works Department officers and Subordinates - Part - I (Without Departmental Test for the officers of Books & With Books) (Test Code No.
    [Show full text]
  • District Survey Report Ariyalur District
    DISTRICT SURVEY REPORT ARIYALUR DISTRICT DISTRICT ENVIRONMENT IMPACT ASSESSMENT AUTHORITY (DEIAA), ARIYALUR AUGUST 2017 DISTRICT SURVEY REPORT ARIYALUR DISTRICT CONTENT Chapter Page No. 1. Introduction 01 2. Administrative details 02 3. Overview of Mining Activity 02 General Profile of the District 03 4. Location and Accessibility 03 5. Rainfall and Climate 03 6. Geomorphology 05 7. Landuse Utilisation Pattern in the District 06 8. Process of Deposition of Sediments in the River of the District 07 9. Geology of Ariyalur District 08 i) Evolution of Cauvery Basin 10 ii) Lithostratigraphic Classification 11 10. The List of Mining Lease details 13-46 11. 11. Details of Royalty / Revenue received in the last three years 47-49 (2014-15 to 2016-17) 12. Details of production of Sand / Bajari / Minor Minerals in the 50 last three years (2014-15 to 2016-17) 13. Conclusion 50 LIST OF PLATES Plate No. 1. Field photographs of Ariyalur District Mines. 1. Introduction In pursuance to the Gazette Notification, Ministry of Environment, Forest and Climate Change, the Government of India Notification No.SO 141 (E) dated 15.01.2016 and SO 190 (E) dated 20.01.2016 the District Level Environment Impact Assessment Authority (DEIAA) and District Environment Appraisal Committee (DEAC) were constituted in Ariyalur District for the grant of Environmental Clearance for category “B2” projects for quarrying of Minor Minerals. The main purpose of preparation of District Survey Report is to identify the mineral resources and developing the mining activities along with other relevant data of the District. The DEAC will scrutinize and screen scope of the category “B2” projects and the DEIAA will grant Environmental Clearance based on the recommendations of the DEAC for the Minor Minerals on the basis of District Survey Report.
    [Show full text]
  • 19 Jun 2017 1427496172E5R
    CONTENTS CHAPTER 1 ..................................................................................................................................... 1 PROJECT SUMMARY ................................................................................................................... 1 CHAPTER 2 ..................................................................................................................................... 2 INTRODUCTION .......................................................................................................................... 2 (I) IDENTIFICATION OF PROJECT AND PROJECT PROPONENT ............................... 2 CHAPTER 3 ..................................................................................................................................... 2 PROJECT DESCRIPTION ............................................................................................................. 3 (I) TYPE OF PROJECT INCLUDING INTERLINKED AND INTERDEPENDENT PROJECTS IF .................................................................................................................................. 3 (II) LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION, AND PROJECT BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATES .......... 4 (III) MINING ............................................................................................................................... 8 (IV) SOURCE OF WATER/ ENERGY AND POWER REQUIREMENT ............................... 8 (V) QUANTITY OF WASTES TO BE GENERATED AT SITE AND
    [Show full text]
  • District Census Handbook, Ariyalur, Part XII-A & B, Series-33
    CENSUS OF INDIA 2001 SERIES-33 TAMILNADU DISTRICT CENSUS HANDBOOK Part - A & B ARIYALUR DISTRICT VILLAGE & TOWN DIRECTORY ~ VILLAGE AND TOWNWISE PRIMARY CENSUS ABSTRACT Dr. C. Chandramouli of the Indian Administrative Service Director of Census Operations, Tamil Nadu , ............. ... •.I" ..: . ~ . • : l.,f . ._ .~ ·. .. SRI BRAHADEESWARAR TEMPLE, GANGAIKONDACHOLAPURAM The Brahadeeswarar temple at Gangaikonda Cholapuram in Ariyalur District was built by Rajendra Chola-I in the 11 th century. The striking feature of the temple is its Vimanam. This temple has a 100 sq ft base with a height of 170 feet by 20 feet perpendicular. There are beautiful plaster figures on the Vimanam. The entire structure is an imposing one and the Vimanam is visible even at a distance of 10 kms. Sri Brahadeswarar, the presiding deity, is represented by 13 feet high in the form of Lingam with a circumference of 16-1/2 feet. It is made out of a single block of stone. (iii) Contents Pages Foreword IX Preface Xl Acknow ledgements xiii Map of Ariyalur District xv District Highlights - 200 1 XVII Important Statistics of the District, 200 I XIX Ranking of Taluks in the District XXI Summary Statements from 1 - 9 Statement 1: Name of the headquarters of Districtffaluk, their rural-urban xxiii status and distance from District headquarters. 200 1 Statement 2: Name of the headquarters of District/CD block, their XX1ll rural-urban status and distance from District headquarters. 2001 Statement 3: Population of the District at each census from 190 I to 200 1 xxiv Statement
    [Show full text]
  • Hydrogeological Report For
    Hydrogeological Report For Gravel Quarry Over an extent of 1.45.0Ha, S.F.Nos. 532/3A, 532/3B, 532/6A, 532/6B, 532/6C & 532/7, Udayarpalayam (East) Village , Udayarpalayam Taluk, Ariyalur District 78 HYDROGEOLOGICAL REPORT FOR UDAYARPALAYAM (East) GRAVEL QUARRY. 1. INTRODUCTION NAME OF THE APPLICANT WITH ADDRESS- Name of the applicant : Thiru.G.Kasinathan, Address : S/o. Gurusamy, No.336, South Street, Silampur Village,Andimadam Taluk, Ariyalur District. State : Tamilnadu. Mobile : + 91 97888 38581. DETAILS OF THE AREA- Land Classification : Patta Land Survey No : 532/3A, 3B, 6A, 6B, 532/6C & 532/7. Extent in Hectares : 1.45.0 Ha Village : Udayarpalayam (East), Taluk : Udayarpalayam, District : Ariyalur. The Client requires detailed information on Ground Water Occurrences at Proposed Project Site. The objective of the present study is to assess the availability of groundwater and comment on aspects of depth to potential aquifers, aquifer availability and type, possible yields and water quality. For this purpose all available hydrogeological information of the areas has been analyzed, and a geophysical survey was done. The investigations involved hydrogeological, geophysical field investigations and a detailed study in which the available relevant geological and hydrogeological data were collected, analyzed, collated and evaluated within the context of the Client's requirements. The data sources consulted were mainly: a) Central Ground Water Board (CGWB) Data b) State & District Geological and Hydrogeological Reports and Maps. c) Technical reports of the area by various organizations. 79 2. SCOPE OF THE WORKS – The scope of works includes: Site visits to familiarize with the project areas. Identify any issues that might impact the Ground Water Scenario due to proposed mining activities.
    [Show full text]